0253S04.45H Sb 89

Total Page:16

File Type:pdf, Size:1020Kb

0253S04.45H Sb 89 0253S04.45H SB 89 House _______________________________________________________ Amendment NO.____ Offered By _____________________________________ ___________________________________ 1 AMEND Senate Committee Substitute for Senate Bill No. 89, Page 1, Section A, Line 3, by 2 inserting after all of said section and line the following: 3 4 "227.463. The portion of Interstate 29 from its intersection of Interstate 70/U.S. State 5 Highway 71/40 in Jackson County north to the bridge crossing over Nishnabotna River in Atchison 6 County, except for those portions of Interstate 29 previously designated as of August 28, 2019, shall 7 be designated the "Purple Heart Trail". Costs for such designation shall be paid by private 8 donations. 9 227.465. The portion of Interstate 55 from State Highway O in Pemiscot County to U.S. 10 Highway 40 in St. Louis City, except for those portions of Interstate 55 previously designated as of 11 August 28, 2019, shall be designated the "Purple Heart Trail". Costs for such designation shall be 12 paid by private donations. 13 227.466. The portion of Interstate 57 from the Missouri/Illinois state line in Mississippi 14 County continuing south to U.S. State Highway 60/State Highway AA in Scott County shall be 15 designated the "Purple Heart Trail". Costs for such designation shall be paid by private donations. 16 227.467. The portion of Interstate 64 from Interstate 70 from the city of Wentzville in St. 17 Charles County continuing east to Interstate 55 at the Missouri/Illinois state line in St. Louis City, 18 except for those portions of Interstate 64/US40/US61 previously designated as August 28, 2019, 19 shall be designated the "Purple Heart Trail". Costs for such designation shall be paid by private 20 donations. 21 227.475. Notwithstanding any provision of this chapter to the contrary, a highway's 22 classification as a "Purple Heart Trail" shall not prevent a segment of such highway from being 23 additionally designated as a memorial highway."; and 24 25 Further amend said bill by amending the title, enacting clause, and intersectional references 26 accordingly. Action Taken___________________________________________ Date __________________ Page 1 of 1.
Recommended publications
  • Table of Contents
    Table of Contents Introduction........................................................................................ 1 County Overview ............................................................................... 2 Population Trends & Demographic Profile .................................... 3 Population Trends in Pottawattamie County ....................................................... 3 Population Profile.............................................................................................. 5 Demographic Profile ......................................................................................... 7 Employment Profile ........................................................................................... 7 Projected Population & Employment ................................................................ 10 Roadways & Bridges ........................................................................ 12 Roadway Systems ............................................................................................ 12 Profile of County Roadways............................................................................. 14 Pavement Condition ........................................................................................ 16 Bridges in Pottawattamie County ..................................................................... 19 Traffic Trends in Pottawattamie County ........................................................... 21 Roadway Safety ..............................................................................................
    [Show full text]
  • Top 10 Bridges by State.Xlsx
