Pembina Mei 2018
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
PMW Tutong District
English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong. -
PMW Tutong District
English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 08th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong lines. A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 08th Oct 2018 8.30 am to 04.30 pm Haji Al-Muhtadee Billah, Tutong Transformer#3. A part of Hospital Building and the surrrounding area. Monday 8.00 am to 12.00 noon 3 08th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Tuesday Maintenance works for Distribution 4 09th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#1. Earth satellite Building and the surrounding area. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 09th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong, lines. Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. Tuesday 8.00 am to 12.00 noon 6 09th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Wednesday Maintenance works for Distribution 7 10th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. -
12 Disember 2001
'X ♦» UAt&WfA 9AAN PETIKAN TTTAH seUAOA dan aaniaara- hOALAM amatan barpuaaa, ^ kasKi bag* ewwa* Kita bukan sa}a diamal dan t^aiats AM^aoar iaMw d< diiattti untuk merahan did -r>T—----" ■ j ari melafcukan dari nsart se'sv,^^ twataw iv- arlura-perkara yang di- Anr acAan Ramadan.* kegah malahan juga dl- =et*a8art SaAa*- lanlurtcan untuk aentlaaa Ki^rs Weaaflaae yirvg icart kacamertangan da- apa {uga bldang dan fartanynkan o*ah Ai-^ m yang tdts lakuKan." • cnxri dafi A/sy^ Raoa^ aampana Hari Raya ihutetii- Hri200a BRUNEI TAHUN 46 BILANCAN 50 RABU 12 DISEMBER. 2001/1422 ^vOWaaj 26 jjlj DITERBITKAN PAOA SETIAP HARI RABU PERCUMA )UN]UNG ZIARAH HARI RAYA AIDILFITR! YANG 1422 HIJRAH NARIK MENJUNJUNG lilah Kebawah Duli Yang Maha Muliu Paduka Scri Baginda Sultan Haji Hassanal uan: Bolkiah Mu'izzaddin Waddaulah, Sultan dan Yang Oi-Pcrtuan Negara Brunei Darussaiont. Yang Amai Muiia Pengiran Penggawa Laita SentaiB Istiadai Pelbagai prodiik dan Diraja Dalam Istana, Grand Chamberlain meng- perkhidmatan umumkan bahawa sempena Hari Raya Aidilfitri Thhun 1422 Hijrah, Istana Nuiul Iman akan dibuka - Muka 2 selama tiga hari. mulai dari Hari Raya Kedua dari jam 10.00 pagi hingga 12.00 tengah han dan dari jam 2.00 petang hingga 4.00 petang. bagi membolehkan elirik Masa Silam : orang ramai mengadap dan menziarahi Kebawah Duli Yang Maha Mulia Paduka Seri Baginda Sultan Terkenang tempat dan Yang Di-Pertuan Negara Brunei Darussalom dan kerabat dtraja. jatuh • Muka 3 Penglihatan ■Mempelbagaikan KPaawAH Dull Yang Maha Mulls Paduka Serl Baginda Sultan Haji Hassanal Bolkiah Mu'izzaddin Waddaulah, Sultan dan lekonomi menjadi Vang CM-Partuan Negara Brunei Darussalam ketika berkenan menerlma mengadap dua setiausaha tetap yang baru dllantlk laitu Awang Ha)l DIrIa, Setiausaha Tetap Kementerlan Perindustrlan dan Sumber-Sumber Utama dan Oslo Paduka Awang Ikeperluan utama Hilal Syawal HaJI Dtnl, Setiausaha Tetap Kementerlan tCrttudayaan, Bella dan Sukan. -
Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN -
Copy of PMW Tutong District (Press Release) Ogos Sept18
