Re: IE12.12

Attachment 3A: Transportation Services Major Capital Projects 2018 - 2020

Location Ward Owner Program name Status Start year End year Description Scope LANGFIELD CRES from WELLS HILL AVE from LYNDHURST AVE to ST CLAIR AVE Transportation 01 Local Road Resurfacing Completed 2018 2018 SILVERSTONE DR to DORWARD Local Road Resurfacing W Services DR

DISCO RD from CARLINGVIEW PRINCE GEORGE DR from ISLINGTON AVE to THE Transportation 01 Local Road Resurfacing Active 2018 2018 DR to [SB] HIGHWAY 427 S Local Road Resurfacing KINGSWAY Services [UNDERPASS]

DISCO RD from CARLINGVIEW PALACE ARCH DR from PRINCE GEORGE DR to PRINCESS Transportation Attwell Dr to Carlingview 01 Sidewalk Construction Completed 2018 2018 DR to [SB] HIGHWAY 427 S MARGARET BLVD Services (north side) [UNDERPASS] Transportation KIPLING AVE from BELFIELD RD Main St from Kingston Rd to 01 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing Services to ALBION RD [S] EASTERN AVE DIVERSION [BRANCH] from [E] DON WESTWYND CRT from Transportation VALLEY PKWY [BRIDGE] to [S/E] EASTERN AVE 01 Local Road Resurfacing Completed 2018 2018 LONGBOURNE DR to Local Road Resurfacing Services DIVERSION [RAMP] LONGBOURNE DR LAWRENCE AVE E from CENTENNIAL RD to Transportation LONGBOURNE DR from MARTIN 01 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing MEADOWVALE RD Services GROVE RD to WILLOWRIDGE RD

Transportation Local Road ARCOT BLVD from TANDRIDGE Finch Ave W from Dufferin St to Wilmington St 01 Completed 2018 2018 Local Road Reconstruction Services Reconstruction CRES to ALBION RD

[37 m N] WOBURN AVE from GREY RD to [143 m E] GREY Transportation Local Road NAMCO RD from KIPLING AVE 01 Active 2018 2018 Local Road Reconstruction RD Services Reconstruction to [180 m S] KIPLING AVE [END]

Transportation Local Road TANDRIDGE CRES from ARCOT HURLEY CRES from PACKARD BLVD to MCCOWAN RD 01 Completed 2018 2018 Local Road Reconstruction Services Reconstruction BLVD to BYNG AVE (ETBK) Transportation KIPLING AVE from REXDALE UNDER LAWRENCE AVE from to 01 Major Road Resurfacing Completed 2018 2018 Major Road Resurfacing Services BLVD to WESTHUMBER BLVD F G GARDINER XY W, F G GARDINER XY E from DAN Transportation KIPLING AVE from BELFIELD RD 01 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing LECKIE WAY to SPADINA AVE Services to WESTHUMBER BLVD DETLING CRT from WAXHAM RD Transportation Ralph St from MacDonald Ave to Lawrence Ave W 01 Local Road Resurfacing Completed 2018 2018 to [55 m S] WAXHAM RD [CUL- Local Road Resurfacing Services DE-SAC] ULLSWATER CRT from Ellesmere Rd over Massey Creek from HIGHLAND CREEK Transportation 01 Local Road Resurfacing Completed 2018 2018 SILVERSTONE DR to [66 m S] Local Road Resurfacing to Services SILVERSTONE DR [CUL-DE-SAC] Transportation GUNTON DR from AMORO DR Coxwell Ave under rail from CNR to 01 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services to WESTHUMBER BLVD

Source: MCIC data Note: Future projects subject to change Page 1 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation CARRIER DR from HWY 27 to Centennial Rd over Creek from HIGHWAY 2A to 01 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services ALBION RD MURCHISON CRES from Toledo Rd over Elmcrest Creek from RENFORTH CREEK Transportation 01 Local Road Resurfacing Completed 2018 2018 BLACKBUSH DR to BLACKBUSH Local Road Resurfacing to Services DR ELMCLIFFE CRT from [67 m S] LAUGHTON AVE from DAVENPORT RD to HOUNSLOW Transportation 01 Local Road Resurfacing Completed 2018 2018 SILVERSTONE DR [CUL-DE-SAC] Local Road Resurfacing HEATH RD Services to SILVERSTONE DR NIVEN ST from [45 m N/E] WILLOWDALE AVE from EMPRESS AVE to ELMWOOD Transportation 01 Local Road Resurfacing Completed 2018 2018 JEFFCOAT DR [END] to Local Road Resurfacing AVE Services JEFFCOAT DR JEFFCOAT DR from Transportation PAPE AVE from BROWNING AVE to SAMMON AVE 01 Local Road Resurfacing Completed 2018 2018 WESTHUMBER BLVD to Local Road Resurfacing Services PORTERFIELD RD Transportation IXWORTH RD from GUNTON DR SACKVILLE ST from SHUTER ST to WELLESLEY ST 01 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services to WEST HUMBER BLVD KIRKSIDE CRT from Transportation CARLAW AVE from BROWNING AVE to GOWAN AVE 01 Local Road Resurfacing Completed 2018 2018 SILVERSTONE DR to [25 m N] Local Road Resurfacing Services SILVERSTONE DR [RING] EDENROCK CRT from MERRILL BRIDGE RD from WEST LYNN AVE to EAST LYNN Transportation 01 Local Road Resurfacing Completed 2018 2018 SILVERSTONE DR to [25 m N] Local Road Resurfacing AVE Services SILVERSTONE DR [CUL-DE-SAC] FONDY CRT from NEEDHAM DR GREENLAW AVE from DAVENPORT RD to ROSEMOUNT Transportation 01 Local Road Resurfacing Completed 2018 2018 to [116 m S] NEEDHAM DR [CUL- Local Road Resurfacing AVE Services DE-SAC] ALEXANDER MUIR RD from YONGE ST to BLYTHWOOD Transportation IRON ST from VULCAN ST to 01 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing RAVINE PARK TRL Services [295 m S] BELFIELD RD [END] Transportation NEEDHAM DR from JEFFCOAT ROSEHEATH AVE from HANSON ST to COPELAND AVE 01 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services DR to [48 m N] NEEDHAM DR

PALMERSTON AVE from BLOOR ST W to PALMERSTON Transportation BURTONWOOD CRES from 01 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing SQ Services DORWARD DR to NETHERLY DR Transportation VULCAN ST from MARTIN PALMERSTON AVE from PALMERSTON SQ to DUPONT ST 01 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services GROVE RD to CITY VIEW DR LITCHFIELD CRT from BLACKTHORN AVE from CAMERON AVE to EGLINTON Transportation 01 Local Road Resurfacing Completed 2018 2018 SILVERSTONE DR to [142 m E] Local Road Resurfacing AVE W Services SILVERSTONE DR [CUL-DE-SAC] BALLATER CRT from [56 m S] DONALD AVE from SILVERTHORN AVE to HAVERSON Transportation 01 Local Road Resurfacing Completed 2018 2018 SILVERSTONE DR [CUL-DE-SAC] Local Road Resurfacing BLVD Services to SILVERSTONE DR

Source: MCIC data Note: Future projects subject to change Page 2 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope GRACELAND CRT from CAULFIELD RD from BURRARD RD to Transportation 01 Local Road Resurfacing Completed 2018 2018 SILVERSTONE DR to [37 m N] Local Road Resurfacing RECREATIONAL TRL Services SILVERSTONE DR [CUL-DE-SAC]

Transportation NETHERLY DR from DORWARD GRANGEWAY AVE from BUSHBY DR to PROGRESS AVE 01 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services DR to SILVERSTONE DR PARKVIEW HILL CRES from WOODBINE HEIGHTS BLVD to Transportation FINCH AVE W from HUMBER 01 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing ST CLAIR AVE E (E YK) Services RIVER to HWY 427 Transportation Local Road COVE DR from SHENDALE DR to SANDRA RD from O'CONNOR DR to ST CLAIR AVE E (E YK) 01 Active 2019 2019 Local Road Reconstruction Services Reconstruction GOLFDOWN DR Transportation RIVERHEAD DR from BARWELL SUMMERFIELD CRES from ODESSA AVE to ODESSA AVE 01 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services CRES to BARFORD RD Transportation On Street Bikeway Brookmere Rd from Kipling Ave Installation of Quiet Street MC ALPINE ST from MC MURRICH ST to DAVENPORT RD 01 Active 2019 2019 Services Paving Markings to Elmhurst Dr Routes CAULFIELD RD from BURRARD Transportation On Street Bikeway Installation of Quiet Street DEFOREST RD from LAVINIA AVE to WINDERMERE AVE 01 Active 2019 2019 RD to HUMBER RIVER Services Paving Markings Routes RECREATIONAL TRL BERGAMOT AVE from 213.9 m Transportation On Street Bikeway Installation of Quiet Street ELM AVE from SHERBOURNE ST N to NANTON AVE 01 Active 2019 2019 W ISLINGTON AVE to BURRARD Services Paving Markings Routes RD WELLINGTON ST W from WALNUT AVE to STRACHAN Transportation On Street Bikeway BURRARD RD from CAULFIELD Installation of Quiet Street 01 Active 2019 2019 AVE Services Paving Markings RD to BERGAMOT AVE Routes Transportation On Street Bikeway Elmhurst Dr from Islington Ave Installation of Quiet Street RICHMOND ST W from NIAGARA ST to STANLEY TER 01 Active 2019 2019 Services Paving Markings to BROOKMERE RD Routes WOODBINE DOWNS BLVD from GLENGROVE AVE from BATHURST ST to DALEMOUNT Transportation 01 Local Road Resurfacing Active 2019 2019 FINCH AVE W to [324 m N] Local Road Resurfacing AVE Services CARRIER DR [CUL-DE-SAC]

CAMBRIDGE AVE from DANFORTH AVE to CHESTER HILL Transportation BLACKBUSH DR from DORWARD 01 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing RD Services DR to MOUNT OLIVE DR HUDDERSFIELD RD from Transportation MARSHA DR from EARLTON RD to DEMPSTER ST 01 Local Road Resurfacing Active 2019 2019 HUMBERLINE DR to CLAIREVILLE Local Road Resurfacing Services RD OSSINGTON AVE from HUMBERT ST, [30.50 m N] QUEEN MAGDALENA CRT from KIDRON Transportation ST W, BRUCE ST, REBECCA ST to HUMBERT ST, ARGYLE 01 Local Road Resurfacing Active 2019 2019 VALLEY DR to [103 m N] KIDRON Local Road Resurfacing Services ST, BRUCE ST, REBECCA ST VALLEY DR [CUL-DE-SAC] QUEENS PLATE DR from Transportation Bloor St W from The East Mall to Islington Ave 01 Local Road Resurfacing Active 2019 2019 REXDALE BLVD to REXDALE Local Road Resurfacing Services BLVD

Source: MCIC data Note: Future projects subject to change Page 3 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope KIPLING AVE from MOUNT KIPLING AVE from MOUNT OLIVE DR to [136.39 m N] Transportation Major Road 01 Active 2020 2020 OLIVE DR to [136.39 m N] Major Road Reconstruction STEELES AVE W [CITY LIMITS] Services Reconstruction STEELES AVE W [CITY LIMITS] Transportation KIPLING AVE from MOUNT KIPLING AVE from MOUNT OLIVE DR to STEELES AVE W 01 Bikeway Trail Active 2020 2020 Installation of multi-use trail Services OLIVE DR to STEELES AVE W Infrastructure 2200 Islington Ave - Transportation Islington Ave from Rexdale Blvd 01 Enhancement - Active 2019 2020 Islington Ave from Rexdale Blvd Reconfiguration of Islinton Ave Services Construction Stage and Rexdale Blvd intersection.

KIDRON VALLEY DR from GIHON SPRING DR to KIPLING Transportation KIDRON VALLEY DR from GIHON 01 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing AVE Services SPRING DR to KIPLING AVE Transportation MARTIN GROVE RD from FINCH MARTIN GROVE RD from FINCH AVE W to ALBION RD 01 Major Road Resurfacing Active 2020 2020 Major Road Resurfacing Services AVE W to ALBION RD NORTHOLT CRT from ISLINGTON DISCO RD from CARLINGVIEW DR to [SB] HIGHWAY 427 Transportation 02 Cold In Place Recycling Active 2018 2018 AVE to [71 m E] ISLINGTON AVE Local Road Reconstruction S [UNDERPASS] Services [CUL-DE-SAC]

PLUMBSTEAD CRT from SIR WILLIAMS LANE to [193 m E] Transportation THE WYND ST from RATHBURN 02 Cold In Place Recycling Active 2018 2018 Local Road Resurfacing SIR WILLIAMS LANE [CUL-DE-SAC] Services RD to THORNCREST RD

PHEASANT LANE from Transportation BIRCHMOUNT RD from HYDRO R O W to STEELES AVE E 02 Cold In Place Recycling Active 2018 2018 RATHBURN RD to [274 m W] Local Road Resurfacing Services THORNCREST RD [CUL-DE-SAC]

PLUMBSTEAD CRT from SIR Transportation CRAVEN RD from QUEEN ST E to GERRARD ST E 02 Cold In Place Recycling Active 2018 2018 WILLIAMS LANE to [193 m E] SIR Local Road Resurfacing Services WILLIAMS LANE [CUL-DE-SAC] PRINCE GEORGE DR from Transportation MAIN ST from GERRARD ST E to KINGSTON RD 02 Local Road Resurfacing Active 2018 2018 ISLINGTON AVE to THE Local Road Resurfacing Services KINGSWAY PALACE ARCH DR from PRINCE RICHMOND ST E from [W] KING ST E [BRIDGE] to Transportation 02 Cold In Place Recycling Active 2018 2018 GEORGE DR to PRINCESS Local Road Reconstruction SUMACH ST Services MARGARET BLVD Transportation PRINCE GEORGE DR from THE Woodbine Ave from O'Connor Dr to Woodbine Ave 02 Cold In Place Recycling Active 2018 2018 Local Road Resurfacing Services KINGSWAY to KIPLING AVE THE WESTWAY from ROYAL Transportation BYNG AVE (ETBK) from ALBION RD to TANDRIDGE CRES 02 Major Road Resurfacing Active 2018 2018 YORK RD to [116 m E] MARTIN Major Road Resurfacing Services GROVE RD

Source: MCIC data Note: Future projects subject to change Page 4 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Potential sidewalk widening, turn radius adjustment, bulb- EGLINTON AVE W from RAKELY CRT to ETOBICOKE Transportation Pedestrian Infrastructure THE WESTWAY from ISLINGTON outs, or other pedestrian 02 Active 2018 2018 CREEK NORTH TRL Services Improvement AVE to MARTIN GROVE RD infrastructure improvements. Applying complete streets principles where possible.

Potential sidewalk widening, turn radius adjustment, bulb- PLASTIC AVE from QUEEN ELIZABETH BLVD to THE Transportation Pedestrian Infrastructure THE WESTWAY from [79 m E] outs, or other pedestrian 02 Active 2018 2018 QUEENSWAY Services Improvement WINCOTT DR to KIPLING AVE infrastructure improvements. Applying complete streets principles where possible.

Potential sidewalk widening, turn radius adjustment, bulb- FINCHLEY RD from HILLDOWNTREE RD, CHESTNUT HILLS Transportation Pedestrian Infrastructure THE WESTWAY from ISLINGTON outs, or other pedestrian 02 Active 2018 2018 PKWY to CHESTNUT HILLS PKWY Services Improvement AVE to HARTSDALE DR infrastructure improvements. Applying complete streets principles where possible.

Islington Avenue from Humber River to north of Rexdale Transportation CLEMENT RD from BRAMPTON 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Boulevard Services RD to MARTIN GROVE RD EDENBROOK HILL from MORNINGSIDE AVE (TO) from [E] MORNINGSIDE AVE Transportation 02 Local Road Resurfacing Active 2018 2018 EDENBRIDGE DR to Local Road Resurfacing (TO) [END] to RIVERSIDE DR (TO) Services RIPPLEWOOD RD EGLINTON AVE W from RAKELY Transportation Kingston Rd from Lawrence Ave E to 02 Bikeway Trail Active 2018 2018 CRT to ETOBICOKE CREEK Installation of bikeway trail Services NORTH TRL BETH NEALSON DR from THORNCLIFFE RD to WICKSTEED Transportation DONALBERT RD from MARTIN 02 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing AVE Services GROVE RD to DORLEN AVE

Transportation DORLEN AVE from DONALBERT CARSON ST from HORNER AVE to [10m S] HORNER AVE 02 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services RD to RATHBURN RD RIVERSTONE DR from VISTA BOULTON DR from RUSSELL HILL RD to [70m W] RUSSELL Transportation 02 Local Road Resurfacing Active 2018 2018 HUMBER DR to LAWRENCE AVE Local Road Resurfacing HILL RD Services W FINCHLEY RD from PENHURST AVE from [61 m S] DALESFORD RD [CUL-DE- Transportation 02 Local Road Resurfacing Active 2018 2018 HILLDOWNTREE RD to Local Road Resurfacing SAC] to Services CHESTNUT HILLS PKWY

Source: MCIC data Note: Future projects subject to change Page 5 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope QUEENSBOROUGH CRES from Transportation BROWNLEA AVE from KINGDOM ST to RAYMORE DR 02 Local Road Resurfacing Active 2018 2018 STRATHDEE DR to STRATHDEE Local Road Resurfacing Services DR CHESTNUT HILLS PKWY from [N] Redwater Dr over Humber River Tributary from BERRY Transportation 02 Local Road Resurfacing Active 2018 2018 HERNE HILL [END] to [N/E] Local Road Resurfacing CREEK to Services FINCHLEY RD [BRANCH]

WHITBURN CRES from BLAYDON AVE to [225 m W] Transportation LANDRON CRES from SUN ROW 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing BLAYDON AVE [S limit] Services DR to SUMMITCREST DR [N] PALMERSTON SQ [BRANCH] from PALMERSTON AVE Transportation HARROP AVE from DORLEN AVE 02 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing to PALMERSTON AVE Services to VANGUARD DR COPELAND AVE from ROSEHEATH AVE to WEST LYNN Transportation EDENBRIDGE DR from ROYAL 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing AVE Services YORK RD to THE KINGSWAY Transportation SAGAMORE CRES from PALMERSTON BLVD from COLLEGE ST to BLOOR ST W 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services GENTIAN DR to ASHFIELD DR FELSTEAD AVE from GREENWOOD AVE to PARKMOUNT Transportation CANTERBURY RD from THE 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing RD Services KINGSWAY to WIMBLETON RD

DUNDURN RD from STRATHGOWAN AVE to DINNICK Transportation BROOK TREE CRES from 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing CRES Services LANDRON CRES to SUN ROW DR LAURELWOOD CRES from Transportation LANSDOWNE AVE from QUEEN ST W to RIDEAU AVE 02 Local Road Resurfacing Active 2018 2018 BROOK TREE CRES to SUN ROW Local Road Resurfacing Services DR Transportation REIGATE RD from ST GEORGES OSSINGTON ST from DEWSON ST to DEWSON ST 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services RD to HERNE HILL MANORHAMPTON DR from Transportation HANSON ST from PARKMOUNT RD to ROSEHEATH AVE 02 Local Road Resurfacing Active 2018 2018 RUSSELL RD to SUMMITCREST Local Road Resurfacing Services DR DEERFOOT RD from Transportation BAY ST from FRONT ST W to DUNDAS ST W 02 Local Road Resurfacing Active 2018 2018 LAURELWOOD CRES to Local Road Resurfacing Services ISLINGTON AVE Transportation CANTERBURY CRES from THE BLUE JAYS WAY from NAVY WHARF CRT to KING ST W 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services KINGSWAY to THE KINGSWAY

SILVERTHORN AVE from ST CLAIR AVE W to KERSDALE Transportation SEDGELEY DR from CALLOWHILL 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing AVE Services DR to MARTIN GROVE RD LLOYD MANOR RD from [N] Transportation DINNICK CRES from DUNDURN RD to LAWRENCE AVE E 02 Local Road Resurfacing Active 2018 2018 FIRWOOD CRES to PRINCESS Local Road Resurfacing Services MARGARET BLVD Transportation FARLEY CRES from CALLOWHILL BRUNSWICK AVE from HARBORD ST to DUPONT ST 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services DR to CALLOWHILL DR

Source: MCIC data Note: Future projects subject to change Page 6 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation MIDDEN CRES from SEDGELEY ROSEMOUNT AVE from GREENLAW AVE to ALBERTA AVE 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services DR to CALLOWHILL DR ST GEORGES RD from Transportation DUPONT ST from HOWLAND AVE to BRUNSWICK AVE 02 Local Road Resurfacing Active 2018 2018 WIMBLETON RD to LAMBETH Local Road Resurfacing Services RD WEST LYNN AVE from COPELAND AVE to MERRILL Transportation BUCKLEY CRES from CLEMENT 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing BRIDGE RD Services RD to CALLOWHILL DR Transportation RUSSELL RD from EGLINTON WINONA DR from DAVENPORT RD to ST CLAIR AVE W 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services AVE W to SUMMITCREST DR Transportation CLEMENT RD from BRAMPTON CARLTON ST from SACKVILLE ST to RD 02 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services RD to BRAMPTON RD LLOYD MANOR RD from NAVY WHARF CRT from BREMNER BLVD to BLUE JAYS Transportation 02 Local Road Resurfacing Active 2018 2018 WINTERTON DR to EGLINTON Mill and Pave WAY Services AVE W BURNHAMILL PL from OLD Transportation Utility Cut Road BURRARD RD from CAULFIELD RD to BERGAMOT AVE 02 Active 2019 2019 BURNHAMTHORPE RD to MILL Utility Cut Road Rehabilitation Services Rehabilitation RD GLOS RD from [72 m E] Transportation MCNAB BLVD from AYRE POINT RD to KINGSTON RD 02 Cold In Place Recycling Active 2019 2019 CRENDON DR to [102 m E] Local Road Reconstruction Services CRENDON DR VANGUARD DR from COWLEY BRUNSWICK AVE from [177.10 m N] COLLEGE ST (TO) to Transportation Utility Cut Road 02 Active 2018 2019 AVE to UPPER HUMBER DR [CUL- Utility Cut Road Rehabilitation ULSTER ST Services Rehabilitation DE-SAC] [27.50 m E] BROADVIEW AVE from MILLBROOK CRES to Transportation ROYAL YORK RD from 02 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing [26.50 m N] MILLBROOK CRES Services SUMMITCREST DR to DIXON RD

Transportation WEST WARESIDE RD from BLOOR ST W from MARTIN GROVE RD to WILMAR RD 02 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services RENFORTH DR to CRENDON DR

MOYLES CRT from WEST Transportation Commander Blvd from Huntingwood Dr to McCowan Rd 02 Local Road Resurfacing Active 2019 2019 WARESIDE RD to [75 m S] WEST Local Road Resurfacing Services WARESIDE RD [CUL-DE-SAC] ROYAL YORK RD from Transportation On Street Bikeway Installation of bikeway The Kingsway from Dundas St W to 02 Active 2019 2019 SUMMITCREST DR to Services Paving Markings pavement markings BRAECREST AVE CLEMENT RD from [59 m W] Transportation QUINAN DR from DUVAL DR to KEELE ST 02 Local Road Resurfacing Active 2019 2019 CLEMENTVIEW CRT to Local Road Resurfacing Services BRAMPTON RD

Source: MCIC data Note: Future projects subject to change Page 7 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Modifications to pavement markings just north of Humber River to provide a transition to Transportation On Street Bikeway SCARLETT RD from HUMBER MCINTOSH ST from ATLEE AVE to 02 Active 2019 2019 the end of the cycling facilities Services Paving Markings RIVER to EDENBRIDGE DR being installed south of the Humber River as part of 2019 MRRS.

LLOYD MANOR RD from Transportation MCINTOSH ST from CLAREMORE AVE to 02 Local Road Resurfacing Active 2019 2019 RATHBURN RD to [S] FIRWOOD Local Road Resurfacing Services CRES Transportation Utility Cut Road BROWNLEA AVE from HILLHURST BLVD from AVENUE RD to MONA DR 02 Active 2019 2019 Utility Cut Road Rehabilitation Services Rehabilitation KINGDOM ST to RAYMORE DR

Transportation RHINESTONE DR from BIRGITTA JANE ST from PRITCHARD AVE to PRITCHARD AVE 02 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services CRES to FAVERSHAM CRES

CLAY CRT from EDENBRIDGE DR Transportation RUNNYMEDE RD from LIVERPOOL ST to HENRIETTA ST 02 Local Road Resurfacing Active 2019 2019 to [126 m W] EDENBRIDGE DR Local Road Resurfacing Services [CUL-DE-SAC] CLEMENTVIEW CRT from LOCKSLEY AVE from EGLINTON AVE W to HOPEWELL Transportation 02 Local Road Resurfacing Active 2019 2019 CLEMENT RD to [30 m N] Local Road Resurfacing AVE Services CLEMENT RD [CUL-DE-SAC] FARNINGHAM CRES from MONTCALM AVE from CLARKSON AVE, SCHELL AVE to Transportation 02 Local Road Resurfacing Active 2019 2019 ASHFORD DR to LLOYD MANOR Local Road Resurfacing CLARKSON AVE, [42 m N] CLARKSON AVE [END] Services RD GLENCAIRN AVE from MONA DR to [304.80 m W] MONA Transportation HOLGATE ST from ISLINGTON 02 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing DR [CITY LIMITS] Services AVE to HARTSDALE DR CRAIG ALAN CRT from [81 m E] Transportation SCHELL AVE from RONALD AVE to CALEDONIA RD 02 Local Road Resurfacing Active 2019 2019 CHAPMAN RD [CUL-DE-SAC] to Local Road Resurfacing Services CHAPMAN RD SHAW ST from [E] YARMOUTH RD [BRANCH] to [W] Transportation PETTIT DR from WINCOTT DR to 02 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing YARMOUTH RD [BRANCH] Services THE WESTWAY CREDITON CRT from ASHFORD Transportation CLAREMONT ST from DUNDAS ST W to TREFORD PL 02 Local Road Resurfacing Active 2019 2019 DR to [53 m E] ASHFORD DR Local Road Resurfacing Services [CUL-DE-SAC] FOXMEADOW RD from Transportation CLAREMONT ST from TREFORD PL to MANSFIELD AVE 02 Local Road Resurfacing Active 2019 2019 HARTSDALE DR to ASHMOUNT Local Road Resurfacing Services CRES PADDINGTON PL from [83 m S] THYRA AVE from DANFORTH AVE to DENTONIA PARK Transportation 02 Local Road Resurfacing Active 2019 2019 ASHMOUNT CRES [CUL-DE-SAC] Local Road Resurfacing AVE Services to ASHMOUNT CRES

Source: MCIC data Note: Future projects subject to change Page 8 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope BRENTSIDE CRT from CHAPMAN Transportation FOREST HILL RD from ORMSBY CRES to SPADINA RD (TO) 02 Local Road Resurfacing Active 2019 2019 RD to [39 m N] CHAPMAN RD Local Road Resurfacing Services [CUL-DE-SAC] GREYSWOOD CRT from Transportation EASTHAMPTON DR to [30 m E] GLEN CEDAR RD from AVA RD to EGLINTON AVE W 02 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services EASTHAMPTON DR [CUL-DE- SAC] FABIAN PL from CHAPMAN RD GLEN CEDAR RD from STRATHEARN RD to MARKDALE Transportation 02 Local Road Resurfacing Active 2019 2019 to [170 m N] CHAPMAN RD Local Road Resurfacing AVE Services [CUL-DE-SAC] Transportation TANGAMO RD from MOFORD WESTLAKE AVE from HAMSTEAD AVE to COSBURN AVE 02 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services CRES to BREADNER DR ARDUA ST from THE WEST Transportation WALNUT AVE from RICHMOND ST W to QUEEN ST W 02 Local Road Resurfacing Active 2019 2019 MALL to [140 m W] THE WEST Local Road Resurfacing Services MALL BLACKDOWN CRES from BORDEN ST from COLLEGE ST (TO), ULSTER ST to ULSTER Transportation 02 Local Road Resurfacing Active 2019 2019 FARNINGHAM CRES to LLOYD Local Road Resurfacing ST, HARBORD ST Services MANOR RD ASHMOUNT CRES from ALDERGROVE AVE from MOBERLY AVE to [80 m E] Transportation 02 Local Road Resurfacing Active 2019 2019 HARTSDALE DR to Local Road Resurfacing MOBERLY AVE [END] Services FOXMEADOW RD BURKSTON PL from ASHFORD [E-W] ROSEMARY LANE [LEG] from ROSEMARY LANE to Transportation 02 Local Road Resurfacing Active 2019 2019 DR to [85 m W] ASHFORD DR Local Road Resurfacing BATHURST ST Services [CUL-DE-SAC] [40 m W] COXWELL AVE from PLAINS RD to [156 m N] Transportation DOWNPATRICK CRES from 02 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing PLAINS RD Services HOLGATE ST to HARTSDALE DR ASHFORD DR from PRINCESS Transportation NUNES LANE from MC FARLAND AVE to VIA ITALIA 02 Local Road Resurfacing Active 2019 2019 MARGARET BLVD to LONGFIELD Local Road Resurfacing Services RD EASTHAMPTON DR from ST HELEN'S AVE from DUNDAS ST W to LUMBERVALE Transportation 02 Local Road Resurfacing Active 2019 2019 [142.70 m S] CHAPMAN RD Local Road Resurfacing AVE Services [CUL-DE-SAC] to CHAPMAN RD THE WEST MALL from Transportation RATHBURN RD to [148 m N] MEDLAND ST from HUMBERSIDE AVE to ANNETTE ST 02 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services WELLESWORTH DR [CUL-DE- SAC] COUNTRY CLUB CRCL from Transportation North Queen St from The East Mall to Kipling Ave 02 Local Road Resurfacing Active 2019 2019 ROYAL YORK RD to EDENBROOK Local Road Resurfacing Services HILL Transportation SUMMERFIELD CRES from The Queensway from The East Mall to Islington Ave 02 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services ODESSA AVE to ODESSA AVE

Source: MCIC data Note: Future projects subject to change Page 9 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope NEWINGTON CRES from NEWINGTON CRES from ELMBROOK CRES to ELMBROOK Transportation 02 Local Road Resurfacing Active 2019 2019 ELMBROOK CRES to ELMBROOK Local Road Resurfacing CRES Services CRES LONE OAK CRT from RAKELY LONE OAK CRT from RAKELY CRT to [E] RAKELY CRT [CUL- Transportation 02 Local Road Resurfacing Active 2019 2019 CRT to [E] RAKELY CRT [CUL-DE- Local Road Resurfacing DE-SAC] Services SAC] FAVERSHAM CRES from FAVERSHAM CRES from RHINESTONE DR to Transportation 02 Local Road Resurfacing Active 2019 2019 RHINESTONE DR to Local Road Resurfacing WELLESWORTH DR Services WELLESWORTH DR SILVERTHORNE BUSH DR from SILVERTHORNE BUSH DR from MARKLAND DR to Transportation 02 Local Road Resurfacing Active 2019 2019 MARKLAND DR to MARKLAND Local Road Resurfacing MARKLAND DR Services DR EGLINTON AVE W from [471 m EGLINTON AVE W from [471 m W] THE EAST MALL to Transportation 02 Major Road Resurfacing Active 2020 2020 W] THE EAST MALL to [189 m S] Major Road Resurfacing [189 m S] RENFORTH DR Services RENFORTH DR BEAVERBROOK AVE from KIPLING AVE to RAVENCREST Transportation BEAVERBROOK AVE from 02 Local Road Resurfacing Active 2018 2020 Local Road Resurfacing DR Services KIPLING AVE to RAVENCREST DR

RAYSIDE DR from TERRYELLEN CRES to LEAVENWORTH Transportation RAYSIDE DR from TERRYELLEN 02 Cold In Place Recycling Active 2020 2020 Local Road Resurfacing CRES Services CRES to LEAVENWORTH CRES Transportation STEVENHARRIS DR from STEVENHARRIS DR from RAYSIDE DR to RADWAY AVE 02 Cold In Place Recycling Active 2020 2020 Local Road Resurfacing Services RAYSIDE DR to RADWAY AVE SEVILLE AVE from [48 m E] SEVILLE AVE from [48 m E] RAYSIDE DR [CUL-DE-SAC] to Transportation 02 Cold In Place Recycling Active 2020 2020 RAYSIDE DR [CUL-DE-SAC] to Local Road Resurfacing RAYSIDE DR Services RAYSIDE DR SNOWELLEN AVE from [43 m E] SNOWELLEN AVE from [43 m E] RAYSIDE DR [END] to Transportation 02 Cold In Place Recycling Active 2020 2020 RAYSIDE DR [END] to RAYSIDE Local Road Reconstruction RAYSIDE DR Services DR BASKERVILLE CRES from BASKERVILLE CRES from RAYSIDE DR to LEAVENWORTH Transportation 02 Cold In Place Recycling Active 2020 2020 RAYSIDE DR to LEAVENWORTH Local Road Resurfacing CRES Services CRES Transportation KOOS RD from RADWAY AVE to KOOS RD from RADWAY AVE to BLOOR ST 02 Cold In Place Recycling Active 2020 2020 Local Road Resurfacing Services BLOOR ST TERRYELLEN CRES from RAYSIDE TERRYELLEN CRES from RAYSIDE DR to [118 m W] Transportation 02 Cold In Place Recycling Active 2020 2020 DR to [118 m W] RAYSIDE DR Local Road Resurfacing RAYSIDE DR [CUL-DE-SAC] Services [CUL-DE-SAC] LEAVENWORTH CRES from [46 LEAVENWORTH CRES from [46 m E] RAYSIDE DR [CUL-DE- Transportation 02 Cold In Place Recycling Active 2020 2020 m E] RAYSIDE DR [CUL-DE-SAC] Local Road Resurfacing SAC] to BLOOR ST Services to BLOOR ST AVERY AVE from [78 m E] KOOS RD [CUL-DE-SAC] to Transportation AVERY AVE from [78 m E] KOOS 02 Cold In Place Recycling Active 2020 2020 Local Road Resurfacing KOOS RD Services RD [CUL-DE-SAC] to KOOS RD

Source: MCIC data Note: Future projects subject to change Page 10 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

New sidewalk from Bloor St W to Radway Ave including all required traffic control, drainage, curb alignment Transportation Koos Rd from Bloor St W to Koos Rd from Bloor St W to Radway Dr 02 Sidewalk Construction Active 2020 2020 modification, utility relocation, Services Radway Dr property acquisition, any other requirements to facilitate sidewalk construction

EGLINTON AVE W from 189 M S EGLINTON AVE W from 189 M S OF RENFORTH DR to 471 Transportation On Street Bikeway Upgrading of existing 02 Active 2020 2020 OF RENFORTH DR to 471 M W M W OF THE EAST MALL Services Paving Markings boulevard trail OF THE EAST MALL New sidewalk from Koos Rd to Stevenharris Dr including all required traffic control, drainage, curb alignment Transportation Radway Ave from Koos Rd to Radway Ave from Koos Rd to Stevenharris Dr 02 Sidewalk Construction Active 2020 2020 modification, utility relocation, Services Stevenharris Dr property acquisition, any other requirements to facilitate sidewalk construction

Transportation On Street Bikeway THE KINGSWAY from DUNDAS THE KINGSWAY from DUNDAS ST W to LAMBETH RD 02 Active 2020 2020 Installation of bike lanes Services Paving Markings ST W to LAMBETH RD MARTIN GROVE RD from MARTIN GROVE RD from DONALBERT RD to RATHBURN Transportation On Street Bikeway 02 Active 2020 2020 DONALBERT RD to RATHBURN Installation of bike lanes RD Services Paving Markings RD RATHBURN RD from 122 M E OF RATHBURN RD from 122 M E OF THE EAST MALL to Transportation On Street Bikeway Existing bike lanes upgraded 02 Active 2020 2020 THE EAST MALL to MARTIN MARTIN GROVE RD Services Construction to cycle tracks GROVE RD RATHBURN RD from MARTIN RATHBURN RD from MARTIN GROVE RD to [122 m E] Transportation 02 Major Road Resurfacing Active 2020 2020 GROVE RD to [122 m E] THE Major Road Resurfacing THE EAST MALL Services EAST MALL THE WEST MALL from WEST THE WEST MALL from WEST MALL CRES to 300M N OF Transportation On Street Bikeway 02 Active 2020 2020 MALL CRES to 300M N OF WEST Installation of urban shoulder WEST MALL CRES Services Paving Markings MALL CRES Transportation On Street Bikeway SWAN AVE from MARTIN Installation of signed and SWAN AVE from MARTIN GROVE RD to ASHBOURNE DR 02 Active 2020 2020 Services Paving Markings GROVE RD to ASHBOURNE DR marked route

