(I) Villages with Public Sewerage Installed
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Official Record of Proceedings
HONG KONG LEGISLATIVE COUNCIL — 17 May 1995 3719 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 17 May 1995 The Council met at half-past Two o’clock PRESENT THE PRESIDENT THE HONOURABLE SIR JOHN SWAINE, C.B.E., LL.D., Q.C., J.P. THE CHIEF SECRETARY THE HONOURABLE MRS ANSON CHAN, C.B.E., J.P. THE FINANCIAL SECRETARY THE HONOURABLE SIR NATHANIEL WILLIAM HAMISH MACLEOD, K.B.E., J.P. THE ATTORNEY GENERAL THE HONOURABLE JEREMY FELL MATHEWS, C.M.G., J.P. THE HONOURABLE ALLEN LEE PENG-FEI, C.B.E., J.P. THE HONOURABLE MRS SELINA CHOW LIANG SHUK-YEE, O.B.E., J.P. THE HONOURABLE HUI YIN-FAT, O.B.E., J.P. THE HONOURABLE MARTIN LEE CHU-MING, Q.C., J.P. THE HONOURABLE PANG CHUN-HOI, M.B.E. THE HONOURABLE SZETO WAH THE HONOURABLE TAM YIU-CHUNG THE HONOURABLE ANDREW WONG WANG-FAT, O.B.E., J.P. THE HONOURABLE EDWARD HO SING-TIN, O.B.E., J.P. THE HONOURABLE RONALD JOSEPH ARCULLI, O.B.E., J.P. THE HONOURABLE MARTIN GILBERT BARROW, O.B.E., J.P. THE HONOURABLE MRS PEGGY LAM, O.B.E., J.P. THE HONOURABLE MRS MIRIAM LAU KIN-YEE, O.B.E., J.P. 3720 HONG KONG LEGISLATIVE COUNCIL — 17 May 1995 DR THE HONOURABLE LEONG CHE-HUNG, O.B.E., J.P. THE HONOURABLE JAMES DAVID MCGREGOR, O.B.E., I.S.O., J.P. THE HONOURABLE MRS ELSIE TU, C.B.E. THE HONOURABLE PETER WONG HONG-YUEN, O.B.E., J.P. THE HONOURABLE ALBERT CHAN WAI-YIP THE HONOURABLE VINCENT CHENG HOI-CHUEN, O.B.E., J.P. -
In Central & Western District
October 2018 Service Boundary of Integrated Home Care Services Teams (Ordinary Cases) in Central & Western District No. Agency Service Unit Address Phone / Fax Service Boundary 1 St. James’ Central & Western 11/F., Sheung Wan 2805 1256, Admiralty, Central, Sheung Wan, Mid-levels,Sai Ying Pun Settlement Integrated Home Care Municipal Bldg., 345 2805 1257 / (Connaught Road West all numbers, Des Voeux Road West from Services Team Queen’s Road West, 2851 6557 number 1 to 408 ),Centre Street (all odd numbers, even numbers Hong Kong. from 2 to 40),Queen’s Road West (odd numbers from 1 to 451 even numbers from 2 to 290), Western Street (even numbers from 2 to 22), Water Street (numbers from 1 to 3), First Street (odd numbers from 1 to 55, even numbers from 2 to 60), Second Street (odd numbers from 1 to 55, even numbers from 2 to 32), Third Street (odd numbers from 1 to 61, even numbers from 2 to 54), High Street (odd numbers from 1 to 51, even numbers from 2 to 44), Mid-levels (Boham Road odd numbers from 1 to 31, all even numbers), Caine Road (all numbers) 1 October 2018 No. Agency Service Unit Address Phone / Fax Service Boundary 2 Hong Kong Family Central & Western G/F, Lower Block, Grand 2546 3332 / Sai Ying Pun, Centre Street (even numbers from 42 to 62), Queen Welfare Society Integrated Home Care Millennium Plaza, 181 to 2167 8987 Road West (odd numbers from 453 onwards, even numbers Services Team 183 Queen’s Road from 292 to 504), Hing Hon Road (all numbers) Central, Sheung Wan. -
Frontier Closed Area (Amendment) Order 2015
《2015 年邊境禁區 ( 修訂 ) 令》 Frontier Closed Area (Amendment) Order 2015 2015 年第 217 號法律公告 L.N. 217 of 2015 B4834 第 1 條 Section 1 B4835 2015 年第 217 號法律公告 L.N. 217 of 2015 《2015 年邊境禁區 ( 修訂 ) 令》 Frontier Closed Area (Amendment) Order 2015 ( 由行政長官在徵詢行政會議的意見後根據《公安條例》( 第 245 章 ) (Made by the Chief Executive under section 36 of the Public Order 第 36 條作出 ) Ordinance (Cap. 245) after consultation with the Executive Council) 1. 生效日期 1. Commencement 本命令自 2016 年 1 月 4 日起實施。 This Order comes into operation on 4 January 2016. 2. 修訂《邊境禁區令》 2. Frontier Closed Area Order amended 《邊境禁區令》( 第 245 章,附屬法例 A) 現予修訂,修訂方式 The Frontier Closed Area Order (Cap. 245 sub. leg. A) is 列於第 3 條。 amended as set out in section 3. 3. 