Sample Procurement Plan Agriculture and Land Growth Management Project (P151469)

Public Disclosure Authorized I. General

2. Bank’s approval Date of the procurement Plan: Original: January 2016 – Revision PP: December 2016 – February 2017 3. Date of General Procurement Notice: - 4. Period covered by this procurement plan: July 2016 to December 2017

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable

Public Disclosure Authorized procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.]

Type de contrats Montant contrat Méthode de passation de Contrat soumis à revue a en US$ (seuil) marchés priori de la banque 1. Travaux ≥ 5.000.000 AOI Tous les contrats

< 5.000.000 AON Selon PPM

< 500.000 Consultation des Selon PPM fournisseurs Public Disclosure Authorized Tout montant Entente directe Tous les contrats

2. Fournitures ≥ 500.000 AOI Tous les contrats

< 500.000 AON Selon PPM

< 200.000 Consultation des Selon PPM fournisseurs Tout montant Entente directe Tous les contrats

Tout montant Marchés passes auprès Tous les contrats d’institutions de l’organisation des Nations Unies Public Disclosure Authorized

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: -

4. Reference to (if any) Project Operational/Procurement Manual: Manuel de procedures (execution – procedures administratives et financières – procedures de passation de marches): décembre 2016 – émis par l’Unite de Gestion du projet Casef (Croissance Agricole et Sécurisation Foncière)

5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] -

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement)

[List the Packages which require Bank’s prior review first and then the other packages]

1 2 3 4 5 6 7

Ref. Description Estimated Packages Domestic Review Comments No. Cost Preference by Bank US$ million (yes/no) (Prior / Post) Summary of the ICB No Prior (Works) Summary of the ICB 1,025 2 No Prior (Goods) Summary of the 5,821 2 No Prior 1st contract NCB (Works) for Prior Review Summary of the 0,257325 1 No Prior 1st contract NCB (Goods) for Prior Review Summary of the ICB - - No Prior (Non-Consultant Services) CFN (Consultations - - No Prior de Fournisseurs) – (travaux) CFN (Consultations 0,0884 1 No Prior de Fournisseurs) – (Fournitures) Entente directe 0,031 1 No Prior (fournitures) Marchés passes 0,703 2 No Prior auprès d’institutions de l’organisation des Nations Unies Summary of the 4,243 2 No Post NCB (Works) Summary of the 0,2031 3 No Post NCB (Goods)

July 9, 2010 CFN (Consultations 0,095 4 No Post de Fournisseurs) – (travaux) CFN (Consultations 0,101 5 No Post de Fournisseurs – Achat à commande) – (Fournitures et services autres que services de consultants)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Type de contrats Montant contrat Méthode de passation Contrat soumis à revue en US$ (seuil) de marchés a priori de la banque 3. Consultants ≥ 200.000 SFQC, SFQ, SCBD Tous les contrats (firmes) SMC, SQC, , < 200.000 SFQC, SFQ, SCBD Selon PPM SMC, SQC , Consultant ≥ 100.000 Comparaison de 3 Tous les contrats individuels CVs < 100.000 Comparaison de 3 Selon PPM CVs Firmes et individuels Tout montant Entente directe Tous les contrats

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable]

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. No. Description of Estimated Packages Review Comments Assignment Cost by Bank US$ (Prior / million Post) Summary of 5,6291 4 Prior number of contracts that

July 9, 2010 will be let under QCBS Summary of 13,75775 23 Prior SFQ, CI, number of SQC, contracts that entente will be let directe under other methods Summary of 0,609 4 Post number of contracts that will be let under QCBS Summary of 0,117 11 Post CI, SQC number of contracts that will be let under other methods

July 9, 2010 PROCUREMENT : Madagascar Agriculture Rural Growth and Land Management Project PLAN General Information Country: Madagascar Banks Approval Date of the Original Procurement Plan: 2017-09-27 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-10-18 Project ID: P151469 GPN Date: Project Name: Madagascar Agriculture Rural Growth and Land Management Project Loan / Credit No: IDA / 57750 Executing Agency(ies): PROJECT MANAGEMENT UNIT AGRICULTURE GROWTH AND LAND MANAGEMENT, Intervention Funds for Development

WORKS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP CASEF-16720-CW- RFQ / T 2-16/C4: Travaux Component 4. Project Request for Single Stage - One Pending d'aménagement du bureau IDA / 57750 Post Limited 23,000.00 0.00 2017-06-17 2017-07-28 2018-08-27 Management and Coordination Quotations Envelope Implementation annexe pour cellule nationale à

MG-UGP CASEF-16721-CW- Component 4. Project Request for Single Stage - One Pending RFQ / T 3-16/C4: Rénovation IDA / 57750 Post Limited 50,000.00 0.00 2017-06-20 2017-08-01 2018-10-29 Management and Coordination Quotations Envelope Implementation locaux cellule Vakinankaratra

MG-UGP CASEF-16722-CW- RFQ / T 4-16/C4: Travaux Component 4. Project Request for Single Stage - One Pending d'aménagement du bureau IDA / 57750 Post Limited 9,000.00 0.00 2017-06-15 2017-07-25 2018-08-23 Management and Coordination Quotations Envelope Implementation annexe pour cellule Vakinankaratra

MG-UGP CASEF-16723-CW- RFQ / T 5-16/C4: Rénovation Component 4. Project Request for Single Stage - One Pending IDA / 57750 Post Limited 7,000.00 0.00 2017-06-19 2017-07-30 2018-08-28 locaux cellule Toamasina et Management and Coordination Quotations Envelope Implementation antenne Analanjirofo

DRFM1TRMPE17ATEC001 / TRAVAUX DE REHABILITATION DU BARRAGE BETSIMISOTRA - Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 91,703.47 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 COMMUNE RURALE Emergency Response Envelope Implementation

BETSIMISOTRA - DISTRICT FANDRIANA

DRFM1TRMPE17ATEC002 / TRAVAUX DE REHABILITATION DU BARRAGE VOLAMENA Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 42,988.40 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 DANS LA COMMUNE RURALE Emergency Response Envelope Implementation

DE VOLAMENA - DISTRICT AMBALAVAO

DRFM1TRMPE17ATEC003 / TRAVAUX DE RECONSTITUTION DES BERGES ET TRAITEMENT Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 15,011.82 0.00 2017-11-19 2017-11-23 2017-12-03 2017-12-05 2017-12-20 2019-05-19 BRECHES SAHAREVO - Emergency Response Envelope Implementation

COMMUNE RURALE ILAKA CENTRE - DISTRICT AMBOSITRA

DRTM1TRMPE1701 / Travaux de reconstruction de la digue Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 100,314.13 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Ambalanosy à Antanifotsy - Emergency Response Envelope Implementation

Commune Ambodiriana

DRTM1TRMPE1702 / Travaux de reconstruction du MPI à Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 84,587.87 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Antsirabe II - Commune Emergency Response Envelope Implementation

