AIRPORTS KINESIS CANADA PROVIDING YOU MORE THAN A SIMPLE IDEA, WE MAKE IT REAL THROUGH A TURN KEY SOLUTION

IMAGE PLACE HOLDER Kinesis Group IN FEW WORDS

An Integrated Team approach Kinesis Group works in partnership with clients to achieve their goals and expectations using a professional Match your approach and the ability to manage expectations expectations. Kinesis Group is aware that every Kinesis Group it’s more than4 majors client is unique, they have a different companies all under a same holding culture, expectations and personalities. and a banner providing a turn key solution to Government and Private Our group commitment is to provide companies you personalized services that not only match but exceed your expectations. INTRODUCTION Kinesis Group a dynamic and innovative group very active since 2012 over the world by being the first in the world to propose turn key solution for airports and infrastructure projects

Kinesis Group & THIS COMPANIES Airports Kinesis Consulting Worldwide was founded in 2011 with a vision to design efficient and sustainable next-generation airports and aeronautical infrastructures. Over the past four years, we have built a strong reputation for our range of expertise and offer of comprehensive services, including airport design and management, operations evaluation aircraft consulting and planning, traffic impact studies, and airline development planning for existing operators around the world. We have rapidly expanded our services from our headquarters in Montreal to 16 countries around the world. Southeast Asia and Asia has been a priority market for our business.

We recently opened a new office in Peru and Guatemala, and are particularly focused on all business related to airports including (Financing, Airport Design, Operation and Construction,Technical, Law and Legal, Green Energy, Carbon Trading, Renewable Energy)

www.airports-kinesis.com INTRODUCTION Kinesis Group a dynamic and innovative group very active since 2012 over the world by being the first in the world to propose turn key solution for airports and infrastructure projects

✈ Kinesis Group & THIS COMPANIES More than 20 companies Located in Malaysia, Thailand, China, AKC Singapore, UAE and other countries AKC GROUP, is created from a merger from more than 4 specialized GROUP companies in 2014, we are one of the most dynamic and largest turn key ✈ ✈ management company in the African, Asia and South America. $€¥ ✈ AIRPORTS KINESIS KINESIS CAPITAL AE&D TRANS ASIA CONSULTANT Kinesis Group offers a full spectrum of services including in priority turn key solutions for Airports and special Infrastructures projects, we provide for the client a complete package including the Design, the feasibility, the financing and investment, the construction, including AIRPORT AIRPORT AIRPORT SUPERVISION DESIGN & OPERATION ENGINEERING Civil & Building construction, roadworks and earthworks, we operate ENGINEERING the project and transfer the asset when the investment is recovered. INVESTMENT DEVELOPMENT ENVIRONMENTAL MANAGEMENT & & & STRATEGIES CONTRACTING FINANCE STRATEGIES The value of Kinesis Group is not limited to only airports and infrastructure buildings, we are also present on very specific project like $€¥ ✈ LOCAL CONFIGURATION FOR PROJECTS NUCLEAR FACILITIES and GEOPLUTONIC Energy solutions Local SPV Local ac9ng as Holding Opera9on AKC IS ALWAYS LOCATED IN THE COUNTRY OF THE PROJECT for financial Company

www.airports-kinesis.com ORGANIGRAM DEDICATED TO

CEO AKC Lord Ronnie Hessnan

VP-CTO group AKC Shad Serroune

TAC Director CFO CCAO CDO David Irwan Tjetjep Prasyeta Zolkeply Bin Muhamud Mohd Nazir Zainun Kinesis Group has been reorganized for the CTO BDM group AKC Hisham Norsham Mickael Senkaya Indonesian Market, the management board still GIS DESIGN always in Canada and the Wilhem Marceny Joseph Vinsu development and management (financial and FAD AIP ENG Jean Paul Bernard Benabdallah technical) is under Indonesian Lecorre Jourdain Djelloul structure.

OEM OEM Air MRO Air MRO ENV DEV Sandra Jean Marc Daniel Durant Spec Spec Pascal PasPer L’emaillet Pierre Vaillant Marc Dufavet Ph D Makowski

www.airports-kinesis.com INTRODUCTION A Capital and Investment company dedicated to important infrastructures governmental or private projects

KINESIS CAPITAL & INVESTMENT Kinesis Capital & Investment is an investment company. We provide investment management, investment services and wealth management that help governments and individuals succeed in infrastructure IMAGE PLACE HOLDER projects all over the world. For several years, Airports Kinesis Consulting has maintained a valued presence all over the world and especially in Asia Pacific, where we have been one of the first Canadian Infrastructure Investment and financial institutions to initiate high skilled project to invest in the region’s vast potential. Today, through several partners and divisions KC&I have over 43 employees in the region and maintain extensive operations in 6 offices across 12 APAC countries.

www.airports-kinesis.com INTRODUCTION Kinesis Group with all this companies combine various specialization in only one banner

Infrastructures Energy Turn Key Contracting Kinesis Group brings a unique blend of Kinesis Group is specialized through From master planning, financing, expertise from financing to contracting this group on large scale renewable supervision and contracting, our group is & operation for several types of energy power plants and new geo- capable to handle your project from day projects like airports, airport cities, plutonics or nuclear, with a combined one to this completion and provides you aerotropolis, ports, etc… generation of more than 1500 MW also operation.

