MASTER THESIS REPORT

Agrivoltaic system: a possible synergy between and energy

September 2019 - March 2020

DOS SANTOS Charline MJ232X - Examensarbete inom kra - och värmeteknologi, avancerad nivå Department of Energy Technology TRITA-ITM-EX 2020:57 Acknowledgements

I would like to express my special thanks of gratitude to my supervisor, Youcef Ait El Kabous, for all his time dedicated to develop my skills and knowledge, for his support and for including me fully in his projects.

I express my profound thanks to my manager, Jennifer Ménagé, for making my internship very interesting, trusting me and giving me sound advice.

I would like to thank Marion Ng Wing Tin for helping me with the technical and innovative aspects of projects.

I would also like to thank the entire team of the North development department at EDF Renew- ables France for their welcome, their advice and the good times shared.

1 Abstract

The development of photovoltaic energy requires a lot of . To maximize the land use, agrivoltaic systems that combine an agricultural and an electrical production on the same land unit are developed. A demonstrator was built in Montpellier (France) with dierent experimental arrangements to study the impact of a xed and a dynamic solutions on the crops below the panels. The eect of shade on lettuces appears to be positive with a greater than 1. To extend the experiment to other crops, the crop species best adapted to the agrivoltaic system are identied. The shade tolerance and vulnerability to change are key parameters to select crops that will benet the most from the installation of PV panels. The SWOT analysis brings out that agrivoltaic systems can be a solution to maximize the land use and to adapt crops to climate change. The technical constraints imposed by the PV structure must be overcome to deploy this technology on a large scale. The greatest threat lies in the non-acceptability of the projects by and the chambers of agriculture. An agrivoltaic project was developed in the South of France as a rst testing area but was nally abandoned because of too important reciprocal constraints for the and the operator.

Utvecklingen av fotovoltaisk energi kräver mycket mark. För att maximera markanvänd- ningen utvecklas agrivoltaiska system som kombinerar en jordbruksproduktion och en elek- trisk produktion på samma markenhet. En demonstrant byggdes i Montpellier (Frankrike) med olika experimentella arrangemang för att studera eekterna av en fast och en dynamisk lösning på grödorna under panelerna. Eekten av skugga på sallader verkar vara positiv med en LER som är större än 1. För att utvidga experimentet till andra grödor identieras de grö- dor som bäst anpassas till det agrivoltaiska systemet. Skuggtoleransen och sårbarheten för klimatförändringar är viktiga parametrar för att välja grödor som kommer att dra mest nytta av installationen av PV-paneler. SWOT-analysen visar att agrivoltaiska system kan vara en lösning för att maximera markanvändningen och anpassa grödorna till klimatförändringar.

2 De tekniska begränsningarna som PV-strukturen sätter måste övervinnas för att kunna an- vända denna teknik i stor skala. Det största hotet ligger i att projekten inte godtas av jord- brukare och jordbrukskamrar. Ett agrivoltaiskt projekt utvecklades i södra Frankrike som ett första testområde men övergavs slutligen på grund av för viktiga ömsesidiga begränsningar för bonden och operatören.

3 Contents

1 Introduction 9

2 Innovative solution to combine agriculture and energy 10

3 Methodology 11

4 Results: Optimization of parameters 13 4.1 Design of the PV ...... 13 4.2 Crop management ...... 14 4.2.1 Key parameters for crop selection ...... 14 4.2.2 Study of some crops ...... 16

5 Results: Development of project 20 5.1 Background and funding of PV projects in France ...... 20 5.1.1 General context ...... 20 5.1.2 PV projects in agricultural zone ...... 21 5.1.3 Incentives for innovation ...... 22 5.2 The steps of development ...... 23 5.3 EDF agrivoltaic demonstrator ...... 25 5.4 Project in development at Sainte-Tulle ...... 26 5.4.1 Site identication ...... 27 5.4.2 Pre-feasibility study ...... 27 5.4.3 Promises of lease and conditions ...... 30 5.4.4 Obstacles ...... 31

6 Results: Analysis of the technology 32

7 Comparison with projects 35 7.1 Regulatory context in France ...... 35 7.2 The funding of wind projects in France ...... 37 7.3 Wind turbine and agriculture ...... 37

8 Discussion 38

9 Conclusion 38

4 List of Figures

1 Activities of EDF Renewables ...... 8 2 Soil occupation in 2018 in Metropolitan France (French Ministry of Agriculture Food and Forestry, 2018) ...... 9 3 Solar plant in Toul-Rosières (France). Source: EDF Renewables France ...... 10 4 Scheme of an agrivoltaic system ...... 11 5 Schema of ’Agri 1: the rst prototype of agrivoltaic system (Sun’R, 2017) . . 12 6 Schema of Sun’Agri 2. PV strings in blue are controlled by an algorithm whereas black ones are stationnary. Full sun areas are control areas (Valle et al., 2017) . . 12 7 Agrivoltaic farm schematic spaced to allow farming under the panels (Dinesh and Pearce, 2016) ...... 13 8 Scheme dierence between monofacial and bifacial modules...... 14 9 Surface and production for dierent vegetables in France. Surfaces are expressed in hectares and production in kilotons. (French Ministry of Agriculture Food and Forestry, 2018) ...... 17 10 Steps of the development of a photovoltaic project ...... 25 11 Photo of the EDF agrivoltaic demonstrator located in Ecuelles (France) . . . . . 26 12 Simplied scheme from the modeling of agrivoltaic system used by EDF (Edouard et al., 2019) ...... 26 13 Identication of the site for the agrivoltaic system in Sainte-Tulle. Source: Car- tographic data from Geoportail ...... 27 14 Daily sum of global per month in Saint-Tulle. Source: PV planner application, Solargis ...... 28 15 Environmental stakes of the project zone in Sainte-Tulle. The project zone is delineated in red...... 29 16 Electrical interconnection path between the project zone and the closest station. The project zone is delineated in red...... 29 17 Passage of a gas pipe (in yellow) in the South of the project zone...... 30

List of Tables

1 Results of lettuce (four dierent species) yield and solar irradiation in two con- gurations : half density (HD) and full density (FD), Montpellier xed agrivoltaic project (Marrou et al., 2013b) ...... 18 2 Results of lettuce yield (Kiribati species) and solar irradiation from the prototype Sun’agri 2 in three congurations : HD (half density), ST (solar tracking) and CT (controlled tracking) ...... 18

5 3 Average lifetime of for dierent species. (Regional direction of Food, Agriculture and Forestry in New-Aquitaine, 2019) ...... 18

6 List of acronyms

AV: Agrivoltaic agriPV: Installation that combine a PV production and an agricultural activity CAP: Common CDPENAF: Departmental directorate for the protection of natural, agri-cultural and forest areas COP: Cereal, oilseeds and protein crops CRE: the French Energy Regulatory Commission CT: Controlled tracking - Algorithms developed to track the path of the sun only from 11 am to 3 pm dB: decibel DDT: Territory Departmental Directorate EDF: of France EDF OA: Electricity of France Obligation to purchase FD: Full Density HD: Half Density ha: hectare, 1 ha = 10,000 m2 INRA: the National Institute for Agricultural Research W: , unit of Wp: Watt peak, unit of power of a photovoltaic cell under standard condition (irradiation of 1,000W/m2 and cell of 25°C) Wh: Watt-hour We: electrical watt, unit of power produced by a generator in normal condition (1 We ≈ 0.8 Wp for a ) LER: Land Equivalent Ratio PLU: Local Urbanism Plan PPA: Power Purchase Agreement PV: Photovoltaic R&D: Research and Devlopment ST: Solar tracking - Algorithm developed to track the path of the sun during all day STICS: multidisciplinary simulator for standard crops SWOT analysis: Strengths, Weaknesses, Opportunities ans Threats analysis ZPS: Special Protection Zone

7 Context of the master thesis

This master thesis is realized in the context of a six-month internship in the company EDF (Elec- tricity of France) Renewables France at the department in charge of the development of solar and onshore wind projects. EDF Renewables France is the subsidiary of EDF responsible for the development of projects (both wind and photovoltaic) in France. EDF Renew- ables (that includes EDF Renewables France and international) is one of the leading companies in the renewable energy sector. Its activity is distributed between wind energy (81% of the total activity and 10,309 MW installed), (17% of the total activity and 2,402 MWp) and innovative development such as storage.

Figure 1: Activities of EDF Renewables

EDF Renewables France is an integrated operator. Its areas of expertise include project devel- opment, construction of photovoltaic or wind , clean energy production, operation and maintenance of the farms and dismantling and recycling of installations. Project development includes all stages from the identication of the area of interest to the com- pletion of the building permit for solar projects or the environmental permit for wind power projects. In 2018, EDF announced a solar plan to build 30 GW of solar capacity between 2020 and 2035 in France. In comparison, currently, EDF exploits 920 MWp in 8 countries. Within the development department, I work on the regions Centre-Val de Loire and Bourgogne- Franche-Comté, located in the centre of France. My main mission focuses on the innovative agrivoltaic solutions. I am also in charge of a wind power project in the centre of France.