Ambohimiarivo

DRTM1TRMPE1703 / Travaux de reconstruction du MPI à Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 84,587.87 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Antsirabe II - Commune Emergency Response Envelope Implementation

Mandrosohasina

DRTM1TRMPE1704 / Travaux de reconstruction de la digue de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 67,610.60 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 protection à - Emergency Response Envelope Implementation

Commune

DRTM1TRMPE1705 / Travaux de reconstruction du drain Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 56,293.43 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Manandona à Antsirabe II - Emergency Response Envelope Implementation

Commune Ambohidranandriana

DRTM1TRMPE1706 / Travaux de reconstruction de la digue de Component 5. Contingency Single Stage - One Pending protection de la Sisaony à IDA / 57750 Post Request for Bids Open - National 46,538.25 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 Emergency Response Envelope Implementation Atsimondrano - Commune Fenoarivo

DRTM1TRMPE1707 / Travaux de reconstruction de l'ouvrage de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 34,908.07 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 franchissement à - Emergency Response Envelope Implementation

Commune Andramasina

DRTM1TRMPE1708 / Travaux de reconstruction du MPI à Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 25,464.90 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 - Commune Emergency Response Envelope Implementation

Amboasary

DRTM1TRMPE1709 / Travaux de reconstruction de la digue de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 19,510.35 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 protection à Andramasina - Emergency Response Envelope Implementation

Commune Vatosola

Page 1 DRTM1TRMPE1710 / Travaux de reconstruction de la digue de protection de la Sisaony à Atsimondrano - Commune Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 24,578.53 0.00 2018-01-04 2018-01-05 2018-02-05 2018-02-06 2018-02-19 2019-06-23 et de la digue de Emergency Response Envelope Implementation protection de l'Andromba à Atsimondrano - Commune Androhibe

DRAM1TRMPE1701 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,044.09 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

01

DRAM1TRMPE1702 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 94,155.44 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

02

DRAM1TRMPE1703 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,044.09 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

10

DRAM1TRMPE1704 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Beanana

DRAM1TRMPE1705 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Mahasoa

DRAM1TRMPE1706 / Travaux Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 de ReconstructionCSB1 Vinanibe Emergency Response Envelope Implementation

DRAM1TRMPE1707 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 63,982.17 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Maroantsetra LOT 03

DRAM1TRMPE1708 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 66,825.83 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Maroantsetra LOT 04

DRAM1TRMPE1709 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe totalement détruites Emergency Response Envelope Implementation

MAROANTSETRA LOT 03

DRAM1TRMPE1710 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,044.09 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

04

DRAM1TRMPE1711 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

05

DRAM1TRMPE1712 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

06

DRAM1TRMPE1713 / Travaux Component 5. Contingency Single Stage - One Pending de réhabilitation MPI IDA / 57750 Post Request for Bids Open - National 48,342.09 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Ambinanintelo

DRAM1TRMPE1714 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 76,778.61 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Maroantsetra LOT 01

DRAM1TRMPE1715 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 98,106.00 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Maroantsetra LOT 02

DRAM1TRMPE1716 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,044.09 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

07

DRAM1TRMPE1717 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

08

DRAM1TRMPE1718 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

09

DRAM1TRMPE1719 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,044.09 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2018-01-28 2018-07-07 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

11

DRAM1TRMPE1720 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Antevibe

DRAM1TRMPE1721 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Madiotsifafana

DRAM1TRMPE1722 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Sakatihina

Page 2 DRAM1TRMPE1723 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 38,389.30 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Maroantsetra LOT 05

DRAM1TRMPE1724 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 94,551.44 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

12

DRAM1TRMPE1725 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 69,100.75 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

13

DRAM1TRMPE1726 / Travaux deReconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 69,100.75 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

14

DRAM1TRMPE1727 / Travaux de Reconstruction des salles de Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 76,778.61 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 classe MAROANTSETRA LOT Emergency Response Envelope Implementation

15

DRAM1TRMPE1728 / Travaux Component 5. Contingency Single Stage - One Pending de réhabilitation MPI Sahena IDA / 57750 Post Request for Bids Open - National 68,816.38 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation LOT 01

DRAM1TRMPE1729 / Travaux Component 5. Contingency Single Stage - One Pending de réhabilitation MPI Sahena IDA / 57750 Post Request for Bids Open - National 68,816.38 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation LOT 02

DRAM1TRMPE1730 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB 2 IDA / 57750 Post Request for Bids Open - National 68,247.65 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Maroantsetra

DRAM1TRMPE1731 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructures IDA / 57750 Post Request for Bids Open - National 31,280.17 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation agricole Maroantsetra LOT 01

DRAM1TRMPE1732 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CHRD2 IDA / 57750 Post Request for Bids Open - National 61,817.87 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Ambodifotatra

DRAM1TRMPE1733 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 54,998.11 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Sainte marie LOT 01

DRAM1TRMPE1734 / Travaux Component 5. Contingency Single Stage - One Pending de Réabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 58,123.00 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical BRICKAVILLE LOT 01

DRAM1TRMPE1735 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation BRICKAVILE

DRAM1TRMPE1736 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation FETRAOMBY

DRAM1TRMPE1737 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation RANOMAINTY

DRAM1TRMPE1738 / Travaux de Reconstruction et réparation Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 98,809.10 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 infrastructure médical Emergency Response Envelope Implementation

BRICKAVILLE LOT 01

DRAM1TRMPE1739 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 29,061.50 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical FENERIVE EST LOT 01

DRAM1TRMPE1740 / Travaux de Reconstruction CSB1 Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 MAROVOVONANA Emergency Response Envelope Implementation

MAROVOVONANA

DRAM1TRMPE1741 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Ambavala

DRAM1TRMPE1742 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Anamborano

DRAM1TRMPE1743 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Miarinarivo

DRAM1TRMPE1744 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 01

DRAM1TRMPE1745 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 02

DRAM1TRMPE1746 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 03

DRAM1TRMPE1747 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 04

Page 3 DRAM1TRMPE1748 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 05

DRAM1TRMPE1749 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 96,629.49 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 06

DRAM1TRMPE1750 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 96,629.49 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 07

DRAM1TRMPE1751 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 90,235.96 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 09

DRAM1TRMPE1752 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 90,235.96 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 10

DRAM1TRMPE1753 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 90,235.96 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 11

DRAM1TRMPE1754 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction des salles de IDA / 57750 Post Request for Bids Open - National 74,542.75 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation classe FENERIVE EST LOT 12

DRAM1TRMPE1755 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation MPI IDA / 57750 Post Request for Bids Open - National 50,857.63 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Ambodifira

DRAM1TRMPE1756 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation MPI IDA / 57750 Post Request for Bids Open - National 59,285.46 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Andongozabe

DRAM1TRMPE1757 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 79,919.13 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 01

DRAM1TRMPE1758 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 01

DRAM1TRMPE1759 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 02

DRAM1TRMPE1760 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation MPI IDA / 57750 Post Request for Bids Open - National 17,436.90 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Ambinanisasika