Transportation On Street Bikeway MARTIN GROVE RD from BLOOR Installation of signed and MARTIN GROVE RD from BLOOR ST W to GAYLORD AVE 02 Active 2020 2020 Services Paving Markings ST W to GAYLORD AVE marked route

Source: MCIC data Note: Future projects subject to change Page 11 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation On Street Bikeway MARTIN GROVE RD from SWAN Installation of signed and MARTIN GROVE RD from SWAN AVE to DONALBERT RD 02 Active 2020 2020 Services Paving Markings AVE to DONALBERT RD marked route Transportation On Street Bikeway JOPLING AVE N from BLOOR ST Installation of signed and JOPLING AVE N from BLOOR ST W to MATTICE AVE 02 Active 2020 2020 Services Paving Markings W to MATTICE AVE marked route Transportation On Street Bikeway MATTICE AVE from ASHBOURNE Installation of signed and MATTICE AVE from ASHBOURNE DR to JOPLING AVE N 02 Active 2020 2020 Services Paving Markings DR to JOPLING AVE N marked route Transportation On Street Bikeway ASHBOURNE DR from MATTICE Installation of signed and ASHBOURNE DR from MATTICE AVE to SWAN AVE 02 Active 2020 2020 Services Paving Markings AVE to SWAN AVE marked route Infrastructure Shaver Ave N from Transportation Six Points Interchange Shaver Ave N from Burnhamthorpe Rd to Bloor St W 02 Enhancement - Active 2017 2020 Burnhamthorpe Rd to Bloor St Services Reconfiguration: Coordination Construction Stage W CHAUNCEY AVE from CHAUNCEY AVE from ISLINGTON AVE to SHAWBRIDGE Transportation 03 Local Road Resurfacing Completed 2018 2018 ISLINGTON AVE to Local Road Resurfacing AVE Services SHAWBRIDGE AVE Transportation SYMONS ST from ROYAL YORK SYMONS ST from ROYAL YORK RD to DWIGHT AVE 03 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services RD to DWIGHT AVE Transportation THIRTIETH ST from LAKE SHORE THIRTIETH ST from LAKE SHORE BLVD W to ELDER AVE 03 Laneway Reconstruction Completed 2018 2018 Local Road Reconstruction Services BLVD W to ELDER AVE Transportation TUPPER AVE from TOWNS RD to Towns Rd to Horner Ave SIMCOE ST from Simcoe St to 03 Sidewalk Construction Completed 2018 2018 Services HORNER AVE (either side) Transportation Local Road TUPPER AVE from TOWNS RD to WARDEN AVE from HEPC to MCNICOLL AVE 03 Active 2018 2018 Local Road Reconstruction Services Reconstruction HORNER AVE HUMBERLINE (W) DR from WOODLOT CRES to HUMBER Transportation HORNER AVE from JUDSON ST 03 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing COLLEGE BLVD Services to [66 m W] KIPLING AVE HUMBERVALE BLVD from Transportation MORNINGSIDE AVE (TO) from Cinemart Dr to Milner Ave 03 Local Road Resurfacing Completed 2018 2018 SUNNYDALE DR to GLENROY Local Road Resurfacing Services AVE Transportation ISLINGTON AVE from LAKE HEPC from PHARMACY AVE to BIRCHMOUNT RD 03 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing Services SHORE BLVD W to QEW S.S. FERNALROY BLVD from GREENSPIRE RD from MAMMOTH HALL TRL to MCLEVIN Transportation 03 Local Road Resurfacing Active 2018 2018 NORSEMAN ST to SPRING Local Road Resurfacing AVE Services GARDEN RD NORTH WIND PL from COMMANDER BLVD to [183 m N] Transportation Islington Ave from Evans Ave to 03 Sidewalk Construction Completed 2018 2018 East side from Judson to Evans COMMANDER BLVD [CUL-DE-SAC] Services Judson St EDENBRIDGE DR from ROYAL YORK RD to THE Transportation OLD MILL TER from BLOOR ST W 03 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing KINGSWAY Services to BLOOR ST W TWENTY SECOND ST from LAKE Transportation SCARLETT RD from DUNDAS ST W to HUMBER RIVER 03 Local Road Resurfacing Active 2018 2018 SHORE BLVD to BIRMINGHAM Local Road Resurfacing Services ST

Source: MCIC data Note: Future projects subject to change Page 12 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Construction of an on-street trail connection, Construction Transportation On Street Bikeway LAKE SHORE BLVD W from FIRST GLOS RD from [72 m E] CRENDON DR to CRENDON DR 03 Active 2017 2018 of an on-street trail Services Construction ST to NORRIS CRES connection,bi-directional cycle track PLASTIC AVE from QUEEN Transportation Keele St from Junction Rd to 03 Local Road Resurfacing Active 2018 2018 ELIZABETH BLVD to THE Local Road Resurfacing Services QUEENSWAY Transportation ADELPHA DR from FERNALROY Dufferin St under Beltline Trl from CNR to 03 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services BLVD to EAGLE RD CANMOTOR AVE from QUEEN Transportation MIDLAND AVE from ELLESMERE RD to HIGHWAY 401 03 Local Road Resurfacing Active 2018 2018 ELIZABETH BLVD to THE Local Road Resurfacing Services QUEENSWAY TANGLEWOOD TR from [60 m S] MILDENHALL RD from STRATFORD CRES to ST Transportation 03 Local Road Resurfacing Active 2018 2018 FIESTA LANE [END] to Local Road Resurfacing LEONARD'S AVE Services RIVERVALLEY CRES Transportation LILLIBET RD from NORSEMAN ST BENSON AVE from ALBERTA AVE to WINONA DR 03 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services to CLAYMORE DR FIMA CRES from HORNER AVE Transportation FULTON AVE from BROADVIEW AVE to PAPE AVE 03 Local Road Resurfacing Active 2018 2018 to [155 m W] BELVIA RD [CUL- Local Road Resurfacing Services DE-SAC] NORTHCLIFFE BLVD from ROSEMOUNT AVE to Transportation PLACID RD from NORSEMAN ST 03 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing EGLINTON AVE W Services to CLAYMORE DR Transportation GLADFERN RD from NORSEMAN LOBB AVE from SHAW ST to CRAWFORD ST 03 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services ST to CLAYMORE DR Transportation BELVIA RD from HORNER AVE to GOWAN AVE from LOGAN AVE to CARLAW AVE 03 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services FIMA CRES RAMSBURY RD from [58 m S] VAUGHAN RD from EGLINTON AVE W to NORTHCLIFFE Transportation 03 Local Road Resurfacing Completed 2018 2018 STANMILLS RD [END] to Local Road Resurfacing BLVD Services NORDIN AVE Transportation CLAYMORE DR from FERNALROY HAVERSON BLVD from DONALD AVE to CAMERON AVE 03 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services BLVD to LOTHIAN AVE Transportation GOVERNMENT RD from MILL SUMACH ST from SHUTER ST to WELLESLEY ST E 03 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services COVE CV to WALFORD RD STOCKBRIDGE AVE from Transportation BROOKMERE RD from KIPLING AVE to ELMHURST DR 03 Local Road Resurfacing Active 2018 2018 NORSEMAN ST to SAYBROOK Local Road Resurfacing Services AVE Transportation DOWNING ST from WILMAR RD EGLINTON AVE W from JANE ST to 250m W of Pearsen St 03 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services to HARJOLYN DR EDILOU DR from RIMILTON AVE Transportation PALMERSTON AVE from QUEEN ST W to COLLEGE ST 03 Local Road Resurfacing Active 2018 2018 to [147 m N] RIMILTON AVE Local Road Resurfacing Services [CUL-DE-SAC]

Source: MCIC data Note: Future projects subject to change Page 13 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope EAST LYNN AVE from MERRILL BRIDGE RD to DANFORTH Transportation FIESTA LANE from STONEGATE 03 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing AVE Services RD to TANGLEWOOD TR

Transportation RIVERVALLEY CRES from BROWNING AVE from BROADVIEW AVE to PAPE AVE 03 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services STONEGATE RD to STEPHEN DR WILLROD RD from GRAYSTONE TORRESDALE AVE from FINCH AVE (N YK) to [370 m N] Transportation 03 Cold In Place Recycling Active 2019 2019 GDNS to [62 m S] VAN DUSEN Local Road Resurfacing FINCH AVE (N YK) [END] Services BLVD Transportation Local Road NORTHROP RD from CHAUNCEY HANNA AVE from LIBERTY ST to SNOOKER ST 03 Active 2019 2019 Local Road Reconstruction Services Reconstruction AVE to BERING AVE DIESEL DR from EVANS AVE COUNTRY CLUB CRCL from ROYAL YORK RD to Transportation Local Road 03 Active 2019 2019 (ETBK) to [192 m N] EVANS AVE Local Road Reconstruction EDENBROOK HILL Services Reconstruction (ETBK) [END] BROCKHOUSE RD from [104.60 Kipling Ave over Humber River Tributary from BERRY Transportation Local Road m W] BESTOBELL RD [CUL-DE- 03 Active 2019 2019 Local Road Reconstruction CREEK to Services Reconstruction SAC] to [127.30 m E] BESTOBELL RD [END] CARSON ST from Transportation BLOOR ST OVER PEDESTRIAN CROSSING from to 03 Local Road Resurfacing Active 2019 2019 STAFFORDSHIRE PL to HORNER Local Road Resurfacing Services AVE

New sidewalk from Evans Ave (ETBK) to [192 m N] Evans Ave (ETBK) [END] including all VICTORIA PARK AVE from [S] RAILWAY LANDS - CNR required traffic control, Diesel Dr from Evans Ave (ETBK) [BRIDGE], MUSGRAVE ST, KINGSTON RD to [N] RAILWAY Transportation drainage, curb alignment 03 Sidewalk Construction Active 2019 2019 to [192 m N] Evans Ave (ETBK) LANDS - CNR [BRIDGE], SWANWICK AVE (TO), Services modification, utility relocation, [END] DANFORTH AVE property acquisition, any other requirements to facilitate sidewalk construction

New sidewalk from Chauncey Ave to Bering Ave including all required traffic control, drainage, curb alignment Transportation NORTHROP RD from CHAUNCEY BEDFORD RD from BLOOR ST W to LOWTHER AVE 03 Sidewalk Construction Active 2019 2019 modification, utility relocation, Services AVE to BERING AVE property acquisition, any other requirements to facilitate sidewalk construction

Source: MCIC data Note: Future projects subject to change Page 14 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

New SW from [104.6 m W] Bestobell Rd [Cul-de-sac] to [127.3 m E] Bestobell Rd including all required traffic Brockhouse Rd from [104.60 m [27.40 m W] DUNCAN ST from [25 m N] ADELAIDE ST W Transportation control, drainage, curb 03 Sidewalk Construction Active 2019 2019 W] Bestobell Rd [Cul-de-sac] to to NELSON ST (TO) Services alignment modification, utility [127.30 m E] Bestobell Rd [End] relocation, property acquisition, any other requirements to facilitate SW construction

Transportation NORTH QUEEN ST from KIPLING Dovercourt Rd from MacKenzie Cres to 03 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing Services AVE to [23 m E] VANSCO RD KARNWOOD DR from DELWOOD DR to KNIGHTSBRIDGE Transportation CARSON ST from HORNER AVE 03 Sidewalk Construction Active 2019 2019 New Sidewalk RD Services to [10m S] HORNER AVE PENHURST AVE from [61 m S] Transportation Utility Cut Road NATAL AVE from MCINTOSH ST to PARK ST 03 Active 2019 2019 DALESFORD RD [CUL-DE-SAC] to Utility Cut Road Rehabilitation Services Rehabilitation THE QUEENSWAY INDEX RD from NORTH QUEEN Transportation WHITMORE AVE from MARLEE AVE to DUFFERIN ST 03 Local Road Resurfacing Active 2019 2019 ST to [305 m N] NORTH QUEEN Local Road Resurfacing Services ST [CUL-DE-SAC] WILLROD RD from [62 m S] VAN COLDSTREAM AVE from MONA DR to [303.50 m W] Transportation 03 Local Road Resurfacing Active 2019 2019 DUSEN BLVD to VAN DUSEN Local Road Resurfacing MONA DR [CITY LIMITS] Services BLVD Transportation KENWAY RD from VAN DUSEN STRATHEARN RD from BATHURST ST to AVA RD 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services BLVD to FIELDWAY RD

CHERRYWOOD AVE from MAPLEWOOD AVE to Transportation DURBAN RD from VAN DUSEN 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing VAUGHAN RD Services BLVD to GARDENVALE RD GLEN CEDAR RD from HEATHDALE RD to [95 m N] Transportation GREEN LANE from FIELDWAY RD 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing HEATHDALE RD Services to FIELDWAY RD Transportation CARYSFORT RD from VAN HUMEWOOD DR from VAUGHAN RD to HEATHDALE RD 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services DUSEN BLVD to FIELDWAY RD ALLERTON RD from [46 m S] Transportation HEATHDALE RD from BATHURST ST to HUMEWOOD DR 03 Local Road Resurfacing Active 2019 2019 VAN DUSEN BLVD to FIELDWAY Local Road Resurfacing Services RD Transportation DUMBARTON RD from CONEY SNOOKER ST from HANNA AVE to ATLANTIC AVE 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services DR to BADGER DR GRAYSTONE GDNS from HANNA AVE from [105.50 m S] LIBERTY ST [END] to Transportation 03 Local Road Resurfacing Active 2019 2019 ISLINGTON AVE to [140 m W] Local Road Resurfacing LIBERTY ST Services WILLROD RD [CUL-DE-SAC]

Source: MCIC data Note: Future projects subject to change Page 15 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope MEADOWVALE DR from [26 m S] O'CONNOR DR from COXWELL AVE to [40 m W] Transportation 03 Local Road Resurfacing Active 2019 2019 MIMICO CRES to GARDENVALE Local Road Resurfacing COXWELL AVE Services RD BEAUCOURT RD from [245 m S] [30.50 m N] DANFORTH AVE from DEWHURST BLVD to Transportation 03 Local Road Resurfacing Active 2019 2019 BERRY RD [CUL-DE-SAC] to Local Road Resurfacing DONLANDS AVE Services BERRY RD VANELLAN CRT from VAN Transportation WINNETT AVE from DURHAM AVE to ARLINGTON AVE 03 Local Road Resurfacing Active 2019 2019 DUSEN BLVD to [78 m N] VAN Local Road Resurfacing Services DUSEN BLVD [CUL-DE-SAC] THIRTY SEVENTH ST from LAKE Transportation AVE from ANNETTE ST to DUNDAS ST W 03 Local Road Resurfacing Active 2019 2019 PROMENADE to LAKE SHORE Local Road Resurfacing Services BLVD Transportation AMBLESIDE AVE from BENTLEY Burnhamthorpe Rd from The East Mall to Dundas St W 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services DR to ISLINGTON AVE

The East Mall from Burnhamthorpe Rd to The Transportation EASTWICK RD from EVANS AVE 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Queensway Services (ETBK) to OXFORD ST (ETBK)

Transportation LORNE AVE from PARK LAWN Shaver Ave N from Burnhamthorpe Rd to Bloor St W 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services RD to BONNYVIEW DR FORTIETH ST from [14 m S] Transportation Shorncliffe Rd from Dundas St W to North Queen St 03 Local Road Resurfacing Active 2019 2019 LAKE PROMENADE [END] to Local Road Resurfacing Services LAKE SHORE BLVD Transportation ELFORD BLVD from CHARTWELL Norseman St from Kipling Ave to Islington Ave 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services RD to ISLINGTON AVE THIRTY EIGHTH ST from LAKE THIRTY EIGHTH ST from LAKE PROMENADE to LAKE Transportation 03 Local Road Resurfacing Active 2019 2019 PROMENADE to LAKE SHORE Local Road Resurfacing SHORE BLVD Services BLVD LAKE PROMENADE from THIRTY LAKE PROMENADE from THIRTY SIXTH ST to FORTY Transportation 03 Local Road Resurfacing Active 2019 2019 SIXTH ST to FORTY SECOND ST Local Road Resurfacing SECOND ST [END] Services [END] WESTLEIGH CRES from [N] WESTLEIGH CRES from [N] SUNSET AVE [BRANCH] to [S] Transportation 03 Local Road Resurfacing Active 2019 2019 SUNSET AVE [BRANCH] to [S] Local Road Resurfacing SUNSET AVE [BRANCH] Services SUNSET AVE [BRANCH] Transportation THIRTY THIRD ST from PARK THIRTY THIRD ST from PARK BLVD to LAKE SHORE BLVD 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services BLVD to LAKE SHORE BLVD JAMES ST (ETBK) from THIRTY SIXTH ST to FORTY Transportation JAMES ST (ETBK) from THIRTY 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing SECOND ST Services SIXTH ST to FORTY SECOND ST Transportation SUNSET AVE from ALBRIGHT SUNSET AVE from ALBRIGHT AVE to HORNER AVE 03 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services AVE to HORNER AVE

Source: MCIC data Note: Future projects subject to change Page 16 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope SKEENS LANE from THIRTIETH ST to [41 m]E THIRTIETH Transportation SKEENS LANE from THIRTIETH 03 Laneway Resurfacing Active 2019 2019 Laneway Resurfacing ST Services ST to [41 m]E THIRTIETH ST

Transportation On Street Bikeway BLOOR ST W from KIPLING AVE Installation of a Cycle Track, a BLOOR ST W from KIPLING AVE to RESURRECTION RD 03 Active 2017 2020 Services Construction to RESURRECTION RD separated cycling facility Infrastructure Transportation Kipling Ave from St Albans Rd to Six Points Interchange Kipling Ave from St Albans Rd to Dundas St W 03 Enhancement - Active 2017 2020 Services Dundas St W Reconfiguration: Coordination Construction Stage Transportation TORLAKE CRES from KIPLING TORLAKE CRES from KIPLING AVE to KIPLING AVE 03 Cold In Place Recycling Active 2020 2020 Cold-In-Place Recycling Services AVE to KIPLING AVE Transportation On Street Bikeway THE EAST MALL from YARN RD THE EAST MALL from YARN RD to BLOOR ST W 03 Active 2020 2020 Installation of sharrows Services Paving Markings to BLOOR ST W New sidewalk on Torlake Cres bounded by Kipling Ave including all required traffic control, drainage, curb Transportation Torlake Cres from Kipling Ave to Torlake Cres from Kipling Ave to Kipling Ave 03 Sidewalk Construction Active 2020 2020 alignment modification, utility Services Kipling Ave relocation, property acquisition, any other requirements to facilitate sidewalk construction

Transportation On Street Bikeway MONTESSON ST from WILMAR Installation of signed and MONTESSON ST from WILMAR RD to ACORN AVE 03 Active 2020 2020 Services Paving Markings RD to ACORN AVE marked route Transportation On Street Bikeway JOPLING AVE S from DUNDAS ST Installation of signed and JOPLING AVE S from DUNDAS ST W to BLOOR ST W 03 Active 2020 2020 Services Paving Markings W to BLOOR ST W marked route

Transportation On Street Bikeway WILMAR RD from MONTESSON Installation of signed and WILMAR RD from MONTESSON ST to BLOOR ST W 03 Active 2020 2020 Services Paving Markings ST to BLOOR ST W marked route

Transportation On Street Bikeway NORSEMAN ST from KIPLING NORSEMAN ST from KIPLING AVE to ROYAL YORK RD 03 Active 2020 2020 Installation of bike lanes Services Paving Markings AVE to ROYAL YORK RD Transportation On Street Bikeway ACORN AVE from DUNDAS ST W Installation of signed and ACORN AVE from DUNDAS ST W to MONTESSON ST 03 Active 2020 2020 Services Paving Markings to MONTESSON ST marked route Infrastructure Transportation Islington Ave from Cordova Ave Six Points Interchange Islington Ave from Cordova Ave to The Queensway 03 Enhancement - Active 2017 2020 Services to The Queensway Reconfiguration: Coordination Construction Stage Infrastructure Transportation Dundas St W from The East Mall Six Points Interchange Dundas St W from The East Mall to Burnhamthorpe Rd 03 Enhancement - Active 2017 2020 Services to Burnhamthorpe Rd Reconfiguration: Coordination Construction Stage Infrastructure Transportation Shaver Ave S from Bloor St W to Six Points Interchange Shaver Ave S from Bloor St W to Dundas St W 03 Enhancement - Active 2017 2020 Services Dundas St W Reconfiguration: Coordination Construction Stage

Source: MCIC data Note: Future projects subject to change Page 17 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Infrastructure Transportation Cordova Ave from Dundas St W Six Points Interchange Cordova Ave from Dundas St W to Islington Ave 03 Enhancement - Active 2017 2020 Services to Islington Ave Reconfiguration: Coordination Construction Stage Infrastructure Transportation North Queen St from The East Six Points Interchange North Queen St from The East Mall to Kipling Ave 03 Enhancement - Active 2017 2020 Services Mall to Kipling Ave Reconfiguration: Coordination Construction Stage Infrastructure Transportation Shorncliffe Rd from Dundas St Six Points Interchange Shorncliffe Rd from Dundas St W to North Queen St 03 Enhancement - Active 2017 2020 Services W to North Queen St Reconfiguration: Coordination Construction Stage Infrastructure Transportation Norseman St from Kipling Ave to Six Points Interchange Norseman St from Kipling Ave to Islington Ave 03 Enhancement - Active 2017 2020 Services Islington Ave Reconfiguration: Coordination Construction Stage Infrastructure Transportation The Queensway from The East Six Points Interchange The Queensway from The East Mall to Islington Ave 03 Enhancement - Active 2017 2020 Services Mall to Islington Ave Reconfiguration: Coordination Construction Stage MORNINGSIDE AVE (TO) from SOUTH KINGSWAY to [W] Transportation WALLER AVE from RENNIE TER 04 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing MORNINGSIDE AVE (TO) [END] Services to LAVINIA AVE Installation of Bikeway Transportation On Street Bikeway SORAUREN AVE from QUEEN ST Danforth Rd from St Clair Ave E to 04 Active 2017 2018 Pavement Markings & Bike Services Paving Markings W to DUNDAS ST W Signal Transportation On Street Bikeway ELLIS AVE from Queensway to Installation of cycling CALLAGHAN LANE from ST to BERKELEY ST 04 Active 2018 2018 Services Paving Markings Lakeshore Blvd W pavement markings RONALD AVE from CASTLEFIELD AVE to [216 m N] Transportation On Street Bikeway DOWLING AVE from Queen St Installation of bikeway 04 Active 2018 2018 CASTLEFIELD AVE [END] Services Paving Markings W to Lakeshore Blvd W pavement markings COLBORNE LODGE DR from Installation of Bikeway Transportation On Street Bikeway Brentdale Dr from Lascelles Blvd to Lawton Blvd 04 Active 2018 2018 LAKE SHORE BLVD W to THE Pavement Markings (Vision Services Paving Markings QUEENSWAY Zero) EDGAR AVE (TO) from MACLENNAN AVE to Transportation On Street Bikeway BEATY AVE from KING ST W to Installation of bikeway 04 Active 2018 2018 ROXBOROUGH DR Services Paving Markings QUEEN ST W pavement markings Transportation On Street Bikeway QUEEN ST W from SORAUREN Installation of bikeway EUCLID AVE (SC) from ZAPH AVE to MEADOWVALE RD 04 Active 2017 2018 Services Paving Markings AVE to DOWLING AVE pavement markings

NET DR from MARTIN Installation of bikeway PICTORIAL ST from CALVERLEY TRL to PONYMEADOW Transportation On Street Bikeway 04 Active 2017 2018 GOODMAN TRL to Lake Shore contraflow, Installation of TER Services Paving Markings Blvd W bikeway pavement markings THE QUEENSWAY EB from TRALEE AVE from MILFORD HAVEN DR to MILFORD Transportation TTC Track Replacement & 04 Major Road Resurfacing Active 2019 2019 RONCESVALLES AVE to CLAUDE HAVEN DR Services Major Road Resurfacing AVE SILVERBELL GRV from NEILSON RD to [72 m E] NEILSON Transportation THE QUEENSWAY from TTC Track Replacement & 04 Major Road Resurfacing Active 2019 2019 AVE [CUL-DE-SAC W/ BULB] Services SUNNYSIDE AVE to CLAUDE AVE Major Road Resurfacing RIVERSIDE TRL from BRULE Transportation Local Road REXLEIGH DR from FERRIS RD to ST CLAIR AVE E (E YK) 04 Active 2018 2019 GDNS to [72.60 m S] BRULE Local Road Reconstruction Services Reconstruction GDNS [CUL-DE-SAC]

Source: MCIC data Note: Future projects subject to change Page 18 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope MC MURRAY AVE from DUNDAS DAWES RD from DANFORTH AVE to [38.90 m N] Transportation Local Road 04 Active 2019 2019 ST W to [77 m N] VINE AVE Local Road Reconstruction BALFOUR AVE [CITY LIMITS] Services Reconstruction [END] HUDDERSFIELD RD from HUMBERLINE DR to Transportation DUNDAS ST W from INDIAN 04 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing CLAIREVILLE RD Services ROAD CRES to KEELE ST

New sidewalk from Baby Point Ter to Baby Point Ter including all required traffic control, drainage, curb alignment WESTON RD from LAWRENCE AVE W, CHURCH ST to ST Transportation Baby Point Cres from Baby Point 04 Sidewalk Construction Active 2019 2019 modification, utility relocation, PHILLIPS RD, CHURCH ST Services Ter to Baby Point Ter property acquisition, any other requirements to facilitate sidewalk construction

Transportation DUNDAS ST W from HIGH PARK Ellesmere Rd from Scarborough Golf Club Rd to 04 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing Services AVE to MC MURRAY AVE

Transportation DUNDAS ST W from ANNETTE Trudelle St from to 04 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing Services ST to INDIAN ROAD CRES Transportation DUNDAS ST W from KEELE ST to Gerrard St E from Parliament St to 04 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing Services MEDLAND ST Transportation FLEUR PL from BABY POINT RD PACIFIC AVE from ANNETTE ST to DUNDAS ST W 04 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to BABT POINT CR BABY POINT TER from BABY Transportation LEACOCK CRES from DENLOW BLVD to DENLOW BLVD 04 Local Road Resurfacing Active 2019 2019 POINT CRES to [N] BABY POINT Local Road Resurfacing Services RD [END] Transportation On Street Bikeway LANSDOWNE AVE from QUEEN Installation of bikeway SORAUREN AVE from GEOFFREY ST to DUNDAS ST W 04 Active 2019 2019 Services Paving Markings ST W to RIDEAU AVE pavement markings BABY POINT RD from BABY Transportation Islington Ave from Cordova Ave to The Queensway 04 Local Road Resurfacing Active 2019 2019 POINT CRES to BABY POINT Local Road Resurfacing Services CRES GLENDONWYNNE RD from Transportation Dundas St W from The East Mall to Burnhamthorpe Rd 04 Local Road Resurfacing Active 2019 2019 CLENDENAN AVE to QUEBEC Local Road Resurfacing Services AVE Transportation BABY POINT CRES from BABY Shaver Ave S from Bloor St W to Dundas St W 04 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services POINT RD to BABY POINT RD GRENADIER HTS from [E-W] Transportation Cordova Ave from Dundas St W to Islington Ave 04 Local Road Resurfacing Active 2019 2019 GRENADIER HTS [LEG] to ELLIS Local Road Resurfacing Services AVE HOWARD PARK AVE from HOWARD PARK AVE from INDIAN GRV to HIGH PARK Transportation 04 Local Road Resurfacing Active 2020 2020 INDIAN GRV to HIGH PARK Local Road Resurfacing GDNS Services GDNS

Source: MCIC data Note: Future projects subject to change Page 19 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope GLENLAKE AVE from GLENLAKE AVE from GLENDONWYNNE RD to KENNEDY Transportation 04 Local Road Resurfacing Active 2020 2020 GLENDONWYNNE RD to Local Road Resurfacing AVE Services KENNEDY AVE GLENLAKE AVE from GLENLAKE AVE from CLENDENAN AVE to Transportation 04 Local Road Resurfacing Active 2020 2020 CLENDENAN AVE to Local Road Resurfacing GLENDONWYNNE RD Services GLENDONWYNNE RD Transportation ARMADALE AVE from LARKIN ARMADALE AVE from LARKIN AVE to BLOOR ST W 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to BLOOR ST W ARMADALE AVE from [59 m N] BLOOR ST W to NELLES Transportation ARMADALE AVE from [59 m N] 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing AVE Services BLOOR ST W to NELLES AVE Transportation PACIFIC AVE from ANNETTE ST PACIFIC AVE from ANNETTE ST to DUNDAS ST W 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to DUNDAS ST W MAYFIELD AVE from WILLARD AVE (TO) to ARMADALE Transportation MAYFIELD AVE from WILLARD 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing AVE Services AVE (TO) to ARMADALE AVE

MAYFIELD AVE from ARMADALE AVE to SOUTH Transportation MAYFIELD AVE from ARMADALE 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing KINGSWAY Services AVE to SOUTH KINGSWAY Transportation CLENDENAN AVE from ELORA CLENDENAN AVE from ELORA RD to GLENLAKE AVE 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services RD to GLENLAKE AVE GOOCH AVE from UNDERWOOD AVE to VAN STASSEN Transportation GOOCH AVE from UNDERWOOD 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing BLVD Services AVE to VAN STASSEN BLVD INDIAN ROAD CRES from INDIAN ROAD CRES from KENNETH AVE (TO) to Transportation 04 Local Road Resurfacing Active 2020 2020 KENNETH AVE (TO) to ANNETTE Local Road Resurfacing ANNETTE ST Services ST Transportation WRIGHT AVE from MACDONELL WRIGHT AVE from MACDONELL AVE to INDIAN RD 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to INDIAN RD SPENCER AVE from Transportation SPENCER AVE from SPRINGHURST AVE to KING ST W 04 Local Road Resurfacing Active 2020 2020 SPRINGHURST AVE to KING ST Local Road Resurfacing Services W Transportation SORAUREN AVE from GEOFFREY SORAUREN AVE from GEOFFREY ST to DUNDAS ST W 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ST to DUNDAS ST W SPRINGHURST AVE from SPRINGHURST AVE from JAMESON AVE to [97.50 m W] Transportation 04 Local Road Resurfacing Active 2020 2020 JAMESON AVE to [97.50 m W] Local Road Resurfacing JAMESON AVE Services JAMESON AVE Transportation DEFOREST RD from LAVINIA AVE DEFOREST RD from LAVINIA AVE to WINDERMERE AVE 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to WINDERMERE AVE INDIAN GRV from ANNETTE ST to [96 m N] HOOK AVE Transportation INDIAN GRV from ANNETTE ST 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing [END] Services to [96 m N] HOOK AVE [END]

Source: MCIC data Note: Future projects subject to change Page 20 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation On Street Bikeway SORAUREN AVE from GEOFFREY Installation of bikeway SORAUREN AVE from GEOFFREY ST to DUNDAS ST W 04 Active 2020 2020 Services Paving Markings ST to DUNDAS ST W pavement markings MEDLAND ST from Transportation MEDLAND ST from HUMBERSIDE AVE to ANNETTE ST 04 Local Road Resurfacing Active 2020 2020 HUMBERSIDE AVE to ANNETTE Local Road Resurfacing Services ST Transportation HIGH PARK AVE from ANNETTE HIGH PARK AVE from ANNETTE ST to DUNDAS ST W 04 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ST to DUNDAS ST W Transportation Local Road BARTONVILLE AVE E from TANDRIDGE CRES from ARCOT BLVD to BYNG AVE (ETBK) 05 Active 2018 2018 Local Road Reconstruction Services Reconstruction WESTON RD to RAY AVE Transportation Local Road EWART AVE from SCOTT RD to Donlands ave from Cosburne Ave to 05 Completed 2018 2018 Local Road Reconstruction Services Reconstruction KEELE ST Don Mills Rd (east side) from 703 Don Mills Rd to Lower Transportation KEELE ST from ROGERS RD to 05 Major Road Resurfacing Completed 2018 2018 Major Road Resurfacing Don Recreational Trail Services EGLINTON AVE W Transportation Gunns Rd from St Clair Ave W to From Weston to St Clair Ave SHERBOURNE ST N from BLOOR ST E to ELM AVE 05 Sidewalk Construction Completed 2018 2018 Services Weston Rd W north side from west limit to HOSKIN AVE from QUEEN'S PARK CRES W to ST GEORGE Transportation Thurodale Ave from Brookhaven 05 Sidewalk Construction Completed 2018 2018 Chiswick, south side from ST Services Dr to Martini Dr Chiswick to existing sidewalk Transportation Tedder St from Thurodale Ave from Harding to Thurodale Sinnott Rd from Eglinton Ave E to Comstock Rd 05 Sidewalk Construction Completed 2018 2018 Services to Harding Ave (side to be determined) Thurodale Ave from Brookhaven north side from west limit to STOCKBRIDGE AVE from NORSEMAN ST to SAYBROOK Transportation 05 Sidewalk Construction Completed 2018 2018 Dr to 46 M West of Martini Dr Chiswick, south side from AVE Services (End of Street) Chiswick to existing sidewalk Transportation GRAY AVE from LAMBTON AVE Neilson Road from CPR to 0.67 km south of Finch Ave 05 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services to OUTLOOK AVE [N-S] SUNNYBRAE CRES [LEG] Transportation CHRISTIE ST from BLOOR ST W to DUPONT ST 05 Local Road Resurfacing Active 2018 2018 from [E-W] SUNNYBRAE CRES Local Road Resurfacing Services [LEG] to BARTONVILLE AVE W Transportation LYDON AVE from BERNICE CRES SILVERTHORN AVE from AILEEN AVE to DONALD AVE 05 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services to EILEEN AVE BERGAMOT AVE from 213.9 M W ISLINGTON AVE to Transportation ELM ST (YK) from WILLIAM ST to 05 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing BURRARD RD Services JOHN ST (YK) widen sidewalk with double Transportation Pedestrian Infrastructure WESTON RD from JANE ST to ST row of paver and curb detail - ST ANDREWS RD from BRIMLEY RD to SURATY AVE 05 Active 2019 2019 Services Improvement PHILLIPS RD Applying complete streets principles where possible. ST CLAIR AVE W from JANE ST AUSTIN TER from [E] WALMER RD [BRANCH] to [W] Transportation 05 Major Road Resurfacing Active 2019 2019 to ST CLAIR AVE W (SCARLETT Major Road Resurfacing WALMER RD [BRANCH] Services RD)

Source: MCIC data Note: Future projects subject to change Page 21 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope FOXMEADOW RD from HARTSDALE DR to ASHMOUNT Transportation SILVERTHORN AVE from 05 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing CRES Services KERSDALE AVE to AILEEN AVE

Transportation RYDING AVE from [26.60 m E] DURBAN RD from VAN DUSEN BLVD to GARDENVALE RD 05 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services GOURLAY CRES to COBALT AVE Transportation Local Road DONALD AVE from KANE AVE to SUMMIT AVE from GILBERT AVE to BRONOCO AVE 05 Active 2019 2019 Local Road Reconstruction Services Reconstruction KEELE ST SILVERTHORNE BUSH DR from MARKLAND DR to Transportation Local Road BERTAL RD from INDUSTRY ST 05 Active 2019 2019 Local Road Reconstruction MARKLAND DR Services Reconstruction to PLANNING BOUNDARY New sidewalk from Strathnairn Ave to Kincort St including all required traffic control, drainage, curb Transportation Castlefield Ave from Strathnairn MIDLAND AVE from DANFORTH RD to LAWRENCE AVE E 05 Sidewalk Construction Active 2019 2019 alignment modification, utility Services Ave to Kincort St relocation, property acquisition, any other requirements to facilitate sidewalk construction

New sidewalk from Industry St to Planning Boundary including all required traffic control, drainage, curb Transportation Bertal Rd from Industry St to St Clair Ave E from O Connor Dr to 05 Sidewalk Construction Active 2019 2019 alignment modification, utility Services Planning Boundary relocation, property acquisition, any other requirements to facilitate sidewalk construction

Transportation On Street Bikeway SCARLETT RD from ST CLAIR AVE Martin Grove Rd from Rathburn Rd to 05 Active 2019 2019 Installation of bike lanes Services Paving Markings W to HUMBER RIVER Transportation On Street Bikeway SILVERTHORN AVE from Installation of bikeway Eglinton Ave W from Russell Rd to 05 Active 2019 2019 Services Paving Markings KERSDALE AVE to AILEEN AVE pavement markings

ST CUTHBERTS RD from BERNEY CRES to BESSBOROUGH Transportation WESTON RD from CLOUSTON 05 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing DR Services AVE to WRIGHT AVE (YK)

Source: MCIC data Note: Future projects subject to change Page 22 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

New sidewalk from MacDonald Ave to Lawrence Ave W including all required traffic control, drainage, curb Transportation Ralph St from MacDonald Ave to ELLINS AVE from KINGHORN AVE to SCARLETT RD (YK) 05 Sidewalk Construction Active 2019 2019 alignment modification, utility Services Lawrence Ave W relocation, property acquisition, any other requirements to facilitate sidewalk construction

SELKIRK ST from WOODYCREST AVE to [40 m E] Transportation On Street Bikeway HAVERSON BLVD from DONALD Installation of bikeway 05 Active 2019 2019 WOODYCREST AVE [END] Services Paving Markings AVE to CAMERON AVE pavement markings

Installation of cycling HARRIET ST from HASTINGS AVE to [44 m E] HASTINGS Transportation EGLINTON AVE W from JANE ST pavement markings and other 05 Bikeway Trail Active 2019 2019 AVE [END] Services to 250m W of Pearsen St cycling infrastructure improvements BLACKTHORN AVE from Russel Hill Rd from Old Forst Hill Rd to 65 m North of Old Transportation On Street Bikeway Installation of bikeway 05 Active 2019 2019 CAMERON AVE to EGLINTON Forst Hill Rd Services Paving Markings pavement markings AVE W DONALD AVE from Transportation On Street Bikeway Installation of bikeway WALNUT AVE from WELLINGTON ST W to KING ST W 05 Active 2019 2019 SILVERTHORN AVE to Services Paving Markings pavement markings HAVERSON BLVD CLINTON PL from CLINTON ST to [82.20 m W] CLINTON Transportation On Street Bikeway SILVERTHORN AVE from AILEEN Installation of bikeway 05 Active 2019 2019 PL [END] Services Paving Markings AVE to DONALD AVE pavement markings Transportation GREENBROOK DR from KEELE ST BURTON RD from BATHURST ST to SPADINA RD 05 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to TRETHEWEY DR MURRAY ROSS PKWY from 70 M W OF EVELYN WIGGNS Transportation LESTER AVE from GLENHAVEN 05 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing DR to KEELE ST Services ST to KEELE ST BROOKHAVEN DR from COLUMBIA GT from 50 M S OF MURRAY ROSS PKWY to Transportation 05 Local Road Resurfacing Active 2019 2019 TRETHEWEY DR to THURODALE Local Road Resurfacing MURRAY ROSS PKWY Services AVE QUEEN ST E from NURSEWOOD RD to VICTORIA PARK Transportation HYDE AVE from NASHVILLE AVE 05 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing AVE Services to [240 m N] VALLEY CRES [END] YORKTOWN DR from Transportation FRED BLAND CRES from MCCOWAN RD to TRUDELLE ST 05 Local Road Resurfacing Active 2019 2019 MUNICIPAL DR to TRETHEWEY Local Road Resurfacing Services DR GLENGROVE AVE W from MONA DR to [304.80 m W] Transportation WATT AVE from ROGERS RD to 05 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing MONA DR [CITY LIMITS] Services KERSDALE AVE Transportation GRACEFIELD AVE from KEELE ST RUTH AVE from MAXOME AVE to BAYVIEW AVE 05 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to CULFORD RD Transportation Local Road LOUVAIN ST from HUMBER COSBURN AVE from HALDON AVE to WESTLAKE AVE 05 Active 2019 2019 Local Road Reconstruction Services Reconstruction BLVD (YK) to CORDELLA AVE

Source: MCIC data Note: Future projects subject to change Page 23 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation VALENCIA CRES from CULFORD BRYN RD from WYNDALE DR to GRACEFIELD AVE 05 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services RD to DEL RIA DR Transportation LACEY AVE from EWART AVE to SCOTT RD from CAMERON AVE to EGLINTON AVE W 05 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services CAMERON AVE CASTLEFIELD AVE from CASTLEFIELD AVE from STRATHNAIRN AVE to Transportation 05 Local Road Resurfacing Active 2019 2019 STRATHNAIRN AVE to Local Road Resurfacing WOODBOROUGH AVE Services WOODBOROUGH AVE WESTON RD from LAWRENCE WESTON RD from LAWRENCE AVE W to CHURCH ST Transportation AVE W to CHURCH ST 05 Major Road Resurfacing Active 2019 2020 Major Road Resurfacing WESTON RD from CHURCH ST to ST PHILLIPS RD Services WESTON RD from CHURCH ST to ST PHILLIPS RD

Driveway narrowing and sidewalk construction through driveway.Contact Alliance Ave from Jane St to Driveway 45 m west of Jane Transportation Pedestrian Infrastructure Alliance Ave from Jane St to geometricsafety@.ca 05 Active 2020 2020 St Services Improvement Driveway 45 m west of Jane St for conceptual.ECS scope includes required surveys drainage curb realignment and utility relocation.

