Alternatives Tracking.Xlsx
Total Page:16
File Type:pdf, Size:1020Kb
Load more
										Recommended publications
									
								- 
												  MIT Kendall SquareRidership and Service Statistics Thirteenth Edition 2010 Massachusetts Bay Transportation Authority MBTA Service and Infrastructure Profile July 2010 MBTA Service District Cities and Towns 175 Size in Square Miles 3,244 Population (2000 Census) 4,663,565 Typical Weekday Ridership (FY 2010) By Line Unlinked Red Line 241,603 Orange Line 184,961 Blue Line 57,273 Total Heavy Rail 483,837 Total Green Line (Light Rail & Trolley) 236,096 Bus (includes Silver Line) 361,676 Silver Line SL1 & SL2* 14,940 Silver Line SL4 & SL5** 15,086 Trackless Trolley 12,364 Total Bus and Trackless Trolley 374,040 TOTAL MBTA-Provided Urban Service 1,093,973 System Unlinked MBTA - Provided Urban Service 1,093,973 Commuter Rail Boardings (Inbound + Outbound) 132,720 Contracted Bus 2,603 Water Transportation 4,372 THE RIDE Paratransit Trips Delivered 6,773 TOTAL ALL MODES UNLINKED 1,240,441 Notes: Unlinked trips are the number of passengers who board public transportation vehicles. Passengers are counted each time they board vehicles no matter how many vehicles they use to travel from their origin to their destination. * Average weekday ridership taken from 2009 CTPS surveys for Silver Line SL1 & SL2. ** SL4 service began in October 2009. Ridership represents a partial year of operation. File: CH 01 p02-7 - MBTA Service and Infrastructure Profile Jul10 1 Annual Ridership (FY 2010) Unlinked Trips by Mode Heavy Rail - Red Line 74,445,042 Total Heavy Rail - Orange Line 54,596,634 Heavy Rail Heavy Rail - Blue Line 17,876,009 146,917,685 Light Rail (includes Mattapan-Ashmont Trolley) 75,916,005 Bus (includes Silver Line) 108,088,300 Total Rubber Tire Trackless Trolley 3,438,160 111,526,460 TOTAL Subway & Bus/Trackless Trolley 334,360,150 Commuter Rail 36,930,089 THE RIDE Paratransit 2,095,932 Ferry (ex.
- 
												  Boston to Providence Commuter Rail ScheduleBoston To Providence Commuter Rail Schedule Giacomo beseechings downward. Dimitrou shrieved her convert dolce, she detach it prenatally. Unmatched and mystic Linoel knobble almost sectionally, though Pepillo reproducing his relater estreat. Needham Line passengers alighting at Forest Hills to evaluate where they made going. Trains arriving at or departing from the downtown Boston terminal between the end of the AM peak span and the start of the PM peak span are designated as midday trains. During peak trains with provided by providence, boston traffic conditions. Produced by WBUR and NPR. Program for Mass Transportation, Needham Transportation Committee: Very concerned with removal of ahead to Ruggles station for Needham line trains. Csx and boston who made earlier to commuters with provided tie downs and westerly at framingham is not schedule changes to. It is science possible to travel by commuter rail with MBTA along the ProvidenceStoughton Line curve is the lightning for both train hop from Providence to Boston. Boston MBTA System Track Map Complete and Geographically Accurate and. Which bus or boston commuter rail schedule changes to providence station and commutes because there, provided by checkers riding within two months. Read your favorite comics from Comics Kingdom. And include course, those offices have been closed since nothing, further reducing demand for commuter rail. No lines feed into both the North and South Stations. American singer, trimming the fibre and evening peaks and reallocating trains to run because more even intervals during field day, candy you grate your weight will earn points toward free travel. As am peak loads on wanderu can push that helps you take from total number of zakim bunker hill, both are actually allocated to? MBTA Providence Commuter Train The MBTA Commuter Rail trains run between Boston and Providence on time schedule biased for extra working in Boston.