修訂附表 3. Schedule amended (1) 附表,第 1 條—— (1) The Schedule, section 1— 廢除 Repeal 所有“74” “74” (wherever appearing) 代以 Substitute “85”。 “85”. (2) 附表—— (2) The Schedule— 廢除在第 3 條之後的所有字句 Repeal everything after section 3 代以 Substitute 《2015 年邊境禁區 ( 修訂 ) 令》 Frontier Closed Area (Amendment) Order 2015 2015 年第 217 號法律公告 L.N. 217 of 2015 B4836 第 3 條 Section 3 B4837 “列表 “Table 第 1 欄 第 2 欄 第 3 欄 第 4 欄 Column 1 Column 2 Column 3 Column 4 點號 座標北 座標東 備註 Point ( 米 ) ( 米 ) number Northing Easting Remarks (m) (m) 然後向東北沿一條方 向 61° 的線至深圳河 From there 中線,之後向東沿深 NORTHEAST following 1 839637 821002 圳河中線和中華人民 a line of bearing 61° 共和國香港特別行政 until it stops at the centre 區行政區域界線至第 line of the Shenzhen 2 點。 River, then EAST following the centre line 然後向東北沿沙頭角 1 839637 821002 2 844880 842107 of the Shenzhen River 海出口至第 3 點。 and the boundary of the administrative division of 然後向東北橫過沙頭 3 845333 842310 the Hong Kong Special 角海至第 4 點。 Administrative Region of the People’s Republic of China to Point 2. -
LC Paper No. CB(1)842/19-20(01)
。LC Paper No. CB(1)842/19-20(01) 商務及經濟發展局 COMMUNICATIONS AND CREATIVE lNDUSTRIES BRANCH 通訊及創意產業科 COMMERCE AND ECONOMIC 香港添馬添美道二號 DEVELOPMENT BUREAU 政府總部西翼二十一摟 21/F, West Wing Central Government Offices 2 Tim Mei Avenue Tamar, Hong Kong 本函檔號 OUR REF 來函檔號 YOUR REF 電語 TEL. NO. 2810 2708 傅真 FAXLINE· 2511 1458 電子郵件 E - mail Address: [email protected] By Email 3 July 2020 Clerk, Legislative Council Panel on Information Technology and Broadcasting Legislative Council Complex 1 Legislative Council Road Central, Hong Kong (Attn.: Mr Daniel SIN) Dear Mr SIN, Panel on Information Technology and Broadcasting Follow-up to Meeting on 8 June 2020 At the meeting of the Legislative Council Panel on Information Technology and Broadcasting on 8 June 2020, Members requested the Government to provide the following supplementary information on the Subsidy Scheme to Extend Fibre-based Networks to Villages in Remote Areas (Subsidy Scheme): Regarding the rolling out of fibre-based lead-in connections to a total of 235 villages as required under the Subsidy Scheme, selected fixed network operators (FNOs) have made additional service commitments for some of the villages, e.g. providing villagers with broadband services at a speed of 1 000 Mbps or above, installing Wi-Fi hotspots within the common area of villages for provision of free Wi-Fi services and/or providing broadband services to villagers at the prevailing market prices during the first three years upon project completion (see Annex A for details). The two selected FNOs are now undertaking various works /Cont'd .... - 2 - pla画ng and 唧lying for relevant statutory permits and approvals. -
List of Recognized Villages Under the New Territories Small House Policy
LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN, -
Report on the 2007 Village Representative Election
111 Appendix XI(A) (Page 1/20) 2007 Village Representative Election Results for RR Elections Number of Votes District/ Candidate Number received Result of Rural Name of Village and as Election Committee Candidate Name Declared by RO ISLANDS Lamma Island Ko Long ─ LAU CHI YUEN ─ Uncontested (North) Lo Tik Wan ─ NG CHONG YIP ─ Uncontested Pak Kok Kau Tsuen ─ CHAN KWOK KIN ─ Uncontested Pak Kok San Tsuen ─ CHOW CHEUNG YAU ─ Uncontested Sha Po ─ MA CHING WAH ─ Uncontested Tai Peng Tsuen ─ WONG KING CHEE ─ Uncontested Tai Wan Kau Tsuen ─ CHAN KAM PANG ─ Uncontested Tai Wan San Tsuen ─ CHAN WAI LUN ALAN ─ Uncontested Tai Yuen ─ CHOW WING CHUNG ALAN ─ Uncontested Wang Long ─ CHOW KWOK KWONG ─ Uncontested Yung Shue Long ─ WONG KING CHUEN ─ Uncontested Yung Shue Wan 1 YU LAI FAN 153 Elected 2 FONG MAN SANG 26 3 NG TAM HING 82 Lamma Island Lo So Shing (South) Luk Chau Mo Tat ─ CHAN KAM WAH ─ Uncontested Mo Tat Wan Po Toi Sok Kwu Wan 1 WONG MING