8 1 Introduction

The competition for land use between energy and food dates back to the 1970s. The rst oil shock encouraged countries to develop alternative energy sources to petroleum. launched The National Alcohol Program to promote bioethanol as a fuel. Ethanol was mainly produced from sugar . Growing sugar plants to produce bioethanol is more protable than growing sugar plant for food purpose. As a consequence, many farmers started to grow plants for fuel rather than food. It entailed a food crisis and the rise of food prices. There is not enough land to fulll the needs for food and energy when biomass is used as an energy source (Popp et al., 2014). The world demand of energy is rising mainly due to an increase of the world population, a more energy-intensive industrial sector and an increase in the average standard of living. At the same time, the threat of climate change is changing the energy strategy. A shift from fossil fuels towards renewable energies is unavoidable and necessary to curb the climate crisis. Solar energy has the potential to oset a signicant fraction of non-renewable electricity demands globally. It is currently the fastest growing power generating technology. However, ground-based solar PV panels will increase the pressure on agricultural land and compete with agriculture. In 2018, cultivated areas represented 35% of the metropolitan territory and 52% of this territory is dedicated to an agricultural use if grass surfaces are taken into account in France.

Figure 2: Soil occupation in 2018 in Metropolitan France (French Ministry of Agriculture Food and Forestry, 2018)

The installation of photovoltaic power plants on agricultural land is therefore an important op- portunity to increase the share of renewable energy in the French energy mix. However, this should not be done at the expense of agricultural production. That is why it is important to develop synergies between food and energy as we need both of them.

9 2 Innovative solution to combine agriculture and energy

The current dominant scheme of production is to separate the land area and to devote one part to food production and the other to fuel production (crops for biodiesel or land for solar plant). Ground-based solar farms raise the question of land management. Currently, 1 hectare of land allows the implantation of a solar plant of 1 MW in the center of France. The power per hectare is higher in the South and lower in the North due to the dierence of solar resource. To have a protable project, the minimum surface needed is 10 hectares (1 ha = 10,000 m2). Thus, the development of solar farm triggers a new competition for land : food vs energy. To reach its target of 30 GW in 2035, EDF needs to install PV farms over a surface of 30,000 ha in France. Therefore, solar plants using ground-based PV panels will compete with agriculture for land. Solar panels and crops will compete for solar radiation. This master thesis focuses on the possible synergies between agriculture and solar energy and more precisely to nd solutions to combine fuel and food production on the same land unit. One synergy already developed in France is the combination of pastoralism and photovoltaic production. Solar panels are elevated at 1 meter above the ground to let the herd walk under the panel. The sheep herd ensures the maintenance of the grass. The rst solar plant was inaugurated in 2012 in Toul-Rosières (France) and it is the rst project of its kind. Feedbacks are very positive and the cohabitation works. The sheep herd got accustomed to the panels and the grass production under panels is suitable for the pastoralism activity. The main drawback is the diculty for the farmer to notice sick animals.

Figure 3: Solar plant in Toul-Rosières (France). Source: EDF Renewables France

The combination of pastoralism and photovoltaic production is an example of synergy between an agricultural activity and electricity production. However, it can not be implemented on every type of agricultural land. used to grow crops are not going to be converted into grass production just in order to develop a photovoltaic production on the land. Innovative solutions need to be found to combine crop production and electricity production.

10 Goetzberger and Zastrow are the rst to explore the idea of mixing solar panels and food crops. Their idea is to elevate by about 2 meters above the ground the panels and to increase the distance between collectors to achieve a nearly uniform radiation (Goetzberger and Zastrow, 1982). Mixed systems that associate, on the same land and at the same period, food crops and photovoltaic panels are called agrivoltaic systems or agri-PV. Two kinds of agrivoltaic systems are developed: xed panels elevated above crops or a dynamic system with panels coupled with trackers.

Figure 4: Scheme of an agrivoltaic system

The agrivoltaic systems developed by EDF Renewables France is a dynamic agrivoltaic system. Solar panels are put on elevated structures. The elevation will depend on the plants below and will ensure the structure to be suitable with the exploitation of the land under the panels. Panels have a rotating and a tracking system ruled by an algorithm. They let the sun rays reach the crop while it needs it by adopting a certain position. Pv panels only capture the solar energy in excess.

3 Methodology

The rst aim of this master thesis is to study the optimization of all the parameters for the agrivoltaic system. The optimal parameters to design both the PV plant and the agricultural production are dened thanks to literature. In 2009, a partnership was signed between Sun’R, a private photovoltaic operator and INRA (the National Institute for Agricultural Research) to develop a research and development program on the concept of agrivoltaic system. A rst prototype of agrivoltaic system was built in Montpellier, France in 2009. It is the practical support for the large majority of papers dealing with agrivoltaic system. This prototype was set up to validate agrivoltaic models and to study the adaptation of crops to shade. It was built on a surface of 820 m2. Panels are monocrystalline modules elevated at 4 above ground. The panels are xed with a tilt of 25°. The tilt angle is not theoretical optimal tilt angle which equals the . It may be the results of an optimization between reducing the shade to increase the number of rows of panels and increasing the electrical production. It is oriented towards East with a 14° angle orientation. The prototype was divided in two dierent subsystems diering in the density of solar panels: a full density (FD) part which

11 optimizes the electrical production and a half density (HD) part which allows more radiation to reach the crops. The space between two dierent rows was 1.6m in FD and 3.2m in HD. A 200 m2 control zone was also set next to the prototype to be on a similar soil but far enough to not be shaded.

Figure 5: Schema of Sun’Agri 1: the rst prototype of agrivoltaic system (Sun’R, 2017)

Studies demonstrated the necessity to install movable panels to have a real benet on the agricul- tural production (Valle et al., 2017). As a consequence, in 2014, Sun’R built a dynamic agrivoltaic system next to the xed one. Panels have trackers to follow the sun path in order to maximize the electricity production and to create the best conditions for crops. Two algorithms were tested: solar tracking (ST) that follows the path of the sun during all the day and controlled tracking (CT) that follows the path of the sun only from 11 am to 3 pm. This new prototype led to new experiments on vegetables and vine trees mainly. Researches in progress may dene the optimal steering of the panels and the irrigation in order to maximize the yield and the quality of crops.

Figure 6: Schema of Sun’Agri 2. PV strings in blue are controlled by an algorithm whereas black ones are stationnary. Full sun areas are control areas (Valle et al., 2017)

12 The last prototype developed by Sun’R, called Sun’Agri 3, is also a dynamic agrivoltaic system with trackers. Three types of crops are targeted: viticulture, arboriculture and market gardening. This master thesis includes also a part of development of project. Once all the parameters of the agrivoltaic systems are dened, a real and large scale project needs to be developed and built. The idea there is to highlight all the obstacles that are mainly humans. Last part of this report is the analysis of the technology thanks to a SWOT analysis.

4 Results: Optimization of parameters

4.1 Design of the PV plant

In order to combine the agricultural and the electricity production, the design of the PV plant needs to be adapted. and crops compete for solar radiation. Firstly, the panels need to be elevated. The elevation depends on the height of the crops and also on the height of the agricultural machine used to harvest. The higher the panels are, the more robust they need to be. Indeed, the structure has to resist the wind. As a consequence, the mounting system is more expensive for agrivoltaic systems compared to common ground-based PV plants. Then, the panels need to be spaced. The spacing between the PV modules has to be large enough to allow standard sized farming equipments to go through the rows of panels. Besides, the space between PV modules allows the to reach the crop. A reduced density of panels may be protable for the crops. It is important to notice that the height of the PV panels does not have any eect on the total quantity available at the soil level but it does aect the heterogeneity of the light. The closer the panels are to the ground, the more heterogeneous the radiation is.

Figure 7: Agrivoltaic farm schematic spaced to allow farming under the panels (Dinesh and Pearce, 2016)

To increase the radiation available for crops, transparent or semi transparent modules can be used. One optimal solution could be the installation of bifacial solar modules. They are semi- transparent cells which can capture the radiation on their two faces. The back of the panels is

13 also a silicium layer and is not an opaque black sheet as traditionnal panels. As a consequence, a part of the radiation can go through the modules. They capture both the direct and the diuse solar radiation. That increases the overall eciency.

Figure 8: Scheme dierence between monofacial and bifacial modules.

