Presentación De Powerpoint

Total Page:16

File Type:pdf, Size:1020Kb

Presentación De Powerpoint Water has been chosen as a main pillar of Argentine Government policies for the period 2016-2019. The sustainable use of water will contribute in parallel to other socioeconomic policies to eradicate poverty, in harmony with Sustainable Development Goals 2030. Facing this challenge, the National Water Plan (NWP) has been prepared by the Undersecretariat of Water Resources bringing a framework for action whose ultimate goal is to maximize the economic, environmental and social function of water resources. The NWP is structured on four axes according to the principle of water security, through the implementation of which are expected to achieve coherent and integrated goals providing drinking water and sewage for all inhabitants; adaptation to the impact of climate variability and change, protecting society against floods and droughts; enhancing agricultural and industrial production (irrigation for agriculture and afforestation, industrial development), as well as multipurpose use of water and biomass including energy generation. In addition, NWP includes four cross-cutting axes such as water resources protection; capacity building; taking advantage of innovation applied to water resources development looking for further practical solutions. All water policies in a framework of stakeholders co-responsibility and participation. 1.100 Fact sheets USD 1000 Chihuido (Neuquen) Project location: Neuquen river basin Total budget: USD 2200 MM Objectives • Regulate Neuquén river floods reducing probable maximum flow peak from 25,500 m³/s to 11.500 m³/s providing security downstream to more than 700.000 people and 200.000 ha of irrigated farms • Improve water supply for irrigation in a new area of 30.000 ha • Incorporation of 637 MW producing 1,750 GWh of average annual energy • Tourism development Main characteristics • Reservoir: Surface: 18.600 ha • Volume: 5.496 million m3 • Spillway: Long. 100 m with 6 radial gates type 14.7 m wide and 19 m high Chihuido (Neuquen) Adaptation to climate extremes Salado river basin – Reach 4 (Buenos Aires) Project location: Buenos Aires Province Total budget: USD 1.000 MM Objectives • Flood drainage and climate change mitigation • Land reclamation and restoration • Improve agricultural and cattle production • Infrastructure protection against floods • Tourism development Main characteristics • Reach IV length: 200 km • Number of bridges to build: 21 Economic losses due to floods in Salado River Basin • Agricultural losses during 2001 flood: U$S 700 M Adaptation to climate extremes Salado river basin – Reach 4 (Buenos Aires) El Tambolar (San Juan) Quines Dam (San Luis) Project location: San Luis Province Total budget: USD 300 MM Objectives Drinking water, irrigation to new areas (Quines, Candelaria and surrounding), tourist development, as well as flood regulation during the rainy season to safeguard the irrigation areas and erosion control Main technical characteristics • Dam: gravity, crown length, 255 m • Reservoir capacity: 124 hm3 (the maximum reservoir quota, 607.15 m) • Area of the reservoir: 323 ha (the maximum reservoir quota) • High: 110 m • Maximun spillwayy discharge:1,650 m3 / sec • Intake: Two 1,20 m diameter pipes with capacity for 6 m3 / sec Irrigation potential • Irrigation potential: 174.000 Ha Fact sheets LA PLATA PUNTA MÉDANOS SCHEME LA PLATA HARBOR Other projects Projects Other projects Projects A. DEEP WATER HARBOR Argentina has several options to build a first deepwater harbor port including: areas near Quequén in the south of the province of Buenos Aires, close to Punta Medanos or in the Rio Bravo in the Parana River Delta Level of development: Feasibility Estimated investment: US $ 300 to 600 million