General Directions from Missouri to Parking Garages General Directions

Total Page:16

File Type:pdf, Size:1020Kb

General Directions from Missouri to Parking Garages General Directions METRO PINE ST. Bank of ATT ATT Parking Parking America Hyatt Garage Garage (Tower Hotel Wainwright Bld Plaza) 8th & Pine CHESTNUT ST. FROM I-70 MetroLink to Archgrounds Station Gateway Center I Kiener Plaza Gateway Old Courthouse Smith Park Center II Underground Pkg. MARKET ST. MARKET ST. AY MARKET ST. EAST-WEST Welcome to East-West Gateway 7TH ST. GATEWAY GATEWAY Bank of MikeMike UMB Bank Drury TOWER Shannon’sShannon’s Hilton Plaza America RestaurantRestaurant Equitable Bld. KMOX Hotel KMOV BROADW WALNUT ST. WALNUT ST. to Archgrounds A Z A Deloitte Stadium FUTURE PARK Bldg. PL Stadium PARK West 8TH ST. M BALLPARK U East Garage I D Garage METRO VILLAGE A Millennium 9TH ST. T S Hotel CLARK AVE. CLARK AVE. Stadium AY MetroLink CLARK AVE. Station Sheraton Westin STL 4TH ST. Comm. Four Points Gateway Tower MEMORIAL DR. Hotel Glaxo/ MEMORIAL DR. College Hotel Smith/ One Memorial Dr., Ste. 1600 Busch BROADW Kline St. Louis, MO 63102 SPRUCE ST. Stadium SPRUCE ST. Parking 314-421-4220 or 618-274-2750 Pointe 400 8TH ST. Parking 64 Not to Scale General Directions from Missouri to parking garages From Interstate 70 Exit on Memorial Drive in downtown. Make a right on Market Street, left onto Broadway to the Stadium East Garage. From Interstate 64 Exit at 6th St., left on Gratiot, left on 4th St, north four blocks to Stadium East Garage (on left). From Interstate 44 Exit at 7th Street. Right off ramp, left on 7th. North on 7th which jogs onto 8th then jogs onto Stadium Plaza around the stadium, east on either Walnut or Market, south on Broadway, Stadium East Garage is on the left. From Interstate 55 Exit on the 2nd Broadway exit. North on Broadway, becomes 4th St,. to Stadium East Garage.OR exit at Memorial Dr. in downtown. Left on Market St., left onto Broadway to Stadium East Garage. General Directions from Illinois to parking garages I-64/-55/70 (Poplar St. Bridge) Exit on Memorial Dr., turn left on Market St. and go three blocks. Turn left on Broadway, Stadium East Garage is on left. Martin Luther King Bridge West on Convention Plaza to Broadway, left on Broadway, ten blocks to Stadium East garage. Eads Bridge Exit I-64 at 3rd St. in East St. Louis. Follow the Casino Queen signs toward the riverfront to the ramps up to the bridge. On St. Louis side, continue west to Broadway, turn left. South on Broadway, seven blocks to the Stadium East Garage..