The consequence of agrivoltaic systems installation is quite clear on the solar production. Indeed, compared to ground-based solar farm, the light sharing triggers a reduction of the electricity production. The cost of the installation is higher. The maintenance of the panel will also be more dicult. However, the implementation of this technology will increase the available surface for solar projects. For ground-based solar farms, 1 hectare of land allows to build a solar plant of 1 MW. With an agrivoltaic system, 1 hectare of land allows to implement a solar plant of 0.5 MW.

4.2 Crop management

The selection of crops suitable with the installation of photovoltaic panels above is a key aspect for the success of the project. Indeed, it will modify its sun exposure, the shade, the availability etc. A study based on literature review was performed to highlight the parameters of the crop aected by the photovoltaic plant and to determine which crops are the best suitable for agrivoltaic system.

4.2.1 Key parameters for crop selection

• Shade Tolerance

The main consequence of the installation of a PV plant above crops is the creation of shade. It is important to know precisely the shade tolerance of crops under the panels that is to say their ability to tolerate low light levels. For some species, it seems that the growth rate does not decrease below the PV panels except during the juvenile phase (Marrou et al., 2013a). The implementation of agrivoltaic systems involve changes in cropping practices. Plants able to maximize their radiation use eciency should be prioritized. Light reduction has not necessarily a harmful eect on crops that can adapt and improve radiation interception eciency (Marrou et al., 2013b). The lack of studies on the large majority of plant precludes any conclusion on the

14 impact of shade on plant growth. However, it is quite admitted that for the majority of plant, it will trigger a reduction of plant characteristics. The optimum shade level for photosynthetic photon ux density is high enough to saturate car- bon dioxide assimilation but low enough to induce shade acclimation and reduce photoinhibition (Dupraz et al., 2011).

• Water stress and irrigation

Shade provided by PV panels could prevent the damaging eect of excessive light and it could limit evapotranspiration during peaks of evaporable demand. The plants that will benet most from the system will be plants with high water requirements and plants that are not resistant to water stress.

• Height

Crops under the panel should not exceed a certain height during their lifetime. Panels are ele- vated at 4 or 5 metres.

It refers to recurrent succession of crops on the same piece of land either in a year or over a longer period of time. The objective is to get maximum prot and ensure the preservation of the fertility of the soil and to keep a uniform distribution of soil nutrients. Crops are divided into exhaustive crops and less exhaustive crops. The crops which uptake higher amount of nutriments from the soil are called exhaustive crops. It is important to take into consideration crop rotation before the installation of the agrivoltaic system to ensure the sustainability of the agriculture under the panels. Every crop decided before the construction of the PV plant should respect criteria mentioned here. They also should be modeled by the STICS model. The STICS model is a generic model for the simulation of crops and their water and nitrogen balances developed by the French institute INRA.

• Lifetime

The exploitation of the PV plant lasts 30 years. The installation of the PV panels will not move during 30 years. As a consequence, it is not possible to grow crops which need huge soil labour during these 30 years. For example, it is not practicable to uproot a tree while the PV installation is there.

• Climate change resilience

Climate change causes higher temperature, higher risks of drought and more radiation stress for crops. The agrivoltaic system increases the shade for crops and it is a protection against climate change consequences. It is interesting to target crops which are badly aected by climate change and for which agrivoltaic systems will contribute to improve their yield.

15 4.2.2 Study of some crops

A rst qualitative study on dierent open-eld farming was conducted in order to identify species that are the most suitable with the criteria of adaptation for agrivoltaic installation.

• Cereal, oilseeds and protein crops (COP)

The main interest of these crops relies on the huge available surface they represent. Indeed, 45% of the total agricultural surface in France is used to grow cereals, oilseeds and protein crops (Agreste, 2018). The main drawbacks linked to the installation of agrivoltaic infrastructure are the loss of harvest at the bottom of the mounting system and the loss of time due to the ma- noeuvre needed to avoid the mounting system. The photovoltaic installation will also have to deal with the height of the agricultural machines and the system of irrigation. The partnership between INRA (French National Institute for Agricultural Research) and EDF Renewables France helps to study the adaptation of species to agrivoltaic system. The main benet is the protection for plants of water stress. Indeed, panels trigger shade protection and shade reduce transpiration needs. This benet will be important for species harvested at the end of the spring or during the autumn such as corn, sunower or . In addition to that, the agrivoltaic system could protect the crops against hail, frost, erosion or heavy rain. An experiment to test the shade tolerance of some species was performed (Fu et al., 2009). It was conducted under 50% shading. The plant height, the stem diameter, the leaf net photo- synthetic rate, the specic leaf weight and the dry matter accumulation were compared. On the 24 maize species tested, 14 were shade-tolerant and 10 were shade-sensitive. These results are encouraging concerning the compatibility of maize with the agrivoltaic system. Shade also has eect on sunower. Experiments show that a reduction of incident radiation be- tween oral initiation and 20 days after the rst anthesis reduces the grain number in sunowers (Cantagallo et al., 2004).

• Industrial cultures

Industrial cultures include industrial beets, bre plants such as line or hemp, aromatic plants, medicinal plants and other industrial cultures such as tobacco, hop or chicory. The large majority of industrial cultures grows in the North of France where sun resources are quite limited. At rst sight it is not interesting to develop agrivoltaic system above industrial cultures. There are some exceptions with aromatic plants such as lavanda which grow exclusively in the South of France.

• Vegetables and potatoes

Cultivated species are varied in France. Figure 8 shows there is no obvious link between culti- vated surface and production. Peas and lentils use large surfaces for a low volume of production. Agrivoltaic systems need large surfaces. However it is also important to take into account the principle of crop rotation for vegetables.

16 Figure 9: Surface and production for dierent vegetables in France. Surfaces are expressed in hectares and production in kilotons. (French Ministry of Agriculture Food and Forestry, 2018)

Exhaustive crops which seem interesting according to Figure 9 are tomato, cabbage and potato. Less exhaustive crops that can be chosen to study their potential for synergies with PV produc- tion are pea, bean, onion, lettuce and carrot. All these crops are well distributed on the territory and especially in the South of France. There is still a need to study the irrigation of these crops and to perform agronomic simulation to highlight the best combination of vegetables suitable with a photovoltaic production. Some synergies between the agrivoltaic system and anti-insect net used for some crops such as lettuce or cabbage are practicable. The agrivoltaic installation could also protect the crops from climatic variations (hail, frost, heavy rain). It could regulate the water intake to control the quality of vegetables.

• Lettuces

Lettuces were grown under the prototype of agrivoltaic system of Sun’R in Montpellier. As a consequence, some results concerning their adaptation to the agrivoltaic systems are available (Marrou et al., 2013b). Four varieties of lettuces were studied under two shade levels : 50% (HD) and 70% (FD) of the incoming radiation during Sun’agri1. The eect on crop yield and the morphological and physiological response of the plant were analysed. Figure 1 shows that every ratio is superior to one. The ratio is dened as the ratio of crop yield on solar irradiation. Biomass reduction is less than the available light reduction. The lettuce has the capacity to produce biomass more eciently when the light resource is reduced. Under half density panel, lettuces maintain relatively high yields under PV. Lettuces improve their ability to

17 Table 1: Results of lettuce (four dierent species) yield and solar irradiation in two congurations : half density (HD) and full density (FD), Montpellier xed agrivoltaic project (Marrou et al., 2013b) intercept light thanks to morphological changes. Experiments show lettuces increase the total plant leaf area and optimize leaf area arrangement to harvest light more eciently. Lettuces grow at the same rate during the period of maximal vegetative growth but the growth rate is reduced at the beginning of the plant life cycle (Marrou et al., 2013b). The dynamic prototype developed by Sun’R, called Sun’agri 2, also tested the impact of the PV panels on lettuces. High productivity per land area unit was reached when trackers are implemented compared to stationary PV panels tested in Sun’Agri 1. It justies the interest to develop algorithms that take into consideration the plant needs and to install trackers (Valle et al., 2017).

Spring 2015 2015 Crop yield Ratio Solar irradiance Crop yield Ratio HD 59% 71% 1.21 56% 68% 1.21 ST 63% 74% 1.18 62% 76% 1.23 CT 82% 83% 1.01 83% 76% 0.92

Table 2: Results of lettuce yield (Kiribati species) and solar irradiation from the prototype Sun’agri 2 in three congurations : HD (half density), ST (solar tracking) and CT (controlled tracking)

• Fruit farming

Fruit farming gather arboriculture (stone fruit and nuts) and bays (blackcurrant, blueberry, rasp- berry etc.). The large majority of the fruit culture is in the South of France.

