GUIDE to NSW TRAINLINK JOURNEYS NOTE: the Times for NSW Trainlink Services in Train Times Provide Both Arrival and Departure Times
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
New Nsw Rail Timetables Rail and Tram News
AUSTRALASIAN TIMETABLE NEWS No. 268, December 2014 ISSN 1038-3697 RRP $4.95 Published by the Australian Timetable Association www.austta.org.au NEW NSW RAIL TIMETABLES designated as Hamilton Yard (Hamilton Station end) and Sydney area Passenger WTT 15 Nov 2014 Hamilton Sidings (Buffer Stop end). Transport for NSW has published a new Passenger Working Timetable for the Sydney area, version 3.70. Book 2 The following sections of the Working Timetable will be re- Weekends is valid from 15 November, and Book 1 issued with effect from Saturday 3 January 2015: • Weekdays valid from 17 November. There appear to be no Section 7- Central to Hornsby-Berowra (All Routes) significant alterations other than the opening of Shellharbour • Section 8- City to Gosford-Wyong-Morisset- Junction station closing of Dunmore station. A PDF of the Broadmeadow-Hamilton new South Coast line Public timetable can be accessed from • Section 9- Hamilton to Maitland-Dungog/Scone. the Sydney trains website. Cover pages, Explanatory Notes and Section Maps will also be issued. Additionally, amendments to Section 6 will need Sydney area Freight WTT 15 Nov 2014 to be made manually to include updated run numbers and Transport for NSW has published a new Freight Working changes to Sydney Yard working as per Special Train Notice Timetable for the Sydney area, version 3.50. Book 5 0034-2015. The re-issued sections of Books 1 & 2 will be Weekends is valid from 15 November, and Book 4 designated as Version 3.92, and replace the corresponding Weekdays valid from 17 November. There appear to be no sections of Working Timetable 2013, Version 3.31, reprint significant alterations. -
Restricted Water Ski Areas in Queensland
Restricted Water Ski areas in Queensland Watercourse Date of Gazettal Any person operating a ship towing anyone by a line attached to the ship (including for example a person water skiing or riding on a toboggan or tube) within the waters listed below endangers marine safety. Brisbane River 20/10/2006 South Brisbane and Town Reaches of the Brisbane River between the Merivale Bridge and the Story Bridge. Burdekin River, Charters Towers 13/09/2019 All waters of The Weir on the Burdekin River, Charters Towers. Except: • commencing at a point on the waterline of the eastern bank of the Burdekin River nearest to location 19°55.279’S, 146°16.639’E, • then generally southerly along the waterline of the eastern bank to a point nearest to location 19°56.530’S, 146°17.276’E, • then westerly across Burdekin River to a point on the waterline of the western bank nearest to location 19°56.600’S, 146°17.164’E, • then generally northerly along the waterline of the western bank to a point on the waterline nearest to location 19°55.280’S, 146°16.525’E, • then easterly across the Burdekin River to the point of commencement. As shown on the map S8sp-73 prepared by Maritime Safety Queensland (MSQ) which can be found on the MSQ website at www.msq.qld.gov.au/s8sp73map and is held at MSQ’s Townsville Office. Burrum River .12/07/1996 The waters of the Burrum River within 200 metres north from the High Water mark of the southern river bank and commencing at a point 50 metres downstream of the public boat ramp off Burrum Heads Road to a point 200 metres upstream of the upstream boundary of Lions Park, Burrum Heads. -
NSW Trains Annual Report 2013-14 | Financial Statements 21
NSW Trains 2013/14 Annual Report Letter to Minister from the Chief Executive The Hon. Gladys Berejiklian MP Minister for Transport Parliament House Macquarie Street Sydney NSW 2000 Dear Minister I am pleased to submit for presentation to Parliament the Annual Report for NSW Trains for the financial year ended 30 June 2014; the first year of operations for NSW Trains. The Annual Report has been prepared in accordance with the Annual Reports (Statutory Bodies) Act 1984 and the Annual Reports (Statutory Bodies) Regulation 2010. Yours sincerely Rob Mason Chief Executive NSW Trains 2 NSW Trains | Annual Report 2013-14 Contents 1 Overview ................................................................................................................. 4 1.1 Report from the Chief Executive ................................................................. 4 1.2 About NSW Trains ...................................................................................... 6 1.3 Corporate Plan 2014-19 ............................................................................. 8 1.4 Performance overview ................................................................................ 9 2 Operational performance ...................................................................................... 10 2.1 Safety, environment, quality and risk ........................................................ 10 2.2 Customers and communities .................................................................... 12 2.3 Assets ..................................................................................................... -
