<<

Gorge Construction Summer 2021 Viento EXIT 58 EXIT 62 I-84 & U.S. 30 (Historic Columbia River Highway) 14 (eastbound only) Stevenson 30 u m b i a R i v e r 14 84 C o l EXIT 56 30 30 EXIT 51 Mitchell Upcoming projects between I-205 and EXIT 47 84 10 Point 11 30 EXIT 54 9 (eastbound Hood Portland to The Dalles 8 only) N Key 281 River y Hw North EXIT 41 Dee Bonneville 14 EXIT 44 Interstates (I-84 and SR 14) EXIT 40 (eastbound exit Skamania westbound Historic Columbia River Highway on ramp only) 7 205 14 84 Toothrock Existing Historic Highway State 30 Tunnel C o l u m b i a R i v e r G o r g e C o l u e r Trail m b i a R i v 6 i v N a t i o n a l S c e n i c A r R Cascade e e a a r b i EXIT 35 u m o l C Warrendale Locks 14 Camas EXIT 31 Washougal Prindle 30 5 Portland 14 Multnomah I-84: Ruckel Creek Culvert Tunnel Sandy EXIT 28 Falls River 7 10 Delta 4 (Historic Columbia River Highway Repairs a culvert that carries Ruckel 84 State Trail) EXIT 17 EXIT 18 EXIT 22 30 Bridal Veil Creek under I-84 just west of 30 84 30 84 Cascade Locks. 1 30 3 ODOT, in partnership with Gateway OREGON State Parks, is constructing a new Transit 2 Vista Schedule: Construction begins in 30 House segment of the Historic Highway Center Corbett 2024.​ State Trail -- a walking, biking and 205 Troutdale hiking facility -- at Mitchell Point. Schedule: Construction began in 1 I-84 Paving 3 U.S. 30 Bridal Veil Bridge Repair 5 I-84 Paving & Toothrock Tunnel 8 I-84: Forest Lane Bridge 2021 and continues into 2023. Improves the roadway surface on Repairs an aging, historic bridge Repairs the aging floor of the Raising U.S. 30 Cascade Avenue at two sections of I-84: from Interstate carrying the Historic Highway over Toothrock Tunnel (which carries Raises the Forest Lane bridge over 11 205 to 169th Avenue, and from just Bridal Veil Creek. I-84 east near ) Interstate 84 in Cascade Locks to Rand Road east of 201st Avenue to Marine Drive and repaves the highway between accommodate taller trucks. (exit 17). Schedule: Construction begins in and Cascade Locks. Improves safety and accessibility at 2024. Schedule: Construction occurs in 2022. the intersection of U.S. 30 (Cascade Schedule: Construction begins in 2022. Schedule: Construction begins in 2022. Ave.) and Rand Road to align the north and south roads of the intersection, adds a traffic signal, U.S. 30 Troutdale Bridge Multnomah Falls Viaducts Repair I-84: McCord Creek Bridge to improves or adds sidewalk and 2 4 6 9 curb ramps, improves stormwater over the Repair Two historic viaducts carry traffic on Replacement Mitchell Point (Historic Columbia River Highway drainage, and adds new street Extends the safety and lifespan of the the Historic Columbia River Highway Replaces the aging bridge carrying State Trail) lighting. Troutdale Bridge over the Sandy River on either side of Multnomah Falls. The I-84 east over McCord Creek near by reducing the potential for water to viaducts are aging and need repairs. Warrendale. Replacing the bridge will ODOT, in partnership with Oregon Schedule: Construction begins in deteriorate the bridge supports. These repairs will allow the viaducts increase the safety and lifespan of the State Parks, is constructing a new 2023. to continue to carry traffic along the highway. 2.7-mile segment of the Historic Schedule: Construction begins in Historic Highway for years to come. Highway State Trail -- a walking, 2024. Schedule: Construction occurs in biking and hiking facility -- between Schedule: Construction occurs 2024-2025. between fall 2022 and summer 2025. Viento State Park and Mitchell Point. Schedule: Construction begins in 2022. Construction I-84 & U.S. 30 (Historic Columbia River Highway) Upcoming projects between I-205 and Hood River

The Columbia River Gorge is one of Oregon’s seven wonders – home to the first highway in the Resources , sweeping vistas and rich history. And for more than 100 years, it’s been an important corridor for freight movements, both in the water and on the road. Project information Over the next several years, we have many construction projects planned on Interstate 84 between • Visit our website at i84gorgeconstruction.com for projects along the corridor to Interstate 205 and Hood River, and on the Historic Columbia River Highway between Troutdale and learn more about each project and its construction impacts. Hood River. • Sign up for email updates to stay informed as projects progress. Visit our website or email ODOT to sign up. Each project brings benefits to residents, businesses and visitors by increasing safety, extending the lifespan of the highways or completing a gap in walking and biking infrastructure. View a map of • Visit wsdot.wa.gov/projects/search/ to learn about projects on SR 14 in Washington. project locations and learn more about each project inside this handout. What is the Historic Trip planning Additional projects • For those visiting the Gorge, whether it be for a day hike or a week-long Columbia River Highway? adventure, ReadysetGorge.com contains tips for your trip. Corridor-wide projects Maintenance work Constructed between 1913 and 1922, the • Did you know the Gorge has its own transit system, including to destinations U.S. 30 Sign Upgrades In 2021, we will patch small Historic Columbia River Highway laid lightly like Multnomah Falls? Visit ridecatbus.org to find more information about sections of rutted pavement on on the land and takes its users to the most routes, schedules and tickets. Installs new curve warning signs I-84 between Ainsworth State beautiful spots and breathtaking vistas of the and upgrade other signs to Park and Cascade Locks prior to Columbia River Gorge. improve safety along the drivable repaving in 2022. Traffic conditions sections of the Historic Highway In the early 1950s, many miles of the Historic • Know before you go: For real-time traffic impacts in between Troutdale and Hood Other projects Columbia River Highway were damaged or Oregon, visit TripCheck.com. River. destroyed to pave the way for Interstate 84. • For real-time travel information in Washington, visit Schedule: Construction begins in A Better Red Currently, an effort is underway to restore WSDOT.com/traffic. 2023. TriMet is constructing a new bridge all 73 miles of the Historic Columbia River I-84: Culvert Repair over I-84 at Gateway as part of its Highway from Troutdale to The Dalles. Questions or comments? Better Red Project. In 2021, expect Some segments are accessible to cars and Repairs culverts along I-84 shoulder closures, nighttime lane cyclists, such as near Multnomah Falls. Some • Contact ODOT: between Troutdale and Hood closures on I-84 and shoulder segments, known as the Historic Highway Katelyn Jackson, Community Affairs Coordinator River, which extends the lifespan closures on I-205 north, and full State Trail, will be accessible only by people 503-731-8503 and safety of the highway. closures of I-84 eastbound Exit 7. In walking, rolling or biking. [email protected] subsequent years, expect additional For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, Schedule: Construction begins in lane closures and full closures of One project is underway now, with another 2022. translation/interpretation services, or more information call 503-731-4128, TTY I-84 and additional closures of I-84 scheduled to begin construction in 2022. 800-735-2900 or Oregon Relay Service 7-1-1. eastbound Exit 7. Learn more about the projects inside or at ¿Habla usted español? Podemos proveer la información en esta publicación en Learn more: https://trimet.org/ www.historichighway.org. español. Para recibir la información en español, por favor llamé al (503) 731-4128. betterred/

Learn more: i84gorgeconstruction.com