OUTLOOK GARDEN BLVD from OUTLOOK GARDEN BLVD from OUTLOOK AVE to Transportation 05 Local Road Resurfacing Active 2020 2020 OUTLOOK AVE to LAMBTON Local Road Resurfacing LAMBTON AVE Services AVE Transportation WYNDALE DR from KEELE ST to New Sidewalk From Keele St WYNDALE DR from KEELE ST to CULFORD RD 05 Sidewalk Construction Active 2020 2020 Services CULFORD RD to Culford Rd DONALD AVE from DONALD AVE from BLACKTHORN AVE to SILVERTHORN Transportation 05 Local Road Resurfacing Active 2020 2020 BLACKTHORN AVE to Local Road Resurfacing AVE Services SILVERTHORN AVE Transportation QUINAN DR from DUVAL DR to QUINAN DR from DUVAL DR to KEELE ST 05 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services KEELE ST Transportation ELLINS AVE from KINGHORN ELLINS AVE from KINGHORN AVE to SCARLETT RD (YK) 05 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to SCARLETT RD (YK) Transportation JOCADA RD from RUSTIC RD to JOCADA RD from RUSTIC RD to FLORAL PKWY 05 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services FLORAL PKWY ARROWDALE AVE from ARROWDALE AVE from MANGROVE RD to [123 m N] Transportation 05 Local Road Resurfacing Active 2020 2020 MANGROVE RD to [123 m N] Local Road Resurfacing MANGROVE RD [CUL-DE-SAC] Services MANGROVE RD [CUL-DE-SAC] Transportation WYNDALE DR from KEELE ST to WYNDALE DR from KEELE ST to CULFORD RD 05 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services CULFORD RD Transportation On Street Bikeway TRETHEWEY DR from JANE ST to TRETHEWEY DR from JANE ST to EGLINTON AVE W 05 Active 2020 2020 Installation of bike lanes Services Paving Markings EGLINTON AVE W Transportation On Street Bikeway EILEEN AVE from FLORENCE Installation of bikeway EILEEN AVE from FLORENCE CRES to SCARLETT RD 05 Active 2020 2020 Services Paving Markings CRES to SCARLETT RD pavement markings

Source: MCIC data Note: Future projects subject to change Page 24 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation On Street Bikeway FLORENCE CRES from Installation of bikeway FLORENCE CRES from PRITCHARD AVE to EILEEN AVE 05 Active 2020 2020 Services Paving Markings PRITCHARD AVE to EILEEN AVE pavement markings Transportation On Street Bikeway PRITCHARD AVE from JANE ST Installation of bikeway PRITCHARD AVE from JANE ST to FLORENCE CRES 05 Active 2020 2020 Services Paving Markings to FLORENCE CRES pavement markings Transportation On Street Bikeway PRITCHARD AVE from Installation of bikeway PRITCHARD AVE from CASTLETON AVE to JANE ST 05 Active 2020 2020 Services Paving Markings CASTLETON AVE to JANE ST pavement markings HENRIETTA ST from Transportation On Street Bikeway On Street Bikeway HENRIETTA ST from RUNNYMEDE RD to CASTLETON AVE 05 Active 2020 2020 RUNNYMEDE RD to CASTLETON Services Construction Construction AVE Transportation On Street Bikeway CASTLETON AVE from On Street Bikeway CASTLETON AVE from HENRIETTA ST to CORBETT AVE 05 Active 2020 2020 Services Construction HENRIETTA ST to CORBETT AVE Construction Transportation On Street Bikeway JANE ST from PRITCHARD AVE On Street Bikeway JANE ST from PRITCHARD AVE to PRITCHARD AVE 05 Active 2020 2020 Services Construction to PRITCHARD AVE Construction Transportation On Street Bikeway RUNNYMEDE RD from On Street Bikeway RUNNYMEDE RD from LIVERPOOL ST to HENRIETTA ST 05 Active 2020 2020 Services Construction LIVERPOOL ST to HENRIETTA ST Construction Transportation BRYN RD from WYNDALE DR to BRYN RD from WYNDALE DR to GRACEFIELD AVE 05 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services GRACEFIELD AVE MONKLANDS AVE from MONKLANDS AVE from EDMUND AVE (YK) to CLOUSTON Transportation 05 Local Road Resurfacing Active 2018 2020 EDMUND AVE (YK) to Local Road Resurfacing AVE Services CLOUSTON AVE Transportation SCOTT RD from CAMERON AVE SCOTT RD from CAMERON AVE to EGLINTON AVE W 05 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to EGLINTON AVE W OLD COLONY RD from [375 m E] HARRISON RD [CUL-DE- Transportation FINCH AVE W from BATHURST 06 Major Road Resurfacing Completed 2018 2018 Major Road Resurfacing SAC] to BAYVIEW AVE Services ST to DUFFERIN ST CAVOTTI CRES from OLD WESTON RD from [E-W] OLD WESTON RD [LEG] to Transportation 06 Local Road Resurfacing Active 2018 2018 WILMINGTON AVE to Local Road Resurfacing [N] ROWNTREE AVE [CITY LIMITS] Services EVANSTON DR New sidewalk from St Regis Crescent N to Ashwarren Rd including all required traffic control, drainage, curb CRAYFORD DR from [92 m W] HUNTSMILL BLVD to Transportation Ceramic Rd from St Regis 06 Sidewalk Construction Completed 2018 2018 alignment modification, utility CRAYFORD DR [RING] Services Crescent N to Ashwarren Rd relocation, property acquisition, any other requirements to facilitate sidewalk construction

Source: MCIC data Note: Future projects subject to change Page 25 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

New sidewalk from St Regis Crescent N to Bakersfield St including all required traffic control, drainage, curb Transportation St Regis Crescent S from St Regis PENWORTH RD from PHARMACY AVE to CAVEHILL CRES 06 Sidewalk Construction Completed 2018 2018 alignment modification, utility Services Crescent N to Bakersfield St relocation, property acquisition, any other requirements to facilitate sidewalk construction

CANTERBURY RD from THE KINGSWAY to WIMBLETON Transportation ANTIBES DR from TORRESDALE 06 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing RD Services AVE [N] to TORRESDALE AVE [S] MANORHAMPTON DR from RUSSELL RD to Transportation Finch Ave W from Dufferin St to 06 Sidewalk Construction Completed 2018 2018 New sidewalk SUMMITCREST DR Services Wilmington St Transportation On Street Bikeway Roding St from Cambrone Ave Installation of bikeway HENDON AVE from GREENVIEW AVE to YONGE ST 06 Active 2017 2018 Services Paving Markings to Langholm Dr pavement markings Transportation On Street Bikeway Exbury Rd from Cambrone Ave Installation of bikeway 2100 Weston Rd from to 06 Active 2017 2018 Services Paving Markings to Ln S Cambrone Ave pavement markings Transportation On Street Bikeway Sheppard Ave W from Sentinel Installation of cycling BIRCHMOUNT RD from FINCH AVE E to HYDRO R O W 06 Active 2017 2018 Services Paving Markings Rd to Sunfield Rd pavement markings Transportation Keele St from Sheppard Ave W 2231 Lawrence Ave E from to 06 Bikeway Trail Active 2018 2018 Installation of bikeway trail Services to Dovehouse Ave Transportation On Street Bikeway Blaydon Ave from Langholm Dr Installation of bikeway Finch Ave E from Tiffield Rd to CPR 06 Active 2018 2018 Services Paving Markings to Whitburn Cres pavement markings Transportation Langholm Dr from Roding St to Maxwell St from Blue Forest Dr to Hove St 06 Bikeway Trail Active 2018 2018 Installation of bikeway trail Services Black Creek Trail Transportation On Street Bikeway SUNFIELD RD from DIANA DR to Installation of bikeway Ryding Ave from Cobalt Ave to 06 Active 2018 2018 Services Paving Markings WYCOMBE RD pavement markings Transportation On Street Bikeway DIANA DR from SUNFIELD RD to Installation of bikeway DUNDAS ST W from KEELE ST to MEDLAND ST 06 Active 2018 2018 Services Paving Markings KEELE ST pavement markings Transportation On Street Bikeway Sunfield Rd from Sheppard Ave Installation of cycling ORLEANS DR from MUIRBANK BLVD to MUIRBANK BLVD 06 Active 2017 2018 Services Paving Markings W to Wycombe Rd pavement markings Transportation On Street Bikeway Sunfield Rd from Sheppard Ave Installation of cycling CONLINS RD from ELLESMERE RD to SHEPPARD AVE E 06 Active 2017 2018 Services Paving Markings W to Wycombe Rd pavement markings DENMARK CRES from Transportation TARSUS CRES from CANMORE BLVD to CALVERLEY TRL 06 Local Road Resurfacing Active 2018 2018 CARSCADDEN DR to Local Road Resurfacing Services CARCADDEN DR ARLSTAN DR from Transportation FIREBRACE RD from HUNTSMILL BLVD to STEELES AVE E 06 Local Road Resurfacing Active 2019 2019 WILMINGTON AVE to [92 m N] Local Road Resurfacing Services EVANSTON DR [CUL-DE-SAC]

ARLSTAN DR from Transportation Wilmington Ave to cul de sac COBB AVE from SPENVALLEY DR to DOLORES RD 06 Sidewalk Construction Active 2019 2019 WILMINGTON AVE to [92 m N] Services (north/east side) EVANSTON DR [CUL-DE-SAC]

Source: MCIC data Note: Future projects subject to change Page 26 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope APPLETREE CRT from DIANA DR MARKAY ST from CHARRINGTON CRES to SPENVALLEY Transportation 06 Local Road Resurfacing Active 2019 2019 to [82.20 m N] DIANA DR [CUL- Local Road Resurfacing DR Services DE-SAC] New sidewalk from Blue Forest Dr to Hove St including all required traffic control, drainage, curb alignment Transportation Maxwell St from Blue Forest Dr Millwood Rd from Southvale Dr to 06 Sidewalk Construction Active 2019 2019 modification, utility relocation, Services to Hove St property acquisition, any other requirements to facilitate sidewalk construction

Wilson Ave from Ridge Rd (1300 Transportation Miscellaneous MIDLAND AVE from ST. CLAIR AVE E to DANFORTH RD 06 Active 2019 2019 Wilson Ave) to Epic Lane Rd Catchbasin relocation Services Transportation Programs (1500 Wilson Ave) WHITBURN CRES from Transportation MCINTOSH ST from VANBURGH AVE to 06 Sidewalk Construction Active 2019 2019 BLAYDON AVE [S limit] to Sidewalk Construction Services BLAYDON AVE [N limit] Transportation Local Road WHITBURN CRES from KEELE ST MCINTOSH ST from PARK ST to 06 Active 2019 2019 Local Road Reconstrution Services Reconstruction to BLAYDON AVE Transportation GILLEY RD from GARRATT BLVD MCINTOSH ST from NATAL AVE to 6 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to KESWICK RD Add sharrows and other Transportation On Street Bikeway Whitburn Cres from Blaydon SHAW ST from LOBB AVE to ARGYLE ST 06 Active 2019 2019 wayfinding pavement Services Paving Markings Ave to Keele St markings. FAWNHAVEN CRT from HIDDEN Transportation CARLAW AVE from QUEEN ST E to DUNDAS ST E 06 Local Road Resurfacing Active 2019 2019 TRL to [100 m W] HIDDEN TRL Local Road Resurfacing Services [CUL-DE-SAC] Transportation MODEL AVE from FAYWOOD VICTORIA PARK AVE from GERRARD ST E to DONSIDE DR 06 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services BLVD to WILSON HEIGHTS BLVD TORRESDALE AVE from FINCH Transportation KILBARRY RD from RUSSELL HILL RD to SPADINA RD 06 Local Road Resurfacing Active 2019 2019 AVE (N YK) to [370 m N] FINCH Local Road Resurfacing Services AVE (N YK) [END] New sidewalk from Steeles Ave W to Finch Ave W including all required traffic control, drainage, curb Transportation Alness St from Steeles Ave W to Alness St from Steeles Ave W to Finch Ave W 06 Sidewalk Construction Active 2020 2020 alignment modification, utility Services Finch Ave W relocation, property acquisition, any other requirements to facilitate sidewalk construction

Source: MCIC data Note: Future projects subject to change Page 27 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation TAVISTOCK RD from KEELE ST to TAVISTOCK RD from KEELE ST to EXBURY RD 06 Sidewalk Construction Active 2020 2020 Sidewalk Construction Services EXBURY RD Transportation TAVISTOCK RD from KEELE ST to TAVISTOCK RD from KEELE ST to EXBURY RD 06 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services EXBURY RD [S] EASTERN AVE DIVERSION [BRANCH] from [S/E] Transportation WALSH AVE from WILSON AVE 07 Major Road Resurfacing Completed 2018 2018 Major Road Resurfacing EASTERN AVE DIVERSION [RAMP] to BROADVIEW AVE Services to WESTON RD London Green Crt from Transportation On Street Bikeway Installation of bikeway Danforth Rd from Kennedy Rd to 07 Active 2017 2018 Driftwood Ave to Black Creek Services Paving Markings pavement markings Trail THE QUEENSWAY EB from RONCESVALLES AVE to Transportation On Street Bikeway Shoreham Dr from Jane St to Installation of bikeway 07 Active 2017 2018 CLAUDE AVE Services Paving Markings The Pond Rd pavement marking ELEANOR AVE from OAKWOOD AVE to [101.60 m W] Transportation Black Creek Trl from Shoreham 07 Bikeway Trail Active 2018 2018 Installation of bikeway trail OAKWOOD AVE [END] Services Dr to 100 m S of Shoreham Dr Transportation On Street Bikeway The Pond Rd from Sentinel Rd to Installation of bikeway DUNDAS ST W from ANNETTE ST to INDIAN ROAD CRES 07 Active 2018 2018 Services Paving Markings Shoreham Dr pavement markings GLEN CEDAR RD from STRATHEARN RD to MARKDALE Transportation On Street Bikeway SHOREHAM DR from JANE ST to Installation of bikeway 07 Active 2019 2019 AVE Services Paving Markings MURRAY ROSS BKWY pavement markings Transportation DERRYDOWN RD from SENTINEL MCINTOSH ST from PHILlIP AVE to 7 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services RD to OLLERTON RD Reesor Rd over Rouge Tributary from ROUGE Transportation COBB AVE from SPENVALLEY DR 07 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing TRIBUTARY to Services to DOLORES RD MARKAY ST from Transportation GLEN PARK AVE from DUFFERIN ST to CAPITOL AVE 07 Local Road Resurfacing Active 2019 2019 CHARRINGTON CRES to Local Road Resurfacing Services SPENVALLEY DR ANCHOR DR from ARLETA AVE GLEN RUSH BLVD from GLENGROVE AVE to GLENGROVE Transportation 07 Local Road Resurfacing Active 2019 2019 to [120 m W] ARLETA AVE [CUL- Local Road Resurfacing AVE Services DE-SAC] Transportation CHARRINGTON CRES from MONA DR from GLENCAIRN AVE to GLENGROVE AVE W 07 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services MARKAY ST to MARKAY ST WATNEY CRES from Transportation SHAW ST from LOBB AVE to ARGYLE ST 07 Local Road Resurfacing Active 2019 2019 SPENVALLEY DR to SPENVALLEY Local Road Resurfacing Services DR Transportation MANDY ST from CHARRINGTON CARLAW AVE from GERRARD ST E to RIVERDALE AVE 07 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services CRES to YATESCASTLE DR

BARBER GREENE RD from OVERLAND DR to DON MILLS Transportation SHOREHAM DR from MURRAY 07 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing RD Services ROSS PKWY to JANE ST Transportation FIRENZA DR from MILADY RD to ELWOOD BLVD from AVENUE RD to CASTLE KNOCK RD 07 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services DUNCANWOODS DR VALEWOOD AVE from CHERRYWOOD AVE to Transportation BENRUBIN DR from FIRENZA DR 07 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing ARLINGTON AVE Services to DUNCANWOODS DR

Source: MCIC data Note: Future projects subject to change Page 28 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope LITTLEDEAN CRT from [87 m S] MONKLANDS AVE from EDMUND AVE (YK) to CLOUSTON Transportation 07 Local Road Resurfacing Active 2019 2019 NAVENBY CRES [CUL-DE-SAC] to Local Road Resurfacing AVE Services NAVENBY CRES Transportation OAKDALE RD from SHEPPARD OAKDALE RD from SHEPPARD AVE E to EDDYSTONE AVE 07 Major Road Resurfacing Active 2020 2020 Major Road Resurfacing Services AVE E to EDDYSTONE AVE

Transportation On Street Bikeway OAKDALE RD from SHEPPARD Installation of buffered bicycle OAKDALE RD from SHEPPARD AVE E to FINCH AVE E 07 Active 2020 2020 Services Paving Markings AVE E to FINCH AVE E lanes Evelyn Wiggins Dr from Evelyn Wiggins Dr from Assiniboine Rd to Finch Hydro Transportation On Street Bikeway Installation of bikeway 07 Active 2020 2020 Assiniboine Rd to Finch Hydro Corridor Trail Services Paving Markings pavement markings Corridor Trail MURRAY ROSS PKWY from MURRAY ROSS PKWY from SHOREHAM DR to STEELES Transportation 07 Bikeway Trail Active 2020 2020 SHOREHAM DR to STEELES AVE Installation of multi-use trail AVE W Services W Transportation On Street Bikeway The Pond Rd from Sentinel Rd to Installation of bikeway The Pond Rd from Sentinel Rd to Petrolia Rd 07 Active 2020 2020 Services Paving Markings Petrolia Rd pavement markings HEPC from FINCH TO HUMBER TRAIL CONNECTION to Transportation HEPC from FINCH TO HUMBER 07 Bikeway Trail Active 2020 2020 Bikeway Trail Construction CPR Services TRAIL CONNECTION to CPR

Reconstruction of Murray Ross/Evelyn Wiggins/Columbia Gt MURRAY ROSS PKWY from 70 M intersection.Bidirectional cycle MURRAY ROSS PKWY from 70 M W OF EVELYN WIGGNS Transportation On Street Bikeway 07 Active 2020 2020 W OF EVELYN WIGGNS DR to track will also be constructed DR to KEELE ST Services Construction KEELE ST along south side of Murray Ross, E to Keele St, including reconstruction of SW corner of intersection.

Reconstruction of Murray Ross / Evelyn Wiggins / Columbia Gate intersection required to COLUMBIA GT from 50 M S OF COLUMBIA GT from 50 M S OF MURRAY ROSS PKWY to Transportation On Street Bikeway connect existing Finch Hydro 07 Active 2020 2020 MURRAY ROSS PKWY to MURRAY ROSS PKWY Services Construction Corridor Trail with new cycle MURRAY ROSS PKWY track on Evelyn Wiggins Dr. This location represents the south leg of the intersection.

COLDSTREAM AVE from [50 m OLD WESTON RD from ST CLAIR AVE W to [E-W] OLD Transportation Utility Cut Road 08 Active 2017 2018 E] GLENMOUNT AVE to Grind & Pave WESTON RD [LEG] Services Rehabilitation DALEMOUNT AVE Transportation WOBURN AVE from AVENUE RD Kingston Rd from Beechgrove Dr to Kingston Rd 08 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services to LEDBURY ST

Source: MCIC data Note: Future projects subject to change Page 29 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation YORKDALE RD [RAMP] from Gunns Rd from St Clair Ave W to Weston Rd 08 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing Services YORKDALE RD to DUFFERIN ST Caledonia Rd from [205m N] Transportation ROXTON RD from DEWSON ST to HARBORD ST 08 Sidewalk Construction Completed 2018 2018 Castlefield Ave to Castlefield west side at 724 Caledonia Rd Services Ave BLUE ANCHOR TRL from PORT UNION RD to EAST AVE Transportation NEPTUNE DR from BATHURST 08 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing (SC) Services ST to RAJAH ST BABY POINT TER from BABY POINT CRES to [N] BABY Transportation Miscellaneous LIVINGSTONE AVE from MARLEE 08 Active 2018 2018 Utility Cut Restoration POINT RD [END] Services Transportation Programs AVE to TIMES RD

Transportation Utility Cut Grind and FAIRLEIGH CRES from EGLINTON BLOOR ST W from BATHURST ST to SPADINA AVE 08 Active 2018 2018 Grind & Pave Services Pave AVE W to WHITMORE AVE COLDSTREAM AVE from MADELAINE AVE from DANFORTH AVE to [62.0 M N] Transportation 08 Local Road Resurfacing Active 2019 2019 ENGLEMOUNT AVE to Local Road Resurfacing DANFORTH AVE Services GLENGROVE AVE RONALD AVE from CASTLEFIELD JAMES ST (ETBK) from THIRTY SIXTH ST to FORTY Transportation Local Road 08 Active 2019 2019 AVE to [216 m N] CASTLEFIELD Local Road Reconstruction SECOND ST Services Reconstruction AVE [END] FAIRBANK AVE from [57 m S] SKEENS LANE from THIRTIETH ST to [41 m]E THIRTIETH Transportation Local Road 08 Active 2019 2019 ROSELAWN AVE [END] to Local Road Reconstruction ST Services Reconstruction ROSELAWN AVE New sidewalk from [57 m S] Roselawn Ave [End] to Roselawn Ave including all required traffic control, Fairbank Ave from [57 m S] Transportation drainage, curb alignment LINKWOOD LANE from SPANBRIDGE RD to ST DENNIS DR 08 Sidewalk Construction Active 2019 2019 Roselawn Ave [End] to Services modification, utility relocation, Roselawn Ave property acquisition, any other requirements to facilitate sidewalk construction. [S] BELSIZE DR [BRANCH] from FORMAN AVE to BOYTON Transportation On Street Bikeway CHATSWORTH DR from Installation of bikeway 08 Active 2019 2019 RD Services Paving Markings LAWRENCE AVE W to YONGE ST pavement markings

Transportation HOTSPUR RD from BATHURST BROCK AVE from QUEEN ST W to BLOOR ST W 08 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services ST to NEPTUNE DR

Transportation DUFFLAW RD from LAWRENCE DUNVEGAN RD from LONSDALE RD to KILBARRY RD 08 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services AVE W to ORFUS RD

Transportation DELL PARK AVE from BATHURST BLOOR ST W from RUNNYMEDE RD to SHAW ST 08 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services ST to SHERMOUNT AVE

Source: MCIC data Note: Future projects subject to change Page 30 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope CARHARTT ST from Transportation KING ST W from SUDBURY ST to SHAW ST 08 Local Road Resurfacing Active 2019 2019 MARQUETTE AVE to [75 m N] Local Road Resurfacing Services MARQUETTE AVE [END] SALINAS CRT from 88 M S OF ROSELAWN AVE to Transportation ORFUS RD from DUFFERIN ST to 08 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing ROSELAWN AVE Services CALEDONIA RD Transportation ROSELAWN AVE from LOCKSLEY MONTESSON ST from WILMAR RD to ACORN AVE 08 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services AVE to SALINAS CRT HOWLAND AVE from DUPONT ST to NORTH OF DUPONT Transportation ST GERMAIN AVE from YONGE 08 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing ST Services ST to JEDBURGH RD ORIOLE PKWY from Transportation MARTIN GROVE RD from BLOOR ST W to GAYLORD AVE 08 Local Road Resurfacing Active 2019 2019 WILLOWBANK BLVD to Local Road Resurfacing Services ORCHARD VIEW BLVD NIAGARA ST from WELLINGTON ST W to RICHMOND ST Transportation GLENCAIRN AVE from DUFFERIN 08 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing W Services ST to CALEDONIA RD DANESBURY AVE from CASEBRIDGE CRT from MORNINGSIDE AVE to 337 M E Transportation 08 Local Road Resurfacing Active 2019 2019 LILYWOOD RD to HILLMOUNT Local Road Resurfacing OF MORNINGSIDE AVE Services AVE HILLMOUNT AVE from DANFORTH AVE from BROADVIEW AVE to DANFORTH Transportation 08 Local Road Resurfacing Active 2018 2019 DANESBURY AVE to DUFFERIN Local Road Resurfacing RD Services ST YORKDALE RD from W R ALLEN RD to YORKDALE RD Transportation Major Road YORKDALE RD from W R ALLEN 08 Active 2020 2020 Major Road Reconstruction [RAMP] Services Reconstruction RD to YORKDALE RD [RAMP] Transportation On Street Bikeway LAWRENCE AVE W from ELM RD Installation of intersection LAWRENCE AVE W from ELM RD to CHATSWORTH DR 08 Active 2020 2020 Services Construction to CHATSWORTH DR improvement Installation of signed and LOCKSLEY AVE from HOPEWELL AVE to EGLINTON AVE Transportation On Street Bikeway LOCKSLEY AVE from HOPEWELL 08 Active 2020 2020 marked route with contra-flow W Services Paving Markings AVE to EGLINTON AVE W bike lane [37 m N] BEDFORD PARK AVE [37 m N] BEDFORD PARK AVE from GREY RD to [81 m W] Transportation 08 Laneway Reconstruction Active 2020 2020 from GREY RD to [81 m W] GREY Laneway Reconstruction GREY RD Services RD GLENCAIRN AVE from 304.8 M Existing signed route GLENCAIRN AVE from 304.8 M W OF MONA DR [CITY Transportation On Street Bikeway 08 Active 2020 2020 W OF MONA DR [CITY LIMITS] upgraded to cycling LIMITS] to MONA DR Services Paving Markings to MONA DR infrastructure TBD Transportation Pedestrian Infrastructure YONGE BLVD from WILSON AVE Pedestrian Infrastructure YONGE BLVD from WILSON AVE to YONGE ST 08 Active 2020 2020 Services Improvement to YONGE ST Improvement Transportation WILLOWBANK BLVD from WILLOWBANK BLVD from ORIOLE PKWY to AVENUE RD 08 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ORIOLE PKWY to AVENUE RD Transportation JEDBURGH RD from WOBURN JEDBURGH RD from WOBURN AVE to CRANBROOKE AVE 08 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to CRANBROOKE AVE Transportation WOBURN AVE from JEDBURGH WOBURN AVE from JEDBURGH RD to GREER RD 08 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services RD to GREER RD

Source: MCIC data Note: Future projects subject to change Page 31 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope ORIOLE PKWY from BURNABY BLVD to WILLOWBANK Transportation ORIOLE PKWY from BURNABY 08 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing BLVD Services BLVD to WILLOWBANK BLVD

Transportation GLENGROVE AVE W from GLENGROVE AVE W from ROSEWELL AVE to AVENUE RD 08 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ROSEWELL AVE to AVENUE RD Transportation HILLHURST BLVD from AVENUE HILLHURST BLVD from AVENUE RD to MONA DR 08 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services RD to MONA DR ROSELAWN AVE from Transportation ROSELAWN AVE from ROSEWELL AVE to ORIOLE PKWY 08 Local Road Resurfacing Active 2020 2020 ROSEWELL AVE to ORIOLE Local Road Resurfacing Services PKWY Transportation CASTLEFIELD AVE from AVENUE CASTLEFIELD AVE from AVENUE RD to CASTLEWOOD RD 08 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services RD to CASTLEWOOD RD

Transportation GLENVIEW AVE from ROSEWELL GLENVIEW AVE from ROSEWELL AVE to AVENUE RD 08 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to AVENUE RD Add sharrows and bikeway Transportation On Street Bikeway GLENGROVE AVE W from GLENGROVE AVE W from ROSEWELL AVE to AVENUE RD 08 Active 2020 2020 pavement markings, bundled Services Paving Markings ROSEWELL AVE to AVENUE RD with 2020 LRRS. GLENGROVE AVE from GLEN GLENGROVE AVE from GLEN RUSH BLVD to [304.8m W] Transportation On Street Bikeway Installation of bikeway 08 Active 2020 2020 RUSH BLVD to [304.8m W] MONA DR Services Paving Markings pavement markings MONA DR GLENGROVE AVE from GLENGROVE AVE from ENGLEMOUNT AVE to Transportation On Street Bikeway ENGLEMOUNT AVE to Installation of bikeway 08 Active 2020 2020 COLDSTREAM AVE (EAST INTERSECTION) Services Paving Markings COLDSTREAM AVE (EAST pavement markings INTERSECTION) Transportation On Street Bikeway CAPITOL AVE from GLEN PARK Installation of bikeway CAPITOL AVE from GLEN PARK AVE to GLENGROVE AVE 08 Active 2020 2020 Services Paving Markings AVE to GLENGROVE AVE pavement markings

Transportation On Street Bikeway GLEN PARK AVE from DUFFERIN Installation of bikeway GLEN PARK AVE from DUFFERIN ST to CAPITOL AVE 08 Active 2020 2020 Services Paving Markings ST to CAPITOL AVE pavement markings GLEN RUSH BLVD from GLEN RUSH BLVD from GLENGROVE AVE to GLENGROVE Transportation On Street Bikeway Installation of bikeway 08 Active 2020 2020 GLENGROVE AVE to AVE Services Paving Markings pavement markings GLENGROVE AVE Transportation On Street Bikeway MONA DR from GLENCAIRN AVE MONA DR from GLENCAIRN AVE to GLENGROVE AVE W 08 Active 2020 2020 Installation of signed route Services Paving Markings to GLENGROVE AVE W SALINAS CRT from 88 M S OF SALINAS CRT from 88 M S OF ROSELAWN AVE to Transportation On Street Bikeway Installation of signed and 08 Active 2020 2020 ROSELAWN AVE to ROSELAWN ROSELAWN AVE Services Paving Markings marked route AVE GLENGROVE AVE W from 304.8 Existing signed and marked GLENGROVE AVE W from 304.8 M W OF MONA RD [CITY Transportation On Street Bikeway 08 Active 2020 2020 M W OF MONA RD [CITY route upgraded to cycling LIMITS] to MONA DR Services Paving Markings LIMITS] to MONA DR infrastructure TBD Transportation On Street Bikeway ELM RD from LAWRENCE AVE W ELM RD from LAWRENCE AVE W to RIDLEY BLVD 08 Active 2020 2020 Installation of bike lanes Services Paving Markings to RIDLEY BLVD

Source: MCIC data Note: Future projects subject to change Page 32 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope GLENGROVE AVE from GLENGROVE AVE from ENGLEMOUNT AVE to Transportation On Street Bikeway Installation of bikeway 08 Active 2020 2020 ENGLEMOUNT AVE to DALEMOUNT AVE Services Paving Markings pavement markings DALEMOUNT AVE GLENGROVE AVE from GLENGROVE AVE from BATHURST ST to GLEN RUSH Transportation On Street Bikeway Installation of bikeway 08 Active 2020 2020 BATHURST ST to GLEN RUSH BLVD Services Paving Markings pavement markings BLVD Transportation On Street Bikeway GLENGROVE AVE W from GLENGROVE AVE W from ROSEWELL AVE to DUPLEX AVE 08 Active 2020 2020 Installation of signed route Services Paving Markings ROSEWELL AVE to DUPLEX AVE