Recommended publications
  • Top 10 Bridges by State.Xlsx
    Top 10 Most Traveled U.S. Structurally Deficient Bridges by State, 2015 2015 Year Daily State State County Type of Bridge Location Status in 2014 Status in 2013 Built Crossings Rank 1 Alabama Jefferson 1970 136,580 Urban Interstate I65 over U.S.11,RR&City Streets at I65 2nd Ave. to 2nd Ave.No Structurally Deficient Structurally Deficient 2 Alabama Mobile 1964 87,610 Urban Interstate I-10 WB & EB over Halls Mill Creek at 2.2 mi E US 90 Structurally Deficient Structurally Deficient 3 Alabama Jefferson 1972 77,385 Urban Interstate I-59/20 over US 31,RRs&City Streets at Bham Civic Center Structurally Deficient Structurally Deficient 4 Alabama Mobile 1966 73,630 Urban Interstate I-10 WB & EB over Southern Drain Canal at 3.3 mi E Jct SR 163 Structurally Deficient Structurally Deficient 5 Alabama Baldwin 1969 53,560 Rural Interstate I-10 over D Olive Stream at 1.5 mi E Jct US 90 & I-10 Structurally Deficient Structurally Deficient 6 Alabama Baldwin 1969 53,560 Rural Interstate I-10 over Joe S Branch at 0.2 mi E US 90 Not Deficient Not Deficient 7 Alabama Jefferson 1968 41,990 Urban Interstate I 59/20 over Arron Aronov Drive at I 59 & Arron Aronov Dr. Structurally Deficient Structurally Deficient 8 Alabama Mobile 1964 41,490 Rural Interstate I-10 over Warren Creek at 3.2 mi E Miss St Line Structurally Deficient Structurally Deficient 9 Alabama Jefferson 1936 39,620 Urban other principal arterial US 78 over Village Ck & Frisco RR at US 78 & Village Creek Structurally Deficient Structurally Deficient 10 Alabama Mobile 1967 37,980 Urban Interstate
    [Show full text]
  • Winter Storm 2004 Hammered the Nation’S Courtesy of Randy West Heartland from the Great Lakes to the Texas Panhandle with Heaping Amounts of Snow and Ice
    The joyful holiday season of 2004 was thrown awry when Heavy snow early in the storm in Harrison County brings traffic to a crawl along mother nature threw in a “large monkey wrench” just before Interstate 64 in southern Indiana. Christmas. Winter Storm 2004 hammered the nation’s Courtesy of Randy West heartland from the Great Lakes to the Texas Panhandle with heaping amounts of snow and ice. This historic event was the biggest winter phenomenon in the Louisville, Kentucky area since the February 1998 and January 1994 major snowstorms. Winter Storm 2004 pounded the Ohio Valley with two heavy bursts of snow and ice separated by only a few hours. Snow fell in southern Indiana at rates approaching 4 inches per hour and totaling up to 30 inches in some areas. In parts of Louisville, up to 6 inches of sleet accumulated with 6-12 inches total of snow and sleet. In some locations across central Kentucky, solid ice layers up to 1-1.5 inches thick blanketed homes, trees, and roadways. Uncommon thunder- snow and thundersleet were observed during this extraordinary Storm Impacts winter storm. To top it all off, bitter cold temperatures as • Very heavy snow accumulations and snow drifts low as -13°F greeted area residents Christmas morning. The up to 5 feet made travel extremely difficult and December 2004 winter storm is one residents in the Ohio shut down interstates in parts of the Ohio River Valley will not soon forget! Valley: I-64 (3 days) and I-65 (12 hours). • Areas of 1-1.5 inches of ice from Bowling Green to Bardstown caused power outages and tree/structural roof damage.
    [Show full text]
  • Gregor Weichbrodt on the Road 0X0a
    0x0a On the Road Gregor Weichbrodt On the Road Gregor Weichbrodt 0x0a © 2014 Gregor Weichbrodt All rights reserved. www.ggor.de CONTENTS About this book ........................ 5 Chapter 1 ............................... 7 Chapter 2 .............................. 23 Chapter 3 .............................. 41 Chapter 4 .............................. 53 ABOUT THIS BOOK Based on the novel “On the Road” by Jack Kerouac and Google Maps Direction Service. The exact and approximate spots Kerouac traveled and described are taken from the book and parsed by Google Direction Service API. The chapters match those of the original book. Gregor Weichbrodt January 2014 www.ggor.de 7 CHAPTER 1 Head northwest on W 47th St toward 7th Ave. Take the 1st left onto 7th Ave. Turn right onto W 39th St. Take the ramp onto Lincoln Tunnel. Parts of this road are closed Mon–Fri 4:00 – 7:00 pm. Entering New Jersey. Continue onto NJ-495 W. Keep right to continue on NJ-3 W, follow signs for New Jersey 3 W/Garden State Parkway/Secaucus. Take the New Jersey 3 W exit on the left toward Clifton. Merge onto NJ-3 W. Slight right onto the Garden State Pkwy N ramp. Merge onto Garden State Pkwy. Take exit 155P on the left to merge onto NJ-19 N toward I-80/ Paterson. Turn left onto Cianci St. Turn right onto Market St. Head west on Market St toward Washington St. Turn left onto Main St. Turn right onto County Rd 509 S. Take the Interstate 80 E ramp. Merge onto I-80 E. Take exit 62A-62B toward Saddle 9 Brook/Saddle River Rd/Garden State Pkwy.