Apple Pear Peach Plum Apricot Cherry Nut Kiwi Grape 15 29 10 21 12 18 28 18 23

Table 3: Average lifetime of orchards for dierent species. (Regional direction of Food, Agricul- ture and Forestry in New-Aquitaine, 2019)

The lifetime of fruit trees is a limitation for the development of agrivoltaic system above them. Indeed, photovoltaic plants are exploited during 25/35 years. Only a few of species have a lifetime longer and it would be dicult to clear and replant trees while the PV structure is in place. One

18 other obstacle of the combination of fruit farming with PV plant is the height of trees. The maximum height for agrivoltaic systems can not exceed 5 m. For example, nut trees reach a too high height. The only fruit tree compatible with the agrivoltaic infrastructure based on these two criteria (lifetime and height) is the pear tree. INRA studies show a reduction of the number of pear trees in France and the low replacement of pear trees (due to their high lifetimes) will reduce the opportunity of implementation of agrivoltaic systems. In the case of a possible combination between fruit trees and agrivoltaic infrastructure, trees could benet from a protection from climatic events (hail, heavy rain, frost) and could help control the need of cold for stone fruit. Bays are free from all constraints studied above: their lifetime is long and the height of the trees is quite low. As a consequence, it is a really interesting plant and studies should deepen their potential.

• Viticulture

Constraints linked to arboriculture are not applicable to vine trees. Their lifetime is around 30 years and there are often cut and they do not exceed 1.5 m height. As in the case of fruit farming or vegetables, agrivoltaic system could be a solution to protect the vine from hail, frost and heavy rain. It will also provide shade and limit the drought. Heatwaves have terrible consequences on vine. Indeed, it slows the grapes maturation, can burn the grapes and entails production loss. It would also help ghting against the spring frost to which the vine is particularly sensitive.

Thus, the comparison of dierent crops shows that some crops are more suitable for the installa- tion of a photovoltaic production. This study helps to focus on the species with the largest chance to survive and develop under PV panels. The interesting species for now are vine trees, pear trees, lavanda trees, COP and combination of exhausting plants (tomato, cabbage and potato) and less exhaustive plants (pea, bean, onion, lettuce and carrot). It shows that some plants like lettuce have the ability to adapt to these conditions and compensate partially or totally the reduction of light availability by a higher light harvesting capability. Our results suggest that these agrivoltaic systems can be optimized both by plant breeding and by specic arrangements of PV panels in order to nd the best compromise between food production and electricity production on the same piece of land. The impact of the agrivoltaic system on the agricultural yield is not obvious. Plants would have a reduced access to light which can limit their growth. However, it could improve the protection against climatic variations such as frosts, droughts, heavy rains or hails. It could provide shade to plants and it could reduce water stress by reducing the plant evapotranspiration. Climate change is a real threat for the agricultural sector and agrivoltaic system could be a solution to reduce the drastic impact of climate change on crops.

19 5 Results: Development of project

5.1 Background and funding of PV projects in France

5.1.1 General context

France is willing to harness its solar potential. Indeed, France set the target of 32% of renewable electricity in the energy mix by 2030 compared to the 22% achieved in 2018 (French Ministry of Ecological and Inclusive Transition, 2019). To reach this target, the French government focuses especially on the development of solar energy. They plan to increase the total solar capacity in France from 8,300 MW to 18,200-20,200 MW in 2023. Currently, two dierent kinds of solar plants are widespread in France. The rst one is ground- based solar farms which maximize the solar energy production because the orientation, the tilt angle and the localisation can be chosen precisely. The second option is solar plants installed on the roofs of industrial, commercial and municipal buildings and connected to the electricity grid. Other technologies such as oating PV are emerging in France too. This paper focuses only on the rst case, ground-based solar farm. To promote the development of solar projects in France, the CRE (the French Energy Regulatory Commission) launched call for tender for ground-based solar plants. Every 6 months, a new call for tender with a certain volume of projects is published by the CRE. This tender is divided into three families:

• Family 1: ground-based photovoltaic installation with a power superior to 5 MWp • Family 2: ground-based photovoltaic installation with a power between 500 kWp and 5 MWp • Family 3: photovoltaic installation on parking shelters with a power between 500 kWp and 10 MWp

For example, the last tender ended in June 2019 and represented a cumulative power of 550 MWp for installations of family 1. That is to say the sum of the power of all the winning projects can not exceed 550 MWp in that case. Each application form has to detail the oer and has to include the localisation and the nature of the site chosen for the project, the expected feed-in tari, the environmental impact of the project, the business plan and the technology used. In order to preserve woody and agricultural areas and to minimize the environmental impact of projects, implementation sites selected for solar projects have to belong to one of these three categories:

• Case 1: The site location is an urbanised area or a zone to be urbanised according to the Local Urbanism Plan (PLU). • Case 2: The site location is a natural zone with a special mention “Renewable energy” according to the urban planning document in eect. The site has to be not situated on a and the project is not subjected to land clearing authorisation.

20 • Case 3: The site is a degraded site such as an aireld, an old mine, an old quarry etc.

For cases 1 and 2, the power of solar project is limited to 30 MWp. It is important to notice that no project can be developed on agricultural lands. It is important to understand the status of the PLU. It is the leading document in town planning. It is a map of the city divided into dierent zones aected by dierent urbanization rules. It indicates for each zone the nature of the area, the kind of project authorized on the zone, the obligations to respect. It is the blueprint for the orientation and evolution of the city. The main zones are: A (agricultural area), N (natural area), U (urbanised area) and AU (to be urbanized). Then, each oer is assessed according to 3 criteria: price, carbon impact and environmental relevance. The rating scale is allocated as follow: the price represents 70 % of the total rate, the carbon impact 21% and the environmental relevance 9%. The carbon impact criterion mainly focuses on the carbon impact of the solar panel and the point for environmental relevance is attributed if the project belongs to case 3 (it is located on a degraded site). Once every oer is rated, the CRE ranks them and selects the top projects while their cumulative power is inferior to the total power proposed in the tender. Every winner of the tender benets from a feed-in tari guaranteed for 20 years. Feed-in taris are huge incentives for renewables because investors receive a guaranteed price for renewable power generation (per kWh) for a specic time period. The average feed-in tari for the last tender was 67.2€/MWh. In comparison the xed price of nuclear electricity in France is 42€/MWh. Every solar project will sell its electricity to the spot market. When the tari on the market spot is inferior to the feed-in tari retained by the CRE, the CRE fund the dierence. On the contrary, if the tari on the market spot is superior to the feed-in tari retained by the CRE, the solar energy producer gives the surplus to the CRE.

5.1.2 PV projects in agricultural zone

The development of PV projects is really framed by the rules of the CRE. Photovoltaic projects implemented in agricultural parcels also have to respect the rules of urban planning of the city (as for every project) to obtain the building permit. In August 2016, a legislative decree set new modalities of application for agricultural compen- sation. Every operator needs to study the potential impact of the project on the agricultural activity. This decree applies to every parcel in zones A or N with an agricultural activity during the last ve years or parcel in zone AU with an agricultural activity since three years (CDPENAF, 2017). Once the impacts are identied, operators have to propose measures to avoid, reduce and compensate their impact to the Departmental directorate for the protection of natural, agricul- tural and forest areas (CDPENAF). Allowances can be individual in order to compensate the loss of income (decrease of CAP aid from Europe, crop destruction etc.) or collective (funding of collective projects, participation in a collective compensation fund etc.). As a consequence, regulations imposed by the CRE, expansive agricultural compensation and town planning laws curb the development of PV plants on agricultural land. However, solar plants can be funded outside the call for tenders process. The electricity can be sold directly on the spot market or a corporate PPA (Power Purchase Agreement) can be concluded with a private entity that buys all the electricity from the solar plant.

21 EDF Renewables France only focuses on projects eligible for CRE’s call for tender. Projects funded outside the call for tender process are considered too risky. Indeed, the price of elec- tricity on the spot market is very uctuating and can not ensure the protability of the project. Moreover, PV panels produce electricity mainly at midday when the electricity is the cheap- est. EDF Renewables France calculated that for a project not funded by the CRE, the minimum surface needed to be protable is around 30-50 ha in the South of France whereas the average protable solar project in France is 10 ha when it is funded by the CRE. Only projects with a very close electrical connection to the grid are competitive because surcharges of connection are very expansive. But, agricultural lands are often far away from electrical stations and quite isolated. However, the politic and regulatory context is changing in France. The government tries to simplify the development of renewable energy project. In 2017, the rst innovative CRE’s call for tender was published and it granted 15 MWp for agrivoltaic systems.

5.1.3 Incentives for innovation

To support innovation in the photovoltaic sector, the CRE launched innovative calls for tender. The procedure is comparable to the call for tender for ground-based solar farms described above. This call for tender is divided into two families:

• Family 1: Innovative photovoltaic ground-based solar installation with a power between 500 kWp and 5 MWp.

