Sijil Kontraktor Okt 2017

Total Page:16

File Type:pdf, Size:1020Kb

Sijil Kontraktor Okt 2017 SENARAI SYARIKAT YANG BERDAFTAR SEBAGAI KONTRAKTOR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 1. A-MAS CONTRACTOR I KA01, B01 8749773 07 Apr 2016 6 Apr 2018 P. O. Box 564 No 48 Kg Sepakon Email : Pusat Memproses Mel Berakas B B 3577 Tanjong Maya Tutong T D 1141 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 2. A.LEEZIQ CONTRACTOR I KA01, B01 7134374 24 Jun 2017 23 Jun 2019 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Email : Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam 3. A.MALI CONTRACTOR I B01, KPB04, S02, S03 8909149 19 Aug 2016 18 Aug 2018 No 6 Simpang 64 No 6 Simpang 64 Email : Simpang 64/6 Jalan 60 Simpang 64/6 Jalan 60 Kampong Perpindahan Rimba Gadong B E Kampong Perpindahan Rimba Gadong B E 3319 3319 Negara Brunei Darussalam Negara Brunei Darussalam 4. A'R YANA CONSTRUCTION I B01 8801295 03 Jul 2017 2 Jul 2019 No. 676 Kampong Pengkalan Mau No. 676 Kampong Pengkalan Mau Email : Kiudang Tutong Kiudang Tutong julaihi.othman @outlook.com Negara Brunei Darussalam Negara Brunei Darussalam 5. ABA BIN OPAK DAN ANAK ANAK CONTRACTOR I KA01, B01, S03 8650010 16 Mar 2016 15 Mar 2018 Lot 4617 No 315 Lot 4617 No 315 Email : Kg Sungai Taring Lumut Seria Kg Sungai Taring Lumut Seria Kuala Belait K C 3135 Kuala Belait K C 3135 Negara Brunei Darussalam Negara Brunei Darussalam 6. ABD GHANI BAHAGIA JAYA CONTRACTOR I KA01, B01 8805491 18 Oct 2016 17 Oct 2018 No 25 Simpang 822 No 25 Simpang 822 Email : Kampong Luagan Dudok Kampong Luagan Dudok Tutong TB 1541 Tutong TB 1541 Negara Brunei Darussalam Negara Brunei Darussalam 7. ABU FAMILY'S ENTERPRISE I KA01, B01, M03, KPB02, 8775838 15 Aug 2017 1 Jun 2018 KPB04, KPB12, S01, S02, S03 P O Box 699 Email : Kuala Belait KA 1189 No 9 Simpang 64 Jalan Mumong [email protected] Negara Brunei Darussalam Kuala Belait Negara Brunei Darussalam 8. AD'DAM'S ENTERPRISE I KA01, B01, M03, KPB02, 8631789, 04 Nov 2016 3 Nov 2018 KPB04, KPB07 3236104 P. O. Box 434 Seria K B 1190 Lot 5344 Simpang 109 Email : Negara Brunei Darussalam Kampong Sungai Tali Lumut [email protected] Kuala Belait KC 3135 Negara Brunei Darussalam 9. AFWANIS CONTRACTOR I KA01, B01, S02 8814441 20 Dec 2016 19 Dec 2018 No 75 Jalan 64 No 75 Jalan 64 Email : Perumahan Negara Lambak Kanan BC 3115 Perumahan Negara Lambak Kanan BC 3115 Negara Brunei Darussalam Negara Brunei Darussalam 10. AJQAL CONTRACTOR I B01 8141439, 31 Jan 2017 30 Jan 2019 8151439 No 9 Jalan 99 Simpang 48-36 No 9 Jalan 99 Simpang 48-36 Rancangan Perumahan Negara Kampong Rancangan Perumahan Negara Kampong Rimba Email : Rimba Gadong BE 3319 [email protected] Gadong BE 3319 Negara Brunei Darussalam Negara Brunei