Network Specification 2016 South East Route Network Specification: March 2016 Network Rail – Network Specification: South East Route 02 South East Route
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
The M25 Motorway (Junctions 19, 22 and 23) and the A40
THE M25 MOTORWAY (JUNCTIONS 19, 22 AND 23) AND THE A40 TRUNK ROAD (DENHAM ROUNDABOUT) TEMPORARY OVERNIGHT LINK/SLIP ROAD CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M25 Motorway and the A40 Trunk Road, in the Counties of Buckinghamshire and Hertfordshire, under section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure of the following: (a) the link roads leading to and from the M25 at Junction 19 (A41/A411); (b)the slip road leading to the clockwise carriageway of the M25 at Junction 22 (A1081); (c) the slip roads leading from the clockwise carriageway and to the anti-clockwise carriageway of the M25 at Junction 23 (A1/A1(M) Junction 1); (d)the slip road leading from the westbound carriageway of the A40 to Denham roundabout (A4020/A412) at M40 Junction 1. These measures would be in the interests of road safety while contractors undertake cyclic maintenance and/or urgent repair work. It is expected that the work would take place for approximately 1 - 2 nights for each closure every 2 months between 22:00 and 05:30 on Monday – Thursday nights, 23:00 and 06:00 on Friday nights, 22:00 and 06:00 on Saturday nights and 22:30 and 05:30 on Sunday nights. The Order would come into force on 16 April 2017 and have a maximum duration of twelve months. -
Highgrove Farm Broadbridge, Bosham, Chichester
Highgrove Farm Broadbridge, Bosham, Chichester Design and Access Statement February 2021 Revision Date Revision Notes Prepared by Authorised by * 2020-12-18 VTS/IDP KD/SR Rev B 2020-12-22 VTS/IDP KD/SR Rev C 2021-01-04 VTS/IDP KD/SR Rev D 2021-01-06 VTS/IDP KD/SR Rev E 2021-01-29 VTS/IDP KD/SR Rev F 2021-02-02 VTS/IDP KD/SR \\IDPSVR01\Projects\N81-2818 Bosham, BDW S'ton\Documents\D&A\Bosham Design and Access Statement.indd [INDD Modified 2021-02-02 10:49], [PDF Output 2021-02-02 10:55] 2 Contents Section 1: Introduction Section 4: Access Proposals 1.1 Introduction 6 4.1 Connections, Movement and Street Hierarchy 38 1.2 Summary of Proposals 7 4.2 Parking 39 Section 5: BHL Assessment Section 2: The Site 5.1 Building for a Healthy Life Assessment 42 2.1 Site Location 10 2.2 Site Description 11 2.3 Site Photographs 12 2.4 Site Context 13 2.5 Constraints and Opportunities 15 2.6 Parish Council Consultation 16 2.7 Layout Analysis 17 2.8 Design Concept 18 Section 3: Design Proposals 3.1 Layout 20 3.2 Accommodation 22 3.3 Affordable Homes 23 3.4 Community / Village Hall 24 3.5 Spatial Syntax 25 3.6 Scale 26 3.7 Materials 27 3.8 Landscape 28 3.9 Streetscenes 30 3.10 Visualisations 32 3 4 Section 1 Introduction 1.1 Introduction This Design and Access Statement has been prepared by IDPartnership on behalf of Barratt David Wilson Homes Southampton to accompany a detailed planning submission for a residential development on land at Highgrove Farm, Bosham, Chichester. -
Greater London Fund for the Blind Annual
Company number: 03693002 Charity number: 1074958 Greater London Fund for the Blind Report and financial statements For the year ended 31 March 2018 *A7KMSSOS* A18 12/12/2018 ¹301 COMPANIES HOUSE SAYER V I NC ENT OOOOO OOOOOOO 0 0 0 0 0 0 0 0 0 0 0 0 Greater London Fund for the Blind Contents For the year ended 31 March 2018 Reference and administrative information . Trustees' annual report . Independent auditor's report . 11 Consolidated statement of financial activities (incorporating income and expenditure account) ... 15 Balance sheets ......................................................""""""." . 16 Consolidated statement of cash flows . 17 Notes to the financial statements . 18 Greater London Fund for the Blind Reference and administrative information For the year ended 31 March 2018 Company number 03693002 Charity number 1074958 Registered office and operational address Sir John Mills House 12 Whitehorse Mews 37 Westminster Bridge Road London SE1 7QD Country of registration England & Wales Country of incorporation United Kingdom Trustees The Trustees, who are also directors under company law, who served during the year and up to the date of this report were as follows: Anna Tylor* —Chair Charles Colquhoun* (Resigned 5 December 2018) Keith Felton* Harry Harris Bob Hughes (Appointed 29 October 2018) James Matthews (Appointed 12 July 2017) Raj Mehta* Sharon Petrie (Appointed 12 May 2017) Frans Pettinga (Resigned 6 July 2017) Daniel Stewart-Smith (Resigned 29 July 2018) *Members of Finance, Audit and Risk Committee Key management -
Kent Rail Strategy 2021
