<<

Building Plans For complete building instructions and instructional videos, please visit the main web site at www.hirstarts.com/watermill/watermill.html. Using these plans alone will not give you enough information to build the .

Please note that this is a fairly large and complex project. If this is your first building project using Hirst Arts molds, I strongly suggest you choose a more simple project instead.

This project uses six different Hirst Arts molds. The number of castings needed are: 20 castings of mold #226, wooden beam mold 16 castings of mold #225, half timber mold 15 castings of mold #253, brick panel mold 10 castings of mold #263, rubble block mold 10 castings of mold #230 clay tile roof mold 8 castings of mold #227, tavern and door mold

This project is designed so that you do not have to make the or water portion of the mill if you do not want to. If you leave these off, you can simply make a nice looking two-story house. However, you will have a few extra unused castings if you do this. Please do the steps below in order. Step 1: Castings and Printed Plans. Cast all of the molds and sort the pieces. If you place all of the pieces from one mold on a sheet of cardboard, it will be easier to find the pieces you need and move them out of the way when you don’t need them.

After printing these plans, several pages will need to be taped together to form a larger plan. Below is a diagram of which pages need assembled.

Page 4 Page 6 Page 8 Page 9 Page 10 Page 11

Page 5 Page 7

Step 2: Gluing wood and stone sections. Glue together the following wood and stone sections: B1 bottom floor T1 top floor R4 roof dormer peaks B2 main beams (7) T2 main beams (6) R5 roof dormer B7 chimney bottom T6 bay window side B8 lower fireplace T7 bay window W4 wooden wheel (don’t glue mantle onto fireplace) T8 bay window side W5 stone wheel support B9 stairway T10 chimney top (12 wooden paddles around B10 large braces T11 upper fireplace the wheel will be painted on B11 small braces T12 porch front top all sides along with this group.) B12 porch side braces T13 porch front railing B13 porch side railing T14 porch side braces B14 porch front brace T15 porch side railing B15 porch front railing T16 stair railing B16 front and side doors (2) T17 upper front door

Floor sections B1 and T1 can be glued to thin card stock or matt board. You can lay the plans for B1 and T1 over card stock, poke holes in the corners, connect the dots and use this as a guide as to where to spread the glue on the floor. Page 1 Step 3: Cutting the water base. If you intend to make the water level, you will need 1/2” thick insulating foam. Lay the plans for W1, W2 and W3 over the foam and poke holes through the plan into the foam. Then connect the dots and accurately cut the three foam shapes. Glue the W2 and W3 foam slabs together. Cut the bank edges in a slop towards the water. You may even want to cut a rock texture into the banks. Glue the rubble blocks around W3 to form the foundation stone under the house. Also glue the stones onto the face of W2. If your foam is slightly thicker than 1/2”, then be sure the stones of the foundation are flush with the top of the foam. The gap underneath can be covered with ground scenic materials later on.

Cut out the riverbed printed texture and varnish it down onto W1. Glue on the underside of the hole in W1 and paint the bottom of the hole brown. W2 and W3 will be glued down to W1 after the stone foundation and banks are painted.

Step 4: Painting the pieces and base. Review the pieces list on page 23 of these plans. All of these pieces will be prepainted individually before gluing them together to form walls. Since this is an exact count of the pieces you will need, it’s a good idea to paint a couple extra of each piece in case you break or lose a piece.

Start with the brick panels. Use permanent double stick tape to stick down the brick panels onto pieces of cardboard. The backs of the pieces may need to be sanded slightly in order to stick. Split five of the 1” x 2” vertical brick panels down the center and split one of the 2” square sections as well. Spray paint these a flat or satin almond color. When dry, stain them with brown shoe polish and wipe off the excess.

Next are the half timber and decorative window pieces. Look on the parts list on page 23 and stick these pieces down to chunks of cardboard. These may also need sanding on the back side. All of these timbers and windows will be spray painted flat black (don’t forget the three straps from mold #226).

Spray paint flat black all of the wooden and stone sections that you assembled on step 1 of these instructions.

Hand paint W2 and W3 (stone foundation and banks) flat black using thinned down acrylic paint. You cannot spray paint these because spray paint will dissolve the foam.