New Technologies REIT & Concessions Operations Kinesis Group is holding more than 10 Through our group, the client is capable Kinesis Group is also specialized in patents in new technologies including to handle very complex projects and operation of airport projects and valuation Airports, Aerotropolis, Finance, Technics concessions using specific financial tools, of projects, we bring value to an airport for development and many more. we provide build to suit projects on Fit in before to transfer to the operator the or Fit out concept, we also provide airport or the infrastructure performance over operation.

www.airports-kinesis.com Green AKC We Catalyze project using new type of energy solu6ons 49238 Tco²/year This number is the amount of carbon credits saved during construction and operation of our group, this carbon is also sold in the clean-spark market generating more than 738 K€/Year

Our group hold the financial trading license to trade carbon credits saved during the construction and operation (Management).

www.airports-kinesis.com INTRODUCTION Kinesis Group a very complete and flexible structure

AKC is a very flexible company capable to design complex airports infrastructures and fullfill all the requirement of a project in very fast way, we invest in first and second phase of very specific projects, our company and this pool of investment is specialized in very high profile investment scheme and projects like airports and high infrastructure solutions like ports, energy, renewables and many more.

Our specialization share is characterized following this scheme.

Financing & Eng. Specializa)on Turn Key 23% 44% 56%

Kinesis Group is specialized in value engineering, financing and Our group is specialized in very complex From Industry, Infrastructures and Roads, our group always find a way to reduce the cost and the duration of your foundations, land reclamation process, hydroelastic is actually providing very complex turn key scheme project, through well know and best responsible practices. platforms and many more. Our research and all over the world, our performance is covered with development division innovate and look always to KPI and the respect of planning and budget. provide the best financial and technical solution to our clients.

www.airports-kinesis.com Kinesis Group OVER THE WORLD A full international presence for investment and operation for several projects

Our presence over the world

Offices 46 Offices 28 Countries Penetration Index : 5.3% Development Ratio : 87%

www.airports-kinesis.com Kinesis Group OVER THE WORLD A group with very strong indicators based on Islamic Finance development Schemes and solid assets on Investments

0.50 31 percent 28 73 percent percent Leverage Ra)o per year Profitability of Group Revenue Solvency Growth on Airports Turn-keys (exp)

AKC & KINESIS CAPITAL INVESTMENT is sitting on very strong and solid potential, through very large infrastructure projects, our group is holding very good numbers and results through the years, our group performed a very good results in very few years, with a profitability ratio of 31% our group has a very high leverage ratio allowing the group to take risks on very high profile projects.

www.airports-kinesis.com IMAGE PLACE HOLDER

OVERVIEW INNOVATIVE FINANCIAL ENGINEERING For nearly five years our company has been committed to helping our KC&I is the first capital government clients, and those who rely on them, achieve financial security. and investment company to We partner with many of the world’s largest, most sophisticated investors and engineer very complex financial intermediaries to help them reach their goals through a rigorous, solutions for complex research-driven investment process spanning both indexing and active projects and institutions disciplines. With billions in infrastructures assets projects already signed and agreed , our scale and global reach offer clients unrivaled access to markets, geographies and asset classes, and allow us to deliver thoughtful insights and innovative solutions. KC&I – A UNIQUE INVESTMENT COMPANY

A unique vision for an investment and capital company specialized in very complex Infrastructure projects ABOUT US

Kinesis Capital & Investment is a diversified investment and asset management company headquartered in Vancouver with three pool of investments all dedicated to Complex Infrastructures and Real Estate projects.

Our company is focusing on identifying value accretive investment opportunities and assets in Asia and other countries all over the world that can be enhanced through the strategic involvement of KC&I established management team and its familiarity with the Asian investment market, value, growth and demand to help generate long-term value for shareholders.

With more than 4 Billions $ of net assets on operation without almost no debt; our company is well positioned to scale its investments and diversify its pool in order to generate more return and revenues to the investors.

Through this mother company KC&I is focusing on creating superior long-term returns for its shareholders using all possible financial or legal tools applicable.