DRAM1TRMPE1761 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 84,278.35 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 03

DRAM1TRMPE1762 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 58,123.00 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 04

DRAM1TRMPE1763 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 05

DRAM1TRMPE1764 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 06

DRAM1TRMPE1765 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 07

DRAM1TRMPE1766 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 08

DRAM1TRMPE1767 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 09

DRAM1TRMPE1768 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 10

DRAM1TRMPE1769 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 43,592.25 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Mahanoro LOT 11

DRAM1TRMPE1770 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Fanorahana

DRAM1TRMPE1771 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructures IDA / 57750 Post Request for Bids Open - National 89,364.11 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation agricole Mananara LOT 01

DRAM1TRMPE1772 / Travaux de Reconstruction et Component 5. Contingency Single Stage - One Pending Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 84,568.97 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Soanierana ivongo LOT 02

Page 4 DRAM1TRMPE1773 / Travaux de Reconstruction et Component 5. Contingency Single Stage - One Pending Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 95,902.95 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical Soanierana Ivongo LOT 01

DRAM1TRMPE1774 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation CSB IDA / 57750 Post Request for Bids Open - National 52,310.70 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Ambohijafy

DRAM1TRMPE1775 / Travaux de Réhabilitationet réparation Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 55,216.85 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 infrastructure médical Emergency Response Envelope Implementation

TOAMASINA I et II

DRAM1TRMPE1776 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation BUREAU IDA / 57750 Post Request for Bids Open - National 58,123.00 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Toamasina I

DRAM1TRMPE1777 / Travaux de Réhabilitation infrastructure Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 52,310.70 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 médical IFIRP Analankininina Emergency Response Envelope Implementation

Hopitaly Be

DRAM1TRMPE1778 / Travaux de Réparation CSB 2 Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 26,155.35 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 TANAMBAO VAHATRAKAKA Emergency Response Envelope Implementation

LOT 01

DRAM1TRMPE1779 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation MPI IDA / 57750 Post Request for Bids Open - National 43,592.25 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Ambohimiadana

DRAM1TRMPE1780 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 47,951.48 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical VATOMANDRY LOT 01

DRAM1TRMPE1781 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 92,996.80 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical VATOMANDRY LOT 02

DRAM1TRMPE1782 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 82,825.28 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical VATOMANDRY LOT 03

DRAM1TRMPE1783 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 84,278.35 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical VATOMANDRY LOT 04

DRAM1TRMPE1784 / Travaux Component 5. Contingency Single Stage - One Pending de Réparation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.50 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical VATOMANDRY LOT 05

DRAM1TRMPE1785 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Ambodimangavalo

DRAM1TRMPE1786 / Travaux Component 5. Contingency Single Stage - One Pending de Réhabilitation infrastructure IDA / 57750 Post Request for Bids Open - National 87,184.49 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation médical VAVATENINA LOT 01

DRAM1TRMPE1787 / Travaux Component 5. Contingency Single Stage - One Pending de Reconstruction CSB1 IDA / 57750 Post Request for Bids Open - National 69,747.59 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Ambatoharanana Miarinarivo

DRAM1TRMPE1788 / Component 5. Contingency Single Stage - One Pending Reconstruction CSB2 IDA / 57750 Post Request for Bids Open - National 69,747.60 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 Emergency Response Envelope Implementation Ambodimanga

DRAM1TRMPE1789 / Travaux de Réparation infrastructure Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 65,388.38 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 médical région atsinanana LOT Emergency Response Envelope Implementation

01

DRAM1TRMPE1790 / Travaux de Réparation infrastructure Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 95,031.11 0.00 2017-11-25 2017-11-27 2017-12-07 2017-12-17 2017-12-28 2018-06-06 médical région atsinanana LOT Emergency Response Envelope Implementation

02

DRKM1TRMPE17002 / Travaux Component 5. Contingency Single Stage - One Pending réhabilitation barrage Ambihilava IDA / 57750 Post Request for Bids Open - National 42,737.01 0.00 2017-11-10 2017-11-12 2017-11-23 2017-11-25 2017-12-20 2018-04-29 Emergency Response Envelope Implementation --

DRSM1TRMPE17001 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

1 (06 salles) - ANTALAHA

DRSM1TRMPE17002 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des infrastructures scolaires LOT Emergency Response Envelope Implementation

2 (06 salles) - ANTALAHA

DGM1TRMPE1701 / Travaux de réhabilitation du MPI Beanantsindra: Canal principal Component 5. Contingency Single Stage - One Pending ensablé sur 3 km et canal de 15 IDA / 57750 Post Request for Bids Open - National 109,996.22 0.00 2017-12-08 2017-12-11 2017-12-22 2018-01-10 2018-01-25 2018-06-21 Emergency Response Envelope Implementation m détruit, canal 2km - Endommagé Localisation: Ambatosia

DGM1TRMPE1702 / Travaux de réhabilitation du MPI au secteur Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 106,971.32 0.00 2017-12-08 2017-12-11 2017-12-22 2018-01-10 2018-01-25 2018-06-21 4 brèches de 120m - Localisation Emergency Response Envelope Implementation

Marovoay

Page 5 DGM1TRMPE1704 / Travaux de réhabilitation du MPI d': Eboulement sur Component 5. Contingency Single Stage - One Pending une longueur de 500 m dans le IDA / 57750 Post Request for Bids Open - National 41,248.58 0.00 2017-12-08 2017-12-11 2017-12-22 2018-01-10 2018-01-25 2018-06-21 Emergency Response Envelope Implementation CP - Ensablement Localisation: Befandriana Nord -

DGM1TRMPE1705 / Travaux de réhabilitation du MPI au secteur Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 24,749.15 0.00 2017-12-08 2017-12-11 2017-12-22 2018-01-10 2018-01-25 2018-06-21 11: brèches, rehaussement Emergency Response Envelope Implementation berge - Localisation Marovoay

DGM1TRMPE1706 / Travaux de réhabilitation du MPI d'Antsakoabe: murette 55m, Component 5. Contingency Single Stage - One Pending canal : murettes IDA / 57750 Post Request for Bids Open - National 19,524.33 0.00 2017-12-08 2017-12-11 2017-12-22 2018-01-10 2018-01-25 2018-06-21 Emergency Response Envelope Implementation 35m, canal Anjavibe: murettes 20m - Localisation: Antsiranana II - Antsakoabe

DGM1TRMPE1703 / Travaux de Component 5. Contingency Single Stage - One Pending réhabilitation de l'abattoir - IDA / 57750 Post Request for Bids Open - National 41,248.58 0.00 2017-12-08 2017-12-11 2017-12-22 2018-01-10 2018-01-25 2018-06-21 Emergency Response Envelope Implementation Localisation: Ambilobe

DRKM1TRMPE17003 / Travaux Réhabilitation Bevinany, Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 42,737.01 0.00 2017-11-10 2017-11-12 2017-11-23 2017-11-25 2017-12-20 2018-04-29 Lavahandry : affaissement digue- Emergency Response Envelope Implementation

