Ieee Asemd2013

Total Page:16

File Type:pdf, Size:1020Kb

Ieee Asemd2013 - ASEMD 2013 - 2013 IEEE International Conference on Applied Superconductivity and Electromagnetic Devices (((ASEMD ))) 25-27 October 2013 Beijing, China http://www.asemd.org IEEE ASEMD 2013 Program Book Sponsors: IEEE (Beijing Section) (Technical Co-Sponsors:) Innopower Superconductor Cable Co., Ltd. University of Electronic Science and Technology of China (Joint Orgnizers:) Administrative Commission of Beijing Economic-Technological Development Area Information for the IEEE ASEMD 2013 International Conference Proceedings : 2013 IEEE International Conference on Applied Superconductivity and Electromagnetic Devices (#31072) IEEE Catalog Number: CFP1320G-CDR ISBN: 978-1-4799-0068-8 2013 IEEE IEEE Copyright Information http://www.ieee.org/web/publications/rights/copyrightmain.html Don't waste paper. Please consider the environment before print. - ASEMD 2013 - Table of Contents General Information III Message from the Conference Committee IX Conference Organization X Program Overview XI Plenary Speeches XII Keynote Speeches XIII Technical Program 1 Plenary Speeches (26-10-2013) 1 Oral Sessions Session A Applied Superconductivity 1 Session B Applied Superconductivity 2 Session G Control and Measurement Session H Electronic Devices, Circuits and Systems Poster Session A Session PA Applied Superconductivity 1 Session PB Applied Superconductivity 2 Session PC Electromagnetic Materials Session PD Electromagnetic Devices Session PE Electric Machines Session PF Electric Power and Renewable Energy Session PG Electronic Devices, Circuits and Systems Session PH Control and Measurement Plenary Speeches (27-10-2013) Oral Sessions Session C Electromagnetic Materials Session D Electromagnetic Devices Session E Electric Machines Session F Electric Power and Renewable Energy Special Session A Technical Issues Special Session B Management Issues Poster Session B (PA-PH) Papers and Posters Author Index 2 2013 IEEE International Conference on Applied Superconductivity and Electromagnetic Devices -- 25-27 October 2013, Beijing, China -- - ASEMD 2013 - General Information Conference Venue The ASEMD 2013 conference will be held in the “Fengda International Hotel” situated in the Beijing Economic-Technological Development Area , Beijing, China . Address: No. 20 Ronghua Middle Road, Beijing Economic-Technological Development Area, Yizhuang, Beijing 100176 , China. Tel: (86 10) 67518888 Fax: (86 10) 67518166 (Hotel contacts) http://www.fengdahotel.cn Conference Secretariat Mrs. S.W. Qi, Mrs. H.H. Li, Mr. W.X. Sun, Mr. J.B. Cui Innopower Superconductor Cable Co., Ltd., China Email: [email protected] Tel: 86 010 67879900-31 Fax: 86 010 67877502 Mrs. H.L. Yan, Dr. X.Y. Chen, Mr. L. Jiang University of Electronic Science and Technology of China Email: [email protected], [email protected] Tel: 86 028 61830796 Fax: 86 028 61830798 Dr. Y.G. Guo Faculty of Engineering, University of Technology, Sydney PO Box 123 Broadway, NSW 2007, Australia Email: [email protected] Tel: 61 2 9514 7903 Fax: 61 2 9514 2435 2013 IEEE International Conference on Applied Superconductivity and Electromagnetic Devices 3 -- 25-27 October 2013, Beijing, China -- - ASEMD 2013 - Venue The conference venue is located in Beijing Yizhuang district - Beijing Economic-Technological Development Area . ASEMD 2013 takes place in the 2nd floors of the main building of “Fengda International Hotel ” (((丰(丰丰丰大酒店大酒店))). Venue Address: No. 20 Ronghua Middle Road, Beijing Economic-Technological Development Area, Beijing 100176 会议地址: 中国北京经济技术开发区荣华中路 20 号 Tel: +86 (0)10 67518888 Fax: (86 10) 67518166 (Venue hotel) Web: http:// www.fengdahotel.cn Registration and Information Desk The ASEMD 2013 Conference Registration