Kent Rail Strategy 2021 Public Consultation Report January 2021 Kent Rail Strategy 2021 Consultation Report Table of Contents 1. Introduction .............................................................................................................................. 4 2. Consultation process................................................................................................................ 4 3. Consultation responses ............................................................................................................ 8 4. Kent Rail Strategy ambitions .................................................................................................. 10 5. Rail policy .............................................................................................................................. 15 6. Fares policy ........................................................................................................................... 20 7. Rail infrastructure enhancements ........................................................................................... 25 8. Rolling stock improvements ................................................................................................... 29 9. Passenger services ................................................................................................................ 33 10. Community Rail Partnerships (CRPs) ................................................................................. 37 11. Rail freight provision .......................................................................................................... -
Fleet Accessibility Information
Fleet accessibility information Fleet accessibility information KEY This key is for the following table. DAC – Dedicated accessible carriage with space for wheelchair and user ST – Standard toilet AT – Accessible toilet (with area to transfer, colour contrasting features, support rails and call for aid) AI – Aural information VI – Visual information PS – Priority seats AS – Accessible signage on outside of train SAA – Scooter/mobility aid acceptance BR – Boarding ramp Great Northern GATWICK SOUTHERN ThamesLink EXPRESS WE’RE WITH YOU December 2020 Class Brand Routes DAC ST of train Entire Southern network excluding Uckfield route and Southern 377 Yes Yes Ashford to Hastings (Marsh Link). London Bridge to Uckfield and Southern 171 Ashford to Yes Yes Hastings (Marsh Link) services Brighton to Seaford, Southern 313/2 Yes No Portsmouth and Ore Southern metro services from Southern 455 * Yes No London Bridge/ London Victoria All Gatwick Express services Gatwick 387/2 including some Yes Yes Express London to Brighton services * These carriages are fully accessible. For minor technical reasons these trains operate under a derogation from the Department of Transport. Further details are available on request. On-train AT AI VI PS AS SAA BR staff Yes; see Check Yes Yes Yes Yes Yes Yes policy online with staff Yes; see Yes Yes Yes Yes Yes Yes Yes policy online Yes; see No Yes Yes Yes Yes Yes Yes policy online Yes; see No Yes Yes Yes Yes Yes No policy online Yes; see Check Yes Yes Yes Yes Yes Yes policy online with staff Class Brand Routes DAC ST -
Accessible Travel Policy Document (Large Print
Accessible Travel Policy Great Northern GATWICK SOUTHERN ThamesLink EXPRESS WE’RE WITH YOU 1 Contents 3 A. Commitments to providing assistance 6 A.1 Booking and providing assistance 15 A.2 Information Provision 26 A.3 Ticketing & fares 30 A.4 Alternative accessible transport 32 A.5 Scooters & mobility aids 34 A.6 Delays, disruption and emergencies 36 A.7 Station facilities 38 A.8 Redress 39 B. Strategy and management 39 B.1 Strategy 39 B.2 Management arrangements 42 B.3 Monitoring & evaluation 46 B.4 Access improvements 48 B.5 Working with disabled customers, local communities and local authorities 51 B.6 Staff training 2 A. Commitments to providing assistance Govia Thameslink Railway (GTR) is the parent company for the following train companies. It runs the largest rail network in the country, operating services across the south-east of England under the following brands: Southern Extensive network from London to stations across Sussex and Surrey, the south coast and suburban ‘metro’ services across south London and to Milton Keynes via Watford Junction. Gatwick Express Direct services between London Victoria and Gatwick Airport (and some services towards Brighton). Thameslink Network of services linking many stations north of London such as Bedford, Cambridge, Peterborough, St Albans with destinations south of the River Thames via St Pancras International such as London Bridge, East Croydon, Sutton, Gatwick Airport, Brighton, Horsham and Rainham (Kent). Great Northern Services from London King’s Cross to Peterborough, King’s Lynn via Cambridge and suburban services from Moorgate towards Hertford North, Welwyn Garden City and Stevenage. -
Units to Let/For Sale from 3,175-46,393 Sq Ft