Today, the company is well positioned to leverage its expertise and existing operations in Asia to build a comprehensive platform for the provision of lending and other financing solutions to the under-served small and medium enterprise segment.

www.airports-kinesis.com KC&I – A UNIQUE INVESTMENT COMPANY

A unique vision for an investment and capital company specialized in very complex Infrastructure projects ABOUT US

KC&I is strategically increasing its focus on investment opportunities in South east Asia with the goal of balancing its global footprint and diversifying its international exposure.

KC&I corporate structure, investment philosophy and culture reflect management’s commitment to the highest level of transparency and corporate governance standards.

These standards have been put in place to support the long-term interests of all stakeholders and strengthen management’s accountability.

Our financial engineering division is well experienced in transformation of very complex tools as an LTN, MTN, BONDS, SOVEREIGN GARANTEES, SUKUK and many more, using a very complex strategy KC&I will add value to your project by using a complex extraction mechanism to generate collaterals to use for financial investments and guarantees, KC&I is capable to raise more than 30 Bn $ on separated pool mechanism using a hybrid solution between conventional finance and non conventional finance systems.

www.airports-kinesis.com WHAT KC & I DO ? Kinesis Capital and Investment is specialized in various investment programs

INVESTMENT STRATEGY & VEHICLES COLLATERAL MANAGEMENT & SEGREGATION KC&I is specialized in Private Equity fund KC&I specialize in Collateral management and segregation, through services, Hedge Funds, Liquid Alternatives for our all dedicated engineering division, we can evaluate and use any Governments and Private Clients collateral.

ALTERNATIVE INVESTMENT WEALTH MANAGEMENT KC&I provides also alternative investments services on Our company offer a wide range of Family office services, Investment private equity or venture capital scheme funding new Management and Wealth and Estate planning with a specialization on and innovative start up companies. Aerotropolis and ports services.

ASSET SERVICING & FINANCIAL GARANTEES FINANCIAL ADVISORY KC&I specialize by delivering fund administration and KC&I provides tailored financial consultancy services to customers complex portfolio management services allowing our according to their specific needs, and assists customers in obtaining company to invest only on high potential and secured access to appropriate financial resources. We provide guarantee services, projects (open ended or close) our company scope of service plus investigation, research, locating sources of financing, and is wide and spread all over several countries. negotiation and closing of financing. In addition, we provide advice on financing, and cash flow planning and management, to better align customers’ cash generation activities with their required repayment schedule, thereby improving their liquidity and reducing their default risk

www.airports-kinesis.com KC&I FUNDS AVAILABLE Over a complete Dark Pool our company holds investment pools of more than 30 Billions $ for asset management projects in open end

Funds Division

The funds are available only for high skilled projects and not Funds for trading Funds for derivative Funds for Asset management available for medium and short term projects are our company is Funds for all type of investment Funds for Bio Medical Investment Funds for direct investment using hedge funds allowing medium and long term strategies.

3% 11% 29% of the funds 35% 9% generate 40% of yield per year over trading to secure the engineering 30% 12% & project risk 30 Billions $ available

www.airports-kinesis.com KC&I – SPECIALIZED IN ISLAMIC FINANCE FOR AIRPORTS A pool of investment specialized in Islamic Finance for Infrastructure projects

ISLAMIC FINANCE

KC&I is specialized in Islamic finance, our company holds specialists in this model of finance with two shariah board compliancy.

Our company mainly invest on Energy sectors, Infrastructure and Construction including airports and travel and transportation, our pool of investment represent 9% of the global investment scheme in this finance ethical model.

With more than 5 Bn $ available for investment without interest and shariah compliant, our company is actively seeking to investing in Islamic countries like Indonesia.

The financial and Islamic board already validated the North airport as a new ethical complete project and we are ready to invest without any interest in this project and share the revenues with the government by creating job, employment and wealth as the Islamic finance ask for.

www.airports-kinesis.com KC&I –ISLAMIC POOL OF INVESTMENTS FOR AIRPORTS Kinesis Capital and Investment is holding several pools of investments

Kinesis Capital and Investment is holding 3 Pools of Investments :

Pool KC-OAD – Open End Fund of 4.4 Bn $ -> 2 Bn $ on Conventional & 2.4 Bn $ on Ethical Finance

Pool KC-ADL – Close End Fund of 9 Bn $ -> 3 Bn $ on Conventional & 4 Bn $ on Ethical Finance

Dark Pool DSS – Dark Open Pool with a full bonded capacity on hybrid scheme of 20 Bn $ with low soft return over processing AIRPORTSINFRASTRUCTURE& TECHNOLOGY NEW INTERNET,COMMUNICATION TECH ENERGY RENEWABLES

