A United Launch Alliance (ULA) Atlas V rocket will Part of NASA’s Commercial Crew Program (CCP), MISSION deliver Boeing’s CST-100 Starliner to a the uncrewed OFT is the first launch of the 98-nautical mile (nmi) sub-orbital trajectory on its CST-100 Starliner. The goals of the OFT mission Orbital Flight Test (OFT) to the International Space are to demonstrate on-orbit operation of all Station (ISS). Following separation from Atlas V, systems; demonstrate the performance of the Starliner engines will burn taking it the rest of the Guidance, Navigation and Control systems of the MISSION way to orbit and on to the ISS. Liftoff will occur Atlas V and Starliner through ascent, on-orbit and from Space Launch Complex-41 at Cape Canaver- reentry; verify acoustic and vibration levels as well al Air Force Station, Florida. as loads across Starliner’s exterior and interior ATLAS V throughout the mission; monitor launch abort OVERVIEW Image Courtesy The Boeing Company triggers; demonstrate end-to-end operational performance and procedures; and demonstrate The Atlas V Starliner configuration reentry and landing. Starliner will land at one of will launch The Boeing Company’s five designated sites in the western United States. CST-100 Starliner vehicle as part All human launch systems, going back to the of NASA’s Commercial Crew Atlas, traditionally conduct uncrewed Program. This is the inaugural flight test flights prior to crewed flights. The uncrewed of this configuration. flight will allow the team to thoroughly evaluate all flight data against pre-flight predictions and make any necessary adjustments prior First flown in 2002, the Atlas V to flying astronauts. launch vehicle has a record of 100 percent mission success over more than 80 launches.

LAUNCH Spacecraft Modified specifically for the Boeing CST-100 Starliner space- VEHICLE craft, the Atlas V Starliner configuration does not include a Starliner payload fairing. Instead, the Starliner’s own protective surfaces Spacecraft take the place of the fairing to protect the uncrewed spacecraft during ascent. The vehicle’s height with the Boeing CST-100 Starliner is approximately 52.4 m (172 ft). Launch Vehicle The CST-100 Starliner is attached to the Atlas V using a launch vehicle adapter (LVA) which also includes an aeroskirt to reduce Adapter & the aerodynamic loads on the vehicle. The aeroskirt is jettisoned Aeroskirt for improved performance following booster stage separation. Centaur Centaur The Centaur second stage is 10 ft in diameter and 41.5 ft in RL10A-4-2 length. Its propellant tanks are pressure-stabilized and con- Engines structed of corrosion-resistant stainless steel. Centaur is a cryogenic vehicle, fueled with liquid hydrogen and liquid Aft Stub oxygen. The Atlas V configuration for this mission is pow- Adapter ered by dual RL10A-4-2 engines, each producing 22,600 lb of thrust. The cryogenic tanks are insulated with a combination of Interstage helium-purged blankets, radiation shields and spray-on foam Adapter MISSION With more than a century of insulation (SOFI). The Centaur forward adapter (CFA) provides combined heritage, ULA is the structural mountings for the fault-tolerant avionics system and electrical interfaces with the spacecraft. The Centaur also in- SUCCESS world’s most experienced and cludes an Emergency Detection System (EDS) that monitors for reliable launch service provider. critical hazards to detect an imminent or occurring failure. The Booster ULA has successfully delivered EDS also provides critical in-flight data which supports jettison more than 130 missions to orbit of the ascent cover and initiates CST-100 spacecraft separation. that provide Earth observation capabilities, enable global com- Booster The booster is 12.5 ft in diameter and 106.5 ft in length. The munications, unlock the mysteries booster’s tanks are structurally rigid and constructed of isogrid of our and support aluminum barrels, spun-formed aluminum domes and intertank Solid life-saving technology. skirts. Booster propulsion is provided by the RD-180 engine Rocket system (a single engine with two thrust chambers). The RD-180 Boosters burns RP-1 (Rocket Propellant-1 or highly purified kerosene) and liquid oxygen and delivers 860,200 lb of thrust at sea level. Two solid rocket boosters (SRBs) generate the additional power required at liftoff, with each SRB providing 348,500 lb of thrust. RD-180 The Centaur avionics system provides guidance, flight control Engine and vehicle sequencing functions during the booster and Centaur phases of flight.