Darussalam 11. AL-FARITZKI CONTRACTOR I B01 8763842 04 May 2017 3 May 2019 No. 19, Simpang 21 No. 19, Simpang 21 Email : Jalan Kemangsi Barat Jalan Kemangsi Barat RPN Meragang RPN Meragang Muara BT 2728 Muara BT 2728 Negara Brunei Darussalam Negara Brunei Darussalam 12. ALIAZ CONTRACTOR I E01, E02 2457666 30 Aug 2016 1 Jun 2018 Unit No 4 2nd Floor Block A Sempurna Unit No 4 2nd Floor Block A Sempurna Complex Email : Complex Batu Bersurat Kampong Pengkalan Gadong [email protected] Batu Bersurat Kampong Pengkalan Gadong Negara Brunei Darussalam Negara Brunei Darussalam Muka surat..1 SENARAI SYARIKAT YANG BERDAFTAR SEBAGAI KONTRAKTOR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 13. AMAN BINA ENTERPRISE I B01 8836118 16 Mar 2016 15 Mar 2018 P. O. Box 813 Unit No 3 2nd Floor Block A Seri Purnama Email : Pusat Memproses Mel Berakas B B 3577 Complex Negara Brunei Darussalam Kg Kiulap Negara Burnei Darussalam 14. AMILLENNIUM HOLDINGS I B01 8874016, 19 Jun 2017 18 Jun 2019 8165192 No 6A Simpang 58 Jalan Mulaut No 6A Simpang 58 Jalan Mulaut Kampong Tanjong Nangka B G 2921 Kampong Tanjong Nangka B G 2921 Email : Negara Brunei Darussalam Negara Brunei Darussalam [email protected] 15. ANLIDA CONTRACTOR I B01, KPB07, KPB12, S02 7253055 07 Nov 2015 6 Nov 2017 No 16 Spg 920 No 16 Spg 920 Email : Kg Jangsak Jalan Gadong B E 2720 Kg Jangsak Jalan Gadong B E 2720 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 16. ARJEY CONTRACTOR I KA01, B01, S03 8752939 19 Jul 2016 18 Jul 2018 No 17 Simpang 49 Jalan Haji Halus Km 8 No 17 Simpang 49 Jalan Haji Halus Km 8 Email : Kampong Bunut B F 1320 Kampong Bunut B F 1320 Negara Brunei Darussalam Negara Brunei Darussalam 17. ARMASY CONTRACTOR I KA01, B01, KPB02, KPB12, S01, 7169196 - 19 Jun 2017 18 Jun 2019 S02, S03 No 24 Simpang 136-53-39-4 Email : Kampong Sengkurong No 24 Simpang 136-53-39-4 Jalan Jerudong Kampong Sengkurong Negara Brunei Darussalam Jalan Jerudong Negara Brunei Darussalam 18. ARQ CONSTRUCTION I KA01, B01, S01, S02 2338175, 2332621 29 Aug 2016 28 Aug 2018 8747675, P.O. Box 465 No. 5 Jalan Kamangsi 8915558 MPC Old Airport, Berakas BB 2577 RPN Kg Meragang, Jalan Muara BT 2728, Negara Brunei Darussalam Negara Brunei Darussalam Email : 19. ASPZ CONSTRUCTION & ENGINEERING I KA01, B01, S03 8602292 2331941 22 May 2017 21 May 2019 P. O. Box 985 No. 10 Simpang 320 Email : Pusat Memproses Mel Kampong Lambak Jalan Pasir Berakas BB 3577 Berakas BB 1714 Negara Brunei Darussalam Negara Brunei Darussalam 20. ASREENDA CONTRACTOR I KA01, KPB04, KPB10, S03 8259394 17 Sep 2017 16 Sep 2019 P O Box 361 No 1072 Email : Pejabat Pos Sengkurong BE 1121 Kampong Rambai Tutong Negara Brunei Darussalam Negara Brunei Darussalam 21. ATAULLAH ENTERPRISE I KA01, B01, S03 