    Top 10 Most Traveled U.S. Structurally Deficient Bridges by State, 2015 2015 Year Daily State State County Type of Bridge Location Status in 2014 Status in 2013 Built Crossings Rank 1 Alabama Jefferson 1970 136,580 Urban Interstate I65 over U.S.11,RR&City Streets at I65 2nd Ave. to 2nd Ave.No Structurally Deficient Structurally Deficient 2 Alabama Mobile 1964 87,610 Urban Interstate I-10 WB & EB over Halls Mill Creek at 2.2 mi E US 90 Structurally Deficient Structurally Deficient 3 Alabama Jefferson 1972 77,385 Urban Interstate I-59/20 over US 31,RRs&City Streets at Bham Civic Center Structurally Deficient Structurally Deficient 4 Alabama Mobile 1966 73,630 Urban Interstate I-10 WB & EB over Southern Drain Canal at 3.3 mi E Jct SR 163 Structurally Deficient Structurally Deficient 5 Alabama Baldwin 1969 53,560 Rural Interstate I-10 over D Olive Stream at 1.5 mi E Jct US 90 & I-10 Structurally Deficient Structurally Deficient 6 Alabama Baldwin 1969 53,560 Rural Interstate I-10 over Joe S Branch at 0.2 mi E US 90 Not Deficient Not Deficient 7 Alabama Jefferson 1968 41,990 Urban Interstate I 59/20 over Arron Aronov Drive at I 59 & Arron Aronov Dr. Structurally Deficient Structurally Deficient 8 Alabama Mobile 1964 41,490 Rural Interstate I-10 over Warren Creek at 3.2 mi E Miss St Line Structurally Deficient Structurally Deficient 9 Alabama Jefferson 1936 39,620 Urban other principal arterial US 78 over Village Ck & Frisco RR at US 78 & Village Creek Structurally Deficient Structurally Deficient 10 Alabama Mobile 1967 37,980 Urban Interstate
    [Show full text]
  • Winter Storm 2004 Hammered the Nation’S Courtesy of Randy West Heartland from the Great Lakes to the Texas Panhandle with Heaping Amounts of Snow and Ice
    The joyful holiday season of 2004 was thrown awry when Heavy snow early in the storm in Harrison County brings traffic to a crawl along mother nature threw in a “large monkey wrench” just before Interstate 64 in southern Indiana. Christmas. Winter Storm 2004 hammered the nation’s Courtesy of Randy West heartland from the Great Lakes to the Texas Panhandle with heaping amounts of snow and ice. This historic event was the biggest winter phenomenon in the Louisville, Kentucky area since the February 1998 and January 1994 major snowstorms. Winter Storm 2004 pounded the Ohio Valley with two heavy bursts of snow and ice separated by only a few hours. Snow fell in southern Indiana at rates approaching 4 inches per hour and totaling up to 30 inches in some areas. In parts of Louisville, up to 6 inches of sleet accumulated with 6-12 inches total of snow and sleet. In some locations across central Kentucky, solid ice layers up to 1-1.5 inches thick blanketed homes, trees, and roadways. Uncommon thunder- snow and thundersleet were observed during this extraordinary Storm Impacts winter storm. To top it all off, bitter cold temperatures as • Very heavy snow accumulations and snow drifts low as -13°F greeted area residents Christmas morning. The up to 5 feet made travel extremely difficult and December 2004 winter storm is one residents in the Ohio shut down interstates in parts of the Ohio River Valley will not soon forget! Valley: I-64 (3 days) and I-65 (12 hours). • Areas of 1-1.5 inches of ice from Bowling Green to Bardstown caused power outages and tree/structural roof damage.
    [Show full text]
  • Gregor Weichbrodt on the Road 0X0a
    0x0a On the Road Gregor Weichbrodt On the Road Gregor Weichbrodt 0x0a © 2014 Gregor Weichbrodt All rights reserved. www.ggor.de CONTENTS About this book ........................ 5 Chapter 1 ............................... 7 Chapter 2 .............................. 23 Chapter 3 .............................. 41 Chapter 4 .............................. 53 ABOUT THIS BOOK Based on the novel “On the Road” by Jack Kerouac and Google Maps Direction Service. The exact and approximate spots Kerouac traveled and described are taken from the book and parsed by Google Direction Service API. The chapters match those of the original book. Gregor Weichbrodt January 2014 www.ggor.de 7 CHAPTER 1 Head northwest on W 47th St toward 7th Ave. Take the 1st left onto 7th Ave. Turn right onto W 39th St. Take the ramp onto Lincoln Tunnel. Parts of this road are closed Mon–Fri 4:00 – 7:00 pm. Entering New Jersey. Continue onto NJ-495 W. Keep right to continue on NJ-3 W, follow signs for New Jersey 3 W/Garden State Parkway/Secaucus. Take the New Jersey 3 W exit on the left toward Clifton. Merge onto NJ-3 W. Slight right onto the Garden State Pkwy N ramp. Merge onto Garden State Pkwy. Take exit 155P on the left to merge onto NJ-19 N toward I-80/ Paterson. Turn left onto Cianci St. Turn right onto Market St. Head west on Market St toward Washington St. Turn left onto Main St. Turn right onto County Rd 509 S. Take the Interstate 80 E ramp. Merge onto I-80 E. Take exit 62A-62B toward Saddle 9 Brook/Saddle River Rd/Garden State Pkwy.