Érosion Farafangana-

DRSM1TRMPE17003 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

03 (06 salles) - ANTALAHA

DRSM1TRMPE17004 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des infrastructures scolaires LOT Emergency Response Envelope Implementation

04 (06 salles) - ANTALAHA

DRSM1TRMPE17005 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,278.90 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

05 (05 salles) - ANTALAHA

DRSM1TRMPE17006 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,278.90 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

06 (05 salles) - ANTALAHA

DRSM1TRMPE17007 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des Infrastructures scolaires LOT Emergency Response Envelope Implementation

07 (06 salles) - ANTALAHA

DRSM1TRMPE17008 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

08 (06 salles) - ANTALAHA

DRSM1TRMPE17009 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

09 (06 salles) - ANTALAHA

DRSM1TRMPE170010 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

10 (06 salles) - ANTALAHA

DRSM1TRMPE170011 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,278.90 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

11 (05 salles) - ANTALAHA

DRSM1TRMPE170012 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,278.90 0.00 2017-12-08 2017-12-11 2017-12-22 2017-12-23 2018-01-25 2018-06-21 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

12 (05 salles) - ANTALAHA

DRSM1TRMPE170013 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

13 (06 salles) - SAMBAVA

DRSM1TRMPE170014 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

14 (06 salles) - SAMBAVA

DRSM1TRMPE170015 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

15 (06 salles) - SAMBAVA

DRSM1TRMPE170016 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

16 (06 salles) - SAMBAVA

DRSM1TRMPE170017 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

17 (06 salles) - SAMBAVA

DRSM1TRMPE170018 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,278.90 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

18 (05 salles) - VOHEMAR

Page 6 DRSM1TRMPE170019 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,278.90 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

19 (05 salles) - VOHEMAR

DRSM1TRMPE170020 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

20 (06 salles) - VOHEMAR

DRSM1TRMPE170021 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 81,934.68 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 des Infrastructures Scolaires LOT Emergency Response Envelope Implementation

21 (06 salles) - VOHEMAR

DRSM1TRMPE170022 / Travaux Component 5. Contingency Single Stage - One Pending de réhabilitation/reconstruction IDA / 57750 Post Request for Bids Open - National 68,997.63 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 Emergency Response Envelope Implementation CSB ANTOMBANA - ANTALAHA

DRSM1TRMPE170023 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,997.63 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 CSB II AMPAHANA - Emergency Response Envelope Implementation

ANTALAHA

DRSM1TRMPE170024 / Travaux Component 5. Contingency Single Stage - One Pending de réhabilitation CHRD2 IDA / 57750 Post Request for Bids Open - National 35,878.77 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 Emergency Response Envelope Implementation AMBONDRONA - ANTALAHA

DRSM1TRMPE170025 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,997.63 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 CSB II AMBODIAMPANA Emergency Response Envelope Implementation

LOKOHO - SAMBAVA

DRSM1TRMPE170026 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,997.63 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 CSB I AMBATOJOBY - Emergency Response Envelope Implementation

SAMBAVA

DRSM1TRMPE170027 / Travaux de réhabilitation/reconstruction Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 68,997.63 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 CSB II FARAHALANA - Emergency Response Envelope Implementation

SAMBAVA

DRSM1TRMPE170028 / Travaux Component 5. Contingency Single Stage - One Pending de réhabilitation/reconstruction IDA / 57750 Post Request for Bids Open - National 43,123.52 0.00 2018-01-06 2018-01-08 2018-01-20 2018-01-22 2018-02-09 2018-06-25 Emergency Response Envelope Implementation CSB 2 NOSIARINA - SAMBAVA

DRSM1TRMPE170029 / Travaux réhabilitation BARRAGE à BEFANDRIANA - Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 27,311.86 0.00 2017-12-20 2017-12-22 2018-01-08 2018-01-10 2018-02-12 2018-06-22 AMPANEFENA - VOHEMAR et Emergency Response Envelope Implementation

BARRAGE à BEDANADANA - ANDRAFENKONA - VOHEMAR

DRSM1TRMPE170030 / Travaux de réhabilitation BARRAGE à Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 14,374.51 0.00 2017-12-20 2017-12-22 2018-01-08 2018-01-10 2018-02-12 2018-06-22 ANTOKOTOKO - AMBALABE - Emergency Response Envelope Implementation

ANTALAHA

DRSM1TRMPE170031 / Travaux de réhabilitation de 03 BARRAGES à ANTSAHALALINA, Component 5. Contingency Single Stage - One Pending ANTSORINDRINA et IDA / 57750 Post Request for Bids Open - National 32,486.38 0.00 2017-12-20 2017-12-22 2018-01-08 2018-01-10 2018-02-12 2018-06-22 Emergency Response Envelope Implementation AMBOHIMALAZA dans la COMMUNE RURALE d'AMBOHIMALAZA - District de SAMBAVA

DRKM1TRMPE17001 / Travaux réhabilitation brèche sur digue Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 58,361.47 0.00 2017-11-10 2017-11-12 2017-11-23 2017-11-25 2017-12-20 2018-04-29 Enitravy Farafangana- Emergency Response Envelope Implementation

MAHAFASA CENTRE

GOODS Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP CASEF-8681-GO-RFQ / F6-16/CN: Fournitures de matériels informatiques (laptops, desktops, imprimantes, Component 4. Project Request for Single Stage - One Pending IDA / 57750 Post Limited 88,400.00 0.00 2017-04-24 2017-05-26 2017-06-09 scanners, etc.) et de kits Management and Coordination Quotations Envelope Implementation autonome de capture d'humidité, pour (UGP) pour central, Foncier, cellules régionales, etc.

MG-UGP CASEF-12803-GO-UN / F1-16/CN-F2-16/CN: Fournitures de 33 Motos pour les services de protection des végétaux, les services fonciers, Component 4. Project IDA / 57750 Prior UN Agencies (Direct) Direct 703,000.00 389,691.47 Signed 2017-02-10 2017-04-13 2017-02-13 2017-04-13 2017-03-17 2017-03-17 2017-05-31 cellules régionales, Management and Coordination correspondants, UGP et de 09 véhicules tout terrain pour la mise en Suvre des activités par CCRF, les cellules régionales

MG-UGP CASEF-13414-GO- RFB / F1-16/C1.1 Fourniture Component 1. Agribusiness Single Stage - One Under équipement de laboratoire de IDA / 57750 Prior Request for Bids Open - International 900,000.00 0.00 2017-01-10 2017-05-12 2017-01-23 2017-03-09 2017-03-09 2017-05-06 2017-05-25 2017-08-17 Value Chain Development Envelope Implementation l'Institut Pasteur de Madagascar (IPM)

Page 7 MG-UGP CASEF-16559-GO- RFQ / F 2-17/C2.2 Fournitures Component 2. Support to Land de mobiliers de bureau pour 11 Request for Single Stage - One Pending IDA / 57750 Policy and Land Rights Post Limited 51,075.00 0.00 2017-06-14 2017-07-27 2017-09-10 Services fonciers régionaux pour Quotations Envelope Implementation Registration fiabilisation du PLOF et pour 20 CRIF et GF standards