TAT 21 2 LAI MUN MING 42 Elected Tung O Yung Shue Ha Mui Wo Chung Hau (North) 1 WONG FUK KAN 151 Elected 2 YUEN YUK KAU 140 Chung Hau (South) 1 CHUI PUI MAN WENDY 252 Elected 2 HO KAM HO 100 Luk Tei Tong 1 LI KWOK KEUNG 99 Elected 2 KAM CHI SHING 84 Man Kok Tsui Ngau Kwu Long Pak Mong ─ KWOK SHU YUNG ─ Uncontested Pak Ngan Heung ─ WONG WAI KIT ─ Uncontested Tai Ho ─ HO TIN SHUNG ─ Uncontested Tai Tei Tong ─ WONG CHAU FUK ─ Uncontested Wo Tin 1 TANG KA HUNG 12 Elected 2 HO HUNG CHAN 10 Peng Chau Nim Shu Wan ─ WONG SIU NGOK ─ Uncontested 112 Appendix XI(A) (Page 2/20) Number of Votes District/ Candidate Number -
Explanatory Statement
KWU TUNG NORTH OUTLINE DEVELOPMENT PLAN No. D/KTN/1A EXPLANATORY STATEMENT ODP No. D/KTN/1 Approved by CPLD on 17.10.2013 ODP No. D/KTN/1A Agreed by NT DipCon on 12.5.2020 Fanling, Sheung Shui & Yuen Long East District Planning Office Planning Department Kwu Tung North Outline Development Plan No. D/KTN/1A Explanatory Statement CONTENTS Page 1. Background ………………………………………………………………..1 2. Objectives and Authority of the Plan ……………………………………...2 3. The Planning Scheme Area ………………………………………………..3 4. Population .………………………………………………………………...6 5. Planning Themes and Urban Design and Landscape Framework .……..…6 6. Land Use Proposals ………………………………………………………15 7. Transport ………………………………………………………………….33 8. Environmental Considerations …………...……………………………….37 9. Cultural Heritage ………………………………………………………….41 10. Utility Services ……………………………………………………………41 11. Implementation ……………………………………………………….......43 Plan 1 : Kwu Tung North New Development Area Location Plan Plan 2 : Urban Design and Landscape Framework Plan 3 : Pedestrian Connections Plan Plan 4 : Cycle Track Network Plan Plan 5 : Transport Network Plan Appendix 1: Schedule of Requirement and Provision of G/IC Facilities and Open Space in Kwu Tung North New Development Area Appendix 2: Development Parameters of Major Development Sites in Kwu Tung North New Development Area Kwu Tung North Outline Development Plan No. D/KTN/1A Explanatory Statement 1. Background 1.1 The Territorial Development Strategy Review in 1990s first identified that there was potential for strategic growth in the North East New Territories (NENT). The Planning and Development Study on NENT commissioned in 1998 identified Kwu Tung North (KTN), Fanling North (FLN) and Ping Che/Ta Kwu Ling (PC/TKL) as suitable for New Development Areas (NDAs) development. The Hong Kong 2030: Planning Vision and Strategy, promulgated in 2007, recommended to proceed with the KTN and FLN NDAs, among others, to address the long-term housing demand and provide employment opportunities. -
Preliminary Concepts for the New Territories North Development
Preliminary Concepts for the New Territories North Development 02 OverviewOOvveveerrvieeww 04 ExistingEExExixisxixisssttitinng CConditionsonondddiittioonnsns 07 OpportunitiesOOppppppoortunnittiiieeses & CoCConstraintsoonnssstttrraaiainntnntss 08 OverallOOvveveerall PPlanninglananniiinnngg ApAApproachespppprrooaoacaachchchehhesess 16 OverallOOvveeraall PPlPlanninglalaannnnnniiinnngg & DesignDDeesessign FrameworkFrarammeeewwoworrkk 20 BroadBBrBroroooaadd LandLaLandnd UUsUseses CoCConceptsoonnccecepeptptss 28 NextNNeexexxt StepStStept p Overview Background 1.4 The Study adopts a comprehensive and integrated approach to formulate the optimal scale of development 1.1 According to the latest population projection, Hong in the NTN. It has explored the potential of building new Kong’s population would continue to grow, from 7.24 communities and vibrant employment and business million in 2014 to 8.22 million by 2043. There is a nodes in the area to contribute to the long-term social continuous demand for land for economic development and economic development of Hong Kong. to sustain our competitiveness. There are also increasing community aspirations for a better living environment. 1.5 The Study is a preliminary feasibility study which has examined the baseline conditions of the NTN covering 1.2 To maintain a steady land supply, the Government is about 5,300 hectares (ha) of land (Plan 1) to identify looking into various initiatives, including exploring further potential development areas (PDAs) and formulate an development opportunities in the -
