Sydney IBX® Data Center NSW 2015 Australia [email protected]

Total Page:16

File Type:pdf, Size:1020Kb

Sydney IBX® Data Center NSW 2015 Australia Servicedesk@Equinix.Com IBX TECHNICAL SPECIFICATIONS 47 Bourke Road 1.800.172.417 (Australia) SY3 Alexandria, Sydney +61.2.8337.2000 (International) Sydney IBX® Data Center NSW 2015 Australia [email protected] EQUINIX SYDNEY DATA CENTERS Equinix is the world’s digital infrastructure company. Digital leaders Parramatta A40 M2 harness our trusted platform to bring together and interconnect the SY6 foundational infrastructure that powers their success. Our Sydney A8 International Business Exchange™ (IBX) data centers consist of M4 eight facilities networked across two campuses to give customers A40 flexibility and redundancy options. Our data centers are business M1 Lidcombe hubs for 765+ companies. Customer can access the broadest A4 Sydney range of cloud services and the largest collection of international A6 and regional network service providers in Australia. A22 Surry Hills A3 Newtown SY3 Our Sydney data centers also allow customers to take advantage Marrickville of peering opportunities with direct access to the largest peering SY1/2 SY8 platform in Australia, and access to key subsea cable facilities— Hawaiki Cable, Southern Cross Cable, PIPE Pacific Cable. SY4 SY5 M5 Mascot M1 M1 A36 SYDNEY IBX BENEFITS • Most interconnected data center campus in Australia Wollongong • Access to 290+ cloud providers (includes direct connection to SY7 B65 AWS, Microsoft Azure, Google Compute and Oracle Cloud) via Equinix Fabric™ M1 B65 • Equinix Internet Exchange™ is the largest network peering Berkeley Port Kembla A1 platform in the Australian market • Access market participants and financial services providers, including Chi-X and Bloomberg, as well as Sydney’s growing electronic payments industry • Located very close to subsea cable stations, facilitating global connectivity for the financial services community • Two campus locations to give customers network-rich redundant options within metro Sydney Equinix.com SY3 Sydney IBX Data Center IBX TECHNICAL SPECIFICATIONS Building Amenities Reliability Space • Break Room Our IBX data centers boast an Colocation Space 6,894 m2 (74,209 ft2) • Loaner Tools industry-leading, high average uptime • Showers track record of >99.9999% globally. Building Type 2-story, pre-cast reinforced • Crash Carts concrete • Work Kiosks Parking Adjacent to building (no charge) • Wifi • Conference Room Certification and Floor Sustainability Floor Type Raised Floor Load Capacity 30.98 kN/m2 (647 psf) Certifications Products and • ISO 27001 • PCI DSS Fire Suppression VESDA, smoke and heat Services detectors, double-interlocked • SOC 1 Type pre-action sprinklers (dry pipe) Colocation • SOC 2 Type • Private Cage • Secure Cabinet Green By Design • AC Power Circuits • LEED Gold • IBXflex® Office and Storage • Granular temperature monitoring Facilities • Antenna • Optimized lighting controls Interconnection Power and Cooling • Equinix Fabric™ Power and 3.0 - 5.0 kVA per cabinet • Cross Connect ABOUT EQUINIX Cooling Density • Equinix Connect Equinix is the world’s digital Utility Feeders 2 • Equinix Internet Exchange™ infrastructure company. Digital leaders harness our trusted platform UPS Configuration Block redundant Services to bring together and interconnect UPS Redundancy N+1 • IBX SmartView™ the foundational infrastructure that ® Standby Power 10 x 2,250 kVA diesel generators • Smart Hands powers their success. We enable Configuration our customers to access all the right places, partners and possibilities they Standby Power N+1 Redundancy need to accelerate advantage. With Equinix, they can scale with agility, Cooling Configuration CRAC units and water-cooled speed the launch of digital services, centrifugal chillers deliver world-class experiences and Cooling Redundancy N+1 (on chillers) and N+25% (on multiply their value. CRAC units) Equinix.com Security Physical Perimeter fence and gate, mantrap Human 24/7 on-site security officers Electronic Biometric readers (in common areas), additional biometric readers (optional), speedstiles with biometric 2-factor authentication, CCTV surveillance with 30-day retention, motion detection SY3 IBX Site Spec v010621 Q320 © 2021 Equinix, Inc..
