World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document PROCUREMENT PLAN (Textual Part) Project information: Ethiopia, One WASH- Consolidated WASH Account (CWA) Project “Phase II”, P167794 Project Implementation agency: Water Development Commission (WDC) of the Ministry of Public Disclosure Authorized Water, Irrigation and Energy (MoWIE) Date of the Procurement Plan: August 28, 2019 Period covered by this Procurement Plan: September 2019 to August 2020. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 revised August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. Public Disclosure Authorized This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Public Disclosure Authorized Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Section 33(1)(a) from 35-48 of the Proclamation Number 649/2009 of the Ethiopian Federal Government Procurement and Property Administration Proclamation, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. • Open Advertising of the procurement opportunity at the national level; • The procurement is open to eligible firms from any country; • The request for bids/Proposal documents shall require that bidders/proposers submitting Bids/Proposal present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of and compliance with the Bank’s Anti- Public Disclosure Authorized Corruption Guidelines, including without limitation the bank’s right to sanction and the Bank’s inspection and audit right; • Contracts with an appropriate allocation of responsibilities, risks and liabilities; • Application of Standstill period and Publication of contract award information; • Maintenance of records of the procurement process; and • The Bank has the right to review procurement documentation and activities. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is applicable for those contracts identified in the Procurement Plan; Works: Is applicable for those contracts identified in the Procurement Plan. Other Relevant Procurement Information. None PROCUREMENT Ethiopia : One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) PLAN General Information Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2020-06-23 Revised Plan Date(s): (comma delineated, leave blank if none)2020-08-20 Project ID: P167794 GPN Date: 2019-12-06 Project Name: One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) Loan / Credit No: IDA / 64450 Executing Agency(ies):Ministry of Health WORKS Procureme Bid Evaluation Activity Reference No. / Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH nt Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Contract Description Component Review Type Method Amount qualification Document / Signed Contract No. Approach Process (Y/N) Risk Document Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Completion (US$) Documents Justification Type Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-MOH-162221-CW-RFQ / Procurement of construction ofone improved latrine Institutional Water Supply, Pending facilities , one placenta pit Request for Single Stage - One IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-08-20 and one sanitation Quotations Envelope (Institutional WASH) tion marketing center in Adi Arkay Woreda of Amhara region by Adi Arkay woreda ET-MOH-162639-CW-RFQ / Procurement of construction of one water supply & one Institutional Water Supply, Pending Request for Single Stage - One waste disposal pit in IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-09-19 Quotations Envelope Janamora health institution (Institutional WASH) tion of Amhara region by Janamora woreda ET-MOH-162640-CW-RFQ / Procurement of construction of One(1) new improved latrine facilities at Health institution with hand Institutional Water Supply, Pending Request for Single Stage - One washing facilities, One(1) IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-08-20 Quotations Envelope SM shed Construction, One (Institutional WASH) tion (1) new water schemes/facilities for Dabat Health Institutions of Amhara region by Dabat Woreda ET-MOH-162641-CW-RFQ / Procurement of the construction of One (1) new impproved latrine facilities Institutional Water Supply, Pending Request for Single Stage - One at Health institution with IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-07-21 Quotations Envelope hand washing facilities, for (Institutional WASH) tion Armacho Health Institutions of Amhara region by Lay Armachiho Woreda ET-MOH-162642-CW-RFQ / Amhara region procurement of the construction of One (1) new waste disposal Institutional Water Supply, Pending Request for Single Stage - One Placenta pits in health IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-08-20 Quotations Envelope institutions, One (1) new (Institutional WASH) tion water schemes/facilities for Health Institutions,"Kinfaz Begena " Woreda. ET-MOH-162650-CW-RFQ / Amhara region procurement of the construction of One Institutional Water Supply, Pending Request for Single Stage - One (1) new waste disposal IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-07-21 Quotations Envelope Placenta pits in health (Institutional WASH) tion institutions, "Chilga " Woreda. ET-MOH-162651-CW-RFQ / Amhara region procurement of the construction of One new improved latrine facilities at Health Institutional Water Supply, Pending Request for Single