MG-UGP CASEF-16576-GO- RFB / F 7-17/CN: Fournitures de matériels bureautiques Component 4. Project Single Stage - One Pending (photocopieuses/Duplicopieurs, IDA / 57750 Post Request for Bids Open - National 50,200.00 0.00 2017-06-06 2017-06-13 2017-07-13 2017-07-27 2017-08-16 2017-09-15 Management and Coordination Envelope Implementation vidéoprojecteurs, etc.) pour central, foncier et cellules régionales

MG-UGP CASEF-16587-GO- RFQ / F 8-17/CN: Fournitures de divers matériels de communication et d'audiovisuels Component 4. Project Request for Single Stage - One Pending IDA / 57750 Post Limited 28,350.00 0.00 2017-06-14 2017-07-23 2017-08-22 (appareils photos professionnels, Management and Coordination Quotations Envelope Implementation dictaphones, smartphone, etc.) pour central et cellules régionales

MG-UGP CASEF-16591-GO-DIR / F 9-17/CN: Fourniture de Component 4. Project Pending IDA / 57750 Prior Direct Selection Direct 31,000.00 0.00 2017-06-09 2017-06-15 2017-07-09 2017-07-30 Logiciel TOM2PRO (2 licences Management and Coordination Implementation pour les deux cellules régionales)

MG-UGP CASEF-16592-GO- RFQ / F 12-17/CN: Fourniture de divers matériels de bureau: calculatrice, machine pour reliure, agrafeuse géante, Component 4. Project Request for Single Stage - One Pending perforateur GM, massicot, IDA / 57750 Post Limited 41,250.00 0.00 2017-06-13 2017-07-21 2017-08-21 Management and Coordination Quotations Envelope Implementation supports pour flipchart avec accessoires complets et tableaux mous muraux pour affichage (usage atelier) avec supports de

MG-UGP CASEF-13419-GO- RFQ / F10-17/CN: Fournitures de mobiliers de bureau (antennes Itasy-Analanjirofo- F/D,CER Régionales, UGP, DPPI, etc.) et Component 4. Project Request for Single Stage - One Pending IDA / 57750 Post Limited 86,600.00 0.00 2017-05-02 2017-06-27 2017-12-24 fourniture de mobiliers en bois Management and Coordination Quotations Envelope Implementation dur du pays (armoires vitrés pour exposition, cadres photos A4 - A3, cadres posters/cartes thématiques)

MG-UGP CASEF-16684-GO- RFQ / F 13-17/CN: Fournitures Component 4. Project Request for Single Stage - One Pending ménagères: Bouilloires, machine IDA / 57750 Post Limited 2,000.00 0.00 2017-06-13 2017-07-21 2017-08-21 Management and Coordination Quotations Envelope Implementation à café, verres, etc. (UGP, CER régionales et DPPI)

MG-UGP CASEF-16686-GO- RFQ / F 17-17/CN Fourniture et Component 4. Project Request for Single Stage - One Pending installation des équipements IDA / 57750 Post Limited 17,000.00 0.00 2017-06-23 2017-08-01 2017-09-01 Management and Coordination Quotations Envelope Implementation complets pour visio-conférence (UGP/MPAE)

MG-UGP CASEF-16717-GO- RFQ / F 16-16/CN: Fournitures de fournitures de bureau, de Component 4. Project Request for Single Stage - One Pending produits d'entretien et diverses IDA / 57750 Post Limited 33,500.00 0.00 2017-08-21 2017-09-29 2017-10-30 Management and Coordination Quotations Envelope Implementation fournitures, de consommables informatiques,etc. (UGP, CER Régionales, DPPI)

MG-UGP CASEF-24129-GO- RFB / F 2-17/C1.1: Fourniture Component 1. Agribusiness Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 50,000.00 0.00 2017-08-21 2017-08-26 2017-09-25 2017-10-13 2017-10-23 2017-11-22 d'Equipements du laboratoire de Value Chain Development Envelope Implementation la DPAL

MG-UGP CASEF-24452-GO- RFB / F 3-17/C1.1: Fourniture Component 1. Agribusiness Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 102,900.00 0.00 2017-08-21 2017-08-26 2017-09-25 2017-10-13 2017-10-23 2017-11-22 d'Equipements du laboratoire de Value Chain Development Envelope Implementation la DPV

DGM1FRNS1704 / Acquisition Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 52,185.71 0.00 2017-09-11 2017-09-11 2017-09-21 2017-09-26 2017-09-29 2017-11-13 tentes pour CSB Emergency Response Envelope Implementation

DGM1FRNS1705 / Marchés multiples: Acquisition des Component 5. Contingency Request for Single Stage - One Pending IDA / 57750 Post Limited 33,696.74 0.00 2017-09-05 2017-09-23 2017-09-30 matériels informatiques pour le Emergency Response Quotations Envelope Implementation personnel

DGM1FRNS1706 / Marchés Component 5. Contingency Request for Single Stage - One Pending multiples: Acquisition mobiliers IDA / 57750 Post Limited 10,931.87 0.00 2017-09-05 2017-09-23 2017-09-30 Emergency Response Quotations Envelope Implementation de bureau pour le personnel

DGM1FRNS1703 / Acquisition Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 53,140.67 0.00 2017-09-11 2017-09-11 2017-09-21 2017-09-26 2017-09-29 2017-11-13 mobiliers pour CSB Emergency Response Envelope Implementation

DGM1FRNS1701 / Acquisition Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 464,996.01 0.00 2017-09-11 2017-09-11 2017-09-21 2017-09-26 2017-09-29 2017-12-28 équipement médical pour CSB Emergency Response Envelope Implementation

DGM1FRNS1702 / Acquisition Component 5. Contingency Single Stage - One Pending matériels informatiques pour IDA / 57750 Post Request for Bids Open - National 42,159.80 0.00 2017-09-08 2017-09-11 2017-09-21 2017-09-26 2017-09-29 2017-11-13 Emergency Response Envelope Implementation CSB

NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Procurement Prequalification Estimated Actual Amount Process Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / Description Loan / Credit No. Component Review Type Method Market Approach and Recommendation Signed Contract Contract Completion Process (Y/N) Amount (US$) (US$) Status Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

Page 8 MG-UGP CASEF-16562-NC- Component 2. Support to Land RFQ / F 1-16/C2.1 Edition et Request for Single Stage - One Pending IDA / 57750 Policy and Land Rights Post Limited 25,000.00 0.00 2017-06-09 2017-07-18 2017-08-17 reproduction de supports de Quotations Envelope Implementation Registration formations pour le foncier

MG-UGP CASEF-16560-NC- RFQ / F 3-17/CN: Service de transit pour dédouanement Component 4. Project Request for Single Stage - One Pending IDA / 57750 Post Limited 37,000.00 0.00 2017-06-09 2017-07-18 2017-09-16 matériels roulants et service de Management and Coordination Quotations Envelope Implementation mise en circulation du véhicule et moto

