FIFE NGL 021799 Asset Fact Sheets MARKETING

Total Page:16

File Type:pdf, Size:1020Kb

FIFE NGL 021799 Asset Fact Sheets MARKETING BRENT D BRENT C BRENT B BRENT A SULLOM VOE FIFE TERMINAL LANGELED NGL PLANTSHETLAND ISLANDS ORKNEY ISLANDS FLAGS GOLDENEYE NELSON TIES ST FERGUS TO FOR HOWE NELSON SOUTH STARLING HAEWENE BRIM MERGANSER ABERDEEN ETAP SCOTER SKUA PIERCE ANASURIA HERON COOK GANNET EGRET TEAL SHEARWATER TEAL SOUTH MOSSMORRAN GUILLEMOT TRITON CURLEW BITTERN BRAEFOOT BAY CURLEW SEAL TS (BP) CA TEESSIDE FGL BARQUE GALLEON SHAMROCK CARAVEL EASINGTON CLIPPER BRIGANTINE FIFE NGL PLANT SKIFF STANLOW INDE INDE FIELD CORVETTE SEAN The Fife NGL Plant processes NGLs from the St Fergus Gas Terminal as well as from the Total SEAN FIELD LEMAN and SAGE wet gas terminals. BACTON BBL GREAT YARMOUTH BALGZAND INTERCONNECTOR KEY FACTS THE HAGUE SCHIEDAM Location The Fractionation Plant is located approximately 3 kilometresLONDON (km) south-east of Cowdenbeath, Fife and covers an area of approximately 250 acres ZEEBRUGGE Hydrocarbons Produced Gas Operated / Non Operated Operated PARIS KEY Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2016 FIFE NGL PLANT INFRASTRUCTURE INFORMATION OSLO Entry Specification: CO2/C2 ratio of 0.1 by weight; H2S: 10 ppmw max; Total Sulphur: 17 ppm wt max; TVP: 13 bara @ 15.5 degC max; Specs on other trace contaminants Exit Specification: Propane > 95.5 %vol, VP < 14.34 barg @ 37.8 degC Butane > 95 %vol, VP < 4.83 barg @ 37.8 degC Gasoline TVP < 0.7 bara @ 26.7 degC Outline details of Three NGL fractionation modules to separate ethane, propane, butane gas treatment and natural gasoline facilities HIGH LEVEL CAPACITY INFORMATION The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years Available Capacities >25% 5% to 25% <5% Unknown Description Capacity Ullage as % of system capacity Comments 2016 2017 2018 2019 2020 NGL capacity 12,500 tonnes/d Capacity depends on ambient conditions (summer/winter), and inlet composition. Due to the integrated nature of the SEGAL system, if a wet gas service is required this capacity information needs to be read in SHELL OPERATED ASSET conjunction with that of the SHELL FPSO relevant pipeline (FLAGS or FGL) NON OPERATED FPSO and the St Fergus Gas Terminal. OFFICE SHELL PLANT ONSHORE GAS FIELD SUBSEA SATELLITE SUBSEA SATELLITE NON OPERATED Graphics, Media and Publication Services (Aberdeen) (Aberdeen) Services Publication and Media Graphics, 2012 MAY : 99209 Ref. : ITV/UD CONTACT INFORMATION Subject to the availability of relevant capacity, each of Shell and Esso is capable of independently providing transportation and processing services using its own proportionate share of available capacity in the Segal System (“Divided Rights”). Please contact either the Shell or Esso representative for further information: Shell For further enquiries regarding the above please contact Charles Cole +44 1224 88 2606 [email protected] Esso For further enquiries regarding the above please contact Nic Harker +44 1372 41 2272 [email protected] Last update: January 2016 Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited); - In good faith and without any liability - Without warranty, implied or express to its accuracy or relevance of use to any other party - That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time.