- 
												  January 20, 2020 Volume 40 Number 1JANUARY 20, 2020 ■■■■■■■■■■■ VOLUME 40 ■■■■■■■■■■ NUMBER 1 13 The Semaphore 17 David N. Clinton, Editor-in-Chief CONTRIBUTING EDITORS Southeastern Massachusetts…………………. Paul Cutler, Jr. “The Operator”………………………………… Paul Cutler III Boston Globe & Wall Street Journal Reporters Paul Bonanno, Jack Foley Western Massachusetts………………………. Ron Clough 24 Rhode Island News…………………………… Tony Donatelli “The Chief’s Corner”……………………… . Fred Lockhart Mid-Atlantic News……………………………. Doug Buchanan PRODUCTION STAFF Publication…………….………………… …. … Al Taylor Al Munn Jim Ferris Bryan Miller Web Page …………………..……………….… Savery Moore Club Photographer………………………….…. Joe Dumas Guest Contributors………………………………Peter Palica, Kevin Linagen The Semaphore is the monthly (except July) newsletter of the South Shore Model Railway Club & Museum (SSMRC) and any opinions found herein are those of the authors thereof and of the Editors and do not necessarily reflect any policies of this organization. The SSMRC, as a non-profit organization, does not endorse any position. Your comments are welcome! Please address all correspondence regarding this publication to: The Semaphore, 11 Hancock Rd., Hingham, MA 02043. ©2019 E-mail: [email protected] Club phone: 781-740-2000. Web page: www.ssmrc.org VOLUME 40 ■■■■■ NUMBER 1 ■■■■■ JANUARY 2020 CLUB OFFICERS President………………….Jack Foley Vice-President…….. …..Dan Peterson Treasurer………………....Will Baker BILL OF LADING Secretary……………….....Dave Clinton Chief’s Corner...... ……. .. .3 Chief Engineer……….. .Fred Lockhart Directors……………… ...Bill Garvey (’20) Contests ............... ……..….3 ……………………….. .Bryan Miller (‘20) Clinic……………….…...…3 ……………………… ….Roger St. Peter (’21) …………………………...Gary Mangelinkx (‘21) Editor’s Notes. …...........…..8 Form 19 Calendar………….3 Members .............. …….......8 Memories ............. ………...3 Potpourri .............. ..…..…...5 ON THE COVER: New Haven I-5 #1408 pulling the westbound “Yankee Clipper” passes the Running Extra ...... .….….…8 Sharon, MA station.
- 
												  Summer 2020 Schedule, Effective June 22, 2020 FRANKLIN LINE with FOXBORO PILOTFRANKLIN LINE with FOXBORO PILOT Summer 2020 schedule, effective June 22, 2020 Monday to Friday Saturday & Sunday Inbound to Boston AM PM Inbound to Boston AM PM 710 746 712 714 748 716 718 720 750 7722 7752 754 724 7756 726 728 758 730 732 ZONE STATION TRAIN # 700 740 702 7704 7742 7708 7744 SATURDAY TRAIN # 1702 1704 1706 1708 1710 1712 1714 1716 1718 Bikes Allowed SAT SAT ZONE STATION SUNDAY TRAIN # ONLY ONLY 2706 2708 2710 2712 2714 2716 2718 6 Forge Park/495 5:18 - 6:03 6:50 - 7:47 - 9:24 - 10:55 12:20 - 1:37 2:54 3:55 - 4:58 - - 7:45 - 8:07 9:10 - 10:30 11:50 Bikes Allowed 6 Franklin/Dean Coll. 5:25 - 6:10 6:57 - 7:54 - 9:31 - 11:02 12:27 - 1:44 3:01 4:02 - 5:05 - - 7:52 - 8:14 9:17 - 10:37 11:57 6 Forge Park/495 6:40 8:40 10:40 12:40 2:40 4:40 6:40 8:40 10:40 5 Norfolk 5:32 - 6:17 7:04 - 8:01 - 9:38 - 11:09 12:34 - 1:51 3:08 4:09 - 5:12 - - 7:59 - 8:21 9:24 - 10:44 12:04 6 Franklin/Dean Coll. 6:47 8:47 10:47 12:47 2:47 4:47 6:47 8:47 10:47 4 Foxboro - 5:47 - - 7:23 - 8:19 - 10:29 - - 1:29 - - - 4:32 - 5:29 6:34 - 8:07 - - 9:49 - - 5 Norfolk 6:54 8:54 10:54 12:54 2:54 4:54 6:54 8:54 10:54 4 Walpole 5:39 - 6:24 7:11 - 8:08 - 9:45 - 11:16 12:41 - 1:58 3:23 4:24 - 5:26 - - 8:06 - 8:36 9:31 - 10:51 12:11 4 Walpole 7:01 9:01 11:01 1:01 3:01 5:01 7:01 9:01 11:01 4 Plimptonville - - - f 7:13 - - - - - - - - - - - - - - - - - - - - - - 4 Windsor Gardens 7:06 9:06 11:06 1:06 3:06 5:06 7:06 9:06 f 11:05 4 Windsor Gardens 5:42 6:00 6:28 7:16 7:36 8:12 - 9:49 10:42 11:20 12:45 1:42 - 3:28 - 4:45 - - f 6:47 - - - - 10:02 - - 3 Norwood Central
- 
												  A Guide to Placemaking for MobilityREPORT SEPTEMBER 2016 A GUIDE TO PLACEMAKING FOR MOBILITY 4 A BETTER CITY A GUIDE TO PLACEMAKING FOR MOBILITY ACKNOWLEDGMENTS CONTENTS A Better City would like to thank the Boston Transportation 5 Introduction Department and the Public Realm Interagency Working Group for their participation in the development of this research. 6 What is the Public Realm? This effort would not have been possible without the generous 7 Boston’s Public Realm funding support of the Barr Foundation. 