Stage - One institution with hand IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-11-18 Quotations Envelope washing facilities,One SM (Institutional WASH) tion Shed Construction ,One (1) new water schemes/facilities for Health Institutions, Ebina woreda ET-MOH-162652-CW-RFQ / Amhara region procurement of construction of One new Institutional Water Supply, Pending waste disposal Incinerators Request for Single Stage - One IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-07-21 in health institutions One Quotations Envelope (Institutional WASH) tion (1) new waste disposal pit for Health Institutions, in "Meketawa " Woreda. Page 1 ET-MOH-162653-CW-RFQ / Procurement of construction of One (1 ) new improved latrine facilities with hand Institutional Water Supply, Pending Request for Single Stage - One washing facilities, One (1) IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-08-20 Quotations Envelope new water schemes/facilities (Institutional WASH) tion for Lay Gayint Health Institution in Amhara region by "Lay Gayint " Woreda ET-MOH-162714-CW-RFQ / procurement of the construction of One (1) new improved latrine facilities Institutional Water Supply, Pending Request for Single Stage - One with hand washing IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-07-21 Quotations Envelope facilities,for TAch Gayint (Institutional WASH) tion Health Institutions in Amhara region Tach Gayint Woreda. ET-MOH-162716-CW-RFQ / Procurement of construction of One (1) new improved latrine facilities with hand Institutional Water Supply, Pending washing facilities,One (1) Request for Single Stage - One IDA / 64450 Sanitation, and Hygiene Post Limited 0.00 Implementa 2021-03-27 2021-05-22 2021-08-20 new water schemes/facilities Quotations Envelope (Institutional WASH) tion for Semen Achefer Health Institutions in Amhara region by Semen Achefer Woreda ET-MOH-162719-CW-RFQ
Recommended publications
  • Districts of Ethiopia
    Region District or Woredas Zone Remarks Afar Region Argobba Special Woreda -- Independent district/woredas Afar Region Afambo Zone 1 (Awsi Rasu) Afar Region Asayita Zone 1 (Awsi Rasu) Afar Region Chifra Zone 1 (Awsi Rasu) Afar Region Dubti Zone 1 (Awsi Rasu) Afar Region Elidar Zone 1 (Awsi Rasu) Afar Region Kori Zone 1 (Awsi Rasu) Afar Region Mille Zone 1 (Awsi Rasu) Afar Region Abala Zone 2 (Kilbet Rasu) Afar Region Afdera Zone 2 (Kilbet Rasu) Afar Region Berhale Zone 2 (Kilbet Rasu) Afar Region Dallol Zone 2 (Kilbet Rasu) Afar Region Erebti Zone 2 (Kilbet Rasu) Afar Region Koneba Zone 2 (Kilbet Rasu) Afar Region Megale Zone 2 (Kilbet Rasu) Afar Region Amibara Zone 3 (Gabi Rasu) Afar Region Awash Fentale Zone 3 (Gabi Rasu) Afar Region Bure Mudaytu Zone 3 (Gabi Rasu) Afar Region Dulecha Zone 3 (Gabi Rasu) Afar Region Gewane Zone 3 (Gabi Rasu) Afar Region Aura Zone 4 (Fantena Rasu) Afar Region Ewa Zone 4 (Fantena Rasu) Afar Region Gulina Zone 4 (Fantena Rasu) Afar Region Teru Zone 4 (Fantena Rasu) Afar Region Yalo Zone 4 (Fantena Rasu) Afar Region Dalifage (formerly known as Artuma) Zone 5 (Hari Rasu) Afar Region Dewe Zone 5 (Hari Rasu) Afar Region Hadele Ele (formerly known as Fursi) Zone 5 (Hari Rasu) Afar Region Simurobi Gele'alo Zone 5 (Hari Rasu) Afar Region Telalak Zone 5 (Hari Rasu) Amhara Region Achefer -- Defunct district/woredas Amhara Region Angolalla Terana Asagirt -- Defunct district/woredas Amhara Region Artuma Fursina Jile -- Defunct district/woredas Amhara Region Banja -- Defunct district/woredas Amhara Region Belessa --
    [Show full text]
  • 20210714 Access Snapshot- Tigray Region June 2021 V2
    ETHIOPIA Tigray: Humanitarian Access Snapshot (July 2021) As of 31 July 2021 The conflict in Tigray continues despite the unilateral ceasefire announced by the Ethiopian Federal Government on 28 June, which resulted in the withdrawal of the Ethiopian National Overview of reported incidents July Since Nov July Since Nov Defense Forces (ENDF) and Eritrea’s Defense Forces (ErDF) from Tigray. In July, Tigray forces (TF) engaged in a military offensive in boundary areas of Amhara and Afar ERITREA 13 153 2 14 regions, displacing thousands of people and impacting access into the area. #Incidents impacting Aid workers killed Federal authorities announced the mobilization of armed forces from other regions. The Amhara region the security of aid Tahtay North workers Special Forces (ASF), backed by ENDF, maintain control of Western zone, with reports of a military Adiyabo Setit Humera Western build-up on both sides of the Tekezi river. ErDF are reportedly positioned in border areas of Eritrea and in SUDAN Kafta Humera Indasilassie % of incidents by type some kebeles in North-Western and Eastern zones. Thousands of people have been displaced from town Central Eastern these areas into Shire city, North-Western zone. In line with the Access Monitoring and Western Korarit https://bit.ly/3vcab7e May Reporting Framework: Electricity, telecommunications, and banking services continue to be disconnected throughout Tigray, Gaba Wukro Welkait TIGRAY 2% while commercial cargo and flights into the region remain suspended. This is having a major impact on Tselemti Abi Adi town May Tsebri relief operations. Partners are having to scale down operations and reduce movements due to the lack Dansha town town Mekelle AFAR 4% of fuel.