Solent Connectivity May 2020
Solent Connectivity May 2020 Continuous Modular Strategic Planning Page | 1 Page | 2 Table of Contents 1.0 Executive Summary .......................................................................................................................................... 6 2.0 The Solent CMSP Study ................................................................................................................................... 10 2.1 Scope and Geography....................................................................................................................... 10 2.2 Fit with wider rail industry strategy ................................................................................................. 11 2.3 Governance and process .................................................................................................................. 12 3.0 Context and Strategic Questions ............................................................................................................ 15 3.1 Strategic Questions .......................................................................................................................... 15 3.2 Economic context ............................................................................................................................. 16 3.3 Travel patterns and changes over time ............................................................................................ 18 3.4 Dual-city region aspirations and city to city connectivity ................................................................ -
The First Train Drivers from D to DR Light Rail 2019 North Tassie
April 2019 TM Remember when: The irst train drivers From D to DR Light Rail 2019 North Tassie trampings South East Queensland standard gauge The Great South Paciic Express goes west New loops, signalling & platform in the Central West Published monthly by the Australian Railway Historical Society (NSW Division) Editor Bruce Belbin April 2019 • $10.00 TM Assistant Editor Shane O’Neil April 2019 National Affairs Lawrance Ryan Volume 57, Number 4 Editorial Assistant Darren Tulk International Ken Date Remember when: General Manager Paul Scells The irst train drivers Subscriptions: Ph: 02 9699 4595 Fax: 02 9699 1714 Editorial Office: Ph: 02 8394 9016 Fax: 02 9699 1714 ARHS Bookshop: Ph: 02 9699 4595 Fax: 02 9699 1714 Mail: 67 Renwick Street, Redfern NSW 2016 Publisher: Australian Railway Historical Society NSW Division, ACN 000 538 803 From D to DR Light Rail 2019 Print Post 100009942 North Tassie trampings South East Queensland standard gauge Publication No. The Great South Paciic Express goes west New loops, signalling & platform in the Central West Newsagent Ovato Retail Distribution Pty Ltd Published monthly by the Australian Railway Historical Society (NSW Division) Distribution Mailing & Distribution Ligare Pty Limited and Australia Post Printing Ligare Pty Limited Features Website www.railwaydigest.com.au Central West NSW: New loops, signalling and platform 30 Facebook www.facebook.com/railwaydigest In recent years a resurgence in intrastate freight business, especially Contributor Guidelines port-related container services and additional passenger services, has Articles and illustrations remain the copyright of the author and publisher. led to an increase in rail activity on the NSW Western Line. -
Transport for Canberra Policy Linkages
Transport for Canberra Transport for a sustainable city 2012–2031 © Australian Capital Territory, Canberra 2012 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced without the written permission of the Environment and Sustainable Development Directorate, GPO Box 158, Canberra ACT 2601. Published by the Environment and Sustainable Development Directorate. Enquiries: Canberra Connect 13 22 81. Website: environment.act.gov.au Printed on recycled paper FOREWORD Minister for the Environment and Sustainable Development Since 2001, the ACT Government has invested over $1 billion in transport infrastructure, programs and services to support a cleaner, more sustainable Canberra. We have delivered on our visionary 2004 Sustainable Transport Plan by designing, building and maintaining transport infrastructure like the Belconnen Bus Stations, bus lanes, and over 800km of on-road cycle lanes and off-road shared paths. We have introduced fast, convenient public transport with the Red Rapid, Blue Rapid and Parliamentary Zone Transport for Canberra will contribute Frequent Network. We have delivered to the ACT’s greenhouse gas emissions important arterial road connections like reduction targets by increasing the …a transport system that Gungahlin Drive; and we are continuing efficiency of our public and private to increase the number of Park and Ride vehicles, and encouraging more people puts people first… and Bike and Ride facilities to make it to choose sustainable transport like even easier to catch a bus in Canberra. walking, cycling and public transport. Transport for Canberra will further It will build on our commitment to build on our strong record of delivering active travel, highlighted by the ACT’s transport for Canberra by creating a signature to the International Charter transport system that puts people first. -