Recommended publications
  • Infrastructure Approval
    Infrastructure approval Section 115ZB of the Environmental Planning & Assessment Act 1979 I grant approval to the State significant infrastructure application referred to in schedule 1, subject to the conditions in schedules 2. These conditions are required to: • prevent, minimise, and/or offset adverse environmental impacts including economic and social impacts; • set standards and performance measures for acceptable environmental performance; • require regular monitoring and reporting; and • provide for the ongoing environmental management of the SSI. The Hon Pru Goward MP Minister for Planning Sydney 2015 SCHEDULE 1 Application no.: SSI-6136 Proponent: Roads and Maritime Services Approval Authority: Minister for Planning Land: Land in the suburbs of Hornsby, North Wahroonga, Wahroonga, Normanhurst, Thornleigh, Pennant Hills, Beecroft, West Pennant Hills, Carlingford, North Rocks, Northmead and Baulkham Hills State Significant Infrastructure: Development for the purposes of the NorthConnex project being a new multi-lane road link between the M1 Pacific Motorway (formerly the F3 Sydney–Newcastle Expressway) at North Wahroonga and the Hills M2 Motorway at Baulkham Hills, including: ▪ construction and operation of two road tunnels for traffic traveling north - south between the M1 Pacific Motorway and the Hills M2 Motorway; ▪ M2 integration works; ▪ construction of access points and improvements to intersections and interchanges in the vicinity of NorthConnex; ▪ construction of ventilation facilities; ▪ motorway control centre; and ▪ 11
    [Show full text]
  • Northconnex Tunnel E&I Designing, Commissioning and Operation Support
    CASE STUDY NORTHCONNEX TUNNEL E&I DESIGNING, COMMISSIONING AND OPERATION SUPPORT PROJECT OVERVIEW NorthConnex, the longest and deepest road tunnel in Australia, is a nine-kilometre tunnel that will link the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. CLIENT SCOPE OF WORK LLBJV (Lend Lease Bouygues Joint Venture) RSGx assigned a specialized team to integrate Level 1 to Level 5 Commissioning: into the existing NorthConnex LLBJV MEI LV Commissioning Instrumentation & Control SERVICES PROVIDED Commissioning team. The team consisted of: LV cable testing FRONT END ENGINEERING DESIGN Commissioning Leads VSD, soft-start motor control systems CONSTRUCTION AND Senior Project Engineers Lighting and emergency lighting systems COMMISSIONING SUPPORT Project Engineers MVAC system HV Permit Manger SCADA system SCOPE HV Permit Controllers DESIGN Fiber Network Design Engineer Calibration and PLC to remote I/O testing: CONSTRUCTION Network Engineers Low Point Sump pressure transmitters, level COMMISSIONING Mechanical and Electrical Superintendents transmitters, flowmeters and control valves Mechanical and Electrical Supervisors. Traffic management system (ISLUS, TMS, COMPLETIONS Smoky Vehicle, PTZ, Boom Gates) INDUSTRY Tasked with managing the commissioning of Vibration sensors for axial fans in vent facilities tunnel services, this team was distributed Photometers for transition lighting INFRASTRUCTURE along the surface, tunnel and at the Motorway Air quality and air velocity sensors LOCATION Control
    [Show full text]
  • Prospect Highway Upgrade Project Update Roads and Maritime Services | June 2019
    Prospect Highway upgrade Project update Roads and Maritime Services | June 2019 Prospect Highway and M4 Motorway interchange looking north west The NSW Government has committed construction funding for the Prospect Highway upgrade between Reservoir Road, Prospect and St Martins Crescent, Blacktown. Once complete, this upgrade will help reduce congestion, improve travel times and meet future traffic demands in the area. Project background Features Prospect Highway is a major roadway through Key features of the upgrade include: western Sydney which connects motorists with: • Widening 3.6 kilometres of Prospect Highway • M4 Motorway to four lanes with a central median (two lanes • Great Western Highway in each direction) • Old Windsor Road • Duplicating the bridges over M4 Motorway and Great Western Highway • M2 Motorway. • A new two way link road between Great Around 35,000 vehicles currently use Prospect Western Highway and Prospect Highway, Highway each day, including 5000 heavy vehicles. with traffic lights at each end of the new road Additionally, Prospect Highway links the Wetherill • New traffic lights at: Park industrial area and Greystanes employment – Stoddart Road area with M4 Motorway, Great Western Highway – M4 Motorway eastbound entry and and Blacktown City centre. The corridor serves exit ramps as a key route for many businesses across western Sydney. – Reservoir Road Prospect Highway between Reservoir Road, • Changing access arrangements at: Prospect and St Martins Crescent, Blacktown – Tudor Avenue currently has only one lane in each direction, which – Roger Place causes congestion and delays for motorists. – Vesuvius Street Roads and Maritime Services will upgrade – Ponds Road Prospect Highway to provide a 3.6 kilometre four lane divided road which will cater for forecast • Upgrading the existing shared path on the transport growth along this corridor.