    [Show full text]
  • Nelson County Comprehensive Plan
    Nelson County Comprehensive Plan As Approved by the Nelson County Board of Supervisors and Nelson County Planning Commission Adopted _______, 2012 Prepared by The Nelson County Planning Commission with the assistance of The Citizens of Nelson County at the request of The Nelson County Board of Supervisors Staff support from the Thomas Jefferson Planning District Commission Design Resources Center, University of Virginia Nelson County Department of Planning Nelson County Comprehensive Plan Table of Contents Executive Summary i Chapter One-Portrait of Nelson County 1 A Brief History of Nelson County 1 Nelson County Today 2 Chapter Two-Purpose of the Plan 4 Chapter Three-Goals and Principles 5 Economic Development 5 Transportation 7 Education 8 Public and Human Services 9 Natural, Scenic, and Historic Resources 10 Recreation 11 Development Areas 13 Rural Conservation 14 Chapter Four-Land Use Plan 16 Introduction 16 Land Use Planning Data 17 Existing Land Use 17 Areas Served by Water and/or Sewer 19 Environmental Constraints: Steep Slopes, Soil Potential for Agricultural Use 21 Land Use Plan for Designated Development Areas 25 Rural Small Town Development Model 26 Rural Village Development Model 28 Neighborhood Mixed Use Development Model 30 Mixed Commercial Development Model 32 Light Industrial Development Model 34 Land Use Plan for Rural Conservation Areas 36 Future Land Use Plan and Map 38 Chapter Five – Transportation Plan 41 Introduction 41 Purpose 41 Background 42 Existing Plans and Studies 42 Existing Roadway Inventory 48 Interstate
    [Show full text]
  • Sb1098 Int.Pdf
    STATE OF OKLAHOMA 2nd Session of the 47th Legislature (2000) SENATE BILL 1098 By: Helton AS INTRODUCED An Act relating to roads, bridges and ferries; amending 69 O.S. 1991, Section 1705, as last amended by Section 414, Chapter 5, 1st Extraordinary Session, O.S.L. 1999 (69 O.S. Supp. 1999, Section 1705), which relates to the Oklahoma Turnpike Authority; requiring the Oklahoma Turnpike Authority to construct an off ramp on the H.E. Bailey Turnpike at Fletcher, Oklahoma in the vicinity of the Interstate 44 and State Highway 277 intersection; prohibiting the removal and requiring maintenance of certain on or off ramp; and providing an effective date. BE IT ENACTED BY THE PEOPLE OF THE STATE OF OKLAHOMA: SECTION 1. AMENDATORY 69 O.S. 1991, Section 1705, as last amended by Section 414, Chapter 5, 1st Extraordinary Session, O.S.L. 1999 (69 O.S. Supp. 1999, Section 1705), is amended to read as follows: Section 1705. The Oklahoma Turnpike Authority is hereby authorized and empowered: (a) To adopt bylaws for the regulation of its affairs and conduct of its business. (b) To adopt an official seal and alter the same at pleasure. (c) To maintain an office at such place or places within the state as it may designate. (d) To sue and be sued in contract, reverse condemnation, equity, mandamus and similar actions in its own name, plead and be impleaded; provided, that any and all actions at law or in equity against the Authority shall be brought in the county in which the principal office of the Authority shall be located, or in the county of the residence of the plaintiff, or the county where the cause of action arose.