• Family 2: Innovative photovoltaic installation on buildings, agricultural hangar and park- ing shelters or agrivoltaic innovation with a power between 100 kWp and 3 MWp.

Agrivoltaic installations are dened in this call for tender as installations which couple a sec- ondary photovoltaic production with an agricultural production and which allow a demonstrable functioning synergy. To be selected, the implementation site has to belong to the three cases described above and a fourth case is possible in this call for tender:

• Case 4: For agricultural hangars and agrivoltaic installations of family 2 only, the site can be located on an agricultural land.

The rating scale is quite dierent. The price represents 55% of the total rate and the innovation 45%. Each oer needs to detail the innovation as precisely as possible. Thus, in France, there are nancial incentives through feed-in taris to develop agrivoltaic in- stallations in order to combine photovoltaic and agricultural production.

22 5.2 The steps of development

To develop a project and to prepare an application for a call for tender CRE, many missions need to be fullled. The rst part is to identify the project. The site location, the owner and the farmer of the land and the availability of the site need to be dened. Then, a study of pre-feasibility is performed. The aim is to dene all the constraints and chal- lenges of the site. Based on online inventories, environmental and patrimonial stakes are ana- lyzed. The urban compliance is checked to conrm the possibility to build a photovoltaic plant in this area. The solar resource is estimated thanks to an online application called PV planner from Solargis. A study on the electrical connection to the grid is led to dene where it is possible to connect, if there is enough capacity and what is the distance between the site and the station. The electricity network operator is consulted to estimate the price of the electrical connection. Finally, administrations are also consulted to know if there are servitudes to take into consid- eration. The administrations contacted are the Army, the Regional Health Agency, Territory Departmental Directorate, Departement of Security of Civil Aviation and the Regional Direc- torate for Environment, Development and Housing. They make recommendations that must be taken into account for the design of the PV plant. Once all the constraints are addressed, the site is considered as "qualied". Promise of emphy- teutic lease are ratied between the owner of the land, the farmer and EDF Renewables France. This document claries all the commitments taken once the promise of lease is signed. It is valid for a period of seven years. During this period, the owner and the farmer allow EDF Renew- ables France to perform studies on their lands and they can not implement activities that can jeopardize the project. In parallel of the signature of the promise of lease, the elected representatives of the city are consulted. The project is presented to the mayor and his municipal council. Their agreement is essential for the success of the project. The opinion of the mayor will be asked during the instruction of the project. When the promise lease is contracted, studies can begin. Independent experts are consulted to lead dierent studies.

– An ecological study is launched to inventory animals and plants living on or next to the site. It highlights the ecological and functional stakes of the area. Heritage and endangered species are listed. Then, all the impacts and measures to implement in order to avoid, reduce and compensate the impact of the project are dened. – An environmental impact study is performed and is dened precisely by the Environment Code (Article R. 122-5). It must include a non-technical summary, a description of the project (its characteristics and its environment), factors possibly aected by the project (population, human health, biodiversity, soil, water, air, landscape etc.), signicant impacts, risks of accidents and disasters and the measures taken by the operator to avoid, reduce and compensate all the negative impacts of the project.

23 – A surveyor is commissioned to provide a topographical study. It identies lines of commu- nication, water point, diverse networks and also the height of vegetation and the typology of the soil. – An architect is mandated to draw up the le for the building permit. He creates the ground plane, the situation plane and he realises the photo-montages. – An intern study is led to choose the nal design that takes into account all the conclusions of studies.

All these studies are compiled and some administrative documents are added to complete the building permit which is, then, registered. Public authorities analyze the permit and they can ask for some complementary pieces to complete the permit. Then, the Territory Departmental Directorate (DDT) requests the opinion of the Regional Environmental Authority and the simple notication of some administrations. The Regional Environmental Authority has two months to give its favourable or unfavourable decision. Once its decision is taken, the public inquiry of one month begins and is ruled by an investigating commissioner. During the public inquiry, questions from the population are asked to the operator who needs to answer precisely. One month after the closure of the public inquiry, the investigating commissioner publishes his report and gives an opinion, positive or negative, about the project. After the reception of the report of the public inquiry, public authorities have two months to investigate the case and to decide whether or not to authorize the construction of the photovoltaic plant. They do not have to follow the decision of the Regional Environmental Authority or the investigating commissioner. To build the photovoltaic plant, the project also has to obtain a feed-in tari by applying to the call for tender of the CRE. A business plan is edited and denes the expected feed-in tari calculated to maximize the protability of the project while guaranteeing a feed-in tari at the call for tender. For common calls for tender for ground-based PV plant (paragraph 2.1), the building permit is necessary to apply contrary to innovative calls for tender (paragraph 2.2). To apply to the innovative call for tender, some pieces are requested:

– The completed application form – A certicate of eligibility for the site location of the project. The project has to be imple- mented on one of the four possible cases described by the call for tender (cf. paragraph 2.2) – A report dealing with the contribution to innovation. It has to detail the proposed innova- tion, the installation considered, the regulatory context of the innovation, the positioning on the market, the technical relevance etc. – A technical report about the synergies with the agricultural use. This report highlights the synergies developed between the PV plant and agricultural production: which crops are selected, what are the motivations, what is the light sharing adopted, the nal design of the agrivoltaic system etc.

After obtaining a feed-in tari, the operator has two years to build the photovoltaic plant. The dierent steps of the development of a photovoltaic project is summed up in Figure 10.

24 Figure 10: Steps of the development of a photovoltaic project

5.3 EDF agrivoltaic demonstrator

An agrivoltaic system was built in 2019 in the EDF Reasearch & Development lab located two hours away from Paris. It is a dynamic system with a power of 155 kWp. The total surface of the demonstrator is 1,900 m2. Alfalfa was planted under the panels in order to test the adaptation of Alfalfa to shade and to test the development of algorithm. The functioning of the demonstrator is detailed by Figure 11. A ray-tracing 3D tool was elaborated by EDF R&D in order to provide accurate predictions of PV plants yield. The radiation model is used to calculate the electrical production and to estimate the incident radiation (by ray tracing) to the crop. It is coupled to a crop model to simulate the growth of the plant. L-egume simulates the growth at the individual scale and allows to ana- lyze the interaction between plants. STICS is a crop model, developed by INRA, that simulates plant growth at the eld scale. It calculates both agricultural variables (yield, input consump- tion) and environmental variables (water and nitrogen losses). The input data of algorithms are instantaneous climate data (wind, solar radiation, temperature and hygrometry).

25 Figure 11: Photo of the EDF agrivoltaic demonstrator located in Ecuelles (France)

Figure 12: Simplied scheme from the modeling of agrivoltaic system used by EDF (Edouard et al., 2019)

5.4 Project in development at Sainte-Tulle

This master thesis includes a part of development of project. Once all the parameters of the agrivoltaic system are dened, a real and large-scale project needs to be developed and built. The target of this project is to be candidate for the call for tender "CRE innovation" which closes on the 3rd of April 2020.

26 5.4.1 Site identication

This project is a rst test for EDF Renewables and its economical viability is not ensured. The site chosen for the project is located in the South of France where the solar irradiation is the highest and solar projects the most protable. It is located in the city of Sainte-Tulle in the Region Provence-Alpes-Côte d’Azur. The owner of the land is EDF, the parent company of EDF Renewables. The farmer grows in this land since 2010. It is mainly cereals (soya, corn, ) but he practices crop rotation so it changes over the years. His total farm represents 110 ha and the surface targeted for the project is approximately 10 ha.

Figure 13: Identication of the site for the agrivoltaic system in Sainte-Tulle. Source: Carto- graphic data from Geoportail

5.4.2 Pre-feasibility study

The application PVPlanner from Solargis allows to estimate the PV output for one year. It is based on meteorological data of previous years to estimate the average . The PV output is then used in the business plan to determine the protability of the project. The PV output for a two-axis tracking PV module is 2060 kWh/kWp. The implementation of an agrivoltaic system

27 will deteriorate the PV production. The use of models will calculate the energy losses due to the lighting share with the agricultural production.