AEROTROPOLIS Our company invest on 6 main sectors and is supported by 6 divisions all specialized in several fields : POOL OF INVESTMENT KINESIS CAPITAL & - Airports & Infrastructure INVESTMENT – ASSET - Renewable Energy Projects MANAGEMENT - Energy Distribution and Production - New Technologies and Software - Aerotropolis (Land Acquisition – Viabilisation and Development) - Bioengineering (including Nanotechnology for Medical) - ICT Distribution and Development

www.airports-kinesis.com PERFORMANCE OF KC&I POOL Four of the main pool are over performing this last years – reaching 80% of performance with short exit strategy for the pool of investment and our asset management specialists - provisional

6

ENERGY PROJECTS 1 5 4

ICT & NEW TECHNOLOGY 2 4

3 2 AEROTROPOLIS ANALYSIS 3 PERFORMANCE OF POOL 1 2 3

AIRPORTS & OTHER 4 INFRASTRUCTURE PROJECTS 1

0 ENERGY KP-POOL ICT POOL KP-POOL AEROTROPOLIS KP- AIRPORTS & INFRA POOL KP-POOL

www.airports-kinesis.com KC&I – SPECIALIZED IN ISLAMIC FINANCE

A pool of investment specialized in Islamic Finance for Infrastructure projects

ABOUT US

This map represent where KC&I investment is actually active in financing and investment strategies including islamic finance.

www.airports-kinesis.com KC&I – SPECIALIZED IN ISLAMIC FINANCE

A pool of investment specialized in Islamic Finance for Infrastructure projects

OUR SPECIALTY IN ETHICAL & CONVENTIONAL HYBRID FINANCE

www.airports-kinesis.com KC&I – SPECIALIZED IN ISLAMIC FINANCE

A pool of investment specialized in Islamic Finance for Infrastructure projects

OUR SPECIALTY IN ETHICAL & CONVENTIONAL HYBRID FINANCE

www.airports-kinesis.com SOME OF KC& I - PORTFOLIO PROJECTS

LIST OF PROJECT UNDER OUR PORTFOLIO FOR INVESTMENT AIRPORTS

JANUARY 2016

New Airport of Sharjah - UAE

PERFORMANCE +85% AKC & KC &I

For a total budget of 1.4 Bn $ invested in full Islamic finance Scheme.

Pool Investment : KC& I Bank : Abu Dhabi Bank Bank Collateral : Saudi Bank Unlocking : Conditionnal

www.airports-kinesis.com SOME OF AKC - PORTFOLIO PROJECTS

LIST OF PROJECT UNDER OUR PORTFOLIO FOR INVESTMENT

MARCH 2016

AEROTROPOLIS – PARIS FRANCE

PERFORMANCE +91% AKC & KC &I

AEROTROPOLIS For a total budget of 3 Bn $ invested in hybrid Islamic finance Scheme.

Pool Investment : KC& I Bank : Barclays UK Bank Collateral : Société Générale Unlocking : Over phasing

www.airports-kinesis.com SOME OF KC& I - PORTFOLIO PROJECTS

LIST OF PROJECT UNDER OUR PORTFOLIO FOR INVESTMENT

AIRPORTS NOVEMBER 2016

NEW BALI AIRPORT– INDONESIA

PERFORMANCE +45% AKC & KC &I

For a total budget of 2.3 Bn $ invested in hybrid Islamic finance Scheme.

Pool Investment : KC& I Bank : Abu Dhabi Bank Investment: AKC Investment & Macquarie Investment & Blackrock Financial Investment

Pool Effectiveness : 72% per annum Instrument Security : SLBC - 2016

www.airports-kinesis.com SOME OF KC& I - PORTFOLIO PROJECTS

LIST OF PROJECT UNDER OUR PORTFOLIO FOR INVESTMENT

MARCH 2016

AEROTROPOLIS – KERTAJATI

PERFORMANCE +56% AKC & KC &I

AEROTROPOLIS For a total budget of 7 Bn $ invested in hybrid Islamic finance Scheme.

Pool Investment : KC& I Bank : HSBC & ICBC Bank Collateral : Bank of Thailand Unlocking : On Development with the airport on process

www.airports-kinesis.com SOME OF KC& I - PORTFOLIO PROJECTS

LIST OF PROJECT UNDER OUR PORTFOLIO FOR INVESTMENT AIRPORTS

DECEMBER 2017

AMAC AIRPARK MALAYSIA

PERFORMANCE +81% AKC & KC &I & AWAN MEGA AKC

For a total budget of 2 Bn $ invested in hybrid finance Scheme.