    [Show full text]
  • CHAPTER I Purpose and Need
    I - 1 CHAPTER I Purpose and Need A. Introduction On June 29, 1956, President Dwight D. Eisenhower signed the Federal Aid Highway Act of 1956. The Interstate Highway System, also known as the Eisenhower System of Interstate and Defense Highways, is an interconnected system of 45,500 miles (73,225.2 km) of limited-access highways across the United States. One of the most important of these highways is Interstate 70 (I-70), providing for east-west transcontinental interstate access across much of the United States. In August 1956, shortly after President Eisenhower signed the legislation creating the Interstate Highway System, the Missouri State Highway Commission awarded the first contract toward the construction of I-70. Construction continued for another nine years and I-70 now spans a distance of more than 250 miles across the state. Other than short reconstructed portions, the newest sections of I-70 are 39 years old. With maintenance provided by the Missouri Department of Transportation (MoDOT), the facility has outlasted its original design life of 20 years and has carried traffic volumes of both cars and heavy trucks that have far exceeded the expectations of the original designers. The Missouri Department of Transportation and the Federal Highway Administration (FHWA) propose improving a portion of the I-70 corridor between just west of Route 19 (milepost 174) and Lake St. Louis Boulevard to meet the current and future needs of this extremely important transportation facility. To facilitate this action, MoDOT has completed a First Tier Environmental Impact Statement and initiated this Second Tier Environmental Impact Statement (STEIS) to fulfill this goal.
    [Show full text]
  • I-64 Strategic Improvement Plan Executive Summary
    EXECUTIVE SUMMARY A. INTRODUCTION The “Final Report: I-64 Strategic Improvement Plan” was prepared for the Kentucky Transportation Cabinet (KYTC) as part of the Interstate 64 Strategic Corridor Planning Study. This study is documented through three (3) products: • Interim Report 1: Existing Conditions Analysis • Interim Report 2: I-64 Highway Needs Identification • Final Report: I-64 Strategic Improvement Plan The “Final Report” evaluates the effectiveness and environmental consequences of potential improvements to address existing and future deficiencies, and establishes priorities for improvements in the I-64 corridor incorporating projects from the I-64/I-75 Common Section Study. The final report includes information used in the evaluation and prioritization of operational improvement (capacity preservation) and functional improvement (capacity expansion) projects including pavement and bridge conditions, accidents (with associated analyses), and existing and forecasted traffic volumes (with associated capacity analyses). Work on this project was begun in 1998, and the completion of the study has been interrupted several times due to other priorities in the Division of Planning. Because of this, the study process and report are not typical of the types of process and report that the Division of Planning is doing currently. Further, the study does not reflect the latest data available at the time of its completion. Nevertheless, the data is still relatively recent and a cursory review of more recent data does not indicate any significant changes. Therefore, the conclusions of the report are still considered to be valid. B. PURPOSE AND SCOPE 1. Purpose The purpose of the Interstate 64 Strategic Corridor Planning Study is to recommend a long-range strategy for prioritized improvements along Interstate 64 (including the mainline and its interchanges) from I-265 (Snyder Freeway) in the Louisville metropolitan area to the Big Sandy River at the West Virginia line.