8647390 09 Jul 2017 8 Jul 2019 No.28, Simpang 415-73 No.28, Simpang 415-73 Email : Jalan Wasai Limuru Jalan Wasai Limuru [email protected] Rancangan Perumahan Negara Kampong Rancangan Perumahan Negara Kampong Tanah Tanah Jambu, Jalan Muara BU 1129 Jambu, Jalan Muara BU 1129 Negara Brunei Darussalam Negara Brunei Darussalam 22. ATRAR CONTRACTOR I KA01, B01, KPB12, S03 2337616 20 Sep 2016 19 Sep 2018 Email : P. O. Box 436 No 12 Simpang 11 [email protected] Pusat Memproses Mel Berakas B B 3577 Kampong Anggerek Desa Berakas 'A' B B 3713 Negara Brunei Darussalam Negara Brunei Darussalam 23. AULA RICH CONSTRUCTION I B01, KPB02, KPB04 8883800, 14 Apr 2017 13 Apr 2019 8852006 Lot 15100 Simpang 51, Jalan Manggis Satu, Lot 15100 Simpang 51, Jalan Manggis Satu, Kas Villa 2, Kas Villa 2, Email : Kampong Manggis, Kampong Manggis, [email protected] Bandar Seri Begawan BC 3615, Bandar Seri Begawan BC 3615, Negara Brunei Darussalam Negara Brunei Darussalam 24. AWIH CONTRACTOR I KA01, B01, M03, KPB02, 7184832 28 Feb 2017 27 Feb 2019 KPB04, KPB07 No. 42 Jalan 26 Email : Perpindahan Rimba Gadong BE 3319 No. 42 Jalan 26 [email protected] Negara Brunei Darussalam Perpindahan Rimba Gadong BE 3319 Negara Brunei Darussalam Muka surat..2 SENARAI SYARIKAT YANG BERDAFTAR SEBAGAI KONTRAKTOR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 25. AZ SOUBORO JAYA CONTRACTOR I KA01, B01 8997155 02 Jun 2016 1 Jun 2018 No 7 Spg 178 Jalan Paya Bunga Merah No 161 Email : Kg Pasai Sengkurong B G 1221 Kg Mulaut Sengkurong B G 2121 Negara Brunei Darussalam Negara Brunei Darussalam 26. AZ ZUKHRUF REEN CONTRACTOR I KA01, B01, M03, KPB04, S02, 8919708 25 Jul 2017 24 Jul 2019 S03 No 508 ' A ' Kampong Pelambaian Email : Jalan Kota Batu B D 2317 No 508 ' A ' Kampong Pelambaian [email protected] Negara Brunei Darussalam Jalan Kota Batu B D 2317 Negara Brunei Darussalam 27. AZHADIRAS CONTRACTOR I KA01, B01 8291318, 06 Sep 2017 5 Sep 2019 8899351 No 1 Simpang 318 Kampong Kapok No 1 Simpang 318 Kampong Kapok Jalan Muara Jalan Muara Email : Negara Brunei Darussalam Negara Brunei Darussalam [email protected] 28. BELAKO ELECTRICAL AND TRADING COMPANY I KA01, B01, E01, S03 8731897 2670867 12 Oct 2017 11 Oct 2019 P. O. Box 1564 Unit 10 Complex Rizqan Maisura Bandar Seri Begawan B S 8673 Kampong Tanjong Bunut B G 2920 Email : Negara Brunei Darussalam Negara Brunei Darussalam [email protected] 29. BUHAIRI CONSTRUCTION I KA01 8849665 07 Jan 2016 6 Jan 2018 No 44 Jalan 31 No 44 Jalan 31 Email : Kg Perpindahan Lambak Kanan Berakas B C Kg Perpindahan Lambak Kanan Berakas B C 2915 2915 Negara Brunei Darussalam Negara Brunei Darussalam 30. BUKIT PERMATA CONTRACTOR & ENGINEERING I KA01, B01, M03 8200777 16 Mar 2016 15 Mar 2018 SERVICES Email : P. O. Box 