Figure 14: Daily sum of global irradiance per month in Saint-Tulle. Source: PV planner applica- tion, Solargis

The local urban plan is being reviewed by the elected representatives. To be eligible for the innovative call for tender, the land needs to be qualied as an agricultural land. Discussions are initiated and, a priori, there is no opposition to qualify this land as an agricultural land compatible with the installation of a photovoltaic plant. Their nal decision has to be taken before the end of February. This project is applying for family 2 "Innovative photovoltaic installation on buildings, agricultural hangar and parking shelters or innovative agrivoltaic innovation with a power between 100 kWp and 3 MWp" and the implementation site belongs to case 4 "For agricultural hangars and agrivoltaic installation of family 2 only, the site location can be situated on an agricultural land" for the innovative call for tender (cf. paragraph 2.2). Online inventories show there is no patrimonial stake. The map below summarizes all the en- vironmental issues. The site belongs to a regional natural park. It is a biosphere reserve. The south of the area is classied as an important area for Bird conservation. The site is closed to a Natura 2000-ZPS zone. Natura 2000-ZPS (Special Protection Zone for wild birds) was created in order to conserve the biodiversity in the European Union. The installations in these zones are regulated. All these environmental constraints are not prohibitive for the construction of a photovoltaic plant but the ecological and the environmental impact studies have to take them into consideration. It will probably imply some extra costs to avoid, reduce and compensate the impact on the environment. The closest station for electrical interconnection is 2.5 km away from the project zone. The total power of the project is 3 MWp or 2.4 MWe. There is no more capacity for renewables available

28 Figure 15: Environmental stakes of the project zone in Sainte-Tulle. The project zone is delin- eated in red. in this station but there is a total free capacity of 24.2 MWe. As a conclusion, it is possible to connect to the network via this station but the project will not benet from a preferential access as the capacity for renewable energy is full.

Figure 16: Electrical interconnection path between the project zone and the closest station. The project zone is delineated in red.

29 The project is close to the highway and it has to respect the Barnier law. This law forbids any construction in a 100 wide strip. A derogation must be granted based on the justication that the project does not induce supplementary impact on the highway and inversely. The consultation of administration revealed some existing servitudes. The site is situated less than 3 km from an airport. As a consequence, it is submitted to a reverberation study. It is compulsory to ensure there is not any risk of glare for pilots. There is a gas pipe in the South of the project zone which will impact the design of the PV plant. Indeed, any construction is allowed in a three metre wide strip on the left and seven metre wide strip on the right centering on the pipe.

Figure 17: Passage of a gas pipe (in yellow) in the South of the project zone.

5.4.3 Promises of lease and conditions

The pre-feasibility study shows some constraints but they are not prohibitive for the develop- ment of a photovoltaic plant. On the 27th of November, a meeting was organised between the farmer, the owner and EDF Renewables France. The aim was to discuss the conditions of the promise of lease. The owner (EDF) rents the land to EDF Renewables France and the farmer cultivates under the panel. Usually for ground-based PV plants, the operator, EDF Renewables France in this case, pays a rent to the owner and the farmer in order to exploit the land instead. It is around 3,000€/ha. The emphyteusis triggers the break of the rural lease between the farmer and the owner. Indeed, it is not possible to have two leases on the same land. The farmer can not continue to cultivate because of the panels and has to nd another land to pursue its activity. In the case of agrivoltaic systems, the farmer continues to exploit the land under the panel. EDF Renewables France will pay the owner, EDF, a rent but EDF Renewables France will not pay the farmer. This decision

30 relies on the fact that the farmer should benet from the agrivoltaic system. Indeed, it is sup- posed to protect the crop from climate change, natural disaster and reduce the need of irrigation. The diculty was to nd a farmer who agrees to cultivate under the panel for free despite the constraints of the PV installation. The farmer does not pay a rent to the owner to cultivate the land in this case. This meeting aims to learn about the cultivation practices of the farmer and how to adapt them in order to make them compatible with the PV plant. The farmer practices the ploughing. To plough and to sow, his agricultural machines are three metres large maximum. For the harvest, the harvester is nine metres large. For the spreading and pulverization of treatments, the machine is 15 metres large. Each machine is a huge investment for the farmer and the agrivoltaic system needs to be compatible with the use of them. To irrigate, he pumps the water from the canal nearby. He uses a diesel pump which consumes and pollutes a lot. The pressure of the water in the spray is six bar and it can reach 10 meters high. As a consequence, its irrigation system is not compatible with the PV plant and a new irrigation system needs to be studied. He grows only organic crops and he can only use copper or sulphur treatments. To limit the spread of fungal diseases, he has to implement crop rotation. To ensure the success of the project, EDF Renewables submits some conditions to the farmer. First of all, he has to use only agricultural practices that can not jeopardize the project. A new irrigation process has to be decided. Then, the farmer must make a commitment to follow a certain crop rotation dened jointly with EDF Renewables France. Every crop should be modeled by the STICS model in order to have an algorithm for the panel control which respects the growth model of the plant. The possible crops mentioned are chickpea, corn, wheat, soya, bean, dry bean and barley. The farmer must commit himself to harvest under the panels in the best conditions and during all the period of the exploitation of the PV plant. A control zone needs to be created and cultivated in the same conditions as the crop under the panels. It will allow to have feedback on the impact of the agrivoltaic system on the agriculture.

5.4.4 Obstacles

The project was abandoned in January. Several problems arose during the development of the project. First of all, the crops desired by the farmer were not adapted to the agriPV (cereals, lentils, peas). Indeed, they cannot be modelled by the STICS model. There is no guarantee that the agrivoltaic system creates favourable conditions for growing these crops. Moreover, the risk of fungal diseases on these shaded crops is high, especially in organic agriculture. The farmer does not wish to adapt his farm to the agrivoltaic system. It is therefore dicult to envisage working with him. It is essential in this type of project to create a clear relationship with the farmer and to make sure you can count on him throughout the project. The farmer did not see the benet of the system. The time limit to candidate to the CRE call for tenders is short. As a consequence, it was decided to give up this project and to focus on another project on viticulture in the South of France.

31 6 Results: Analysis of the technology

A SWOT analysis is performed to assess the strengths (S), weaknesses (W), opportunities (O) and threats (T) of the development of agrivoltaic systems for EDF Renewables France.

STRENGTHS WEAKNESSES S1. Maximize the land use W1. Non mature technology S2. Adaptation of crops against climate change and natural disaster W2. Less eciency for crop yield and energy production S3. Diversication of farmer’s income W3. Technical constraints for farmers and for the exploitation of the PV farm OPPORTUNITIES THREATS O1. A new market T1. Lack of acceptability from farmers O2. Compatible with various crops T2. Opposition from agriculture chambers O3. Increase the communication about renewables in rural world T3. Technological breakthrough

S1. Maximize the land use Mixing solar panels and food crops on the same land maximizes the land use. To quantify the productivity of the land and to compare the agrivoltaic system with separating solar farm and agriculture, the Land Equivalent Ratio (LER) is adapted to this new concept. Usually, the LER is a criteria used in agriculture to evaluate dierent situations. For two mixed species, the LER equation is dened as follows :

LER = mixed yield1/pure yield1 + mixed yield2/pure yield2

The result measures the amount of land needed to grow both specie together compared with the amount of land needed for (Malérieux et al., 2008).A LER greater than 1.0 signals mixed systems are advantageous and a LER less than 1.0 indicates that intercropping triggers a reduction of yield and is a disadvantage. The denition of LER can be adapted for agrivoltaic systems (Dupraz et al., 2011). It is dened as :

LER = crop yield in AV/monocrop yield + electricity yield in AV/PV yield where AV stands for agrivoltaic and PV for standard PV farm. Dupraz et al. calculated the predicted LER for the experimentation in Montpellier thanks to models. For the FD agrivoltaic system, the LER is estimated at 1.7 and for the HD agrivoltaic system, the predicted LER is 1.3. A LER equals to 1.7 means that 100 ha of agrivoltaic farms would produce as much electricity and food as a 170 ha farm (Dupraz et al., 2011). The high level of LER obtained conrms the relevance of agrivoltaic systems to maximize the land use. S2. Adaptation of crops against climate change and natural disaster As described before, panels above the agricultural land provide shade and a protection for the crops. Climate change triggers more frequent hail events, heatwaves and other natural hazards that can be a disaster for crops. The shade provided by the panel prevents the culture above to burn and it also reduces the water stress. The shade reduces the transpiration of plants and thus their water needs. Moreover, agrivoltaic systems do not trigger soil articialisation which is currently a huge threat for agriculture.