Recommended publications
  • Press Release
    Press Release Amsterdam, The Netherlands / 6 November 2020 OCI Selected as Biofuel Supplier for Esso petrol in the United Kingdom OCI N.V. (Euronext: OCI) today announced that it has reached an agreement with Esso Petroleum Company, Limited (Esso), a subsidiary of Exxon Mobil Corporation, to supply a biofuel alcohol mix consisting of bio-methanol and ethanol, which will be blended with Esso’s standard Synergy grade petrol sold in the United Kingdom. The superior performance provided by OCI’s alcohol mix enables its customers to exceed mandated biofuel blending targets set by the UK and the EU without the introduction of a new fuel standard such as E10. OCI’s bio-methanol is an advanced biofuel that reduces greenhouse gas emissions compared to conventional petrol. Bio-methanol has a number of advantages: 1. Unlike ethanol which is primarily derived from food crops such as corn, wheat or sugar, bio-methanol is an advanced, second generation biofuel derived from bio-methane sourced from organic waste put into municipal landfills or anaerobic digesters. As such, in addition to the advantage that the use of bio-methanol results in lower consumption of fossil fuels, it provides an outlet for bio-waste, contributing to the circular economy and reducing methane emissions into the atmosphere. 2. Traditional methanol derived from natural gas has already long been used in auto racing to boost octane and deliver superior engine performance. Bio-methanol delivers the same benefits, while offering greenhouse gas (GHG) savings of more than 60% versus petrol derived from fossil fuels (volume for volume). Ahmed El-Hoshy, Chief Executive Officer of OCI NV, commented: “Through our cooperation with ExxonMobil, we aim to promote the use of bio-methanol as a complimentary biofuel alongside ethanol to reduce the carbon intensity of road transportation fuels.
    [Show full text]
  • UK Offshore Oil and Gas
    House of Commons Energy and Climate Change Committee UK offshore oil and gas First Report of Session 2008–09 Volume II Oral and written evidence Ordered by The House of Commons to be printed date 17 June 2009 HC 341-II Published on date 30 June 2009 by authority of the House of Commons London: The Stationery Office Limited £16.50 The Committee Name The Energy and Climate Change Committee is appointed by the House of Commons to examine the expenditure, administration, and policy of the Department of Energy and Climate Change and associated public bodies. Current membership Mr Elliot Morley MP (Labour, Scunthorpe) (Chairman) Mr David Anderson MP (Labour, Blaydon) Colin Challen MP (Labour, Morley and Rothwell) Nadine Dorries MP (Conservative, Mid Bedfordshire) Charles Hendry MP (Conservative, Wealden) Miss Julie Kirkbride MP (Conservative, Bromsgrove) Anne Main MP (Conservative, St Albans) Judy Mallaber MP (Labour, Amber Valley) John Robertson MP (Labour, Glasgow North West) Sir Robert Smith MP (Liberal Democrats, West Aberdeenshire and Kincardine) Paddy Tipping MP (Labour, Sherwood) Dr Desmond Turner MP (Labour, Brighton Kemptown) Mr Mike Weir MP (Scottish National Party, Angus) Dr Alan Whitehead MP (Labour, Southampton Test) Powers The committee is one of the departmental select committees, the powers of which are set out in House of Commons Standing Orders, principally in SO No 152. These are available on the Internet via www.parliament.uk. Publication The Reports and evidence of the Committee are published by The Stationery Office by Order of the House. All publications of the Committee (including press notices) are on the Internet at www.parliament.uk/parliamentary_committees/ecc.cfm.
    [Show full text]
  • Not for Quotation Without Permission of the Author
    NOT FOR QUOTATION WITHOUT PERMISSION OF THE AUTHOR DECISION CASE STUDY UNITED KINGDOM MOSSMORRAN-BWFOOT BAY Sally M. Macgill July 1982 CP-82- 4 0 Collaborative Papers report work which has not been performed solely at the International Institute for Applied Systems Analysis and which has received only limited review. Views or opinions expressed herein do not necessarily represent those of the Insti- tute, its National Member Organizations, or other organizations supporting the work. INTERNATIONAL INSTITUTE FOR APPLIED SYSTEMS ANALYSIS 2361 Laxenburg, Austria CONTENTS CHAPTER 1 : INTRODUCTION 1.1. Perspective 1.2. Status of Report 1.3. Outline CHAPTER 2 : THE DECISION STRUCTURE 2.1. Context for the Developments 2.2. Site Choice 2.3. The Main Parties to the Decision 2.4. The Main Events in the Decision Process CHAPTER 3: THE DIMENSIONS OF THE DECISION 3.1. Statement of Dimensions 3.2. National Benefits 3.3. Local Socio-Economic Benefits 3.4. Health and Safety Aspects 3.5. Environmental Impacts CHAPTER 4 : PARTY PERSPECTIVES ON VARIOUS DIMENSIONS 4.1. Overview of Conflicts 4.2. The Oil Companies: Shell and Esso 4.2.1. National Benefits 4.2.2. Local Socio-Economic Benefits 4.2.3. Health and Safety 4.2.4. Environment 4.3. The Scottish Development Department 4.4. Departments of Energy and Industry 4.5. The Local Authorities: Fife, Dunfermline and Kirkcaldy 4.5.1. National Benefits 4.5.2. Local Socio-Economic Effects 4.5.3. Health and Safety 4.5.4. Environment 4.6. The Forth Ports Authority 4.7. The Health and Safety Executive 4.8.