Dry brush all wooden pieces with medium brown from the earth tone colors. Mask off the stone sections on floors B1 and T1, then heavily dry brush all stone pieces using the same medium brown. Afterwards, lightly dry brush all stone sections with light gray from the castle gray colors. Dry brush all hinges and straps with silver.

Step 5: Building the remaining walls. Assemble wall sections B3, B4, B5, B6, T3, T4, T5 and T9 using all prepainted brick panels and timbers. Wait to glue on fireplaces and items with hinges until after the walls are assembled, otherwise wall will not lay flat when gluing on the back side.

Paint the insides of the doorways and the tops of the wall sections with raw umber paint (or some color that looks appropriate). This will hide the light brick color that’s sandwiched between the dark planks. Paint black on the insides of the chimney and dry brush black around the fireplace openings and chimney top.

Step 6: Gluing the walls onto the floors. Glue the bottom floor pieces B2, B3, B4, B5 and B6 onto the B1 floor to form a complete circle of wall. Glue the porch pieces B2, B12, B13, B14 and B15. Do not glue on the chimney yet. Once dry, flip this first floor upside down and glue the B10 and B11 braces onto the outsides of the wall.

Glue the top floor pieces T2, T3, T4, T5, T6, T7, T8, and T9 onto the T1 floor to form a complete circle of wall. Assemble the upper porch using pieces T2, T12, T13, T14 and T15.

To determine where the chimney should go, set the first floor of the house down onto the foundation (or onto page 14 of the plan if you didn’t make a foundation). Set the second floor down on top of the first floor so they line up. Glue the bottom and top chimneys onto the sides of the house, making sure that the right side of the chimney aligns with the center peak of the house.

Step 7: Finishing the water base. Glue W2 and W3 down onto W1 foam base. Glue the wooden insert into the W5 stone wheel support. Glue the wooden Page 2 paddle template (looks like a saw blade) onto some heavy card stock and cut it out. Use this as a guide to glue the wooden paddles into the . Slide a B2 beam through the water wheel (trimming will be needed) and position the water wheel according to the instructions on the web site. The B2 beam should not interfere with setting the house into position on the foundation.

Dam around the outside edges of the river using strips of insulating foam with packaging tape stuck to them. Pin these in place around the river and seal all edges using 5 minute epoxy. Mix up 12 ounces of Envirotex Lite and add food coloring; 5 drops blue, 5 drops green and 2 drops red. Mix this up and pour it into your river. When cured, remove the strips and trim off any excess plastic. Varnish the wooden wheel with gloss varnish. Use acrylic gloss medium to texture the water. Finish the dry land by painting it a dirt color and gluing on ground foam scenic materials.

Step 8: Making the roof. Lay the roof plans for R1 and R2 onto thick card stock and poke holes in the corners. Remove the plan and connect the dots, then cut the outside shape of the roof. Across the main peak, cut only halfway down into the card stock so the roof will fold properly. The small side roof on R1 will need to be cut underneath so this part will fold upwards. Test fit the roof onto the building and trim as needed. Glue the roof tiles from mold #230 into place on the roof and glue on the peak tiles. Tiles on the plan that look “broken” will need to be trimmed to fit properly. This can be done using tile nippers and a file.

Roof section R2 will need to be assembled separately. Find a good 90 degree angled peak surface to set the card stock roof section over and glue on the roof tiles, extending over the angled back edge. Also glue on the peak tiles. Once dry, the back edge of the roof will need to be carefully clipped and sanded to fit against the R1 main roof. Once it fits properly, glue it into place and then fill any large gaps between R1 and R2 with paintable caulking.

Once completely dry, glue three of the 90 degree angle supports (found on page 36) underneath R1 and one underneath R2 . These can be made from cardboard or foam core board. Be sure these are at least one inch in from the edge of the roof.

Lay the roof plans for R3 onto thin card stock and poke holes in the corners. Remove the plan and connect the dots, then cut the outside shape of the roof. Do this for two small roofs. Fold these down the center line, lay them over a 90 degree peak surface and glue on the roof tiles and pieak tiles.

Completely paint all three roof sections (main assembled roof and two dormer roofs). Spray paint them with rust colored primer and then dry brush them with medium pink.