and Information Desk is located inside of the hotel main entry and/or the 2nd floor foyer of the conference venue hotel from 9:30 to 18:00 on 25 October, and 8:30 to 12:00 on 26 October for registration. The Information Desk opens during the conference. ASEMD2013 venue and hotel assistant office: Mrs. Suwei Qi, Mr. Wenxu Sun Innopower Superconductor Cable Co., Ltd., China 北京云电英纳超导电缆有限公司(Tel 010-67879900) 北京经济技术开发区(亦庄)荣昌东街 7 号隆盛工业园内 503 室(五号楼三层) Email: [email protected], [email protected] Tel: 86 010 67879900-31 Fax: 86 010 67877502 Oral Presentation and Preparation All speakers are required to arrive in their presentation rooms 15 minutes prior to the start of their sessions. Upload your PPT file using a USB to the project computer. The allowed presentation time is set as follows: Plenary talks - 30 minutes including questions and comments. Parallel oral sessions - 15 minutes and 20 minutes for a contributed oral and for an invited oral respectively, including questions and discussions. Poster Presentation and Preparation All ASEMD 2013 authors are required to prepare a poster for each accepted paper even the paper has been assigned as an oral presentation. This means that every ASEMD 2013 ID has a corresponding poster. The PPT template to prepare the poster has been sent to all authors. It is suggested to use the template and to paste your contents readily, and then email back. 4 2013 IEEE International Conference on Applied Superconductivity and Electromagnetic Devices -- 25-27 October 2013, Beijing, China -- - ASEMD 2013 - Venue Floor Plan Registration and Information Desk – Located inside the conference hotel main entry and/or in the foyer of 2nd floor. 会议注册、接待及问讯处:位于会议宾馆人口处和 2 层主会场旁。 Welcome Reception and Closing Ceremony – 2nd floor Open Area. 欢迎接待会:2 层开放区。 Opening Ceremony – 2nd floor Main Conference Hall - Jiuhua Hall. 开幕式及闭幕式:2 层主会场。 Plenary and Oral Sessions – 2nd floor Main Conference Hall - Jiuhua Hall, and Meeting Room 1 - Lily Hall, and Meeting Room 2 - Baile Hall. 大会报告:2 层主会场九华厅;口头报告:2 层 1 号会议室-百合园和 2 号会议室-百乐园。 Poster Sessions and Exhibition Booth – 2nd floor Open Area. 海报展示:2 层开放区。 Reception, Lunch, Dinner, Banquet and Frewell The conference Reception, Lunch, Dinner, Banquet and Frewell information have been scheduled as shown in the program table, and notifications will also be posted on the conference notice board for details and variations. Internet Access Free WiFi internet access will be avavlable in the conference area during the conference period, and also computers are available in the Information Desk provided for urgent email check only. 2013 IEEE International Conference on Applied Superconductivity and Electromagnetic Devices 5 -- 25-27 October 2013, Beijing, China -- - ASEMD 2013 - Hotels The conference does not arrange any accommodations for the participants. Booking a hotel around the conference venue is convenient. The conference web is updated to help you to find a convenient one. Following hotels are near to the conference venue by short walking distances, and are convenient with reasonable prices. Besides the venue hotel, Jinjiang Fuyuan Hotel is adequate in all aspects and recommended. For the venue hotel booking, [email protected] or [email protected] can also be used for contact and booking. Hotel Phone Address Reg Fee (RMB) 酒店 预定电话 地址 参考价格 Fengda International Hotel +86 10 No.20 Ronghua Middle Road, Beijing Economic-Technological 458 北京丰大国际大酒店 67518888 Development Area, Beijing, China (RMB) www.fengdahotel.cn Fax: 86 10 北京市经济技术开发区荣华中路 20 号 ~75 (Venue Hotel) 67518166 (US$) Jinjiang Fuyuan Hotel +86 10 No.11 Ronghua Middle Road, Beijing Economic-Technological 480 北京锦江富园大酒店 67800888 Development Area, Beijing www.jjfyhotel.com.cn Fax: 86 10 中国北京经济技术开发区荣华中路 11 号 (0.7km