DIRECT PUBLIC INVESTMENT

- Upgrade and Rehabilitation of Route 11 CH - Optimization of Route 41 CH - Improvement of Route E-30-F - Upgrade of Route 7 by sections - Provincial Hospital of Curicó - Calama Prison Complex - Canelillo Reservoir - Pocuro Reservoir - Catemu Reservoir

PROJECT DATA SHEET NATIONAL ROAD DEPARTMENT UPGRADE AND REHABILITATION Data Sheet: October 2015 ROUTE 11 CH

Project Information: Location & Parinacota Region Improvement of the international Location Objective highway Arica to Tambo Quemado.

Maintenance and upgrade of 132 km. in different sections of the Route 11 CH. Asphalt repair, Description of construction of auxiliary tracks, Works road safety measures, path rectification, bridge construction and environmental measures.

Estimated 2016-2019: US$ 82 million Investment 2020-2024: US$ 162 million Type of Public Investment Improvement of connectivity between and Bolivia and the access to the Port of Arica. Benefits Reduction of risk of accidents and travel times and improving road safety.

Current Situation Timetable

Completion of requirements for tendering the first section. Call for bids first Preparation of TOR to bid the design. Generation of plans Last quarter 2015 section for Citizen Participation. Mitigation measures required. Part of the route is within Call for bids of Second quarter 2016 the Lauca National Park. engineering design Engineering design and first section works approved by Call for bids second the Ministry of Social Development and Ministry of Second quarter 2016 section Finance Participation of indigenous communities and expropriations should be considered prior to the End of works 2024. executions of the works.

Source: Sub-Department of Development, Sub-Department of Works

PROJECT DATA SHEET NATIONAL ROAD DEPARTMENT OPTIMIZATION OF ROUTE 41 CH Data Sheet: October 2015

Project Information: Location

Location

Improvement of the international connection from Coquimbo - La Objective Serena to Argentina (San Juan) and the Mercosur. Improvement works and expansion in some sections. Construction of Description of bridges and protection structures in works an international route of 235 km in the Chilean side. Estimated 2016-2019: US$ 20 million Investment 2020-2024: US$193 million Type of Public Investment To improve connection between Chile and Argentina and the access to the Port of Coquimbo and the Benefits touristic areas in La Serena and Vicuña. Reduce the risk of accidents, reduce travel times and improve safety on the route.

Current Situation Timetable

Completion of requirements during 2017 for tendering the first section. Preparation of TOR to bid the design of the Call for bids engineering Second quarter 2017 second section. Plans for Citizen Participation during the design second section whole Project. Environmental management measures should be taken Call for bids first section Second quarter 2018 even if the Project is not in a National Park The first section must be evaluated during 2016 by the Call for bids. Works in Ministry of Social Development. The second section has Third quarter 2020 second section been positively recommended. Expropriations prior to works execution in the End of works 2025 of La Serena.

Source: Sub-Department of Development, Sub-Department of Works

PROJECT DATA SHEET NATIONAL ROAD DEPARTMENT IMPROVEMENT OF ROUTE E-30-F Data Sheet: October 2015

Project Information: Location

Valparaíso Region, from the Location crossing of National Highway 5 to Zapallar - Puchuncaví - Concón. Improve the standard of urban and Objective interurban roads between Zapallar and Concón. The first section will have 7 m. wide and an outer berm of 2 m. Description of In the urban section a roundabout is Works considered together with a new bridge over the Aconcagua river

Estimated 2016-2019: US$ 52 million Investment 2020-2024: US$ 327million Type of Public Investment Improve coastal connectivity in the North of the Region with the Benefits reduction of travel times, reduction of the risks of accidents and improvement in safety of the route.

Current Situation Timetable

During year 2016 the expropriation process will be completed. Engineering study of expansion works is under Call for bids first section Second quarter 2016 way. Citizen participation plans are considered in every stage of the project.

The route is not located in a National Park Call for bids second section Third quarter 2017 All projects are highly recommended by the different Call for bids expansion works Third quarter 2018 Ministries Expropriations prior to works execution should be End of works 2024 considered

Source: Sub -Department of Development, Sub -Department of Works

PROJECT DATA SHEET NATIONAL ROAD DEPARTMENT UPGRADE OF ROUTE 7 BY SECTIONS Data Sheet: October 2015

Project Information: Location

Location Aysén Region Improve the current standard of the Objective road to adapt it to the requirements of a structural connection. 54 km. of a structuring long-distance road, improvement of the standard, Description of geometry, sanitation works and works incorporation of security and control elements. Estimated US$ 137 million (2016-2019) Investment Type of Public Investment Improve connectivity of the Region, with the reduction of travel times, risk Benefits of accidents and the improving of road safety.