B. MEDITERRANEAN WATERWAY Strategic waterway project of 1000 kilometers long from Northern Argentina in province of Formosa, crossing Santiago del Estero and Cordoba with the outlet to the Atlantic Ocean in the Province of Buenos Aires. The waterway is defined by a channel of 3 m. of depth and 25 m of width. In its route is planned the construction of 24 locks Level of development: Idea Estimated investment: US $ 880 million C. DAMS IN THE BERMEJO BASIN The Bermejo river basin has at least 12 projects whose main purpose is to generate energy, as well as irrigation and sediment control. At least they are: 1. Cambari (Tarija) 7. Vado Hondo (Blanco or Zenta) 2. Shipyards (Tarija) 8. Bermejo (Tiger) 3. The Pavas (Bermejo) 9. Burrumayo (Bermejo) 4. Arrazayal (Bermejo) 10. Large Bottom (Large river) 5. The Portillo (Iruya) 11. Mojotoro (Mojotoro) 6. Pescado I (pescado) Level of development: Several from profile to executive project Estimated investment: U $ D 5 billion D. TIDAL HYDROPOWER Project to take advantage of the tidal range of the Atlantic Ocean between the Gulf of San Matías and the New Gulf along the Carlos Ameghino isthmus (5 to 7 kilometers wide), containing on one side and another the rising water that alternate in one and the other Gulf. The maximum potential available is 40,000 MW. Level of development: Miscellaneous Estimated investment: U $ S 500 to 8000 million E. MATANZA-RIACHUELO RIVER RESTORATION Plan to clean up the basin including the control of industrial pollution, mud treatment and power generation, waste, and relocation of settlements. Level of development: Plan Estimated investment: US $ 1000 to 2000 million F. MULTIPROPOSE PROJECTS IN CHUBUT PROVINCE • La Helena Project (Carrenleufú): It is a dam located in the Carrenleufú River Basin that aims to provide water for human consumption, irrigation, power generation and tourism. It is located near the town of Corcovado. Level of development: Feasibility Estimated investment: US $ 800 million (estimated) • La Escondida Projet (Río Percey): The dam is located in the River Basin Futaleufú that aims to provide water for human consumption, animal and irrigation, as well as power generation, recreation and tourism to Esquel, Terevelin and the Valley October 16 Level of development: Feasibility Estimated investment: US $ 600 million (estimated) • Los Monos The purpose of the project is to provide water for human, animal and irrigation purposes, as well as the maintenance of the drought in the Lake Muster-Coluhé Huapi lake system, flood mitigation, power generation, preservation of fish fauna, recreation And tourism. Level of development: Feasibility Estimated investment: US $ 300 million (estimated) G.COLONIA-BUENOS AIRES BRIDGE Construction of an international bridge of 42 km to LINK Buenos Aires with Montevideo. It would allow to use the Port of Montevideo like of deep waters harbor. Level of development: Miscellaneous Estimated investment: US $ 800 million H. AQUEDUCT NORTE SANTACRUCEÑO Aqueduct that will allow drinking water to supply to 11 localities in the north Santacruceño: Los Antiguos - Perito Moreno - Las Heras - Jaramillo - Koluel Kaike - Pico Truncado - Puerto Deseado - Fitz Roy - Tellier - Cañadón Seco - Caleta Olivia. The source of water may be an outlet at Lake Buenos Aires, following agreement in the General Plan of Use of the Waters with Chile or a derivation of the River Senguerr to build the Los Monos Dam. Level of development: Feasibility Estimated investment: US $ 1.2 billion I. BIOCEANIC CORRIDORS Paso Huemules Integrated System (Chubut) Connectivity corridor between Puerto Madryn-Comodoro Rivadavia-Puerto Chacabuco through the Huemules pass that includes possible rail connectivity. Level of development: Project idea Estimated investment: US $ 670 million .