    [Show full text]
  • Benefit SBN 2019 Annual Report
    Benefit SBN 2019 Annual Report 1 2 Contents 1.Sustainable agricultural production: Production cost price reduction 1 1.1. Sustainable agricultural production – Production cost price reduction 1 1.1.1. Yield and quality improvement 2 1.1.2. Harvest, transport and storage loss reduction 8 1.1.3. Improved farmers’ access to input credit 9 2. Product and market development 11 2.1. Post-harvest value creation 11 2.1.1 Store management 12 2.1.2.Cleaning and sorting 12 2.1.3. Exploring local oil extraction and quality standards 12 2.1.4. Product development for sesame and its rotational crops 13 2.2 Improved market linkages and sales 13 2.2.1. Cooperative spot market trade 13 2.2.2. Direct marketing unions and investors 14 2.2.3. Sourcing of processing companies 14 2.2.4. Marketing rotational crops 15 2.3. Improved access to marketing credit 15 2.3.1 Guarantee fund 15 3.Strengthened enabling environment for the Ethiopian sesame sector 17 3.1. Evidence-based information gathering and sharing 18 3.1.1. Stakeholder databases at woreda level (Excel and E-Prod) 18 3.1.2. Lessons learned, issue briefs and experience papers 18 3.1.3. Market information 19 3.1.4. Training and extension materials 19 3.2, Stakeholder capacity development 20 3.2.1. ARC staff training 20 3.2.2. Agronomic training 20 Table 2. No of farmers participated in GAP at woreda and kebele levels 21 Table 3 No of development agents trained at woreda and zone level 21 3.2.3.
    [Show full text]
  • Socio-Economic Base-Line Survey of Rural and Urban Households in Tana Sub-Basin, Amhara National Regional State
    Socio-Economic Base-Line Survey of Rural and Urban Households in Tana Sub-Basin, Amhara National Regional State Kassahun Berhanu & Tegegne Gebre-Egziabher FSS Monograph No. 10 Forum for Social Studies (FSS) Addis Ababa © 2014 Forum for Social Studies (FSS) All rights reserved. Printed in Addis Ababa Typesetting & Layouts: Konjit Belete ISBN: 13: 978-99944-50-49-7 Forum for Social Studies (FSS) P.O. Box 25864 code 1000 Addis Ababa, Ethiopia Email: [email protected] Web: www.fssethiopia.org.et This monograph has been published with the financial support of the Civil Societies Support Program (CSSP). The contents of the monograph are the sole responsibilities of the authors and can under no circumstances be regarded as reflecting the position of the CSSP or the FSS. Table of Contents List of Tables vii Acronyms xvii I. INTRODUCTION 1 1.1 Background and Statement of the Problem 1 1.2 Objectives 9 1.3 Research Questions (Issues) 10 1.4 Methodology 11 1.4.1 Sampling 11 1.4.2 Types of Data, Data collection techniques, and 13 Data Sources 1.5 Significance and Policy Implications 15 1.6 Organization of the Report 15 II. POPULATION CHARACTERISTICS OF RURAL 17 HOUSHOLDS 2.1 Age-Sex Composition 17 2.2 Household Composition and Marital Status 20 2.3 Ethnic and Religious Composition 22 2.4 Educational characteristics 22 2.5 Primary Activity 25 III. AGRICULTURE 27 3.1 Crop Production 27 3.1.1 Land Ownership 27 3.1.2 Number of Plots Owned and Average Distance 28 Traveled to Farm Plots 3.1.3 Size of holding (ha) 29 3.1.4 Other Forms of Land Holding by Respondents 30 in Study Woredas 3.1.5 Possession of Private Fallow and Grazing Land 31 3.1.6 Land Use Certification and Security of Tenure 32 3.1.7 Possession of Plough Oxen 33 3.1.8 Usage of Farm Implements 33 3.1.9 Means and Ways of Engaging in Farming 34 Activities 3.1.10 Annual Production (Base Year 2004 EC) 38 3.1.11 Use of Agricultural Inputs 38 3.1.12 Irrigated Agriculture 42 3.2 Livestock Production and Services 47 IV.