Installation of bikeway GLENCAIRN AVE from pavement markings, Transportation On Street Bikeway GLENCAIRN AVE from DALEMOUNT AVE to DUFFERIN ST 08 Active 2020 2020 DALEMOUNT AVE to DUFFERIN Installation of quiet street Services Paving Markings ST route, Installation of signed route GLENGROVE AVE from BWPM will be installed along GLENGROVE AVE from BATHURST ST to DALEMOUNT Transportation On Street Bikeway 08 Active 2020 2020 BATHURST ST to DALEMOUNT Glengrove in 2020 by the AVE Services Paving Markings AVE Cycling unit. GLENGROVE AVE W from GLENGROVE AVE W from MONA DR to [304.80 m W] Transportation Local Road 08 Active 2020 2020 MONA DR to [304.80 m W] Local Road Reconstruction MONA DR [CITY LIMITS] Services Reconstruction MONA DR [CITY LIMITS] LOCKSLEY AVE from EGLINTON AVE W to HOPEWELL Transportation Local Road LOCKSLEY AVE from EGLINTON 08 Active 2020 2020 Local Road Reconstruction AVE Services Reconstruction AVE W to HOPEWELL AVE Transportation Local Road WHITMORE AVE from MARLEE WHITMORE AVE from MARLEE AVE to DUFFERIN ST 08 Active 2020 2020 Local Road Reconstruction Services Reconstruction AVE to DUFFERIN ST MONTCALM AVE from SCHELL MONTCALM AVE from SCHELL AVE to [42 m N] Transportation Local Road 08 Active 2020 2020 AVE to [42 m N] CLARKSON AVE Local Road Reconstruction CLARKSON AVE [END] Services Reconstruction [END] GLENCAIRN AVE from MONA DR GLENCAIRN AVE from MONA DR to [304.80 m W] MONA Transportation Local Road 08 Active 2020 2020 to [304.80 m W] MONA DR Local Road Reconstruction DR [CITY LIMITS] Services Reconstruction [CITY LIMITS] COLDSTREAM AVE from MONA COLDSTREAM AVE from MONA DR to [303.50 m W] Transportation Local Road 08 Active 2020 2020 DR to [303.50 m W] MONA DR Local Road Reconstruction MONA DR [CITY LIMITS] Services Reconstruction [CITY LIMITS] Transportation Local Road SCHELL AVE from RONALD AVE SCHELL AVE from RONALD AVE to CALEDONIA RD 08 Active 2020 2020 Local Road Reconstruction Services Reconstruction to CALEDONIA RD Transportation Local Road ELWOOD BLVD from AVENUE ELWOOD BLVD from AVENUE RD to CASTLE KNOCK RD 08 Active 2020 2020 Local Road Reconstruction Services Reconstruction RD to CASTLE KNOCK RD FREDERICK G GARDINER [RAMP Q] from [EB] FREDERICK Transportation On Street Bikeway Dundas St W from College St to Installation of a bikeway 09 Active 2018 2018 G GARDINER to YONGE ST/YORK ST Services Paving Markings Lansdowne Ave pavement markings Yonge York Bay FGG Ramsp from Gardiner E Bound to Transportation On Street Bikeway Lansdowne Ave from College St Installation of a bikeway 09 Active 2018 2018 Lakeshore Blvd Services Paving Markings to Dundas St W pavement markings COLDSTREAM AVE from [50 m E] GLENMOUNT AVE to Transportation DUFFERIN ST from COLLEGE ST 09 Major Road Resurfacing Completed 2018 2018 Major Road Resurfacing DALEMOUNT AVE Services (TO) to BLOOR ST W

Source: MCIC data Note: Future projects subject to change Page 33 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation Pedestrian Infrastructure PEEL AVE from GLADSTONE AVE Ensure compliance with GLEN RD from BEAUMONT RD to SUMMERHILL AVE 09 Active 2018 2018 Services Improvement to DUFFERIN ST existing streetscape plan

Transportation Pedestrian Infrastructure GLADSTONE AVE from QUEEN Ensure compliance with KIPLING AVE from REXDALE BLVD to ALBION RD 09 Active 2018 2018 Services Improvement ST W to PEEL AVE existing streetscape plan

OLD WESTON RD from [S] Transportation Ellerslie Ave from Senlac Rd to 260 Ellerslie Ave 09 Major Road Resurfacing Active 2018 2018 HYDRO R O W [END] to [N] Major Road Resurfacing Services ROWNTREE AVE [CITY LIMITS]

Caledonia Rd from [205m N] Castlefield Ave to Transportation OLD WESTON RD from ST CLAIR 09 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing Castlefield Ave Services AVE W to ROCKWELL AVE Fairbank Ave from [57 m S] Roselawn Ave [End] to Transportation On Street Bikeway EDWIN AVE from RUSKIN AVE to Installation of cycling 09 Active 2018 2018 Roselawn Ave Services Paving Markings DUPONT ST pavement markings CHERRYDALE CRT from CENTENNIAL RD to [384 m W] Transportation On Street Bikeway DUFFERIN ST from WATERLOO Installation of bikeway 09 Active 2017 2018 CENTENNIAL RD [CUL-DE-SAC] Services Paving Markings AVE to FLORENCE ST pavement markings SHERIDAN AVE from MUIR AVE CLEMENT RD from [59 m W] CLEMENTVIEW CRT to Transportation Utility Cut Grind and 09 Active 2018 2018 (TO) to [44 m N] MUIR AVE (TO) Grind & Pave BRAMPTON RD Services Pave [END] LAUGHTON AVE from Transportation On Street Bikeway Installation of bikeway Elm Ave from South Dr to 09 Active 2019 2019 DAVENPORT RD to HOUNSLOW Services Paving Markings pavement markings HEATH RD Transportation On Street Bikeway BENSON AVE from ALBERTA Installation of bikeway BARTON AVE from BATHURST ST to CHRISTIE ST 09 Active 2019 2019 Services Paving Markings AVE to WINONA DR pavement markings GREENLAW AVE from Transportation On Street Bikeway Installation of bikeway BOULTBEE AVE from KISWICK ST to BLAKE ST 09 Active 2019 2019 DAVENPORT RD to Services Paving Markings pavement markings ROSEMOUNT AVE ROSEMOUNT AVE from INDIAN GRV from ANNETTE ST to [96 m N] HOOK AVE Transportation On Street Bikeway Installation of bikeway 09 Active 2019 2019 GREENLAW AVE to ALBERTA [END] Services Paving Markings pavement markings AVE Transportation On Street Bikeway HOUNSLOW HEATH RD from ST Installation of bikeway BEDFORD RD from BLOOR ST W to LOWTHER AVE 09 Active 2019 2019 Services Paving Markings CLAIR AVE W to LAUGHTON AVE pavement markings MOCCASIN TRL from NOB LANE to 146 M N/E OF NOB Transportation NORFOLK ST from SHIRLEY ST to 09 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing LANE Services HICKSON ST OSSINGTON CRES from Transportation MCLEVIN AVE from MALVERN ST to MORNINGSIDE AVE 09 Local Road Resurfacing Active 2019 2019 OSSINGTON AVE to [72 m W] Local Road Resurfacing Services OSSINGTON AVE [END] SARNIA AVE from [91 m E] Transportation Utility Cut Grind and HENRIETTA ST from RUNNYMEDE RD to CASTLETON AVE 09 Active 2019 2019 CAMPBELL AVE [END] to Utility Cut Grind and Pave Services Pave CAMPBELL AVE Transportation SUMMIT AVE from GILBERT AVE SUMMIT AVE from GILBERT AVE to BRONOCO AVE 09 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to BRONOCO AVE

Source: MCIC data Note: Future projects subject to change Page 34 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Infrastructure Transportation GLADSTONE AVE from QUEEN Peel-Gladstone GLADSTONE AVE from QUEEN ST W to PEEL AVE 09 Enhancement - Active 2020 2020 Services ST W to PEEL AVE Reconstruction: Construction Construction Stage Infrastructure Transportation PEEL AVE from GLADSTONE AVE Peel-Gladstone PEEL AVE from GLADSTONE AVE to DUFFERIN ST 09 Enhancement - Active 2020 2020 Services to DUFFERIN ST Reconstruction: Construction Construction Stage LUMBERVALE AVE from LUMBERVALE AVE from LANSDOWNE AVE (TO) to ST Transportation Local Road 09 Active 2020 2020 LANSDOWNE AVE (TO) to ST Local Road Reconstruction HELEN'S AVE Services Reconstruction HELEN'S AVE MC FARLAND AVE from MC FARLAND AVE from DAVENPORT RD to Transportation 09 Local Road Resurfacing Active 2020 2020 DAVENPORT RD to Local Road Resurfacing ASHBURNHAM RD Services ASHBURNHAM RD Transportation SHANNON ST from OSSINGTON SHANNON ST from OSSINGTON AVE to DOVERCOURT RD 09 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to DOVERCOURT RD

TOWNSLEY ST from [19 m W] OLD WESTON RD to Transportation TOWNSLEY ST from [19 m W] 09 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing UNION ST Services OLD WESTON RD to UNION ST SHERIDAN AVE from [W] SHERIDAN AVE from [W] MOUTRAY ST [BRANCH] to Transportation 09 Local Road Resurfacing Active 2020 2020 MOUTRAY ST [BRANCH] to Local Road Resurfacing COLLEGE ST (TO) Services COLLEGE ST (TO) Transportation SHERIDAN AVE from FLORENCE SHERIDAN AVE from FLORENCE ST to BANK ST 09 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ST to BANK ST Transportation SHERIDAN AVE from FRANKISH SHERIDAN AVE from FRANKISH AVE to DUNDAS ST W 09 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to DUNDAS ST W

WALLACE AVE from RUSSETT AVE to LANSDOWNE AVE Transportation WALLACE AVE from RUSSETT 09 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing (TO) Services AVE to LANSDOWNE AVE (TO)

WESTMOUNT AVE from REGAL RD to ROSEMOUNT AVE Transportation WESTMOUNT AVE from REGAL 09 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing (TO) Services RD to ROSEMOUNT AVE (TO) Transportation BEACONSFIELD AVE from BEACONSFIELD AVE from ARGYLE ST to AFTON AVE 09 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ARGYLE ST to AFTON AVE BEACONSFIELD AVE from AFTON AVE to MACKENZIE Transportation BEACONSFIELD AVE from 09 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing CRES Services AFTON AVE to MACKENZIE CRES Transportation NUNES LANE from MC FARLAND NUNES LANE from MC FARLAND AVE to VIA ITALIA 09 Laneway Reconstruction Active 2020 2020 Laneway Reconstruction Services AVE to VIA ITALIA ST HELEN'S AVE from DUNDAS ST W to LUMBERVALE Transportation Local Road ST HELEN'S AVE from DUNDAS 09 Active 2020 2020 Local Road Reconstruction AVE Services Reconstruction ST W to LUMBERVALE AVE

Transportation New bridge connecting West SHAW ST from DOURO ST to WESTERN BATTERY RD 10 Bridge Rehabilitation Active 2017 2018 New Ped bridge Services Battrey Rd to Dourno St

Source: MCIC data Note: Future projects subject to change Page 35 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

During this time, the York-Bay- Yonge off-ramp and the eastbound on-ramp to the will be closed. As part of the project, GARDINER E BAY ST RAMP, LAKE SHORE BLVD W, Harbour Street will be GARDINER E YORK ST RAMP, HARBOUR ST from LOWER Transportation Gardiner Expressway Replacement of FGG York, widened between Lower SIMCOE ST, GARDINER E BAY ST RAMP, HARBOUR ST, 10 Active 2016 2018 Services Rehabilitation Yonge, Bay ramps Simcoe Street and , GARDINER E YORK ST RAMP, LAKE SHORE BLVD W, F G and the intersections of the GARDINER XY E to YORK ST, HARBOUR ST, BAY ST eastbound and Harbour Street at Lower Simcoe Street, York Street, and Bay Street will be reconfigured.

FREDERICK G GARDINER [RAMP Transportation Major Road Q] from [EB] FREDERICK G DAVENPORT RD from BEDFORD RD to DUPONT ST 10 Active 2016 2018 Ramp Reconstruction Services Reconstruction GARDINER to YONGE ST/YORK ST Transportation Major Road YORK ST from HARBOUR ST to YORK ST from HARBOUR ST to [N/W] YORK ST [RAMP] 10 Active 2016 2018 Intersection Reconfiguration Services Reconstruction [N/W] YORK ST [RAMP] Transportation Major Road YORK ST from HARBOUR ST to TUPPER AVE from TOWNS RD to HORNER AVE 10 Active 2016 2018 Intersection Reconfiguration Services Reconstruction [N/W] YORK ST [RAMP] Transportation Major Road YORK ST from HARBOUR ST to JARVIS ST from QUEEN ST E to DUNDAS ST E 10 Active 2016 2018 Intersection Reconfiguration Services Reconstruction [N/W] YORK ST [RAMP] [N] LAKE SHORE BLVD W Transportation Major Road Kingston Rd from Morningside Ave to 10 Active 2016 2018 [BRANCH] from BAY ST to REES Intersection Reconfiguration Services Reconstruction ST Transportation On Street Bikeway STRACHAN AVE from LAKE KEYWEST AVE from LAUDER AVE to NORTHCLIFFE BLVD 10 Active 2018 2018 Installation of Bikeway Trail Services Paving Markings SHORE BLVD W to QUEEN ST W

Transportation Lake Shore Blvd W from Ontario PORTRUSH CRES from CALVERLEY TRL to PICTORIAL ST 10 Bikeway Trail Active 2017 2018 Installation of bikeway trail Services Place Blvd to Remembrance Dr Transportation Utility Cut Grind and CHARLOTTE ST from KING ST W SCARLETT RD from HUMBER RIVER to EDENBRIDGE DR 10 Active 2018 2018 Grind & Pave Services Pave to ADELAIDE ST W QUEEN ST E from KINGSTON RD to 110 m W of Transportation Utility Cut Grind and WELLINGTON ST W from YORK 10 Active 2018 2018 Grind & Pave KINGSTON RD Services Pave ST to UNIVERSITY AVE RFP 9117-18-5058 FGG RFP 9117-18-5058 FGG MONARCH PARK AVE from FELSTEAD AVE to SAMMON Transportation Gardiner Expressway 10 Active 2019 2019 Substructure Repair Spadina to Substructure Repair Spadina AVE Services Rehabilitation Dan Lackey to Dan Lackey Transportation On Street Bikeway LAKE SHORE BLVD E from Installation of bikeway Strathearn Rd from Ava Rd to Bathurst St 10 Active 2019 2019 Services Paving Markings PARLIAMENT ST to BOOTH AVE pavement markings

Source: MCIC data Note: Future projects subject to change Page 36 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation On Street Bikeway LOBB AVE from SHAW ST to Installation of bikeway DUNVEGAN RD from ST CLAIR AVE W to LONSDALE RD 10 Active 2019 2019 Services Paving Markings CRAWFORD ST pavement markings Installation of cycling Transportation On Street Bikeway BLUE JAYS WAY from NAVY WHITNEY AVE from GLEN RD to ROXBOROUGH DR 10 Active 2019 2019 pavement markings and flexi Services Paving Markings WHARF CRT to KING ST W posts NAVY WHARF CRT from Installation of cycling Transportation On Street Bikeway ADELAIDE ST W from STRACHAN AVE to SHAW ST 10 Active 2019 2019 BREMNER BLVD to BLUE JAYS pavement markings and flexi Services Paving Markings WAY posts Transportation On Street Bikeway ARGYLE ST from OSSINGTON Installation of bikeway SHAW ST from DOURO ST to KING ST W 10 Active 2019 2019 Services Paving Markings AVE to SHAW ST pavement markings Transportation On Street Bikeway TECUMSETH ST from NIAGARA Installation of bikeway REID MANOR PARK - BRIDGE from to 10 Active 2019 2019 Services Paving Markings ST to QUEEN ST W pavement markings Transportation CAMERON ST from QUEEN ST W GLEN CEDAR RD from MARKDALE AVE to AVA RD 10 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to GRANGE AVE STAFFORD ST from GLENGROVE AVE from ENGLEMOUNT AVE to Transportation 10 Local Road Resurfacing Active 2019 2019 WELLINGTON ST W to CANNIFF Local Road Resurfacing DALEMOUNT AVE Services ST Transportation Utility Cut Grind and HANNA AVE from LIBERTY ST to FLORENCE CRES from PRITCHARD AVE to EILEEN AVE 10 Active 2019 2019 Utility Cut Grind and Pave Services Pave SNOOKER ST [25 m N] ADELAIDE ST W from [25 m N] ADELAIDE ST W from DUNCAN ST to [27.40 m Transportation 10 Laneway Reconstruction Active 2020 2020 DUNCAN ST to [27.40 m W] Laneway Reconstruction W] DUNCAN ST Services DUNCAN ST [27.40 m W] DUNCAN ST from [27.40 m W] DUNCAN ST from [25 m N] ADELAIDE ST W Transportation 10 Laneway Reconstruction Active 2020 2020 [25 m N] ADELAIDE ST W to Laneway Reconstruction to NELSON ST (TO) Services NELSON ST (TO) Infrastructure Transportation Algonquin Bridge Rd from Cibola Algonquin Island Bridge: Algonquin Bridge Rd from Cibola Ave to Omaha Ave 10 Enhancement - Active 2019 2020 Services Ave to Omaha Ave Construction Construction Stage Transportation Utility Cut Road RICHMOND ST W from YORK ST RICHMOND ST W from YORK ST to BATHURST ST 10 Active 2019 2020 Utility Cut Road Rehabilitation Services Rehabilitation to BATHURST ST Transportation On Street Bikeway WALNUT AVE from RICHMOND Installation of signed and WALNUT AVE from RICHMOND ST W to QUEEN ST W 10 Active 2020 2020 Services Paving Markings ST W to QUEEN ST W marked route

New sidewalk from Liberty St to end of Hanna Ave including all required traffic control, drainage, curb alignment Transportation Hanna Ave from Liberty St to Hanna Ave from Liberty St to Hanna Ave [End] 10 Sidewalk Construction Active 2020 2020 modification, utility relocation, Services Hanna Ave [End] property acquisition, any other requirements to facilitate sidewalk construction

Transportation SHAW ST from LOBB AVE to SHAW ST from LOBB AVE to ARGYLE ST 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ARGYLE ST

Source: MCIC data Note: Future projects subject to change Page 37 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation SHAW ST from QUEEN ST W to SHAW ST from QUEEN ST W to LOGIE PL 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services LOGIE PL Transportation CANNIFF ST from STAFFORD ST CANNIFF ST from STAFFORD ST to STRACHAN AVE 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to STRACHAN AVE REMEMBRANCE DR from REMEMBRANCE DR from ONTARIO PLACE BLVD to [N-S] Transportation 10 Local Road Resurfacing Active 2020 2020 ONTARIO PLACE BLVD to [N-S] Local Road Resurfacing REMEMBRANCE DR [LEG] Services REMEMBRANCE DR [LEG] Transportation MARKHAM ST from QUEEN ST MARKHAM ST from QUEEN ST W to ROBINSON ST 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services W to ROBINSON ST Transportation CLAREMONT ST from QUEEN ST CLAREMONT ST from QUEEN ST W to ROBINSON ST 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services W to ROBINSON ST Transportation CRAWFORD ST from KING ST W CRAWFORD ST from KING ST W to LOGIE PL 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to LOGIE PL Transportation CRAWFORD ST from DOURO ST CRAWFORD ST from DOURO ST to CANNIFF ST 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to CANNIFF ST Transportation WIDMER ST from ADELAIDE ST WIDMER ST from ADELAIDE ST W to RICHMOND ST W 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services W to RICHMOND ST W Transportation ADELAIDE ST W from ADELAIDE ST W from STRACHAN AVE to SHAW ST 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services STRACHAN AVE to SHAW ST Transportation RICHMOND ST W from RICHMOND ST W from NIAGARA ST to STANLEY TER 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services NIAGARA ST to STANLEY TER WALNUT AVE from Transportation WALNUT AVE from WELLINGTON ST W to KING ST W 10 Local Road Resurfacing Active 2020 2020 WELLINGTON ST W to KING ST Local Road Resurfacing Services W Transportation On Street Bikeway ADELAIDE ST W from Installation of bikeway ADELAIDE ST W from STRACHAN AVE to SHAW ST 10 Active 2020 2020 Services Paving Markings STRACHAN AVE to SHAW ST pavement markings Transportation On Street Bikeway SHAW ST from LOBB AVE to Installation of bikeway SHAW ST from LOBB AVE to ARGYLE ST 10 Active 2020 2020 Services Paving Markings ARGYLE ST pavement markings Transportation On Street Bikeway SHAW ST from DOURO ST to Installation of bikeway SHAW ST from DOURO ST to KING ST W 10 Active 2020 2020 Services Paving Markings KING ST W pavement markings Transportation On Street Bikeway Shaw St from QUEEN ST W to Installation of bikeway Shaw St from QUEEN ST W to LOGIE PL 10 Active 2020 2020 Services Paving Markings LOGIE PL pavement markings WELLINGTON ST W from WALNUT AVE to STRACHAN Transportation On Street Bikeway WELLINGTON ST W from Installation of bikeway 10 Active 2020 2020 AVE Services Paving Markings WALNUT AVE to STRACHAN AVE pavement markings Transportation On Street Bikeway RICHMOND ST W from Installation of bikeway RICHMOND ST W from NIAGARA ST to STANLEY TER 10 Active 2020 2020 Services Paving Markings NIAGARA ST to STANLEY TER pavement markings Transportation SHAW ST from DOURO ST to SHAW ST from DOURO ST to KING ST W 10 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services KING ST W Transportation On Street Bikeway SHAW ST from LOBB AVE to Installation of bikeway SHAW ST from LOBB AVE to ARGYLE ST 10 Active 2020 2020 Services Paving Markings ARGYLE ST pavement markings Installation of signed and Transportation On Street Bikeway KING ST W from SUDBURY ST to KING ST W from SUDBURY ST to SHAW ST 10 Active 2020 2020 marked route with traffic Services Paving Markings SHAW ST calming devices

Source: MCIC data Note: Future projects subject to change Page 38 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Installation of signed and NIAGARA ST from WELLINGTON ST W to RICHMOND ST Transportation On Street Bikeway NIAGARA ST from WELLINGTON marked route, Installation of 10 Active 2020 2020 W Services Paving Markings ST W to RICHMOND ST W signed and marked route with traffic calming devices Installation of signed and Transportation On Street Bikeway DOURO ST from KING ST W to DOURO ST from KING ST W to STRACHAN AVE 10 Active 2020 2020 marked route with traffic Services Paving Markings STRACHAN AVE calming devices Transportation On Street Bikeway RICHMOND ST W from Installation of signed and RICHMOND ST W from STRACHAN AVE to NIAGARA ST 10 Active 2020 2020 Services Paving Markings STRACHAN AVE to NIAGARA ST marked route Transportation On Street Bikeway STRACHAN AVE from QUEEN ST Installation of signed and STRACHAN AVE from QUEEN ST W to KING ST W 10 Active 2020 2020 Services Paving Markings W to KING ST W marked route ADELAIDE ST W from ADELAIDE ST W from DOVERCOURT RD to STRACHAN Transportation On Street Bikeway Installation of signed and 10 Active 2020 2020 DOVERCOURT RD to STRACHAN AVE Services Paving Markings marked route AVE Transportation Local Road WALNUT AVE from RICHMOND WALNUT AVE from RICHMOND ST W to QUEEN ST W 10 Active 2020 2020 Local Road Reconstruction Services Reconstruction ST W to QUEEN ST W Transportation Local Road SNOOKER ST from HANNA AVE SNOOKER ST from HANNA AVE to ATLANTIC AVE 10 Active 2020 2020 Local Road Reconstruction Services Reconstruction to ATLANTIC AVE HANNA AVE from [105.50 m S] LIBERTY ST [END] to Transportation Local Road HANNA AVE from [105.50 m S] 10 Active 2020 2020 Local Road Reconstruction LIBERTY ST Services Reconstruction LIBERTY ST [END] to LIBERTY ST Transportation OSSINGTON AVE from REBECCA OSSINGTON AVE from REBECCA ST to BRUCE ST 10 Major Road Resurfacing Active 2020 2020 Major Road Resurfacing Services ST to BRUCE ST MACLENNAN AVE from ROSEDALE HEIGHTS DR to OLD Transportation from ROSEDALE HEIGHTS DR to 11 Bridge Rehabilitation Active 2018 2018 Retaining Wall maintenance BRIDLE PATH Services OLD BRIDLE PATH Transportation DAVENPORT RD from BEDFORD TUPPER AVE from TOWNS RD to HORNER AVE 11 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing Services RD to DUPONT ST INVERGORDON AVE from MCCOWAN RD to HAVENVIEW Transportation Local Road GLEN RD from BEAUMONT RD 11 Active 2018 2018 Local Road Reconstruction RD Services Reconstruction to SUMMERHILL AVE RENNIE TER from WALLER AVE to MORNINGSIDE AVE Transportation Local Road GLEN RD from DOUGLAS DR to 11 Active 2018 2018 Local Road Reconstruction (TO) Services Reconstruction [230 m N] DOUGLAS AVE [END] Transportation On Street Bikeway DEWSON ST from ROXTON RD Installation of bikeway CARSON ST from STAFFORDSHIRE PL to HORNER AVE 11 Active 2018 2018 Services Paving Markings to SHAW ST pavement markings Installation of bikeway Transportation On Street Bikeway BLOOR ST W from AVENUE RD Agincourt Dr from Lockie Ave to [84 Agincourt Dr] 11 Active 2018 2018 pavement markings (Vision Services Paving Markings to SHAW ST Zero) Installation of bikeway pavement markings, Transportation On Street Bikeway HARBORD ST from ST GEORGE Kennedy Park Rd from Margdon Rd to 11 Active 2018 2018 Installation of Bikeway Services Paving Markings ST to ROXTON RD Pavement Markings (Vision Zero)

Source: MCIC data Note: Future projects subject to change Page 39 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Installation of Bikeway Transportation On Street Bikeway COLLEGE ST from BAY ST to Bertal Rd from Industry St to Planning Boundary 11 Active 2018 2018 Pavement Markings (Vision Services Paving Markings MANNING AVE Zero) Transportation On Street Bikeway ROXTON RD from DEWSON ST Installation of bikeway Rowntree Mill Rd from Emily Ave to Emily Ave 11 Active 2018 2018 Services Paving Markings to HARBORD ST pavement markings Installation of Bikeway MOYLES CRT from WEST WARESIDE RD to [75 m S] WEST Transportation On Street Bikeway HOSKIN AVE from QUEEN'S 11 Active 2018 2018 Pavement Markings (Vision WARESIDE RD [CUL-DE-SAC] Services Paving Markings PARK CRES W to ST GEORGE ST Zero) Transportation Utility Cut Grind and ELM ST from BAY ST to WHITBURN CRES from KEELE ST to BLAYDON AVE 11 Active 2018 2018 Grind & Pave Services Pave ELIZABETH ST (TO) Transportation BLOOR ST W from AVENUE RD ROSELAWN AVE from LOCKSLEY AVE to SALINAS CRT 11 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing Services to BATHURST ST FOREST MANOR RD from PARKWAY FOREST DR to Transportation MC CAUL ST from GRANGE RD TTC Track Replacement & 11 Major Road Resurfacing Active 2019 2019 PARKWAY FOREST DR Services to [29 m S] DUNDAS ST W Major Road Resurfacing Streetscape enhancements Transportation Neighbourhood Glen Rd from Binscarth Rd to BARRINGTON AVE from COLEMAN AVE to LUMSDEN AVE 11 Active 2018 2019 associated with geometric Services Improvements Roxborough Dr safety improvements. Transportation On Street Bikeway SHAW ST from HARRISON ST to Installation of bikeway Maplewood Ave from Cherrywood Ave to 11 Active 2019 2019 Services Paving Markings COLLEGE ST pavement markings Transportation On Street Bikeway SHAW ST from HARRISON ST to Installation of bikeway The Queensway from Park Lawn Rd to 11 Active 2019 2019 Services Paving Markings COLLEGE ST pavement markings Construction of an on-street DONALD AVE from BLACKTHORN AVE to SILVERTHORN Transportation On Street Bikeway BLOOR ST W from BATHURST ST 11 Active 2019 2019 trail connection,bi-directional AVE Services Construction to SPADINA AVE cycle track ALBANY AVE from BLOOR ST W to [E] BARTON AVE Transportation On Street Bikeway PALMERSTON BLVD from Installation of bikeway 11 Active 2019 2019 [BRANCH] Services Paving Markings COLLEGE ST to BLOOR ST W pavement markings Transportation On Street Bikeway CHRISTIE ST from BLOOR ST W FOREST HILL RD from ST CLAIR AVE W to ORMSBY CRES 11 Active 2019 2019 Installation of bike lanes Services Paving Markings to DUPONT ST KINGSMOUNT PARK RD from EASTWOOD RD to Transportation On Street Bikeway PALMERSTON AVE from BLOOR Installation of bikeway 11 Active 2019 2019 FAIRMOUNT CRES Services Paving Markings ST W to PALMERSTON SQ pavement markings

BIN-SCARTH RD from HIGHLAND AVE to [36.21 m E] Transportation On Street Bikeway PALMERSTON AVE from Installation of bikeway 11 Active 2019 2019 ROXBOROUGH DR [END] Services Paving Markings PALMERSTON SQ to DUPONT ST pavement markings VESTA DR from OLD FOREST HILL RD to EGLINTON AVE Transportation On Street Bikeway BRUNSWICK AVE from Installation of bikeway 11 Active 2019 2019 W Services Paving Markings HARBORD ST to DUPONT ST pavement markings Transportation On Street Bikeway DUPONT ST from HOWLAND Installation of bikeway MC CONNELL AVE from LOGAN AVE to FENWICK AVE 11 Active 2019 2019 Services Paving Markings AVE to BRUNSWICK AVE pavement markings CASTLE FRANK RD from [E-W] DRUMSNAB RD [LEG] to Transportation On Street Bikeway HOWLAND AVE from BLOOR ST Installation of bikeway 11 Active 2019 2019 NANTON AVE Services Paving Markings W to DUPONT ST pavement markings Transportation On Street Bikeway BORDEN ST from HARBORD ST Installation of bikeway SHAW ST from QUEEN ST W to LOGIE PL 11 Active 2019 2019 Services Paving Markings to BLOOR ST W pavement markings SCHOLFIELD AVE from ROXBOROUGH DR to Transportation ROBLOCKE AVE from [35.40 m 11 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing MACLENNAN AVE Services S] PENDRITH ST to PENDRITH ST

Source: MCIC data Note: Future projects subject to change Page 40 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope BRUNSWICK AVE from [177.10 Transportation RIVERDALE AVE from BROADVIEW AVE to KISWICK ST 11 Local Road Resurfacing Active 2019 2019 m N] COLLEGE ST (TO) to Local Road Resurfacing Services ULSTER ST ST. CLAIR AVE W from DUNVEGAN RD to POPLAR PLAINS Transportation HARRISON ST from SHAW ST to 11 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing RD Services OSSINGTON AVE GLENGROVE AVE from BATHURST ST to GLEN RUSH Transportation ULSTER ST from EUCLID AVE 11 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing BLVD Services (TO) to MANNING AVE (TO) Transportation SHAW ST from HARRISON ST to GLENGROVE AVE W from ROSEWELL AVE to DUPLEX AVE 11 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services COLLEGE ST (TO) Transportation ELGIN AVE from AVENUE RD to ELGIN AVE from AVENUE RD to BEDFORD RD 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services BEDFORD RD [30.20 m E] HAZELTON AVE [30.20 m E] HAZELTON AVE from [42.70 m S] SCOLLARD Transportation 11 Laneway Reconstruction Active 2020 2020 from [42.70 m S] SCOLLARD ST Laneway Reconstruction ST to SCOLLARD ST Services to SCOLLARD ST [38.10 m E] BATHURST ST from LENNOX ST to BLOOR ST Transportation [38.10 m E] BATHURST ST from 11 Laneway Reconstruction Active 2020 2020 Laneway Reconstruction W Services LENNOX ST to BLOOR ST W Transportation BEDFORD RD from BLOOR ST W BEDFORD RD from BLOOR ST W to LOWTHER AVE 11 Major Road Resurfacing Active 2020 2020 Major Road Resurfacing Services to LOWTHER AVE Transportation On Street Bikeway GERRARD ST W from ELIZABETH Upgrading of existing bike GERRARD ST W from ELIZABETH ST to YONGE ST 11 Active 2020 2020 Services Paving Markings ST to YONGE ST lanes Installation of signed and Transportation On Street Bikeway BORDEN ST from COLLEGE ST to marked route, Installation of BORDEN ST from COLLEGE ST to HARBORD ST 11 Active 2020 2020 Services Paving Markings HARBORD ST signed and marked route with contraflow bike lanes Upgrading of existing signed Transportation On Street Bikeway SHAW ST from COLLEGE ST to SHAW ST from COLLEGE ST to DEWSON ST 11 Active 2020 2020 and marked route with Services Paving Markings DEWSON ST contraflow bike lane Transportation On Street Bikeway COLLEGE ST from BORDEN ST to Installation of intersection COLLEGE ST from BORDEN ST to BELLEVUE AVE 11 Active 2020 2020 Services Construction BELLEVUE AVE improvement New sidewalk from Roxborough Dr to Glen Rd including all required traffic control, drainage, curb Transportation Glen Rd from Roxborough Dr to Glen Rd from Roxborough Dr to Glen Rd 11 Sidewalk Construction Active 2020 2020 alignment modification, utility Services Glen Rd relocation, property acquisition, any other requirements to facilitate sidewalk construction

GERRARD ST W from [34 m W] YONGE ST to ELIZABETH Transportation Major Road GERRARD ST W from [34 m W] 11 Active 2020 2020 Major Road Reconstruction ST (TO) Services Reconstruction YONGE ST to ELIZABETH ST (TO) Transportation BLOOR ST W from AVENUE RD BLOOR ST W from AVENUE RD to SPADINA RD (TO) 11 Major Road Resurfacing Active 2020 2020 Major Road Resurfacing Services to SPADINA RD (TO)

Source: MCIC data Note: Future projects subject to change Page 41 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation SHAW ST from HARBORD ST to SHAW ST from HARBORD ST to BLOOR ST W 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services BLOOR ST W SHAW ST from IRENE AVE to [E] YARMOUTH RD Transportation SHAW ST from IRENE AVE to [E] 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing [BRANCH] Services YARMOUTH RD [BRANCH]

SHAW ST from [W] YARMOUTH RD [BRANCH] to Transportation SHAW ST from [W] YARMOUTH 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing DUPONT ST Services RD [BRANCH] to DUPONT ST Transportation MARKHAM ST from COLLEGE ST MARKHAM ST from COLLEGE ST (TO) to FOLLIS AVE 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services (TO) to FOLLIS AVE MARKHAM ST from DUNDAS ST W to [38 m S] COLLEGE Transportation MARKHAM ST from DUNDAS ST 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing ST (TO) Services W to [38 m S] COLLEGE ST (TO) CASTLE FRANK RD from CASTLE FRANK RD from HAWTHORN AVE to DALE AVE Transportation 11 Local Road Resurfacing Active 2020 2020 HAWTHORN AVE to DALE AVE Local Road Resurfacing (TO) Services (TO) CASTLE FRANK RD from CASTLE FRANK RD from HAWTHORN GDNS to NANTON Transportation 11 Local Road Resurfacing Active 2020 2020 HAWTHORN GDNS to NANTON Local Road Resurfacing AVE Services AVE Transportation BERNARD AVE from ST GEORGE BERNARD AVE from ST GEORGE ST (TO) to WALMER RD 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ST (TO) to WALMER RD Transportation CLINTON ST from HARBORD ST CLINTON ST from HARBORD ST to [61 m N] BLOOR ST W 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to [61 m N] BLOOR ST W CLINTON ST from COLLEGE ST CLINTON ST from COLLEGE ST (TO) to [86 m N] COLLEGE Transportation 11 Local Road Resurfacing Active 2020 2020 (TO) to [86 m N] COLLEGE ST Local Road Resurfacing ST (TO) Services (TO) Transportation BURNFIELD AVE from SHAW ST BURNFIELD AVE from SHAW ST to OSSINGTON AVE 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to OSSINGTON AVE Transportation ELM AVE from MOUNT ELM AVE from MOUNT PLEASANT RD to NANTON AVE 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services PLEASANT RD to NANTON AVE

BELLWOODS AVE from DUNDAS ST W to MANSFIELD Transportation BELLWOODS AVE from DUNDAS 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing AVE Services ST W to MANSFIELD AVE Transportation HERRICK ST from BATHURST ST HERRICK ST from BATHURST ST to MARKHAM ST 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to MARKHAM ST Transportation HALLAM ST from SHAW ST to HALLAM ST from SHAW ST to OSSINGTON AVE 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services OSSINGTON AVE Transportation BARTON AVE from BATHURST BARTON AVE from BATHURST ST to CHRISTIE ST 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ST to CHRISTIE ST Transportation BARTON AVE from CRAWFORD BARTON AVE from CRAWFORD ST to SHAW ST 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ST to SHAW ST Transportation BARTON AVE from HOWLAND BARTON AVE from HOWLAND AVE (TO) to ALBANY AVE 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE (TO) to ALBANY AVE

Source: MCIC data Note: Future projects subject to change Page 42 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope ALBANY AVE from BLOOR ST W to [E] BARTON AVE Transportation ALBANY AVE from BLOOR ST W 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing [BRANCH] Services to [E] BARTON AVE [BRANCH]