ulalaunch.com Copyright © 2019 United Launch Alliance, LLC. All Rights Reserved. DELTA II ATLAS V 401 ATLAS V 411 ATLAS V 421 ATLAS V 431

1 Sacramento, CA 1 Sacramento, CA 1 Sacramento, CA Solid Rocket Booster Fabrica- Solid Rocket Booster Fabrica- Solid Rocket Booster Fabrica- tion at Aerojet Rocketdyne tion at Aerojet Rocketdyne tion at Aerojet Rocketdyne 1 Denver, CO 2 Denver, CO 2 Denver, CO 2 Denver, CO ULA Headquarters & Design ULA Headquarters & Design ULA Headquarters & Design ULA Headquarters & Design 1 Sacramento, CA Center Engineering Center Engineering Center Engineering Center Engineering RS27A and AJ10118K Engine 2 Harlingen, TX 3 Harlingen, TX 3 Harlingen, TX 3 Harlingen, TX Fabrication at Aerojet Rocketdyne Payload Fairing, Payload Payload Fairing, Payload Payload Fairing, Payload Payload Fairing, Payload 1 2 2 Magna, UT Fairing Adapter, Booster 1 Fairing Adapter, Booster 1 Fairing Adapter, Booster 1 Fairing Adapter, Booster 3 Graphite Epoxy Motor Fabrication 1 2 2 2 Adapter & Centaur Adapter Adapter & Centaur Adapter Adapter & Centaur Adapter Adapter & Centaur Adapter at Northrop Grumman Fabrication Fabrication Fabrication Fabrication 3 Denver, CO 3 Decatur, AL 4 Decatur, AL 4 Decatur, AL 4 Decatur, AL ULA Headquarters & 4 3 Booster Fabrication & Final 4 Booster Fabrication & Final 4 Booster Fabrication & Final 4 Booster Fabrication & Final 5 Design Center Engineering Assembly, Centaur Tank Assembly, Centaur Tank Assembly, Centaur Tank Assembly, Centaur Tank 4 Iuka, MS Fabrication & Centaur Final Fabrication & Centaur Final Fabrication & Centaur Final Fabrication & Centaur Final Payload Fairing Fabrication at Assembly Assembly Assembly Assembly Northrop Grumman 4 4 West Palm Beach, FL 5 5 West Palm Beach, FL 5 5 West Palm Beach, FL 5 5 West Palm Beach, FL 5 Decatur, AL 6 5 RL10C1 Engine Fabrication RL10C1 Engine Fabrication 6 RL10C1 Engine Fabrication 6 RL10C1 Engine Fabrication Booster, Payload Fairing & 2 3 3 3 at Aerojet Rocketdyne at Aerojet Rocketdyne at Aerojet Rocketdyne at Aerojet Rocketdyne Second Stage Fabrication 5 Khimki, Russia 6 Khimki, Russia 6 Khimki, Russia 6 Khimki, Russia RD180 Engine Fabrication at RD180 Engine Fabrication at RD180 Engine Fabrication at RD180 Engine Fabrication at NPO Energomash NPO Energomash NPO Energomash NPO Energomash