GETTING Homesafely Anewapproach.Com.Au
GETTING Home SAFELY Labor’s pLAN TO MAKE TRAIN TRAVEL SAFER ON FRIDAY AND SATURDAY NIGHTS Labor understands that the people of NSW deserve safe, reliable and comfortable public transport. As part of providing a public transport service that meets community needs a Foley Government will do all it can to make travelling on public transport safer. That’s why Labor will: • Re-introduce Guardian train services on Friday and Saturday nights; and • Run all-night train services from Kings Cross to Town Hall and Central Stations. Feeling safe and having confidence in the security on our trains is a major factor for people choosing whether or not to use the rail network, especially for women, parents with children, and older and other vulnerable people. The NRMA’s Seeing Red on Rail reported personal security as the second most pressing issue for over 11,000 thousand commuters. 38% of commuters in this survey said that they do not feel safe at certain times of the day. The Sydney Trains network includes 12 lines, 176 stations and many interchanges. NSW TrainLink network includes 5 intercity lines and over 130 stations. It is a large area to cover. Knowing that there is assistance if other passengers are being anti-social, violent or abusive – especially at night, can increase the numbers of people using public transport as well as improve security. Under the Baird Liberal Government, security on the rail network has been cut. When the Liberals and Nationals came to government in 2011 there were 600 dedicated transit officers for trains and 300 commuter police attached to local area commands. -
Members and Parish/Neighbourhood Councils RAIL UPDATE
ITEM 1 TRANSPORT COMMITTEE NEWS 07 MARCH 2000 This report may be of interest to: All Members and Parish/Neighbourhood Councils RAIL UPDATE Accountable Officer: John Inman Author: Stephen Mortimer 1. Purpose 1.1 To advise the Committee of developments relating to Milton Keynes’ rail services. 2. Summary 2.1 West Coast Main Line Modernisation and Upgrade is now in the active planning stage. It will result in faster and more frequent train services between Milton Keynes Central and London, and between Milton Keynes Central and points north. Bletchley and Wolverton will also have improved services to London. 2.2 Funding for East-West Rail is now being sought from the Shadow Strategic Rail Authority (SSRA) for the western end of the line (Oxford-Bedford). Though the SSRA have permitted a bid only for a 60 m.p.h. single-track railway, excluding the Aylesbury branch and upgrade of the Marston Vale (Bedford-Bletchley) line, other Railtrack investment and possible developer contributions (yet to be investigated) may allow these elements to be included, as well as perhaps a 90 m.p.h. double- track railway. As this part of East-West Rail already exists, no form of planning permission is required; however, Transport and Works Act procedures are to be started to build the missing parts of the eastern end of the line. 2.3 New trains were introduced on the Marston Vale line, Autumn 1999. A study of the passenger accessibility of Marston Vale stations identified various desirable improvements, for which a contribution of £10,000 is required from this Council. -
Appendix C Consultation
Environmental Impact Statement Wellington Solar Farm APPENDIX C CONSULTATION 17‐076 Final v1.1 C‐I Community Consultation Plan WELLINGTON SOLAR FARM NOVEMBER 2017 www.nghenvironmental.com.au e [email protected] Sydney Region Canberra ‐ NSW SE & ACT Wagga Wagga ‐ Riverina and Western NSW 18/21 mary st 17/27 yallourn st (po box 62) suite 1, 39 fitzmaurice st (po box 5464) surry hills nsw 2010 (t 02 8202 8333) fyshwick act 2609 (t 02 6280 5053) wagga wagga nsw 2650 (t 02 6971 9696) Newcastle ‐ Hunter and North Coast Bega ‐ ACT and South East NSW Bathurst ‐ Central West and Orana 7/11 union st suite 1, 216 carp st (po box 470) 35 morrisset st (po box 434) newcastle west nsw 2302 (t 02 4929 2301) bega nsw 2550 (t 02 6492 8333) bathurst nsw 2795 (t 02 6331 4541) Document Verification Project Title: CCP ‐ Wellington Solar Farm Project Number: 17‐076 Project File Name: Wellington CCP Final v1.1 Revision Date Prepared by (name) Reviewed by (name) Approved by (name) Draft V1 20/04/17 Jenny Walsh Nick Graham‐Higgs Jenny Walsh Final v1 19/10/17 Zoe Quaas Brooke Marshall Brooke Marshall Final v1 06/11/17 Jane Blomfield Minor changes NGH Environmental prints all documents on environmentally sustainable paper including paper made from bagasse (a by‐ product of sugar production) or recycled paper. NGH Environmental Pty Ltd (ACN: 124 444 622. ABN: 31 124 444 622) and NGH Environmental (Heritage) Pty Ltd (ACN: 603 938 549. ABN: 62 603 938 549) are part of the NGH Environmental Group of Companies. -