Transportation MC ALPINE ST from MC MC ALPINE ST from MC MURRICH ST to DAVENPORT RD 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services MURRICH ST to DAVENPORT RD BIN-SCARTH RD from HIGHLAND BIN-SCARTH RD from HIGHLAND AVE to [36.21 m E] Transportation 11 Local Road Resurfacing Active 2020 2020 AVE to [36.21 m E] Local Road Resurfacing ROXBOROUGH DR [END] Services ROXBOROUGH DR [END] MARLBOROUGH AVE from MARLBOROUGH AVE from YONGE ST to [96 m W] Transportation 11 Local Road Resurfacing Active 2020 2020 YONGE ST to [96 m W] Local Road Resurfacing CROWN'S LANE Services CROWN'S LANE Transportation WHITNEY AVE from GLEN RD to WHITNEY AVE from GLEN RD to ROXBOROUGH DR 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ROXBOROUGH DR CLINTON PL from CLINTON ST to [82.20 m W] CLINTON Transportation CLINTON PL from CLINTON ST to 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing PL [END] Services [82.20 m W] CLINTON PL [END]

Transportation MANCHESTER AVE from SHAW MANCHESTER AVE from SHAW ST to OSSINGTON AVE 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ST to OSSINGTON AVE Transportation On Street Bikeway ELM AVE from SHERBOURNE ST Installation of bikeway ELM AVE from SHERBOURNE ST N to NANTON AVE 11 Active 2020 2020 Services Paving Markings N to NANTON AVE pavement markings CASTLE FRANK RD from [E-W] CASTLE FRANK RD from [E-W] DRUMSNAB RD [LEG] to Transportation On Street Bikeway Installation of bikeway 11 Active 2020 2020 DRUMSNAB RD [LEG] to NANTON AVE Services Paving Markings pavement markings NANTON AVE Transportation On Street Bikeway SHAW ST from HARBORD ST to Installation of bikeway SHAW ST from HARBORD ST to DUPONT ST 11 Active 2020 2020 Services Paving Markings DUPONT ST pavement markings Refresh/upgrade bike lane Transportation On Street Bikeway BEDFORD RD from BLOOR ST W pavement markings with BEDFORD RD from BLOOR ST W to LOWTHER AVE 11 Active 2020 2020 Services Paving Markings to LOWTHER AVE potential extension to Bloor. Bundle with MRRS BORDEN ST from Transportation On Street Bikeway Installation of signed and BORDEN ST from VANKOUGHNET ST to ULSTER ST 11 Active 2020 2020 VANKOUGHNET ST to ULSTER Services Paving Markings marked route ST Construction of an on-street Transportation On Street Bikeway BLOOR ST W from BATHURST ST BLOOR ST W from BATHURST ST to AVENUE RD 11 Active 2020 2020 trail connection,bi-directional Services Construction to AVENUE RD cycle track ROXBOROUGH DR from MT. PLEASANT RD to HIGHLAND Transportation On Street Bikeway ROXBOROUGH DR from MT. Installation of signed and 11 Active 2020 2020 AVE Services Paving Markings PLEASANT RD to HIGHLAND AVE marked route

Transportation On Street Bikeway HIGHLAND AVE from Installation of signed and HIGHLAND AVE from ROXBOROUGH DR to GLEN RD 11 Active 2020 2020 Services Paving Markings ROXBOROUGH DR to GLEN RD marked route SCHOLFIELD AVE from SCHOLFIELD AVE from ROXBOROUGH DR to Transportation On Street Bikeway Installation of signed and 11 Active 2020 2020 ROXBOROUGH DR to MACLENNAN AVE Services Paving Markings marked route MACLENNAN AVE

Source: MCIC data Note: Future projects subject to change Page 43 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope MACLENNAN AVE from MACLENNAN AVE from SCHOLFIELD AVE to NORTH OF Transportation On Street Bikeway Installation of signed and 11 Active 2020 2020 SCHOLFIELD AVE to NORTH OF OLD BRIDLE PATH Services Paving Markings marked route OLD BRIDLE PATH SHAW ST from [E] YARMOUTH SHAW ST from [E] YARMOUTH RD [BRANCH] to [W] Transportation 11 Local Road Resurfacing Active 2020 2020 RD [BRANCH] to [W] Local Road Resurfacing YARMOUTH RD [BRANCH] Services YARMOUTH RD [BRANCH]

Transportation CLAREMONT ST from DUNDAS CLAREMONT ST from DUNDAS ST W to TREFORD PL 11 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ST W to TREFORD PL Transportation Local Road BORDEN ST from COLLEGE ST BORDEN ST from COLLEGE ST (TO) to ULSTER ST 11 Active 2020 2020 Local Road Reconstruction Services Reconstruction (TO) to ULSTER ST

St Clair Ave W to Lyndhurst WELLS HILL AVE from Transportation Ave (including intersection KEELE ST from ROGERS RD to EGLINTON AVE W 12 Sidewalk Construction Active 2018 2018 LYNDHURST AVE to ST CLAIR Services improvements at Wells HIll AVE W Ave and Lyndhurst Ave)

Transportation Local Road CEDRIC AVE from JESMOND AVE Islington Ave from Evans Ave to Judson St 12 Active 2018 2018 Local Road Reconstruction Services Reconstruction to VAUGHAN RD POPLAR PLAINS RD from Transportation On Street Bikeway Installation of bikeway Steeles Ave E from Don Mills Rd to 12 Active 2018 2018 DAVENPORT RD to Services Paving Markings pavement markings COTTINGHAM ST BOULTON DR from POPLAR Transportation On Street Bikeway DUNDAS ST W from HIGH PARK AVE to MC MURRAY AVE 12 Active 2018 2018 PLAINS RD to 100 m N Installation of bike lanes Services Paving Markings COTTINGHAM RD WELLS HILL AVE from WOODFIELD RD from WOODFIELD RD TRAIL to 36.2 M N Transportation Local Road 12 Active 2019 2019 LYNDHURST AVE to ST CLAIR Local Road Reconstruction THE RAIL GARDEN TRL Services Reconstruction AVE W AUSTIN TER from SPADINA RD Transportation NELSON ST (TO) from SIMCOE ST to DUNCAN ST 12 Major Road Resurfacing Active 2019 2019 (TO) to [E] WALMER RD Major Road Resurfacing Services [BRANCH] THIRTY EIGHTH ST from LAKE PROMENADE to LAKE Transportation Local Road VAUGHAN RD from OAKWOOD 12 Active 2019 2019 Local Road Reconstruction SHORE BLVD Services Reconstruction AVE to NORTHCLIFFE BLVD ELEANOR AVE from OAKWOOD FAVERSHAM CRES from RHINESTONE DR to Transportation Local Road 12 Active 2019 2019 AVE to [101.60 m W] Local Road Reconstruction WELLESWORTH DR Services Reconstruction OAKWOOD AVE [END] EGLINTON AVE W from [471 m W] THE EAST MALL to Transportation Local Road KEYWEST AVE from LAUDER 12 Active 2019 2019 Local Road Reconstruction [189 m S] RENFORTH DR Services Reconstruction AVE to NORTHCLIFFE BLVD [N-S] LYNDHURST CRT [LEG] Transportation Markdale Ave from Strathearn Rd to Markdale Ave [End] 12 Local Road Resurfacing Active 2019 2019 from LYNDHURST CRT to Local Road Resurfacing Services AUSTIN TER VAUGHAN RD from Transportation On Street Bikeway Howard Park Ave from Parkside Dr to 12 Active 2019 2019 NORTHCLIFFE BLVD to Installation of bike lanes Services Paving Markings OAKWOOD AVE

Source: MCIC data Note: Future projects subject to change Page 44 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope BOULTON DR from RUSSELL Transportation DINNICK CRES from WEYBOURNE CRES to POTE AVE 12 Sidewalk Construction Active 2019 2019 HILL RD to [70m W] RUSSELL New Sidewalk Services HILL RD Transportation On Street Bikeway VAUGHAN RD from EGLINTON Installation of bikeway DALHOUSIE ST from DUNDAS ST E to GOULD ST 12 Active 2019 2019 Services Paving Markings AVE W to NORTHCLIFFE BLVD pavement markings

Transportation BRENTDALE DR from LAWTON SHUTER ST from CHURCH ST [TO] to SHERBOURNE ST 12 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services BLVD to LASCELLES BLVD Transportation COLIN AVE from CHAPLIN CRES ACORN AVE from DUNDAS ST W to MONTESSON ST 12 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to ANDERSON AVE RIDGEWOOD RD (TO) from [212 Transportation MATTICE AVE from ASHBOURNE DR to JOPLING AVE N 12 Local Road Resurfacing Active 2019 2019 m E] BATHURST ST [END] to Local Road Resurfacing Services BATHURST ST Transportation AVA RD from VESTA DR to ASHBOURNE DR from MATTICE AVE to SWAN AVE 12 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services GLENAYR RD MACPHERSON AVE from MACPHERSON AVE from RATHNELLY AVE to POPLAR Transportation Local Road 12 Active 2020 2020 RATHNELLY AVE to POPLAR Local Road Reconstruction PLAINS RD Services Reconstruction PLAINS RD MACPHERSON AVE from [N] MACPHERSON AVE from [N] DAVENPORT RD [BRANCH] Transportation Local Road 12 Active 2020 2020 DAVENPORT RD [BRANCH] to Local Road Reconstruction to MADISON AVE Services Reconstruction MADISON AVE Installation of signed and STRATHEARN RD from GLEN CEDAR RD to GLEN CEDAR Transportation On Street Bikeway STRATHEARN RD from GLEN marked route, Installation of 12 Active 2020 2020 RD Services Paving Markings CEDAR RD to GLEN CEDAR RD signed and marked route with traffic calming devices

New sidewalk from Strathearn Rd to end of Markdale Ave including all required traffic control, drainage, curb Transportation Markdale Ave from Strathearn Markdale Ave from Strathearn Rd to Markdale Ave [End] 12 Sidewalk Construction Active 2020 2020 alignment modification, utility Services Rd to Markdale Ave [End] relocation, property acquisition, any other requirements to facilitate sidewalk construction

New sidewalk from Ava Rd to Bathurst St including all required traffic control, drainage, curb alignment Transportation Strathearn Rd from Ava Rd to Strathearn Rd from Ava Rd to Bathurst St 12 Sidewalk Construction Active 2020 2020 modification, utility relocation, Services Bathurst St property acquisition, any other requirements to facilitate sidewalk construction

Source: MCIC data Note: Future projects subject to change Page 45 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope GLEN CEDAR RD from Existing signed route GLEN CEDAR RD from STRATHEARN RD to MARKDALE Transportation On Street Bikeway 12 Active 2020 2020 STRATHEARN RD to MARKDALE upgraded to signed and AVE Services Paving Markings AVE marked route GLEN CEDAR RD from Existing signed route GLEN CEDAR RD from HEATHDALE RD to 95 M N OF Transportation On Street Bikeway 12 Active 2020 2020 HEATHDALE RD to 95 M N OF upgraded to signed and HEATHDALE RD Services Paving Markings HEATHDALE RD marked route ROSEMARY LANE from ROSEMARY LANE from DEWBOURNE AVE to [E-W] Transportation 12 Local Road Resurfacing Active 2020 2020 DEWBOURNE AVE to [E-W] Local Road Resurfacing ROSEMARY LANE [LEG] Services ROSEMARY LANE [LEG] HEATH ST W from [36.60 m W] HEATH ST W from [36.60 m W] SPADINA RD (YK) to Transportation Utility Cut Grind and Grind & Pave, Local Road 12 Active 2020 2020 SPADINA RD (YK) to WALMER WALMER RD Services Pave Resurfacing RD MILLBANK AVE from Transportation MILLBANK AVE from STRATHEARN BLVD to GLENAYR RD 12 Local Road Resurfacing Active 2020 2020 STRATHEARN BLVD to GLENAYR Local Road Resurfacing Services RD Transportation ARDMORE RD from SPADINA RD ARDMORE RD from SPADINA RD (TO) to GLENAYR RD 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services (TO) to GLENAYR RD STRATHEARN BLVD from STRATHEARN BLVD from SPADINA RD (TO) to [50 m W] Transportation 12 Local Road Resurfacing Active 2020 2020 SPADINA RD (TO) to [50 m W] Local Road Resurfacing GLENAYR RD [END] Services GLENAYR RD [END] ROSEMARY RD from ARDMORE ROSEMARY RD from ARDMORE RD to [W] ELDERWOOD Transportation 12 Local Road Resurfacing Active 2020 2020 RD to [W] ELDERWOOD DR Local Road Resurfacing DR [BRANCH] Services [BRANCH] COULSON AVE from RUSSELL HILL RD to SPADINA RD Transportation COULSON AVE from RUSSELL 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing (TO) Services HILL RD to SPADINA RD (TO) Transportation DEER PARK CRES from ST CLAIR DEER PARK CRES from ST CLAIR AVE W to HEATH ST W 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE W to HEATH ST W Transportation RICHVIEW AVE from BURTON RICHVIEW AVE from BURTON RD to DEWBOURNE AVE 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services RD to DEWBOURNE AVE Transportation ORIOLE RD from ST CLAIR AVE ORIOLE RD from ST CLAIR AVE W to LONSDALE RD 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services W to LONSDALE RD Transportation DUNVEGAN RD from ST CLAIR DUNVEGAN RD from ST CLAIR AVE W to LONSDALE RD 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE W to LONSDALE RD

RUSSELL HILL RD from CHAPLIN CRES to EGLINTON AVE Transportation RUSSELL HILL RD from CHAPLIN 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing W Services CRES to EGLINTON AVE W

Transportation RUSSELL HILL RD from COULSON RUSSELL HILL RD from COULSON AVE to FOREST HILL RD 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to FOREST HILL RD Transportation MELGUND RD from HILTON AVE MELGUND RD from HILTON AVE to BATHURST ST 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to BATHURST ST

Source: MCIC data Note: Future projects subject to change Page 46 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation BRAEMAR AVE from CHAPLIN BRAEMAR AVE from CHAPLIN CRES to EGLINTON AVE W 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services CRES to EGLINTON AVE W

Transportation FOREST HILL RD from ST CLAIR FOREST HILL RD from ST CLAIR AVE W to ORMSBY CRES 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE W to ORMSBY CRES

Transportation VESTA DR from STRATHEARN VESTA DR from STRATHEARN BLVD to AVA CRES 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services BLVD to AVA CRES Transportation VESTA DR from MILLBANK AVE VESTA DR from MILLBANK AVE to STRATHEARN BLVD 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to STRATHEARN BLVD VESTA DR from OLD FOREST HILL RD to EGLINTON AVE Transportation VESTA DR from OLD FOREST 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing W Services HILL RD to EGLINTON AVE W Transportation KILBARRY RD from LASCELLES KILBARRY RD from LASCELLES BLVD to RUSSELL HILL RD 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services BLVD to RUSSELL HILL RD Transportation LAWTON BLVD from YONGE ST LAWTON BLVD from YONGE ST to LONSDALE RD 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to LONSDALE RD Transportation On Street Bikeway RUSSELL HILL RD from COULSON Installation of bikeway RUSSELL HILL RD from COULSON AVE to FOREST HILL RD 12 Active 2020 2020 Services Paving Markings AVE to FOREST HILL RD pavement markings

Transportation On Street Bikeway DUNVEGAN RD from ST. CLAIR Installation of signed and DUNVEGAN RD from ST. CLAIR AVE W to LONSDALE RD 12 Active 2020 2020 Services Paving Markings AVE W to LONSDALE RD marked route Existing signed route GLEN CEDAR RD from GLEN CEDAR RD from DEWBOURNE AVE to EGLINTON Transportation On Street Bikeway upgraded to signed and 12 Active 2020 2020 DEWBOURNE AVE to EGLINTON AVE W Services Paving Markings marked route with contraflow AVE W bike lane Transportation On Street Bikeway KILBARRY RD from AVENUE RD SOGR RE-INSTALLATION OF A KILBARRY RD from AVENUE RD to LASCELLES BLVD 12 Active 2020 2020 Services Paving Markings to LASCELLES BLVD FADED BIKE LANE Transportation On Street Bikeway DUNVEGAN RD from ST. CLAIR Installation of signed and DUNVEGAN RD from ST. CLAIR AVE W to KILBARRY RD 12 Active 2020 2020 Services Paving Markings AVE W to KILBARRY RD marked route Installation of signed and Transportation On Street Bikeway KILBARRY RD from SPADINA RD KILBARRY RD from SPADINA RD to DUNVEGAN RD 12 Active 2020 2020 marked route with traffic Services Paving Markings to DUNVEGAN RD calming devices Installation of signed and Transportation On Street Bikeway HEATH ST W from DUNVEGAN HEATH ST W from DUNVEGAN RD to YONGE ST 12 Active 2020 2020 marked route with traffic Services Paving Markings RD to YONGE ST calming devices GLEN CEDAR RD from GLEN CEDAR RD from MARKDALE AVE to DEWBOURNE Transportation On Street Bikeway Installation of signed and 12 Active 2020 2020 MARKDALE AVE to AVE Services Paving Markings marked route DEWBOURNE AVE Installation of signed and Transportation On Street Bikeway BURTON RD from BATHURST ST BURTON RD from BATHURST ST to SPADINA RD 12 Active 2020 2020 marked route with traffic Services Paving Markings to SPADINA RD calming devices

Source: MCIC data Note: Future projects subject to change Page 47 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation FOREST HILL RD from ORMSBY FOREST HILL RD from ORMSBY CRES to SPADINA RD (TO) 12 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services CRES to SPADINA RD (TO) GLEN CEDAR RD from GLEN CEDAR RD from DEWBOURNE AVE to EGLINTON Transportation Local Road 12 Active 2020 2020 DEWBOURNE AVE to EGLINTON Local Road Reconstruction AVE W Services Reconstruction AVE W GLEN CEDAR RD from GLEN CEDAR RD from STRATHEARN RD to MARKDALE Transportation Local Road 12 Active 2020 2020 STRATHEARN RD to MARKDALE Local Road Reconstruction AVE Services Reconstruction AVE Transportation Local Road STRATHEARN RD from STRATHEARN RD from BATHURST ST to WARWICK AVE 12 Active 2020 2020 Local Road Reconstruction Services Reconstruction BATHURST ST to WARWICK AVE CHERRYWOOD AVE from CHERRYWOOD AVE from MAPLEWOOD AVE to Transportation Local Road 12 Active 2020 2020 MAPLEWOOD AVE to VAUGHAN Local Road Reconstruction VAUGHAN RD Services Reconstruction RD VALEWOOD AVE from VALEWOOD AVE from CHERRYWOOD AVE to Transportation Local Road 12 Active 2020 2020 CHERRYWOOD AVE to Local Road Reconstruction ARLINGTON AVE Services Reconstruction ARLINGTON AVE GLEN CEDAR RD from GLEN CEDAR RD from HEATHDALE RD to [95 m N] Transportation Local Road 12 Active 2020 2020 HEATHDALE RD to [95 m N] Local Road Reconstruction HEATHDALE RD Services Reconstruction HEATHDALE RD Transportation Local Road HUMEWOOD DR from WINDLEY HUMEWOOD DR from WINDLEY AVE to HEATHDALE RD 12 Active 2020 2020 Local Road Reconstruction Services Reconstruction AVE to HEATHDALE RD

Transportation Local Road HEATHDALE RD from BATHURST HEATHDALE RD from BATHURST ST to HUMEWOOD DR 12 Active 2020 2020 Local Road Reconstruction Services Reconstruction ST to HUMEWOOD DR

Transportation Local Road WINNETT AVE from DURHAM WINNETT AVE from DURHAM AVE to ARLINGTON AVE 12 Active 2020 2020 Local Road Reconstruction Services Reconstruction AVE to ARLINGTON AVE Transportation JARVIS ST from RICHMOND ST E Keele St from St Regis Cres to 13 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing Services to DUNDAS ST E Transportation Pedestrian Infrastructure RICHMOND ST E from [W] KING Lane width and ROW BLAYDON AVE from LANGHOLM DR to WHITBURN CRES 13 Active 2018 2018 Services Improvement ST E [BRIDGE] to SUMACH ST allocation review

Streetscape improvements including but not limited to ADELAIDE ST E from JARVIS ST blvd paving, sidewalk POPLAR PLAINS RD from DAVENPORT RD to Transportation Pedestrian Infrastructure 13 Active 2018 2018 to EASTERN AVE DIVERSION reconstruction, tree & shrub COTTINGHAM ST Services Improvement METRO NO.20 planting, site furnishings, corner radii adjustments and bumpouts.

Source: MCIC data Note: Future projects subject to change Page 48 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Permeable paving pedestrian [E-W] FAIRLEIGH CRES [LEG] from FAIRLEIGH CRES to Transportation Neighbourhood Richmond St E from Power St E 13 Active 2018 2018 pathway. To be bundled with PARK HILL RD Services Improvements to Sackville St Richmond St ramp resurfacing. Installation of Bikeway Transportation On Street Bikeway SHERBOURNE ST from FRONT RIVERHEAD DR from BARWELL CRES to BARFORD RD 13 Active 2018 2018 Pavement Markings (Vision Services Paving Markings ST E to BLOOR ST E Zero) Transportation On Street Bikeway SUMACH ST from KING ST E to Installation of bikeway DONALD AVE from KANE AVE to KEELE ST 13 Active 2018 2018 Services Paving Markings SHUTER ST pavement markings Transportation Utility Cut Road ADELAIDE ST E from JARVIS ST ST GERMAIN AVE from YONGE ST to JEDBURGH RD 13 Active 2019 2019 Shave and Pave Services Rehabilitation to [E] ONTARIO ST [BRANCH] RICHMOND ST E from POWER ORIOLE PKWY from WILLOWBANK BLVD to ORCHARD Transportation Utility Cut Road 13 Active 2019 2019 ST to [N] EASTERN AVE Shave and Pave VIEW BLVD Services Rehabilitation DIVERSION [RAMP] WESTBROOK AVE from WESTLAKE AVE to CHISHOLM Transportation Utility Cut Road ADELAIDE ST E from BERKELEY 13 Active 2019 2019 Shave and Pave AVE Services Rehabilitation ST to PARLIAMENT ST Transportation Utility Cut Road ADELAIDE ST E from JARVIS ST TREADWAY BLVD from PLAINS RD to O'CONNOR DR 13 Active 2019 2019 Shave and Pave Services Rehabilitation to GEORGE ST (TO)

ADELAIDE ST E from [W] KING ST E [BRIDGE] to [S] EASTERN AVE DIVERSION [RAMP] Transportation Utility Cut Road ADELAIDE ST E from SUMACH BRENTDALE DR from LAWTON BLVD to LASCELLES BLVD 13 Active 2019 2019 Shave and Pave Services Rehabilitation ST to [S] EASTERN AVE DIVERSION [RAMP] ADELAIDE ST E from POWER ST to [W] KING ST E [BRIDGE]

Transportation JARVIS ST from RICHMOND ST E LOGAN AVE from FLOYD AVE to GOWAN AVE 13 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing Services to QUEEN ST E WOODBINE DOWNS BLVD from FINCH AVE W to [324 m Transportation SHERBOURNE ST from CARLTON 13 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing N] CARRIER DR [CUL-DE-SAC] Services ST to BLOOR ST E Transportation DROVERS LANE from ONTARIO KINGSTON RD OVER HIGHLAND CREEK from to 13 Laneway Reconstruction Active 2019 2019 Laneway Reconstruction Services ST to BERKELEY ST Transportation On Street Bikeway SHERBOURNE ST from CARLTON Installation of bikeway Ava Rd from Strathearn Rd to 13 Active 2019 2019 Services Paving Markings ST to BLOOR ST E pavement markings Transportation On Street Bikeway ADELAIDE ST E from JARVIS ST Installation of bikeway Cindy Nicolas Dr from Lampman Dr to 13 Active 2019 2019 Services Paving Markings to PARLIAMENT ST pavement markings HARWOOD RD from [37.70 m S] MILLWOOD RD [END] to Transportation On Street Bikeway SACKVILLE ST from SHUTER ST Installation of bikeway 13 Active 2019 2019 MILLWOOD RD Services Paving Markings to WELLESLEY ST pavement markings SPRINGHURST AVE from JAMESON AVE to [97.50 m W] Transportation On Street Bikeway SUMACH ST from SHUTER ST to Installation of bikeway 13 Active 2019 2019 JAMESON AVE Services Paving Markings WELLESLEY ST E pavement markings

Source: MCIC data Note: Future projects subject to change Page 49 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation On Street Bikeway CARLTON ST from SACKVILLE ST Installation of bikeway LAWTON BLVD from YONGE ST to LONSDALE RD 13 Active 2019 2019 Services Paving Markings to RIVERDALE PARK RD pavement markings

Transportation On Street Bikeway BLOOR ST E from SHERBOURNE Installation of bikeway CASTLETON AVE from HENRIETTA ST to CORBETT AVE 13 Active 2019 2019 Services Paving Markings ST to PARLIAMENT ST pavement markings Transportation Major Road SHUTER ST from SHERBOURNE SHUTER ST from SHERBOURNE ST to RIVER ST 13 Active 2020 2020 Major Road Reconstruction Services Reconstruction ST to RIVER ST O'KEEFE LANE from [15.20 m N] GOULD ST to GERRARD Transportation O'KEEFE LANE from [15.20 m N] 13 Laneway Reconstruction Active 2020 2020 Laneway Reconstruction ST E Services GOULD ST to GERRARD ST E Transportation On Street Bikeway SHUTER ST from SHERBOURNE Existing bike lanes upgraded SHUTER ST from SHERBOURNE ST to RIVER ST 13 Active 2020 2020 Services Paving Markings ST to RIVER ST to cycle tracks Transportation On Street Bikeway WELLESLEY ST E from Upgrading of existing cycle WELLESLEY ST E from SHERBOURNE ST to ONTARIO ST 13 Active 2020 2020 Services Construction SHERBOURNE ST to ONTARIO ST tracks

Transportation Major Road WELLESLEY ST E from WELLESLEY ST E from SHERBOURNE ST to ONTARIO ST 13 Active 2020 2020 Major Road Reconstruction Services Reconstruction SHERBOURNE ST to ONTARIO ST Transportation EARL ST from HUNTLEY ST to EARL ST from HUNTLEY ST to BLEECKER ST 13 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services BLEECKER ST Transportation MUTUAL ST from WOOD ST to MUTUAL ST from WOOD ST to MAITLAND ST 13 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services MAITLAND ST Transportation DALHOUSIE ST from DUNDAS ST DALHOUSIE ST from DUNDAS ST E to GOULD ST 13 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services E to GOULD ST Transportation CRAVEN RD from QUEEN ST E to Islington Ave from Evans Ave to Islington Ave 14 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services GERRARD ST E KIPLING AVE from REXDALE BLVD to WESTHUMBER Transportation EASTERN AVE from MARIGOLD 14 Major Road Resurfacing Completed 2018 2018 Major Road Resurfacing BLVD Services AVE to KNOX AVE (TO) DONLANDS AVE from Transportation SENTINEL RD from DOVEHOUSE AVE to THE POND RD 14 Major Road Resurfacing Completed 2018 2018 WOODVILLE AVE to O'CONNOR Major Road Resurfacing Services DR Installation of Bikeway BROCKHOUSE RD from [104.60 m W] BESTOBELL RD Transportation On Street Bikeway GREENWOOD AVE from QUEEN 14 Active 2018 2018 Pavement Markings (Vision [CUL-DE-SAC] to [127.30 m E] BESTOBELL RD [END] Services Paving Markings ST E to DANFORTH AVE Zero) Installation of bikeway pavement markings. Transportation On Street Bikeway CHATHAM AVE from JONES AVE Castlefield Ave from Strathnairn Ave to Kincort St 14 Active 2018 2018 Coordination with traffic Services Paving Markings to GREENWOOD AVE operations neighbourhood traffic calming. Transportation Unwin Ave from Outer Harbour CARLISLE CRES from RYLANDER BLVD to RYLANDER BLVD 14 Bikeway Trail Active 2017 2018 Installation of bikeway trail Services Rd to Leslie St

Source: MCIC data Note: Future projects subject to change Page 50 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope GOUGH AVE from DANFORTH Transportation Utility Cut Grind and PELL ST from RIDGEMOOR AVE to SANDOWN AVE 14 Active 2018 2018 AVE to [30.50 m N] CANNING Grind & Pave Services Pave AVE [CITY LIMITS]

WHITBURN CRES from BLAYDON AVE [S limit] to Transportation Utility Cut Grind and LANGLEY AVE from BROADVIEW 14 Active 2018 2018 Grind & Pave BLAYDON AVE [N limit] Services Pave AVE to HOWLAND RD [30.50 m N] DAGMAR AVE from Transportation DELL PARK AVE from BATHURST ST to SHERMOUNT AVE 14 Laneway Reconstruction Active 2019 2019 [30.50 m W] MARJORY AVE to Laneway Reconstruction Services MARJORY AVE BLACKDOWN CRES from FARNINGHAM CRES to LLOYD Transportation JONES AVE from GERRARD ST E 14 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing MANOR RD Services to MYRTLE AVE FORTIETH ST from [14 m S] LAKE PROMENADE [END] to Transportation JONES AVE from STRATHCONA 14 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing LAKE SHORE BLVD Services AVE to DANFORTH AVE

Transportation On Street Bikeway LAKE SHORE BLVD E from Installation of bikeway Blvd from Beecroft Rd to Yonge St 14 Active 2019 2019 Services Paving Markings PARLIAMENT ST to BOOTH AVE pavement markings GLEN CEDAR RD from HEATHDALE RD to 95 M N OF Transportation On Street Bikeway JONES AVE from BAIRD AVE to Installation of bikeway 14 Active 2019 2019 HEATHDALE RD Services Paving Markings DANFORTH AVE pavement markings Transportation On Street Bikeway JONES AVE from GERRARD ST E Installation of bikeway COLLEGE ST from BORDEN ST to BELLEVUE AVE 14 Active 2019 2019 Services Paving Markings to BOULTBEE AVE pavement markings Transportation On Street Bikeway FULTON AVE from BROADVIEW Installation of bikeway BARTON AVE from CRAWFORD ST to SHAW ST 14 Active 2019 2019 Services Paving Markings AVE to PAPE AVE pavement markings Transportation On Street Bikeway PAPE AVE from BROWNING AVE Installation of bikeway ADELAIDE ST W from STRACHAN AVE to SHAW ST 14 Active 2019 2019 Services Construction to SAMMON AVE construction FELSTEAD AVE from HARWOOD RD from [S] BELSIZE DR [BRANCH] to [N] Transportation On Street Bikeway Installation of bikeway 14 Active 2019 2019 GREENWOOD AVE to BELSIZE DR [BRANCH] Services Paving Markings pavement markings PARKMOUNT RD Transportation On Street Bikeway GOWAN AVE from LOGAN AVE Installation of bikeway SPENCER AVE from SPRINGHURST AVE to KING ST W 14 Active 2019 2019 Services Paving Markings to CARLAW AVE pavement markings Transportation On Street Bikeway CARLAW AVE from BROWNING Installation of bikeway MELGUND RD from HILTON AVE to BATHURST ST 14 Active 2019 2019 Services Paving Markings AVE to GOWAN AVE pavement markings

GLENMOUNT PARK RD from CORLEY AVE to GLEN DAVIS Transportation On Street Bikeway BROWNING AVE from Installation of bikeway 14 Active 2019 2019 CRES Services Paving Markings BROADVIEW AVE to PAPE AVE pavement markings

Transportation On Street Bikeway MONARCH PARK AVE from Installation of bikeway RUSSELL HILL RD from COULSON AVE to FOREST HILL RD 14 Active 2019 2019 Services Paving Markings FELSTEAD AVE to SAMMON AVE pavement markings

WOODFIELD RD from Transportation On Street Bikeway Installation of bikeway BEDFORD RD from LOWTHER AVE to 14 Active 2019 2019 WOODFIELD RD TRAIL to 36.2 m Services Paving Markings pavement markings N THE RAIL GARDEN TRL

Source: MCIC data Note: Future projects subject to change Page 51 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation GOWAN AVE from BROADVIEW STANLEY TERR from KING ST W to RICHMOND ST W 14 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services AVE to LOGAN AVE Transportation LOGAN AVE from FLOYD AVE to BERKLEY ST from RICHMOND ST E to THE ESPLANADE 14 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services GOWAN AVE Transportation PHIN AVE from OAKVALE AVE to NOB LANE from GREEN BELT DR to MOCCASIN TRL 14 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services CHATHAM AVE [27.50 m E] BROADVIEW AVE Transportation EILEEN AVE from FLORENCE CRES to SCARLETT RD 14 Laneway Resurfacing Active 2019 2019 from MILLBROOK CRES to Laneway Resurfacing Services [26.50 m N] MILLBROOK CRES

[26.50 m N] MILLBROOK CRES Transportation RUNNYMEDE RD from DUNDAS ST W to LIVERPOOL ST 14 Laneway Resurfacing Active 2019 2019 from [115.80 m W] INGHAM Laneway Resurfacing Services AVE to INGHAM AVE

New sidewalk from Bouchette St to Leslie St including all required traffic control, drainage, curb alignment Transportation COMMISSIONERS ST from COMMISSIONERS ST from CARLAW AVE to LESLIE ST (TO) 14 Sidewalk Construction Active 2020 2020 modification, utility relocation, Services CARLAW AVE to LESLIE ST (TO) property acquisition, any other requirements to facilitate sidewalk construction

Transportation BROADVIEW AVE from LANGLEY Installation of signed and BROADVIEW AVE from LANGLEY AVE to RIVERDALE AVE 14 Bikeway Trail Active 2020 2020 Services AVE to RIVERDALE AVE marked route LADYSMITH AVE from LADYSMITH AVE from MOUNTJOY AVE to DANFORTH Transportation 14 Local Road Resurfacing Active 2020 2020 MOUNTJOY AVE to DANFORTH Local Road Resurfacing AVE Services AVE Transportation BOULTON AVE from DUNDAS ST BOULTON AVE from DUNDAS ST E to GERRARD ST E 14 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services E to GERRARD ST E SELKIRK ST from WOODYCREST SELKIRK ST from WOODYCREST AVE to [40 m E] Transportation 14 Local Road Resurfacing Active 2020 2020 AVE to [40 m E] WOODYCREST Local Road Resurfacing WOODYCREST AVE [END] Services AVE [END] Transportation BOULTBEE AVE from KISWICK ST BOULTBEE AVE from KISWICK ST to BLAKE ST 14 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to BLAKE ST HARRIET ST from HASTINGS AVE HARRIET ST from HASTINGS AVE to [44 m E] HASTINGS Transportation 14 Local Road Resurfacing Active 2020 2020 to [44 m E] HASTINGS AVE Local Road Resurfacing AVE [END] Services [END] Transportation MC CONNELL AVE from LOGAN MC CONNELL AVE from LOGAN AVE to FENWICK AVE 14 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to FENWICK AVE

Source: MCIC data Note: Future projects subject to change Page 52 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation On Street Bikeway CARLAW AVE from GERRARD ST Installation of bikeway CARLAW AVE from GERRARD ST E to RIVERDALE AVE 14 Active 2020 2020 Services Paving Markings E to RIVERDALE AVE pavement markings Transportation On Street Bikeway CARLAW AVE from QUEEN ST E CARLAW AVE from QUEEN ST E to DUNDAS ST E 14 Active 2020 2020 Installation of bike lane Services Paving Markings to DUNDAS ST E Transportation On Street Bikeway KISWICK ST from RIVERDALE Installation of signed and KISWICK ST from RIVERDALE AVE to BOULTBEE AVE 14 Active 2020 2020 Services Paving Markings AVE to BOULTBEE AVE marked route Transportation On Street Bikeway BOULTBEE AVE from KISWICK ST Installation of bikeway BOULTBEE AVE from KISWICK ST to JONES AVE 14 Active 2020 2020 Services Paving Markings to JONES AVE pavement markings Installation of signed and Transportation On Street Bikeway RIVERDALE AVE from marked route, Installation of RIVERDALE AVE from BROADVIEW AVE to KISWICK ST 14 Active 2020 2020 Services Paving Markings BROADVIEW AVE to KISWICK ST signed and marked route with contraflow bike lane CAMBRIDGE AVE from CAMBRIDGE AVE from DANFORTH AVE to CHESTER HILL Transportation On Street Bikeway Installation of bikeway 14 Active 2020 2020 DANFORTH AVE to CHESTER RD Services Paving Markings pavement markings HILL RD [26 m S] O'CONNOR DR from [26 m S] O'CONNOR DR from COXWELL AVE to [40 m W] Transportation 14 Laneway Resurfacing Active 2020 2020 COXWELL AVE to [40 m W] Laneway Resurfacing COXWELL AVE Services COXWELL AVE [40 m W] COXWELL AVE from [40 m W] COXWELL AVE from PLAINS RD to [156 m N] Transportation 14 Laneway Resurfacing Active 2020 2020 PLAINS RD to [156 m N] PLAINS Laneway Resurfacing PLAINS RD Services RD [30.50 m N] DANFORTH AVE [30.50 m N] DANFORTH AVE from DEWHURST BLVD to Transportation 14 Laneway Resurfacing Active 2020 2020 from DEWHURST BLVD to Laneway Resurfacing DONLANDS AVE Services DONLANDS AVE OLD COLONY RD from [375 m E] Transportation Local Road DUNDAS ST W from COLLEGE ST to LANSDOWNE AVE 15 Completed 2016 2018 HARRISON RD [CUL-DE-SAC] to Local Road Reconstruction Services Reconstruction BAYVIEW AVE GREENBRAE CRCT from LAWRENCE AVE E to MARKHAM Transportation Local Road GLENFOREST RD from YONGE ST 15 Active 2018 2018 Local Road Reconstruction RD Services Reconstruction to MOUNT PLEASANT RD