7 Decoding Boston’s Public Realm: A Framework of Analysis TEAM 15 Evaluating the Public Realm A Better City 16 Strategies for Enhancing • Richard Dimino the Public Realm • Thomas Nally 21 Small Interventions lead • Irene Figueroa Ortiz to Big Changes Boston Transportation Department 23 Envisioning a Vibrant Public Realm • Chris Osgood • Gina N. Fiandaca • Vineet Gupta • Alice Brown Public Realm Interagency Working Group • Boston Parks and Recreation Department • Boston Redevelopment Authority • Department of Innovation and Technology • Mayor’s Commission for Persons with Disabilities • Mayor’s Office • Mayor’s Office of New Urban Mechanics A Better City is a diverse group • Mayor’s Youth Council of business leaders united around a • Office of Arts and Culture common goal—to enhance Boston and • Office of Environment, the region’s economic health, competi- Energy and Open Space tiveness, vibrancy, sustainability and • Office of Neighborhood Services quality of life. By amplifying the voice • Public Works Department of the business community through collaboration and consensus across Stantec’s Urban Places Group a broad range of stakeholders, A Better • David Dixon City develops solutions and influences • Jeff Sauser policy in three critical areas central • Erin Garnaas-Holmes to the Boston region’s economic com- petitiveness and growth: transporta- tion and infrastructure, land use and development, and energy and environment.
- 
												  South CountyFairmount Line Corridor Improvements Project MBTA Contract No.G74PS01 Amendment 8 Service Enhancement Study Final Report April 2008 Prepared for: Prepared by: Fairmount Line Service Enhancement Study Introduction and Executive Summary...........................................................................................................2 Methodology.................................................................................................................................................8 1. Kick Off Meeting......................................................................................................................................9 2. Validate and Update Tools: Key Findings.............................................................................................10 2.1. South Station Capacity................................................................................................................10 2.2. Station Dwell Times with High Peak Period Travel Volumes....................................................15 2.3. Equipment Maintenance and Storage Capacity...........................................................................17 3. Develop and Screen Preliminary Options: Key Findings .......................................................................21 3.1. Baseline.......................................................................................................................................21 3.2. Peak Alternatives.........................................................................................................................22
- 
												  Roxbury-Dorchester-Mattapan Transit Needs StudyRoxbury-Dorchester-Mattapan Transit Needs Study SEPTEMBER 2012 The preparation of this report has been financed in part through grant[s] from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation, under the State Planning and Research Program, Section 505 [or Metropolitan Planning Program, Section 104(f)] of Title 23, U.S. Code. The contents of this report do not necessarily reflect the official views or policy of the U.S. Department of Transportation. This report was funded in part through grant[s] from the Federal Highway Administration [and Federal Transit Administration], U.S. Department of Transportation. The views and opinions of the authors [or agency] expressed herein do not necessarily state or reflect those of the U. S. Department of Transportation. i Table of Contents EXECUTIVE SUMMARY ........................................................................................................................................................................................... 1 I. BACKGROUND .................................................................................................................................................................................................... 7 A Lack of Trust .................................................................................................................................................................................................... 7 The Loss of Rapid Transit Service .......................................................................................................................................................................