to venue) 67800999 Shengkun Hotel +86 10 No.3 Tianhua South Street, Beijing Economic-Technological 438 北京圣坤酒店 67868866 Development Area, Beijing www.shengkunhotel.com 北京经济技术开发区天华南街 3 号 (<0.5km to venue) GreenTree Hotel +86 10 No.14 Ronghua Middle Road, Beijing Economic-Technological 246 北京亦庄格林豪泰酒店 67850998 Development Area, Beijing www.998.com 北京市经济技术开发区荣华中路甲 14 号 (<0.5km to venue) Hongyifang Hotel +86 10 No.14 Ronghua Middle Road, Tianhua South Street, Beijing 218 北京红一坊酒店 67880918 Economic-Technological Development Area, Beijing web no available 北京经济技术开发区荣华中路 14 号 (<0.5km to venue) Super 8 Hotel +86 10 No.5 Tianhua North Street, Beijing Economic-Technological 178 北京亦庄速 8 酒店 51296099 Development Area, Beijing www.super8.com.cn 北京市经济技术开发区天华北街 5 号 (<0.5km to venue) Hotel Booking Assistants: Mrs. Suwei Qi, Mr. Wenxu Sun Email: [email protected], [email protected] Tel: 86 010-67879900-31 Fax: 86 010-67877502 6 2013 IEEE International Conference on Applied Superconductivity and Electromagnetic Devices -- 25-27 October 2013, Beijing, China -- - ASEMD 2013 - Transportation In Beijing Airport, there is a subway train service. Taxi and shuttle bus services are also available. It is convenient to take the subway train. Information for travel to the venue: 1) Subway: Terminal 2 take Airport Express, get off at Sanyuanqiao Station, transfer to subway Line 10 (clockwise) to Songjiazhuang Station, take Subway Yizhuang Line and get off at Rongjingdongjie Station. Take exit A. The whole journey will take 1 hour 40 minutes and cost RMB 30 for all tickets. 2) Shuttle Bus: Terminal 2 take Airport Shuttle Bus to Sanyuanqiao Station, transfer to subway Line 10 (clockwise) to Songjiazhuang Station, take Subway Yizhuang Line and get off at Rongjingdongjie Station. Take exit A. The whole journey will take 2 hours and RMB 30. 3) Taxi: About 47 kms from the airport to the Fengda hotel, and the journey will take about 50 minutes and RMB 130. Subway Taxi 2013 IEEE International Conference on Applied Superconductivity and Electromagnetic Devices 7 -- 25-27 October 2013,
Recommended publications
  • Ambitious Roadmap for City's South
    4 nation MONDAY, MARCH 11, 2013 CHINA DAILY PLAN FOR BEIJING’S SOUTHERN AREA SOUND BITES I lived with my grandma during my childhood in an old community in the former Xuanwu district. When I was a kid we used to buy hun- dreds of coal briquettes to heat the room in the winter. In addition to the inconvenience of carry- ing those briquettes in the freezing winter, the rooms were sometimes choked with smoke when we lit the stove. In 2010, the government replaced the traditional coal-burning stoves with electric radiators in the community where grand- ma has spent most of her life. We also receive a JIAO HONGTAO / FOR CHINA DAILY A bullet train passes on the Yongding River Railway Bridge, which goes across Beijing’s Shijingshan, Fengtai and Fangshan districts and Zhuozhou in Hebei province. special price for electricity — half price in the morn- ing. Th is makes the cost of heating in the winter Ambitious roadmap for city’s south even less. Liang Wenchao, 30, a Beijing resident who works in the media industry Three-year plan has turned area structed in the past three years. In addition to the subway, six SOUTH BEIJING into a thriving commercial hub roads, spanning 167 km, are I love camping, especially also being built to connect the First phase of “South Beijing Three-year Plan” (2010-12) in summer and autumn. By ZHENG XIN product of the Fengtai, Daxing southern area with downtown, The “New South Beijing Three-year Plan” (2013-15) [email protected] We usually drive through and Fangshan districts is only including Jingliang Road and Achievements of the Plan for the next three 15 percent of the city’s total.