    [Show full text]
  • Ethiopia Round 6 SDP Questionnaire
    Ethiopia Round 6 SDP Questionnaire Always 001a. Your name: [NAME] Is this your name? ◯ Yes ◯ No 001b. Enter your name below. 001a = 0 Please record your name 002a = 0 Day: 002b. Record the correct date and time. Month: Year: ◯ TIGRAY ◯ AFAR ◯ AMHARA ◯ OROMIYA ◯ SOMALIE BENISHANGUL GUMZ 003a. Region ◯ ◯ S.N.N.P ◯ GAMBELA ◯ HARARI ◯ ADDIS ABABA ◯ DIRE DAWA filter_list=${this_country} ◯ NORTH WEST TIGRAY ◯ CENTRAL TIGRAY ◯ EASTERN TIGRAY ◯ SOUTHERN TIGRAY ◯ WESTERN TIGRAY ◯ MEKELE TOWN SPECIAL ◯ ZONE 1 ◯ ZONE 2 ◯ ZONE 3 ZONE 5 003b. Zone ◯ ◯ NORTH GONDAR ◯ SOUTH GONDAR ◯ NORTH WELLO ◯ SOUTH WELLO ◯ NORTH SHEWA ◯ EAST GOJAM ◯ WEST GOJAM ◯ WAG HIMRA ◯ AWI ◯ OROMIYA 1 ◯ BAHIR DAR SPECIAL ◯ WEST WELLEGA ◯ EAST WELLEGA ◯ ILU ABA BORA ◯ JIMMA ◯ WEST SHEWA ◯ NORTH SHEWA ◯ EAST SHEWA ◯ ARSI ◯ WEST HARARGE ◯ EAST HARARGE ◯ BALE ◯ SOUTH WEST SHEWA ◯ GUJI ◯ ADAMA SPECIAL ◯ WEST ARSI ◯ KELEM WELLEGA ◯ HORO GUDRU WELLEGA ◯ Shinile ◯ Jijiga ◯ Liben ◯ METEKEL ◯ ASOSA ◯ PAWE SPECIAL ◯ GURAGE ◯ HADIYA ◯ KEMBATA TIBARO ◯ SIDAMA ◯ GEDEO ◯ WOLAYITA ◯ SOUTH OMO ◯ SHEKA ◯ KEFA ◯ GAMO GOFA ◯ BENCH MAJI ◯ AMARO SPECIAL ◯ DAWURO ◯ SILTIE ◯ ALABA SPECIAL ◯ HAWASSA CITY ADMINISTRATION ◯ AGNEWAK ◯ MEJENGER ◯ HARARI ◯ AKAKI KALITY ◯ NEFAS SILK-LAFTO ◯ KOLFE KERANIYO 2 ◯ GULELE ◯ LIDETA ◯ KIRKOS-SUB CITY ◯ ARADA ◯ ADDIS KETEMA ◯ YEKA ◯ BOLE ◯ DIRE DAWA filter_list=${level1} ◯ TAHTAY ADIYABO ◯ MEDEBAY ZANA ◯ TSELEMTI ◯ SHIRE ENIDASILASE/TOWN/ ◯ AHIFEROM ◯ ADWA ◯ TAHTAY MAYCHEW ◯ NADER ADET ◯ DEGUA TEMBEN ◯ ABIYI ADI/TOWN/ ◯ ADWA/TOWN/ ◯ AXUM/TOWN/ ◯ SAESI TSADAMBA ◯ KLITE
    [Show full text]
  • 2020 Annual Report P.O
    Wageningen Centre for Development Innovation Wageningen Centre for Development Innovation supports value creation by Wageningen University & Research strengthening capacities for sustainable development. As the international expertise BENEFIT Partnership – 2020 Annual Report P.O. Box 88 and capacity building institute of Wageningen University & Research we bring 6700 AB Wageningen knowledge into action, with the aim to explore the potential of nature to improve The Netherlands the quality of life. With approximately 30 locations, 6,500 members (5,500 fte) of T +31 (0)317 48 68 00 staff and 12,500 students, Wageningen University & Research is a world leader in its www.wur.eu/cdi domain. An integral way of working, and cooperation between the exact sciences Bilateral Ethiopian-Netherlands Eff ort for Food, Income and Trade Partnership and the technological and social disciplines are key to its approach. Report WCDI-21-136 Dawit Alemu, Irene Koomen, Selome Kebede, Legesse Abate & Mirjam Schaap, Amsalu Ayana, Mohammed Hassena & Gareth Borman, Eyasu Elias & Eric Smaling, Helen Getaw & Monika Sopov, Geremew Terefe & Ted Schrader, Tewodros Tefera & Remko Vonk BENEFIT Partnership – 2020 Annual Report Bilateral Ethiopian-Netherlands Effort for Food, Income and Trade Partnership Dawit Alemu, Irene Koomen, Selome Kebede, Legesse Abate & Mirjam Schaap1 Amsalu Ayana, Mohammed Hassena & Gareth Borman2 Eyasu Elias & Eric Smaling3 Helen Getaw & Monika Sopov4 Geremew Terefe & Ted Schrader5 Tewodros Tefera & Remko Vonk6 1 PCU 2 ISSD 3 CASCAPE 4 ENTAG 5 SBN 6 REALISE Wageningen University & Research Wageningen / Addis Ababa, February 2021 Report WCDI-21-136 Dawit Alemu, Irene Koomen, Selome Kebede, Legesse Abate & Mirjam Schaap, Amsalu Ayana, Mohammed Hassena & Gareth Borman, Eyasu Elias & Eric Smaling, Helen Getaw & Monika Sopov, Geremew Terefe & Ted Schrader, Tewodros Tefera & Remko Vonk, 2021.
    [Show full text]
  • Download Download
    ABC Journal of Advanced Research, Volume 7, No 2 (2018) ISSN 2304-2621(p); 2312-203X (e) Assessment of Sesame Bacterial Blight (Xanthomonas Campestris Pv. Sesami) on Sesame (Sesamum indicum L.) in North Gondar, Ethiopia Asfaw Azanaw1*, Chemeda Fininsa2, Samuel Sahile3, Geremew Terefe4 1Plant Pathologist, Gondar Agricultural Research Center, P.O.Box 1337 Gondar, ETHIOPIA 2Plant Pathologist and University President, Haramaya University, P.O.Box 138 Dire Dawa, ETHIOPIA 3Plant Pathologist, University of Gondar, P.O. Box 309, Gondar, ETHIOPIA 4Plant Pathologist, Sesame Bussiness Network Programme Coordinator, P.O.Box 1337 Gondar, ETHIOPIA *Corresponding Contact: Email: [email protected] ABSTRACT Sesame is one of the important oil crops in Ethiopia for the international market while its production has challenged by lack of appropriate agronomic practices, weather uncertainties, weeds, insects and diseases outbreaks. Bacterial leaf blight caused by Xanthomonas campestris PV. sesami is the most common and inflicts heavy qualitative and quantitative losses. The objectives of the present study were to assess bacterial blight incidence, severity and its association with agronomic practices in north Gondar Ethiopia. A Field survey was conducted in Metema and Mirab Armachiho in 2014 cropping season at flowering and fruiting growth stages. A total of 80 fields were assessed for the disease assessment from both large and small-scale farmers. Data on prevalence, incidence, severity and, management practices have been recorded. All surveyed fields were infected both at flowering and fruiting stage of the crop. Mean incidence over the two districts varied from 78% at Metema to 96.5% at Mirab Armachiho. The minimum mean severity (6.1%) has been recorded in Metema district and, the highest mean severity (76.9%) has been recorded at Mirab Armachiho.