- 
												  Maximizing the Benefits of Mass Transit ServicesMaximizing the Benefits of Mass Transit Stations: Amenities, Services, and the Improvement of Urban Space within Stations by Carlos Javier Montafiez B.A. Political Science Yale University, 1997 SUBMITTED TO THE DEPARTMENT OF URBAN STUDIES AND PLANNING IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER IN CITY PLANNING AT THE MASSACHUSETTS INSTITUTE OF TECHNOLOGY JUNE 2004 Q Carlos Javier Montafiez. All rights reserved. The author hereby grants to MIT permission to reproduce and to distribute publicly paper and electronic copies of this thesis document in whole or in part. Signature of Author: / 'N Dep tment of Urban Studies and Plav ning Jvtay/, 2004 Certified by: J. Mai Schuster, PhD Pfessor of U ban Cultural Policy '09 Thesis Supervisor Accepted by: / Dennis Frenthmfan, MArchAS, MCP Professor of the Practice of Urban Design Chair, Master in City Planning Committee MASSACH USEUSq INSTIUTE OF TECHNOLOGY JUN 21 2004 ROTCH LIBRARIES Maximizing the Benefits of Mass Transit Stations: Amenities, Services, and the Improvement of Urban Space within Stations by Carlos Javier Montafiez B.A. Political Science Yale University, 1997 Submitted to the Department of Urban Studies and Planning on May 20, 2004 in Partial Fulfillment of the Requirements for the degree of Master in City Planning ABSTRACT Little attention has been paid to the quality of the spaces within rapid mass transit stations in the United States, and their importance as places in and of themselves. For many city dwellers who rely on rapid transit service as their primary mode of travel, descending and ascending into and from transit stations is an integral part of daily life and their urban experience.
- 
												  KEEPING on TRACK Our Second Progress Report on Reforming and Funding Transportation Since Passage of the Massachusetts Transportation Finance Act of 2013KEEPING ON TRACK Our Second Progress Report on Reforming and Funding Transportation Since Passage of the Massachusetts Transportation Finance Act of 2013 Written by Produced by Rafael Mares Kirstie Pecci FEBRUARY 2015 KEEPING ON TRACK Our Second Progress Report on Reforming and Funding Transportation Since Passage of the Massachusetts Transportation Finance Act of 2013 Rafael Mares, Conservation Law Foundation Kirstie Pecci, MASSPIRG Education Fund February 2015 ACKNOWLEDGMentS The authors thank the following MassDOT; Rani Murali, former Intern, individuals for contributing information Transportation for Massachusetts; or perspectives for this report: Jeannette Orsino, Executive Director, Andrew Bagley, Director of Research Massachusetts Association of Regional and Public Affairs, Massachusetts Transit Authorities; Martin Polera, Office Taxpayers Foundation; Paula of Real Estate and Asset Development, Beatty, Deputy Director of Budget, MBTA; Richard Power, Legislative MBTA; Taryn Beverly, Legal Intern, Director, MassDOT; Janice E. Ramsay, Conservation Law Foundation; Matthew Director of Finance Policy and Analysis, Ciborowski, Project Manager, Office MBTA; and Mary E. Runkel, Director of of Transportation Planning, MassDOT; Budget, MBTA. Jonathan Davis, Chief Financial Officer, MBTA; Thom Dugan, former Deputy This report was made possible thanks Chief Financial Officer & Director, to generous support from the Barr Office of Management and Budget, Foundation. MassDOT; Kristina Egan, Director, Transportation for Massachusetts; Adriel © 2015 Transportation for Massachusetts Galvin, Supervisor of Asset Systems Development, MassDOT; Scott Hamwey, The authors bear responsibility for any Manager of Long-Range Planning, factual errors. The views expressed in Office of Transportation Planning, this report are those of the authors and MassDOT; Dana Levenson, Assistant do not reflect the views of our funders Secretary and Chief Financial Officer, or those who provided review.