When dry, glue together the R3, R4 and R5 pieces to form the completed dormers. After the glue dries, trim and sand the back edge of the dormer roofs to fit flat against the existing roof and glue them into place. It really doesn’t matter how you position them, but try to put the edges of the dormers resting on the top peaks of the tiles so you don’t have deep grooves around the edges of the dormers.

Touch up any places with paint that need it. Many times, planks will have a white edge showing where they connect to a wall beam.

Page 3 Texture side facing upward. R4,R5 R4,R5 R2 B11 B10 1” R3

R3 Glue 2 pieces back to back. Window Make 4 of these with 2” R R1 Make 4 and bot Roof of these Glue 2 braces back to back and glue them under a 1” beam.

T2 T2 W1,W2 T2 T12,T13 T14,T15 T3 T2 T17 T10 T11 T1 T16 T4 ae4 Page

T T9 Top floor W2

T8 W2 is a 12” x 7 3/4” piece of T5 T6 ½” thick insulating foam with W3 T7 T2 T2 notches cut out of it to fit the B2 B2 lowest stone wall across the B14,B15 B12,B13 waterside of the mill. B2 B2 B3 B16 B10 B8

B7 B1

B4 W3 W3 B B16 B6

Bottom B9 floor B2 B5 B11 B2 2” 2” W3 W3 1.5”

1.5” W3 1” 1.5” 1.5” W3 is cut from a ½”thi

1” 1”

1.5” insulating foam and fo

W3 foundation of the build

2” 5”

. around. Wt l 3 ” ” 1.5

1.5 W3 1” 1.5” 1.5” W3 is cut from a ½”thi

1” 1”

1.5” insulating foam and fo W3 foundation of the build 2” around.

Water layer 3 1.5” 1” 1.5” 1.5” W3 W3

2” 2” 2” 2”

W2 W2

W2 3/4” W2 W2 W2,W3 Water layer 2 2” 2” This edge will be carved to slope down into the water.

ae5 Page 3/4” 3/4” 2” 2” 2” 2” Top edges of hole are tapered outwards so wooden wheel W1 W1 will fit. Water layer 1 W1 is a 12” x 12” piece of ½”thick insulating foam.

B2

W4 W1 Lay this plan over your pieces of ½”thick insulating foam. Poke small hole W5 the dots with a pen. This will give you the outline of where the foam should the first three bottom layers W1, W2 and W3. o

g

W

ftebidn all building the of n

rma½tikpeeof piece ½”thick a from

omadfrsthe forms and foam

idw le akt back to back glued Windows ih2 lnsgudot top onto glued planks 2” with n bottom. and

3

2”

T16

ae3 Page

W3 W3

2.5”

W3

hs p These h aksd fthe of side back the imn windows. diamond

rmofteextra the off Trim .”paklength. plank 2.5”

nl oon go anels

W1,W2

3/4”

1.5” 1.5”

2”

idw r le othick to glued are Windows adsokadbto is button and stock card le ntecenter the in glued ane odnclrand color wooden a painted hngudit h square the into glued then oeaf hole painted.

Inside

2”

e h tn is stone the ter

2”

1.5” 1.5”

W5

3/4”

hsis This .

Page 6 o

e

g

d

e

W3

k

i

a

a

ftebidn all building the of n

t.

rma½tikpeeof piece ½”thick a from

gsof dges

nwheel en

ml oe hog h lnweetecrlsae eoetepa n connect and plan the Remove are. circles the where plan the through holes small e

omsol etrimmed. be should foam

omadfrsthe forms and foam

d so rds

et re

apered

W1 W1

2”

5welspotge here goes support wheel W5

o iledu ihtrepee f½fa htwl form will that ½”foam of pieces three with up end will You

hsi oectoto the of out cut hole a is This h otmo h oeis hole the of bottom The foam. ½” of piece W1 oee ihcr tc and stock card with covered elds httewater the that so sealed ilntla u h bottom. the out leak not will

ae3 Page

2”

W2,W3

W2

3/4”

W1 W1

W2

W2

hseg ilbe will edge This avdt slope to carved onit h water the into down

W2 W1

.