234 No 9C 1st Floor Bengkurong Kompleks [email protected] Seri Complex Spg 132 Jalan Bengkurong Masin B F 1920 Jalan Tutong B A 1779 Negara Brunei Darussalam Negara Brunei Darussalam 31. CAHAYA MAJA CONTRACTOR I KA01 8767274 01 Mar 2016 28 Feb 2018 No 8 Kg Sengkurong A No 8 Kg Sengkurong A Email : Jalan Jerudong B G 3122 Jalan Jerudong B G 3122 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 32. D.N ABDUL WAFI HUSAIN ENTERPRISE I KA01, B01 8607864 05 Oct 2016 4 Oct 2018 No 12 - 10 Simpang 339 No 12 - 10 Simpang 339 Email : Kampong Burong Lepas Kampong Burong Lepas [email protected] Jalan Bengkurong Masin B F 1720 Jalan Bengkurong Masin B F 1720 Negara Brunei Darussalam Negara Brunei Darussalam 33. DAHLIAH SALIUS CONTRACTOR I KA01, B01, KPB07, S03 8862574 07 Apr 2016 6 Apr 2018 No 615 Kg Bebuloh No 615 Kg Bebuloh Email : Jalan Wasan Limau Manis B H 3323 Jalan Wasan Limau Manis B H 3323 Negara Brunei Darussalam Negara Brunei Darussalam 34.
Recommended publications
  • Press Release
    English Section Listed below are the designated areas for the planned maintenance work as for February, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.00 am to 4.00 pm Monday Substation Ikas Bandung, Kupang, Extension of 11kV network to New Industrial 1 (For info: Department of Electrical Service will supply Kampong Ikas Bandung and surrounding areas. 12th February 2018 temporary electricity to the affected areas through mobile Tutong. areas Kg Lugu. generator service at the substation) Thursday 08.30 am to 04.00 pm Kampong Pengkalan Pinang, Jln Spg 193 dan Spg 205 Kampong Pengkalan Pinang 2 Replacement of Distribution Feeder pillar. 15th February 2018 Penanjong. Tutong and surrounding areas. Thursday Wayleave clearing works for Low voltage Spg 1304, Spg 1274 Kampong Sungai Kelugos and surrounding 3 08.30 am to 09.30 am Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines areas. Thursday Wayleave clearing works for Low voltage Spg 1048, Spg 1030 Kampong Sungai Kelugos and surrounding 4 09.30 am to 11.30 am Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines areas. Thursday Wayleave clearing works for Low voltage Spg 1179, Spg 1148, Spg 1080 Kampong Sungai Kelugos and 5 01.30 pm to 04.30 pm Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines surrounding areas. Monday 08.30 am to 04.00 pm Substation Sungai Damuan, Kupang, 6 Replacement of Distribution Feeder pillar. Part of Kampong Kupang, Tutong 19th February 2018 Tutong Monday 08.30 am to 11.30 am Wayleave clearing works for Low voltage Spg 935, Spg 873, Spg 861 Kampong Sungai Kelugos and 7 Kampong Sungai Kelugos, Tutong 19th February 2018 overhead lines surrounding areas.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong.