Current Situation Timetable

This initiative is part of the portfolio of projects of the Special Development Plan for Extreme Areas (PEDZE) of Call for bids first section Second quarter 2016 the Region of Aysén. Citizen participation plans are considered. Call for bids second The route is not located in a National Park Second quarter 2016 section All projects are highly recommended by the different Call for bids third section Third quarter 2016. Ministries Expropriations prior to works execution should be End of works 2019 considered

Source: Sub-Department of Development, Sub-Department of Works

NATIONAL DEPARTMENT OF PROJECT DATA SHEET ARCHITECTURE

PROVINCIAL HOSPITAL OF CURICÓ Data Sheet: October 2015

Project Information:

Location Commune of Curicó, Maule Region

Set up a health infrastructure to give Objective high complexity coverage to 285,000 inhabitants in the province of Curicó Building of seven levels and two undergrounds. Levels one and two for clinical care and ambulatory services Description of are closed. Level three is a works mechanical floor. Levels 4, 5 and 6 correspond to hospitalization. It will have 400 beds and 800 parking spaces in an area of 102,930 m2 Estimated US$ 306 million Investment Type of Public, Ministry of Health. Investment It should cover: open care, hospitalization, therapeutic proce- Other needs dures, emergency telemedicine and a nursery.

Current Situation Timetable

Project with economic technical recommendation by the Call for bids June 2015 Ministry of Social Development. Bidding documents under study by different firms Technical bids December 2015 interested in the project. opening Indicators: equivalent cost of care: $CH 5,120, increases Economic bids February 2016 to $10,300 with diagnosis and treatment. opening occupied bed $CH 168,000. Cost when Daily cost of Execution of Works Second quarter 2016 – 2020 leaving hospital $CH 1,736,000.

Planning and Coordination Division

NATIONAL DEPARTMENT OF PROJECT DATA SHEET ARCHITECTURE CALAMA PRISON COMPLEX Data Sheet: October 2015

Project Information: Location

Crossing of Route 23 CH with Route Location B-195 Camino Tuina. 31 km from the city of Calama

Reduce prison overcrowding and Objective improve living conditions and safety of inmates and staff.

Replacement of the actual prison with Description of a capacity of 1,084 inmates. Aprox. works Area: 45,824 m2 and prisonyards: 19,412 m2

Estimated US$ 177 million Investment Type of Public, Ministry of Justice Investment Photovoltaic solar plant for electrical Other input connection.

Current Situation Timetable

Technical feasibility and land Developing of technical feasibility 2015 considered for the Project Call for bids - Construction Preparation of bidding conditions 2016 design

Call for bids - Construction 2018

Unit Projects, Ministry of Justice

NATIONAL DEPARTMENT FOR PROJECT DATA SHEET HYDRAULIC WORKS CANELILLO RESERVOIR Data Sheet: October 2015

Project Information: Location Province of Choapa in Coquimbo Location Region

Capacity: 200 Hm3 Description of Flood area 800 ha works Wall height: 84 m.

Irrigation Area 15,000 ha

Communes , Canela,

Estimated US$ 164 million Investment Hidroelectric Under analysis generation

The National Department has rights for 150 MM m3/year. Water Rights Possibilities to uptake the water near the reservoir under study

Current Situation Timetable

Feasibility studies 2015-2016

Feasibility studies are been executed by Empresa SMI. Call for bids - Design 2017 - 2020

Developing of works 2020 - 2027

Department of Irrigation Projects

NATIONAL DEPARTMENT FOR PROJECT DATA SHEET HYDRAULIC WORKS POCURO RESERVOIR Data Sheet: October 2015

Project Information: Location

Commune of Calle Larga, Location Region of

Lateral reservoir 3 Reservoir volume: 100 Hm . Description of Dam height: 103 m Works Feeder Canal: 17 km (from 3 Aconcagua River) and 20 m /s capacity. Irrigation Area 11.500 ha. Sections 1 and 2 of Aconcagua Included Sections River Estimated US$ 308 million Investment Hidroelectric Installed capacity of 6 MW at the Generation foot of the dam.

The National Department has water Water Rights rights for 400 Hm3/year in the 1st section of Aconcagua River.