    [Show full text]
  • Guide to Using Northconnex for Recreational Vehicles December 2020
    Guide to using NorthConnex for recreational vehicles December 2020 Pennant Hills Road, Pennant Hills NorthConnex is a nine kilometre twin tunnel motorway, NorthConnex delivers faster, safer, more reliable and providing a seamless connection between the M1 more efcient journeys for road users. It also returns local Pacifc Motorway at Wahroonga and the M2 Hills roads to local communities, improves air quality along Motorway at West Pennant Hills. The $3 billion project Pennant Hills Road and reduces congestion and noise. has been delivered by Transurban in partnership with Benefts include reduced travel times of up to 15 minutes, the Australian and NSW Governments. NorthConnex a straighter and fatter route for increased fuel efciency opened to trafc on 31 October 2020. and reduced wear and tear, and 3.5 metre wide lanes and a breakdown lane with 24 hour monitoring. Benefts of NorthConnex for you Options for recreational vehicles Recreational vehicles have the choice to use NorthConnex or Pennant Hills Road. This includes a motorhome or a car towing a caravan, trailer, boat or horse foat. If customers with recreational vehicles choose to use NorthConnex and the vehicle has a total combined length of over 12.5 metres long or over 2.8 metres clearance height the Class B toll will apply. A rebate may be available for eligible users. Please see below. Towed recreational Changes for trucks vehicle rebate and buses The NSW Government has a new rebate scheme for The requirements for trucks and buses do not afect eligible towed private recreational vehicles to pay tolls recreational vehicles. at the Class A toll rate rather than the Class B rate on Sydney’s motorways.
    [Show full text]
  • Beaches Link and Gore Hill Freeway Connection Scoping Report BLANK PAGE Document Controls
    October 2017 Beaches Link and Gore Hill Freeway Connection Scoping Report BLANK PAGE Document controls Title: Beaches Link and Gore Hill Freeway Connection Scoping report Approval and authorisation Prepared by: Arcadis | Jacobs Accepted on behalf of Roads and Maritime Camilla Drover Services NSW by: Executive Director Motorways Signed: Date: 30/10/2017 Location File name BL_Scoping Report_Final Document status Date Final Scoping Report 30 October 2017 © Roads and Maritime Services NSW Executive summary Introduction and need The Western Harbour Tunnel and Beaches Link is a NSW Government initiative to provide additional road network capacity across Sydney Harbour and to improve connectivity with Sydney’s northern beaches. The Western Harbour Tunnel and Beaches Link program of works includes: The Western Harbour Tunnel and Warringah Freeway Upgrade project, comprising a new tolled motorway tunnel connection across Sydney Harbour, and the Warringah Freeway Upgrade to integrate the new motorway infrastructure with the existing road network and to connect to the Beaches Link and Gore Hill Freeway Connection The Beaches Link and Gore Hill Freeway Connection, including a new tolled motorway tunnel connection from the Warringah Freeway to Balgowlah and Frenchs Forest, and upgrade and integration works to connect to the Gore Hill Freeway. This scoping report relates to the Beaches Link and Gore Hill Freeway Connection (the project). A separate application and scoping report has been prepared for the Western Harbour Tunnel and Warringah Freeway Upgrade project. The project would involve construction and operation of a 7.5 kilometre, tolled twin tunnel motorway to improve transport connections to the Northern Beaches, reduce road congestion, improve amenity and provide better access to employment centres.