    [Show full text]
  • Guide to the American Petroleum Institute Photograph and Film Collection, 1860S-1980S
    Guide to the American Petroleum Institute Photograph and Film Collection, 1860s-1980s NMAH.AC.0711 Bob Ageton (volunteer) and Kelly Gaberlavage (intern), August 2004 and May 2006; supervised by Alison L. Oswald, archivist. August 2004 and May 2006 Archives Center, National Museum of American History P.O. Box 37012 Suite 1100, MRC 601 Washington, D.C. 20013-7012 [email protected] http://americanhistory.si.edu/archives Table of Contents Collection Overview ........................................................................................................ 1 Administrative Information .............................................................................................. 1 Arrangement..................................................................................................................... 3 Biographical / Historical.................................................................................................... 2 Scope and Contents........................................................................................................ 2 Names and Subjects ...................................................................................................... 4 Container Listing ............................................................................................................. 6 Series 1: Historical Photographs, 1850s-1950s....................................................... 6 Series 2: Modern Photographs, 1960s-1980s........................................................ 75 Series 3: Miscellaneous
    [Show full text]
  • Imperial Standard: Imperial Oil, Exxon, and the Canadian Oil Industry from 1880
    University of Calgary PRISM: University of Calgary's Digital Repository University of Calgary Press University of Calgary Press Open Access Books 2019-04 Imperial Standard: Imperial Oil, Exxon, and the Canadian Oil Industry from 1880 Taylor, Graham D. University of Calgary Press Taylor, G. D. (2019). Imperial Standard: Imperial Oil, Exxon, and the Canadian Oil Industry from 1880. "University of Calgary Press". http://hdl.handle.net/1880/110195 book https://creativecommons.org/licenses/by-nc-nd/4.0 Downloaded from PRISM: https://prism.ucalgary.ca IMPERIAL STANDARD: Imperial Oil, Exxon, and the Canadian Oil Industry from 1880 Graham D. Taylor ISBN 978-1-77385-036-8 THIS BOOK IS AN OPEN ACCESS E-BOOK. It is an electronic version of a book that can be purchased in physical form through any bookseller or on-line retailer, or from our distributors. Please support this open access publication by requesting that your university purchase a print copy of this book, or by purchasing a copy yourself. If you have any questions, please contact us at [email protected] Cover Art: The artwork on the cover of this book is not open access and falls under traditional copyright provisions; it cannot be reproduced in any way without written permission of the artists and their agents. The cover can be displayed as a complete cover image for the purposes of publicizing this work, but the artwork cannot be extracted from the context of the cover of this specific work without breaching the artist’s copyright. COPYRIGHT NOTICE: This open-access work is published under a Creative Commons licence.