WILLOWDALE AVE from EMPRESS AVE to FINCH AVE (N Transportation On Street Bikeway Thorncliffe Park Dr from Overlea Installation of bikeway 15 Active 2017 2018 YK) Services Paving Markings Blvd to Overlea Blvd pavement markings BETH NEALSON DR from HOUNSLOW HEATH RD from ST CLAIR AVE W to Transportation 15 Local Road Resurfacing Active 2019 2019 THORNCLIFFE PARK DR to Local Road Resurfacing LAUGHTON AVE Services WICKSTEED AVE BETH NEALSON DR from ANTRIM CRES from KENNEDY RD to [520 m E] KENNEDY Transportation 15 Sidewalk Construction Active 2019 2019 THORNCLIFFE RD to WICKSTEED New Sidewalk AVE [CUL-DE-SAC] Services AVE MILDENHALL RD from Transportation On Street Bikeway Installation of bikeway Russell Hill Rd from Hillholm Rd to 15 Active 2019 2019 STRATFORD CRES to ST Services Paving Markings pavement markings LEONARD'S AVE

Source: MCIC data Note: Future projects subject to change Page 53 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope ST LEONARD'S AVE from INDIAN ROAD CRES from KENNETH AVE (TO) to Transportation On Street Bikeway Installation of bikeway 15 Active 2019 2019 WEYBOURNE CRES to ANNETTE ST Services Paving Markings pavement markings MILDENHALL RD STRATFORD CRES from RUSSELL HILL RD from CHAPLIN CRES to EGLINTON AVE Transportation On Street Bikeway Installation of bikeway 15 Active 2019 2019 MILDENHALL RD to STRATFORD W Services Paving Markings pavement markings PARK TRL DUNDURN RD from Transportation On Street Bikeway Installation of bikeway RUSSELL HILL RD from COULSON AVE to FOREST HILL RD 15 Active 2019 2019 STRATHGOWAN AVE to Services Paving Markings pavement markings DINNICK CRES Transportation On Street Bikeway DINNICK CRES from DUNDURN Installation of bikeway VESTA DR from MILLBANK AVE to STRATHEARN BLVD 15 Active 2019 2019 Services Paving Markings RD to LAWRENCE AVE E pavement markings STRATHGOWAN AVE from Transportation On Street Bikeway Installation of bikeway SHAW ST from LOBB AVE to ARGYLE ST 15 Active 2019 2019 BLYTHWOOD RAVINE PARK TRL Services Paving Markings pavement markings to DUNDURN RD WEYBOURNE CRES from ST Transportation On Street Bikeway Installation of bikeway SHAW ST from DOURO ST to KING ST W 15 Active 2019 2019 EDMUND'S DR to ST LEONARD'S Services Paving Markings pavement markings AVE Transportation On Street Bikeway ST EDMUND'S DR from YONGE Installation of bikeway BELLEFAIR AVE from QUEEN ST E to JUNIPER AVE 15 Active 2019 2019 Services Paving Markings ST to WEYBOURNE CRES pavement markings GLENGROVE AVE from DALEMOUNT AVE, COLDSTREAM SUTHERLAND DR from Transportation AVE to COLDSTREAM AVE (EAST INTERSECTION), 15 Local Road Resurfacing Active 2019 2019 EGLINTON AVE E to GLENVALE Local Road Resurfacing Services BATHURST ST BLVD Transportation HANNA RD from DONLEA DR to CAPITOL AVE from GLEN PARK AVE to GLENGROVE AVE 15 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services GLENVALE BLVD LOWER DON TRAIL from LAKE SHORE BLVD to Transportation HANNA RD from MCRAE DR to 15 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing RIVERDALE PARK Services MILLWOOD RD KILLDEER CRES from Transportation SWAN AVE from MARTIN GROVE RD to ASHBOURNE DR 15 Local Road Resurfacing Active 2019 2019 BRENTCLIFFE RD to Local Road Resurfacing Services BRENTCLIFFE RD Transportation FAIRFIELD RD from RAWLINSON JOPLING AVE N from BLOOR ST W to MATTICE AVE 15 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services AVE to CARDIFF RD BANBURY RD from LAWRENCE AVE E to WILKET CREEK Transportation ROEHAMPTON AVE from 15 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing TRAIL Services CARDIFF RD to WALDER AVE New sidewalk from Wicksteed Ave to Vanderhoof Ave including all required traffic control, drainage, curb Transportation Brentcliffe Rd from Wicksteed Brentcliffe Rd from Wicksteed Ave to Research Rd 15 Sidewalk Construction Active 2020 2020 alignment modification, utility Services Ave to Research Rd relocation, property acquisition, any other requirements to facilitate sidewalk construction

Source: MCIC data Note: Future projects subject to change Page 54 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation Local Road FLEMING CRES from DONEGALL FLEMING CRES from DONEGALL DR to PARKHURST BLVD 15 Active 2019 2020 Local Road Reconstruction Services Reconstruction DR to PARKHURST BLVD

New sidewalk from Brentcliffe Rd to Glassworks Dr including all required traffic control, drainage, curb alignment Transportation Vanderhoof Ave from Brentcliffe Vanderhoof Ave from Brentcliffe Rd to Glassworks Dr 15 Sidewalk Construction Active 2020 2020 modification, utility relocation, Services Rd to Glassworks Dr property acquisition, any other requirements to facilitate sidewalk construction

PARKHURST BLVD from PARKHURST BLVD from DONEGALL DR to CAMERON Transportation 15 Local Road Resurfacing Active 2020 2020 DONEGALL DR to CAMERON Local Road Resurfacing CRES Services CRES ST CUTHBERTS RD from BERNEY CRES to BESSBOROUGH Transportation ST CUTHBERTS RD from BERNEY 15 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing DR Services CRES to BESSBOROUGH DR

Transportation LEACOCK CRES from DENLOW LEACOCK CRES from DENLOW BLVD to DENLOW BLVD 15 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services BLVD to DENLOW BLVD

Transportation DINNICK CRES from DINNICK CRES from WEYBOURNE CRES to POTE AVE 15 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services WEYBOURNE CRES to POTE AVE SUTHERLAND DR from Transportation SUTHERLAND DR from BESSBOROUGH DR to ASTOR AVE 15 Local Road Resurfacing Active 2020 2020 BESSBOROUGH DR to ASTOR Local Road Resurfacing Services AVE Transportation CHEVAL DR from DENLOW BLVD CHEVAL DR from DENLOW BLVD to BRAMBLE DR 15 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to BRAMBLE DR Transportation AIRDRIE RD from MILLWOOD AIRDRIE RD from MILLWOOD RD to LEA AVE 15 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services RD to LEA AVE HARWOOD RD from [S] BELSIZE HARWOOD RD from [S] BELSIZE DR [BRANCH] to [N] Transportation 15 Local Road Resurfacing Active 2020 2020 DR [BRANCH] to [N] BELSIZE DR Local Road Resurfacing BELSIZE DR [BRANCH] Services [BRANCH] HARWOOD RD from [37.70 m S] HARWOOD RD from [37.70 m S] MILLWOOD RD [END] to Transportation 15 Local Road Resurfacing Active 2020 2020 MILLWOOD RD [END] to Local Road Resurfacing MILLWOOD RD Services MILLWOOD RD Installation of signed and BANBURY RD from LAWRENCE AVE E to WILKET CREEK Transportation On Street Bikeway BANBURY RD from LAWRENCE 15 Active 2020 2020 marked route with contraflow TRAIL Services Paving Markings AVE E to WILKET CREEK TRAIL bike lane Transportation On Street Bikeway Grenoble Dr from Gateway Blvd Installation of bikeway Danforth Rd from Birchmount Rd to 16 Active 2017 2018 Services Paving Markings to Gateway Blvd pavement markings Transportation On Street Bikeway Gateway Blvd from Don Mills Rd Installation of bikeway Danforth Rd from Warden Ave to 16 Active 2017 2018 Services Paving Markings to Don Mills Rd pavement markings

Source: MCIC data Note: Future projects subject to change Page 55 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation On Street Bikeway Deauville Lane from St. Dennis Installation of bikeway SHERBOURNE ST from CARLTON ST to BLOOR ST E 16 Active 2017 2018 Services Paving Markings Dr to Grenoble Dr pavement markings GRANDHALL CRT from GOLDERS GREEN AVE to [150 m Transportation RAILSIDE RD from LAWRENCE 16 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing N] GOLDERS GREEN AVE [CUL-DE-SAC] Services AVE E to LAWRENCE AVE E VALLEY WOODS RD from [430 m Transportation GOLD BROOK GT from WANITA RD to INVERMARGE DR 16 Local Road Resurfacing Active 2018 2018 S] YORK MILLS RD to Local Road Resurfacing Services BROOKBANKS DR MOBERLY AVE from ALDERGROVE AVE to [W] MERRILL Transportation YORK MILLS RD from DON MILLS 16 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing AVE E [BRANCH] Services RD to LESLIE ST (N YK) GRAYDON HALL DR from Transportation DOURO ST from KING ST W to STRACHAN AVE 16 Local Road Resurfacing Active 2019 2019 FENELON DR to GRAYDON HALL Local Road Resurfacing Services PL WYNFORD DR from ST DENNIS WYNFORD DR from ST DENNIS DR to EGLINTON AVE Transportation east side from Eglinton to St 16 Sidewalk Construction Active 2020 2020 DR to EGLINTON AVE [OVERPASS] Services Dennis [OVERPASS] LINKWOOD LANE from Transportation Local Road LINKWOOD LANE from SPANBRIDGE RD to ST DENNIS DR 16 Active 2020 2020 SPANBRIDGE RD to ST DENNIS Local Road Reconstruction Services Reconstruction DR WYNFORD DR from ST DENNIS WYNFORD DR from ST DENNIS DR to EGLINTON AVE Transportation 16 Local Road Resurfacing Active 2020 2020 DR to EGLINTON AVE Local Road Resurfacing [OVERPASS] Services [OVERPASS] ST DENNIS DR from EGLINTON E ST DENNIS DR from EGLINTON E ST DENNIS [RAMP] to Transportation 16 Local Road Resurfacing Active 2020 2020 ST DENNIS [RAMP] to DON Local Road Resurfacing DON VALLEY PKWY S Services VALLEY PKWY S LINKWOOD LANE from Transportation Local Road LINKWOOD LANE from SPANBRIDGE RD to ST DENNIS DR 16 Active 2020 2020 SPANBRIDGE RD to ST DENNIS Local Road Reconstruction Services Reconstruction DR [S/E] DONWAY E THE [S/E] DONWAY E THE [QUADRANT] from DON MILLS RD Transportation 16 Major Road Resurfacing Active 2020 2020 [QUADRANT] from DON MILLS Major Road Resurfacing to DON MILLS RD Services RD to DON MILLS RD [S/W] DONWAY W THE [S/W] DONWAY W THE [QUADRANT] from DON MILLS Transportation 16 Major Road Resurfacing Active 2020 2020 [QUADRANT] from DON MILLS Major Road Resurfacing RD to DON MILLS RD Services RD to DON MILLS RD Transportation On Street Bikeway THE DONWAY E from DON Installation of buffered bicycle THE DONWAY E from DON MILLS RD to DON MILLS RD 16 Active 2020 2020 Services Construction MILLS RD to DON MILLS RD lanes Transportation On Street Bikeway THE DONWAY W from DON Installation of buffered bicycle THE DONWAY W from DON MILLS RD to DON MILLS RD 16 Active 2020 2020 Services Construction MILLS RD to DON MILLS RD lanes MALLARD RD from DON MILLS MALLARD RD from DON MILLS RD to [240 m W] DON Transportation 16 Local Road Resurfacing Active 2020 2020 RD to [240 m W] DON MILLS RD Local Road Resurfacing MILLS RD [RING] Services [RING] Transportation RUSTYWOOD DR from RUSTYWOOD DR from AVONWICK GT to DEERPATH RD 16 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVONWICK GT to DEERPATH RD

Source: MCIC data Note: Future projects subject to change Page 56 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Construction of new trail in EAST TRL from EAST DON RIVER TRL from EGLINTON AVE E to EAST Transportation hydro corridor to extend from 16 Bikeway Trail Active 2017 2020 EGLINTON AVE E to EAST DON DON RIVER TRL Services West River Don Trail to East RIVER TRL Don River Trail

BARBER GREENE RD from OVERLAND DR to DON MILLS Transportation On Street Bikeway BARBER GREENE RD from Installation of signed and 16 Active 2020 2020 RD Services Paving Markings OVERLAND DR to DON MILLS RD marked route Transportation On Street Bikeway NOB LANE from GREEN BELT DR Installation of signed and NOB LANE from GREEN BELT DR to MOCCASIN TRL 16 Active 2020 2020 Services Paving Markings to MOCCASIN TRL marked route OVERLAND DR from BARBER Installation of bike lane, OVERLAND DR from BARBER GREENE RD to BARBER Transportation On Street Bikeway 16 Active 2020 2020 GREENE RD to BARBER GREENE Installation of cycling GREENE RD Services Paving Markings RD infrastructure Transportation On Street Bikeway GREEN BELT DR from DON Installation of signed and GREEN BELT DR from DON MILLS RD to NOB LANE 16 Active 2020 2020 Services Paving Markings MILLS RD to NOB LANE marked route MOCCASIN TRL from NOB LANE to 146 M N/E OF NOB Transportation On Street Bikeway MOCCASIN TRL from NOB LANE Installation of signed and 16 Active 2020 2020 LANE Services Paving Markings to 146 M N/E OF NOB LANE marked route

MOCCASIN TRL from NOB LANE to 146 M N/E OF NOB Transportation On Street Bikeway MOCCASIN TRL from NOB LANE Installation of signed and 16 Active 2020 2020 LANE Services Paving Markings to 146 M N/E OF NOB LANE marked route

Transportation YATESBURY RD from PINEWAY LANSDOWNE AVE from DUNDAS ST W to COLLEGE ST 17 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services BLVD to PINEWAY BLVD

ADELAIDE ST E from JARVIS ST to EASTERN AVE Transportation Local Road GOODVIEW RD from NYMARK 17 Active 2018 2018 Local Road Reconstruction DIVERSION METRO NO.20 Services Reconstruction AVE to SHAUGHNESSY BLVD THE WESTWAY from [100 m W] KIPLING AVE, Transportation Local Road GOODVIEW RD from NYMARK HARTSDALE DR to [116 m E] MARTIN GROVE RD, [79 m 17 Active 2018 2018 Local Road Reconstruction Services Reconstruction AVE to SHAUGHNESSY BLVD E] WINCOTT DR CITATION DR from [33 m E] Transportation WHEELING DR from EAST AVE (SC) to MABERLEY CRES 17 Local Road Resurfacing Active 2018 2018 TALLY LANE [CUL-DE-SAC] to Local Road Resurfacing Services BURBANK DR GOODVIEW RD from Transportation RYLANDER BLVD from KINGSTON RD to TIDESWELL BLVD 17 Local Road Resurfacing Active 2018 2018 SHAUGHNESSY BLVD to DON Local Road Resurfacing Services MILLS RD SPARWOOD CRT from DUNWATSON DR from MEADOWVALE RD to Transportation GOLDENWOOD RD to [115 m N] 17 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing DELBEATRICE CRES Services GOLDENWOOD RD [CUL-DE- SAC] Transportation COVEWOOD ST from TARBERT HOUNDTRAIL DR from CALVERLEY TRL to CALVERLEY TRL 17 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services RD to LAURELEAF RD LAWRENCE AVE E from CHESTERTON SHORES RD to Transportation BESTVIEW DR from TARBERT RD 17 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing PORT UNION RD Services to STEELES AVE E

Source: MCIC data Note: Future projects subject to change Page 57 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope HAIDA CRT from LASH CRT to [90 m W] LASH CRT [CUL- Transportation TOPAZ GT from GOLDENWOOD 17 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing DE-SAC W/ BULB] Services RD to MINTWOOD DR

Transportation KENTLAND CRES from TARBERT TIDESWELL BLVD from RYLANDER BLVD to VANDORF ST 17 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services RD to BESTVIEW DR LOWBANK CRT from Transportation HARRINGTON CRES to [130 m SUGARBUSH SQ from MORRISH RD to MORRISH RD 17 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services N] HARRINGTON CRES [CUL-DE- SAC] MINTWOOD DR from Transportation DEEP DENE DR from KINGSTON RD to ELLESMERE RD 17 Local Road Resurfacing Completed 2018 2018 HARRINGTON CRES to [65 m N] Local Road Resurfacing Services TOPAZ GT [CUL-DE-SAC] Transportation ROCKLAND DR from FEAGAN DR from BATHGATE DR to BATHGATE DR 17 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services COVEWOOD ST to SYDNOR RD GOLDENWOOD RD from SCENIC HILL CRT from MILITARY TRL to [100 m S] Transportation 17 Local Road Resurfacing Completed 2018 2018 HARRINGTON CRES to Local Road Resurfacing MILITARY TRL [CUL-DE-SAC] Services BESTVIEW DR CHARLOTTETOWN BLVD from LAWRENCE AVE E to Transportation TARBERT RD from KENTLAND 17 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing CONFERENCE BLVD Services CRES to STEELES AVE E YORKLAND BLVD from CALVERLEY TRL from CANMORE BLVD to CANMORE Transportation 17 Local Road Resurfacing Active 2018 2018 CONSUMERS RD to Local Road Resurfacing BLVD Services CONSUMERS RD BATHGATE DR from INVERMARGE DR to MEADOWVALE Transportation YORKLAND RD from YORKLAND 17 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing RD Services BLVD to SHEPPARD AVE E TOWNSEND RD from Transportation HALFMOON SQ from CANMORE BLVD to HALFMOON SQ 17 Local Road Resurfacing Completed 2018 2018 FRESHMEADOW DR to STEELES Local Road Resurfacing Services AVE E SORREL CRT from CITATION DR Transportation WESTON RD from CLOUSTON AVE to WRIGHT AVE (YK) 17 Local Road Resurfacing Active 2018 2018 to [50 m N] CITATION DR [CUL- Local Road Resurfacing Services DE-SAC] LAWRENCE AVE E from CHESTERTON SHORES RD to Transportation CLANSMAN BLVD from BRAHMS 17 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing PORT UNION RD Services AVE to MCNICOLL AVE FRESHMEADOW DR from Transportation FLEUR PL from BABY POINT RD to BABT POINT CR 17 Local Road Resurfacing Completed 2018 2018 TOWNSEND RD to DON MILLS Local Road Resurfacing Services RD Transportation BRAHMS AVE from MCNICOLL CONLINS RD from ELLESMERE RD to SHEPPARD AVE 17 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services AVE to CLANSMAN BLVD

Transportation PARKWAY FOREST DR from DON MARTIN GROVE RD from SWAN AVE to DONALBERT RD 17 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services MILLS RD to SHEPPARD AVE E

Source: MCIC data Note: Future projects subject to change Page 58 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope FOREST MANOR RD from GLENGROVE AVE W from 304.8 M W OF MONA RD [CITY Transportation 17 Local Road Resurfacing Active 2019 2019 PARKWAY FOREST DR to Local Road Resurfacing LIMITS] to MONA DR Services PARKWAY FOREST DR Transportation Local Road WALKER RD from CAMERON Yonge St from Wellington St E to Wellington St W 18 Active 2018 2018 Local Road Reconstruction Services Reconstruction AVE to FRANKLIN AVE (N YK) NORTON AVE (N YK) from Transportation PEEL AVE from GLADSTONE AVE to DUFFERIN ST 18 Local Road Resurfacing Active 2018 2018 WILLOWDALE AVE to KENNETH Local Road Resurfacing Services AVE (N YK) Transportation Ellerslie Ave from Senlac Rd to north side from Senlan to DIANA DR from SUNFIELD RD to KEELE ST 18 Sidewalk Construction Completed 2018 2018 Services 260 Ellerslie Ave school FRANKLIN AVE (N YK) from Transportation BURNT BARK DR from TREERUN AVE to SANWOOD BLVD 18 Local Road Resurfacing Active 2018 2018 BOTHAM RD to [119 m W] Local Road Resurfacing Services BASSANO RD [END] BEN DORAN BLVD from BENORAMA CRES to BENARY Transportation Holcolm Rd from 110 Holcolm north side from 110 Holcolm 18 Sidewalk Construction Active 2018 2018 CRES Services Rd to Tamworth Rd to Tamworth Unit paver installation [45 m E] YONGE ST from [20 m HIGHLAND CREEK - GATINEAU TRAIL from ELLESMERE Transportation Neighbourhood between Olive Square park 18 Active 2018 2018 S] FINCH AVE E to [30 m N] RD/ MILITARY TRL to MORNINGSIDE PARK TRAIL Services Improvements boundaries bundled with OLIVE AVE laneway reconstruction.

PONYMEADOW TER from GOOD RD to [760 m N] GOOD Transportation MCKEE AVE from WILLOWDALE 18 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing RD [CUL-DE-SAC] Services AVE to WILLOWDALE AVE

DON RIVER BLVD from [58 m N] ISLAND RD from ROUGE HILLS DR to [105 m W] ROUGE Transportation 18 Local Road Resurfacing Active 2018 2018 SHEPPARD AVE W to [395 m N] Local Road Resurfacing HILLS DR [CUL-DE-SAC] Services SHEPPARD AVE W [END] DELBEATRICE CRES from DUNWATSON DR to Transportation ENDELL ST from FINCH AVE (N 18 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing INVERMARGE DR Services YK) to LANBROOKE AVE Transportation ANCONA ST from FINCH AVE (N IVAN RD from BATHGATE DR to ROYDAWN CRT 18 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services YK) to DEVONDALE AVE To bridge gap in hydro Transportation Hendon Ave from Greenview DONALDA CRES from MIDLAND AVE to LOCKIE AVE 18 Bikeway Trail Active 2019 2019 corridor trail across Yonge Services Ave to Yonge St Street To bridge gap in hydro Transportation Bishop Ave from Yonge St to HELICON GT from ELLESMERE RD to PORTICO DR 18 Bikeway Trail Active 2019 2019 corridor trail across Yonge Services Willowdale Ave Street To bridge gap in hydro Transportation Finch Corridor Trl from Hendon CHARRINGTON CRES from MARKAY ST to MARKAY ST 18 Bikeway Trail Active 2019 2019 corridor trail across Yonge Services Ave to Finch Trail Connection Street Transportation Major Road WILLOWDALE AVE from BYNG LORNE AVE from PARK LAWN RD to BONNYVIEW DR 18 Active 2019 2019 Major Road Reconstruction Services Reconstruction AVE (N YK) to FINCH AVE (N YK)

Source: MCIC data Note: Future projects subject to change Page 59 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation On Street Bikeway Willowdale Ave from Empress Bathurst St from Davenport Rd to 18 Active 2019 2019 Installation of multi-use trail Services Construction Ave to Finch Ave E ELISE TER from GREENWIN Transportation KISWICK ST from RIVERDALE AVE to BOULTBEE AVE 18 Local Road Resurfacing Active 2019 2019 VILLAGE RD to GREENWIN Local Road Resurfacing Services VILLAGE RD New sidewalk from Beecroft Rd to Yonge St including all required traffic control, drainage, curb alignment Transportation North York Blvd from Beecroft North York Blvd from Beecroft Rd to Yonge St 18 Sidewalk Construction Active 2020 2020 modification, utility relocation, Services Rd to Yonge St property acquisition, any other requirements to facilitate sidewalk construction

Transportation SHEPPARD AVE E from BAYVIEW SHEPPARD AVE E from BAYVIEW AVE to YONGE ST 18 Major Road Resurfacing Active 2020 2020 Major Road Resurfacing Services AVE to YONGE ST Transportation RUTH AVE from MAXOME AVE RUTH AVE from MAXOME AVE to BAYVIEW AVE 18 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to BAYVIEW AVE FREDERICK G GARDINER [RAMP Q] from [EB] FREDERICK Transportation MAIN ST from KINGSTON RD to 19 Major Road Resurfacing Completed 2018 2018 Major Road Resurfacing G GARDINER to YONGE ST/YORK ST Services GERRARD ST E [42.70 m N] LYALL AVE from LANGFIELD CRES from SILVERSTONE DR to DORWARD Transportation 19 Laneway Reconstruction Completed 2018 2018 [48.80 m W] KIMBERLEY AVE to Laneway Reconstruction DR Services KIMBERLEY AVE KEWBEACH AVE from [E] Transportation LA PEER BLVD from HEPC to MCNICOLL AVE 19 Local Road Resurfacing Active 2017 2018 WOODBINE AVE [BRANCH] to Local Road Resurfacing Services WAVERLEY RD lane restriping and the STRACHAN AVE from LAKE SHORE BLVD W to QUEEN ST Transportation Pedestrian Infrastructure MAIN ST from KINGSTON RD to removal of parking on one 19 Active 2018 2018 W Services Improvement GERRARD ST E side of the street. Bike Sharrows ,may be added

Replacement of precast tree planters and adjustment of Transportation Pedestrian Infrastructure MAIN ST from GERRARD ST E to KEELE ST from SHEPPARD AVE W to DOVEHOUSE AVE 19 Active 2018 2018 Benlamonde Ave intersection Services Improvement KINGSTON RD and associated blvd improvments.

Installation of Transportation On Street Bikeway NORWAY AVE from ELMER AVE WESTON RD from LAWRENCE AVE W to LITTLE AVE 19 Active 2017 2018 sharrows,bikeway pavement Services Paving Markings to LEE AVE markings Transportation On Street Bikeway CORLEY AVE from WOODBINE Installation of cycling Steeles Ave E from Birchmount Rd to 19 Active 2018 2018 Services Paving Markings AVE to BROOKSIDE DR pavement markings

Source: MCIC data Note: Future projects subject to change Page 60 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation On Street Bikeway NORWAY AVE from WOODBINE Installation of cycling Brooke Ave from Falkirk St to 19 Active 2018 2018 Services Paving Markings AVE to ELMER AVE pavement markings Installation of Brockhouse Rd from [104.60 m W] Bestobell Rd [Cul-de- Transportation On Street Bikeway ELMER AVE from NORWAY AVE 19 Active 2018 2018 sharrows,bikeway pavement sac] to [127.30 m E] Bestobell Rd [End] Services Paving Markings to NORWAY AVE markings New sidewalk from Woodbine Heights Blvd to St Clair Ave E including all required traffic Parkview Hill Crescent from control, drainage, curb MACPHERSON AVE from RATHNELLY AVE to POPLAR Transportation 19 Sidewalk Construction Active 2019 2019 Woodbine Heights Blvd to St alignment modification, utility PLAINS RD Services Clair Ave E relocation, property acquisition, any other requirements to facilitate sidewalk construction

Transportation Utility Cut Road PICKERING ST from KINGSTON Dovercourt Rd from Humbert St to 19 Active 2019 2019 Utility Cut Road Rehabilitation Services Rehabilitation RD to GERRARD ST E COPELAND AVE from WALLACE AVE from RUSSETT AVE to LANSDOWNE AVE Transportation On Street Bikeway Installation of bikeway 19 Active 2019 2019 ROSEHEATH AVE to WEST LYNN (TO) Services Paving Markings pavement markings AVE Transportation On Street Bikeway MERRILL BRIDGE RD from WEST Installation of bikeway BRAEMAR AVE from CHAPLIN CRES to EGLINTON AVE W 19 Active 2019 2019 Services Paving Markings LYNN AVE to EAST LYNN AVE pavement markings

BEACONSFIELD AVE from AFTON AVE to MACKENZIE Transportation On Street Bikeway ROSEHEATH AVE from HANSON Installation of bikeway 19 Active 2019 2019 CRES Services Paving Markings ST to COPELAND AVE pavement markings WEST LYNN AVE from Transportation On Street Bikeway Installation of bikeway MANCHESTER AVE from SHAW ST to OSSINGTON AVE 19 Active 2019 2019 COPELAND AVE to MERRILL Services Paving Markings pavement markings BRIDGE RD Transportation On Street Bikeway EAST LYNN AVE from MERRILL Installation of bikeway KILBARRY RD from LASCELLES BLVD to RUSSELL HILL RD 19 Active 2019 2019 Services Paving Markings BRIDGE RD to DANFORTH AVE pavement markings

Transportation On Street Bikeway EDGEWOOD AVE from DUNDAS Installation of bikeway SHAW ST from HARBORD ST to DUPONT ST 19 Active 2019 2019 Services Paving Markings ST E to EASTWOOD RD pavement markings EASTWOOD RD from Transportation On Street Bikeway Installation of bikeway DUNVEGAN RD from ST. CLAIR AVE W to LONSDALE RD 19 Active 2019 2019 EDGEWOOD AVE to WOODBINE Services Paving Markings pavement markings AVE WHITE PINE AVE from [S] Transportation TRETHEWEY DR from JANE ST to EGLINTON AVE W 19 Local Road Resurfacing Active 2019 2019 PARKVIEW HILL CRES [LEG] to Local Road Resurfacing Services [N] PARKVIEW HILL CRES [LEG] Transportation KEYSTONE AVE from PATRICIA BOULTBEE AVE from KISWICK ST to JONES AVE 19 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services DR to MORTON RD

Source: MCIC data Note: Future projects subject to change Page 61 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation LUMSDEN AVE from MAIN ST to SUDBURY ST from ABELL ST to KING ST W 19 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services BARRINGTON AVE Transportation SELWOOD AVE from GLEN RICHMOND ST W from STRACHAN AVE to STANLEY TER 19 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services MANOR DR to MACLEAN AVE Transportation SELWYN AVE from GARDENS WILMAR RD from MONTESSON ST to BLOOR ST W 19 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services CRES to WESTVIEW BLVD WESTBROOK AVE from Transportation ELM RD from LAWRENCE AVE W to RIDLEY BLVD 19 Local Road Resurfacing Active 2019 2019 WESTLAKE AVE to CHISHOLM Local Road Resurfacing Services AVE ROXBOROUGH DR from MT. PLEASANT RD to HIGHLAND Transportation TREADWAY BLVD from PLAINS 19 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing AVE Services RD to O'CONNOR DR LAWLOR AVE from KINGSTON Transportation NORSEMAN ST from KIPLING AVE to ROYAL YORK RD 19 Local Road Resurfacing Active 2019 2019 RD to [E] SWANWICK AVE (TO) Local Road Resurfacing Services [BRANCH] BARRINGTON AVE from Transportation HIGHLAND AVE from ROXBOROUGH DR to GLEN RD 19 Local Road Resurfacing Active 2019 2019 COLEMAN AVE to LUMSDEN Local Road Resurfacing Services AVE Transportation HERBERT AVE from QUEEN ST E HEATH ST W from DUNVEGAN RD to YONGE ST 19 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to [38.10 m N] QUEEN ST E SWANWICK AVE (TO) from Transportation STRACHAN AVE from QUEEN ST W to KING ST W 19 Local Road Resurfacing Active 2019 2019 LAWLOR AVE to SCARBOROUGH Local Road Resurfacing Services RD OVERLAND DR from BARBER GREENE RD to BARBER Transportation MACLEAN AVE from QUEEN ST 19 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing GREENE RD Services E to PINE CRES HEPC from FINCH TO HUMBER TRAIL CONNECTION to Transportation REXLEIGH DR from FERRIS RD to 19 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing CPR Services GLENWOOD CRES MOBERLY AVE from Transportation The Esplanade from Church St to Berkeley St 19 Local Road Resurfacing Active 2019 2019 ALDERGROVE AVE to [W] Local Road Resurfacing Services MERRILL AVE E [BRANCH] PARKVIEW HILL CRES from MACLENNAN AVE from SCHOLFIELD AVE to NORTH OF Transportation 19 Local Road Resurfacing Active 2019 2019 WOODBINE HEIGHTS BLVD to ST Local Road Resurfacing OLD BRIDLE PATH Services CLAIR AVE E (E YK) DAWES RD from DANFORTH Transportation GLENCAIRN AVE from DALEMOUNT AVE to DUFFERIN ST 19 Major Road Resurfacing Active 2019 2019 AVE to [38.90 m N] BALFOUR Major Road Resurfacing Services AVE [CITY LIMITS] MOCCASIN TRL from NOB LANE to 146 M N/E OF NOB Transportation SANDRA RD from O'CONNOR DR 19 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing LANE Services to ST CLAIR AVE E (E YK)

[35 m S] SUTHERLAND AVE from [35 m S] SUTHERLAND AVE from VICTORIA PARK AVE to Transportation 19 Laneway Reconstruction Active 2020 2020 VICTORIA PARK AVE to [102 m Laneway Reconstruction [102 m W] VICTORIA PARK AVE Services W] VICTORIA PARK AVE

Source: MCIC data Note: Future projects subject to change Page 62 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation Major Road O'CONNOR DR from SANDRA RD O'CONNOR DR from SANDRA RD to BERMONDSEY RD 19 Active 2020 2020 Major Road Reconstruction Services Reconstruction to BERMONDSEY RD

Transportation Local Road HALDON AVE from COSBURN HALDON AVE from COSBURN AVE to HALDON AVE 19 Active 2020 2020 Local Road Reconstruction Services Reconstruction AVE to HALDON AVE HALDON AVE from COSBURN HALDON AVE from COSBURN AVE to 340 M N OF Transportation On Street Bikeway Installation of signed and 19 Active 2020 2020 AVE to 340 M N OF COSBURN COSBURN AVE Services Paving Markings marked route AVE Existing signed route QUEEN ST E from NURSEWOOD RD to VICTORIA PARK Transportation On Street Bikeway QUEEN ST E from NURSEWOOD 19 Active 2020 2020 upgraded to signed and AVE Services Paving Markings RD to VICTORIA PARK AVE marked route Transportation LEUTY AVE from ALFRESCO LEUTY AVE from ALFRESCO LAWN to QUEEN ST E 19 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services LAWN to QUEEN ST E SPRINGDALE BLVD from SPRINGDALE BLVD from GLEBEMOUNT AVE to Transportation 19 Local Road Resurfacing Active 2020 2020 GLEBEMOUNT AVE to Local Road Resurfacing WOODBINE AVE Services WOODBINE AVE HOLBORNE AVE from Transportation HOLBORNE AVE from WOODBINE AVE to GLEDHILL AVE 19 Local Road Resurfacing Active 2020 2020 WOODBINE AVE to GLEDHILL Local Road Resurfacing Services AVE Transportation HANNAFORD ST from HANNAFORD ST from KINGSTON RD to LYALL AVE 19 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services KINGSTON RD to LYALL AVE KINGSMOUNT PARK RD from KINGSMOUNT PARK RD from EASTWOOD RD to Transportation 19 Local Road Resurfacing Active 2020 2020 EASTWOOD RD to FAIRMOUNT Local Road Resurfacing FAIRMOUNT CRES Services CRES GLENMOUNT PARK RD from GLENMOUNT PARK RD from CORLEY AVE to GLEN DAVIS Transportation 19 Local Road Resurfacing Active 2020 2020 CORLEY AVE to GLEN DAVIS Local Road Resurfacing CRES Services CRES Transportation LONG CRES from LEE AVE to [N- LONG CRES from LEE AVE to [N-S] LONG CRES [LEG] 19 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services S] LONG CRES [LEG] Transportation BELLEFAIR AVE from QUEEN ST BELLEFAIR AVE from QUEEN ST E to JUNIPER AVE 19 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services E to JUNIPER AVE QUEEN ST E from NURSEWOOD RD to VICTORIA PARK Transportation QUEEN ST E from NURSEWOOD 19 Major Road Resurfacing Active 2020 2020 Major Road Resurfacing AVE Services RD to VICTORIA PARK AVE THYRA AVE from DANFORTH AVE to DENTONIA PARK Transportation Local Road THYRA AVE from DANFORTH 19 Active 2020 2020 Local Road Reconstruction AVE Services Reconstruction AVE to DENTONIA PARK AVE WESTLAKE AVE from Transportation Local Road WESTLAKE AVE from HAMSTEAD AVE to COSBURN AVE 19 Active 2020 2020 HAMSTEAD AVE to COSBURN Local Road Reconstruction Services Reconstruction AVE Transportation Local Road COSBURN AVE from GLEDHILL COSBURN AVE from GLEDHILL AVE to OAK PARK AVE 19 Active 2020 2020 Local Road Reconstruction Services Reconstruction AVE to OAK PARK AVE ALDERGROVE AVE from ALDERGROVE AVE from MOBERLY AVE to [80 m E] Transportation 19 Local Road Resurfacing Active 2020 2020 MOBERLY AVE to [80 m E] Local Road Resurfacing MOBERLY AVE [END] Services MOBERLY AVE [END]