1.5”

odnbeams Wooden odnPlanks Wooden #226 Mold from idw n decorative and Windows #225 Mold from rc panels Brick #227 Mold from pieces tn rmRubble from Stone #253 Mold from lyro tiles roof Clay #263 Mold block rmMl #230 Mold from

”hc iko leinsulating blue or pink ½”thick om(hw nright) on (shown foam

oo Key Color

Outside

3/4”

2”

1.5”

Sloped blocks

Page 7 Front of Watermill

Page 8 Page 9 Back of Watermill

Page10 Page11 Right side of Watermill

Page 12 Left side of Watermill

Page 13 2”

1” 1” lc od#263 Mold block Rubble from Stone

1.5”

1”

1”

2”

1.5”

1.5”

2” 3/4”

2” ½”

W3

blasted blasted

Sand Sand

2”

2” 3/4” ½”

1.5”

2”

blasted 1.5” Sand

1.5” 1.5” 1.5”

blasted Sand

Page 14 Wooden beams from Mold #226

Stone from Rubble 3” block Mold #263 B1 1.5” 2” 1.5”

1.5” 1.5”

2.5” 3” 1.5”

2.5” 3” 2”

3” 2.5” 2.5”

1.5” 2.5” 2” Page 15

3” 3”

2.5” 3” Chimney goes here 2.5” 2” 2”

2” 2.5” 2.5” 2.5” 2” 3” 2.5” 1.5”

2” 2” 2” Wooden beams from Mold #226 3” Stone from Rubble block Mold #263 T1 1.5” 2.5” 1.5” 2.5”

2.5” 1.5” 1.5” 2”

1” 2” 3” 2”

2.5” 2” 2” 2.5”

1.5” 2” 3” Page 16

1.5” 2.5” 2.5”

Chimney goes here 3” 2.5” 1.5”

2” 2.5” 1”

2.5” 2.5” 1” 2.5” Hole for 2.5” 2” 3” stairway 1”

2” 2.5” 3”

1.5” 2” Left

Left

T10

le akt akwt lcswapdaon it. around wrapped blocks with back to back glued

Front

o hme oei aefo w .”beams 2.5” two from made is core chimney Top 3/4”

Front

1.5”

letee3bikstrip brick 3 these Glue h shoulders the ftechimney the of 3/4” Right

lc le together glued block

.

oro each of Four

Right Back

son

.

2.5”

Left

l idw r igewno le nothick onto glued window single a are windows All adsok hs idw iledu en recessed being up end will windows These stock. card ntesoeadp and stone the in

qae top Squared oftteruddsoearches. stone rounded the fit to

”boko edge on block 1”

3/4”

fwnosaesne down sanded are windows of s

1.5” 1.5”

itdasoecolor stone a ainted

Front

2” 2” 1” 3/4”

hsgopo blocks of group This osbhn here. behind goes

.

letee3 these Glue rc strip brick h shoulders the ftechimney the of

B7

Right

son

. Page 17 fthese. of

/”soe nterside. their on stones 3/4”

3/4”

ae2 Make

otmforfireplace floor Bottom

W4

w /”planks 3/4” Two

stacked.

B8

3/4”

1.5”

2”

1.5”

2”

3/4”

1” 1”

igepakgudot n side. one onto glued plank single a

atei ige25ba with 2.5”beam single a is Mantle

2” 2”

Sloped stones

Stone cubes

1” 1”

2.5”

bricks

2”

Tiny

Smallest angles

1.5”

1.5”

eddhere. needed

xr glue Extra

atewill Mantle epainted be separately eoebeing before le onto glued fireplace

etrdside Textured fbasface beams of outward.

eaaeyp Separately

fthese. of

fthese. of

ae7 Make

ae6 Make

T2 B2

leti epaet thick to template this Glue epaefrposition for Template dotted on out Cut stock. card fpdls ade are Paddles paddles. of hole center Position lines. aefo .”ln beams long 1.5” from made frame. on hole over lcdo end. on placed

it1 p 12 aint

hs r w ”baswt an with beams 2” two are These beams 3” two are These nl nteedgudbc oback. to back glued end the on angle back. to back glued

dl em .”long. 1.5” beams addle

2”

3”

Page 18 3”

3” 1” 1”

2.5”

leteebc oback to back these Glue

2.5”

2.5”

lethese Glue akt back to back

T6

T8 tc of Stack planks 2

2.5”

2.5”

.”3” 2.5”

1” 1”

3” rmMl #225 Mold from Planks Wooden #226 Mold from beams Wooden

leteebc oback to back these Glue

2”

3” 3” 3” icsfo od#227 Mold from pieces decorative and Windows

1”

T7

tc of Stack planks 2 under windows

Page 19 aha Each different direction.