English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday 08.30 am to 02.30 pm Kampong Kiudang, Mukim Kiudang, Maintenance works for Low voltage overhead Spg 860 Kg Kiudang, Mukim Kiudang 1 02nd August 2018 Tutong lines and surrounding area. Saturday 08.30 am to 12.30 pm Maintenance works for Low voltage overhead Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong and 2 Kampong Sg Kelugos, Keriam, Tutong 04th August 2018 lines surrounding areas Monday Maintenance works for Low voltage overhead 3 08.30 am to 4.00 pm Kampong Birau, Mukim Kiudang, Tutong Jln Kecil Kg Birau , Mukim Kiudang and surrounding areas 06th August 2018 lines Tuesday 08.30 am to 4.00 pm Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 4 Spg 554 Kg Kupang, Mukim Keriam and surrounding areas 07th August 2018 Tutong. lines Wednesday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 5 08.30 am to 12.00 noon A part of kampong Lamunin, Tutong. 08th August 2018 Tutong lines Thursday 08.30 am to 4.00 pm Maintenance works for Low voltage overhead 6 Kampong Telamba, Mukim Telisai, Tutong A part of Kampong Telamba, Mukim Telisai,Tutong. 09th August 2018 lines Monday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 7 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 13th August 2018 lines Tuesday 08.30 am to 4.30 pm Maintenance works for Low -
Press Release
English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 Kampong Padnunuk, Mukim Kiudang, Tutong A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. 08th Oct 2018 2.00 pm to 4.30 pm lines. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 8.30 am to 4.30 pm A part of Hospital Building and the surrrounding area. 08th Oct 2018 Haji Al-Muhtadee Billah, Tutong Transformer#3. Monday 8.00 am to 12.00 noon 3 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 08th Oct 2018 2.00pm to 4.30 pm Tuesday Maintenance works for Distribution 4 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong. Earth satellite Building and the surrounding area. 09th Oct 2018 Transformer#1. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 Kampong Padnunuk, Mukim Kiudang, Tutong, Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. 09th Oct 2018 2.00pm to 4.30 pm lines. Tuesday 8.00 am to 12.00 noon 6 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 09th Oct 2018 2.00 pm to 4.30 pm Wednesday Maintenance works for Distribution 7 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong. -
The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah Binti
3-5 February 2014- Istanbul, Turkey Proceedings of INTCESS14- International Conference on Education and Social Sciences Proceedings 1053 The Vitality & Revitalisation of a Minority Language: The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah binti Hj. Awg. Chuchu (Dr.) & Najib Noorashid Universiti Brunei Darussalam; Brunei Darussalam [email protected]; [email protected]. Keywords: Language vitality, language revitalisation, language extinction, ethnic minority, Dusun, Brunei. Abstract. Language extinction or language death is a sociolinguistic phenomenon which concerns and is often discussed among linguists or members of speaker in general (Aitchison, 2001; Crystal, 2000; Dalby, 2003; Mufwene, 2004; Nelson, 2007; Fishman, 2002; 2007). Due to rapid globalisation, the effect of linguistic "superstratum-substratum" is inevitable (Crystal, 2003), in particular to those languages of ethnic minorities; those in Brunei Darussalam are not the exclusion (Martin, 1995; Noor Azam, 2005; David, Cavallaro & Coluzzi, 2009; Clynes, 2012; Coluzzi, 2012). These minority languages are inclined to endangeredment due to urbanisation, education system, migrations and others, which lead to language shift and consequently, extinction. Brunei Darussalam is a multilingual country that has a diverse population and cultures which generate variations of language and dialect (Nothofer, 1991; Fatimah & Poedjosoedarmo, 1995; Azmi Abdullah, 2001; Jaludin Chuchu, 2005; David, Cavallaro & Coluzzi, 2009). Recognised as one of the seven indigenous in Brunei under the Citizenship Status laws 1961 of the Constitution of Negari Brunei 1959, Dusun ethnic is alleged to have and practice its own code of dialect. All dialects and languages spoken by indigenous ethnics are regarded as minority languages, except for the dialect of Brunei Malay. By focusing on Dusun dialect, this paper discusses the current situation of its language use and perceptions among the native speakers. -