Recommended publications
  • YPF Luz Canadon Leon SLIP COMPILED FINAL 27Jun19
    Supplemental Lenders Information Package (SLIP) Cañadon Leon Windfarm 27 June 2019 Project No.: 0511773 The business of sustainability Document details Document title Supplemental Lenders Information Package (SLIP) Document subtitle Cañadon Leon Windfarm Project No. 0511773 Date 27 June 2019 Version 03 Author ERM Client Name YPF Luz Document history ERM approval to issue Version Revision Author Reviewed by Name Date Comments Draft 01 ERM Camille Maclet For internal review Draft 02 ERM Camille Maclet C. Maclet 12/06/2019 For client comments Final 03 ERM Camille Maclet C. Maclet 27/06/2019 Final issue www.erm.com Version: 03 Project No.: 0511773 Client: YPF Luz 27 June 2019 Signature Page 27 June 2019 Supplemental Lenders Information Package (SLIP) Cañadon Leon Windfarm Luisa Perez Gorospe Camille Maclet Project Manager Partner in Charge ERM Argentina S.A. #2677 Cabildo Ave. C1428AAI, Buenos Aires City Argentina © Copyright 2019 by ERM Worldwide Group Ltd and / or its affiliates (“ERM”). All rights reserved. No part of this work may be reproduced or transmitted in any form, or by any means, without the prior written permission of ERM www.erm.com Version: 03 Project No.: 0511773 Client: YPF Luz 27 June 2019 SUPPLEMENTAL LENDERS INFORMATION PACKAGE (SLIP) YPF LUZ Cañadon Leon Windfarm TABLE OF CONTENTS ACRONYMS AND ABBREVIATIONS .................................................................................................................... A EXECUTIVE SUMMARY .......................................................................................................................................
    [Show full text]
  • Padron Empleados
    PADRÓN EMPLEADOS LOCALIDAD APELLIDO Y NOMBRES DNI 28 DE NOVIEMBRE ARAMAYO ISABEL 11.663.934 28 DE NOVIEMBRE CHOQUE VERONICA HORTENSIA 26.956.848 28 DE NOVIEMBRE COLQUE OLGA SANTOS 12.193.318 28 DE NOVIEMBRE CUYUL NORMA MACARENA 35.065.300 28 DE NOVIEMBRE PEREA NOELIA BEATRIZ 35.065.113 28 DE NOVIEMBRE ROMANUT CABALLERO DIEGO RODOLFO 18.388.477 28 DE NOVIEMBRE VALENCIA MONICA ALEJANDRA 30.801.165 CABA - CIUDAD AUTONOMA DE BUENOS AIRES MENGARELLI GABRIELA 29.439.770 CABA - CIUDAD AUTONOMA DE BUENOS AIRES MIHANOVIC AHMET MAYRA ARACELI 41.253.860 CABA - CIUDAD AUTONOMA DE BUENOS AIRES RUMI JUAN JOSE 28.490.591 CALETA OLIVIA ABURTO MARLENE DEL CARMEN 22.323.318 CALETA OLIVIA ACUÑA MARIA SILVINA 18.483.791 CALETA OLIVIA AGUIAR LIBIA EDITH 33.260.337 CALETA OLIVIA AGUIL JUAN CARLOS 12.750.878 CALETA OLIVIA AGUIL MARIA LAURA 29.058.431 CALETA OLIVIA ALAMO CLAUDIA ANDREA 21.666.557 CALETA OLIVIA ALCAIN EMILIO LUIS 27.143.284 CALETA OLIVIA ALONSO EMILIO 40.386.530 CALETA OLIVIA AMADO EDUARDO ARIEL 29.485.449 CALETA OLIVIA AMELLA YESICA ROMINA 28.003.579 CALETA OLIVIA ANDREOLI GRACIELA INES 22.301.725 CALETA OLIVIA ANGELONI DIEGO JOSE 29.439.773 CALETA OLIVIA APARICIO NATALIA ALEJANDRA 37.337.512 CALETA OLIVIA AVALLAY SILVIA LORENA 26.065.036 CALETA OLIVIA AYALA LORENA MARIA TERESA 25.033.624 CALETA OLIVIA AYBAR LEONARDO PATRICIO 21.105.553 CALETA OLIVIA BAHAMONDE MARCOS AUGUSTO 24.861.608 CALETA OLIVIA BAIER MAGALI ESTER 34.562.578 CALETA OLIVIA BALERO SILVIA ELENA 28.004.750 CALETA OLIVIA BALLIRIAIN COSTA MARIA PAULA 28.004.680 CALETA OLIVIA
    [Show full text]
  • Puerto Caleta Paula – Caleta Olivia – Santa Cruz