    [Show full text]
  • Nelson County Comprehensive Plan
    Nelson County Comprehensive Plan As Approved by the Nelson County Board of Supervisors and Nelson County Planning Commission Adopted _______, 2012 Prepared by The Nelson County Planning Commission with the assistance of The Citizens of Nelson County at the request of The Nelson County Board of Supervisors Staff support from the Thomas Jefferson Planning District Commission Design Resources Center, University of Virginia Nelson County Department of Planning Nelson County Comprehensive Plan Table of Contents Executive Summary i Chapter One-Portrait of Nelson County 1 A Brief History of Nelson County 1 Nelson County Today 2 Chapter Two-Purpose of the Plan 4 Chapter Three-Goals and Principles 5 Economic Development 5 Transportation 7 Education 8 Public and Human Services 9 Natural, Scenic, and Historic Resources 10 Recreation 11 Development Areas 13 Rural Conservation 14 Chapter Four-Land Use Plan 16 Introduction 16 Land Use Planning Data 17 Existing Land Use 17 Areas Served by Water and/or Sewer 19 Environmental Constraints: Steep Slopes, Soil Potential for Agricultural Use 21 Land Use Plan for Designated Development Areas 25 Rural Small Town Development Model 26 Rural Village Development Model 28 Neighborhood Mixed Use Development Model 30 Mixed Commercial Development Model 32 Light Industrial Development Model 34 Land Use Plan for Rural Conservation Areas 36 Future Land Use Plan and Map 38 Chapter Five – Transportation Plan 41 Introduction 41 Purpose 41 Background 42 Existing Plans and Studies 42 Existing Roadway Inventory 48 Interstate
    [Show full text]
  • I-64 Strategic Improvement Plan Executive Summary
    EXECUTIVE SUMMARY A. INTRODUCTION The “Final Report: I-64 Strategic Improvement Plan” was prepared for the Kentucky Transportation Cabinet (KYTC) as part of the Interstate 64 Strategic Corridor Planning Study. This study is documented through three (3) products: • Interim Report 1: Existing Conditions Analysis • Interim Report 2: I-64 Highway Needs Identification • Final Report: I-64 Strategic Improvement Plan The “Final Report” evaluates the effectiveness and environmental consequences of potential improvements to address existing and future deficiencies, and establishes priorities for improvements in the I-64 corridor incorporating projects from the I-64/I-75 Common Section Study. The final report includes information used in the evaluation and prioritization of operational improvement (capacity preservation) and functional improvement (capacity expansion) projects including pavement and bridge conditions, accidents (with associated analyses), and existing and forecasted traffic volumes (with associated capacity analyses). Work on this project was begun in 1998, and the completion of the study has been interrupted several times due to other priorities in the Division of Planning. Because of this, the study process and report are not typical of the types of process and report that the Division of Planning is doing currently. Further, the study does not reflect the latest data available at the time of its completion. Nevertheless, the data is still relatively recent and a cursory review of more recent data does not indicate any significant changes. Therefore, the conclusions of the report are still considered to be valid. B. PURPOSE AND SCOPE 1. Purpose The purpose of the Interstate 64 Strategic Corridor Planning Study is to recommend a long-range strategy for prioritized improvements along Interstate 64 (including the mainline and its interchanges) from I-265 (Snyder Freeway) in the Louisville metropolitan area to the Big Sandy River at the West Virginia line.
    [Show full text]
  • Federal Register/Vol. 65, No. 233/Monday, December 4, 2000
    Federal Register / Vol. 65, No. 233 / Monday, December 4, 2000 / Notices 75771 2 departures. No more than one slot DEPARTMENT OF TRANSPORTATION In notice document 00±29918 exemption time may be selected in any appearing in the issue of Wednesday, hour. In this round each carrier may Federal Aviation Administration November 22, 2000, under select one slot exemption time in each SUPPLEMENTARY INFORMATION, in the first RTCA Future Flight Data Collection hour without regard to whether a slot is column, in the fifteenth line, the date Committee available in that hour. the FAA will approve or disapprove the application, in whole or part, no later d. In the second and third rounds, Pursuant to section 10(a)(2) of the than should read ``March 15, 2001''. only carriers providing service to small Federal Advisory Committee Act (Pub. hub and nonhub airports may L. 92±463, 5 U.S.C., Appendix 2), notice FOR FURTHER INFORMATION CONTACT: participate. Each carrier may select up is hereby given for the Future Flight Patrick Vaught, Program Manager, FAA/ to 2 slot exemption times, one arrival Data Collection Committee meeting to Airports District Office, 100 West Cross and one departure in each round. No be held January 11, 2000, starting at 9 Street, Suite B, Jackson, MS 39208± carrier may select more than 4 a.m. This meeting will be held at RTCA, 2307, 601±664±9885. exemption slot times in rounds 2 and 3. 1140 Connecticut Avenue, NW., Suite Issued in Jackson, Mississippi on 1020, Washington, DC, 20036. November 24, 2000. e. Beginning with the fourth round, The agenda will include: (1) Welcome all eligible carriers may participate.