Copy of MEMO 028 Copy of PMW Tutong District
English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 1 Wayleave clearing 20th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Thursday 8.30 am to 11.30 am Kampong Rambai, 2 Wayleave clearing A part of Kg Rambai and its surrounding areas 21th November 2019 1.30 pm to 4.30 pm Mukim Rambai Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 3 Wayleave clearing 21th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Saturday 8.30 am to 11.30 am Kampong Rambai, 4 Wayleave clearing A part of Kg Rambai and its surrounding areas 23th November 2019 1.30 pm to 4.30 pm Mukim Rambai Saturday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 5 Wayleave clearing 23th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Monday 8.30 am to 11.30 am Kampong Rambai, 6 Wayleave clearing A part of Kg Rambai and its surrounding areas 25th November 2019 1.30 pm to 4.30 pm Mukim Rambai Monday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 25th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. -
Copy of Copy of PMW Tutong District (Press Release) Memo22
English Section Listed below are the designated areas for the planned maintenance work as for September and October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Tuesday Maintenance works for low voltage overhead 1 18th Sept 2018 8.30 am to 04.30 pm Kampong Kuala Ungar, Mukim Rambai,Tutong. lines. A part of kampong Kuala Ungar and surrounding area. Tuesday Hj Hassbolah Building, 2 18th Sept 2018 8.30 am to 04.30 pm Kg Petani, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Hj Hassbolah Building, Kg Petani. Wednesday Kampong Bukit Udal, Jln Nong Janang and Jln Kecil Bukit Kukob, Bukit Udal and A part 3 19th Sept 2018 8.30 am to 04.30 pm Mukim Tanjong Maya, Tutong Maintenance works for Distribution Transformer. of Kg sg Damit and surrounding areas Saturday Kampong Biong, 4 22th Sept 2018 8.30 am to 04.30 pm Mukim Lamunin, Tutong Maintenance works for Distribution Transformer. A part of Kampong Biong and surrounding area Monday 5 24th Sept 2018 8.30 am to 04.30 pm Kampong Long Mayan, Mukim Ukong , Tutong Maintenance works for Distribution Transformer. A part of Kampong Long Mayan and surrounding area Monday Kampong Merimbun, 6 24th Sept 2018 8.30 am to 04.30 pm Mukim Rambai, Tutong Maintenance works for Distribution Transformer. A part of Kampong Merimbun and surrounding area Kampong Lubuk Ubar, Monday 8.00 am to 11.30 am Jln Kuru-Benutan, Maintenance works for low voltage overhead 7 24th Sept 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines. -
Copy of Copy of PMW Tutong District (Press Release) 4Wk July18
English Section Listed below are the designated areas for the planned maintenance work as for July and August, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.30 am to 02.00 pm Saturday Kampong Bukit Panggal, Mukim Keriam, Replacement of Distribution Feeder Pillar Spg 8, 1 Spg 8, Kampong Bukit Panggal , Mukim Keriam, Tutong. 21th July 2018 Tutong. Kampong Bukit Panggal , Tutong. 08.30 am to 11.30 am Tuesday Kampong Sengkarai, Mukim Pekan Maintenance works for Low voltage overhead Spg 28, Jln Pengasing, Kampong Sengkarai, Mukim Pekan 2 1.30 pm to 05.00pm 24th July 2018 Tutong. lines Tutong. 08.30 am to 11.30 am Wednesday Kampong Sengkarai, Mukim Pekan Maintenance works for Low voltage overhead Spg 28, Jln Pengasing, Kampong Sengkarai, Mukim Pekan 3 1.30 pm to 05.00pm 25th July 2018 Tutong. lines Tutong. 