ATLAS V 501 ATLAS V 511 ATLAS V 521 ATLAS V 531 ATLAS V 541

1 Sacramento, CA 1 Sacramento, CA 1 Sacramento, CA 1 Sacramento, CA Solid Rocket Booster Fabrication Solid Rocket Booster Fabrication Solid Rocket Booster Fabrication Solid Rocket Booster Fabrication 1 Denver, CO at Aerojet Rocketdyne at Aerojet Rocketdyne at Aerojet Rocketdyne at Aerojet Rocketdyne ULA Headquarters & Design 2 Denver, CO 2 Denver, CO 2 Denver, CO 2 Denver, CO Center Engineering ULA Headquarters & Design ULA Headquarters & Design ULA Headquarters & Design ULA Headquarters & Design 2 Harlingen, TX Center Engineering Center Engineering Center Engineering Center Engineering Payload Adapter, Booster 3 Harlingen, TX 3 Harlingen, TX 3 Harlingen, TX 3 Harlingen, TX Adapter & Centaur Adapter Payload Adapter, Booster Payload Adapter, Booster Payload Adapter, Booster Payload Adapter, Booster Fabrication Adapter & Centaur Adapter Adapter & Centaur Adapter Adapter & Centaur Adapter Adapter & Centaur Adapter CAPE DELTA IV M+ (5,2) CAPE DELTA IV M+ (5,4) CAPE DELTA IV HEAVY CAPE DELTA IV M+ (4,2) 3 Decatur, AL Fabrication Fabrication Fabrication Fabrication Booster Fabrication & Final 4 Decatur, AL 4 Decatur, AL 4 Decatur, AL 4 Decatur, AL 1 Assembly, Centaur Tank 1 2 1 2 1 2 1 2 Booster Fabrication & Final Booster Fabrication & Final Booster Fabrication & Final Booster Fabrication & Final Fabrication & Final Assembly Assembly, Centaur Tank Assembly, Centaur Tank Assembly, Centaur Tank Assembly, Centaur Tank 4 West Palm Beach, FL Second Second Second Fabrication & Final Assembly Fabrication & Final Assembly Fabrication & Final Assembly Fabrication & Final Assembly 1 1 1 RL10C1 Engine Fabrication at Solid Rocket Stage Solid Rocket Stage Second Solid Rocket Stage 3 4 5 West Palm Beach, FL 4 5 West Palm Beach, FL 4 5 West Palm Beach, FL 4 5 West Palm Beach, FL 1 Stage Aerojet Rocketdyne Motors Motors Motors RL10C1 Engine Fabrication at RL10C1 Engine Fabrication at RL10C1 Engine Fabrication at RL10C1 Engine Fabrication at 5 Khimki, Russia Booster Booster Booster Aerojet Rocketdyne Aerojet Rocketdyne Aerojet Rocketdyne Aerojet Rocketdyne Booster(s) 5 RD180 Engine Fabrication at 6 6 6 6 6 Khimki, Russia 6 Khimki, Russia 6 Khimki, Russia 6 Khimki, Russia NPO Energomash 2 1 Delta Operations Center 2 1 Delta Operations Center 2 1 Delta Operations Center 4 5 RD180 Engine Fabrication at 5 RD180 Engine Fabrication at 5 RD180 Engine Fabrication at 5 RD180 Engine Fabrication at Fairing Fairing Fairing 6 Zurich, Switzerland Mission Director’s Center & Mission Director’s Center & Fairing Halves Mission Director’s Center & NPO Energomash NPO Energomash NPO Energomash NPO Energomash Halves Halves 6 2 5-m Payload Fairing 7 3 7 3 7 3 7 3 Second Stage Processing Second Stage Processing Halves Second Stage Processing 7 Zurich, Switzerland 7 Zurich, Switzerland 7 Zurich, Switzerland 7 Zurich, Switzerland Fabrication at RUAG Space 2 Receipt Inspection Shop 2 Receipt Inspection Shop 2 Receipt Inspection Shop 5-m Payload Fairing 5-m Payload Fairing 5-m Payload Fairing 5-m Payload Fairing Fabrication at RUAG Space Fabrication at RUAG Space Fabrication at RUAG Space Fabrication at RUAG Space Receiving, Inspection, Staging Receiving, Inspection, Staging 1 Delta Operations Center Receiving, Inspection, Staging Payload & Final Processing Payload & Final Processing Payload Payload & Final Processing Attach Mission Director’s Center & 3 Attach 3 Attach Second Stage Processing 3 Attach Fitting 3 Horizontal Integration Facility Fitting 3 Horizontal Integration Facility Fitting Fitting 3 Horizontal Integration Facility 5 Receiving, Inspection & Vehicle 5 Receiving, Inspection & Vehicle 2 2 Horizontal Integration Facility 5 Receiving, Inspection & Vehicle Integration Integration 4 Receiving, Inspection & Vehicle Integration Integration ATLAS V STARLINER DELTA IV HEAVY DELTA IV 5,2 DELTA IV 5,4 ATLAS V 551 4 Spacecraft