    [Show full text]
  • (2007) Collaroy-Narrabeen Coastal Imaging System Report 3, Analysis
    COLLAROY-NARRABEEN COASTAL IMAGING SYSTEM REPORT 3 ANALYSIS OF SHORELINE VARIABILITYAND EROSION/ACCRETION TRENDS: JULY 2006 - JUNE 2007 by M J Blacka, D J Anderson and I L Turner Technical Report 2007/30 August 2007 THE UNIVERSITY OF NEW SOUTH WALES SCHOOL OF CIVIL AND ENVIRONMENTAL ENGINEERING WATER RESEARCH LABORATORY COLLAROY-NARRABEEN COASTAL IMAGING SYSTEM REPORT 3 ANALYSIS OF SHORELINE VARIABILITY AND EROSION/ACCRETION TRENDS: JULY 2006 – JUNE 2007 WRL Technical Report 2007/30 August 2007 by M J Blacka, D J Anderson and I L Turner Water Research Laboratory School of Civil and Environmental Engineering Technical Report No 2007/30 University of New South Wales ABN 57 195 873 179 Report Status Final King Street Date of Issue August 2007 Manly Vale NSW 2093 Australia Telephone: +61 (2) 9949 4488 WRL Project No. 02092.03 Facsimile: +61 (2) 9949 4188 Project Manager Doug Anderson Title Collaroy-Narrabeen Coastal Imaging System - Report 3: Analysis of Shoreline Variability and Erosion/Accretion Trends: July 2006 – June 2007 Author(s) Matthew J Blacka, Doug J Anderson and Ian L Turner Client Name Warringah Council Client Address Civic Centre, 725 Pittwater Road, Dee Why NSW 2099 Client Contact Daylan Cameron – Catchment Management Team Client Reference The work reported herein was carried out by the Water Research Laboratory, School of Civil and Environmental Engineering, University of New South Wales, acting on behalf of the client. Information published in this report is available for general release only by permission of the Director, Water Research Laboratory, and the client. WRL TECHNICAL REPORT 2007/30 CONTENTS 1. INTRODUCTION 1-1 1.1 General 1-1 1.2 Maintenance, Upgrades and Operational Issues 1-2 1.3 Report Outline 1-2 2.
    [Show full text]
  • Subject: Lane Cove Road M2 Additional On-Ramp Proposal
    Page 1 of2 @ Andrew Beattie - Lane Cove Road M2 additional on-ramp proposal From: michmich michmich <mich_blogs@hotmail,com> To: < plan_comment@plann ing, nsw,gov.au > Date: Bl22l20L2 6:46 PM Subject: Lane Cove Road M2 additional on-ramp proposal These comments are about the plan to construct an additional on-ramp to the M2 from Lane Cove Road, Good points This connection will be a useful connection between the radial M2 metroad and the peripheral M3 metroad This connection will make it easier for long-distance car, bus and truck traffic to travel from Pymble to Sydney without using the Pacific highway south of Pymble, This connection will remove some traffic travelling from the M3 to the M2 from the extremely congested area near the McDonalds, and also from the congested intersection of Wick Rd and Epping Road. This connection will make it easier to proceed from the M3 ( from the nofth ) to the cemetery and commercial area in Delhi Road. Bad points This connection will operate in one direction only, There will be no connection in the opposite direction. This will be confusing to some road users and bad from the point of the "legibility" of the road network, The above point will be exacerbated because of the incomplete nature of the connection between the M2 metroad and the M3 metroad which were promoted as legible routes for non-Sydney residents, It is rather suspicious that the promotion mentions time savings in the PM peak, What is the indicative time saving in the AM peak. As the direction of this connection is fundamental in the direction of being towards the CBD, surely this is the key criterion ? Is something being "covered up" here ? Price.