    ICT-UNPA-177-2018 ISSN: 1852-4516 Aprobado por Resolución N° 0476/18-R-UNPA http://dx.doi.org/10.22305/ict-unpa.v10i1.264 Los puertos y el Desarrollo Local. Análisis de Caso: Puerto Caleta Paula – Caleta Olivia – Santa Cruz The ports and Local Development. Case: Puerto Caleta Paula – Caleta Olivia – Santa Cruz Marcelo Robledo, [email protected] Mariano Prado, [email protected] Universidad Nacional de la Patagonia Austral, Unidad Académica Caleta Olivia Instituto de Trabajo, Economía y Territorio (ITET) Caleta Olivia, Santa Cruz, Argentina Recibido: 03/10/2017. Aceptado: 10/04/2018 RESUMEN El desarrollo local, como herramienta de transformación social, requiere canalizar y promover el esfuerzo y trabajo de los diferentes actores sociales y aprovechar las potencialidades de los recursos que se disponen en el territorio. La provincia de Santa Cruz cuenta, bajo su administración política y operativa, con 5 puertos operables a lo largo de los 1.200 km de costa (incluyendo valiosos recursos costeros y marítimos) y además es la tercera provincia en términos de desembarque de captura marítima, configurando de esta forma la actividad portuaria como un recurso estratégico para el desarrollo. En esta producción académica se abordará el caso del puerto Caleta Paula, ubicado en cercanía de la zona urbana de Caleta Olivia – zona norte de Santa Cruz, desde una perspectiva económica y social con la finalidad de poner en discusión las posibilidades y las limitaciones que tiene la actividad portuaria para consolidarse con un actor clave del desarrollo local. Palabras clave: Desarrollo Local, Actividad Portuaria, PyMEs Regionales, Zona Norte de Santa Cruz ABSTRACT Local development, as a tool for social transformation, requires channeling and promoting the effort and work of the different social actors and take advantage of the potential of the resources available in the territory.
    [Show full text]
  • Spotlight on Retirement: Argentina, English Version
    Spotlight on Retirement: Argentina 2019 Hernán Poblete Miranda Associate Director, International Research LIMRA and LOMA +569 78454757 [email protected] © 2019, LL Global, Inc., and Society of Actuaries. All rights reserved. This publication is a benefit of LIMRA and Society of Actuaries memberships. No part may be shared with other organizations or reproduced in any form without SOA’s or LL Global’s written permission. 0498-1019 (50700-10-404-21507) Contents Introduction ............................................................................................................................................... 9 Executive Summary ................................................................................................................................ 11 About the Survey .................................................................................................................................... 12 Demographic Transition .......................................................................................................................... 13 Phases of the Demographic Transition ................................................................................................... 21 Current Pension Structure and Challenges ............................................................................................ 23 Sustainability of Pension Systems .......................................................................................................... 25 Retirement From the Consumer Perspective.........................................................................................