”ba nedge on beam 1” R5 these of each 2 Make etr iefcn up. facing side texture

ae2ec fthese of each 2 Make

oc sides Porch

B12

B13

ml support Small le akt back to back glued n centered and ne beam. under

”agebeam angle 1” decorative Two idw glued windows ”pako top on plank 1” with back to back lnsalaround. all planks

Decorative idw glued windows akt back. to back

etr aigoutwards. facing texture

ag nl rcswith braces angle Large

Upper Porch

R4

s

h ekR n h idwR5 window the and R4 peak The r sebe sep assembled are ane odcolor wood a painted

ne h emwt the with beam the under

etr aigoutward. facing texture

”ba nedge on beam 3” etr iefcn up. facing side texture

nl rc p brick angle

support

oc front Porch

leteelarge these Glue

”plank 1” le onto glued akside. back

w ane large painted two

sebe using assembled

B15

B14

h omris dormer the

centered s

Afterwards,

ahside. each

rtl,then arately,

nl on anels

.

addftot h xsigroof. existing the onto fit sanded

/”pako top on plank 3/4”

Deocrative idw glued windows akt back to back

R6

le noteroof the onto glued

fewrs tis it Afterwards, rmMl #225 Mold from Planks Wooden #226 Mold from beams Wooden #227 Mold from Pieces #253 Mold from panels Brick

n h akis back the and

sassembled is

n painted and

separately.

ofR6 roof

The

Page 20 ”ba nedge on beam 1” etr iefcn up. facing side texture

T14

ae2ec fthese of each 2 Make

T15

3”

etrdsd up side Textured

”ba cae ieup side scraped beam 3”

leteebc oback to back these Glue

”ba nedge on beam 3”

T12

”pako top on plank 1”

Decorative idw glued windows akt back to back

ml support Small le akt back to back glued etrdudrbeam. under centered

s

T13

3”

sebe,gu hs small these glue assembled,

pe porch. upper

r ane n h oc is porch the and painted are

support

lete notecorners. the into them glue

hsi h rn fthe of front the is This

akt ak then back, to back s

pe Porch Upper

fe l pieces all After icsfo od#227 Mold from pieces decorative and Windows #225 Mold from Planks Wooden #226 Mold from beams Wooden

akt back to back

fthese of

orglued Door

ae2 Make

B16

T17

Page 21 Top step will overhang slightly . B9 Stairway

Glue these stone Glue this assembled side blocks together . onto a thick piece of card stock. 1” 2.5” 2.5” Stone from Rubble 1” block Mold #263

2” Wooden beams from Mold #226

2” 2.5” 2.5” Wooden Planks from Mold #225 Left Back Right Windows and decorative pieces from Mold #227 Railing is Page 22 2” Rail top is a 2” and a 2.5” inset slightly . plank. Sand one end so the plank end Sand blasted blocks will set flush at the top. 1.5”

Texture facing Glue this toward you. over plank 2.5” T11 Glue under Steps are mantel 1.5” beams Front 57 58 22 45 19 22 12

hs r rmtebikp brick the from are These

icssc ste1 qae T square. 1” the as such pieces

hs r rmtehl ibrml #225. mold timber half the from are These

xr ics uti aeyuaccident you case in just pieces, extra np1o h eann icsin pieces remaining the of 1 Snap aft aete2etahorizont extra 2 the make to half It walls. the for needed number exact the are here shown pieces of number The

½”

3/4”

1”

1.5”

66

12

2”

4 sep be to Pieces

2.5”

4

13

nlml #253. mold anel

2

aeteeetapee,yuwl edt ra oeo h agrpee nhalf. in pieces larger the of some break to need will you pieces, extra these make o

12

lpanels al

4

rtl ae ont ador n p and cardboard to down taped arately

10 17

lybeko oesm pieces. some lose or break ally

10 needed Not 0

o ilntc htwt 5csig o ilnthv nuho some of enough have not will you castings 15 with that notice will You

0

np5o h eann icsin pieces remaining the of 5 Snap aft aete1 qae o need. you squares 1” the make to half

8 8 7 5 5

5 t the from are These 4

3

24

2

14 24

8

vr idw&do od#227 mold door & window avern

8

spoal odie op to idea good a probably ’s

4

15

3

14

itdindividually ainted

4

6

edt ep be to need

osalangles small No

r needed. are

2

icsntsonwl not will shown not Pieces

0

6

15

itdindividually ainted

2

itacul of couple a aint

.