32 S3. Diversication of the farmer’s income The agricultural sector is going through an economic crisis. Farmers’ incomes are low and state aid is becoming scarce. The loss of crop due to a bad weather is dramatic for farmers that can not make prot from their agricultural exploitation. A little nancial compensation can be con- sidered to compensate for constraints of the system or to report infrastructure malfunctions for example. The business plan of agrivoltaic system is not clearly dened yet. It may evolve according to the discussion with agricultural chambers. The business plan proposed by EDF Renewables is to rent the land at very low prices for installing panels above crops and protect them. It is supposed to be a win-win process with advantages in the crop management for farm- ers. This business plan will not participate to the increase of the market value of agricultural land. W1. Non mature technology Agrivoltaic systems are a non mature technology. The rst prototype dates back from 2009 and there is no major project development in this sector. The cost of this kind of project is higher compared to basic solar project. It is also risky because there is a lack of knowledge on the real impact of the installation on the agriculture. Indeed, results concerning the dynamic agrivoltaic system implemented in 2014 are not published. It is still in the experimental stage. Moreover, experiments performed can not allow to conclude on the eciency of the system for every type of crops. There is still a great deal of uncertainty about the impact of the agrivoltaic system on crops above. W2. Less eciency for crop yield and energy production The agricultural and electrical production per hectare is reduced. That can be an obstacle for farmers and solar developers. The energy production does not overcome 80% and it represents a huge loss for the operator. Even if the LER is expected to be greater than 1, it is dicult to convince actors from the two sectors (agriculture and energy) to combine their activities. W3. Technical constraints for farmers and for the exploitation of the PV farm The structure supporting the panels is a constraint for the farmer. Once it is implemented, he can not change the dimension of his agricultural machines because the design of the PV plant is based on the dimensions of the machines used. Farming around metal poles is more dicult. The system of irrigation also needs to be adapted. The use of some chemical products has to be controlled to ensure they can not damage the metal structure or the panels. The elevation of panels is also a constraint for the operation and maintenance of the solar farm. Maintenance personnel must be authorised to work at heights. The exploitation of the agricultural and so- lar farm is much more complicated when an agrivoltaic system is implemented and it requires adaptation of cropping practices. O1. A new market The market is expanding and opportunities are various. Competition is weak. The rst company to develop large-scale agrivoltaic project will become a reference in the eld. O2. Compatible with various crops The impossibility of building a plant on agricultural land is currently the main ob- stacle to the development of large-scale solar power plants. In France, 28 million ha of land are

33 dedicated to agriculture (French Ministry of Agriculture Food and Forestry, 2018). The possibil- ity to implement PV plants on agricultural land is huge. Agrivoltaic experiments are currently conducted on dierent types of crops such as arboriculture or market gardening. O3. Increase the communication about renewable energy in rural world Through his behavior, his consumer choices, his political vote, every citizen impacts the strategy of his country. To ght against climate change and to build a more sustainable society, the sup- port of the population is needed. Raising public awareness of the need for the energy transition requires communication. They are a good example of dialogue on the integration of renewable energies into the modern lifestyles. T1. Lack of acceptability from farmers Agrivoltaic projects will only be a success if they get the support of farmers. To demonstrate the possible synergy between agriculture and photovoltaic energy, crops against the panels must be maintained. The know-how of the farmers is essential to the success of the project. But farmers can be reluctant to these kind of project. First of all, that implies some constraints for them. A social study was performed in 2018 questioning the acceptability of renewable energy projects in the rural world (Saubamea, 2018). Interviews of farmers highlight the main points of opposition. Farmers do not trust the technical aspects of the projects. The technology is not mature and there are no exploitable results to convince them of the feasibility of the projects. Another opposition comes from the gap between rural and urban worlds. Farmers do not feel concerned about renewable energy projects that are driven by the urban world and they feel that the projects are being imposed on them. Better communication and greater integration of farmers in the projects could reduce this threat. T2. Opposition from agriculture chambers The biggest threat is an opposition from chambers of agriculture. Discussions are under way be- tween farmers’ representatives and solar operators. The Board of Directors of the Young Farmers expressed an unfavourable opinion regarding the development of photovoltaic projects. Accord- ing to them, the photovoltaic activity presents several risks of land drifts such as a price increase and a change in the destination of the land. The agricultural sector is currently facing a critical demographic situation: in less than ten years, half of all farmers will retire. The transfer of vi- able and liveable farms to young farmers is at the heart of their plans. According to them, the agrivoltaic systems pose a threat to the transfer of farms and are a brake on the establishment of young people. Moreover, they fear that if farmers are nancially compensated for the installa- tion of the PV power plant, they will abandon farming under the panels. It will therefore harm food production. The problem has already arisen with PV . In March 2017, the CRE launched its rst call for tender for PV greenhouses. PV greenhouses are transparent PV glass integrated within roofs. Some projects were built and obtained a feed-in tari but they did not couple the production of electricity with an agricultural activity. PV greenhouses where built only to get a tari for the electricity and did not care about the crops inside the greenhouse. T3. Technological breakthrough Agrivoltaic projects are consistent with the current strategy of EDF Renewables France. In 2018, EDF announced a solar plan to build 30 GW of solar capacity between 2020 and 2035 in France.

34 The development of the technology could be a way to reach the target dened in the solar plan. However, it is not impossible to envisage a change of the strategy of the company due to a change of political orientation or a technological breakthrough. Floating panels can also be a solution to reach the objectives of the solar plan. Wind turbines are more and more powerful and they consume a very limited space. The development of oshore wind turbines is booming. Other sources of energy can be a threat for the development of agrivoltaic systems such as the progress on the discoveries of nuclear fusion.

7 Comparison with wind projects

During my internship at EDF Renewables France, I was also in charge of a wind project in France. It is located near Chartres. The context of development of wind energy is dierent from the solar energy in France. This part only deals with onshore wind farms.

7.1 Regulatory context in France

In 2010, Grenelle Laws 2 and its application decree of 2011 stated that wind turbines are con- sidered as facilities classied for environmental protection. It implies obtaining a prefectoral authorization before building the wind farm. This regulatory framework also provides for a minimum distance of 500 meters from the rst home, in addition to limit values for noise ex- posure. The construction of a wind farm has to be compatible with the town planning laws. Regional wind energy planning schemes were also elaborated to identify favorable zones for the implementation of wind farms. The process to obtain a prefectoral authorization is divided into dierent steps:

• Preparation of a form including a study of the environmental impact of the project, a hazard assessment study (re, overspeed, blade projection), a notice concerning hygiene and security and informations about technical and nancial capacities of the operators

• Review of the form and consultation of the administrative authorities. Each authority has to emit an opinion, whether positive or negative.

• A one-month public inquiry. The commissioner in charge of the public inquiry gives an opinion on the project.

• The nal decision of the prefect and the publication of the prefectoral decree.

Globally, the steps are quite similar to solar projects but the studies to perform in order to obtain the prefectoral authorization are much more burdensome. The ecological study lasts one year and exposes the initial situation of the project zone during an entire life cycle of the fauna and ora. The main stakes are linked to the impact of the wind turbines on birds and chiropterans. During the development of the project and for a duration of at least one year, a mast measure- ment is implemented on the project zone. It is equipped with many captors that measure the

35 direction and the speed of the wind. That aims to calculate precisely the expected energy ca- pacity production and to build a business plan. It is also used to install chiropterans captors to study the activity of bats. The environmental impact study for a wind farm includes an acoustic analysis. Wind turbines generate sounds due to dierent phenomena such as the interaction of wind turbines blades with atmospheric turbulence, the rotor rotation, the interaction between the rotor wake and the support tower etc. The noise emergence of the wind farm must comply to the decree of the 26th of August 2011. The noise emergence is dened as the dierence between the background sound and the background sound that includes the introduction of some specic sound. In the case of a wind farm, it is the dierence between the background sound without the wind turbines and the background sound with the wind turbines. In France, the noise emergence of a wind farm should not overcome 5 dB during the day (7 a.m. to 10 p.m.) and 3 dB during the night (10 p.m. to 7 a.m.). A landscape study also has to be performed in order to evaluate the landscape integration of the project. Photomontages are created from each monument and identied site in the study zone that can reach a diameter of 20 km around the project zone. Photomontages are also made from main roads in order to ensure a certain consistency of the territory. The studies to develop wind farms in France are more robust than studies for solar projects. The duration of development of a wind energy project, that is to say the time between the beginning of the project and the construction of the wind farm, is around 6 years contrary to 3 years for a solar plant. Another specicity of a wind farm project is the conditions of decommissioning. The lifetime of a wind turbine is estimated at 30-35 years. In France, there is no wind farm that reaches this seniority. But it is possible to consider a decommissioning before the end of the life of wind turbines. For example, some operations of re-powering are led to replace old turbines with more powerful ones. Companies are always responsible for turbine removal and it is clearly indicated in the legally-binding contract to lease land between local farmers, the owner and the operator. The goal is to restore the land as close as possible to the initial situation. The concrete used for the foundation of wind turbines needs to be remove partially. Then, 90% of the total mass of the wind turbine is recycled. In France, during the development of a wind farm project, the operator must invest 50,000 euros per wind turbine on a fund that will only be used for the dismantling of the wind turbine. Public concern about the possible impacts of wind farms on the environment and human health often slows down the project. Many residents living near current wind farm sites complain about the potential role of infrasound and low frequencies emitted by wind turbines. The other main opposition deals with the impact of wind turbines on landscape. After the publication of the prefectoral decree which authorizes the build of the wind farm, associations and people have four months to attack the state decision. Legal remedies take place in front of the administrative court and can take years. Increasing the acceptability of wind farm project is still a huge challenge.