Processing Facility 4 Spacecraft Processing Facility 4 Spacecraft Processing Facility PRODUCTION FLIGHT 4 Spacecraft Processing, Testing 4 Spacecraft Processing, Testing 3 3 Spacecraft Processing Facility 4 Spacecraft Processing, Testing & Encapsulation & Encapsulation & Encapsulation Spacecraft Processing, Testing PROFILE 1 Sacramento, CA Spacecraft Spacecraft & Encapsulation Spacecraft 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower 1 Sacramento, CA Solid Rocket Booster Fabrication Launch Launch Vehicle Integration & Launch Launch Vehicle Integration & 4 Mobile Service Tower Launch Launch Vehicle Integration & Solid Rocket Booster Fabrica- at Aerojet Rocketdyne Table Testing, Spacecraft Mate & Table Testing, Spacecraft Mate & Launch Vehicle Integration & Table Testing, Spacecraft Mate & tion at Aerojet Rocketdyne 2 Denver, CO Integrated Operations Integrated Operations Spacecraft Integrated Operations Testing, Spacecraft Mate & 2 Denver, CO ULA Headquarters & Design Payload Payload Payload Integrated Operations Payload ULA Headquarters & Design Center Engineering Transporter Transporter Transporter Transporter Center Engineering 3 Harlingen, TX 3 Harlingen, TX 1 Canoga Park, CA 1 Canoga Park, CA 1 Canoga Park, CA Payload Adapter, Booster Booster Adapter & Centaur RS68A Engine Fabrication at RS68A Engine Fabrication at RS68A Engine Fabrication at Adapter & Centaur Adapter 1 2 Adapter Fabrication Aerojet Rocketdyne 2 Aerojet Rocketdyne 2 Aerojet Rocketdyne Fabrication 4 Decatur, AL OFT 2 Time 2 Denver, CO 3 2 Brigham City, UT 3 2 Brigham City, UT 1 2 4 Decatur, AL Booster Fabrication & Final Event (hr:min:sec) ULA Headquarters & Design Solid Rocket Motor Fabrication at Solid Rocket Motor Fabrication at Booster Fabrication & Final Assembly, Centaur Tank 1 Center Engineering 1 Northrop Grumman 1 Northrop Grumman MISSION1 RD-180 Engine Ignition 6 -0:00:02.77 8 9 Assembly, Centaur Tank 4 Fabrication & Centaur Final 5 3 Decatur, AL 10 3 Denver, CO 3 Denver, CO Fabrication & Final Assembly Liftoff (Thrust to Weight> 1) 0:00:01.1 Assembly, Aeroskirt PROFILE 3 Booster, Payload Fairing and 4 ULA Headquarters & Design 4 ULA Headquarters & Design 4 5 West Palm Beach, FL 11 Fabrication Begin Pitch/Yaw Maneuver 0:00:06.1 Second Stage Fabrication Center Engineering Center Engineering RL10C1 Engine Fabrication at 4 5 West Palm Beach, FL Maximum Dynamic Pressure 0:00:41.8 4 West Palm Beach, FL 4 Decatur, AL 4 Decatur, AL 6 Aerojet Rocketdyne RL10 Engine Fabrication at Aerojet ULA Booster, Payload Fairing and ULA Booster, Payload Fairing and 5 RL10A42 Engine Fabrication Mach 1 0:01:05.8 12 6 Khimki, Russia at Aerojet Rocketdyne 4 Rocketdyne 5 Second Stage Fabrication 5 Second Stage Fabrication 5 RD180 Engine Fabrication at 6 3 SRB Jettison 0:02:22.0 6 Khimki, Russia 2 5 West Palm Beach, FL 5 West Palm Beach, FL 7 3 NPO Energomash RD180 Engine Fabrication at 3 Atlas Booster Engine Cutoff (BECO) 0:04:29.0 RL10 Engine Fabrication at Aerojet RL10 Engine Fabrication at Aerojet 7 Zurich, Switzerland 3 NPO Energomash 4 Atlas Centaur Separation 0:04:35.0 Rocketdyne Rocketdyne 5-m Payload Fairing 5 Ascent Cover Jettison Time0:04:41.0 Cape Canaveral Air Force Station, Florida Fabrication at RUAG Space Event (hr:min:sec) 6 Centaur First1 Main Engine Start (MES-1) -0:00:00:04:45.02.7 0:00:01.1 9 SPACE 7 Aeroskirt Jettison 0:05:05.0 Begin Pitch/Yaw Maneuver 0:00:06.1 8 7 DELTA II VAFB, CA CAPE ATLAS V 401 CAPE ATLAS V 411 CAPE ATLAS V 421 CAPE ATLAS V 431 LAUNCHCAPE ATLAS V Starliner 8 Centaur FirstMach Main 1 Engine Cutoff (MECO-1) 0:00:0:11:54.544.3 6 COMPLEX-41 9 Starliner SeparationMaximum Dynamic Pressure 0:010:14:54.5:05.9 current as of 1.31.18 2 2 SRB Jettison 0:02:20.6 10 Start Blowdown 0:26:07.5 PROCESSING 3 0:04:29.0 DELTA IV 4,2 1 11 End of Atlas4 AVtlas Mission Centaur Separation 0:00:38:03.54:35.0 10-ft Payload Solid Rocket Solid Rocket 1 5 