EDGINGTON WAY | SIDCUP | KENT | DA14 5NH UNITS TO LET/FOR SALE www.klingerindustrialpark.co.uk FROM 3,175-46,393 SQ FT A NEW DEVELOPMENT OF WAREHOUSE/INDUSTRIAL/TRADE COUNTER UNITS A20 SIDCUP BYPASS ROAD A20 B&Q PROPOSED CAR DEALERSHIP JAGUAR A 2 2 COSTA 3 TESCO E D G I N BOOKER G www.klingerindustrialpark.co.uk T O N W COCA COLA A Y EDMUNDSON ELECTRICAL HOWDENS A 2 2 3 SELCO SCREWFIX ALSFORD TIMBER BP TOYOTA LEXUS Minimum clear height of 8 metres TO LET/ EDGINGTON WAY Generous yard and car parking provisions FOR SALE 1 full height loading door per unit AVAILABLE Q3 2017 Floor loading of 37.5 kN/sq m 2b 2a Ability to combine units 1 First floor mezzanine - can be fitted as offices or used as storage UNDER OFFER 3 Excellent access to A20, M25 and Central London 4 5 Images of similar Chancerygate schemes 6 Warehouse 1st Floor Total sq ft (sq m) Car parking 17 .6m Unit 1 UNDER OFFER Unit 2a 3,175 - 3,175 (295) 7 Unit 2b 3,175 - 3,175 (295) 7 16 m Unit 3 11,248 2,174 13,423 (1,247) 14 Unit 4 9,795 1,916 11,711 (1,088) 12 10 9 Unit 5 8,719 1,701 10,420 (968) 12 8 Unit 6 9,203 1,636 10,839 (1,007) 12 7 Unit 7 5,328 1,485 6,813 (633) 8 11 Unit 8 4,575 1,270 5,845 (543) 7 12 Unit 9 4,844 1,346 6,190 (575) 8 Planning use 13 Unit 10 4,844 1,335 6,179 (574) 8 B1 (c), B2, B8 and Unit 11 7,912 2,099 10,011 (930) 12 Trade Counter. -
Railway Development Society Limited Is a Not-For-Profit Company Limited by Guarantee Registered in England & Wales No.5011634
railse no. 128 June 2015 Railfuture in London and the South East quarterly branch newsletter The independent campaign for a better passenger and freight rail network Terminal decline of diesels Refreshing electrification London terminals – a group of 14 mainline stations The most recent Network Rail strategy on electrification spread around Zone 1, all but one of which are fully was the Network RUS published back in October 2009. equipped for electric traction, yet half of them are still Since September 2012 the Network RUS Working invaded by noisy, smelly and polluting diesel trains. Group: Electrification ‘refresh’ remit has been to review That’s not to mention the diesels’ higher operating and options for further electrification over the next 30 years, maintenance costs, and generally poorer performance and consider a priority for delivery. A consultation draft in terms of reliability and acceleration. Railfuture has is expected imminently, postponed from pre-purdah. long advocated the various benefits of electric traction. The drivers for further electrification are seen as: ~ reduced rolling stock leasing, maintenance and operating costs; ~ reduced infrastructure maintenance costs; ~ improved rolling stock reliability; ~ reduced journey times and potential reduction in rolling stock requirement; ~ shorter freight routeings and potential release of capacity through more consistent train performance; ~ ability to haul greater freight loads; ~ enhancing capacity on un-electrified routes through cascade of diesel rolling stock; ~ increased network availability through provision of diversionary routes; ~ lower emissions and reduced noise; ~ compliance with environmental policy legislation. The shape of things to come – IEP train for Paddington The ‘Smelly Seven’ stations are: Euston – Virgin’s Voyagers King’s Cross – Grand Central and Hull Trains London Bridge – Southern’s Turbostars, to Uckfield Marylebone – the only all-diesel London terminus Paddington – all, except Heathrow Express/Connect St. -
NETWORK RAIL's KENT ROUTE STUDY CONSULTATION JTB: 13Th
NETWORK RAIL’S KENT ROUTE STUDY CONSULTATION JTB: 13th June 2017 Author / Service Andrew Osborne – Economic Head Development Manager Portfolio Holder Cllr P. Clokie Purpose of the report To update the Joint Transport Board on Ashford Borough Council’s draft response to Network Rail’s consultation on the South East Route: Kent Area Route Study. Background Network Rail have published their consultation document for the long term planning for the “South East Route: Kent Area Route Study”, which includes proposed track, signalling and station improvements on this network, and sets out the strategic vision for the next 30 years. The purpose of the study is to provide the evidence base to inform funder’s consideration of the medium and long-term options. The consultation was opened in March 2017 and closes on the 30th June 2017. The Department for Transport has also published their “South Eastern Rail Franchise Public Consultation” document in March 2017, originally requesting responses by 23rd May 2017, although this has now been extended to the 30th June 2017 due to the calling of the General Election. The results of this consultation will then inform a tender document that will start the process in the autumn 2017 of procuring a new franchise operator. The new franchise operator will commence operations at the expiry of the current franchise in December 2018. Ashford Borough Council’s draft response to these consultations was reported to Cabinet in May 2017, and the key priorities within the Council’s response is set out below. South East Route: Kent Area Route Study – Draft for Consultation Network Rail have published their consultation document on proposed improvements to the rail network by 2024 and projects to be developed for delivery between 2024 and 2044. -
West Sussex County Council Response to the Network Rail Draft Sussex Area Route Study Consultation