    [Show full text]
  • Sydney IBX Data Center NSW 2020 Australia [email protected]
    IBX TECHNICAL SPECIFICATIONS Unit B, 639 Gardeners Road 1.800.172.417 (Australia) SY1 Mascot, Sydney +61.2.8337.2000 (International) Sydney IBX Data Center NSW 2020 Australia [email protected] EQUINIX SYDNEY DATA CENTERS Equinix helps companies accelerate business performance Parramatta A40 M2 by connecting them to their customers and partners inside the SY6 world’s most networked data centers. Our Sydney International A8 Business Exchange™ (IBX®) data centers consist of seven facilities M4 networked across two campuses to give customers flexibility and A40 redundancy options, with the eighth data center, SY5, targeted to M1 Lidcombe open in the second half of 2019. Our data centers are business A4 Sydney hubs for 730+ companies. Customers can choose from a broad A6 range of network services from 155+ network service providers A22 Surry Hills and interconnect directly to customers and partners in their digital A3 Newtown SY3 supply chain. Marrickville SY1/2 SY8 Our Sydney data centers are where companies can gain direct access to both submarine cable landing station and PoP. Equinix’s SY4 SY5 M5 Mascot M1 Internet Exchange is also the largest network peering platform in M1 A36 the Australian market and our facilities have the largest collection of international and regional networks in Australia. Wollongong SY7 B65 SYDNEY IBX® BENEFITS • Most interconnected data center campus in Australia M1 B65 • Access to 265+ cloud providers (includes direct connection to Berkeley Port Kembla A1 AWS, Microsoft Azure, Google Compute and Oracle
    [Show full text]
  • ACRP Synthesis 9 – Effects of Aircraft Noise
    AIRPORT COOPERATIVE RESEARCH ACRP PROGRAM SYNTHESIS 9 Effects of Aircraft Noise: Research Update on Selected Topics A Synthesis of Airport Practice ACRP OVERSIGHT COMMITTEE* TRANSPORTATION RESEARCH BOARD 2008 EXECUTIVE COMMITTEE* CHAIR OFFICERS JAMES WILDING Chair: Debra L. Miller, Secretary, Kansas DOT, Topeka Independent Consultant Vice Chair: Adib K. Kanafani, Cahill Professor of Civil Engineering, University of California, Berkeley VICE CHAIR Executive Director: Robert E. Skinner, Jr., Transportation Research Board JEFF HAMIEL MEMBERS Minneapolis–St. Paul Metropolitan Airports Commission J. BARRY BARKER, Executive Director, Transit Authority of River City, Louisville, KY ALLEN D. BIEHLER, Secretary, Pennsylvania DOT, Harrisburg MEMBERS JOHN D. BOWE, President, Americas Region, APL Limited, Oakland, CA LARRY L. BROWN, SR., Executive Director, Mississippi DOT, Jackson JAMES CRITES DEBORAH H. BUTLER, Executive Vice President, Planning, and CIO, Norfolk Southern Dallas–Ft. Worth International Airport Corporation, Norfolk, VA RICHARD DE NEUFVILLE WILLIAM A.V. CLARK, Professor, Department of Geography, University of California, Los Angeles Massachusetts Institute of Technology DAVID S. EKERN, Commissioner, Virginia DOT, Richmond KEVIN C. DOLLIOLE NICHOLAS J. GARBER, Henry L. Kinnier Professor, Department of Civil Engineering, UCG Associates University of Virginia, Charlottesville JOHN K. DUVAL JEFFREY W. HAMIEL, Executive Director, Metropolitan Airports Commission, Minneapolis, MN Beverly Municipal Airport EDWARD A. (NED) HELME, President, Center for Clean Air Policy, Washington, DC STEVE GROSSMAN WILL KEMPTON, Director, California DOT, Sacramento Oakland International Airport SUSAN MARTINOVICH, Director, Nevada DOT, Carson City TOM JENSEN MICHAEL D. MEYER, Professor, School of Civil and Environmental Engineering, Georgia National Safe Skies Alliance Institute of Technology, Atlanta CATHERINE M. LANG MICHAEL R. MORRIS, Director of Transportation, North Central Texas Council of Governments, Federal Aviation Administration Arlington GINA MARIE LINDSEY NEIL J.