    [Show full text]
  • Beijing Subway Map
    Beijing Subway Map Ming Tombs North Changping Line Changping Xishankou 十三陵景区 昌平西山口 Changping Beishaowa 昌平 北邵洼 Changping Dongguan 昌平东关 Nanshao南邵 Daoxianghulu Yongfeng Shahe University Park Line 5 稻香湖路 永丰 沙河高教园 Bei'anhe Tiantongyuan North Nanfaxin Shimen Shunyi Line 16 北安河 Tundian Shahe沙河 天通苑北 南法信 石门 顺义 Wenyanglu Yongfeng South Fengbo 温阳路 屯佃 俸伯 Line 15 永丰南 Gonghuacheng Line 8 巩华城 Houshayu后沙峪 Xibeiwang西北旺 Yuzhilu Pingxifu Tiantongyuan 育知路 平西府 天通苑 Zhuxinzhuang Hualikan花梨坎 马连洼 朱辛庄 Malianwa Huilongguan Dongdajie Tiantongyuan South Life Science Park 回龙观东大街 China International Exhibition Center Huilongguan 天通苑南 Nongda'nanlu农大南路 生命科学园 Longze Line 13 Line 14 国展 龙泽 回龙观 Lishuiqiao Sunhe Huoying霍营 立水桥 Shan’gezhuang Terminal 2 Terminal 3 Xi’erqi西二旗 善各庄 孙河 T2航站楼 T3航站楼 Anheqiao North Line 4 Yuxin育新 Lishuiqiao South 安河桥北 Qinghe 立水桥南 Maquanying Beigongmen Yuanmingyuan Park Beiyuan Xiyuan 清河 Xixiaokou西小口 Beiyuanlu North 马泉营 北宫门 西苑 圆明园 South Gate of 北苑 Laiguangying来广营 Zhiwuyuan Shangdi Yongtaizhuang永泰庄 Forest Park 北苑路北 Cuigezhuang 植物园 上地 Lincuiqiao林萃桥 森林公园南门 Datunlu East Xiangshan East Gate of Peking University Qinghuadongluxikou Wangjing West Donghuqu东湖渠 崔各庄 香山 北京大学东门 清华东路西口 Anlilu安立路 大屯路东 Chapeng 望京西 Wan’an 茶棚 Western Suburban Line 万安 Zhongguancun Wudaokou Liudaokou Beishatan Olympic Green Guanzhuang Wangjing Wangjing East 中关村 五道口 六道口 北沙滩 奥林匹克公园 关庄 望京 望京东 Yiheyuanximen Line 15 Huixinxijie Beikou Olympic Sports Center 惠新西街北口 Futong阜通 颐和园西门 Haidian Huangzhuang Zhichunlu 奥体中心 Huixinxijie Nankou Shaoyaoju 海淀黄庄 知春路 惠新西街南口 芍药居 Beitucheng Wangjing South望京南 北土城
    [Show full text]
  • EUROPEAN COMMISSION DG RESEARCH STADIUM D2.1 State
    EUROPEAN COMMISSION DG RESEARCH SEVENTH FRAMEWORK PROGRAMME Theme 7 - Transport Collaborative Project – Grant Agreement Number 234127 STADIUM Smart Transport Applications Designed for large events with Impacts on Urban Mobility D2.1 State-of-the-Art Report Project Start Date and Duration 01 May 2009, 48 months Deliverable no. D2.1 Dissemination level PU Planned submission date 30-November 2009 Actual submission date 30 May 2011 Responsible organization TfL with assistance from IMPACTS WP2-SOTA Report May 2011 1 Document Title: State of the Art Report WP number: 2 Document Version Comments Date Authorized History by Version 0.1 Revised SOTA 23/05/11 IJ Version 0.2 Version 0.3 Number of pages: 81 Number of annexes: 9 Responsible Organization: Principal Author(s): IMPACTS Europe Ian Johnson Contributing Organization(s): Contributing Author(s): Transport for London Tony Haynes Hal Evans Peer Rewiew Partner Date Version 0.1 ISIS 27/05/11 Approval for delivery ISIS Date Version 0.1 Coordination 30/05/11 WP2-SOTA Report May 2011 2 Table of Contents 1.TU UT ReferenceTU DocumentsUT ...................................................................................................... 8 2.TU UT AnnexesTU UT ............................................................................................................................. 9 3.TU UT ExecutiveTU SummaryUT ....................................................................................................... 10 3.1.TU UT ContextTU UT ........................................................................................................................