    [Show full text]
  • Technical Environmental Impact Study Cañadón León Wind Farm
    Client: YPF Energía Eléctrica S.A. Location: Cañadón Seco – Santa Cruz Province Date: May 26, 2017 Report: ETIA PECL 001-17 Technical Environmental Impact Study Cañadón León Wind Farm Technical Study for Environmental Impact Assessment Cañadón León Wind Farm Client: YPF Energía Eléctrica S.A. ETIA PECL 001/17 Author: Scudelati & Asociados S.A. www.scudelati.com.ar Contents 1 PROFESSIONALS RESPONSIBLE FOR THE T-EIA ......................................................................... 5 2 PROJECT GENERAL INFORMATION ........................................................................................... 6 2.1 DETAILS OF PROJECT REPRESENTATIVES ........................................................................... 6 2.2 CORPORATE MAIN BUSINESS ............................................................................................. 6 2.3 PROJECT TECHNICAL, ECONOMIC AND SOCIAL JUSTIFICATION ........................................ 6 2.4 AIMS .................................................................................................................................... 7 3 PROJECT DESCRIPTIVE REPORT ................................................................................................. 8 3.1 LOCATION............................................................................................................................ 8 3.2 SITE CHARACTERISTICS ..................................................................................................... 12 3.3 WIND FARM CONFIGURATION ........................................................................................
    [Show full text]
  • Santa Cruz Sneep 2018
    SISTEMA NACIONAL DE ESTADÍSTICAS SOBRE EJECUCIÓN DE LA PENA Informe Anual SANTA CRUZ SNEEP 2018 Dirección Nacional de Política Criminal en materia de Justicia y Legislación Penal Subsecretaría de Política Criminal Secretaría de Justicia Ministerio de Justicia y Derechos Humanos SNEEP 2018 - SANTA CRUZ UNIDAD SEGÚN SITUACIÓN LEGAL TOTAL CONDE- PROCE- PROVINCIA UNIDAD OTROS POR NADOS SADOS UNIDAD UNIDAD PENITENCIARIA N° 1 PICO TRUNCADO 57 11 0 68 UNIDAD PENITENCIARIA N° 2 26 14 0 40 MODULO PENITENCIARIO N° 5 6 12 0 18 MODULO PENITENCIARIO N° 6 13 6 0 19 ALCAIDIA PENITENCIARIA RIO GALLEGOS 19 11 0 30 ALCAIDIA PENITENCIARIA CALETA OLIVIA 11 10 0 21 ALCAIDIA PENITENCIARIA DE MUJERES 5 4 0 9 ALCAIDIA PENITENCIARIA EL CALAFATE 11 8 0 19 ALCAIDIA PENITENCIARIA PUERTO DESEADO 12 6 0 18 ALCAIDIA PENITENCIARIA PUERTO SAN JULIAN 16 1 0 17 COMISARIA SECCIONAL 1ª - PICO TRUNCADO 2 10 0 12 COMISARIA SECCIONAL 2ª - PICO TRUNCADO 5 11 0 16 COMISARIA SECCIONAL 2ª - PUERTO SAN JULIAN 9 2 0 11 SANTA CRUZ COMISARIA SECCIONAL 2º - RIO GALLEGOS 1 8 0 9 COMISARIA SECCIONAL 4º - RIO GALLEGOS 0 0 3 3 COMISARIA YACIMIENTO RIO TURBIO 10 2 0 12 COMISARIA 28 DE NOVIEMBRE 5 1 0 6 COMISARIA GOBERNADOR GREGORES 0 2 1 3 COMISARIA PERITO MORENO 1 2 0 3 COMISARIA PUERTO SANTA CRUZ 5 5 0 10 COMISARIA SECCIONAL 2º - LAS HERAS 9 2 0 11 COMISARIA SECCIONAL 1º - CALETA OLIVIA 0 1 0 1 COMISARIA SECCIONAL 3º - CALETA OLIVIA 9 4 0 13 COMISARIA SECCIONAL 4º - CALETA OLIVIA 6 9 0 15 COMISARIA SECCIONAL 5º - CALETA OLIVIA 9 11 0 20 COMISARIA SECCIONAL 1º - PIEDRA BUENA 3 0 0 3 COMISARIA SECCIONAL 2º - PIEDRA BUENA 1 2 0 3 TOTAL SERVICIO PENITENCIARIO PROVINCIAL 251 155 4 410 SNEEP 2018 - SANTA CRUZ Edades Cant.