Current Situation Timetable Call for bids feasibility December 2015 studies TOR of feasibility and environmental studies Design and environmental impact 2017 Working on a model to run in a single contract both design assessment and construction. Call for bids: design and Fourth quarter 2017 construction

Start of construction 2018

Department of Irrigation Projects

NATIONAL DEPARTMENT FOR PROJECT DATA SHEET HYDRAULIC WORKS CATEMU RESERVOIR Data Sheet: October 2015

Project Information: Location

Commune of Catemu. Region of Location Valparaíso

Volume of the reservoir: 180 Hm3. Description of Dam height: 65 m Works Feeder Canal: 25 km (from Río Aconcagua) and a capacity of 20 m3/s.

38,000 ha Irrigation Area 4,160 benefit properties Included Lower areas of 2nd, 3rd and 4th sections Sections of Aconcagua River Estimated US$ 243 million Investment

Hydroelectric Preliminary evaluation: 5 to 10 MW Generation

The National Department has water Water Rights rights for 630 Hm3/year in the 2nd section of Aconcagua River.

Current Situation Timetable

Technical studies to review and complement the feasibility Completion of design of the dam are performed via direct contracts and environmental 2016 impact assessment

Decision by the Ministry of Environment Environmental decision 2016

Working on a model to run in a single contract both design Call for bids: design and First quarter 2017 and construction construction

Department of Irrigation Projects

CONCESSIONS

- Re-tender of Route N° 5 Los Vilos – La Serena - Re-tender of Route F-20 Nogales – Puchuncaví - Road Connection Highway 68 with Highway 78 - Costanera Central Highway - Eastern Americo Vespucio Urban Highway - Fruit Highway, G-66 - Nahuelbuta Route - Metropolitan Highway of - North-South Route of Chiloé

PROJECT DATA SHEET PUBLIC WORKS PPP RE-TENDER OF ROUTE N° 5 Data Sheet: October 2015 LOS VILOS – LA SERENA

Location Project Information:

North of from km Location 220 to km. 500

Re- tender of the contract for Route N° 5 from Los Vilos to Coquimbo, Objective including urban sector between Coquimbo and La Serena  229 km 4-lanes intercity road Description of works  17 km of urban highway with three lanes in each direction  Toll road Economic 0 subsidy Conditions   Manual tolls Estimated US$ 225 million Investment

Type of Investment PPP – BOT

 Improve urban connectivity Increase transport Benefits  capacity on the urban sector  Reduce accidents

Current Situation Timetable

 Private Initiative Call for bids Third quarter of 2016  Finishing project proposal Reception of bids First quarter of 2017  Preparation of bidding conditions

Contract award Second quarter of 2017

Fuente: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP RE-TENDER OF ROUTE F-20 Data Sheet: October 2015 NOGALES-PUCHUNCAVI

Project Information: Location

Location 110 km north of Santiago

Improve connectivity to the west Objective towards an important touristic area near the seaside.

 Improve a 27 km 4-lanes road Description of with a monthly average traffic of works 80.000 vehicles doubling during summer.

 Toll road Economic Estimated 25% of state subsidy Conditions   Free flow tolls

Estimated US$ 210 million Investment Type of PPP – BOT Investment  Improve connectivity Reduce transport costs Benefits   Reduce accidents, safety conditions and travel time

Current Situation Timetable

Call for bids Fourth quarter of 2015  Finishing technical studies

 Final approval of economic conditions Reception of bids First quarter of 2016  Preparation of bidding contracts Contract award Second quarter of 2016

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP ROAD CONNECTION OF Data Sheet: October 2015 HIGHWAY 68 WITH HIGHWAY 78

Project Information: Location

Western side of Santiago Location Metropolitan Area

Improvement of transport system, connectivity and Objective infrastructure standard of Santiago

Construction of a 9,4 km 4- Description of  lanes road to reduce traffic works impact in urban zones

 Toll road Economic Non subsidies Conditions   Free flow tolls

Estimated US$ 220 million Investment Type of PPP – BOT Investment  Improve connectivity between central and western areas of Santiago  Improve connection to the main seaports avoiding to cross through Santiago. Benefits  Better local urban development  Reduction of accidents, travel times and pollution emissions.

Current Situation Timetable

Call for bids Second quarter of 2016  Finishing technical studies Reception of bids Third quarter of 2016  Preparation of bidding contracts

Contract award Fourth quarter of 2016

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP COSTANERA CENTRAL HIGHWAY Data Sheet: October 2015

Project Information: Location

South-east side of Santiago Location Metropolitan area

Improvement of transport system, Objective connectivity and infrastructure standard of the city  Building a high standard Description of underground highway in a 22 works km long axis  Toll road Economic  Estimated 40% of state Conditions subsidy  Free flow tolls Estimated US$ 2 billion Investment Type of PPP – BOT Investment  Improvement of connectivity between south-east districts and downtown Benefits  Reduction of traffic congestion.  Reduction of operational costs.  Improvement of safety conditions.

