<<

40th International Society of City and Regional Planners Young Planners Workshop

Challenges and Opportunities of the CEVA Project

presented by SCALED SOLUTIONS Aletta Britz, South Africa Maya Damayanti, Indonesia Simone Gabi, / Hale Mamunlu, / Switzerland Peter Vanden Abeele, Sebastian Wilske, Germany

19 September 2004 Scaled Solutions 1 Presentation Structure:

1. General idea of the CEVA Project (Cornavin-Eaux-Vives- Annemasse) 2. Two possible strategies along CEVA line 3. Three development sites – three themes 4. Time Frame 5. Actors 6. Conclusions

19 September 2004 Scaled Solutions 2 CEVA: Border-crossing link in the Agglomeration of

Lausanne, Nyon

Paris, Lyon

Thonon

Mica Etoile

Legend La Praille International Railways Streets Trams

N 1 km 2 km CEVA Line 19 September 2004 Scaled SolutionsParis, Lyon 3 CEVA and the urban tissue (development centers)

UNO

Mica Etoile

Annemasse

Legend La Praille Commercial Housing Public Station area N 1 km 2 km 19 September 2004 Scaled SolutionsCity / Green 4 Assumptions about the effects of CEVA

1. REGIONAL LEVEL • A Connection between Switzerland and will be created • The CEVA line will be an impulse for economic development • A solution for commuter traffic will be introduced

2. LOCAL LEVEL (/LaPraille, Annemasse, Ambilly and Mon Idee) • The value and accessibility of the sites will grow

19 September 2004 Scaled Solutions 5 Development Strategy with CEVA

19 September 2004 Scaled Solutions 6 Development Strategy Before CEVA

Landscape

TGV

Tram

Tram TGV

Highway

19 September 2004 Scaled Solutions 7 Development Principle

Development from inside to outside

Development from outside to inside (firstly empty)

19 September 2004 Scaled Solutions 8 Theme for Carouge/ La Praille: A multifunctional central area

Motivation: • High density around accessible activity center, regenerate urban activity •Priority: High

66 ha

Population Carouge: 10.000

19 September 2004 Scaled Solutions 9 Theme for Carouge/ La Praille: A multifunctional central area

Legend: Highway mainroads Trainline (+ CEVA) Station area Parking area Tramline 19 September 2004 Scaled SolutionsGreen Area 10 Theme for Carouge/ La Praille: A multifunctional central area

Legend: Mixed housing Offices + shopping Services, small enterprises, Offices Green area 19 September 2004 Scaled SolutionsRecreational 11 facilities Theme for Annemasse: Urban Creativity Motivation: • High density around accessible activity center, provide new vibrant facilities for local and commuting people • Priority: High

34 ha

Population : 25.000

19 September 2004 Scaled Solutions 12 Theme for Annemasse: Urban Creativity

Legend: Highway mainroads Trainline (TGV, CEVA) Station area 19 September 2004 Scaled SolutionsParking area 13 Theme for Annemasse: Urban Creativity

Legend: Trainline (TGV, CEVA) Station area Mixed housing Offices + shopping

Agricultural area 19 September 2004 Scaled Solutions 14 Theme for Green Field: Reserve for future shrinking

Motivation: • Not within action radius of railway station • Far from urban activities • Greenfield with limited access • Development not desirable, but if pressure for more housing rises – concept • Priority: Low

29 ha 33 ha

19 September 2004 Scaled Solutions 15 Theme for Green Field Reserve for future shrinking

Legend: Main road Bus access Project area Housing block 19 September 2004 Scaled SolutionsPrivate 16parking Theme for Green Field Reserve for future shrinking

Legend: Privat parking Housing block

Agricultural area

19 September 2004 Scaled SolutionsForest 17 Actors Users, Owners, … III 1. The CRFG (Comité Régional Franco- Genevois) 2. CEVA Organization*) I II 3. Swiss: • Switzerland Federal • 4. France: • French Central Government • Rhone-alpes Carouge : Ambilly – Mon Indee and Regional Annemasse: Government • Commune Geneve • Commune Chéne-Bourg • Department de Haute • Commune • Commune Thönex Savoie • Commune Carouge *) = to realize CEVA project • Community Organization in France

19 September 2004 Scaled Solutions 18 Commune

Cologny

Geneve Thönex

Chéne- Bourg Lancy Chéne- Bourgéries Carouge

19 September 2004 Scaled Solutions 19 Time Frame

2004: 2005 : 2015: 2025: Negotiations Tramline in High density activities established Development pressure leads to with La Praille around La Praille annd Annemasse development of Ambilly and commune completed Mon Idée Prepare sites for new higher density develop

CEVA can start at any point

19 September 2004 Scaled Solutions 20 Conclusions

1. The development of these concepts do not rely entirely on the start/timing of the CEVA line, however, it could contribute to even more vibrant and active centers around La Praille and Annemasse stations.

2. The development of the Greenfields is not a high priority in the short to medium term, however, if pressure for more housing rises in the long term, the proposed concept will be implemented.

3. The various and overlapping Institutions and Stakeholders might be a challenge that has to be addressed.

19 September 2004 Scaled Solutions 21 t h a n k y o u

19 September 2004 Scaled Solutions 22