36 7.2 The funding of wind farm projects in France

The context of electricity sale in France changed in 2017. The former system granted a xed price for each MW of wind energy connected to the grid and funded by EDF OA (Obligation to purchase). EDF OA is a subsidiary company of EDF in charge of the purchase of renewable energy. It gave a xed feed-in tari to renewable installations. Now, the process to obtain a tari depends on the project.

• Wind farms with less than six wind turbines and any with a power superior to 3 MW

They make an agreement of additional compensation with EDF. The feed-in tari is xed each year and only depends on the size of the rotor. It is around 72 and 74 €/MWh. It is guaranteed for 20 years. An additional compensation process is based on the fact that the CRE compensates the dierence between the price on the spot market and the feed-in tari obtained.

• Wind farms with more than seven wind turbines or with a wind turbine with a power superior to 3 MW

A call for tender is launched by the CRE every six months. The cumulative power for each phase is 500 MW for now. Each application form has to detail the oer and to provide the environmental authorization and some administrative piece. Then, each admissible candidate is assessed only on the basis of the tari expected and detailed in the oer. Every winner of the tender benets from a feed-in tari guaranteed for 20 years. It is an additional compensation process. In 2018, the average feed-in tari for onshore wind farms calls for tender was 65€/MWh. The CRE seems to strive towards a call for tender for this kind of wind farms too.

7.3 Wind turbine and agriculture

Contrary to solar farms, wind farms and agricultural land have always coexisted. To reduce the visual and the acoustical impacts of wind turbines, they are located the furthest away from the dwellings. Currently in France, the law requires that the minimum distance between a wind turbine and a house is 500 meters. The CRE is considering on a possible increase in the distance. As a consequence, wind turbines are always located in elds. The oor space needed for a wind turbine is around 3,000 m2 regardless of the power of the wind turbine. The ground footprint of a wind turbine is very small compared to that of a solar farm. There is no competition of land use between agriculture and wind farm. The Departmental Commission for the Preservation of Natural, Agricultural and Forest Areas (CDPENAF) is responsible for preventing the excessive articialisation of agricultural land. It seeks to preserve agricultural land. During project ap- praisal, it emits an opinion on the project. For large wind farms that consume more than 5 ha on the ground, collective compensation is expected. It is often of a nancial nature and may also take the form of ecological compensation measures (planting hedges, restoring natural in neighbouring areas, etc.).

37 The main link between wind turbines and agriculture is nancial. Wind turbines represent a signicant diversication of rents for farmers. In order of magnitude, for 2,000 m2 an owner of agricultural land earns 30€, a farmer hopes to earn 400€ of sales. On the other hand, for 2,000m2 EDF Renewables France oers rent of 10,000€ to split between the farmer and the owner. In conclusion, the synergies between wind turbines and the agricultural world are weak. The two activities have always coexisted without causing many inconveniences to each other.

8 Discussion

It is not possible to conclude clearly on the eectiveness of agrivoltaic systems in developing strong synergies between agriculture and solar energy. Indeed, the models used show that for certain crops, the presence of solar panels allows to reduce irrigation and provides protection to crops against climate change. However, many crops have not been evaluated for agrivoltaic application. Literature focuses only on lettuces. Future work must extend the implementation of agrivoltaic systems to other plants. From a technical point of view, this technology seems viable. Fixed system with vegetables under the panels has already been developed in USA or in Asia. Fixed agrivoltaic systems consist only of elevating the panels and spacing them. The diculty for dynamic agrivoltaic system is the development of an algorithm that takes into consideration the needs of the plant. Moreover, the results from the models will have to be compared with the results obtained on the Sun’agri prototypes and other demonstrators. To develop agrivoltaic projects, farmers must have condence in the technical aspect of the project. Today it is dicult to assure farmers that the system will not lead to a drastic decrease in agricultural yields due to lack of experience. It is dicult to quantify the costs and investments involved in agrivoltaic projects. The economic viability of projects is not assured. The common investment for a ground-based solar farm is one million euros per mega-watt (EDF gure). The estimation of the investment of an agrivoltaic sys- tem for EDF can not be released. However, literature is quite optimistic concerning the economic viability of agrivoltaic system. The economic value of an agrivoltaic systems deploying above grape farms in India is estimated more than 15 times higher than a conventional farming while maintaining the same grape production (Malu et al., 2017). Economic value measures the benet provided by a good or a service to an economical agent. According to EDF, the economical via- bility can be reached only in regions with a high solar resource that is to say only in the South of France.

9 Conclusion

Agrivoltaic projects combine on the same land an agricultural and an electrical production. They have the potential to maximize the land use and reduce the competition between food and energy. The analysis of optimal parameters for PV plant design and crop management is essential to ensure the success of the rst agrivoltaic projects. It is important to co-construct agrivoltaic

38 projects with farmers and chambers of agriculture so that a real synergy exists and so that solar panels do not harm agricultural production. The regulatory framework with the establishement of a new family for agrivoltaic project for the CRE innovative call for tender is a huge incentive. Agrivoltaic projects represent a great potential to reach the 30 GW of solar capacity in 2035 xed by EDF’ solar plan. Finally, there is a lack of large-scale project to conrm models and to know precisely the eco- nomic viability of the project.

39 References

Cantagallo, J.-E., Medan, D., and Hall, A.-J. (2004). Grain number in sunower as aected by shading during oret growth, anthesis and grain setting. Field Crops Research, pages 191–202.

Dinesh, H. and Pearce, J. M. (2016). The potential of agrivoltaic systems. Sustainable Energy Review 54, pages 299–308.

Dupraz, C., Marrou, H., Talbot, G., Dufour, L., Nogier, A., and Ferard, Y. (2011). Combining solar photo- voltaic panels and food crops for optimising land use: Towards new agrivoltaic schemes. Renewable Energy, vol. 36, pages 2725–2732.

Edouard, S., Combes, D., Van Iseghem, M., Louarn, G., and Escobar-Gutiérrez, A. (2019). Analysis and modeling (stics/l-egume) of crop growth under shading conditions in agripv context. Applied Energy 206.

French Ministry of Agriculture Food and Forestry (2018). Annual Agricultural Statistic.

French Ministry of Ecological and Inclusive Transition (2019). Energy and climate project law: towards an increase of the development of renewable energy. Available at https://www.ecologique- solidaire.gouv.fr/projet-loi-energie-climat-vers-acceleration-du-deploiement-des-energies- renouvelables.

Fu, J., Li, C.-H., Zhao, J.-R., Ma, L., and Liu, T. (2009). Shade-tolerance indices of maize: Selection and evaluation. Chinese Journal of Applied , vol.20, pages 2705–2709.

Goetzberger, A. and Zastrow, A. (1982). On the coexistence of solar-energy conversion and plant cultiva- tion. International Journal of Solar Energy, 1, pages 55–69.

Malu, P., Sharma, U., and Pearce, M. (2017). Agrivoltaic potential on grape farms in india. Sustainable Energy Technologies and Assessments, v23, pages 104–110.

Malérieux, E., Crozat, Y., Dupraz, C., Laurans, M., Makowski, D., Ozier-Lafontaine, H., Rapidel, B., de Tour- donnet, S., and Valantin-Morison, M. (2008). Mixing plant species in croppingsystems: concepts, tools and models.areview. for Sustainable Development, pages 43–62.

Marrou, H., Guilioni, L., Dufour, L., Dupraz, C., and Wery, J. (2013a). Microclimate under agrivoltaic systems: is crop growth rate aected in the partial shade of solar panels? Agricultural and Forest , vol. 177, pages 117–132.

Marrou, H., Wery, J., Dufour, L., and Dupraz, C. (2013b). Productivity and radiation use eciency of lettuces grown in the partial shade of photovoltaic panels. European Journal of Agronomy 44, pages 54–66.

Popp, J., Lakner, Z., Harangi-Rákos, M., and Fáric, M. (2014). The eect of bioenergy expansion: Food, energy, and environment. Renewable and Sustainable Energy Reviews, v32, pages 559–578.

Regional direction of Food, Agriculture and Forestry in New-Aquitaine (2019). Tree and fruit industry.

Saubamea, G. (2018). Renewable energies and the agricultural world. Master thesis in partnership with EDF Renewables France.

40 Sun’R (2017). Sun’agri, press release.

Valle, B., Simonneau, T., Sourd, F., Pechier, P., Hamard, P., Frisson, T., Ryckewaert, M., and Christophe, A. (2017). Increasing the total productivity ofaland bycombining mobile photovoltaic panels and food crops. Applied Energy 206, pages 1495–1507.

41