    [Show full text]
  • Corporate Tax Avoidance Submission
    name jurisdiction_dincorporation_date ibcRUC node_id sourceID 1 ESSO (BM-S-EIGHT) BRAZIL EXPLORATION LIMITED Bahamas 19-Jul-06 144579B 20144579 Bahamas Leaks 2 ESSO (BM-S-ELEVEN) BRAZIL EXPLORATION LIMITED Bahamas 11-Aug-06 144827B 20144827 Bahamas Leaks 3 ESSO (BM-S-NINE) BRAZIL EXPLORATION LIMITED Bahamas 11-Aug-06 144831B 20144831 Bahamas Leaks 4 ESSO (BM-S-TEN) BRAZIL EXPLORATION LIMITED Bahamas 11-Aug-06 144830B 20144830 Bahamas Leaks 5 ESSO (BM-S-TWENTY TWO) BRAZIL EXPLORATION LIMITED Bahamas 25-Jan-00 102571B 20102571 Bahamas Leaks 6 ESSO (BM-S-TWENTY-FOUR) BRAZIL EXPLORATION LIMITED Bahamas 11-Aug-06 144829B 20144829 Bahamas Leaks 7 ESSO (BM-S-TWENTY-ONE) BRAZIL EXPLORATION LIMITED Bahamas 11-Aug-06 144828B 20144828 Bahamas Leaks 8 ESSO (ROUND NINE) BRAZIL EXPLORATION LIMITED Bahamas 2-Nov-07 151113B 20151113 Bahamas Leaks 9 ESSO ANGOLA (THIRTY) LIMITED Bahamas 1-Sep-99 95609B 20095609 Bahamas Leaks 10 ESSO ANGOLA (TWENTY EIGHT) LIMITED Bahamas 1-Sep-99 95607B 20095607 Bahamas Leaks 11 ESSO ANGOLA (TWENTY NINE) LIMITED Bahamas 1-Sep-99 95608B 20095608 Bahamas Leaks 12 ESSO ANGOLA (TWENTY SEVEN) LIMITED Bahamas 1-Sep-99 95606B 20095606 Bahamas Leaks 13 ESSO ANGOLA (TWENTY SIX) LIMITED Bahamas 1-Sep-99 95610B 20095610 Bahamas Leaks 14 ESSO ANGOLA GAS COMPANY LIMITED Bahamas 16-Jan-01 117958B 20117958 Bahamas Leaks 15 ESSO ANGOLA INVESTMENTS LIMITED Bahamas 20-Aug-01 120962B 20120962 Bahamas Leaks 16 ESSO BOLIVA LIMITED Bahamas 11-Aug-95 35376B 20035376 Bahamas Leaks 17 ESSO BRAZIL INVESTMENTS LIMITED Bahamas 30-Nov-00 116707B 20116707
    [Show full text]
  • Gasket Chemical Services Guide
    Gasket Chemical Services Guide Revision: GSG-100 6490 Rev.(AA) • The information contained herein is general in nature and recommendations are valid only for Victaulic compounds. • Gasket compatibility is dependent upon a number of factors. Suitability for a particular application must be determined by a competent individual familiar with system-specific conditions. • Victaulic offers no warranties, expressed or implied, of a product in any application. Contact your Victaulic sales representative to ensure the best gasket is selected for a particular service. Failure to follow these instructions could cause system failure, resulting in serious personal injury and property damage. Rating Code Key 1 Most Applications 2 Limited Applications 3 Restricted Applications (Nitrile) (EPDM) Grade E (Silicone) GRADE L GRADE T GRADE A GRADE V GRADE O GRADE M (Neoprene) GRADE M2 --- Insufficient Data (White Nitrile) GRADE CHP-2 (Epichlorohydrin) (Fluoroelastomer) (Fluoroelastomer) (Halogenated Butyl) (Hydrogenated Nitrile) Chemical GRADE ST / H Abietic Acid --- --- --- --- --- --- --- --- --- --- Acetaldehyde 2 3 3 3 3 --- --- 2 --- 3 Acetamide 1 1 1 1 2 --- --- 2 --- 3 Acetanilide 1 3 3 3 1 --- --- 2 --- 3 Acetic Acid, 30% 1 2 2 2 1 --- 2 1 2 3 Acetic Acid, 5% 1 2 2 2 1 --- 2 1 1 3 Acetic Acid, Glacial 1 3 3 3 3 --- 3 2 3 3 Acetic Acid, Hot, High Pressure 3 3 3 3 3 --- 3 3 3 3 Acetic Anhydride 2 3 3 3 2 --- 3 3 --- 3 Acetoacetic Acid 1 3 3 3 1 --- --- 2 --- 3 Acetone 1 3 3 3 3 --- 3 3 3 3 Acetone Cyanohydrin 1 3 3 3 1 --- --- 2 --- 3 Acetonitrile 1 3 3 3 1 --- --- --- --- 3 Acetophenetidine 3 2 2 2 3 --- --- --- --- 1 Acetophenone 1 3 3 3 3 --- 3 3 --- 3 Acetotoluidide 3 2 2 2 3 --- --- --- --- 1 Acetyl Acetone 1 3 3 3 3 --- 3 3 --- 3 The data and recommendations presented are based upon the best information available resulting from a combination of Victaulic's field experience, laboratory testing and recommendations supplied by prime producers of basic copolymer materials.