    [Show full text]
  • Can Light Rail Benefit Job-Housing Relationships and Land Use-Transp Ortation Integration in New Town? ——Case Study of Yizhuang in Beijing
    Can Light Rail Benefit Job-Housing Relationships and Land Use-Transp ortation Integration in New Town? ——case study of Yizhuang in Beijing Chun Zhang USC Nov 10, 2016 BJTU Beijing Jiaotong University 1.The Research Background 1.1 Beijing Urban Rail Transit bursty expansion • After 2002 ,the Beijing urban metro construction suddenly accelerated, and firstly the northern part of Beijing which is more developed than southern part formed the urban metro network. urban metro network 2000 urban metro network 2010 urban metro network 2015 The study on synergy development of urban metro and urban space Beijing Jiaotong University 1.The Research Background 1.2 Spatial differentiation of urban functions • With the expansion of the population and scale of city , the function and division of urban land are more clear than ever, the phenomenon of urban spatial differentiation is more obvious. • The city of Beijing is divided into 4 different functional areas. Different urban functions require organic connection, and mutual complement among urban functions can help city work effectively. The study on synergy development of urban metro and urban space Beijing Jiaotong University 2.The Research methods 2.1 The research target • Yizhuang line is the suburb line of Beijing urban metro network, the line starts with the Songjiazhuang station in the Fengtai District and end with Yizhuang railway station. • Yizhuang line makes the urban metro network cover the southeast part of Beijing, connects the center part and Yizhuang Economic Development Zone. The study
    [Show full text]
  • Job-Worker Spatial Dynamics in Beijing: Insights from Smart Card Data
    Published as: Huang, Jie, Levinson, D., Wang, Jiaoe, Jin, Haitao (2019) Job-worker spatial dynamics in Beijing: Insights from Smart Card Data. Cities 86, 89-93 https://doi.org/10.1016/j.cities.2018.11.021 1 Job-worker spatial dynamics in Beijing: insights from Smart 2 Card Data 3 Abstract: 4 As a megacity, Beijing has experienced traffic congestion, unaffordable housing 5 issues and jobs-housing imbalance. Recent decades have seen policies and projects 6 aiming at decentralizing urban structure and job-worker patterns, such as subway 7 network expansion, the suburbanization of housing and firms. But it is unclear 8 whether these changes produced a more balanced spatial configuration of jobs and 9 workers. To answer this question, this paper evaluated the ratio of jobs to workers 10 from Smart Card Data at the transit station level and offered a longitudinal study for 11 regular transit commuters. The method identifies the most preferred station around 12 each commuter’s workpalce and home location from individual smart datasets 13 according to their travel regularity, then the amounts of jobs and workers around each 14 station are estimated. A year-to-year evolution of job to worker ratios at the station 15 level is conducted. We classify general cases of steepening and flattening job-worker 16 dynamics, and they can be used in the study of other cities. The paper finds that (1) 17 only temporary balance appears around a few stations; (2) job-worker ratios tend to be 18 steepening rather than flattening, influencing commute patterns; (3) the polycentric 19 configuration of Beijing can be seen from the spatial pattern of job centers identified.