    [Show full text]
  • 8/14/2010 Pelitabrunei Nama-Nama Amil Keluaran 14 Ogos Pelita1
    2 HARI SABTU 14 OGOS 2010 ZAKAT FITRAH BAGI TAHUN 1431H BERSAMAAN 2010M SENARAI NAMA-NAMA AMIL BAGI SELURUH NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431-1432H / 2010-2011M BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR KERAMAIAN AMIL-AMIL DAN KAWASAN-KAWASAN BAGI SELURUH 31. Jalan Tasek Lama hingga NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431 - 1432H / 2010 - 2011M Terrace Hotel 32. Jalan Stoney Yang Mulia, Mudim Awang KERAMAIAN AMIL 33. Jalan Dato Ibrahim Haji Amran bin Haji Mohd. JABATAN / DAERAH KAWASAN 34. Jalan Istana Darussalam Salleh JABATAN MAJLIS UGAMA ISLAM 29 ORANG 4 35. Kg. Pengiran Pemanca Lama 36. Kg. Sungai Kedayan A dan B Masjid Omar 163 ORANG BRUNEI / MUARA 75 37. Kg. Kianggeh dan Sekitarnya 'Ali Saifuddien BELAIT 27 ORANG 15 38. Kg. Ujong Tanjong 39. Kg. Kuala Sg. Peminyak Yang Mulia, Mudim Awang TUTONG 55 ORANG 30 40. Kg. Ujong Bukit Haji Ahmad Kasra bin Haji 41. Kg. Limbongan Ibrahim TEMBURONG 17 ORANG 12 42. Kg. Bukit Salat JUMLAH 291 ORANG 136 43. Kg. Sumbiling Lama Yang Mulia Ustaz Haji Adanan Surau Ibu Pejabat SENARAI NAMA-NAMA AMIL JABATAN MAJLIS UGAMA ISLAM Balai Bomba Bandar Seri Begawan bin Haji Ahmad Perkhidmatan Bomba 2. Brunei (Khas untuk Pegawai dan (Ketua Guru Agama Jabatan dan Penyelamat, BAGI TAHUN 1431-1432H / 2010-2011M Kakitangan serta keluarganya) Perkhidmatan Bomba dan Lapangan Terbang Penyelamat) Lama Berakas, Brunei BIL LANTIKAN ATAS NAMA JAWATAN BIL LANTIKAN ATAS NAMA BATANG TUBUH 2. BANDAR SERI BEGAWAN 'B' mengandungi: BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR 1. Setiausaha Majlis Ugama Islam, Brunei 1. Awang Haji Abd. Wahab bin Haji Sapar (Awang Haji Harun bin Haji Junid) (Pegawai Ugama Kanan Kumpulan 2) Awang Haji Ahmad bin Haji 2.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 08th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong lines. A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 08th Oct 2018 8.30 am to 04.30 pm Haji Al-Muhtadee Billah, Tutong Transformer#3. A part of Hospital Building and the surrrounding area. Monday 8.00 am to 12.00 noon 3 08th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Tuesday Maintenance works for Distribution 4 09th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#1. Earth satellite Building and the surrounding area. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 09th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong, lines. Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. Tuesday 8.00 am to 12.00 noon 6 09th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Wednesday Maintenance works for Distribution 7 10th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • 12 Disember 2001
    'X ♦» UAt&WfA 9AAN PETIKAN TTTAH seUAOA dan aaniaara- hOALAM amatan barpuaaa, ^ kasKi bag* ewwa* Kita bukan sa}a diamal dan t^aiats AM^aoar iaMw d< diiattti untuk merahan did -r>T—----" ■ j ari melafcukan dari nsart se'sv,^^ twataw iv- arlura-perkara yang di- Anr acAan Ramadan.* kegah malahan juga dl- =et*a8art SaAa*- lanlurtcan untuk aentlaaa Ki^rs Weaaflaae yirvg icart kacamertangan da- apa {uga bldang dan fartanynkan o*ah Ai-^ m yang tdts lakuKan." • cnxri dafi A/sy^ Raoa^ aampana Hari Raya ihutetii- Hri200a BRUNEI TAHUN 46 BILANCAN 50 RABU 12 DISEMBER. 