    [Show full text]
  • Ide to I-70 Through Southeastern Utah – Discovermoab.Com - 6/22/07 Page 1
    A Guide to I-70 Through Southeastern Utah – discovermoab.com - 6/22/07 Page 1 and increase to Milepost 227 near the Colorado border. Mileage marker posts 2W - Thompson Springs A Guide to I-70 Through (or Mileposts) and Exit numbers Welcome Center Southeastern Utah correspond, and both are used in the Milepost 189 descriptive text which follows. This rest area welcomes westbound Although the scenery is spectacular as visitors with free brochures and maps. viewed from the highway, you are The center, operated by the State of Utah, encouraged to stop at the sites described is open all year. From Memorial Day Moab Area Travel Council below to see even more. Other nearby through Labor Day, personnel are on duty Internet Brochure Series points of interest accessible from 1-70 are from 8 a.m. to 8 p.m. to answer your Available from: briefly noted and located on the map. questions. The rest of the year the center More detailed information on these sights is operated from 9 a.m. to 5 p.m. Indoor discovermoab.com can be obtained by contacting the rest rooms, water, picnic shelters, and a appropriate agencies listed in this public phone are available at all times. brochure. INTRODUCTION Food and fuel are available at Thompson 1W - Harley Dome View Area Springs (Exit 187), which provides access Interstate 70 (1-70) through southeastern Milepost 228 to a panel of Native American rock art in Utah is a journey through fascinating Sego Canyon. To visit this site, follow the landscapes. The route reveals vast deserts, The Harley Dome View Area is located signs from the north side of town.
    [Show full text]
  • Construction Suspended Where Possible for July 4
    State of Illinois JB Pritzker, Governor Illinois Department of Transportation Omer Osman, Acting Secretary FOR IMMEDIATE RELEASE: CONTACT: July 1, 2020 Paul Wappel 217.685.0082 Maria Castaneda 312.447.1919 Construction suspended where possible for July 4 Non-emergency closures called off, but motorists should still expect work zones SPRINGFIELD – The Illinois Department of Transportation announced today that lanes that have been closed for construction will reopen, where possible, for the Fourth of July holiday to minimize travel disruption. Non-emergency closures will be suspended from 3 p.m. July 2 to 11:59 p.m. July 5. The following lane closures will remain in place during the holiday weekend. Work zone speed limits will remain in effect where posted. Please buckle up, put your phone down and drive sober. District 1 City of Chicago: • The following ramps in the Jane Byrne Interchange work zone will remain closed: • o Inbound Kennedy (Interstate 90/94) Expressway exit to inbound Ida B. Wells Drive. o Outbound Dan Ryan Expressway exit to Taylor Street and Roosevelt Road. o Outbound Ida B. Wells Drive entrance from Canal Street. o Outbound Ida B. Wells Drive exit to outbound Dan Ryan. o Outbound Ida B. Wells Drive exit to outbound Kennedy. o Inbound Eisenhower Expressway (Interstate -290) to outbound Kennedy; detour with U-turn posted. o Inbound Eisenhower; lane reductions continue. o Inbound Ida B. Wells Drive; lane reductions continue. • Outbound Kennedy exit at Canfield Road; closed. • Westbound Bryn Mawr Avenue between Harlem and Oriole avenues; lane reductions continue. • Westbound Higgins Avenue between Oriole and Canfield avenues; lane reductions continue.
    [Show full text]
  • Federal Register/Vol. 65, No. 233/Monday, December 4, 2000
    Federal Register / Vol. 65, No. 233 / Monday, December 4, 2000 / Notices 75771 2 departures. No more than one slot DEPARTMENT OF TRANSPORTATION In notice document 00±29918 exemption time may be selected in any appearing in the issue of Wednesday, hour. In this round each carrier may Federal Aviation Administration November 22, 2000, under select one slot exemption time in each SUPPLEMENTARY INFORMATION, in the first RTCA Future Flight Data Collection hour without regard to whether a slot is column, in the fifteenth line, the date Committee available in that hour. the FAA will approve or disapprove the application, in whole or part, no later d. In the second and third rounds, Pursuant to section 10(a)(2) of the than should read ``March 15, 2001''. only carriers providing service to small Federal Advisory Committee Act (Pub. hub and nonhub airports may L. 92±463, 5 U.S.C., Appendix 2), notice FOR FURTHER INFORMATION CONTACT: participate. Each carrier may select up is hereby given for the Future Flight Patrick Vaught, Program Manager, FAA/ to 2 slot exemption times, one arrival Data Collection Committee meeting to Airports District Office, 100 West Cross and one departure in each round. No be held January 11, 2000, starting at 9 Street, Suite B, Jackson, MS 39208± carrier may select more than 4 a.m. This meeting will be held at RTCA, 2307, 601±664±9885. exemption slot times in rounds 2 and 3. 1140 Connecticut Avenue, NW., Suite Issued in Jackson, Mississippi on 1020, Washington, DC, 20036. November 24, 2000. e. Beginning with the fourth round, The agenda will include: (1) Welcome all eligible carriers may participate.