MG-UGP CASEF-16630-NC- RFQ / F 4-17/CN: Création, Component 4. Project Request for Single Stage - One Pending IDA / 57750 Post Limited 15,000.00 0.00 2017-07-10 2017-08-21 2017-09-20 maintenance et mise à jour de Management and Coordination Quotations Envelope Implementation site web pour le projet CASEF

DGM1PRLOC1701 / Location Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 100,001.89 0.00 2017-09-08 2017-09-08 2017-09-18 2017-09-23 2017-09-26 2017-10-17 véhicules Emergency Response Envelope Implementation

DGM1PRLOC1702 / Location Component 5. Contingency Single Stage - One Pending IDA / 57750 Post Request for Bids Open - National 1,903.95 0.00 2017-09-08 2017-09-08 2017-09-18 2017-09-23 2017-09-26 2017-10-17 motos Emergency Response Envelope Implementation

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Contract Type Estimated Actual Amount Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Report and Draft Signed Contract Contract Completion Amount (US$) (US$) Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP CASEF-13206-CS- QCBS / C1-16/C2.2 Appui aux GF et CRIF pour la délivrance des certificats fonciers, Component 2. Support to Land opérations de recensement et de Quality And Cost- IDA / 57750 Policy and Land Rights Prior Open - International 4,393,100.00 0.00 Under Review 2017-02-25 2017-05-10 2017-03-11 2017-05-11 2017-05-12 2017-06-12 2017-06-27 2017-07-21 2017-08-21 2018-08-21 certification, inventaire du Based Selection Registration domaine privé titré au nom de l'Etat,impression et diffusion du PLOF, appui aux SAC (schéma d'aménagements communaux)

MG-UGP CASEF-16594-CS- QBS / C 1-17/C1 et 3: Component 1. Agribusiness Quality Based Assistance technique à l'appui IDA / 57750 Prior Open - International 2,800,000.00 0.00 Under Review 2017-06-09 2017-07-26 2017-06-20 2017-08-09 2017-07-19 2017-09-24 2017-10-09 2017-11-07 2017-11-23 2021-05-21 Value Chain Development Selection aux chaines de valeurs agricoles sur la côte Est

MG-UGP CASEF-16622-CS- QBS / C 2-17/C1 et 3 Assistance Component 1. Agribusiness Quality Based technique à l'appui aux chaines IDA / 57750 Prior Open - International 6,400,000.00 0.00 Under Review 2017-06-09 2017-07-26 2017-06-20 2017-08-09 2017-07-19 2017-09-25 2017-10-10 2017-11-08 2017-11-24 2021-05-22 Value Chain Development Selection de valeurs agricoles sur les Hautes terres

MG-UGP CASEF-20504-CS- QBS / C1-16/C2.2: Appui aux Guichets Fonciers et CRIFs pour délivrance certificats fonciers, Component 2. Support to Land opérations recensement et Quality Based IDA / 57750 Policy and Land Rights Prior Open - International 8,400,000.00 0.00 Under Review 2017-02-25 2017-09-06 2017-03-11 2017-09-18 2017-07-31 2017-09-29 2017-10-19 2017-11-21 2017-11-28 2021-03-31 certification, inventaire domaine Selection Registration privé titré au nom de l'Etat, impression et diffusion PLOF, appui aux SAC (schéma d'aménagements communaux)

MG-UGP CASEF-24079-CS- CQS / FOR 03-17/C1.1: Consultant Component 1. Agribusiness Pending Formations locales pour IDA / 57750 Post Qualification Open - National 20,000.00 0.00 2017-08-14 2017-08-28 2017-09-28 2017-11-13 2017-11-17 2017-12-17 Value Chain Development Implementation renforcement de capacités des Selection agents de la DPAL

DRFM1CFMO17001 / MAITRISE D'OEUVRE DE LA REHABILITATION DU BARRAGE Component 5. Contingency Quality And Cost- Pending IDA / 57750 Post Open - National 10,189.27 0.00 2017-09-05 2017-09-07 2017-09-13 2017-10-03 2017-10-04 2017-10-07 2017-10-11 2018-10-11 BETSIMISOTRA - COMMUNE Emergency Response Based Selection Implementation

RURALE BETSIMISOTRA - DISTRICT FANDRIANA

DRFM1CFMO17002 / MAITRISE D'OEUVRE DE LA REHABILITATION DE BARRAGE Component 5. Contingency Quality And Cost- Pending IDA / 57750 Post Open - National 4,776.49 0.00 2017-09-05 2017-09-07 2017-09-13 2017-10-03 2017-10-04 2017-10-07 2017-10-11 2018-10-11 VOLAMENA - COMMUNE Emergency Response Based Selection Implementation

RURALE VOLAMENA -DISTRICT AMBALAVAO

DRFM1CFMO17003 / MAITRISE D'OEUVRE DE LA RECONSTITUTION BERGES ET Component 5. Contingency Quality And Cost- Pending TRAITEMENT BRECHES IDA / 57750 Post Open - National 2,047.07 0.00 2017-09-05 2017-09-06 2017-09-13 2017-10-03 2017-10-04 2017-10-07 2017-10-11 2018-10-11 Emergency Response Based Selection Implementation SAHAREVO - COMMUNE RURALE ILAKA CENTRE - DISTRICT AMBOSITRA

DRTM1CFMO17001 / Maîtrise Consultant d'Suvre digue Ambalanosy à Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 10,931.87 0.00 2017-09-11 2017-09-12 2017-11-02 2017-11-12 2017-11-14 2018-06-30 Antanifotsy - Commune Emergency Response Implementation Selection Ambodiriana

DRTM1CFMO17002 / Maîtrise Consultant Component 5. Contingency Pending d'Suvre MPI à Antsirabe II - IDA / 57750 Post Qualification Open - National 9,159.13 0.00 2017-09-11 2017-09-12 2017-11-02 2017-11-12 2017-11-14 2018-06-30 Emergency Response Implementation Commune Ambohimiarivo Selection

DRTM1CFMO17003 / Maîrise Consultant Component 5. Contingency Pending d'Suvre MPI à Antsirabe II - IDA / 57750 Post Qualification Open - National 9,159.13 0.00 2017-09-11 2017-09-12 2017-11-02 2017-11-12 2017-11-14 2018-06-30 Emergency Response Implementation Commune Mandrosohasina Selection

DRAM1CFATEC1701 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 58,568.30 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAROANTSETRA LOT 01

Page 9 DRTM1CFMO17004 / Maîtrise Consultant d'Suvre digue de protection à Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 7,386.40 0.00 2017-09-11 2017-09-12 2017-11-02 2017-11-12 2017-11-14 2018-06-30 Ambohidratrimo - Commune Emergency Response Implementation Selection Talatamaty

DRAM1CFATEC1702 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 58,146.44 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAROANTSETRA LOT 02