Straps rmmold from #226 painted iewood. like

1 6

3

. Page 23

B3

½” 2” 1” 1” 2” ½” 2” 2”

nieo wall of Inside

2” 1” 2” 2.5” 2.5” 1”

1”

2” 1” 2” 2.5” 1”

1” 2”

1” 2”

1”

1”

ontgu ori place. in door glue not Do

2” 1” 2” 3/4” 1”

2”

1” 1”

2” 1”

2” 1” 2” 3/4” 1”

2” 1”

1” 2”

2” 2.5” 2.5” 1”

2” 1” 2” 2.5” 1”

1”

1”

1” 2”

1” 2” rmMl #225 Mold from Planks Wooden rmMl #253 Mold from panels Brick icsfo od#227 Mold from pieces decorative and Windows

Page 24

1”

1”

2”

1”

½” ½”

2.5” ½” ½”

2.5” ½”

½”

2”

2” 1”

2” 1”

1”

2” 1”

2” 1”

B3

1”

2” usd fwall of Outside 1”

2” 1” 2” 2.5” 1”

2” 2.5” 1”

2” 1” 2” 2.5” 1”

1.5”

1”

ontgu ori place. in door glue not Do

3/4”

1” 2”

1” 2”

1” 1”

2” 3/4”

1”

2” 1” 2” 2.5” 3/4” 1”

2” 1” 2” 2.5” 1”

1” 2”

2” 2.5” 2.5” 1”

1”

1” 2”

1” 2” icsfo od#227 Mold from pieces decorative and Windows rmMl #253 Mold from panels Brick rmMl #225 Mold from Planks Wooden

Page 25

1”

1”

2”

1”

½” ½”

2.5” ½” ½”

2.5” ½”

½”

2” 1.5” rmMl #225 Mold from Planks Wooden

usd fwall of Outside

2”

1” 2” 1” 2.5” 2”

ontgu ori place. in door glue not Do

1” 2” 1” 2.5” 2”

1” 1”

1” 2” 1” 2.5” 2”

1” 2” 2.5” 2” 1” #227 Mold from pieces decorative and Windows

2”

1.5”

1.5”

2” nieo wall of Inside

1” 2” 2.5” 2” ontgu ori place. in door glue not Do 1”

rmMl #253 Mold from panels Brick

1” 2” 1” 2”

1” 1”

1” 2” 1” 2”

1” 2” 1” 2.5” 2”

2”

1.5”

B4

Page 26

1”

1”

2”

1”

½” ½”

2.5” ½” ½”

2.5” ½”

½”

2” B5

Corners ipdoff nipped ”plank. 2” a

hsarea This ilb covered be will ytest the by

1” 1”

airway.

nieo wall of Inside

2” 2”

2” 2”

2.5”

½”

1.5”

½” 2.5”

2” 2”

1”

1”

2”

1”

2” 2” 2.5”

3/4” ½”

”pako edge on plank 1” ofr bench. a form to

atadgu this glue and Wait natrwl is wall after on opeeyassembled. completely rmMl #253 Mold from panels Brick #227 Mold from pieces decorative and Windows #225 Mold from Planks Wooden

Page 27

1”

1”

2”

1”

½” ½”

2.5” ½” ½”

2.5” ½”

½”

2”

B5 1.5” wall of Outside

2.5” 2.5”

1” 1”

1” 1” 2”

2” 2”

1” 1” 1.5”

2” 2”

2.5”

2.5”

1.5”

2.5” 2.5” 3/4” 2.5” 1.5”

atadgu hsdoor this glue and Wait natrwl scompletely is wall after on sebe eas the because assembled igssikout. stick hinges rmMl #253 Mold from panels Brick #227 Mold from pieces decorative and Windows #225 Mold from Planks Wooden