Ascent Cover Jettison 0:04:41.0 Interstage Solid Rocket 12 Centaur Ocean Impact 0:57:45.2 Fairing Solid Rocket 1 Boosters 1 Boosters 6 0:04:45.0 Adapter 1 Boosters Orbit Booster Booster 7 Aeroskirt Jettison 0:05:05.0 Second Booster Booster Booster Booster Starliner Orbit at Separation Ascent Stage Boattail Boattail Boattail Boattail Boattail Perigee: 39.308 nmi | Apogee: 98.00 nmi 0:11:54.3 Graphite Epoxy 9 Starliner Separation 0:14:54.3 ISA ISA ISA ISA ISA Inclination: 51.61 deg | Azimuth: 50.40 deg Motors Centaur 10 Start Blowdown 0:26:07.3 Starliner Orbit at Separation 1 11 End of Mission 0:38:03.3 Perigee: 39.30 nmi | Apogee: 98.00 deg Booster Longitude (deg) 1 Aeroskirt 12 Ocean Impact 0:57:46.0 Inclination: 51.62 deg | Azimuth: 50.40 deg Centaur Centaur Centaur Centaur 2 2 2 2 2 2 80 1 Canoga Park, CA 1 Atlas RS68A Engine Fabrication at Operations Center (ASOC) 2 Aerojet Rocketdyne 60 1 Atlas Spaceflight Launch Control Center & 2 Brigham City, UT Operations Center (ASOC) Mission Director’s Center 3 Payload Payload BOSS Solid Rocket Motor Fabrication at Payload Launch Control Center & Mission Payload 9 Adapter Adapter Director’s Center Adapter Adapter 2 Delta Operations Center Starliner 40 8 1 Northrop Grumman Spacecraft Spacecraft TEL-4 10 3 Denver, CO Payload 1 Atlas Spaceflight Spacecraft Spacecraft 1 Atlas Spaceflight ISA, Centaur, Boattail & 7 1 Building 1670 2 Delta Operations Center Payload Vertical Integration 6 ULA Headquarters & Design Receiving, Inspection, Staging, Fairing Operations Center (ASOC) Fairing Operations Center (ASOC) 20 4 Halves ISA, Centaur, Boattail & Vertical Center Engineering Final Processing & Material Stores Launch Control Center & Integration Halves Launch Control Center & Mission Director’s Center Mission Director’s Center 3 Spacecraft Processing Facility 4 Decatur, AL Payload Spacecraft Processing, Testing 3 Adapter 2 Building 836 1 Atlas Spaceflight 0 11 ULA Booster, Payload Fairing and 3 Spacecraft Processing Facility Payload & Encapsulation Fitting Receiving, Inspection & Booster 2 Delta Operations Center Payload Spacecraft Processing, Testing & 2 Delta Operations Center Operations Center (ASOC) 5 Second Stage Fabrication Transfer ISA, Centaur, Boattail & Vertical Fairing ISA, Centaur, Boattail & Vertical Fairing Launch Control Center & Encapsulation 4 Vertical Integration Facility -20 5 West Palm Beach, FL 5 Integration Halves Integration Halves Mission Director’s Center Launch Vehicle Integration & RL10 Engine Fabrication at Aerojet 3 Hazardous Processing 4 Vertical Integration Facility Testing, Spacecraft Mate & Geodetic Latitude (deg) Receiving, Inspection, Destruct 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility 2 Delta Operations Center Rocketdyne 4 Launch Vehicle Integration & Integrated Operations -40 Installation & Second Stage Nozzle Spacecraft Processing, Testing Spacecraft Processing, Testing ISA, Centaur, Boattail & Spacecraft Testing, Spacecraft Mate & 12 Installation Mobile & Encapsulation Mobile & Encapsulation Mobile Mobile Aeroskirt Vertical Integration 3 3 Integrated Operations Launch 3 Launch 3 Launch Launch Crew Crew Crew -60 4 Spacecraft Processing 4 Vertical Integration Facility Mobile Platform 4 Vertical Integration Facility Platform Crew Platform Platform Access Access Access Access 3 Vertical Integration Facility Spacecraft Processing, Testing & 4 Launch Vehicle Integration & 4 Launch 4 Launch Vehicle Integration & 4 3 Launch Vehicle Integration & Tower Platform Tower Tower Tower Launch Vehicle /Spacecraft Groundtrack Encapsulation Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Starliner Mate & -80 Integrated Operations Integrated Operations Integrated Operations Fixed Umbilical 5 Mobile Service Tower Tower (FUT) Crew -135 -90 -45 0 45 90 135 Launch Vehicle Integration & Access All Values Approximate Testing, Spacecraft Mate & Tower Integrated Operations