DRAM1CFATEC1703 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 58,779.23 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAROANTSETRA LOT 03

DRAM1CFATEC1704 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 54,068.45 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAROANTSETRA LOT 04

DRAM1CFATEC1705 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 15,929.45 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE SAINTE MARIE LOT 01

DRTM1CFMO17005 / Maîtrise Consultant d'Suvre drain Manandona à Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 6,204.57 0.00 2017-09-11 2017-09-12 2017-11-02 2017-11-12 2017-11-14 2018-06-30 Antsirabe II - Commune Emergency Response Implementation Selection Ambohidranandriana

DRTM1CFMO17006 / Maîtrise Consultant d'Suvre digue de protection de la Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 5,022.75 0.00 2017-09-11 2017-09-12 2017-11-02 2017-11-12 2017-11-14 2018-06-30 Sisaony à Atsimondrano - Emergency Response Implementation Selection Commune Fenoarivo

DRAM1CFATEC1706 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 27,561.55 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE BRICKAVILLE LOT 01

DRTM1CFMO17007 / Maîtrise Consultant d'Suvre ouvrage de Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 3,840.93 0.00 2017-09-11 2017-09-12 2017-11-02 2017-11-12 2017-11-14 2018-06-30 franchissement à Andramasina - Emergency Response Implementation Selection Commune Andramasina

DRTM1CFMO17008 / Maîtrise Consultant Component 5. Contingency Pending d'Suvre MPI à Anjozorobe - IDA / 57750 Post Qualification Open - National 2,659.10 0.00 2017-09-11 2017-09-12 2017-11-02 2017-11-12 2017-11-14 2018-06-30 Emergency Response Implementation Commune Amboasary Selection

DRAM1CFATEC1707 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 48,123.34 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE FENERIVE EST LOT 01

DRTM1CFMO17009 / Maîtrise Consultant d'Suvre digue de protection à Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 2,363.65 0.00 2017-09-11 2017-09-12 2017-11-02 2017-11-12 2017-11-14 2018-06-30 Andramasina - Commune Emergency Response Implementation Selection

DRAM1CFATEC1708 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 55,057.48 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE FENERIVE EST LOT 02

DRTM1CFMO17010 / Maîtrise d'Suvre digue de protection de la Sisaony à Atsimondrano - Consultant Component 5. Contingency Pending Commune Ampahitrosy et digue IDA / 57750 Post Qualification Open - National 3,545.47 0.00 2017-09-11 2017-09-12 2017-11-02 2017-11-12 2017-11-14 2018-06-30 Emergency Response Implementation de protection de l'Andromba à Selection Atsimondrano - Commune Androhibe

DRAM1CFATEC1709 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 37,733.08 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAHANORO LOT 01

Page 10 DRAM1CFATEC1710 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 41,342.33 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE MAHANORO LOT 02

DRAM1CFATEC1711 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR LES TRAVAUX DE Consultant Component 5. Contingency Pending RECONSTRUCTION ET IDA / 57750 Post Qualification Open - National 25,560.06 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 Emergency Response Implementation REHABILITATION DES Selection INFRASTRUCTURES DE BASE MANANARA/SOENIERANA IVONGO LOT 01

DRAM1CFATEC1712 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 16,405.69 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE TOAMASINA LOT 01

DRAM1CFATEC1713 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 34,998.80 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE VATOMANDRY LOT 01

DRAM1CFATEC1714 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 17,061.91 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE VAVATENINA LOT 01

DRAM1CFATEC1715 / ASSISTANCE AU MAITRE D'OUVRAGE DELEGUE POUR Consultant LES TRAVAUX DE Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 12,074.58 0.00 2017-09-05 2017-09-07 2017-09-20 2017-10-01 2017-10-16 2018-06-16 RECONSTRUCTION ET Emergency Response Implementation Selection REHABILITATION DES INFRASTRUCTURES DE BASE ATSINANANA LOT 01

DGM1CFMO1701 / Maîtrise d'oeuvre des travaux de réhabilitation du MPI Consultant Beanatsindra: Canal principal Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 14,999.48 0.00 2017-09-10 2017-09-10 2017-09-15 2017-10-04 2017-10-24 2018-06-19 ensablé sur 3km et canal de 15m Emergency Response Implementation Selection détruit, Antsamaka canal 2km- Endommagé - Localisation: Bealanana - Ambatosia

DRKM1CFMO17001 / Maitrise d'Suvre réhabilitation brèche sur Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 4,136.38 0.00 2017-09-12 2017-09-12 2017-09-12 2017-09-27 2017-09-28 2017-09-30 2017-10-22 2018-03-29 digue Enitravy Farafangana- Emergency Response Implementation

MAHAFASA CENTRE

DGM1CFMO1703 / Maîtrise Consultant d'oeuvre des travaux de Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 5,624.81 0.00 2017-09-10 2017-09-10 2017-09-16 2017-10-04 2017-10-24 2018-06-19 réhabilitation de l'abattoir - Emergency Response Implementation Selection Localisation AMBILOBE

DRSM1CFATEC17005 / Assistance au Maître d'Ouvrage Délégué des 07 Infrastructures Sanitaires :CSB1 ANTOMBANA(ANTALAHA)- CSB2 AMPAHANA (ANTALAHA)- Component 5. Contingency Pending CHRD2 AMBONDRONA IDA / 57750 Post Least Cost Selection Open - National 36,868.73 0.00 2017-09-29 2017-09-29 2017-09-29 2017-10-16 2017-10-17 2017-10-19 2017-11-08 2018-06-30 Emergency Response Implementation (ANTALAHA)-CSB2 AMBODIAMPANA (SAMBAVA)- CSB1 AMBATOJOBY (SAMBAVA)-CSB2 FARAHALANA(SAMBAVA)- CSB2 NOSIARINA (SAMBAVA)

DRSM1CFATEC17001 / Assistance au Maître d'Ouvrage Component 5. Contingency Pending Délégué des Infrastructures IDA / 57750 Post Least Cost Selection Open - National 40,373.61 0.00 2017-09-17 2017-09-17 2017-09-17 2017-10-02 2017-10-03 2017-10-05 2017-10-26 2018-06-30 Emergency Response Implementation Scolaires LOT 1 à 6 (34 salles) - ANTALAHA

DRSM1CFATEC17002 / Assistance au Maître de Component 5. Contingency Pending l'Ouvrage Délégué des IDA / 57750 Post Least Cost Selection Open - National 40,373.61 0.00 2017-09-17 2017-09-17 2017-09-17 2017-10-02 2017-10-03 2017-10-05 2017-10-26 2018-06-30 Emergency Response Implementation Infrastructures Scolaires LOT 7 à 12 (34 salles) - ANTALAHA

DRSM1CFATEC17003 / Assistance au Maître d'Ouvrage Component 5. Contingency Pending Délégué des Infrastructures IDA / 57750 Post Least Cost Selection Open - National 35,623.77 0.00 2017-09-29 2017-09-29 2017-09-29 2017-10-16 2017-10-17 2017-10-19 2017-11-08 2018-06-30 Emergency Response Implementation scolaires LOT 13 à 17 (30 salles) - SAMBAVA

