THE BUCKINGHAMSHIRE COUNTY COUNCIL The Council has made The Buckinghamshire County Council (Grove Road, Burnham in the Parish of Burnham CP) (Temporary Prohibition of Through Traffic) Order, 2018 which will temporarily prohibit any vehicle from proceeding, except for access, in Grove Road from junction of Court Lane. Alternative route: Grove Road, Britwell Road, Court Lane, Green Lane, Pumpkin Hill and Victoria Drive. The closure is required whilst gas service works take place commencing on 8 January 2018. The proposed Order will come into operation on 8 January 2018, as signed, with maximum 18 months duration. Dated: 29 December 2017

The Council has made The Buckinghamshire County Council (Ashmead Lane, Denham in the Parish of Denham CP) (Temporary Prohibition of Through Traffic) Order, 2018 which will temporarily prohibit any vehicle from proceeding, except for access, in Ashmead Lane from junction of Village Road to its junction Ashmead Drive. Alternative route: Village Road, Old Mill Road, Cheapside Lane and Ashmead Lane. The closure is required whilst drainage works take place commencing on 8 January 2018 for 10 days. The proposed Order will come into operation on 8 January 2018, as signed, with maximum 18 months duration. Dated: 29 December 2017

The council intends to make Buckinghamshire County Council (Temporary Prohibition of Through Traffic) (Various roads, South Bucks District) Order, 2018, which will temporarily prohibit any vehicle from proceeding, except for access, in various roads in [South Bucks District] as specified in the Schedule below. The closures are required whilst conventional works take place between [15 January 2018] and [23 March 2018]. The proposed Order will come into operation on 15 January 2018 and will be in effect when signed and between times as per schedule below on the days signed, with a maximum duration of 18 months. SCHEDULE - “AR” = Alternative Route Amersham Road, Beaconsfield from Lenborough Road to Minerva Way. AR- Amersham Road, Gore Hill, Amersham Bypass, Whielden Lane, Penn Road, Amersham Hill, Crendon Street, Easton Street, Abbey Way, Abbey Way Gyratory, Queen Victoria Road, London Road, Knaves Beech, White Hill, Wycombe End and London End. Denham Road, Denham for entire length of the road. AR- Southlands Road, Denham Road, Church Road, Road, Road, Bangors Road North, St John’s Road, Rockingham Road, New Windsor Street, Trumper Way, Oxford Road, Sanderson Road, Denham and A40 J M40/a412/a4020 Roundabout. Bath Road, Taplow from Hitchim Road to Retail park entrance. AR-Bath Road, Bridge Road, St Cloud Way, Subway At Saint Cloud Way From Providence Place To St Cloud Gate, Bad Godesberg Way Roundabout, Bad Godesberg Way, Subway At Bad Godesberg Way From West Street To Kidwells Park, Castle Hill, Castle Hill Terrace, A404 A4, A404 A404m J9b Join N, A404m Through J9b N, A404 From A4 To Marlow Boundary, A404 From A404m J9b To J A4130 N, A404 Through J A4130 N, A404 A4130 Henley Road, A404 J A4130 Leave N, Henley Road, A404 J A4130 Join N, A404 From J A4130 To J A308 N, Link Between Dungrovehill Lane And Hurley Lane, A404 A308, A404 From J A4155 To J A308 Including Roundabout S, A404 From J A308 To J A4155 N, A404 From A4155 To The River Bridge, A404 Through J A4155 N, A404 J A4155 Leave N, A404 From M40 To A4155, A404 From J A4155 To M40 J4 Roundabout N, Winchbottom Lane, A404 M40 J4 Roundabout, , Marlow Hill, Abbey Way, Easton Street, London Road, Gordon Road, Knaves Beech, White Hill, Wycombe End, London End, Park Lane, Slough Road, Windsor Road, Dorney Hill North, Dorney Hill South, Collinswood Road, Beaconsfield Road and Farnham Road. These closures will consist of day or night works. Dated: 29 December 2017

The Council intends to make The Buckinghamshire County Council (High Street, Taplow in the Parish of Taplow CP) (Temporary Prohibition of Through Traffic) Order, 2018 which will temporarily prohibit any vehicle from proceeding, except for access, in High Street opposite Victoria Cottage. Alternative route: High Street, Hill Farm Road, Rectory Road and Wellbank. The closure is required whilst sewer cover replacement works take place commencing on 18 January 2018 between 1900 and 2200. The proposed Order will come into operation on 18 January 2018, as signed, with maximum 18 months duration. Dated: 29 December 2017