    [Show full text]
  • Mississippi River Bridge Project, I-70, St. Louis, Missouri
    MISSISSIPPI RIVER BRIDGE ST. LOUIS, INTERSTATE 70 St.Louis,Missouri Missouri Department of Transportation (MoDOT) Illinois Department of Transportation (IDOT) Design completed 2003 Project Type: Urban Freeway; Reconstruct PURPOSE The New Mississippi River Bridge Project (MRB) is a group of major transportation improvements designed to enhance the region’s infrastructure. The economic future of the St. Louis urban core on both sides of the Mississippi River depends on the efficient movement of goods and services and the ability of people to simply get to work. Transportation paralysis will force businesses, jobs, andnewgrowthoutoftheurbancore.Animprovedhighwaysystemwillhelp to revitalize downtown St. Louis, the north riverfront, and the Metro East area, notably East St. Louis and the National Stockyards redevelopment area. The number of motorists wanting to cross the Mississippi River will continue to increase.Theregioncannotcontinuetorelyonasingleinterstatecrossingatthe heartofdowntown DESCRIPTION The proposed $700 million structure will feature an estimated 12,000 foot bridge, potentially creating the widest Mississippi River Crossing in the United States. The bridge will carry eight lanes of traffic. The bridge is a critical structure tothe area in order to open economic opportunities to isolated communities on either side of the river. The project includes multi-lane roadways on new alignments, new interchanges, land acquisition on both sides of the river, utility coordination, and the relocation of several railroads. Improvements include 4.2 miles of relocated Interstate 70, 2.7 miles of connector between the Interstate 70 relocation and Interstate 64, and 5.5 miles of relocated Illinois Route 3. A major public engagement program involved the St. Louis community in the project through participation on several aesthetic issues, such as urban design treatments and bridge architecture.
    [Show full text]
  • I-29 - Exit 62 to Exit 73 INTERSTATE Corridor Study 29
    July 2018 I-29 - Exit 62 to Exit 73 INTERSTATE Corridor Study 29 Project No: HP 5596 19 prepared for: South Dakota Department of Transportation 700 East Broadway Avenue Pierre, SD 57501 I-29 Exit 62 to Exit 73 Corridor Study Lincoln County, SD Project No: HP 5596 19 Prepared for: South Dakota Department of Transportation 700 East Broadway Avenue Pierre, SD 57501 Prepared by: Felsburg Holt and Ullevig 11422 Miracle Hills Drive, Suite 115 Omaha, NE 68154 402-445-4405 In Association with SRF Consulting Group, Inc. Principal-in-Charge / Project Manager: Kyle Anderson, PE, PTOE Deputy Project Manager: Mark Meisinger, PE, PTOE FHU Reference No. 17-089 July 2018 The preparation of this report has been financed in part through grant(s) from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation, under the State Planning and Research Program, Section 505 [or Metropolitan Planning Program, Section 104(f)] of Title 23, U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation. The South Dakota Department of Transportation (SDDOT) provides services without regard to race, color, gender, religion, national origin, age or disability, according to the provisions contained in SDCL 20-13, Title VI of the Civil Rights Act of 1964, the Rehabilitation Act of 1973, as amended, the Americans With Disabilities Act of 1990 and Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, 1994. To request additional information on the SDDOT’s Title VI/Nondiscrimination policy or to file a discrimination complaint, please contact the Department’s Civil Rights Office at 605-773-3540.