    [Show full text]
  • Smart Train Operation Algorithms Based on Expert Knowledge and Ensemble Cart for the Electric Locomotive,” Knowledge-Based Systems, Vol
    PREPRINT VERSION. PUBLISHED IN IEEE TRANSACTIONS ON SYSTEMS, MAN, AND CYBERNETICS: SYSTEMS - https://ieeexplore.ieee.org/abstract/document/9144488. Smart Train Operation Algorithms based on Expert Knowledge and Reinforcement Learning Kaichen Zhou, Student Member, IEEE, Shiji Song, Member, IEEE, Anke Xue, Member, IEEE Keyou You, Member, IEEE and Hui Wu, Student Member, IEEE Abstract—During recent decades, the automatic train operation on the train’s trajectory. And improving the performance of the (ATO) system has been gradually adopted in many subway systems ATO system has become a focus in the field of the transportation for its low-cost and intelligence. This paper proposes two smart system. In most cases, research on the urban subway system train operation algorithms by integrating the expert knowledge with reinforcement learning algorithms. Compared with previous works, can be divided into two parts: the energy-efficient train operation the proposed algorithms can realize the control of continuous action committed to designing an off-line optimized train trajectory, and for the subway system and optimize multiple critical objectives the automatic train tracking method to track the real-time train without using an offline speed profile. Firstly, through learning speed-distance profile. historical data of experienced subway drivers, we extract the expert knowledge rules and build inference methods to guarantee the riding During recent years, lot of studies are devoted to designing comfort, the punctuality, and the safety of the subway system. Then an off-line optimized train trajectory to improve the energy we develop two algorithms for optimizing the energy efficiency of efficiency. For example, Albrecht et al.
    [Show full text]
  • China Clean Energy Study Tour for Urban Infrastructure Development
    China Clean Energy Study Tour for Urban Infrastructure Development BUSINESS ROUNDTABLE Tuesday, August 13, 2019 Hyatt Centric Fisherman’s Wharf Hotel • San Francisco, CA CONNECT WITH USTDA AGENDA China Urban Infrastructure Development Business Roundtable for U.S. Industry Hosted by the U.S. Trade and Development Agency (USTDA) Tuesday, August 13, 2019 ____________________________________________________________________ 9:30 - 10:00 a.m. Registration - Banquet AB 9:55 - 10:00 a.m. Administrative Remarks – KEA 10:00 - 10:10 a.m. Welcome and USTDA Overview by Ms. Alissa Lee - Country Manager for East Asia and the Indo-Pacific - USTDA 10:10 - 10:20 a.m. Comments by Mr. Douglas Wallace - Director, U.S. Department of Commerce Export Assistance Center, San Francisco 10:20 - 10:30 a.m. Introduction of U.S.-China Energy Cooperation Program (ECP) Ms. Lucinda Liu - Senior Program Manager, ECP Beijing 10:30 a.m. - 11:45 a.m. Delegate Presentations 10:30 - 10:45 a.m. Presentation by Professor ZHAO Gang - Director, Chinese Academy of Science and Technology for Development 10:45 - 11:00 a.m. Presentation by Mr. YAN Zhe - General Manager, Beijing Public Transport Tram Corporation 11:00 - 11:15 a.m. Presentation by Mr. LI Zhongwen - Head of Safety Department, Shenzhen Metro 11:15 - 11:30 a.m. Tea/Coffee Break 11:30 - 11:45 a.m. Presentation by Ms. WANG Jianxin - Deputy General Manager, Tianjin Metro Operation Corporation 11:45 a.m. - 12:00 p.m. Presentation by Mr. WANG Changyu - Director of General Engineer's Office, Wuhan Metro Group 12:00 - 12:15 p.m.