Source: MCIC data Note: Future projects subject to change Page 63 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope GOODVIEW RD from NYMARK AVE to SHAUGHNESSY Transportation MONTVALE DR from CHINE DR 20 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing BLVD Services to GIDLEY RD Transportation Sinnott Rd from Eglinton Ave E SHAW ST from HARRISON ST to COLLEGE ST 20 Sidewalk Construction Completed 2018 2018 Eglinton Ave E to Comstock Rd Services to Comstock Rd Transportation SAUGEEN CRES from MERRIAN WILLOWDALE AVE from EMPRESS AVE to FINCH AVE E 20 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services RD to MERRIAN RD GLENSHEPHARD DR from [143.30 m E] YONGE ST from [29.20 m S] PRICE ST to Transportation 20 Local Road Resurfacing Active 2018 2018 DANFORTH RD to DANFORTH Local Road Resurfacing PRICE ST Services RD LOMBARDY CRES from [262 m E] WESTON RD from RUTHERFORD AVE to Transportation 20 Local Road Resurfacing Active 2018 2018 GLENSHEPHARD DR to Local Road Resurfacing CRAYDON AVE Services GLENSHEPHARD DR SCARBORO CRES from DRAKE [59.70 m W] YONGE ST from [47.90 m S] FARNHAM AVE Transportation 20 Local Road Resurfacing Completed 2018 2018 CRES to [29.10 m S] DRAKE CRES Local Road Resurfacing to FARNHAM AVE Services [END] Transportation GIDLEY RD from MONTVALE DR EAST HAVEN DR from CLIFFSIDE DR to RIDGEMOOR AVE 20 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to ST CLAIR AVE E (SC) Transportation KIDBROOKE CRES from FROLICK CRES from TRALEE AVE to GREENOCK AVE 20 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services MONTVALE DR to GIDLEY RD COLLINGWOOD ST from KENNEDY RD to [228.70 m E] Transportation DANFORTH RD from DANFORTH 20 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing KENNEDY AVE [END] Services AVE to ST CLAIR AVE E (TO) Installation of cycling Transportation On Street Bikeway DANFORTH RD from DANFORTH HANNA RD from MCRAE DR to MILLWOOD RD 20 Active 2019 2019 pavement markings and flexi Services Paving Markings AVE to ST CLAIR AVE E (TO) posts ORIOLE PKWY from BURNABY BLVD to WILLOWBANK Transportation Utility Cut Road PELL ST from RIDGEMOOR AVE 20 Active 2019 2019 Utility Cut Road Rehabilitation BLVD Services Rehabilitation to SANDOWN AVE Transportation EAST HAVEN DR from CLIFFSIDE Warden Ave over Massey Creek from MASSEY CREEK to 20 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services DR to RIDGEMOOR AVE MADELAINE AVE from Transportation Downsview Ave over Black Creek from BLACK CREEK to 20 Local Road Resurfacing Active 2019 2019 DANFORTH AVE to [62.0 M N] Local Road Resurfacing Services DANFORTH AVE Van Dusen Blvd pedestrian bridge over Mimico Creek Transportation MCNAB BLVD from AYRE POINT 20 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing from MIMICO CREEK to Services RD to KINGSTON RD Transportation ADANAC DR from COLONIAL Steeles Ave over from ROUGE RIVER to 20 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services AVE to BELLAMY RD S Gordon MacKay Rd over Black Creek from BLACK CREEK Transportation BALCARRA AVE from FENWOOD 20 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing to Services HTS to PINE RIDGE DR

MURRAY ROSS PKWY from SHOREHAM DR to STEELES Transportation FALLINGBROOK RD from LAKE 20 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing AVE W Services ONTARIO to KINGSTON RD

Source: MCIC data Note: Future projects subject to change Page 64 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope CLAREMORE AVE from CLAREMORE AVE from KINGSTON RD to AYLESWORTH Transportation 20 Local Road Resurfacing Active 2017 2020 KINGSTON RD to AYLESWORTH Local Road Resurfacing AVE Services AVE Transportation CLAREMORE AVE from CLAREMORE AVE from KINGSTON RD to MCINTOSH ST 20 Local Road Resurfacing Active 2017 2020 Local Road Resurfacing Services KINGSTON RD to MCINTOSH ST

MIDLAND AVE from ST CLAIR AVE E (SC) to DANFORTH Transportation MIDLAND AVE from ST CLAIR 20 Major Road Resurfacing Active 2020 2020 Major Road Resurfacing RD Services AVE E (SC) to DANFORTH RD

Transportation KINGSTON RD from LAKEHURST Installation of boulevard multi- KINGSTON RD from LAKEHURST DR to GLEN EVEREST RD 20 Bikeway Trail Active 2020 2020 Services DR to GLEN EVEREST RD use trail Existing signed route Transportation On Street Bikeway QUEEN ST E from BLANTYRE QUEEN ST E from BLANTYRE AVE to FALLINGBROOK RD 20 Active 2020 2020 upgraded to signed and Services Paving Markings AVE to FALLINGBROOK RD marked route Transportation On Street Bikeway MIDLAND AVE from ST. CLAIR MIDLAND AVE from ST. CLAIR AVE E to DANFORTH RD 20 Active 2020 2020 Installation of urban shoulder Services Paving Markings AVE E to DANFORTH RD Transportation KENNEDY RD from PARK ST to KENNEDY RD from PARK ST to DANFORTH RD 20 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services DANFORTH RD Transportation MCINTOSH ST from HIGHVIEW MCINTOSH ST from HIGHVIEW AVE (SC) to PARK ST 20 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE (SC) to PARK ST Transportation BOLSTER AVE from PITT AVE to BOLSTER AVE from PITT AVE to PHARMACY AVE 20 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services PHARMACY AVE KARNWOOD DR from KARNWOOD DR from DELWOOD DR to KNIGHTSBRIDGE Transportation 20 Local Road Resurfacing Active 2020 2020 DELWOOD DR to Local Road Resurfacing RD Services KNIGHTSBRIDGE RD NATAL AVE from AYLESWORTH NATAL AVE from AYLESWORTH AVE to [260 m N] Transportation 20 Local Road Resurfacing Active 2020 2020 AVE to [260 m N] AYLESWORTH Local Road Resurfacing AYLESWORTH AVE [CUL-DE-SAC] Services AVE [CUL-DE-SAC] Transportation NATAL AVE from MCINTOSH ST NATAL AVE from MCINTOSH ST to PARK ST 20 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to PARK ST PARNELL AVE from Transportation PARNELL AVE from BIRCHMOUNT RD to N EDGELY AVE 20 Local Road Resurfacing Active 2020 2020 BIRCHMOUNT RD to N EDGELY Local Road Resurfacing Services AVE Transportation PHARMACY AVE from Richmond St E from Power St E to Sackville St 21 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing Services EGLINTON AVE E to CPR Streetscape improvements to be bundled with road Transportation Neighbourhood Pharmacy Ave from Eglinton LIVINGSTONE AVE from MARLEE AVE to TIMES RD 21 Active 2018 2018 resurfacing replacement of Services Improvements Ave E to CPR paving in blvds and/or medians.

Source: MCIC data Note: Future projects subject to change Page 65 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope CITADEL DR from [63 m N] Transportation SHERBOURNE ST from CARLTON ST to BLOOR ST E 21 Local Road Resurfacing Completed 2018 2018 STANSBURY CRES [CUL-DE-SAC] Local Road Resurfacing Services to STANSBURY CRES SHANGARRY DR from Transportation SILVERTHORN AVE from KERSDALE AVE to AILEEN AVE 21 Local Road Resurfacing Completed 2018 2018 ARNCLIFFE CRES to PHARMACY Local Road Resurfacing Services AVE Transportation SHANEEN BLVD from BISCAYNE CONRAD AVE from HILLCREST DR to TYRREL AVE 21 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services BLVD to NOREEN DR

[253 m E] WESTON RD from VICTORIA BLVD to Transportation CROSLAND DR from ELLESMERE 21 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing RUTHERFORD AVE Services RD to PENWORTH RD

[30 m S] LAKE SHORE BLVD W from THIRD ST (ETBK) to Transportation REDDINS RD from PHARMACY 21 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing SECOND ST (ETBK) Services AVE to CROSLAND DR [30 m S] LAKE SHORE BLVD W from FIFTH ST (ETBK) to Transportation HURLEY CRES from PACKARD 21 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing FOURTH ST (ETBK) Services BLVD to MCCOWAN RD PENWORTH RD from [29.20 m S] PRICE ST from [85.30 m E] YONGE ST to [157 Transportation 21 Local Road Resurfacing Active 2018 2018 PHARMACY AVE to CAVEHILL Local Road Resurfacing m E] YONGE ST Services CRES CAVEHILL CRES from [30 m S] LAKE SHORE BLVD W from NINTH ST to EIGHTH Transportation 21 Local Road Resurfacing Active 2018 2018 PENWORTH RD to [823 m N] Local Road Resurfacing ST Services PENWORTH RD [CUL-DE-SAC] NORTH QUEEN ST from KIPLING AVE to [23 m E] Transportation DALLYN CRES from CHILLERY 21 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing VANSCO RD Services AVE to BRIMLEY RD Transportation ARNCLIFFE CRES from DYSON GRAYBARK CRES from GOOD RD to PONYMEADOW TER 21 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services BLVD to VICTORIA PARK AVE

Streetscape improvements to Transportation Neighbourhood Midland Ave from Ellesmere Rd be bundled with road STAFFORD ST from WELLINGTON ST W to CANNIFF ST 21 Active 2018 2019 Services Improvements to Progress Ave resurfacing replacement of paving in blvds. BIRCHMOUNT RD from Transportation SHAW ST from HARRISON ST to COLLEGE ST (TO) 21 Major Road Resurfacing Active 2019 2019 EGLINTON AVE E to LAWRENCE Major Road Resurfacing Services AVE E Transportation MIDLAND AVE from ELLESMERE FRANKLIN AVE (TO) from RUSKIN AVE to ANTLER ST 21 Major Road Resurfacing Active 2018 2019 Major Road Resurfacing Services RD to SHEPPARD AVE E

Shoreham Dr under pedestrian bridge from SHOREHAM Transportation ST ANDREWS RD from 21 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing DRIVE to Services AMBERDALE DR to SURATY AVE

ELLESMERE RD from WARDEN AVE to VICTORIA PARK Transportation ELLESMERE RD from WARDEN 21 Major Road Resurfacing Active 2020 2020 Major Road Resurfacing AVE Services AVE to VICTORIA PARK AVE

Source: MCIC data Note: Future projects subject to change Page 66 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation PHARMACY AVE from PHARMACY AVE from ELLESMERE RD to HIGHWAY 401 21 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ELLESMERE RD to HIGHWAY 401 ANTRIM CRES from KENNEDY ANTRIM CRES from KENNEDY RD to [520 m E] KENNEDY Transportation 21 Local Road Resurfacing Active 2020 2020 RD to [520 m E] KENNEDY AVE Local Road Resurfacing AVE [CUL-DE-SAC] Services [CUL-DE-SAC] Transportation BROADBENT AVE from BROADBENT AVE from MIDLAND AVE to CHILLERY AVE 21 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services MIDLAND AVE to CHILLERY AVE

Transportation FRED BLAND CRES from FRED BLAND CRES from MCCOWAN RD to TRUDELLE ST 21 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services MCCOWAN RD to TRUDELLE ST Construction of trail to extend Transportation Pharmacy Ave from HEPC to the Finch hydro corridor trail BIRCHMOUNT RD from [30 M S] HEPC to MCNICOLL AVE 22 Bikeway Trail Active 2018 2018 Services Mcnicoll Ave from Victoria Park Ave to Birchmount Rd Construction of trail to extend Transportation Warden Ave from HEPC to the Finch hydro corridor trail MONTVALE DR from CHINE DR to GIDLEY RD 22 Bikeway Trail Active 2018 2018 Services Mcnicoll Ave from Victoria Park Ave to Birchmount Rd Construction of trail to extend ATTWELL (N) DR from [366 m E] CARLINGVIEW DR, Transportation Brookshire Blvd from HEPC to the Finch hydro corridor trail CARLINGVIEW DR to [366 m E] CARLINGVIEW DR, [504 m 22 Bikeway Trail Active 2018 2018 Services Mcnicoll Ave from Victoria Park Ave to E] CARLINGVIEW DR Birchmount Rd Construction of trail to extend MILITARY TRL from ELLESMERE RD to EAST HIGHLAND Transportation Birchmount Rd from [30 m S] the Finch hydro corridor trail 22 Bikeway Trail Active 2018 2018 CREEK Services HEPC to Mcnicoll Ave from Victoria Park Ave to Birchmount Rd Construction of trail to extend GOODVIEW RD from NYMARK AVE to SHAUGHNESSY Transportation La Peer Blvd from HEPC to the Finch hydro corridor trail 22 Bikeway Trail Active 2018 2018 BLVD Services Mcnicoll Ave from Victoria Park Ave to Birchmount Rd Installation of cycling PRINCE GEORGE DR from THE KINGSWAY to KIPLING Transportation BIRCHMOUNT RD from HYDRO pavement markings and other 22 Bikeway Trail Active 2017 2018 AVE Services R O W to STEELES AVE E cycling infrastructure improvements Construction of trail to extend NAMCO RD from KIPLING AVE to [180 m S] KIPLING AVE Transportation STONEBRIDGE RD from HEPC to the Finch hydro corridor trail 22 Bikeway Trail Active 2018 2018 [END] Services MCNICOLL AVE from Victoria Park Ave to Birchmount Rd KENNEDY RD from [390 m S] Transportation MADISON AVE from Madison Ave to 22 Major Road Resurfacing Completed 2018 2018 PASSMORE AVE to STEELES AVE Major Road Resurfacing Services E

Source: MCIC data Note: Future projects subject to change Page 67 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope PHARMACY AVE from THE WESTWAY from [79 m E] WINCOTT DR to KIPLING Transportation 22 Major Road Resurfacing Completed 2018 2018 SHEPPARD AVE E to FINCH AVE Major Road Resurfacing AVE Services E Construction of trail to extend Transportation HEPC from PHARMACY AVE to the Finch hydro corridor trail VULCAN ST from MARTIN GROVE RD to CITY VIEW DR 22 Bikeway Trail Active 2018 2018 Services BIRCHMOUNT RD from Victoria Park Ave to Birchmount Rd LAKE SHORE BLVD E from PARLIAMENT ST to BOOTH Transportation ARNALL AVE from PHARMACY 22 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing AVE Services AVE to HUNTSMILL BLVD

Transportation BAMBURGH CRCL from SHOREHAM DR from JANE ST to BLACK CREEK BRIDGE 22 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services WARDEN AVE to WARDEN AVE

Transportation BURNT BARK DR from TREERUN SCARLETT RD from ST CLAIR AVE W to HUMBER RIVER 22 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services AVE to SANWOOD BLVD ECCLESFIELD DR from Transportation ADELAIDE ST E from JARVIS ST to PARLIAMENT ST 22 Local Road Resurfacing Active 2018 2018 HUNTSMILL BLVD to Local Road Resurfacing Services HUNTSMILL BLVD [36 m W] FIFTH ST (ETBK) from [28 m N] LAKE SHORE Transportation PHARMACY AVE from HIGHWAY 22 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing BLVD W to BIRMINGHAM ST Services 401 to SHEPPARD AVE E SILVER STAR BLVD from [30.50 m N] DAVENPORT RD from AVENUE RD to [69.80 Transportation 22 Local Road Resurfacing Active 2018 2018 MIDLAND AVE to [170 m S] Local Road Resurfacing m W] AVENUE RD Services KILCULLEN CASTLE GT HUNTSMILL BLVD from [23.50 m W] YONGE ST from WELLESLEY ST W to [25.90 Transportation 22 Local Road Resurfacing Active 2018 2018 BAMBURGH CRCL to Local Road Resurfacing m N] WELLESLEY ST W Services GLENDINNING AVE CRAYFORD DR from [92 m W] [69.80 m W] AVENUE RD from [30.50 m N] DAVENPORT Transportation 22 Local Road Resurfacing Active 2018 2018 HUNTSMILL BLVD to CRAYFORD Local Road Resurfacing RD to [27.40 m S] PEARS AVE Services DR [RING] LITTLEBOROUGH CRT from MUIRBANK BLVD to [120 m Transportation TREERUN AVE from BURNT 22 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing N] MUIRBANK BLVD [CUL-DE-SAC] Services BARK DR to SANWOOD BLVD

QUEENS PLATE DR from REXDALE BLVD to REXDALE Transportation BIRCHMOUNT RD from FINCH 22 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing BLVD Services AVE E to HYDRO R O W

Source: MCIC data Note: Future projects subject to change Page 68 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

New sidewalk from Agincourt Dr and Stainforth Dr from including all required traffic control, drainage, curb Plymbridge Road from Don River, west to 1 km east of Transportation Havendale Rd from Agincourt Dr 22 Sidewalk Construction Active 2019 2019 alignment modification, utility Services to Stainforth Dr relocation, property acquisition, any other requirements to facilitate sidewalk construction

Transportation AGINCOURT DR from SHEPPARD SHAW ST from DEWSON ST to HARBORD ST 22 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services AVE E to HAVENDALE RD HUNTSMILL BLVD from Transportation Kipling Ave from Steeles Ave W to 22 Local Road Resurfacing Active 2019 2019 GLENDINNING AVE to Local Road Resurfacing Services BAMBURGH CRCL Transportation FIREBRACE RD from HUNTSMILL Danforth Rd over West Highland Creek from STREAM to 22 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services BLVD to STEELES AVE E

The Queensway over Parkside Dr from PARKSIDE DRIVE Transportation DONALDA CRES from MIDLAND 22 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing to Services AVE to LOCKIE AVE COLLINGWOOD ST from Drumheller Rd over Humber River Tributary from BERRY Transportation 22 Local Road Resurfacing Active 2019 2019 KENNEDY RD to [228.70 m E] Local Road Resurfacing CREEK to Services KENNEDY AVE [END] Transportation LOCKIE AVE from AGINCOURT Sheppard Ave over Black Creek from BLACK CREEK to 22 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services DR to MIDLAND AVE Infrastructure Transportation Steeles Ave E from Kelvin Grove Steeles GO Grade Separation: Steeles Ave E from Kelvin Grove Ave to Midland Ave 22 Enhancement - Active 2018 2020 Services Ave to Midland Ave Construction Construction Stage WISHING WELL DR from WISHING WELL DR from PHARMACY AVE to PHARMACY Transportation 22 Local Road Resurfacing Active 2020 2020 PHARMACY AVE to PHARMACY Local Road Resurfacing AVE Services AVE Transportation MARSHA DR from EARLTON RD New Sidewalk from Ealton Rd MARSHA DR from EARLTON RD to DEMPSTER ST 22 Sidewalk Construction Active 2020 2020 Services to DEMPSTER ST to Dempster St Transportation MARSHA DR from EARLTON RD MARSHA DR from EARLTON RD to DEMPSTER ST 22 Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to DEMPSTER ST Thurodale Ave from Brookhaven Dr to 46 M West of Transportation MILNER AVE from MCCOWAN McCowan Rd to Scunthorpe 23 Sidewalk Construction Completed 2018 2018 Martini Dr (End of Street) Services RD to BELLAMY RD N Rd (north side) GLENFOREST RD from YONGE ST to MOUNT PLEASANT Transportation TAPSCOTT RD from NEILSON RD 23 Cold In Place Recycling Active 2018 2018 Major Road Resurfacing RD Services to MCLEVIN AVE

Source: MCIC data Note: Future projects subject to change Page 69 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Thurodale Ave from Brookhaven Dr to 46 M West of Transportation MCLEVIN AVE from GREENSPIRE 23 Cold In Place Recycling Active 2018 2018 Major Road Resurfacing Martini Dr (End of Street) Services RD to TAPSCOTT RD

Address missing links and substandard sidewalk in both Transportation Markham Rd from Steeles Ave E GRANADA CRES from ROTARY DR to ROTARY DR 23 Sidewalk Construction Completed 2018 2018 directions on Markham Rd Services to Finch Ave E from Steeles Ave E to Finch Ave E INVERGORDON AVE from Transportation REDDINS RD from PHARMACY AVE to CROSLAND DR 23 Local Road Resurfacing Completed 2018 2018 MCCOWAN RD to HAVENVIEW Local Road Resurfacing Services RD GOLDHAWK TRL from Transportation JONES AVE from BAIRD AVE to DANFORTH AVE 23 Local Road Resurfacing Active 2018 2018 OAKHAVEN DR (N INT) to Local Road Resurfacing Services OAKHAVEN DR (N INT) GREENSPIRE RD from [36.60 m S] BEDFORD PARK AVE from [62 m W] YONGE Transportation 23 Local Road Resurfacing Active 2018 2018 MAMMOTH HALL TRL to Local Road Resurfacing ST to [112 m W] YONGE ST Services MCLEVIN AVE SOUTH SHIELDS AVE from [30 m S] LAKE SHORE BLVD W from SEVENTH ST to SIXTH Transportation 23 Local Road Resurfacing Active 2018 2018 MIDLAND AVE to ALEXMUIR Local Road Resurfacing ST (ETBK) Services BLVD INVERGORDON AVE from [30 m S] LAKE SHORE BLVD W from FOURTH ST (ETBK) to Transportation 23 Local Road Resurfacing Completed 2018 2018 MCCOWAN RD to HAVENVIEW Local Road Resurfacing THIRD ST (ETBK) Services RD NORTH WIND PL from Transportation COMMANDER BLVD to [183 m PICKERING ST from KINGSTON RD to GERRARD ST E 23 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services N] COMMANDER BLVD [CUL-DE- SAC] WASHBURN WAY from Transportation MILITARY TRL from OLD KINGSTON RD to KINGSTON RD 23 Local Road Resurfacing Active 2018 2018 SHEPPARD AVE E to TAPSCOTT Local Road Resurfacing Services RD MAGDALENA CRT from KIDRON VALLEY DR to [103 m N] Transportation Major Road MILNER AVE from NABLY CRT to 23 Active 2019 2019 Major Road Reconstrution KIDRON VALLEY DR [CUL-DE-SAC] Services Reconstruction NEILSON RD

New sidewalk from Tiffield Rd to CPR including all required traffic control, drainage, curb Transportation Finch Ave E from Tiffield Rd to alignment modification, utility Dundas St E from Coxwell Ave to 23 Sidewalk Construction Active 2019 2019 Services CPR relocation, property acquisition, any other requirements to facilitate sidewalk construction.

Berry Creek Dr over Humber River Tributary from BERRY Transportation PITFIELD RD from BRIMLEY RD 23 Cold In Place Recycling Active 2019 2019 Local Road Resurfacing CREEK to Services to MCCOWAN RD Transportation BLACKWELL AVE from BERNER Foxridge Dr over Massey Creek from MASSEY CREEK to 23 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services TRL to TAPSCOTT RD

Source: MCIC data Note: Future projects subject to change Page 70 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope CHANNEL NINE CRT from EAST DON RIVER TRL from WEST DON RIVER TRL to Transportation 23 Cold In Place Recycling Active 2019 2019 MCCOWAN RD to [213 m S] Local Road Resurfacing GATINEAU HYDRO CORRIDOR TRAIL Services MCCOWAN RD [CUL-DE-SAC]

EAST DON RIVER TRL from EGLINTON AVE E to EAST Transportation STONEWALL GT from PITFIELD 23 Cold In Place Recycling Active 2019 2019 Local Road Resurfacing DON RIVER TRL Services RD to LAWNMERE CRES SHEPPARD AVE E from Transportation SHEPPARD AVE E from MARKHAM RD to MCCOWAN RD 23 Major Road Resurfacing Active 2020 2020 MARKHAM RD to MCCOWAN Major Road Resurfacing Services RD New sidewalk from Huntingwood Dr to McCowan Rd including all required traffic Commander Blvd from control, drainage, curb Transportation Commander Blvd from Huntingwood Dr to McCowan Rd 23 Sidewalk Construction Active 2020 2020 Huntingwood Dr to McCowan alignment modification, utility Services Rd relocation, property acquisition, any other requirements to facilitate sidewalk construction

Transportation On Street Bikeway MALVERN ST from SHEPPARD MALVERN ST from SHEPPARD AVE E to MCLEVIN AVE 23 Active 2020 2020 Installation of bike lanes Services Paving Markings AVE E to MCLEVIN AVE Ellesmere Rd from Orton Park Transportation ARCOT BLVD from TANDRIDGE CRES to ALBION RD 24 Bikeway Trail Active 2017 2018 Rd/Military Trail to Orton Park Installation of bikeway trail Services Rd/Military Trail Transportation MILITARY TRL from ELLESMERE EASTERN AVE from MARIGOLD AVE to KNOX AVE (TO) 24 Cold In Place Recycling Active 2017 2018 Local Road Reconstruction Services RD to EAST HIGHLAND CREEK GUILDWOOD PKWY from LAKE SHORE BLVD E from PARLIAMENT ST to BOOTH Transportation 24 Local Road Resurfacing Active 2018 2018 LIVINGSTON RD to GALLOWAY Local Road Resurfacing AVE Services RD Transportation BEN NEVIS DR from BENLEIGH JONES AVE from GERRARD ST E to BOULTBEE AVE 24 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services DR to BEN SHIRE DR

Transportation BENLIGHT CRES from BENLEIGH HUMBER BLVD S from ALLIANCE AVE to NORTH END 24 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing Services DR to BENLEIGH DR GREENBRAE CRCT from THE EAST MALL ML from EAST MALL CRES, VICKERS RD Transportation 24 Local Road Resurfacing Active 2018 2018 LAWRENCE AVE E to MARKHAM Local Road Resurfacing to EAST MALL CRES, YARN RD Services RD [274 m E] WESTON RD from CRAYDON AVE to MAHONEY Transportation BENROYAL CRES from BENLEIGH 24 Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing AVE Services DR to BENARY CRES

Source: MCIC data Note: Future projects subject to change Page 71 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope HUNTSMILL BLVD from GLENDINNING AVE to Transportation BENARY CRES from BENROYAL 24 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing BAMBURGH CRCL Services CRES to BENSHIRE DR BEN DORAN BLVD from BEAVERBROOK CRT from EAST AVE (SC) to [152 m E] Transportation 24 Local Road Resurfacing Active 2018 2018 BENORAMA CRES to BENARY Local Road Resurfacing EAST AVE (SC) [HAMMER HEAD] Services CRES New sidewalk from McCowan Rd to Grangeway Ave including all required traffic control, drainage, curb [38.10 m E] BATHURST ST from LENNOX ST to BLOOR ST Transportation Bushby Dr from McCowan Rd to 24 Sidewalk Construction Active 2019 2019 alignment modification, utility W Services Grangeway Ave relocation, property acquisition, any other requirements to facilitate sidewalk construction.

New sidewalk from Bushby Dr to Progress Ave including all required traffic control, drainage, curb alignment ST DENNIS DR from EGLINTON E ST DENNIS [RAMP] to Transportation Grangeway Ave from Bushby Dr 24 Sidewalk Construction Active 2019 2019 modification, utility relocation, DON VALLEY PKWY S Services to Progress AVe property acquisition, any other requirements to facilitate sidewalk construction

MILFORD HAVEN DR from Transportation KEELE ST from FOUR WINDS DR to MURRAY ROSS PKWY 24 Local Road Resurfacing Active 2019 2019 GREENOCK AVE to [37.42 m E] Local Road Resurfacing Services GREENOCK AVE [END] Transportation FROLICK CRES from TRALEE AVE Don River Blvd over Don River from DON RIVER, WEST to 24 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to GREENOCK AVE NEWARK RD from Don Valley Parkway under Don Mills Rd from DON MILLS Transportation 24 Local Road Resurfacing Active 2019 2019 SCARBOROUGH GOLF CLUB RD Local Road Resurfacing ROAD to Services to MILFORD HAVEN DR Transportation INGRID DR from SLAN AVE to BATHURST ST OVER RAIL from to 24 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services MILFORD HAVEN DR TRALEE AVE from MILFORD Transportation Bathurst St over rail from to 24 Local Road Resurfacing Active 2019 2019 HAVEN DR to MILFORD HAVEN Local Road Resurfacing Services DR Rexdale Blvd over Jockey Club Rd from JOCKEY CLUB Transportation GREENOCK AVE from SLAN AVE 24 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing ROAD to Services to MILFORD HAVEN DR Transportation GRANGEWAY AVE from BUSHBY KILBARRY RD from LASCELLES BLVD to RUSSELL HILL RD 24 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services DR to PROGRESS AVE Transportation BUSHBY DR from MCCOWAN RD BLOOR ST W from SPADINA AVE to AVENUE RD 24 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to GRANGEWAY AVE

Source: MCIC data Note: Future projects subject to change Page 72 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope EVELYN WIGGINS DR from ASSINIBOINE RD to FINCH Transportation HELICON GT from ELLESMERE 24 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing HYDRO CORRIDOR TRAIL Services RD to PORTICO DR ELLESMERE RD from ORTON ELLESMERE RD from ORTON PARK AVE (MILITARY TRL) Transportation 24 Major Road Resurfacing Active 2020 2020 PARK AVE (MILITARY TRL) to Major Road Resurfacing to MARKHAM RD Services MARKHAM RD ELLESMERE RD from MARKHAM ELLESMERE RD from MARKHAM RD to SCARBOROUGH Transportation 24 Bikeway Trail Active 2020 2020 RD to SCARBOROUGH GOLF Installation of boulevard trail GOLF CLUB RD Services CLUB RD

Transportation KINGSTON RD from LAWSON RD Wanless Ave from Kappele Ave to 25 Major Road Resurfacing Active 2018 2018 Major Road Resurfacing Services to MORNINGSIDE AVE (TO)

FRANKLIN AVE (N YK) from WALKER RD to [35 m E] Transportation SEWELLS RD from NEILSON RD 25 Cold In Place Recycling Active 2018 2018 Major Road Resurfacing WALKER RD [END] Services to MORNINGSIDE AVE (SC) LAWRENCE AVE E from Transportation HARROP AVE from DORLEN AVE to VANGUARD DR 25 Major Road Resurfacing Active 2018 2018 CENTENNIAL RD to Major Road Resurfacing Services MEADOWVALE RD LAWRENCE AVE E from Transportation GIDLEY RD from MONTVALE DR to ST CLAIR AVE E (SC) 25 Major Road Resurfacing Active 2018 2018 CENTENNIAL RD to CENTENNIAL Major Road Resurfacing Services RD LAKE SHORE BLVD E from PARLIAMENT ST to BOOTH Transportation GRANADA CRES from ROTARY 25 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing AVE Services DR to ROTARY DR THE EAST MALL ML from NORTH QUEEN ST to VICKERS Transportation ROSCOE RD from ROTARY DR to 25 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing RD Services LIONHEAD TRL [36.60 m S] BEDFORD PARK AVE from [62 m E] Transportation ROTARY DR from GENERATION 25 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing UNSWORTH AVE to UNSWORTH AVE Services BLVD to MEADOWVALE RD GENERATION BLVD from CALGIE LANE from [40.30 m N] DUNDAS ST E to [40.30 m Transportation MEADOWVALE RD to [640 m E] 25 Local Road Resurfacing Active 2018 2018 Local Road Resurfacing S] GERRARD ST E Services MEADOWVALE DR [CUL-DE- SAC] WARWICK CASTLE CRT from [26.50 m N] MILLBROOK CRES from [115.80 m W] Transportation JOHN TABOR TRL to [270 m N] 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing INGHAM AVE to INGHAM AVE Services JOHN TABOR TRL [CUL-DE-SAC W/ BULB] Transportation GRAYBARK CRES from GOOD RD Church St from Hayden St to 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to PONYMEADOW TER BEAVERBROOK CRT from EAST Transportation Church St from Charles St E to 25 Local Road Resurfacing Active 2019 2019 AVE (SC) to [152 m E] EAST AVE Local Road Resurfacing Services (SC) [HAMMER HEAD]

Source: MCIC data Note: Future projects subject to change Page 73 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope LITTLEBOROUGH CRT from Transportation Dovercourt Rd from Argyle St to 25 Local Road Resurfacing Active 2019 2019 MUIRBANK BLVD to [120 m N] Local Road Resurfacing Services MUIRBANK BLVD [CUL-DE-SAC]

Transportation MILITARY TRL from OLD Kipling Ave from Markbrook Ln to 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services KINGSTON RD to KINGSTON RD

Transportation ORLEANS DR from MUIRBANK Rathburn Rd from [30m W] Martin Grove Rd to 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services BLVD to MUIRBANK BLVD

Transportation CONLINS RD from ELLESMERE Claxton Blvd from Raglan Ave to 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services RD to SHEPPARD AVE E

Transportation CARLISLE CRES from RYLANDER Kipling Ave from Annabelle Dr/Rowntree Rd to 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services BLVD to RYLANDER BLVD

CHERRYDALE CRT from Transportation Church St from Isabella St to 25 Local Road Resurfacing Active 2019 2019 CENTENNIAL RD to [384 m W] Local Road Resurfacing Services CENTENNIAL RD [CUL-DE-SAC] WINTER GARDENS TRL from Transportation Kipling Ave from Mount Olive Dr to 25 Local Road Resurfacing Active 2019 2019 PORT UNION RD to GOLDERS Local Road Resurfacing Services GREEN AVE IRVINE RD from [141.50 m S] Transportation Kipling Ave from Beaconhill Rd to 25 Local Road Resurfacing Active 2019 2019 LAWSON RD [END] to LAWSON Local Road Resurfacing Services RD Transportation PICTORIAL ST from CALVERLEY Sheppard Ave E from Wilfred Ave to 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services TRL to PONYMEADOW TER

LUMBERVALE AVE from LANSDOWNE AVE (TO) to ST Transportation PORTRUSH CRES from 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing HELEN'S AVE Services CALVERLEY TRL to PICTORIAL ST COLLEGE ST (TO) from LANSDOWNE AVE (TO) to [N] Transportation FRIENDSHIP AVE from 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing COLLEGE ST (TO) [BRANCH] Services KIRKDENE DR to ISLAND RD DOVERCOURT RD from [E-W] SUDBURY ST [BRANCH] to Transportation WHEELING DR from EAST AVE 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing QUEEN ST W Services (SC) to MABERLEY CRES RYLANDER BLVD from Transportation (New Street) from Kenaston Gdns to Rean Dr 25 Local Road Resurfacing Active 2019 2019 KINGSTON RD to TIDESWELL Local Road Resurfacing Services BLVD DUNWATSON DR from Transportation YONGE BLVD from WILSON AVE to YONGE ST 25 Local Road Resurfacing Active 2019 2019 MEADOWVALE RD to Local Road Resurfacing Services DELBEATRICE CRES HOUNDTRAIL DR from Transportation Port Union Rd from Lawrence Ave to Highway 401 25 Local Road Resurfacing Active 2019 2019 CALVERLEY TRL to CALVERLEY Local Road Resurfacing Services TRL

Source: MCIC data Note: Future projects subject to change Page 74 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope LAWRENCE AVE E from [N] COLLEGE ST (TO) [BRANCH] from COLLEGE ST (TO) to Transportation 25 Local Road Resurfacing Active 2019 2019 CHESTERTON SHORES RD to Local Road Resurfacing ST HELEN'S AVE Services PORT UNION RD HAIDA CRT from LASH CRT to [N] COLLEGE ST [BRANCH] from COLLEGE ST (TO) to ST Transportation 25 Local Road Resurfacing Active 2019 2019 [90 m W] LASH CRT [CUL-DE- Local Road Resurfacing HELEN'S AVE Services SAC W/ BULB] HEATH ST W from [36.60 m W] SPADINA RD (YK) to Transportation GOOD RD from CONLINS RD to 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing WALMER RD Services CALVERLEY TRL TIDESWELL BLVD from Transportation BLOOR ST W from AVENUE RD to SPADINA RD (TO) 25 Local Road Resurfacing Active 2019 2019 RYLANDER BLVD to VANDORF Local Road Resurfacing Services ST Transportation SUGARBUSH SQ from MORRISH WELLESLEY ST E from SHERBOURNE ST to ONTARIO ST 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services RD to MORRISH RD