Note for Finance Committee
For information FCRI(2017-18)15 NOTE FOR FINANCE COMMITTEE HEAD 706 – HIGHWAYS Transport – Roads 721TH – Widening of Yuen Long Highway between Lam Tei and Shap Pat Heung Interchange PURPOSE The purpose of this note is to update the scope of 721TH to reflect the reduced length of noise barriers covered by the project. PROJECT SCOPE AND NATURE 2. In February 2003, the Finance Committee (FC) approved the upgrading of 721TH to Category A at an estimated cost of $931.0 million in money-of-the-day (MOD) prices1. The approved scope of 721TH comprises – (a) widening of 6.8-kilometre (km) long Yuen Long Highway between Lam Tei and Shap Pat Heung Interchange from a dual two-lane to a dual three-lane carriageway with provision of hard shoulder; (b) modification of the existing Tin Shui Wai West Interchange and Tong Yan San Tsuen Interchange and the associated slip roads affected by the proposed road widening; (c) extension of existing highway structures affected by the proposed road widening including vehicular bridges, vehicular underpasses, pedestrian subways and culverts; /(d) ….. __________________________________ 1 The Secretary for Financial Services and the Treasury approved an increase in the approved project estimate under delegated authority from $931.0 million by $13.7 million to $944.7 million in MOD prices on 27 May 2016. FCRI(2017-18)15 Page 2 (d) installation of 11.6-km long noise barriers ranging from 2 metres (m) to 7.3 m high and provision of noise reducing road surfacing; and (e) associated works including road rehabilitation, geotechnical, drainage, lighting, landscaping and a closed circuit television system. -
C N Figure 13.1 Yuen Long Shap Pat Heung Ping Shan Cultural Heritage
t en e pm g ui a q td r E L o e s t Tin Shui Estate 5 nc ce S 0 Open Storage a vi dv r n A e e S p D n O Ope A age D Open Storage tor DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE. O S OA R R 0 Elegant Villa T 5 S Tin Shui Wai Park K A E ALL RIGHTS RESERVED. p A pp p P HO P I I p p N U p Legend N F P I c OVE ARUP & PARTNERS HONG KONG LIMITED. G p U T N Open Storage H p K A p A H H Hong Kong 1 p Wang Chau S 0 d I R School of Motoring n p O S Fuk Hing Tsuen a d i Tin Shui Wai A T t n p WANG CHAU a 0 D R 10 S u Bus Depot W o E Chung Hau r i E Ponds G T Wang Chau u N p Yu Man San Tsuen S h 2 s 0 Tung Tau Wai San Tsuen S t T t D T a I r N A S T n n 0 S i o O Open Storage I 2 d p R K T H T N p IN U S HU T K O I A C p ST P T 50 Potential Development Area 0 RE IN p ET N S Water Tank 5 R TI T O Z A D 0 Jetty D R Open Storage A 5 Jetty p O O Ting Fook Villas Sherwood A R D D D Court T Wang Chau A D N (PDA) A A I O Tin Oi Court O N Meon R p O p Yeung Hau R E Chung Sam Wai P R I p U S U Court Y Temple Wang Chau W H G p S N IN I U ING p T N Ha Mei H T Tung Tau Wai C L G Tung Tau Ka Fuk Yuen K San Tsuen p R p Tsuen N A OA P I A p D p p p S KA p Tin Tsz Estate I Tin Lai Court E h M Shan Pui Hong Mei a 20 Wang Chau l Tin Yiu Estate l Chung Hau Tsuen Tsuen A Sai Tau Wai u T H N Open Storage I p Works Boundary Outside PDA N p Wang Chau LAU Lo Uk Y Lam Uk Tsuen YIP I S NG TR Tsuen EET h a R Works in progress ll D u OA N Shan Pui D OA R Wang Chau G Yeung Uk Tsuen N Kingswood Villas p p I D San Wai P A p Open Storage Yuk Yat Garden O San Wai D R A p -