    [Show full text]
  • The DA GHGI Improvement Programme 2009-2010 Industry Sector Task
    The DA GHGI Improvement Programme 2009-2010 Industry Sector Task DECC, The Scottish Government, The Welsh Assembly Government and the Northern Ireland Department of the Environment AEAT/ENV/R/2990_3 Issue 1 May 2010 DA GHGI Improvements 2009-2010: Industry Task Restricted – Commercial AEAT/ENV/R/2990_3 Title The DA GHGI Improvement Programme 2009-2010: Industry Sector Task Customer DECC, The Scottish Government, The Welsh Assembly Government and the Northern Ireland Department of the Environment Customer reference NAEI Framework Agreement/DA GHGI Improvement Programme Confidentiality, Crown Copyright copyright and reproduction File reference 45322/2008/CD6774/GT Reference number AEAT/ENV/R/2990_3 /Issue 1 AEA Group 329 Harwell Didcot Oxfordshire OX11 0QJ Tel.: 0870 190 6584 AEA is a business name of AEA Technology plc AEA is certificated to ISO9001 and ISO14001 Authors Name Stuart Sneddon and Glen Thistlethwaite Approved by Name Neil Passant Signature Date 20th May 2010 ii AEA Restricted – Commercial DA GHGI Improvements 2009-2010: Industry Task AEAT/ENV/R/2990_3 Executive Summary This research has been commissioned under the UK and DA GHG inventory improvement programme, and aims to research emissions data for a group of source sectors and specific sites where uncertainties have been identified in the scope and accuracy of available source data. Primarily this research aims to review site-specific data and regulatory information, to resolve differences between GHG data reported across different emission reporting mechanisms. The research has comprised: 1) Data review from different reporting mechanisms (IPPC, EU ETS and EEMS) to identify priority sites (primarily oil & gas terminals, refineries and petrochemicals), i.e.
    [Show full text]
  • Exxonmobil Indonesia at a Glance Country Fact Sheet
    ExxonMobil Indonesia at a glance Country fact sheet KEY FACTS 1898 Standard Oil Company of New York (Socony) opens a marketing office in Java. 1968 Mobil Oil Indonesia Inc. (MOI) is formed and becomes one of the first contractors to be involved in the country’s newly established “Production Sharing Contract (PSC)” approach for B block in North Aceh. MOI is later renamed ExxonMobil Oil Indonesia (EMOI) in 2000. 2001 A discovery of over 450 million barrels of oil at Banyu Urip oil field, East Java. 2005 ExxonMobil Cepu Limited (EMCL) assigned as operator for the Cepu block under PSC. 2006 Banyu Urip Plan of Development (POD) approved by the government of Indonesia. 2009 Cepu block commenced commercial production through Early Production Facility (EPF). 2011 EMCL awards five major Banyu Urip project Engineering, Procurement and Construction (EPC) contracts to five Indonesian-led consortiums. 2015 In October, ExxonMobil assigned its interest in the North Sumatra Block Offshore (NSO) and B Block PSC to Pertamina. The start-up of Banyu Urip’s onshore Central Processiong Facility (CPF) commenced in December. 2016 POD production of 165,000 barrels of oil per day is achieved at Banyu Urip field. NOW Approximately 570 employees at ExxonMobil Indonesia. Nearly 90 percent are Indonesians, many of whom are senior managers and engineers. Increasing energy supply for Indonesia. The FSO vessel, Gagak Rimang, connected to the mooring tower. UPSTREAM Cepu block East Natuna block • The Cepu Block PSC was signed on 17 September 2005 • Located in the South China Sea. covering the Cepu Contract Area in Central and East Java.
    [Show full text]
  • Fife Ethylene Plant, Mossmorran, United Kingdom
    APPLICATION INFORMATION N° 301 CHEMICAL & PETROCHEMICAL INDUSTRY Fife Ethylene Plant, Mossmorran, United Kingdom SIL 3 Capable Market segment: Chemical & Petrochemical Industry Ethylen-Cracker ExxonMobil Chemical's Fife Ethylene Plant (FEP) is one of Europe's largest and most modern ethylene plants. Construction at Mossmorran, 25 miles north of Edinburgh, began in 1981 and the plant was offi cially opened by the Queen in 1986. It was the fi rst plant specifi cally designed to use natural gas liquids from the North Sea as feedstock. The plant has an annual capacity of 830’000 tons of ethylene. To make ethylene, ethane feedstock is heated to almost 900°C to 'crack' it to eth- ylene in the steam cracking furnaces. The gas stream is then cooled to below -160°C to recover the valuable ethylene product. 2 high and 1 high high alarm Requirement for level switches Why Trimod Besta? ▪ Hazardous area. Zone 0 for fl oats Bachofen offers level switches for appli- ▪ Intrinsically safe circuits, gold plated contacts cations from -200°C to +400°C and from vacuum to 320 bar process pressure. High ▪ Operating temperature To: -160°C to +320°C ▪ Min. Density: 0.4 kg/dm3 reliability, an unbeatable life time as well as ▪ Interface control of 2 liquids (e.g. oil and water) long lasting experience in handling ambi- ▪ Extremely high reliability of switch mechanism tious projects were further arguments for ▪ Manufacturing of complex fl oat chambers incl. welding procedure the contractor to choose Trimod Besta level specifi cation switches and fl oat chambers. Installed level switch types Totally 114 Trimod Besta level switches and 110 fl oat chambers are installed in the hot (400°C) and in the cold (-160°C) part of the ethylene production process.