DRSM1CFMO17004 / Maîtrise d'Suvre des Infrastructures Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 26,124.10 0.00 2017-10-06 2017-10-06 2017-10-06 2017-10-23 2017-10-24 2017-10-26 2017-11-15 2018-06-30 Scolaires LOT 18 à 21 (22 salles) Emergency Response Implementation

- VOHEMAR

DRKM1CFMO17002 / Maitrise d'Suvre réhabilitation barrage Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 4,136.38 0.00 2017-09-12 2017-09-12 2017-09-12 2017-09-27 2017-09-28 2017-09-30 2017-10-22 2018-03-29 Ambihilava -Farafangana- Emergency Response Implementation

MAROVANDRIKA

Page 11 DGM1CFMO1702 / Maîtrsie d'oeuvre des travaux de Consultant Component 5. Contingency Pending réhabilitation du MPI au secteur IDA / 57750 Post Qualification Open - National 14,587.00 0.00 2017-09-10 2017-09-10 2017-09-15 2017-10-04 2017-10-24 2018-06-19 Emergency Response Implementation 4: brèches de 120 m - Selection Localisation: Marovoay

DGM1CFMO1704 / Maîtrise d'oeuvre des travaux de réhabilitation du MPI Ambarijeby: Consultant Component 5. Contingency Pending Eboulement sur une longueur de IDA / 57750 Post Qualification Open - National 5,624.81 0.00 2017-09-10 2017-09-10 2017-09-16 2017-10-04 2017-10-24 2018-02-24 Emergency Response Implementation 500m dans CP - Ensablement Selection Localisation: Befandriana Nord - Antsakanalabe

DGM1CFMO1705 / Maîtrise d'oeuvre des travaux de Consultant Component 5. Contingency Pending réhabilitation du MPI au secteur IDA / 57750 Post Qualification Open - National 3,374.88 0.00 2017-09-10 2017-09-10 2017-09-16 2017-10-04 2017-10-24 2018-06-19 Emergency Response Implementation 11: brêches, rehaussement Selection berge - Localisation: Marovoay

DGM1CFMO1706 / Maîtrsie d'oeuvre des travaux de réhabilitation du MPI Consultant d'Antsakoabe: murette 55m, Component 5. Contingency Pending IDA / 57750 Post Qualification Open - National 2,662.41 0.00 2017-09-10 2017-09-10 2017-09-16 2017-10-04 2017-10-24 2018-06-19 canal Antsahalalina: murette Emergency Response Implementation Selection 35m, canal Anjavibe: murette 20m - Localisation: Antsiranana II - Antsakoabe

DRSM1CFMO17006 / Maîtrise d'Suvre de 06 BARRAGES : -BEFANDRIANA - VHM -BEDANADANA - VHM Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 6,449.80 0.00 2017-10-09 2017-10-09 2017-10-09 2017-10-24 2017-10-25 2017-10-27 2017-11-17 2018-06-30 -ANTOKOTOKO - ATL Emergency Response Implementation

-ANTSAHALALINA - SVB -ANTSORINDRINA - SVB -AMBOHIMALAZA - SVB

DRKM1CFMO17003 / Maitrise d'Suvre Réhabilitation Bevinany, Component 5. Contingency Pending IDA / 57750 Post Least Cost Selection Open - National 4,136.38 0.00 2017-09-12 2017-09-12 2017-09-12 2017-09-27 2017-09-28 2017-09-30 2017-10-22 2018-03-29 Lavahandry : affaissement digue- Emergency Response Implementation

Érosion Farafangana-IABOHAZO

INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Contract Type Estimated Actual Amount Draft Negotiated Description Loan / Credit No. Component Review Type Method Market Approach Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion Amount (US$) (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

MG-UGP CASEF-13417-CS- INDV / C7-16/CN4: Recrutement Component 4. Project Individual Consultant Under IDA / 57750 Prior Open 52,350.00 0.00 2017-04-18 2017-05-12 2017-06-06 2017-06-27 2017-08-01 2018-01-28 d'un Expert politiques publiques Management and Coordination Selection Implementation et gouvernance cellule nationale

MG-UGP CASEF-14664-CS- Component 1. Agribusiness CDS / PA 1-16/C1.3 Fonds de IDA / 57750 Prior Direct Selection Direct 1,600,000.00 1,500,000.00 Signed 2016-11-28 2017-05-10 2016-11-28 2017-03-03 2017-03-03 2017-12-31 Value Chain Development garantie partielle de portefeuille

MG-UGP CASEF-23908-CS- INDV / C5-17/C1.2: Identification Component 1. Agribusiness Individual Consultant Pending IDA / 57750 Post Open 20,000.00 0.00 2017-08-18 2017-10-03 2017-10-15 2017-10-19 2017-12-18 des éléveurs et diagnostic de Value Chain Development Selection Implementation l'état sanitaire du cheptel

MG-UGP CASEF-23910-CS- INDV / C6-17/C1.2: Evaluation de la capacité d'intervention des Component 1. Agribusiness Individual Consultant Pending IDA / 57750 Post Open 7,000.00 0.00 2017-09-01 2017-10-17 2017-10-29 2017-11-02 2017-12-22 services de santé animale (public Value Chain Development Selection Implementation et privé) des régions Androy et Anosy

MG-UGP CASEF-23919-CS- INDV / C 1-17/C2.2: Consultant individuel international chargé appui évaluation propositions Component 2. Support to Land recrutement AT appui GF pour Individual Consultant Under IDA / 57750 Policy and Land Rights Post Open 25,000.00 0.00 2017-08-18 2017-10-10 2017-10-03 2017-10-15 2017-10-19 2018-01-17 délivrance certificats fonciers, Selection Implementation Registration opérations recensement et certification, inventaire domaine privé Etat, impress, diffusion PLOF, appui SAC

MG-UGP CASEF-24383-CS- INDV / C2-17/C1.2: Finalisation Component 1. Agribusiness Individual Consultant Pending IDA / 57750 Post Open 5,000.00 0.00 2017-08-21 2017-10-06 2017-10-18 2017-10-23 2017-12-22 de la Stratégie de Gestion post- Value Chain Development Selection Implementation récolte sur les céréales

DGM2CIATEC1701 / Assistance Component 5. Contingency Individual Consultant Pending technique à la mise en oeuvre IDA / 57750 Post Open 4,800.00 0.00 2017-09-05 2017-09-08 2017-09-12 2017-09-18 2018-07-01 Emergency Response Selection Implementation des activités du MRI

MG-UGP CASEF-24110-CS- CDS / FOR 04-17/C1.1: Stages, Component 1. Agribusiness Pending IDA / 57750 Post Direct Selection Direct 20,000.00 0.00 2017-10-23 2017-11-03 2017-12-07 2018-04-06 visites d'échanges, formations à Value Chain Development Implementation l'extérieur des agents de la DPAL