Page 28

½” ½”

2.5” ½” ½”

2.5” ½”

½”

2” ½”

1” 2.5” rmMl #225 Mold from Planks Wooden

usd fwall of Outside

2”

usd fhouse of outside

oefor Hole fireplace

hme on Chimney

oshere. goes

icsfo od#227 Mold from pieces decorative and Windows 2.5”

2” 2”

1” 1”

1.5” 1.5”

2” nieo wall of Inside rmMl #253 Mold from panels Brick

ielc n mantel and Fireplace

ali assembled. is wall

att lei on it glue to Wait

ni af until

oshere. goes

oefor Hole fireplace 3/4”

e the ter

2” rmMl #226 Mold from beams Wooden

½” ½”

B6

Page 29

½” ½”

2.5” ½” ½”

2.5” ½”

½”

2”

T3 2.5”

nieo wall of Inside

1”

½” ½” 2.5”

2.5” 2.5”

1.5”

2.5”

ontgu ori place. in door glue not Do

rmMl #225 Mold from Planks Wooden

½” ½”

2”

1.5”

2.5” 2.5”

icsfo od#227 Mold from pieces decorative and Windows 2.5”

½” ½”

1”

½”

2.5” ½” rmMl #253 Mold from panels Brick

2”

Page 30 T3

usd fwall of Outside

2”

2.5” ½” ½”

2.5” ½” ½”

ontgu ori place. in door glue not Do

1.5” rmMl #225 Mold from Planks Wooden

1.5”

2.5” ½” ½”

2.5” ½” ½” icsfo od#227 Mold from pieces decorative and Windows

2”

letesutr on shutters the Glue fe h alsection wall the after scompletely is sebe because assembled h igssikout. stick hinges the rmMl #253 Mold from panels Brick

2”

Page 31 nieo wall of Inside

T4

icsfo od#227 Mold from pieces decorative and Windows #225 Mold from Planks Wooden

½”

1.5” 1.5”

½” 2” 1”

2.5” 1.5” rmMl #253 Mold from panels Brick

2.5” 2.5”

½” 2” 1”

1.5” ½”

2”

Page 32 usd fwall of Outside

T4

2” icsfo od#227 Mold from pieces decorative and Windows #225 Mold from Planks Wooden

3/4”

2.5”

½” 2.5” 1” 2” 2” 1”

rmMl #253 Mold from panels Brick

½” 2.5” 1”

2.5”

3/4”

Page 33 T5

3/4” 2.5”

usd fwall of Outside

rmMl #225 Mold from Planks Wooden

2” 2” 2.5”

3/4” icsfo od#227 Mold from pieces decorative and Windows

3/4” 3/4” 2.5”

nieo wall of Inside

2” 2”

rmMl #253 Mold from panels Brick 2.5”

3/4” 3/4”

Page 34 fireplace

oefor Hole

nieo wall of Inside

T9

de ilbe will Edges rknofand off broken sanded.

R2

3/4” 3/4”

2.5” 3/4”

fe h wall the after

leti on this Glue

assembled.

oshere goes

eto is section

Fireplace

1” 2.5”

3/4” icsfo od#227 Mold from pieces decorative and Windows #225 Mold from Planks Wooden rmMl #253 Mold from panels Brick rmMl #230 Mold from tiles roof Clay

Page 35 Wooden Planks Brick panels Clay roof tiles from Mold #225 from Mold #253 from Mold #230

Windows and decorative pieces from Mold #227

Outside of wall Roof angle support s. T9 Make 2 set s of these.

½” 2.5” 2.5”

R3 Page 36 Make 2 of these

½” Edges will be broken off and sanded. 1” 1.5” 1.5”

Chimney goes here 2” 2” 2” 2”

Hole for fireplace R1 Clay roof tiles from Mold #230

cr n oddown. fold and Score

oftlso hsscinmyhave may section this on tiles Roof omv slightly move to h ofhsbe e ntebuilding. the on set been has roof the

cr nbc side back on Score n odup. fold and

ogu hs af these glue so ,

ter

Page 37 Riverbed

Slots may need to be cut deeper depending on the angle of your slope.

Wheel support W5 goes here

Image from Mayang’s free texture library

Cut slots

Wheel support W5 goes here

Page 38