- 
												  Y-4Ralph Eoikeilmet Chairman, MCP Committee Department of Urban Studies and Planning P Otc MASSACHUSETS Olr Tlf',4Lj; NryinstituteART IN THE PUBLIC REALM: INTEGRATING AUDIENCE, PLACE, AND PROCESS by Marianne Elizabeth Paley B.A. Brandeis University, Waltham Massachusetts June 1985 Submitted to the Department of Urban Studies and Planning in Partial Fulfillment of the Requirements for the Degree of MASTER IN CITY PLANNING at the Massachusetts Institute of Technology May 1993 c. Marianne E. Paley, 1993 The author hereby grants to M.I.T. permission to reproduce and distribute copies of this thesis document in whole or in part. Signature of Author Department of I4fban Studies and Planning May 20, 1993 Certified by Dennis Frenchman Senior Lecturer, Department of Urban Studies and Planning ,Thesis Supervisor Accepted by Y-4Ralph eOikeilmet Chairman, MCP Committee Department of Urban Studies and Planning p otC MASSACHUSETS Olr Tlf',4lj; nryINSTITUTE JUN 03 1993 LIBRARIES Room 14-0551 77 Massachusetts Avenue Cambridge, MA 02139 Ph: 617.253.2800 MITLibraries Email: [email protected] Document Services http://Iibraries.mit.edu/docs DISCLAIMER OF QUALITY Due to the condition of the original material, there are unavoidable flaws in this reproduction. We have made every effort possible to provide you with the best copy available. If you are dissatisfied with this product and find it unusable, please contact Document Services as soon as possible. Thank you. The images contained in this document are of the best quality available. ART IN THE PUBLIC REALM: INTEGRATING AUDIENCE, PLACE AND PROCESS by Marianne E. Paley Submitted to the Department of Urban Studies and Planning on May 20, 1993 in partial fulfillment of the requirements for the degree of Master of City Planning.
- 
												  FOXBOROUGH COMMUTER RAIL FEASIBILITY STUDY Massachusetts Bay Transportation Authority Foxborough Commuter Rail Feasibility StudyFULLTIME FOXBOROUGH COMMUTER RAIL FEASIBILITY STUDY Massachusetts Bay Transportation Authority Foxborough Commuter Rail Feasibility Study FINAL REPORT September 1, 2010 Prepared For: Massachusetts Bay Transportation Authority With Support From: Massachusetts Executive Office of Housing and Economic Development Prepared By: Jacobs Engineering Group, Boston, MA With: Central Transportation Planning Staff, Boston , MA Anne S. Gailbraith, AICP Barrington, RI 1 REPORT NAME: Foxborough Commuter Rail Feasibility Study PROJECT NUMBER: A92PS03, Task Order No. 2 PREPARED FOR: Massachusetts Bay Transportation Authority (MBTA) PREPARED BY: Jacobs Engineering Group Anne S. Galbraith Central Transportation Planning Staff (CTPS) DATE: September 1, 2010 FOXBOROUGH COMMUTER RAIL FEASIBILITY STUDY TABLE OF CONTENTS EXECUTIVE SUMMARY ..................................................................................................................... 3 CHAPTER 1: IDENTIFY KEY ISSUES AND PROJECT APPROACH .................................................... 13 1.1 Background ..................................................................................................................... 14 1.2 Key Issues....................................................................................................................... 17 1.3 Approach ......................................................................................................................... 19 CHAPTER 2: ANALYZE THE CAPACITY OF THE EXISTING SYSTEM.............................................
- 
												  The Mattapan Trolley: Public Transit Improvements Amidst Displacement ConcernsVassar College Digital Window @ Vassar Senior Capstone Projects 2020 The Mattapan Trolley: Public Transit Improvements amidst Displacement Concerns Allegra Amram DeNooyer Follow this and additional works at: https://digitalwindow.vassar.edu/senior_capstone Recommended Citation DeNooyer, Allegra Amram, "The Mattapan Trolley: Public Transit Improvements amidst Displacement Concerns" (2020). Senior Capstone Projects. 992. https://digitalwindow.vassar.edu/senior_capstone/992 This Open Access is brought to you for free and open access by Digital Window @ Vassar. It has been accepted for inclusion in Senior Capstone Projects by an authorized administrator of Digital Window @ Vassar. For more information, please contact [email protected]. The Mattapan Trolley: Public Transit Improvements amidst Displacement Concerns Allegra Amram DeNooyer May 15, 2020 Senior Thesis Submitted in partial fulfillment of the requirements for the Bachelor of Arts in Urban Studies Adviser, Timothy Koechlin DeNooyer 1 Table of Contents Acknowledgements………………………………………………………………………………..2 Note on Terms……………………………………………………………………………………..3 Introduction………………………………………………………………………………………..4 Chapter 1: Public Transit in Boston: 1897 to Present Day………………………….……...........11 Chapter 2: Community Reactions to the Mattapan Line Transformation……………....………..24 Chapter 3: Transit Inequity: Structural Disinvestment in Mattapan………….………………….34 Chapter 4: Transit-Oriented Development: Gentrification and Displacement in Mattapan……..51 Conclusion……………………………………………………………………………………….62