    [Show full text]
  • Exploration in the Curriculum and Teaching Based Cultivation of Innovation Capabilities for Graduate Students
    2016 2nd International Conference on Modern Education and Social Science (MESS 2016) ISBN: 978-1-60595-346-5 Research on Beijing Urban Rail Transit Network Based on Traffic Efficiency Shu-Lan ZHANGa,*, Hao WUb and Wen SUNc Beijing Jiaotong University, School of Economics and Management, China [email protected], [email protected], [email protected] *Corresponding author Keywords: Urban rail transit, Network density, Transfer station, Transport efficiency. Abstract. The coordination between urban rail transit network and city spatial functional distribution plays an important role in the process of urbanization. This paper, based on an empirical analysis, studies the characteristics of the Beijing urban rail transit network from the perspective of time and space. Then, according to statistical analysis, a series of reasonable evaluating indicators and comparison among the typical cities in the world, we summarize the obvious problems existing in the network. At last, we draw the conclusions that the network needs improvement and we put forward six suggestions aiming to increase the transport efficiency and optimize the network layout. Introduction Beijing is in the stage of adjusting its city spatial layout to “two-axis, two-belt and multiple centers” according to The General Plan of Beijing (2004-2020). The non-capital core functional industries will be moved to suburban regions and the core-functional industries will be strengthened, aiming to achieve balanced development. With the adjustment of Beijing population and industrial distribution, the demand for transport shows new features. The key method to solve the traffic problem is to build urban transport system coordinated with the overall development plan of the city.
    [Show full text]
  • Multi-Train Energy Saving for Maximum Usage of Regenerative Energy by Dwell Time Optimization in Urban Rail Transit Using Genetic Algorithm
    energies Article Multi-Train Energy Saving for Maximum Usage of Regenerative Energy by Dwell Time Optimization in Urban Rail Transit Using Genetic Algorithm Fei Lin *, Shihui Liu, Zhihong Yang, Yingying Zhao, Zhongping Yang and Hu Sun School of Electrical Engineering, Beijing Jiaotong University, No. 3 Shangyuancun, Beijing 100044, China; [email protected] (S.L.); [email protected] (Z.Y.); [email protected] (Y.Z.); [email protected] (Z.Y.); [email protected] (H.S.) * Correspondence: fl[email protected]; Tel.: +86-136-4139-8863 Academic Editor: William Holderbaum Received: 2 February 2016; Accepted: 10 March 2016; Published: 17 March 2016 Abstract: With its large capacity, the total urban rail transit energy consumption is very high; thus, energy saving operations are quite meaningful. The effective use of regenerative braking energy is the mainstream method for improving the efficiency of energy saving. This paper examines the optimization of train dwell time and builds a multiple train operation model for energy conservation of a power supply system. By changing the dwell time, the braking energy can be absorbed and utilized by other traction trains as efficiently as possible. The application of genetic algorithms is proposed for the optimization, based on the current schedule. Next, to validate the correctness and effectiveness of the optimization, a real case is studied. Actual data from the Beijing subway Yizhuang Line are employed to perform the simulation, and the results indicate that the optimization method of the dwell time is effective. Keywords: genetic algorithm; dwell time; energy saving; braking energy; multi-train; urban rail transit 1.
    [Show full text]
  • Flood Risk Assessment of Subway Systems in Metropolitan Areas Under Land Subsidence Scenario: a Case Study of Beijing
    remote sensing Article Flood Risk Assessment of Subway Systems in Metropolitan Areas under Land Subsidence Scenario: A Case Study of Beijing Guangpeng Wang 1,2,3 , Yong Liu 1,2,3, Ziying Hu 1,2,3, Guoming Zhang 1,2,3, Jifu Liu 1,2,3, Yanli Lyu 1,2,3, Yu Gu 1,2,3, Xichen Huang 1,2,3, Qingyan Zhang 1,2,3 and Lianyou Liu 1,2,3,* 1 Key Laboratory of Environmental Change and Natural Disaster, Ministry of Education, Beijing Normal University, Beijing 100875, China; [email protected] (G.W.); [email protected] (Y.L.); [email protected] (Z.H.); [email protected] (G.Z.); [email protected] (J.L.); [email protected] (Y.L.); [email protected] (Y.G.); [email protected] (X.H.); [email protected] (Q.Z.) 2 Engineering Research Center of Desertification and Blown-sand Control, Ministry of Education, Beijing Normal University, Beijing 100875, China 3 Faculty of Geographical Science, Academy of Disaster Reduction and Emergency Management, Beijing Normal University, Beijing 100875, China * Correspondence: [email protected]; Tel.: +86-10-58802600 Abstract: Flooding is one of the most destructive natural events that severely damage the ground and inundate underground infrastructure. Subway systems in metropolitan areas are susceptible to flooding, which may be exacerbated when land subsidence occurs. However, previous studies have focused on flood risk evaluation on regional/watershed-scales and land subsidence monitoring in plains, instead of on subway flood risk evaluation and how land subsidence aggravates the flood risk in subway systems.