2001/1422 ^vOWaaj 26 jjlj DITERBITKAN PAOA SETIAP HARI RABU PERCUMA )UN]UNG ZIARAH HARI RAYA AIDILFITR! YANG 1422 HIJRAH NARIK MENJUNJUNG lilah Kebawah Duli Yang Maha Muliu Paduka Scri Baginda Sultan Haji Hassanal uan: Bolkiah Mu'izzaddin Waddaulah, Sultan dan Yang Oi-Pcrtuan Negara Brunei Darussaiont. Yang Amai Muiia Pengiran Penggawa Laita SentaiB Istiadai Pelbagai prodiik dan Diraja Dalam Istana, Grand Chamberlain meng- perkhidmatan umumkan bahawa sempena Hari Raya Aidilfitri Thhun 1422 Hijrah, Istana Nuiul Iman akan dibuka - Muka 2 selama tiga hari. mulai dari Hari Raya Kedua dari jam 10.00 pagi hingga 12.00 tengah han dan dari jam 2.00 petang hingga 4.00 petang. bagi membolehkan elirik Masa Silam : orang ramai mengadap dan menziarahi Kebawah Duli Yang Maha Mulia Paduka Seri Baginda Sultan Terkenang tempat dan Yang Di-Pertuan Negara Brunei Darussalom dan kerabat dtraja. jatuh • Muka 3 Penglihatan ■Mempelbagaikan KPaawAH Dull Yang Maha Mulls Paduka Serl Baginda Sultan Haji Hassanal Bolkiah Mu'izzaddin Waddaulah, Sultan dan lekonomi menjadi Vang CM-Partuan Negara Brunei Darussalam ketika berkenan menerlma mengadap dua setiausaha tetap yang baru dllantlk laitu Awang Ha)l DIrIa, Setiausaha Tetap Kementerlan Perindustrlan dan Sumber-Sumber Utama dan Oslo Paduka Awang Ikeperluan utama Hilal Syawal HaJI Dtnl, Setiausaha Tetap Kementerlan tCrttudayaan, Bella dan Sukan.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • Copy of PMW Tutong District (Press Release) Ogos Sept18
    English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday 08.30 am to 02.30 pm Kampong Kiudang, Mukim Kiudang, Maintenance works for Low voltage overhead Spg 860 Kg Kiudang, Mukim Kiudang 1 02nd August 2018 Tutong lines and surrounding area. Saturday 08.30 am to 12.30 pm Maintenance works for Low voltage overhead Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong and 2 Kampong Sg Kelugos, Keriam, Tutong 04th August 2018 lines surrounding areas Monday Maintenance works for Low voltage overhead 3 08.30 am to 4.00 pm Kampong Birau, Mukim Kiudang, Tutong Jln Kecil Kg Birau , Mukim Kiudang and surrounding areas 06th August 2018 lines Tuesday 08.30 am to 4.00 pm Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 4 Spg 554 Kg Kupang, Mukim Keriam and surrounding areas 07th August 2018 Tutong. lines Wednesday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 5 08.30 am to 12.00 noon A part of kampong Lamunin, Tutong. 08th August 2018 Tutong lines Thursday 08.30 am to 4.00 pm Maintenance works for Low voltage overhead 6 Kampong Telamba, Mukim Telisai, Tutong A part of Kampong Telamba, Mukim Telisai,Tutong. 09th August 2018 lines Monday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 7 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 13th August 2018 lines Tuesday 08.30 am to 4.30 pm Maintenance works for Low
    [Show full text]
  • Copy of MEMO 028 Copy of PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 1 Wayleave clearing 20th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Thursday 8.30 am to 11.30 am Kampong Rambai, 2 Wayleave clearing A part of Kg Rambai and its surrounding areas 21th November 2019 1.30 pm to 4.30 pm Mukim Rambai Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 3 Wayleave clearing 21th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Saturday 8.30 am to 11.30 am Kampong Rambai, 4 Wayleave clearing A part of Kg Rambai and its surrounding areas 23th November 2019 1.30 pm to 4.30 pm Mukim Rambai Saturday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 5 Wayleave clearing 23th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Monday 8.30 am to 11.30 am Kampong Rambai, 6 Wayleave clearing A part of Kg Rambai and its surrounding areas 25th November 2019 1.30 pm to 4.30 pm Mukim Rambai Monday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 25th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu.