Pool Investment : KC& I Bank Collateral : UOB

www.airports-kinesis.com SOME OF KC& I - PORTFOLIO PROJECTS

LIST OF PROJECT UNDER OUR PORTFOLIO FOR INVESTMENT AIRPORTS

SEPTEMBER 2017

1200 MW HABBANYAH POWER PLANT

PERFORMANCE +51% LOTUS ENERJI TURKEY – AKC – KC GROUP

A fixed group in partnership with the government of irak and the SOMO for the production of 1200 MW of electricity and energy

Pool Investment : KC& I & SOMO Bank Collateral : Mank Ashraf – Private Bank Caymans

www.airports-kinesis.com SOME OF KC& I - PORTFOLIO PROJECTS

LIST OF PROJECT AKC GROUP AIRPORTS 2017 2014 2013 2015

French Guyana Power and Cargo Wallis & Futuna – South Pacific Namibia Airports Male Airport - Maldives Operations MASTERPLANNING & AIRSIDE MASTERPLANNING & AIRSIDE MASTERPLANNING & AIRSIDE TURN KEY INCLUDING DESIGN – SERVICES SERVICES SERVICES MASTERPLANNING & FINANCING AKC RINCENT BTP AKC RINCENT BTP AKC RINCENT BTP AKC & SEMAFF Major Airside Services for the Major Airside Services for the Major Airside Services for the Development of a major power airport. airport. airport. plant and energy production center using a Air Cargo operation for the shipping of major goods necessary for the operation.

Client : Government of France Client : Government of France Client : Civil Aviation of Namibia Client : Government of Maldives Country : France & Europe Country : France – South Pacific Country : Namibia Country Country : Maldives

www.airports-kinesis.com SOME OF KC& I - PORTFOLIO PROJECTS

LIST OF PROJECT AKC GROUP AIRPORTS 2016 2013 2016 2014 Babylon New Airport – Babel Cayenne Airport – French Guyana Dushanbe Airport - Tadjikistan Pondok Cabe – Indonesia MASTERPLANNING & AIRSIDE MASTERPLANNING & AIRSIDE MASTERPLANNING & AIRSIDE MASTERPLANNING & FINANCIAL SERVICES SERVICES SERVICES AKC & CH2MHILL – GOLDMAN AKC RINCENT BTP AKC RINCENT AKC – TAC SACHS Major Airside Services for the Major Airside Services for the Major Masterplanning design & MasterPlanning design, financial airport. airport. Evaluation for with design and overview planning and financing proposal and realization financial structuration with of the complete overview Goldman Sachs

Client : Civ il Aviation Tadjikistan Client : PT Pertamina - EO Client : Ministry of Transportation Client : DGCA France Country : Tadjikistan Country : Indonesia – Java Island Country : Iraq Country : Government of France

www.airports-kinesis.com SOME OF KC& I - PORTFOLIO PROJECTS

LIST OF PROJECT AKC GROUP AIRPORTS 2015 2014 2016 2014 St Denis la Reunion – France La tantouta International Airport Pierrefonds Airport - Reunion Mitiga intl Airport – Libya MASTERPLANNING & AIRSIDE MASTERPLANNING & AIRSIDE MASTERPLANNING & FINANCIAL MASTERPLANNING & AIRSIDE SERVICES SERVICES SERVICES – BUSINESS PLAN SERVICES AKC RINCENT AKC RINCENT AIRPORT AKC RINCENT AIRPORT AKC INEO FRANCE - PWC Major Airside Services for the Major Airside Services for the MasterPlanning design, financial MasterPlanning design, financial airport. airport. design and overview planning and design and overview planning and financial structuration with financial structuration with PWC Reunion - Pierrefonds

Client : Ministry of Transportation Client : DGCA – Reunion France Client : DGCA – Tahiti France Client : Reunion Committee Country : Libya – LAHCOO Country : Government of France Country : Government of France Country : France

www.airports-kinesis.com SOME OF KC& I - PORTFOLIO PROJECTS

LIST OF PROJECT AKC GROUP AIRPORTS 2015 2014 2016 2017

Queen Alia Airport - Jordania Bobo Dialousso – Burkina Faso Lubumbashi Airport & Aerotropolis Bangui Airport – CAR

MASTERPLANNING & AIRSIDE MASTERPLANNING & AIRSIDE MASTERPLANNING & FINANCIAL MASTERPLANNING & AIRSIDE SERVICES SERVICES SERVICES – BUSINESS PLAN SERVICES

AKC RINCENT AKC RINCENT AIRPORT AKC & INEO - ACGT AKC RINCENT AIRPORT

Major Airside Services for the Major Airside Services for the MasterPlanning design, financial Major Airside Services for the airport. airport. design and overview planning and airport. financial structuration with financial engineering for bonds emissions