CAPE ATLAS V 501 CAPE ATLAS V 511 CAPE ATLAS V 521 CAPE ATLAS V 531 CAPE ATLAS V 541 CAPE ATLAS V 551

1 1 1 1 1 1 Booster Booster Booster Booster Booster Booster Solid Rocket Boattail Solid Rocket Boattail Solid Rocket Boattail Solid Rocket Boattail Boattail Solid Rocket Boattail Boosters Boosters Boosters Boosters Boosters CISA CISA CISA CISA CISA CISA CFLR CFLR CFLR CFLR CFLR CFLR

Centaur Centaur Centaur Centaur Centaur Centaur 2 2 2 2 2 2 1 Atlas Spaceflight 1 Atlas Spaceflight 1 Atlas Spaceflight 1 Atlas Spaceflight 1 Atlas Spaceflight 1 Atlas Spaceflight Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Launch Control Center, Mission Director's Center, Mission Support Launch Control Center & Mission Launch Control Center & Payload Launch Control Center & Mission Payload Launch Control Center & Launch Control Center & Payload Payload Director’s Center Mission Director’s Center Director’s Center Mission Director’s Center Payload Mission Director’s Center Teams, Launch Vehicle Horizontal Payload Adapter Adapter Adapter Adapter Adapter Adapter Processing & Ordnance Installation Spacecraft Spacecraft Spacecraft Spacecraft Spacecraft 2 Delta Operations Center Spacecraft 2 Delta Operations Center 2 Delta Operations Center 2 Delta Operations Center 2 Delta Operations Center ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical 2 Delta Operations Center Integration Integration Integration Integration Integration Interstage Adapter, Centaur, Boattail, Base Module Vertical 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility Integration Payload Spacecraft Processing, Testing Payload Spacecraft Processing, Testing Payload Spacecraft Processing, Testing Payload Spacecraft Processing, Testing Payload Spacecraft Processing, Testing Payload Transporter Transporter Transporter Transporter Transporter 3 Spacecraft Processing Facility & Encapsulation Transporter & Encapsulation Payload & Encapsulation Payload & Encapsulation Payload & Encapsulation Payload Payload Payload Fairing Halves Fairing Halves Spacecraft Processing, Testing Fairing Halves Fairing Halves Fairing Halves 4 Vertical Integration Facility Fairing Halves 4 Vertical Integration Facility 4 Vertical Integration Facility 4 Vertical Integration Facility 4 Vertical Integration Facility & Encapsulation Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Spacecraft Mate & 4 Vertical Integration Facility Launch Vehicle Integration & Mobile 3 Integrated Operations Integrated Operations Mobile Integrated Operations Mobile Integrated Operations Integrated Operations Launch Mobile 3 3 3 Mobile 3 Mobile 3 Testing, Spacecraft Mate & Crew Launch Launch Launch Launch Launch Platform Crew Platform Crew Crew Crew Crew Integrated Operations 4 Access Platform Access Platform Platform Platform Access Tower 4 Access 4 Access Access 4 Tower Tower Tower 4 Tower 4 Tower

VAFB ATLAS V 401 VAFB ATLAS V 411 VAFB ATLAS V 421 VAFB ATLAS V 431 VAFB DIV_5Œ2 VAFB DIV_5Œ4 VAFB DELTA IV HEAVY