    [Show full text]
  • Diapositiva 1
    Llamado a Licitación Pública Nacional e Internacional Acueducto para el Desarrollo Económico y Social del Norte de Santa Cruz Datos de la licitación Llamado a Licitación Pública Nacional e Internacional Acueducto para el Desarrollo Económico y Social del Norte de Santa Cruz Organismo ejecutor: Ente Nacional de Obras Hídricas (ENOHSA) Secretaría de Obras Publicas de la Nación Plazo de ejecución: 48 meses (4 años) Inversión Nacional Total: $11.680.140.624 (mínimo del 50% con financiamiento internacional y el restante por el Tesoro Nacional) Datos de la licitación 1) Día de publicación de llamado a licitación: 9, 10 y 11 de octubre 2015 2) Venta de pliegos: 30 de noviembre 2015 3) Apertura de sobres: 2 de marzo de 2016 Situación hídrica norte de la provincia de Santa Cruz La provisión de agua a las localidades de la región norte de la provincia de Santa Cruz se ha dado siempre de manera dificultosa debido a la escasez del recurso o a la complejidad del acceso al mismo. Para solucionar esta problemática, se ha desarrollado un proyecto que contará con la construcción del siguiente conjunto de obras: 1. Sistema Los Antiguos 2. Sistema Puerto Deseado 3. Acueducto para el Desarrollo Económico y Social del Norte de Santa Cruz (anuncio llamado a licitación) Situación hídrica norte de la provincia de Santa Cruz De esta manera, se llevará agua de riego para el desarrollo y agua potable a toda la población contenida en las 11 localidades del norte santacruceño: Los Antiguos – Perito Moreno – Las Heras – Jaramillo – Koluel Kaike – Pico Truncado – Puerto Deseado – Fitz Roy – Tellier – Cañadón Seco – Caleta Olivia 1.
    [Show full text]
  • Document Details Document Title Annex a Heavy Traffic Assessment
    ANNEX A HEAVY TRAFFI C ASSESSMENT YPF LUZ Cañadon Leon Windfarm Document details Document title Annex A Heavy Traffic Assessment Document subtitle Cañadon Leon Windfarm Project No. 0511773 Date 27 June 2019 Version 03 Author ERM Client Name YPF Luz Document history ERM approval to issue Version Revision Author Reviewed by Name Date Comments Draft 01 Paul Grant Ben Sussman Draft 02 Paul Grant Ben Sussman C. Maclet 12/06/2019 Final 03 Paul Grant Ben Sussman C. Maclet 27/06/2019 ANNEX A HEAVY TRAFFI C ASSESSMENT YPF LUZ Cañadon Leon Windfarm TABLE OF CONTENTS 1. HEAVY TRAFFIC BASELINE & IMPACTS ................................................................................................ 1 1.1 Baseline ......................................................................................................................................... 1 1.2 Impacts .......................................................................................................................................... 3 1.3 Mitigation Measures and Residual Impact ..................................................................................... 5 APPENDIX A. ROAD SURVEY (ALE HEAVYLIFT, JANUARY 2018) .................................................................. 6 List of Tables Table 1-1 Route from Puerto Deseado to Cañadon Leon ............................................................... 1 Table 1-2 Average Annual Daily Traffic (AADT) .............................................................................. 2 ANNEX A HEAVY TRAFFI C ASSESSMENT YPF LUZ
    [Show full text]
  • Marzo 2021 Subdelegación Caleta Olivia