    [Show full text]
  • State of Illinois
    State of Illinois Illinois Department of Transportation District 1 – Urban Interstate Resurfacing Milling and resurfacing on Interstate 290 from Sacramento Boulevard to Interstate 90/94 in Chicago. District 2 – Rural 4 Lane Bridge Rehabilitation Miscellaneous repairs on the structure carrying Interstate 80 over the Mississippi River. District 6 – Rural 2 Lane Concrete pavement on County Highway 10 east of Elkhart. District 6 – Urban Streetscape Streetscape reconstruction that includes new concrete pavers, sidewalks, lighting, planting beds and traffic signals on Capitol Avenue between 5th Street and 7th Street in Springfield. District 8 – Urban Pedestrian Bridge Construction Construction of a 3-span pedestrian bridge, sidewalk, lighting, landscaping, sewer and retaining walls for the city of Alton over US 67 at Riverfront Park. Printed by authority of the State of Illinois, 0445-11, 01/11, 500 FY 2012-2017 Proposed Highway Improvement Program Spring 2011 Published by the Illinois Department of Transportation Springfield, Illinois 62764 Printed by authority of State of Illinois, April 2011, 275 copies. This document is printed on recycled paper. This document is available on-line at www.dot.il.gov/opp/publications.html. CONTENTS Page Program Development Process ................................... 1 Seeking Public Involvement – Outreach Meetings ....... 3 Executive Summary ..................................................... 5 Department of Transportation District Map ................. 21 Public Review and Comment Form ...........................
    [Show full text]
  • National Hazardous Materials Route Registry (March 31, 2021)
    32306 Federal Register / Vol. 86, No. 115 / Thursday, June 17, 2021 / Notices under which such actions were taken Resource Conservation and Recovery Office hours are from 9 a.m. to 5 p.m., are described in the Environmental Act (RCRA) [42 U.S.C. 6901–6992(k)]. ET., Monday through Friday, except for Assessment (EA) approved on December 10. Executive Orders: E.O. 11990 Federal holidays. 17, 2020, in FHWA’s FONSI issued on Protection of Wetlands; E.O. 11988 Legal Basis and Background May 26, 2021, and other documents in Floodplain Management; E.O. 12898, the project file. The EA, FONSI and Federal Actions to Address Paragraphs (a)(2) and (b) of section other project records are available by Environmental Justice in Minority 5112 of title 49 United States Code contacting FHWA or the Georgia Populations and Low Income (U.S.C.) permit States and Tribal Department of Transportation at the Populations; E.O. 11593 Protection and governments to designate and limit addresses listed above. The EA and Enhancement of Cultural Resources; highway routes over which hazardous FONSI can also be reviewed and E.O. 13007 Indian Sacred Sites; E.O. materials (HM) may be transported, downloaded from the project website at 13287 Preserve America; E.O. 13175 provided the State or Tribal government https://majormobilityga.com/projects/ Consultation and Coordination with complies with standards prescribed by eastsideic/. Indian Tribal Governments; E.O. 11514 the Secretary of Transportation (the This notice applies to all Federal Protection and Enhancement of Secretary) and meets publication agency decisions as of the issuance date Environmental Quality; E.O.
    [Show full text]
  • Road Construction Projects Set for Omaha-Council Bluffs Metro Area
    METROPOLITAN AREA PLANNING AGENCY What's Happening March/April 2016 for Community Leaders Road construction projects set for Omaha-Council Bluffs Metro Area Get ready to adjust your travel time to work or errands and In late May, southbound traffic on I-29 shifts to northbound watch for more lane changes and closures. Several major road lanes with one lane southbound and two lanes northbound construction projects in MAPA’s Transportation Management and one northbound lane at the south cross-over. Starting in Area (TMA) of Douglas and Sarpy Counties and the City of late June, north and southbound traffic will both be in the new Council Bluffs are underway currently or will get underway northbound lanes with two lanes in each direction. during the summer and fall months. Other closures starting in late May along southbound I-29 Phase 3 of the Interstate 80/Interstate 680 Interchange bridge include the entrance ramp from US 275/Iowa Hwy 92 and the construction is happening right now in Douglas County. This exit loop ramp from I-80 westbound. That exit ramp closure involves building the east half of the bridge while keeping two becomes a full closure in late summer through November 2016. lanes of traffic open. I-80 westbound will shift south to new pavement within the The I and L Streets Collector-Distributor Road to Northbound West System Interchange just west of 24th Street during the I-680 is closed along with the I and L Street Loop Ramps to summer. US 275 and Iowa Hwy 92 and I-29 are expected to be I-80 Eastbound and I-680 Northbound.
    [Show full text]