Client : Queen Alia Operation Client : ASECNA - DG Client : ACGT – Congo Travaux Client : Ministry of Transportation Country : Government of Jordan Country : Government of Burkina Country : Republic Congo Country : Central Africa Republic

www.airports-kinesis.com SOME OF KC& I - PORTFOLIO PROJECTS

LIST OF PROJECT AKC GROUP AIRPORTS 2015 2014 2016 2017

Queen Alia Airport - Jordania Bobo Dialousso – Burkina Faso Lubumbashi Airport & Aerotropolis Bangui Airport – CAR

MASTERPLANNING & AIRSIDE MASTERPLANNING & AIRSIDE MASTERPLANNING & FINANCIAL MASTERPLANNING & AIRSIDE SERVICES SERVICES SERVICES – BUSINESS PLAN SERVICES

AKC & RINCENT AKC – RINCENT AIRPORT AKC & INEO - ACGT AKC & RINCENT AIRPORT

Major Airside Services for the Major Airside Services for the MasterPlanning design, financial Major Airside Services for the airport. airport. design and overview planning and airport. financial structuration with financial engineering for bonds emissions

Client : Queen Alia Operation Client : ASECNA - DG Client : ACGT – Congo Travaux Client : Ministry of Transportation Country : Government of Jordan Country : Government of Burkina Country : Republic Congo Country : Central Africa Republic

MORE PROJECTS AVAILABLE ON DEMAND OVER EMAIL TO [email protected]

www.airports-kinesis.com SOME OF AKC INDONESIA EXPERIENCE

INDONESIA LIST OF PROJECT UNDER OUR PORTFOLIO

CONTRACT PROJECT LOCATIONS OWNER NO./DATE 2 3 4 5 Consulting Services : Business Plan 40/SPJ-DIR/BIJB/XI/2015 and Action Plan - Kertajati West Java International Airport 16 Nov 2015 International Airport Aerocity

04.DELH/PERJ/SK- EIA Study on Airport, Cluster IV Directorate General of Civil Aviation DBU/IVII/2015 28 July 2015

MASTERPLANNING 11.DELH/PERJ/SK- EIA Study on Airport, Cluster IX Jakarta Directorate General of Civil Aviation DBU/IX/2015 22 Sep 15

KU,001/SOO/002/II/GWT- Landside DED Study (1 package) Gewayantana Airport Technical Implemetation Unit 2015 11 Feb 15 Berau Kalimatan Supervision on Taxiway and Apron Timur Directorate General of Civil Aviation 610/KU.003/PHB-KLM/2014 Construction -Maratua Airport East Kalimarau Airport

Directorate General of Civil Aviation Landside and Airside DED Study (1 Padangsidempuan Aek Godang Airport Padang Sidempuan NU.003/11/20/AGD-2014 package) Aek Godang Directorate General of Civil Aviation Supervision on Pantar Airport Mali-Alor Mali - Alor KU.103/PPK.BMA/14/MA-14 CONSULTING & CONSULTING Construction

www.airports-kinesis.com SOME OF AKC _ INDONESIA EXPERIENCE

INDONESIA LIST OF PROJECT UNDER OUR PORTFOLIO

Directorate General of Civil Aviation Supervision on Murung Raya Airport Mali - Alor Palangkaraya KU.003/035/3166/TJR.PLK.13 Construction

Feasibility Studi (FS) Bandar Udara Kab. South Bolaang Dinas Perhubungan Komunikasi dan 009/KONTRAK/PKDI- Bolaang Mongondow Informatika BMS/V/2014 9 May 14

Feasibility Study (FS) of South Bolang South Bolaang Dept. of Transportation Communication and 009/KONTRAK/PKDI- MASTERPLANNING Mongondow Airport Mongondow Informatics BMS/V/2014 9 May 14

Studi Kelayakan (FS) dan Rencana Induk Dinas Perhubungan, Komunikasi dan 02-SP/PPK- Bulukumba (MP) Perencanaan Informatika SKRI/DISHUB/V/2014

Feasibility Study (FS) and Master Plan Dept. of Transportation Communication and 02-SP/PPK- Bulukumba (MP) of Bulukumba Airport Construction Informatics SKRI/DISHUB/V/2014

Pekerjaan Pembuatan Pedoman Audit Kementerian Perhubungan Direktorat Jenderal 20/PERJ/SK-DBU/IX/2014 Jakarta Kinerja Pengusahaan Perhubungan Udara 12 Sep 14