    [Show full text]
  • Sesame Business Network Newsletter
    Sesame Business Network Newsletter Issue 5 November 2014 Field days: best sesame production technologies in northwest Ethiopia About this newsletter The purpose of the SBN newsletter is to provide relevant and timely information about the overall activities of the SBN and its support programme. In this issue we would like to highlight the major activities that have taken place between August and November 2014 Inside this issue Crop-rotation trial …………….…....2 Quick facts about the roll-out activities………………………………...2 Sesame field days…………………..3 Sesame cuisine : Asia ...………….4 Labour study................................5 Farmers and officials visiting demonstrations of improved sesame production technologies and crop rotation trials Sesame marketing research .....5 Mersha Awoke‟s profile…………...6 The Sesame Business Network (SBN) Support Programme, in collaboration with Amhara and Tigray HuARC to release new sesame Region Agriculture Bureaus and Agriculture Research Institutions, is scaling out locally adapted and seed variety …………………………...7 improved sesame production technologies across eight woredas and 92 kebeles in North-West GARC works to increase sesame Ethiopia. More than 20 partners, over 1000 development agents (DAs) and model farmers are production and productivity……..7 working together in creating awareness of and access to sesame production technologies that are proven to double yields. Over 75,000 farmers across 500,000 hectares in the North Gondar and West Three DAs awarded………………...7 Tigray zones are within reach of obtaining these improvements. Field days at farmer training centres HuARC demonstrates precision (FTCs) and model farmer demonstration plots in this season are generating the awareness that yields row planter……………………………..8 can double, when applying the optimal sesame production technologies and practices.
    [Show full text]
  • A Five-Year Trend Analysis of Malaria Surveillance Data in Selected Zones of Amhara Region, Northwest Ethiopia Damtie Lankir1, Samrawit Solomon1 and Addisu Gize2*
    Lankir et al. BMC Public Health (2020) 20:1175 https://doi.org/10.1186/s12889-020-09273-5 RESEARCH ARTICLE Open Access A five-year trend analysis of malaria surveillance data in selected zones of Amhara region, Northwest Ethiopia Damtie Lankir1, Samrawit Solomon1 and Addisu Gize2* Abstract Background: Trend analysis of malaria surveillance data is essential to inform stakeholders on progress towards malaria control. From the total 387,096 cases of malaria reported in Amhara region in 2017, 167,079 (43.2%) cases were in Central, North and West Gondar zones. From this total figure of zones, 15,445 (9.2%) were ≤ 5 years which contributes 4% of cases in the region. So, the purpose of this study was to analyze trends of malaria parasite in Selected Zones of Amhara Region, Northwest Ethiopia. Methods: A Retrospective study was conducted on purposely selected Central, North and West Gondar zones from July 1–30/ 2018. Data were collected, entered, cleaned, analyzed and interpreted using Microsoft Excel-2010. Different tables, figures and maps were used to present results. Result: A total of 2,827,722 cases have been received a diagnostic test of; Microscopy 1,712,193(60.56%) and Rapid Diagnostic Test (RDT) 1,115,529(39.44%). Trends of total patients treated as confirmed and clinical malaria cases in July 2017–June 2018 were decreased to 139,297 (14%) as compared from July 2015–June 2016, 249,571(25%). From total cases received diagnostic tests only 1,003,391 (36%) were confirmed and clinical cases treated with antimalaria. Of these Plasmodium falciparum and vivax malaria cases were confirmed to be 1002,946 (99.96%) and clinical malaria cases were 445(0.04%), respectively.