    [Show full text]
  • Alpha Numeric Route Numbering
    March 2014 Easier navigation for travellers in NSW Implementing a new alpha-numeric road numbering system Roads and Maritime Services has now completed an update of road signs in New South Wales as part of the introduction of the new alpha-numeric road numbering system. Introducing the system across the state has brought NSW into line with other State and Territories who are already using the nationally-agreed system. Stages of implementation Physical implementation of the new system started in May 2013. Work occurred in three stages and was completed in early December 2013: 1. May - July 2013: Routes where the number is changing (e.g. from route 18 to B72) 2. August – November 2013: Motorways and the majority of A routes 3. Nov – Dec 2013: All remaining A and B routes, and decommissioned routes. Final checking of routes and some minor modification works took place up to the end of March 2014. Renamed roads Some important routes have been renamed as motorways, as published in the Government Gazette on 1 February 2013: • M1 Pacific Motorway – previously known as the F3 - Sydney to Newcastle Expressway from the Pacific Highway at Wahroonga to John Renshaw Drive at Beresfield. • M1 Pacific Motorway – part of the former Pacific Highway from Brunswick Heads to the Queensland Border. • M1 Princes Motorway - previously known as the F6 Southern Freeway from Princes Highway at Waterfall to Mount Ousley Road to the Illawarra Highway at Yallah. • M4 Western Motorway – formerly known as the F4 Western Freeway from Concord Road (Great Western Highway) at Strathfield to Great Western Highway at Lapstone.
    [Show full text]
  • Sydney IBX® Data Center NSW 2015 Australia [email protected]
    IBX TECHNICAL SPECIFICATIONS Unit B, 200 Bourke Road 1.800.172.417 (Australia) SY5 Alexandria, Sydney +61.2.8337.2000 (International) Sydney IBX® Data Center NSW 2015 Australia [email protected] EQUINIX SYDNEY DATA CENTERS Equinix is the world’s digital infrastructure company. Digital leaders Parramatta A40 M2 harness our trusted platform to bring together and interconnect the SY6 foundational infrastructure that powers their success. Our Sydney A8 International Business Exchange™ (IBX) data centers consist of M4 eight facilities networked across two campuses to give customers A40 flexibility and redundancy options. Our data centers are business M1 Lidcombe hubs for 765+ companies. Customer can access the broadest A4 Sydney range of cloud services and the largest collection of international A6 and regional network service providers in Australia. A22 Surry Hills A3 Newtown SY3 Our Sydney data centers also allow customers to take advantage Marrickville of peering opportunities with direct access to the largest peering SY1/2 SY8 platform in Australia, and access to key subsea cable facilities— Hawaiki Cable, Southern Cross Cable, PIPE Pacific Cable. SY4 SY5 M5 Mascot M1 M1 A36 SYDNEY IBX BENEFITS • Most interconnected data center campus in Australia Wollongong • Access to 290+ cloud providers (includes direct connection to SY7 B65 AWS, Microsoft Azure, Google Compute and Oracle Cloud) via Equinix Fabric™ M1 B65 • Equinix Internet Exchange™ is the largest network peering Berkeley Port Kembla A1 platform in the Australian market • Access
    [Show full text]
  • Hills M2 Upgrade Project
    Hills M2 Upgrade project FACT SHEET January 2010 The New South Wales Government and Hills Motorway, owners of the Hills M2 Motorway reached an in-principle agreement for an upgrade of the motorway on 13 October 2009. Project details Benefits The M2 Upgrade project would reduce congestion in peak Major project benefits include: periods, improve access to major growth areas, and Reduction in congestion during morning and provide new bus priority access. x afternoon peak periods. The M2 Upgrade project would include: x New access points to Sydney’s growing residential x New west facing Windsor Road on and off ramps. and business centres. x Additional eastbound lane from Windsor Road to x Restoration of 100 km/h speed limit along the Pennant Hills Road. motorway from Lane Cove Road to Beecroft Road. x Additional eastbound lane from Pennant Hills Road through M2 Tunnel to Lane Cove Road, which x 800 new construction and engineering jobs through includes a T2 lane east of Terrys Creek. the life of the project. x A new Christie Road eastbound on ramp. x 2,400 indirect jobs created through the life of the project. x A new Herring Road westbound off ramp. x Work to widen lanes from Lane Cove Road to x Increased capacity to accommodate planned Beecroft Road. residential and business growth. x Additional westbound lane from Beecroft Road to Pennant Hills Road. Background Project financing x On a typical work day, the M2 is used by more x The project is expected to cost approximately $550 than 100,000 vehicles and over 17,000 bus million.
    [Show full text]