Establishment of Business Performance 20/PERJ/SK-DBU/IX/2014 Jakarta Directorate General of Civil Aviation Audit Guidelines in Airport 12 Sep 14 CONSULTING & CONSULTING

www.airports-kinesis.com SOME OF AKC _ INDONESIA EXPERIENCE

INDONESIA LIST OF PROJECT UNDER OUR PORTFOLIO

Pekerjaan Penulisan dan Penerbitan Buku Kementerian Perhubungan Direktorat Jenderal 21/PERJ/SK-DBU/IX/2014 Jakarta Bandar Udara Di Indonesia Perhubungan Udara 15 Sep 14

Writing and Publishing "Airports in 21/PERJ/SK-DBU/IX/2014 Jakarta Directorate General of Civil Aviation Indonesia" Book 15 Sep 14

Master Plan, Obstacle Limitation Surface South Bolaang Dept. of Transportation Tourism 073.a/KONTRAK/PKDI- and Noise Mapping of South Bolang

MASTERPLANNING Mongondow Communication and Informatics BMS/VI/2014 Mongondow Airport

Directorate General of Civil Aviation Rokot SPP.04/VI/PPK-RKT/2014 DED of Rokot Airport Rokot - Sipora Airport - Sipora 4 June 14

Study of Business Zoning Model in 19/PERJ/SK-DBU/IX/2014 Jakarta Directorate General of Civil Aviation Airport 5 Sep 14

Air Transportation Infrastructure and Dept. of Transportation Communication and PPK-Udara/SPK- Bengkalis Facilities Construction Planning Informatics KONSULTAN/08/2013

Pekerjaan Penulisan dan Penerbitan Buku Kementerian Perhubungan Direktorat Jenderal 21/PERJ/SK-DBU/IX/2014 Jakarta Bandar Udara Di Indonesia Perhubungan Udara 15 Sep 14 CONSULTING & CONSULTING

www.airports-kinesis.com SOME OF AKC _ INDONESIA EXPERIENCE

INDONESIA LIST OF PROJECT UNDER OUR PORTFOLIO

Alor District Government, Dept. DED of Landside and Airside Facilities - 569/651/Dishub.Kom.Info/X/20 Alor of Transportation Communication and Kabir Airport 13 Informatics 01-SP/PPK- Feasibility Study of New Airport in Bulukumba Bulukumba District Government SKBUB/DISHUB/VII/2013 Bulukumba 22 June 13 Study on Depot Needs and Construction for Aircraft Fuel To Increase the Aircraft KU.003/VI/6/PBJK-BLTU-2013 Jakarta Civil Aviation Research And Development MASTERPLANNING Operations Efficiency on Aviation 25 March 13 Research And Development Study of Cooperation Model of 17/PERJ/SK-DBU/X/2013 Government and Private in the Airport Jakarta Directorate General of Civil Aviation 1 Oct 13 Services Field

Master Plan Review of Soekarno Hatta Directorate General of Civil Aviation PJJ.02.07/00/02/2013/028 Jakarta Airport -Tangerang 18 Feb 13

Intergrated Study of Air Transport Service KU.003/VII/17-BLTU-2012 Conectivity Corridor 3 (Kalimantan) and Jakarta Civil Aviation Research And Development 16 March 12 Corridor 4 () to Support MP3EI Alor District Government, Dept. DED of Landside and Airside Facilities - 569/651/Dishub.Kom.Info/X/20 Alor of Transportation Communication and Kabir Airport 13

CONSULTING & CONSULTING Informatics

www.airports-kinesis.com SOME OF AKC _ INDONESIA EXPERIENCE

INDONESIA LIST OF PROJECT UNDER OUR PORTFOLIO

Dinas Perhubungan Komunikasi dan Studi AMDAL Pembangunan Bandara Lamandau 027/158/HUB/IV/2012 Informatika

Dept. of Transportation Communication and EIA Study of Airport Construction Lamandau 027/158/HUB/IV/2012 Informatics

DED Review Pasir Pengairan Airport - Dept. of Transportation Rokan Hulu District 053.10/PPK-DISHUB/IX/2011 Rokan

MASTERPLANNING Rokan Hulu Government 8 Sep 11

Dept. of Transportation DED of Airside - , 09/PERS/SK-DBU/IV/2011 Directorate General of Civil Aviation Ternate 14 Apr 11

Environmental Evaluation Document on No SP3 02.04/00/08/2011/014 Minangkabau International Airport, Padang Head Quarters 15 Aug 11 Padang Dept. of Transportation Study of Reformation Bureaucracy in 05/KTR/REN/PPK/VII/2011 Muara Directorate General of Civil Aviation Directorate General of Civil Aviation 7 July 11

