BRENT D
BRENT C BRENT B BRENT A SULLOM VOE FIFE TERMINAL
LANGELED NGL PLANTSHETLAND ISLANDS
ORKNEY ISLANDS
FLAGS
GOLDENEYE
NELSON TIES ST FERGUS TO FOR HOWE
NELSON SOUTH STARLING HAEWENE BRIM MERGANSER ABERDEEN ETAP SCOTER SKUA PIERCE ANASURIA HERON COOK GANNET EGRET TEAL SHEARWATER TEAL SOUTH MOSSMORRAN GUILLEMOT TRITON CURLEW BITTERN BRAEFOOT BAY CURLEW
SEAL TS (BP)
CA
TEESSIDE FGL
BARQUE GALLEON SHAMROCK CARAVEL EASINGTON CLIPPER BRIGANTINE FIFE NGL PLANT SKIFF STANLOW INDE INDE FIELD CORVETTE
SEAN The Fife NGL Plant processes NGLs from the St Fergus Gas Terminal as well as from the Total SEAN FIELD LEMAN and SAGE wet gas terminals. BACTON BBL GREAT YARMOUTH BALGZAND INTERCONNECTOR
KEY FACTS THE HAGUE SCHIEDAM Location The Fractionation Plant is located approximately 3 kilometresLONDON (km) south-east of Cowdenbeath, Fife and covers an area of approximately 250 acres ZEEBRUGGE
Hydrocarbons Produced Gas
Operated / Non Operated Operated
PARIS
KEY
Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015 FIFE NGL PLANT
INFRASTRUCTURE INFORMATION
OSLO Entry Specification: CO2/C2 ratio of 0.1 by weight; H2S: 10 ppmw max; Total Sulphur: 17 ppm wt max; TVP: 13 bar(a) @ 15.5 degrees C max; Specs on other trace contaminants
Exit Specification: Propane >95.5 %vol, VP <14.34 bar(g) @ 37.8 degrees C Butane >95 %vol, VP <4.83 bar(g) @ 37.8 degrees C Gasoline TVP <0.7 bar(a) @ 26.7 degrees C
Outline details of Three NGL fractionation modules to separate ethane, propane, butane gas treatment and natural gasoline facilities
HIGH LEVEL CAPACITY INFORMATION
The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years
Available Capacities >25% 5% to 25% <5% Unknown
Description Capacity Ullage as % of system capacity Comments 2015 2016 2017 2018 2019 NGL capacity 12,500 tonnes/d Capacity depends on ambient conditions (summer/winter), and inlet composition. Due to the integrated nature of the SEGAL system, if a wet gas service is required this capacity information needs to be read in conjunction SHELL OPERATED ASSET with that of the relevant pipeline SHELL FPSO (FLAGS or FGL) and the St Fergus NON OPERATED FPSO Gas Terminal. OFFICE
SHELL PLANT
ONSHORE GAS FIELD
SUBSEA SATELLITE
SUBSEA SATELLITE NON OPERATED Graphics, Media and Publication Services (Aberdeen) (Aberdeen) Services Publication and Media Graphics, 2012 MAY : 99209 Ref. : ITV/UD CONTACT INFORMATION Subject to the availability of relevant capacity, each of Shell and Esso is capable of independently providing transportation and processing services using its own proportionate share of available capacity in the Segal System (“Divided Rights”). Please contact either the Shell or Esso representative for further information:
Shell For further enquiries regarding the above please contact Charles Cole +44 1224 88 2606 [email protected] Esso For further enquiries regarding the above please contact Marc Bong-Schmidt +44 1372 412 354 marc.bong-schmidt@exxonmobil.com Last update: January 2015
Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited); - In good faith and without any liability - Without warranty, implied or express to its accuracy or relevance of use to any other party - That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time