    [Show full text]
  • Mississippi River Bridge Project, I-70, St. Louis, Missouri
    MISSISSIPPI RIVER BRIDGE ST. LOUIS, INTERSTATE 70 St.Louis,Missouri Missouri Department of Transportation (MoDOT) Illinois Department of Transportation (IDOT) Design completed 2003 Project Type: Urban Freeway; Reconstruct PURPOSE The New Mississippi River Bridge Project (MRB) is a group of major transportation improvements designed to enhance the region’s infrastructure. The economic future of the St. Louis urban core on both sides of the Mississippi River depends on the efficient movement of goods and services and the ability of people to simply get to work. Transportation paralysis will force businesses, jobs, andnewgrowthoutoftheurbancore.Animprovedhighwaysystemwillhelp to revitalize downtown St. Louis, the north riverfront, and the Metro East area, notably East St. Louis and the National Stockyards redevelopment area. The number of motorists wanting to cross the Mississippi River will continue to increase.Theregioncannotcontinuetorelyonasingleinterstatecrossingatthe heartofdowntown DESCRIPTION The proposed $700 million structure will feature an estimated 12,000 foot bridge, potentially creating the widest Mississippi River Crossing in the United States. The bridge will carry eight lanes of traffic. The bridge is a critical structure tothe area in order to open economic opportunities to isolated communities on either side of the river. The project includes multi-lane roadways on new alignments, new interchanges, land acquisition on both sides of the river, utility coordination, and the relocation of several railroads. Improvements include 4.2 miles of relocated Interstate 70, 2.7 miles of connector between the Interstate 70 relocation and Interstate 64, and 5.5 miles of relocated Illinois Route 3. A major public engagement program involved the St. Louis community in the project through participation on several aesthetic issues, such as urban design treatments and bridge architecture.
    [Show full text]
  • 0253S04.45H Sb 89
    0253S04.45H SB 89 House _______________________________________________________ Amendment NO.____ Offered By _____________________________________ ___________________________________ 1 AMEND Senate Committee Substitute for Senate Bill No. 89, Page 1, Section A, Line 3, by 2 inserting after all of said section and line the following: 3 4 "227.463. The portion of Interstate 29 from its intersection of Interstate 70/U.S. State 5 Highway 71/40 in Jackson County north to the bridge crossing over Nishnabotna River in Atchison 6 County, except for those portions of Interstate 29 previously designated as of August 28, 2019, shall 7 be designated the "Purple Heart Trail". Costs for such designation shall be paid by private 8 donations. 9 227.465. The portion of Interstate 55 from State Highway O in Pemiscot County to U.S. 10 Highway 40 in St. Louis City, except for those portions of Interstate 55 previously designated as of 11 August 28, 2019, shall be designated the "Purple Heart Trail". Costs for such designation shall be 12 paid by private donations. 13 227.466. The portion of Interstate 57 from the Missouri/Illinois state line in Mississippi 14 County continuing south to U.S. State Highway 60/State Highway AA in Scott County shall be 15 designated the "Purple Heart Trail". Costs for such designation shall be paid by private donations. 16 227.467. The portion of Interstate 64 from Interstate 70 from the city of Wentzville in St. 17 Charles County continuing east to Interstate 55 at the Missouri/Illinois state line in St. Louis City, 18 except for those portions of Interstate 64/US40/US61 previously designated as August 28, 2019, 19 shall be designated the "Purple Heart Trail".
    [Show full text]