Graphite/Epoxy Graphite/Epoxy Motors (GEM) Motors (GEM) 1 1 1 1 1 1 Remote Launch Control Center 1 Remote Launch Control Center Second (RLCC) 2 Launch Control Center & Mission Second (RLCC) Second Centaur Centaur Centaur Centaur Stage Booster 2 Booster Stage Director’s Center Stage Launch Control Center & Mission 1 Boosters Fairing Director’s Center 2 Building 945 Fairing 1 Boattail Solid Rocket Boattail Solid Rocket Boattail Solid Rocket Boattail Halves Payload Booster ASA 1 Remote Launch Control Center Booster ASA 1 Remote Launch Control Center Booster ASA 1 Remote Launch Control Center Booster ASA 1 Remote Launch Control Center Receiving, Inspection, Staging Halves 2 Building 945 Boosters ISA Boosters ISA Boosters Mobile 3 Mobile 3 Receiving, Inspection, Staging Attach ISA (RLCC) (RLCC) (RLCC) ISA (RLCC) & Final Processing Mobile Fitting Assembly Assembly & Final Processing Assembly 1 Remote Launch Control Center Launch Control Center & Launch Control Center & Mission Launch Control Center & Launch Control Center & Mission Payload 2 Mission Director’s Center Director’s Center Mission Director’s Center Director’s Center Shelter 3 Horizontal Integration Facility Shelter Payload Shelter (RLCC) 5 Adapter 5 Attach 3 Horizontal Integration Facility Launch Control Center & Mission 2 Centaur 2 Centaur 2 Centaur 2 Centaur Fittings Receiving, Inspection & Second 2 Operations Center 2 Operations Center 2 Operations Center 2 Operations Center Stage Integration Fitting Receiving, Inspection & Second Director’s Center Receiving & Inspection Receiving & Inspection Receiving & Inspection Receiving & Inspection Stage Integration 4 4 Spacecraft Processing Facility 2 Horizontal Integration Facility 3 Building 8337 3 Building 8337 3 Building 8337 3 Building 8337 Spacecraft Processing, Testing & 4 Spacecraft Processing Facility Receiving, Inspection & Second 5 5 5 5 Encapsulation Spacecraft Processing, Testing & Stage Integration Spacecraft PLF/Adapter Receiving & Spacecraft PLF/Adapter Receiving Spacecraft PLF/Adapter Receiving & Spacecraft PLF/Adapter Receiving & Inspection & Inspection Inspection Inspection 4 4 Encapsulation 5 Mobile Service Tower 3 Spacecraft Processing Facility 5 Mobile Service Tower 4 4 Spacecraft Processing Facility 4 4 Spacecraft Processing Facility 4 4 Spacecraft Processing Facility 4 4 Spacecraft Processing Facility Launch Vehicle Integration & Testing, 3 Spacecraft Processing, Testing & Spacecraft Processing, Testing Spacecraft Processing, Testing Spacecraft Processing, Testing Spacecraft Processing, Testing & Spacecraft Mate & Integrated Launch Vehicle Integration & Encapsulation Fairing Fairing Fairing Testing, Spacecraft Mate & Halves & Encapsulation Fairing & Encapsulation & Encapsulation Encapsulation Operations Payload Payload Halves Payload Halves Payload Halves Integrated Operations Spacecraft 4 Mobile Service Tower Spacecraft Fixed Spacecraft Transporter 5 Mobile Service Tower Transporter 5 Mobile Service Tower Transporter 5 Mobile Service Tower Transporter 5 Mobile Service Tower Fixed Payload Launch Payload Launch Vehicle Integration & Testing, 3 Launch Vehicle Integration & 3 Launch Vehicle Integration & 3 Launch Vehicle Integration & 3 Launch Vehicle Integration & Launch Transporter Platform Transporter Fixed Spacecraft Mate & Integrated Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Spacecraft Mate & Testing, Spacecraft Mate & Platform Launch Payload Operations Integrated Operations Integrated Operations Integrated Operations Integrated Operations Platform Transporter Fixed Fixed Fixed Fixed Launch Launch Launch Platform Launch Platform Platform Platform