Current Situation Timetable

Call for bids Fourth quarter of 2016  Private initiative

 Developing of technical studies Reception of bids Second quarter of 2017  Consultations with local communities Contract award Third quarter of 2017

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP EASTERN AMERICO VESPUCIO Data Sheet: October 2015 URBAN HIGHWAY

Project Information: Location

Location Eastern side of Santiago

Complete the Americo Vespucio Objective ring road with high quality and service standards  Construction of two underground double tracks with 3 lanes each Description of works  Urban redeveloping in surface considering larger green areas and more facilities for urban transportation  Toll road Economic Estimated 15% of state subsidy Conditions   Free Flow Tolls

Estimated US$ 800 million Investment Type of PPP – BOT Investment

 Complete the Américo Vespucio ring road with a high service standard  Reduce accidents and traffic Benefits jams, mainly during rush hours.  Reduce commuting time and pollution emissions.  Improve public transportation and connectivity in the city.

Current Situation Timetable

Call for bids First semester of 2016  Finishing technical studies

 Preparation of bidding contracts Reception of bids Second semester of 2016  Closing agreements with local authorities Contract award Second semester of 2016

Source : CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP FRUIT HIGHWAY, G-66 Data Sheet: October 2015

Project Information: Location

120 km south from Santiago to the Location port of San Antonio

Improve connectivity for small and medium producers (fruits, vegetables Objective and wine) from O’Higgins and Maule Regions to the port of San Antonio

 Restore and improve 138 km of the existing road and Description of construction of a bidirectional works road to reduce traffic impact in urban zones  Construction of a 21 km 4-lanes road

 Toll road Economic Estimated 60% of state subsidy Conditions   Free Flow Tolls

Estimated US$ 600 million Investment Type of PPP – BOT Investment  Improve connectivity  Reduce transport costs for local Benefits producers  Reduce accidents

Current Situation Timetable

 Finishing technical studies Call for bids First semester of 2016  Preparation of bidding contracts Reception of bids First quarter of 2017  Closing agreements with local authorities near San

Antonio Contract award Second quarter of 2017

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP NAHUELBUTA ROUTE Data Sheet: October 2015

Project Information: Location

Location Km 520 south of Santiago

Improve connectivity and maximize economic and Objective social benefits in a forestry area

 55 km road Description of works  4-lanes highway  Uneven links

 Toll road Economic  Estimated 41% of state Conditions subsidy  Manual Tolls Estimated US$ 254 million Investment

Type of Investment PPP – BOT  Connectivity improvement  Reduction of transport Benefits costs for local producers  Reduction of accidents

Current Situation Timetable

Call for bids First semester of 2016  Bidding conditions under revision by the Legal Department Reception of bids Second quarter of 2016  Closing agreements with local authorities and

indigenous communities Contract award Third quarter of 2016

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP METROPOLITAN HIGHWAY OF Data Sheet: October 2015 PUERTO MONTT

Project Information: Location

Puerto Montt - 1.000 km. south of Location Santiago

 Improvement of transport system, connectivity and infrastructure standard of Objective Puerto Montt  Improvement of connection between Puerto Varas and El Tepual Airport

Description of  4-lanes highway in 34 km. works  High urban standard

 Toll road Economic Estimated 30% of state subsidy Conditions   Free flow tolls Estimated US$ 340 million Investment Type of PPP – BOT Investment  Improvement of connectivity between Puerto Montt and Puerto Varas Benefits  Reduction of traffic congestion.  Reduction of operational costs.

 Improvement of safety conditions.

Current Situation Timetable

Call for bids Fourth quarter of 2016  Private initiative

 Developing of technical studies Reception of bids Second quarter of 2017  Defining economic conditions Contract award Second quarter of 2017

Source : CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP NORTH-SOUTH CHILOE ROUTE) Data Sheet: October 2015

Project Information: Location

Location 1.100 km south of Santiago

Improve and extend the Objective transportation system in the island of Chiloé

 101 km road Second bridge over Pudeto Description of works  river  New by-pass to Ancud.

 Toll road Economic  Estimated 25% of state Conditions subsidy  Free Flow Tolls

Estimated US$ 262 million Investment

Type of Investment PPP – BOT

 Improve connectivity  Increase transport capacity on Benefits the trunk road of the island  Reduce accidents

Current Situation Timetable

 Private initiative Call for bids Third quarter of 2017  Finishing project proposal Reception of bids First quarter of 2018  Preparation of bidding conditions

Contract award First quarter of 2018

Source: CCOP