    [Show full text]
  • Decision Case Study: United Kingdom, Mossmorran-Braefoot Bay
    Decision Case Study: United Kingdom, Mossmorran-Braefoot Bay Macgill, S.M. IIASA Collaborative Paper July 1982 Macgill, S.M. (1982) Decision Case Study: United Kingdom, Mossmorran-Braefoot Bay. IIASA Collaborative Paper. Copyright © July 1982 by the author(s). http://pure.iiasa.ac.at/2078/ All rights reserved. Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage. All copies must bear this notice and the full citation on the first page. For other purposes, to republish, to post on servers or to redistribute to lists, permission must be sought by contacting [email protected] NOT FOR QUOTATION WITHOUT PERMISSION OF THE AUTHOR DECISION CASE STUDY UNITED KINGDOM MOSSMORRAN-BWFOOT BAY Sally M. Macgill July 1982 CP-82- 4 0 Collaborative Papers report work which has not been performed solely at the International Institute for Applied Systems Analysis and which has received only limited review. Views or opinions expressed herein do not necessarily represent those of the Insti- tute, its National Member Organizations, or other organizations supporting the work. INTERNATIONAL INSTITUTE FOR APPLIED SYSTEMS ANALYSIS 2361 Laxenburg, Austria CONTENTS CHAPTER 1 : INTRODUCTION 1.1. Perspective 1.2. Status of Report 1.3. Outline CHAPTER 2 : THE DECISION STRUCTURE 2.1. Context for the Developments 2.2. Site Choice 2.3. The Main Parties to the Decision 2.4. The Main Events in the Decision Process CHAPTER 3: THE DIMENSIONS OF THE DECISION 3.1.
    [Show full text]
  • Linear Alpha-Olefins (681.5030)
    IHS Chemical Chemical Economics Handbook Linear alpha-Olefins (681.5030) by Elvira O. Camara Greiner with Yoshio Inoguchi Sample Report from 2010 November 2010 ihs.com/chemical November 2010 LINEAR ALPHA-OLEFINS Olefins 681.5030 B Page 2 The information provided in this publication has been obtained from a variety of sources which SRI Consulting believes to be reliable. SRI Consulting makes no warranties as to the accuracy completeness or correctness of the information in this publication. Consequently SRI Consulting will not be liable for any technical inaccuracies typographical errors or omissions contained in this publication. This publication is provided without warranties of any kind either express or implied including but not limited to implied warranties of merchantability fitness for a particular purpose or non-infringement. IN NO EVENT WILL SRI CONSULTING BE LIABLE FOR ANY INCIDENTAL CONSEQUENTIAL OR INDIRECT DAMAGES (INCLUDING BUT NOT LIMITED TO DAMAGES FOR LOSS OF PROFITS BUSINESS INTERRUPTION OR THE LIKE) ARISING OUT OF THE USE OF THIS PUBLICATION EVEN IF IT WAS NOTIFIED ABOUT THE POSSIBILITY OF SUCH DAMAGES. BECAUSE SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES THE ABOVE LIMITATION MAY NOT APPLY TO YOU. IN SUCH STATES SRI CONSULTING’S LIABILITY IS LIMITED TO THE MAXIMUM EXTENT PERMITTED BY SUCH LAW. Certain statements in this publication are projections or other forward-looking statements. Any such statements contained herein are based upon SRI Consulting’s current knowledge and assumptions about future events including without limitation anticipated levels of global demand and supply expected costs trade patterns and general economic political and marketing conditions.
    [Show full text]