Master Plan of Minangkabau International PJJ.02.07/00/06/2011/110 Padang Head Quarters Airport, Padang 6 June 11 CONSULTING & CONSULTING

www.airports-kinesis.com SOME OF AKC _ INDONESIA EXPERIENCE

INDONESIA LIST OF PROJECT UNDER OUR PORTFOLIO

Supervision on (1 package) Continuation of Apron and Taxiway Construction for Surabaya Directorate General of Civil Aviation Surabaya PBUJ-SUB/I/2010 VIP Terminal Phase II East Side IP-514 - 01/ Juanda Airport, Surabaya 10/PERJ/SK-DBU/VI/2010 Associated With Master Plan Andi Jema, Seko and Rampi Sulawesi Directorate General of Civil Aviation PT. Lapi Ganeshatama Consulting Airports 25 June 10

Master Plan of Juwata Airport Class 1 (1 Dept. of Transportation Directorate General of KU.103/BM-JWT/II/2010 Tarakan 63/ package), Tarakan Civil Aviation Juwata - Tarakan Feb 10 MASTERPLANNING 17

Document of Environmental Management Dept. of Transportation Directorate General of PERJ/SK-DBU/V/2009 and Monitoring of Airports in Tarakan Jakarta 05/ Civil Aviation May 09 and 29-

Dept. of Transportation Bangka Belitung SPK/08/DISHUB/2009 Study of Road Transportation Network Bangka Belitung 550/ Province Government 8 June 2009 07/SDAU/MPA/VI/2008 Dept. of Transportation 07 June 2008 Master Plan of Air Transportation in Directorate General of Civil Aviation Surabaya Jakarta Associated With Indonesia Directorate of Air Transportation PT. Digratia Avia

Dept. of Transportation 17/KTR/KUM/PPK/XI/2008 Licensing Guide Book in Aviation Field Jakarta Directorate General of Civil Aviation CONSULTING & CONSULTING 17 November 2008

www.airports-kinesis.com SOME OF AKC _ INDONESIA EXPERIENCE

INDONESIA LIST OF PROJECT UNDER OUR PORTFOLIO

07/PERJ/SK-DTBU/VII/2008 Dept. of Transportation Benefit Monitoring Evaluation (BME) 07 July 2008 Surabaya Directorate of Airport Engineering Juanda Airport, Surabaya KSO PT. Bennanta Jasindo

KNT.09/SDAU/PML/VI/2007 Evaluation of International Entrance Dept. of Transportation 06 June 2007 Arrangement Criteria to Support Directorate of Air Transportation Associated With International tourism PT. Puser Bumi

05/PERJ/SK-DTBU/V/2007 Benefit Monitoring Evaluation (BME) SM. Dept. of Transportation 31 May 2007 Badaruddin II Airport, MASTERPLANNING Directorate of Airport Engineering Associated With Palembang PT. Kencana Mandiri U.N

11/PERJ/DTBU/VII/2006 Benefit Monitoring And EvaluationBenefit Dept. of Transportation 21 July 2006 Monitoring And Evaluation North Sumatera Directorate of Airport Engineering Associated With (BME) FL Tobing PT. Rutarona Cipta Sibolga 05/PERJ/SK-DTBU/VII/2006 19 July 2006 Dept. of Transportation Associated With AJAT-3 Asean Japan Airport Study Jakarta Directorate of Airport Engineering PT. Konsultansi Pembangunan Atmadasa CONSULTING & CONSULTING

www.airports-kinesis.com SOME OF AKC _ INDONESIA EXPERIENCE

INDONESIA LIST OF PROJECT UNDER OUR PORTFOLIO

07/PERJ/SK-DTBU/VII/2008 Dept. of Transportation Benefit Monitoring Evaluation (BME) 07 July 2008 Surabaya Directorate of Airport Engineering Juanda Airport, Surabaya KSO PT. Bennanta Jasindo

KNT.09/SDAU/PML/VI/2007 Evaluation of International Entrance Dept. of Transportation 06 June 2007 Arrangement Criteria to Support Directorate of Air Transportation Associated With International tourism PT. Puser Bumi MASTERPLANNING CONSULTING & CONSULTING

www.airports-kinesis.com NEW PROJECTS AKC LIST OF NEW PROJECTS SIGNED AND AGREED WITH AKC & KC & INVESTMENT

GENERAL AVIATION OF CHINA AIRPORTS - CHINA REIT

CO-INVESTMENT OVER REIT MARKET PRIMARY SCHEME WITH KINESIS CAPITAL, KINESIS GROUP & HEBEI GROUP CHINA INVEST, INVEST SINO GROUP

OFFICIAL OPERATOR : AIRPORTS KINESIS CANADA

www.airports-kinesis.com AKC Kinesis Group & KC& I 201-4501 Kingsway, unit 133 Burnaby, BC, V5H 0E5 – CANADA Tel : 514 426 6156 Fax : 514 426 6106 Email : [email protected] Web : airports-kinesis.com