    [Show full text]
  • Assessing Survivability of the Beijing Subway System
    University of Tennessee, Knoxville TRACE: Tennessee Research and Creative Exchange Masters Theses Graduate School 8-2014 Assessing Survivability of the Beijing Subway System Yan Li University of Tennessee - Knoxville, [email protected] Follow this and additional works at: https://trace.tennessee.edu/utk_gradthes Part of the Geographic Information Sciences Commons Recommended Citation Li, Yan, "Assessing Survivability of the Beijing Subway System. " Master's Thesis, University of Tennessee, 2014. https://trace.tennessee.edu/utk_gradthes/2872 This Thesis is brought to you for free and open access by the Graduate School at TRACE: Tennessee Research and Creative Exchange. It has been accepted for inclusion in Masters Theses by an authorized administrator of TRACE: Tennessee Research and Creative Exchange. For more information, please contact [email protected]. To the Graduate Council: I am submitting herewith a thesis written by Yan Li entitled "Assessing Survivability of the Beijing Subway System." I have examined the final electronic copy of this thesis for form and content and recommend that it be accepted in partial fulfillment of the equirr ements for the degree of Master of Science, with a major in Geography. Hyun Kim, Major Professor We have read this thesis and recommend its acceptance: Shih-Lung Shaw, Dali Wang Accepted for the Council: Carolyn R. Hodges Vice Provost and Dean of the Graduate School (Original signatures are on file with official studentecor r ds.) Assessing Survivability of the Beijing Subway System A Thesis Presented for the Master of Science Degree The University of Tennessee, Knoxville Yan Li August 2014 Copyright © 2014 by Yan Li All rights reserved.
    [Show full text]
  • Coordinated Train Control in a Fully Automatic Operation System for Reducing Energy Consumption
    Computers in Railways XIII 3 Coordinated train control in a fully automatic operation system for reducing energy consumption J. Xun1, X. Yang1, B. Ning1, T. Tang1 & W. Wang2 1The State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 2National Engineering Research Center of Rail Transportation Operation and Control System, Beijing Jiaotong University, Beijing Abstract Energy efficient train operation includes four levels for energy saving: energy efficient driving, real-time multi-train coordination and rescheduling, energy- saving timetabling, and energy-saving planning. For a fully automatic operation system, it provides a flexible way to coordinate trains. The coordination of trains can improve some system performances, such as the efficient use of regenerative energy. The efficient use of energy regenerated by other trains which are during braking phase can contribute to reducing energy consumption. In general, the approaches of coordinated train control for using regenerative energy can be divided into two types: train dwell time control and train running time control. This paper proposes an approach for coordinating trains in fully automatic operation system by modifying running time between adjacent stations. Simulation studies are performed and the usage of regenerative energy and average passenger waiting time is analysed by using the proposed method. It is shown that improvements in the usage of regenerative energy can be achieved by using the proposed method. Keywords: coordinated train control, energy-saving, fully automatic operation, running time control. WIT Transactions on The Built Environment, Vol 127, © 2012 WIT Press www.witpress.com, ISSN 1743-3509 (on-line) doi:10.2495/CR120011 4 Computers in Railways XIII 1 Introduction Reduction of energy consumption has drawn more and more attractions in railway industry.
    [Show full text]