Ref No: HT21 (14/15) Cabinet Member for Highways and Transport Key Decision: Yes West Sussex County Council response to the Part I or Part II: Network Rail draft Sussex Area Route Study Part I consultation Report by Director of Highways and Transport and Electoral Director of Strategic Planning and Place Divisions: All Executive Summary Network Rail is undertaking a consultation to gather views on its draft South East Route: Sussex Area Route Study. This study sets out a 30-year vision for this area of the rail network. It primarily focuses on rail industry Control Period 6 (2019-2024) to inform Government investment decisions for this time frame, but also considers growth in demand for rail travel to 2043. Consultation responses are being welcomed on any of the ideas and interventions set out in the study. The study will inform future decisions about rail infrastructure and rail service planning as well as the capacity of major stations, rather than specific timetable, service quality and station access issues which are concerns for the rail franchisee. Key issues highlighted in the County Council response include: support for investment to expand capacity for the Brighton Main Line; a request for further investment in rail infrastructure away from routes to London to support a balanced economy; support for analysis undertaken within the Study into the Arundel Chord scheme and provision of an improved journey times along the West Coastway route; and requests for greater attention to be made to level crossing and car parking issues within the study. Recommendation The Cabinet Member for Highways and Transport approves West Sussex County Council’s consultation response, contained in Appendix A of the report, for submission to the Network Rail draft South East Route: Sussex Area Route Study. -
A CRITICAL EVALUATION of the LOWER-MIDDLE PALAEOLITHIC ARCHAEOLOGICAL RECORD of the CHALK UPLANDS of NORTHWEST EUROPE Lesley
A CRITICAL EVALUATION OF THE LOWER-MIDDLE PALAEOLITHIC ARCHAEOLOGICAL RECORD OF THE CHALK UPLANDS OF NORTHWEST EUROPE The Chilterns, Pegsdon, Bedfordshire (photograph L. Blundell) Lesley Blundell UCL Thesis submitted for the degree of PhD September 2019 2 I, Lesley Blundell, confirm that the work presented in this thesis is my own. Where information has been derived from other sources, I confirm that this has been indicated in the thesis. Signed: 3 4 Abstract Our understanding of early human behaviour has always been and continues to be predicated on an archaeological record unevenly distributed in space and time. More than 80% of British Lower-Middle Palaeolithic findspots were discovered during the late 19th/early 20th centuries, the majority from lowland fluvial contexts. Within the British planning process and some academic research, the resultant findspot distributions are taken at face value, with insufficient consideration of possible bias resulting from variables operating on their creation. This leads to areas of landscape outside the river valleys being considered to have only limited archaeological potential. This thesis was conceived as an attempt to analyse the findspot data of the Lower-Middle Palaeolithic record of the Chalk uplands of southeast Britain and northern France within a framework complex enough to allow bias in the formation of findspot distribution patterns and artefact preservation/discovery opportunities to be identified and scrutinised more closely. Taking a dynamic, landscape = record approach, this research explores the potential influence of geomorphology, 19th/early 20th century industrialisation and antiquarian collecting on the creation of the Lower- Middle Palaeolithic record through the opportunities created for artefact preservation and release. -
Glyne Gap – Operational Assessment (Pdf)
Proposed new passenger station at Glyne Gap, Bexhill Technical note – Stage 3b: Operational assessment March 2013 Rother District Council, East Sussex County Council, Land Securities Group PLC Confidential Proposed311776 ITD newITN passenger1 A Document5 station at Glyne Gap,5 October Bexhill 2012 Technical note – Stage 3b: Operational assessment March 2013 Rother District Council, East Sussex County Council, Land Securities Group PLC Confidential Rother District Council, Town Hall, Bexhill-on-Sea TN39 3JX Mott MacDonald, Spring Bank House, 33 Stamford Street, Altrincham, Cheshire WA14 1ES, United Kingdom T +44(0) 161 926 4000 F +44(0) 161 926 4100, W www.mottmac.com Proposed new passenger station at Glyne Gap, Bexhill Confidential Issue and revision record Revision Date Originator Checker Approver Description A 26 Nov 2012 MCS KP RJF Draft technical note summarising operational issues surrounding Glyne Gap station B 28 March 2013 MCS/KP KP/RJF RJF Final version with client comments addressed This document is issued for the party which commissioned it We accept no responsibility for the consequences of this and for specific purposes connected with the above-captioned document being relied upon by any other party, or being used project only. It should not be relied upon by any other party or for any other purpose, or containing any error or omission which used for any other purpose. is due to an error or omission in data supplied to us by other parties. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it.