VAFB ATLAS V 501 VAFB ATLAS V 511 VAFB ATLAS V 521 VAFB ATLAS V 531 VAFB ATLAS V 541 VAFB ATLAS V 551

1 1 1 1 1 Centaur Centaur Centaur Centaur Centaur Centaur

Booster Booster Booster Booster Booster Booster CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center 1 Boattail (RLCC) Boattail (RLCC) Boattail (RLCC) Boattail (RLCC) Boattail (RLCC) Boattail (RLCC) Launch Control Center & Solid Rocket Launch Control Center & Mission Solid Rocket Launch Control Center & Mission Solid Rocket Launch Control Center & Solid Rocket Launch Control Center & Mission Solid Rocket Launch Control Center & Mission Mission Director’s Center Boosters Director’s Center Boosters Director’s Center Boosters Mission Director’s Center Boosters Director’s Center Boosters Director’s Center Centaur Centaur Centaur Centaur Centaur Centaur 2 Operations Center 2 Operations Center 2 Operations Center 2 Operations Center 2 Operations Center 2 Operations Center 2 Receiving & Inspection 2 Receiving & Inspection 2 Receiving & Inspection 2 Receiving & Inspection 2 Receiving & Inspection 2 Receiving & Inspection

3 Building 8337 3 Building 8337 3 Building 8337 3 Building 8337 3 Building 8337 3 Building 8337 PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & 5 Inspection 5 Inspection 5 Inspection 5 Inspection 5 Inspection 5 Inspection Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility Spacecraft Processing, Testing Spacecraft Processing, Testing & Spacecraft Processing, Testing & Spacecraft Processing, Testing & Spacecraft Processing, Testing & Spacecraft Processing, Testing & & Encapsulation Encapsulation Encapsulation Encapsulation Encapsulation Encapsulation 4 4 4 4 4 4 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations

Fixed Fixed Fairing Halves, Fixed Fairing Halves, Fixed Fairing Halves, Fixed Fairing Halves, Fairing Halves, Fairing Halves, Fixed Base Modules, CFLR Base Modules, CFLR Base Modules, CFLR Base Modules, CFLR Launch Base Modules, CFLR Launch Base Modules, CFLR Launch Launch Launch Launch Platform Platform Platform Platform Platform Platform