    [Show full text]
  • SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh
    SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 1 3A & COMPANY KPN-6055 I B01 [email protected] 05 Apr 2021 4 Apr 2024 Tel No: Fax: 8242518 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Gadong BE 1918 Gadong BE 1918 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0043/2021 2 A.J. CONSTRUCTION AND TRADING KPN-6133 I KA01, B01 [email protected] 26 Jun 2021 25 Jun 2024 COMPANY Tel No: Fax: 8977362, No 30 Simpang 766 No 30 Simpang 766 8767838 Kampong Sungai Lalit Kampong Sungai Lalit Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0224/2021 3 A.LEEZIQ CONTRACTOR KPN-5686 I KA01, B01 a.leeziq.contractor@gmail. 24 Jun 2019 23 Jun 2022 com Tel No: Fax: 7134374 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0238/2019 4 A.MALI CONTRACTOR KPN-5150 I B01, KPB04, S02, S03 19 Aug 2018 18 Aug 2021 Tel No: Fax: 8909149 No 6 Kampong Rimba Gadong No 6 Kampong Rimba Gadong Jalan 60 Simpang 64-6 Jalan 60 Simpang 64-6 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0438/2018 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..1 7 Jul 2021 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 5 A'R YANA CONSTRUCTION KPN-5902 I B01 julaihi.othman @outlook.com 08 Jul 2019 7 Jul 2022 Tel No: Fax: 8801295 No 676 Kampong Pengkalan Mau No 676 Kampong Pengkalan Mau Kiudang Tutong Kiudang Tutong Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0333/2019 6 ABU FAMILY'S ENTERPRISE KPN-5759 I KA01, B01, M03, abufamilysenterprises@gmail.
    [Show full text]
  • MEMO 029 Copy of PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Tuesday 8.30 am to 11.30 am Kampong Rambai, 1 Wayleave clearing A part of Kg Rambai and its surrounding areas. 26th November 2019 1.30 pm to 4.30 pm Mukim Rambai Tuesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 2 Wayleave clearing 26th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Wednesday 8.30 am to 11.30 am Kampong Rambai, 3 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 4 Wayleave clearing 27th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Wednesday 8.30 am to 11.30 am Kampong Rambai, 5 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday Kampong Luagan Dudok, Replacement of Ring Main Unit at substation A part of Kg Luagan Duduk and its surrounding 6 8.30 am to 4.30 pm 27th November 2019 Mukim Keriam Haji Abdul Azim Mosque areas. Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 28th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu.
    [Show full text]
  • Majlis Disambung Bersidang Pada Jam 2
    PETANG HARI RABU, 17 SAFAR 1428 / 7 MAC 2007 24 Majlis disambung bersidang pada jam lagi kepada orang-orang yang telahpun 2.30 petang dikeluarkan daripada Rumah Al-Islah ini terurtama sekali dalam mencari pekerjaan. Yang Dipertua Dewan: Sekarang bersidang semula, oleh kerana apabila kita duduk sama- Sukacita saya menerangkan bahawa sama dalam Jawatankuasa, jadi sekarang Majlis Kementerian saya ada sedikit sebanyak ditangguhkan untuk balik kepada Jawatankuasa terbabit dalam memberikan pertolongan ini dan membincangkan