    [Show full text]
  • Download File
    Report One size does not fit all The patterning and drivers of child marriage in Ethiopia’s hotspot districts Nicola Jones, Bekele Tefera, Guday Emirie, Bethelihem Gebre, Kiros Berhanu, Elizabeth Presler-Marshall, David Walker, Taveeshi Gupta and Georgia Plank March 2016 This research was conducted by Overseas Development Institute (ODI), contracted by UNICEF in collaboration with the National Alliance to End Child Marriage and FGM in Ethiopia by 2025. UNICEF and ODI hold joint copyright. The opinions expressed in this report are those of the authors and do not necessarily represent the policies or views of UNICEF or ODI. UNICEF Ethiopia UNECA Compound, Zambezi Building Tel: +251115184000 Fax: +251115511628 E-mail:[email protected] www.unicef.org/Ethiopia Overseas Development Institute 203 Blackfriars Road London SE1 8NJ Tel. +44 (0) 20 7922 0300 Fax. +44 (0) 20 7922 0399 E-mail: [email protected] www.odi.org www.odi.org/facebook www.odi.org/twitter Readers are encouraged to reproduce material from ODI Reports for their own publications, as long as they are not being sold commercially. As copyright holder, ODI and UNICEF request due acknowledgement and a copy of the publication. For online use, we ask readers to link to the original resource on the ODI and UNICEF websites. © Overseas Development Institute and United Nations Children’s Fund 2015. This work is licensed under a Creative Commons Attribution-NonCommercial Licence (CC BY-NC 3.0). ISSN: 2052-7209 All ODI Reports are available from www.odi.org Cover photo: Hands, Ethiopia
    [Show full text]
  • ETHIOPIA IDP Situation Report May 2019
    ETHIOPIA IDP Situation Report May 2019 Highlights • Government return operations continue at full scale and sites are being dismantled. • Where security is assured and rehabilitation support provided, IDPs have opted to return to their areas of origin. IDPs who still feel insecure and have experienced trauma prefer to relocate elsewhere or integrate within the community. Management of IDP preferences differs in every IDP caseload. • There is minimal to no assistance in areas of return. Local authorities have requested international partner sup- port to address the gap. Meanwhile, public-private initiatives continue to fundraise for the rehabilitation of IDPs. • The living condition of the already vulnerable host communities has deteriorated having shared their limited resources with the IDPs for over a year. I. Displacement context Government IDP return operations have been implemented at full scale since early May 2019 following the 8 April 2019 announcement of the Federal Government’s Strategic Plan to Address Internal Displacement and a costed Re- covery/Rehabilitation Plan. By end May, most IDP sites/camps were dismantled, in particular in East/West Wollega and Gedeo/West Guji zones. Humanitarian partners have increased their engagement with Government at all levels aiming to improve the implementation of the Government return operation, in particular advocating for the returns to happen voluntarily, in safety, sustainably and with dignity. Overall, humanitarian needs remain high in both areas of displacement and of return. Most assistance in displace- ment areas is disrupted following the mass Government return operation and the dismantling of sites, while assis- tance in areas of return remain scant to non-existent, affecting the sustainability of the returns.
    [Show full text]
  • Flood Hazard Assessment Using Multi-Criteria Evaluation Approach in Dembiya Woreda, Amhara Region, Ethiopia
    ERJSSH 5(2), December 2018 ORIGINAL ARITICLE Flood Hazard Assessment Using Multi-criteria Evaluation Approach in Dembiya Woreda, Amhara Region, Ethiopia Dessie Tegegne1, Ebrahim Esa2 and Assayew Nebere3 Abstract The current climate change scenario and various studies in the past related to climate change have shown that flood impact has increased vulnerability of people in the flood plains. The aim of this study was to examine the spatial distribution of flood hazard severity in Dembiya Woreda in Amhara Region using GIS and remote sensing techniques. The study employed the multi criteria evaluation (MCE) based flood hazard severity to examine the extent and magnitude of flood hazard severity in the study area. The flood hazard mapping was undertaken using GIS and remote sensing technique to show spa- tial distribution of flood hazard severity hotspots in the study woreda. The flood hazard map obtained from the overlay analysis of flood causative factors in the study area soundly agrees to each other. The flood hazard severity map indicated that about 40777ha (32.8%) and 81350ha (65.4%) of land were subjected to high and moderate flood hazard severity, respectively. These could have a tremendous im- pact on crop production in areas that are frequently being hit by flood hazards. Therefore, multi-criteria based flood hazard assessment is vital to show spatial distributions of different severity levels of flood hazard so that the required mitigation and adaptation strategies can be implemented. Keywords: MCE, flood hazard severity, hazards mapping, GIS, Remote sensing, mitigation and adap- tation strategies Introduction Background of the Study Flooding is defined as the spilling over of the normal limits for example river, lake, sea, stream or accumulation of water as a result of heavy precipitation through lack or ex- ceeding of the discharge capacity of drains, or snow melt, dams or dikes break affecting areas which are normally not submerged (Douben and Ratnayake, 2005).
    [Show full text]