    26 de Marzo 2021 RESUMEN ESTRATÉGICO – ENARGAS y GERENCIA DELEGACIONES • El ENARGAS es un Organismo con competencia nacional, por lo que resulta esencial su presencia en las distintas provincias de nuestro país, resultando de interés que los usuarios y usuarias, así como aquellos potenciales usuarios y usuarias del Servicio Público de Transporte y Distribución de Gas ejerzan sus derechos fundamentales conforme lo dispuesto por la Ley 24.076, las respectivas Licencias y la Constitución Nacional. • La Gerencia Regional Delegaciones del ENARGAS tiene como una de sus funciones primarias la supervisión, contralor, coordinación y gestión de las actividades desarrolladas por las Delegaciones y Subdelegaciones en pos de proteger adecuadamente los derechos de los usuarios y usuarias, futuros usuarios y usuarias y terceras/terceros interesados del servicio de distribución de gas natural y gas licuado por redes, de acuerdo con los objetivos fijados por la máxima Autoridad del Organismo y la normativa vigente. • Entiende en la atención de consultas y reclamos ejerciendo las acciones necesarias para la adecuada protección de los derechos de los usuarios y las usuarias (actuales y potenciales) en el ámbito de su competencia y canaliza las consultas y requerimientos recibidos en las Delegaciones y Subdelegaciones desde las distintas entidades representativas de usuarias/usuarios, organismos nacionales, provinciales y municipales; considerando los lineamientos de la Gerencia de Protección del Usuario. • En la Provincia de Santa Cruz opera la Licenciataria Camuzzi Gas del Sur S.A., que presta servicio en la zona a más de 52.400 usuarios y usuarias, y la subdistribuidora Distrigas S.A., que según datos de facturación a diciembre 2020 tiene alrededor de 63.000 usuarios.
    [Show full text]
  • Energy That Transforms Us
    Energy That Transforms Us Sustainability Report 2019 > Energy That Transforms Us Sustainability Report 2019 > > 2 — 3 Table of Contents Impact of Letter from Letter from the COVID-19 the Chairman the CEO Pandemic 01 02 03 About Us Sustainability Governance, Ethics and Integrity 04 05 06 Economic Environmental Social Performance Performance Performance 07 GRI Content Index > 4 — 5 Impact of the COVID-19 Pandemic n March 11, 2020, the World Health Organization contractors’. Measures derived from COVID-19 measures and news in relation to protocols and 1. Take care of our people. Always prioritize declared the Coronavirus (COVID-19) are significantly affecting the national, regional other Covid-19 news through internal health and safety, in compliance with health Ooutbreak a global pandemic and global economy, due to impacts on the chain communication channels. regulations. Protect the jobs of our people. as it rapidly spread around the world, having of supply and significant increase of economic • A dedicated page on COVID-19 was created on Collaborate with employees who require affected more than 190 countries. Most of the uncertainty, as evidenced by higher volatility of the Intranet, where employees have access to support, encouraging teamworking to come out governments are taking restrictive measures to asset prices and exchange rates, and a decrease all information: protocols, rules, news and stronger and better. prevent propagation. in long-term interest rates. advice. 2. Safeguard revenues and costs. Minimize • A section on Covid-19 was added to the website costs to those that are strictly required. Work In Argentina, where the company operates, on To cope with this pandemic and considering that www.ypfluz.com with information relevant to closely with clients to make sure that they will March 12, 2020 Decree 260/2020 established the electric power generation has been declared an communities and stakeholders.