Future of Railway Heritage in Nsw
FUTURE OF RAILWAY HERITAGE IN NSW Reece McDougall Director NSW Heritage Office Future of Rail Heritage in NSW 1 m1 Railway Heritage Estate CHARACTERISTICS • Covers a broad range of buildings, works, sites and movable heritage items • Has high community interest and support • Bulk of items are under the ownership and control of Government Future of Rail Heritage in NSW 2 NSW Heritage Office - Working together to preserve our heritage 1 Slide 2 m1 mcdougr, 6/09/2005 Statutory Listings – Railway items HO Database (HOD) • (LEP’s, S.170 + SHR) total 1702 Railway items • S.170 Railway listings 854 (Government owned) SHR • 272 items • 236 in Government ownership Future of Rail Heritage in NSW 3 Listing Consequences STATE HERITAGE REGISTER • Heritage Council Approval • Minimum Maintenance Standards SECTION 170 HERITAGE REGISTER • Ministerial Principles and Heritage Council Guidelines •HAMS • Register Finalised LEP HERITAGE SCHEDULE • Notification to local council Future of Rail Heritage in NSW 4 NSW Heritage Office - Working together to preserve our heritage 2 STATE HERITAGE REGISTER – Railway items • SHR was established 1996 • Announced through “NSW Government Heritage Policy” Minister Knowles • Included previous PCOs 1937 Rail Paybus. SHR 2003. RTM Thirlmere Future of Rail Heritage in NSW 5 Celebration ! eg Commissioners Carriages, SHR 2003 Albury Station. SHR 1999 Future of Rail Heritage in NSW 6 NSW Heritage Office - Working together to preserve our heritage 3 Celebration ! eg Commissioners Carriages, SHR 2003 Future of Rail Heritage in NSW -
Wednesday, 19 July 2017 ______
19 Jul 2017 Estimates—Transport, Infrastructure and Planning 1 WEDNESDAY, 19 JULY 2017 _______________ ESTIMATES—INFRASTRUCTURE, PLANNING AND NATURAL RESOURCES COMMITTEE—TRANSPORT, INFRASTRUCTURE AND PLANNING EST IMATES—TR ANSPORT, INFR ASTRUCTURE AND PLANNING Estimate Committee Members Mr J Pearce (Chair) Mr CD Crawford Mr S Knuth Mrs BL Lauga Ms AM Leahy Mr AJ Perrett _______________ Members in Attendance Mr AP Cripps Mr SL Dickson Ms DE Farmer Mrs DK Frecklington Mrs JR Miller Mr AC Powell Mr LP Power Mr IB Walker _______________ In Attendance Hon. JA Trad, Deputy Premier, Minister for Transport and Minister for Infrastructure and Planning Mr M Collins, Chief of Staff Department of Infrastructure, Local Government and Planning Mr F Carroll, Director-General Ms K Parton, Deputy Director-General—Strategy, Governance and Engagement Building Queensland Mr D Gould, Chief Executive Officer Department of Transport and Main Roads Mr N Scales, Director-General Queensland Rail Limited Mr N Easy, Chief Executive Officer _______________ Committee met at 9.00 am CHAIR: Good morning everyone. I declare open this estimates hearing for the Infrastructure, Planning and Natural Resources Committee. I would like to introduce the members of the committee. I am Jim Pearce, the member for Mirani and chair of committee. We have Ms Ann Leahy, the member for Warrego, who is the deputy chair. The other committee members are Mr Craig Crawford, the member for Barron River; Mr Shane Knuth, the member for Dalrymple; Mrs Brittany Lauga, the member 2 Estimates—Transport, Infrastructure and Planning 19 Jul 2017 for Keppel; and Mr Tony Perrett, the member for Gympie. -
Referral of Proposed Action
Referral of proposed action Project title: Cross River Rail 1 Summary of proposed action 1.1 Short description The Cross River Rail project is a proposed new 10.2 kilometre rail link in Brisbane connecting Dutton Park in the south to Bowen Hills in the north. The project will include 5.9 kilometres of twin rail tunnels (one track in each direction) under Brisbane’s inner city and new underground rail stations at Albert Street and Roma Street (in the Brisbane CBD), Woolloongabba, Boggo Road and a new surface station at the Exhibition showgrounds. Upgrades and enhancements to parts of the existing rail network will be delivered where these interface with the project and to support Cross River Rail operations. READING NOTE: The Cross River Rail project has previously (2010) been referred to the then Department of the Environment, Water, Heritage and Arts under reference number 2010/5427. The project was determined to be ‘not a controlled action - if undertaken in a particular manner’. Further planning and design has been undertaken since the original Cross River Rail concept was referred. This has resulted in a modified project of a smaller scale with reduced potential impacts and enhanced affordability. This referral has been prepared as a new referral based on key changes to the project resulting from further planning and design. The referral has been prepared as a stand-alone document that can be assessed without having to reference the previous referral. While the Cross River Rail proponent does not consider the proposed action likely to have a significant impact on a matter protected under the EPBC Act, this referral has also been prepared in light of the CRR 2010 EPBC decision including a number of particular manner conditions that require reassessment.