kerana menyambung di mana melalui ‘Outward Bound Brunei beberapa Anggaran Belanjawan yang belum lagi Darussalam’, Kementerian Kebudayaan, Belia diselesaikan, dengan demikian saya tangguhkan dan Sukan telahpun sejak tahun 2005 majlis. mengadakan program yang dinamakan Program Jatidiri, khusus bagi orang-orang (Majlis bersidang selaku Jawatankuasa) yang telahpun keluar daripada Rumah Al-Islah ini. Pengerusi: Ahli-Ahli Yang Berhormat tadi kita masih lagi Tajuk SAO4A, Biro Kawalan Selama ini kita telahpun mengadakan Nakotik, sekiranya tidak ada Ahli-Ahli untuk sebanyak lapan kali program, ini yang melatih membahaskan ataupun Ahli-Ahli sebelah kanan di antara empat belas hingga lapan belas untuk dijelaskan. orang, orang-orang yang di bawah perhatian dan alhamdulillah setelah kita mengadakan Yang Berhormat Pehin Orang Kaya Seri Dewa kursus selama dua minggu di mana pelatih- Mejar Jeneral (B) Dato Seri Pahlawan Awang pelatih dapat menyelami kepercayaan ataupun Haji Mohammad bin Haji Daud, Menteri dapat mengukur kepercayaan diri mereka
    [Show full text]
  • Senarai Restoran Dan Kedai Makan Yang Telah Mendapat Sijil Halal
    SENARAI RESTORAN DAN KEDAI MAKAN YANG TELAH MENDAPAT SIJIL HALAL Kemaskini Data : 26.01.2017 DAERAH RESTORAN / KEDAI MAKAN Belait 1 ADIANN RESTORAN & CATERING SERVICES Tarikh Mansuh Catatan Cawangan : - 17/12/2017 Gerai No. 05, Jalan Bunga Simpur, Kuala Belait, Negara Brunei Darussalam. 2 ALBAASITHU RASA RESTAURANT & CATERING Tarikh Mansuh Catatan SERVICES 13/2/2018 Cawangan : - Lot 7563, Unit 12B, Block B, Jalan Pandan Enam, Kuala Belait, Negara Brunei Darussalam. 3 ALL SEASONS RESTAURANT Tarikh Mansuh Catatan Cawangan : - 18/12/2018 Unit No. F5 & F6, Sentral Shopping Centre, Jalan Seri Maharaja, Kampung Mumong 'A' KA1531, Negara Brunei Darussalam 4 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Mukim Liang, Belait 17/12/2017 Lot. 2061, B-3, Ground Floor, Kampong Gana, Mukim Liang, Daerah Belait, Negara Brunei Darussalam. 5 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Jalan Pandan 7, Belait 17/12/2017 (P/P) A4. Lot. 7268, Jalan Pandan 7, Kuala Belait, Negara Brunei Darussalam. 6 AL-MALABAR RESTAURANT Tarikh Mansuh Catatan Cawangan : Jalan Pandan 4, Belait 17/12/2017 Unit No. 14, Bangunan Haji Hassan bin Haji Abd Ghani & Anak-Anak, Pandan 4, Kuala Belait, Negara Brunei Darussalam. 7 AMEY & MIMI'S RESTAURANT & CATERING SERVICES Tarikh Mansuh Catatan Cawangan : - 17/9/2017 Lot 4005,Jalan Setia Negara, Negara Brunei Darussalam 8 AMIRA SDN BHD Tarikh Mansuh Catatan Cawangan : - 19/8/2018 Lot 4838, No 188 D, No 4, Kampong Sungai Bakong, Lumut, Negara Brunei Darussalam Hak Cipta Terpelihara Bahagian Kawalan Makanan Halal, Jabatan Hal Ehwal Syariah, Kementerian Hal Ehwal Ugama, Negara Brunei Darussalam Page 1 of 178 DAERAH RESTORAN / KEDAI MAKAN 9 ANISA RESTAURANT& CATERING Tarikh Mansuh Catatan Cawangan : - 9/4/2017 Lot 4486 , No.2 Simpang 131, Jalan Pantai, Sungai Liang, Kuala Belait, Negara Brunei Darussalam 10 ANJUNG WARISAN RESTAURANT & CAFÉ Tarikh Mansuh Catatan Cawangan : - 14/11/2017 Lot 7065, Block B, Unit No.
    [Show full text]