    [Show full text]
  • BOLETIN OFICIAL Correo Argentino FRANQUEO a PAGAR RIO GALLEGOS CUENTA Nº 07-0034
    “1520-2020: 500 Años de la Primera Misa en lo que actualmente conforma el Territorio Argentino” y “2020- Año del Bicentenario del Paso a la Inmortalidad del General Manuel Belgrano”.- GOBIERNO DE LA PROVINCIA DE SANTA CRUZ Ministerio de la Secretaría General de la Gobernación BOLETIN OFICIAL Correo Argentino FRANQUEO A PAGAR RIO GALLEGOS CUENTA Nº 07-0034 AÑO LXV Nº 5514 PUBLICACION BISEMANAL (Martes y Jueves) RÍO GALLEGOS, 01 de Diciembre de 2020.- Dra. ALICIA MARGARITA KIRCHNER las partes acuerdan un aumento del quince por ciento (15%) DECRETOS DEL Gobernadora al básico a percibir con los haberes del mes de julio del año Sr. LEONARDO DARIO ALVAREZ 2020 y otro cinco por ciento (5%) mas al básico, a percibir PODER EJECUTIVO Ministro Jefatura de Gabinete Sr. LEANDRO EDUARDO ZULIANI con los haberes del mes de septiembre del año 2020, los cua- Ministro de Gobierno les arrojan un total acumulado del veinte por ciento (20%) Dr. LISANDRO GABRIEL DE LA TORRE de aumento para el personal mencionado precedentemente, DECRETO N° 1009 Ministro de Seguridad Lic. IGNACIO PERINCIOLI estableciéndose que los adicionales ligados al básico se in- RÍO GALLEGOS, 26 de Agosto de 2020.- Ministro de Economía, Finanzas e Infraestructura crementan de igual medida, conforme surge el Anexo I que Sra. CLAUDIA ALEJANDRA MARTINEZ Ministra de la Secretaría General forma parte integrante del acta; V I S T O : de la Gobernación Que así mismo, se deja establecido que solo en lo que res- El Expediente MTEySS-N° 524.468/20, elevado por el Lic. SILVINA DEL VALLE CORDOBA pecta a las asignaciones familiares se aplicaran de modo refe- Ministra de la Producción, Comercio e Industria Ministerio de Trabajo, Empleo y Seguridad Social; y Dra.
    [Show full text]
  • Santa Cruz Sneep 2012
    SISTEMA NACIONAL DE ESTADÍSTICAS SOBRE EJECUCIÓN DE LA PENA Informe Anual PROVINCIA DE SANTA CRUZ SNEEP 2012 Dirección Nacional de Política Criminal en materia de Justicia y Legislación Penal Subsecretaría de Política Criminal Secretaría de Justicia Ministerio de Justicia y Derechos Humanos SNEEP 2012 - SANTA CRUZ DISTRIBUCIÓN POR UNIDAD Y SITUACIÓN LEGAL INIMPUTABLES/ TOTAL POR UNIDADES CONDENADOS PROCESADOS MENORES o Sin Discriminar UNIDAD ALCAIDIA POLICIAL ZONA SUR - RIO GALLEGOS 15 15 COMISARIA SECCIONAL 3º - RIO GALLEGOS 3 1 4 COMISARIA SECCIONAL 5º - RIO GALLEGOS 11 11 COMISARIA SECCIONAL 6º - RIO GALLEGOS 6 7 13 ALCAIDIA POLICIAL ZONA CENTRO - PUERTO SAN 14 1 15 JULIAN COMISARIA SECCIONAL 2º - PUERTO SAN JULIAN 1 6 7 ALCAIDIA POLICIAL ZONA NORTE - CALETA OLIVIA 5 5 10 ALCAIDIA POLICIAL PICO TRUNCADO 39 17 56 COMISARIA SECCIONAL 1º - PICO TRUNCADO 5 5 COMISARIA SECCIONAL 2º - PICO TRUNCADO 4 4 ALCAIDIA POLICIAL PUERTO DESEADO 6 5 11 COMISARIA YACIMIENTO RIO TURBIO 12 3 15 COMISARIA 28 DE NOVIEMBRE 2 3 5 COMISARIA PUERTO SANTA CRUZ 4 4 TOTALES PROVINCIALES 107 68 0 175 SNEEP 2012 - SANTA CRUZ Edades Cant. 65 años y De 55 a 64 Menores de 18 años 0 más años 2% De 18 a 24 5% años De 18 a 24 años 35 20% De 45 a 54 De 25 a 34 años 60 años 17% De 35 a 44 años 37 De 45 a 54 años 29 De 55 a 64 años 8 De 35 a 44 años 65 años y más 4 De 25 a 34 21% años Sin Datos 2 35% Total 175 Sexo Cant.
    [Show full text]