08.30 am to 11.30 am Kampong Keranching, Kampong Wednesday Belaban, Kampong Benutan and Replacement of Ring Main Unit at substation Kampong Keranching, Kampong Belaban, Kampong Benutan and 4 1.30 pm to 05.00pm 25th July 2018 (For info: Department of Electrical Service will supply temporary electricity Kampong Lubuk Ubar, Mukim Rambai, Benutan #1, Tutong. apart of Kampong Lubuk Ubar, Mukim Rambai, Tutong. to the affected areas through mobile generator service at the substation) Tutong. Thursday 08.30 am to 02.00 pm Kampong Suran dan Kampong Panchor Replacement of Distribution Feeder Pillar at Kampong Suran and apart of kampong Panchor Dulit, Mukim 5 26th July 2018 Dulit, Mukim Pekan Tutong. Kampong Suran. -
SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh
SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 1 3A & COMPANY KPN-6055 I B01 [email protected] 05 Apr 2021 4 Apr 2024 Tel No: Fax: 8242518 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Gadong BE 1918 Gadong BE 1918 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0043/2021 2 A.J. CONSTRUCTION AND TRADING KPN-6133 I KA01, B01 [email protected] 26 Jun 2021 25 Jun 2024 COMPANY Tel No: Fax: 8977362, No 30 Simpang 766 No 30 Simpang 766 8767838 Kampong Sungai Lalit Kampong Sungai Lalit Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0224/2021 3 A.LEEZIQ CONTRACTOR KPN-5686 I KA01, B01 a.leeziq.contractor@gmail. 24 Jun 2019 23 Jun 2022 com Tel No: Fax: 7134374 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0238/2019 4 A.MALI CONTRACTOR KPN-5150 I B01, KPB04, S02, S03 19 Aug 2018 18 Aug 2021 Tel No: Fax: 8909149 No 6 Kampong Rimba Gadong No 6 Kampong Rimba Gadong Jalan 60 Simpang 64-6 Jalan 60 Simpang 64-6 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0438/2018 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..1 7 Jul 2021 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 5 A'R YANA CONSTRUCTION KPN-5902 I B01 julaihi.othman @outlook.com 08 Jul 2019 7 Jul 2022 Tel No: Fax: 8801295 No 676 Kampong Pengkalan Mau No 676 Kampong Pengkalan Mau Kiudang Tutong Kiudang Tutong Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0333/2019 6 ABU FAMILY'S ENTERPRISE KPN-5759 I KA01, B01, M03, abufamilysenterprises@gmail. -
Majlis Disambung Bersidang Pada Jam 2
PETANG HARI RABU, 17 SAFAR 1428 / 7 MAC 2007 24 Majlis disambung bersidang pada jam lagi kepada orang-orang yang telahpun 2.30 petang dikeluarkan daripada Rumah Al-Islah ini terurtama sekali dalam mencari pekerjaan. Yang Dipertua Dewan: Sekarang bersidang semula, oleh kerana apabila kita duduk sama- Sukacita saya menerangkan bahawa sama dalam Jawatankuasa, jadi sekarang Majlis Kementerian saya ada sedikit sebanyak ditangguhkan untuk balik kepada Jawatankuasa terbabit dalam memberikan pertolongan ini dan membincangkan kerana menyambung di mana melalui ‘Outward Bound Brunei beberapa Anggaran Belanjawan yang belum lagi Darussalam’, Kementerian Kebudayaan, Belia diselesaikan, dengan demikian saya tangguhkan dan Sukan telahpun sejak tahun 2005 majlis. mengadakan program yang dinamakan Program Jatidiri, khusus bagi orang-orang (Majlis bersidang selaku Jawatankuasa) yang telahpun keluar daripada Rumah Al-Islah ini. Pengerusi: Ahli-Ahli Yang Berhormat tadi kita masih lagi Tajuk SAO4A, Biro Kawalan Selama ini kita telahpun mengadakan Nakotik, sekiranya tidak ada Ahli-Ahli untuk sebanyak lapan kali program, ini yang melatih membahaskan ataupun Ahli-Ahli sebelah kanan di antara empat belas hingga lapan belas untuk dijelaskan. orang, orang-orang yang di bawah perhatian dan alhamdulillah setelah kita mengadakan Yang Berhormat Pehin Orang Kaya Seri Dewa kursus selama dua minggu di mana pelatih- Mejar Jeneral (B) Dato Seri Pahlawan Awang pelatih dapat menyelami kepercayaan ataupun Haji Mohammad bin Haji Daud, Menteri dapat mengukur kepercayaan diri mereka