Transportation DEEP DENE DR from KINGSTON TAVISTOCK RD from KEELE ST to EXBURY RD 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services RD to ELLESMERE RD Transportation FEAGAN DR from BATHGATE DR KENNEDY RD from PARK ST to DANFORTH RD 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to BATHGATE DR SCENIC HILL CRT from MILITARY Transportation PHARMACY AVE from ELLESMERE RD to HIGHWAY 401 25 Local Road Resurfacing Active 2019 2019 TRL to [100 m S] MILITARY TRL Local Road Resurfacing Services [CUL-DE-SAC] CHARLOTTETOWN BLVD from Transportation WILLOWBANK BLVD from ORIOLE PKWY to AVENUE RD 25 Local Road Resurfacing Active 2019 2019 LAWRENCE AVE E to Local Road Resurfacing Services CONFERENCE BLVD PONYMEADOW TER from GOOD Transportation WILLARD AVE (TO) from BLOOR ST W to GRASSMERE RD 25 Local Road Resurfacing Active 2019 2019 RD to [760 m N] GOOD RD [CUL- Local Road Resurfacing Services DE-SAC] PETERBOROUGH AVE from MC FARLAND AVE to VIA Transportation CALVERLEY TRL from CANMORE 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing ITALIA Services BLVD to CANMORE BLVD BATHGATE DR from Transportation WILLARD AVE (TO) from ARDAGH ST to ANNETTE ST 25 Local Road Resurfacing Active 2019 2019 INVERMARGE DR to Local Road Resurfacing Services MEADOWVALE RD PARKHURST BLVD from DONEGALL DR to CAMERON Transportation BLUE ANCHOR TRL from PORT 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing CRES Services UNION RD to EAST AVE (SC)

ISLAND RD from ROUGE HILLS Transportation JEDBURGH RD from WOBURN AVE to CRANBROOKE AVE 25 Local Road Resurfacing Active 2019 2019 DR to [105 m W] ROUGE HILLS Local Road Resurfacing Services DR [CUL-DE-SAC] DELBEATRICE CRES from GLENLAKE AVE from GLENDONWYNNE RD to KENNEDY Transportation 25 Local Road Resurfacing Active 2019 2019 DUNWATSON DR to Local Road Resurfacing AVE Services INVERMARGE DR

Source: MCIC data Note: Future projects subject to change Page 75 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope GRANDHALL CRT from GOLDERS GLENLAKE AVE from CLENDENAN AVE to Transportation GREEN AVE to [150 m N] 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing GLENDONWYNNE RD Services GOLDERS GREEN AVE [CUL-DE- SAC] OUTLOOK GARDEN BLVD from OUTLOOK AVE to Transportation GOLD BROOK GT from WANITA 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing LAMBTON AVE Services RD to INVERMARGE DR

Transportation TARSUS CRES from CANMORE ARMADALE AVE from LARKIN AVE to BLOOR ST W 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services BLVD to CALVERLEY TRL ARMADALE AVE from [59 m N] BLOOR ST W to NELLES Transportation IVAN RD from BATHGATE DR to 25 Local Road Resurfacing Active 2019 2019 Local Road Resurfacing AVE Services ROYDAWN CRT LAWRENCE AVE E from Transportation On Street Bikeway Installation of bikeway MCINTOSH ST from HIGHVIEW AVE (SC) to PARK ST 25 Active 2019 2019 CHESTERTON SHORES RD to Services Paving Markings pavement markings PORT UNION RD Transportation On Street Bikeway CONLINS RD from ELLESMERE Installation of bikeway WOBURN AVE from JEDBURGH RD to GREER RD 25 Active 2019 2019 Services Paving Markings RD to SHEPPARD AVE pavement markings FRIENDSHIP AVE from GLEN CEDAR RD from DEWBOURNE AVE to EGLINTON Transportation 25 Local Road Resurfacing Active 2019 2019 STARSPRAY BLVD to BLUEKING Local Road Resurfacing AVE W Services CRES SILVERBELL GRV from NEILSON Transportation BARTON AVE from ALBANY AVE to HOWLAND AVE 25 Local Road Resurfacing Active 2019 2019 RD to [72 m E] NEILSON AVE Local Road Resurfacing Services [CUL-DE-SAC W/ BULB] ROYDAWN CRT from LAWSON GATINEAU HYDRO CORRIDOR TRAIL from EAST DON Transportation 25 Local Road Resurfacing Active 2019 2019 RD to [77 m E] IVAN RD [CUL-DE- Local Road Resurfacing RIVER TRAIL to BERMONDSEY RD Services SAC] ELLESMERE RD from Transportation ELLESMERE RD from MORNINGSIDE AVE to CONLINS RD 25 Bikeway Trail Active 2020 2020 MORNINGSIDE AVE to CONLINS Installation of boulevard trail Services RD New sidewalk from Ellesmere Rd to Military Trl including all required traffic control, drainage, curb alignment Transportation Bobmar Rd from Ellesmere Rd Bobmar Rd from Ellesmere Rd to Military Trl 25 Sidewalk Construction Active 2020 2020 modification, utility relocation, Services to Military Trl property acquisition, any other requirements to facilitate sidewalk construction

ELLESMERE RD from CONLINS RD to ELLESMERE RD Transportation On Street Bikeway ELLESMERE RD from CONLINS Installation of buffered bicycle 25 Active 2020 2020 (BRANCH) Services Construction RD to ELLESMERE RD (BRANCH) lanes or cycle tracks

Source: MCIC data Note: Future projects subject to change Page 76 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Infrastructure Transportation Port Union Rd from Lawrence Port Union Rd from Lawrence Ave to HWY 401 25 Enhancement - Active 2020 2020 Port Union Road: Construction Services Ave to HWY 401 Construction Stage CASEBRIDGE CRT from CASEBRIDGE CRT from MORNINGSIDE AVE to 337 M E Transportation On Street Bikeway 25 Active 2020 2020 MORNINGSIDE AVE to 337 M E Installation of bike lanes OF MORNINGSIDE AVE Services Paving Markings OF MORNINGSIDE AVE MARTIN GROVE RD from Transportation BELLAMY RD N from GRACE ST (SC) to CEDAR BRAE BLVD 01,02 Major Road Resurfacing Completed 2018 2018 EGLINTON AVE W to [100 m N] Major Road Resurfacing Services LAVINGTON DR MARTIN GROVE RD from Transportation GUNTON DR from AMORO DR to WESTHUMBER BLVD 01,02 Major Road Resurfacing Completed 2018 2018 CLEMENT RD to [100 m N] Major Road Resurfacing Services LAVINGTON DR

Potential sidewalk widening, turn radius adjustment, bulb- MARTIN GROVE RD from EDILOU DR from RIMILTON AVE to [147 m N] RIMILTON Transportation Pedestrian Infrastructure outs, or other pedestrian 01,02 Active 2018 2018 EGLINTON AVE W to [100 m N] AVE [CUL-DE-SAC] Services Improvement infrastructure improvements. LAVINGTON DR Applying complete streets principles where possible.

ROYAL YORK RD from LAKE Installation of Bikeway Transportation On Street Bikeway Jane St from Threthewey Dr to Denison Rd E 02,03 Active 2018 2018 SHORE BLVD W to LAWRENCE Pavement Markings (Vision Services Paving Markings AVE W Zero) Transportation On Street Bikeway BLOOR ST W from JOPLING AVE Installation of a Cycle Track, a BLOOR ST W from JOPLING AVE N to KIPLING AVE 02,03 Active 2017 2020 Services Construction N to KIPLING AVE separated cycling facility Infrastructure Transportation Kipling Ave from Bloor St W to Six Points Interchange Kipling Ave from Bloor St W to Dundas St W 02,03 Enhancement - Active 2017 2020 Services Dundas St W Reconfiguration: Construction Construction Stage Transportation On Street Bikeway BLOOR ST W from PRENNAN Installation of a Cycle Track, a BLOOR ST W from PRENNAN AVE to KIPLING AVE 02,03 Active 2017 2020 Services Construction AVE to KIPLING AVE separated cycling facility Transportation On Street Bikeway BLOOR ST W from MARTIN Installation of intersection BLOOR ST W from MARTIN GROVE RD to WILMAR RD 02,03 Active 2020 2020 Services Construction GROVE RD to WILMAR RD improvement THE WEST MALL from WEST THE WEST MALL from WEST MALL CRES to 300M N OF Transportation On Street Bikeway 02,03 Active 2020 2020 MALL CRES to 300M N OF WEST Installation of urban shoulder WEST MALL CRES Services Paving Markings MALL CRES THE WEST MALL from WEST THE WEST MALL from WEST MALL CRES to [300 m N] Transportation 02,03 Major Road Resurfacing Active 2020 2020 MALL CRES to [300 m N] WEST Major Road Resurfacing WEST MALL CRES Services MALL CRES Infrastructure Transportation Burnhamthorpe Rd from The Six Points Interchange Burnhamthorpe Rd from The East Mall to Dundas St W 02,03 Enhancement - Active 2017 2020 Services East Mall to Dundas St W Reconfiguration: Coordination Construction Stage Infrastructure The East Mall from The East Mall from Burnhamthorpe Rd to The Transportation Six Points Interchange 02,03 Enhancement - Active 2017 2020 Burnhamthorpe Rd to The Queensway Services Reconfiguration: Coordination Construction Stage Queensway

Source: MCIC data Note: Future projects subject to change Page 77 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Infrastructure Transportation Bloor St W from The East Mall Six Points Interchange Bloor St W from The East Mall to Islington Ave 02,03 Enhancement - Active 2017 2020 Services to Islington Ave Reconfiguration: Coordination Construction Stage WOODFIELD RD TRAIL from LAKE SHORE BLVD E to Transportation SCARLETT RD from DUNDAS ST 04,05 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing WOODFIELD RD Services W to HUMBER RIVER Transportation On Street Bikeway RUNNYMEDE RD from DUNDAS Installation of bikeway RUNNYMEDE RD from DUNDAS ST W to LIVERPOOL ST 04,05 Active 2020 2020 Services Paving Markings ST W to LIVERPOOL ST pavement markings Transportation On Street Bikeway BROCK AVE from QUEEN ST W Installation of Bikeway BROCK AVE from QUEEN ST W to BLOOR ST W 04,09 Active 2020 2020 Services Paving Markings to BLOOR ST W pavement markings 04,09, Transportation On Street Bikeway BLOOR ST W from LANSDOWNE BLOOR ST W from LANSDOWNE AVE to SHAW ST Active 2020 2020 Installation of a cycle track 11 Services Paving Markings AVE to SHAW ST LAWRENCE AVE W from REDBERRY PKWY to CALEDONIA Transportation from REDBERRY PKWY to Maintenance Repair work to 05,08 Bridge Rehabilitation Active 2018 2018 RD Services CALEDONIA RD bridge Transportation On Street Bikeway SILVERTHORN AVE from ST Installation of bikeway VESTA DR from STRATHEARN BLVD to AVA CRES 05,09 Active 2019 2019 Services Paving Markings CLAIR AVE W to KERSDALE AVE pavement markings

VAUGHAN RD from OAKWOOD AVE to NORTHCLIFFE Transportation On Street Bikeway Sentinel Rd from Dovehouse Installation of bikeway 06,07 Active 2018 2018 BLVD Services Paving Markings Ave to The Pond Rd pavement markings Build MUT in west boulevard. KEELE ST from FOUR WINDS DR to FINCH HYDRO Transportation KEELE ST from FOUR WINDS DR May involve relocation of 06,07 Bikeway Trail Active 2020 2020 CORRIDOR TRL Services to FINCH HYDRO CORRIDOR TRL signal plant, trees, and sidewalks. ALEXANDER MUIR RD from Transportation On Street Bikeway Installation of bikeway BEACONSFIELD AVE from ARGYLE ST to AFTON AVE 08,15 Active 2019 2019 YONGE ST to BLYTHWOOD Services Paving Markings pavement markings RAVINE PARK TRL Transportation Local Road DOVERCOURT RD from ARGYLE DOVERCOURT RD from ARGYLE ST to DUNDAS ST W 09,10 Active 2020 2020 Local Road Reconstruction Services Reconstruction ST to DUNDAS ST W DOVERCOURT RD from [E-W] DOVERCOURT RD from [E-W] SUDBURY ST [BRANCH] to Transportation Local Road 09,10 Active 2020 2020 SUDBURY ST [BRANCH] to Local Road Reconstruction QUEEN ST W Services Reconstruction QUEEN ST W Installation of signed and Transportation On Street Bikeway SUDBURY ST from ABELL ST to SUDBURY ST from ABELL ST to KING ST W 09,10 Active 2020 2020 marked route with traffic Services Paving Markings KING ST W calming devices Transportation On Street Bikeway DEWSON ST from HAVELOCK ST Installation of cycling DROVERS LANE from ONTARIO ST to BERKELEY ST 09,11 Active 2018 2018 Services Paving Markings to ROXTON pavement markings Transportation On Street Bikeway OSSINGTON AVE from DEWSON Installation of bikeway Weston Rd from St Phillips Rd to 09,11 Active 2018 2018 Services Paving Markings ST to HARBORD ST pavement markings Installation of Bikeway Parkview Hill Crescent from Woodbine Heights Blvd to St 09,11, Transportation On Street Bikeway DAVENPORT RD from BAY ST to Active 2018 2018 Pavement Markings (Vision Clair Ave E 12 Services Paving Markings OLD WESTON RD Zero) NORTHCLIFFE BLVD from Transportation On Street Bikeway Installation of bikeway HANNAFORD ST from KINGSTON RD to LYALL AVE 09,12 Active 2019 2019 ROSEMOUNT AVE to EGLINTON Services Paving Markings pavement markings AVE W

Source: MCIC data Note: Future projects subject to change Page 78 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation On Street Bikeway WINONA DR from DAVENPORT Installation of bikeway LONG CRES from LEE AVE to [N-S] LONG CRES [LEG] 09,12 Active 2019 2019 Services Paving Markings RD to ST CLAIR AVE W pavement markings

MODEL AVE from FAYWOOD BLVD to WILSON HEIGHTS Transportation DUNDAS ST W from BAY ST to 10,11 Major Road Resurfacing Active 2018 2019 Major Road Resurfacing BLVD Services [E] UNIVERSITY AVE [BRANCH] DUNDAS ST W from PARKWAY FOREST DR from DON MILLS RD to SHEPPARD Transportation Utility Cut Road 10,11 Active 2018 2019 KENSINGTON AVE (TO) to Major Road Resurfacing AVE E Services Rehabilitation CARLYLE ST Transportation Utility Cut Road DUNDAS ST W from SIMCOE ST MAXWELL ST from DELLBANK RD to OVERBROOK PL 10,11 Active 2018 2019 Major Road Resurfacing Services Rehabilitation to LARCH ST Road resurfacing to DANESBURY AVE from LILYWOOD RD to HILLMOUNT Transportation Pedestrian Infrastructure DUNDAS ST W from HICKORY ST 10,11 Active 2018 2019 incorporate design by existing AVE Services Improvement to CASIMIR ST streetscape plan. Road resurfacing to Transportation Pedestrian Infrastructure DUNDAS ST W from CASIMIR ST GREENBROOK DR from KEELE ST to TRETHEWEY DR 10,11 Active 2018 2019 incorporate design by existing Services Improvement to CARLYLE ST streetscape plan. Road resurfacing to Transportation Pedestrian Infrastructure DUNDAS ST W from LARCH ST COLIN AVE from CHAPLIN CRES to ANDERSON AVE 10,11 Active 2018 2019 incorporate design by existing Services Improvement to HICKORY ST streetscape plan. Road resurfacing to ROBLOCKE AVE from [35.40 m S] PENDRITH ST to Transportation Pedestrian Infrastructure DUNDAS ST W from SIMCOE ST 10,11 Active 2018 2019 incorporate design by existing PENDRITH ST Services Improvement to HURON ST streetscape plan. Transportation On Street Bikeway PALMERSTON AVE from QUEEN Installation of bikeway BEECH AVE from PINE AVE to BALSAM AVE 10,11 Active 2019 2019 Services Paving Markings ST W to COLLEGE ST pavement markings Installation of bikeway pavement markings, MARLBOROUGH AVE from YONGE ST to [96 m W] Transportation On Street Bikeway BAY ST from FRONT ST W to 10,13 Active 2019 2019 Installation of cycling CROWN'S LANE Services Paving Markings DUNDAS ST W pavement markings, Installation of sharrows Transportation On Street Bikeway The Esplanade from Yonge St to Installation of bikeway The Esplanade from Yonge St to Berkeley St 10,13 Active 2020 2020 Services Paving Markings Berkeley St pavement markings ELLESMERE RD from CONLINS RD to ELLESMERE RD Transportation On Street Bikeway LAKE SHORE BLVD E from Installation of bikeway 10,14 Active 2019 2019 (BRANCH) Services Paving Markings PARLIAMENT ST to BOOTH AVE pavement markings

HOWLAND AVE from DUPONT ST to NORTH OF DUPONT Transportation On Street Bikeway HOWLAND AVE from DUPONT Installation of signed and 11,12 Active 2020 2020 ST Services Paving Markings ST to NORTH OF DUPONT ST marked route Installation of Bikeway CLAIREVILLE RD from [N] HUMBERLINE DR [BRANCH] to Transportation On Street Bikeway SHERBOURNE ST N from BLOOR 11,13 Active 2018 2018 Pavement Markings (Vision [S] HUMBERLINE DR [BRANCH] Services Paving Markings ST E to ELM AVE Zero) Transportation CHURCH ST from WELLESLEY ST CHURCH ST from WELLESLEY ST E to PARK RD 11,13 Major Road Resurfacing Active 2020 2020 Major Road Resurfacing Services E to PARK RD Installation of Bikeway Transportation On Street Bikeway from Barse St from Brookdale Ave to Cranbrooke Ave 11,14 Active 2018 2018 Pavement Markings (Vision Services Paving Markings BLOOR ST E to DANFORTH AVE Zero)

Source: MCIC data Note: Future projects subject to change Page 79 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Installation of Bikeway Transportation On Street Bikeway DUNDAS ST E from BROADVIEW BERTAL RD from INDUSTRY ST to PLANNING BOUNDARY 14,19 Active 2018 2018 Pavement Markings (Vision Services Paving Markings AVE to KINGSTON RD Zero) Old Forst Hill Rd from Russel Hill Rd to 65 n North of Transportation On Street Bikeway HANSON ST from PARKMOUNT Installation of bikeway 14,19 Active 2019 2019 Russel Hill Rd Services Paving Markings RD to ROSEHEATH AVE pavement markings Transportation On Street Bikeway SAMMON AVE from PAPE AVE Installation of bikeway SORAUREN AVE from GEOFFREY ST to DUNDAS ST W 14,19 Active 2019 2019 Services Paving Markings to WOODBINE AVE pavement markings DANFORTH AVE from DANFORTH AVE from BROADVIEW AVE to DANFORTH 14,19, Transportation On Street Bikeway Active 2020 2020 BROADVIEW AVE to DANFORTH Installation of a cycle track RD 20 Services Construction RD SWANWICK AVE (TO) from LAWLOR AVE to Transportation Don Mills Rd from CNR Bridge to 15,16 Bikeway Trail Active 2019 2019 Installation of bikeway trail SCARBOROUGH RD Services 165 m S of Overlea VICTORIA PARK AVE from VICTORIA PARK AVE from KINGSTON RD to DANFORTH Transportation 19,20 Major Road Resurfacing Active 2020 2020 KINGSTON RD to DANFORTH Major Road Resurfacing AVE Services AVE VICTORIA PARK AVE from VICTORIA PARK AVE from GERRARD ST E to DANFORTH Transportation On Street Bikeway 19,20 Active 2020 2020 GERRARD ST E to DANFORTH Installation of bike lanes AVE Services Paving Markings AVE VICTORIA PARK AVE from VICTORIA PARK AVE from GERRARD ST E to GATINEAU Transportation On Street Bikeway Installation of Bike Lanes or 19,20 Active 2020 2020 GERRARD ST E to GATINEAU TRAIL Services Paving Markings Cycle Tracks. TRAIL Transportation Major Road MIDLAND AVE from DANFORTH MIDLAND AVE from DANFORTH RD to LAWRENCE AVE E 20,21 Active 2020 2020 Major Road Reconstruction Services Reconstruction RD to LAWRENCE AVE E

Streetscape improvements to CITATION DR from [33 m E] TALLY LANE [CUL-DE-SAC] to 21,22, Transportation Neighbourhood Midland Ave from Ellesmere Rd be bundled with road Active 2018 2018 BURBANK DR 23 Services Improvements to Sheppard Ave E resurfacing replacement of paving in blvds. Transportation BRIMLEY RD from HWY 401 to BLACKBUSH DR from DORWARD DR to MOUNT OLIVE DR 21,23 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing Services HUNTINGWOOD DR BELLAMY RD N from [216 m S] Transportation MAIN ST from KINGSTON RD to GERRARD ST E 21,24 Major Road Resurfacing Completed 2018 2018 GRACE ST (SC) [END] to CEDAR Major Road Resurfacing Services BRAE BLVD ELMCLIFFE CRT from [67 m S] SILVERSTONE DR [CUL-DE- Transportation On Street Bikeway BELLAMY RD from EGLINTON Installation of bikeway 21,24 Active 2018 2018 SAC] to SILVERSTONE DR Services Paving Markings AVE E to BRIMORTON DR pavement markings Transportation BELLAMY RD N from GRACE ST DON VALLEY PARKWAY UNDER WYNFORD DR from to 21,24 Major Road Resurfacing Completed 2018 2018 Major Road Resurfacing Services (SC) to CEDAR BRAE BLVD BELLAMY RD N from [216 M S] BETH NEALSON DR from THORNCLIFFE PARK DR to Transportation On Street Bikeway Installation of bikeway 21,24 Active 2018 2018 GRACE ST (SC) [END] to CEDAR WICKSTEED AVE Services Paving Markings pavement markings BRAE BLVD

Source: MCIC data Note: Future projects subject to change Page 80 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Address missing links on west side of Midland Ave at near GOLDHAWK TRL from OAKHAVEN DR (N INT) to Transportation Midland Ave from Passmore 22,23 Sidewalk Construction Completed 2018 2018 Artillery St and between Finch OAKHAVEN DR (N INT) Services Ave to Kilcullen Castle Gt Corridor Trail and Kilcullen Castle Gt Transportation HUNTINGWOOD DR from FIRENZA DR from MILADY RD to DUNCANWOODS DR 22,23 Major Road Resurfacing Active 2019 2019 Major Road Resurfacing Services KENNEDY RD to BRIMLEY RD Transportation On Street Bikeway MCLEVIN AVE from MALVERN MCLEVIN AVE from MALVERN ST to MORNINGSIDE AVE 23,25 Active 2020 2020 Installation of bike lanes Services Paving Markings ST to MORNINGSIDE AVE Transportation BAYVIEW AVE OVER DON RIVER from to Bridge Rehabilitation Completed 2018 2018 Maintenance bridge work Services Transportation CRESCENT RD OVER TTC from to Bridge Rehabilitation Completed 2018 2018 Maintenance Bridge Work Services Transportation TWYN RIVERS DR OVER ROUGE RIVER from to Bridge Rehabilitation Active 2018 2018 Maintenance Bridge Work Services Transportation RIDGE DR from to Bridge Rehabilitation Active 2018 2018 Retaining wall work Services Transportation Bathurst Street from TTR to ST PATRICK ST from St Patrick St to Bridge Rehabilitation Active 2018 2018 Bridge Rehab Services south of Reduce corner radius to 1.0 m Transportation Pedestrian Infrastructure FINCH AVE W from BATHURST ST to DUFFERIN ST Active 2018 2018 Dundas St W / St Patrick St at NE corner, as there are no Services Improvement right turns occuring there. [S/E] YORK ST [RAMP] from [S] Transportation Major Road YATESBURY RD from PINEWAY BLVD to PINEWAY BLVD Active 2016 2018 HARBOUR ST [RAMP] to YONGE Ramp Reconstruction Services Reconstruction ST/YORK ST Infrastructure Yonge York Bay FGG Ramsp HIGHLAND CRES (N YK) from BEECHWOOD AVE, Transportation Yonge/York/Bay/FGG Ramps Enhancement - Completed 2017 2018 from Gardiner E Bound to BIRCHWOOD AVE to BAYVIEW AVE, BIRCHWOOD AVE Services Reconfiguration: Construction Construction Stage Lakeshore Blvd Reduce corner radius to 1.0 m KEWBEACH AVE from [E] WOODBINE AVE [BRANCH] to Transportation Pedestrian Infrastructure at SW corner, NW corner, as Active 2018 2018 Dundas St W / Simcoe St WAVERLEY RD Services Improvement there are no right turns occuring there. FREDERICK G GARDINER [RAMP Transportation Major Road Q] from [EB] FREDERICK G THE WYND ST from RATHBURN RD to THORNCREST RD Active 2016 2018 Ramp Reconstruction Services Reconstruction GARDINER to YONGE ST/YORK ST HIGHLAND CRES (N YK) from PHEASANT LANE from RATHBURN RD to [274 m W] Transportation Local Road Active 2018 2018 BEECHWOOD AVE to Local Road Reconstruction THORNCREST RD [CUL-DE-SAC] Services Reconstruction BIRCHWOOD AVE

Source: MCIC data Note: Future projects subject to change Page 81 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Removal of right turn channel on NE and SW corner. DISCO RD from CARLINGVIEW DR to [SB] HIGHWAY 427 Transportation Pedestrian Infrastructure Potential bus bay removal at Completed 2018 2018 Kingston Rd / Morningside Ave S [UNDERPASS] Services Improvement NE corner, consult with TTC, based on Complete Streets guidelines [E] WOODBINE AVE [BRANCH] Transportation Glen Cedar Rd over Cedarvale Ravine from RAVINE to Local Road Resurfacing Completed 2017 2018 from KEWBEACH AVE to LAKE Local Road Resurfacing Services SHORE BLVD E Proposed widening of , north of St. Regis Crescent. This includes Transportation Safety widening the northbound curb ELLESMERE RD from ORTON PARK RD/MILITARY TRAIL to Transportation Keele St / St Regis Cres from Local Improvements Completed 2018 2018 and passing lane as well as the ORTON PARK RD/MILITARY TRAIL Services Keele St to St Regis Cres Program southbound left turn lane to provide sufficient space for bus and passenger vehicle operations

Reduce corner radius to 1.0 m KENNEDY RD from [390 m S] PASSMORE AVE to STEELES Transportation Pedestrian Infrastructure Yonge St / Wellington St E / at SE corner, SW corner, as Active 2018 2018 AVE E Services Improvement Wellington St W there are no right turns occuring there. ATTWELL (N) DR from DISCO RD to [370 m N] DISCO RD MORNINGSIDE AVE (SC) from SHEPPARD AVE E, ATTWELL (N) DR from [366 m E] MORNINGVIEW TRL, [437 m S/E] SHEPPARD AVE E, Transportation CARLINGVIEW DR to [504 m E] Cold In Place Recycling Active 2018 2018 Local Road Reconstruction MCLEVIN AVE to SHEPPARD AVE E, SEWELLS RD, Services CARLINGVIEW DR MORNINGVIEW TRL, MCLEVIN AVE ATTWELL (N) DR from CARLINGVIEW DR to [366 m E] CARLINGVIEW DR Transportation Rehabilitation of Glen Cedar BARTONVILLE AVE E from WESTON RD to RAY AVE Bridge Rehabilitation Completed 2017 2018 Redecking, clean and coat Services Bridge MORNINGSIDE AVE (TO) from Transportation Tedder St from Thurodale Ave to Harding Ave Major Road Resurfacing Active 2018 2018 [437 m S/E] SHEPPARD AVE E to Major Road Resurfacing Services SEWELLS RD Transportation Local Road ASTORIA AVE from GUESTVILLE Marine Parade Dr from Waterfront Dr to Completed 2018 2018 Local Road Reconstruction Services Reconstruction AVE to LAMBTON AVE

Source: MCIC data Note: Future projects subject to change Page 82 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Reduce corner radius to 1.0 m at SW corner, NE corner, as there are no right turns occuring there. CANDIDATE Transportation Pedestrian Infrastructure Morningside Ave from Sheppard Ave E to Active 2018 2018 Bloor St W / Brunswick Ave FOR BUMP-OUT: - there is Services Improvement already a curb extension on the north/east and south/west corners, extending into Brunswick

Reduce corner radius to 1.0 m at NW corner, as there are no right turns occuring there. Transportation Pedestrian Infrastructure Bloor St W / Albany Ave / MARTIN GROVE RD from CLEMENT RD to LAVINGTON DR Active 2018 2018 CANDIDATE FOR BUMP-OUT: - Services Improvement Lippincott St there is already a curb extension on the north/east corner, extending into Albany

Reduce corner radius to 1.0 m FRANKLIN AVE from BOTHAM RD to [50 m W] BASSANO Transportation Pedestrian Infrastructure Bloor St W / Walmer Rd / Active 2018 2018 at SW corner, as there are no RD Services Improvement Robert St right turns occuring there.

[35.80 m S] WELLINGTON ST W from WINDSOR ST (TO) Transportation Pedestrian Infrastructure Removal of the porkchop at Active 2018 2018 Adelaide St E to BLUE JAYS WAY Services Improvement the southwest corner create bumpout on NE corner DRIFTWOODS AVE from YORKWOODS GT to LONDON Transportation Pedestrian Infrastructure to shorten PXO crossing and to Completed 2018 2018 from Swanwick Avenue GREEN CRT Services Improvement improve visibility for pedestrians Normalize intersection by LAKE SHORE BLVD W from LAKE SHORE BLVD W to F G Transportation Pedestrian Infrastructure realigning NW corner. Move Completed 2018 2018 from Benlamond Ave GARDINER XY E Services Improvement curb, and reconfigure intersection Transportation Pedestrian Infrastructure Radius right sizing where DOVEHOUSE RD from SENTINEL RD to KEELE ST Active 2018 2018 Services Improvement possible

Transportation Pedestrian Infrastructure Intersection normalization at GREENWOOD AVE from QUEEN ST E to DANFORTH AVE Active 2018 2018 from Whitney Ave Services Improvement Whitney and Edgar Avenue

Transportation Pedestrian Infrastructure DEWSON ST from HAVELOCK ST to ROXTON Completed 2018 2018 from Cosburn Ave CRTL Removal Services Improvement

Transportation Pedestrian Infrastructure DEWSON ST from ROXTON RD to SHAW ST Active 2018 2018 from Roxborough Dr Intersection Normalization Services Improvement

Source: MCIC data Note: Future projects subject to change Page 83 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Reduce corner radius to 1.0 m at NE corner, as there are no Transportation Pedestrian Infrastructure right turns occuring there. DAVENPORT RD from BAY ST to OLD WESTON RD Active 2018 2018 from Madison Ave Services Improvement CANDIDATE FOR BUMP-OUT: - north/east corner, extending into Madison

Transportation Safety Adjustment of curb cut to Transportation NORWAY AVE from WOODBINE AVE to ELMER AVE Local Improvements Active 2018 2018 from Pitfield Rd to Midland Ave match crosswalk alignment. Services Program Survey is required.

Geometric safety improfements (e.g. curb Transportation Safety radius adjustment). ECS to ROYAL YORK RD from LAKE SHORE BLVD W to Transportation from Sheppard Ave E to Local Improvements Completed 2018 2018 secure consultant is retained LAWRENCE AVE W Services Morningside Ave Program for signal redesign as a result of proposed changes. Survey is required.

Reduction of wide curb radii at all or some corners. ECS to Transportation Safety Transportation from Huntingwood Dr to secure consultant is retained ELMER AVE from NORWAY AVE to NORWAY AVE Local Improvements Completed 2018 2018 Services Pharmacy Ave for signal redesign as a result Program of proposed changes. Survey is required. Transportation Safety Narrowing the approach at Transportation from Beechgrove Dr to Kingston LANGHOLM DR from RODING ST to BLACK CREEK TRAIL Local Improvements Completed 2018 2018 Beechgrove Drive. Survey is Services Rd Program required. Removal of NW and SE corner channelized right turn lanes. Transportation Safety Transportation ECS to secure consultant is COLLEGE ST from BAY ST to MANNING AVE Local Improvements Completed 2018 2018 from Evans Ave to Islington Ave Services retained for signal redesign as Program a result of proposed changes. Survey is required.

Source: MCIC data Note: Future projects subject to change Page 84 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

1) Removal of CRTL at SW corner; 2) Installation of APS & related infrastructure; 3) Transportation Safety Introduction of bike facilities, GUILDWOOD PKWY from LIVINGSTON RD to GALLOWAY Transportation Woodbine Ave from O'Connor Local Improvements Completed 2018 2018 2-stage left turn bike box and RD Services Dr to Woodbine Ave Program raised cycle track on N side of O’Connor; 4) Relocation of Bell communications tower from SW corner.

ROTARY DR from GENERATION BLVD to MEADOWVALE Transportation RENNIE TER from WALLER AVE Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing RD Services to MORNINGSIDE AVE (TO)

Right sizing of NW corner to permit left turn lane and shared thru right. coordination with Hydro to move Hydro SOUTH SHIELDS AVE from MIDLAND AVE to ALEXMUIR Transportation Pedestrian Infrastructure Completed 2018 2018 Main St from Kingston Rd pole away from corner BLVD Services Improvement property line. Pavement marking realignment on the south side of the intersection. Signal Design required.

Transportation Safety SILVER STAR BLVD from MIDLAND AVE to [170 m S] Transportation Marine Parade Dr from Intersection narrowing and Local Improvements Active 2018 2018 KILCULLEN CASTLE GT Services Waterfront Dr sidewalk connection Program New sidewalk from Ceramic Rd to Bakersfield St including all required traffic control, drainage, curb alignment INVERGORDON AVE from MCCOWAN RD to HAVENVIEW Transportation St Regis Crescent N from Sidewalk Construction Completed 2018 2018 modification, utility relocation, RD Services Ceramic Rd to Bakersfield St property acquisition, any other requirements to facilitate sidewalk construction

Transportation Neighbourhood TARBERT RD from KENTLAND CRES to STEELES AVE E Active 2018 2018 Wanless Ave from Kappele Ave Turn Channel Removal Services Improvements Streetscape Improvements MCKEE AVE from WILLOWDALE AVE to WILLOWDALE Transportation Neighbourhood Woodbine Ave from O Connor Active 2018 2018 associated with PII/TSLIP. To AVE Services Improvements Dr be bundled with PII/TSLIP.

Source: MCIC data Note: Future projects subject to change Page 85 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Streetscape Improvements YORKLAND BLVD from CONSUMERS RD to CONSUMERS Transportation Neighbourhood Donlands ave from Cosburne associated with geometric Active 2018 2018 RD Services Improvements Ave safety improvmenet. To be bundled with PII/TSLIP.

Streetscape Improvements YORKLAND RD from YORKLAND BLVD to SHEPPARD AVE Transportation Neighbourhood Morningside Ave from Sheppard Active 2018 2018 associated with PII/TSLIP. To E Services Improvements Ave E be bundled with PII/TSLIP.

Streetscape Improvements to Transportation Neighbourhood NEPTUNE DR from BATHURST ST to RAJAH ST Active 2018 2018 Donlands Ave from O Connor Dr be bundled with resurfacing. Services Improvements Blvd paving in front of 7-11.

Streetscape Improvements to be bundled with resurfacing. DON RIVER BLVD from [58 m N] SHEPPARD AVE W to Transportation Neighbourhood Active 2018 2018 Kennedy Rd from Steeles Ave E Realignment/closure of [395 m N] SHEPPARD AVE W [END] Services Improvements driveway and paving imrpovements at bus stop.

Streetscape Improvements Transportation Neighbourhood ENDELL ST from FINCH AVE (N YK) to LANBROOKE AVE Active 2018 2018 Dundas St W from Casimir St associated with PII/TSLIP. To Services Improvements be bundled with PII/TSLIP.

Streetscape Improvements Transportation Neighbourhood RAILSIDE RD from LAWRENCE AVE E to LAWRENCE AVE E Active 2018 2018 Dundas St W from Carlyle St associated with PII/TSLIP. To Services Improvements be bundled with PII/TSLIP.

Streetscape Improvements VALLEY WOODS RD from [430 m S] YORK MILLS RD to Transportation Neighbourhood Active 2018 2018 Main St from Benlamond Ave associated with PII/TSLIP. To BROOKBANKS DR Services Improvements be bundled with PII/TSLIP. HUMBERLINE (W) DR from Transportation ADELPHA DR from FERNALROY BLVD to EAGLE RD Local Road Resurfacing Active 2018 2018 WOODLOT CRES to HUMBER Local Road Resurfacing Services COLLEGE BLVD [S] EASTERN AVE DIVERSION Transportation [BRANCH] from [S/E] EASTERN LANDRON CRES from SUN ROW DR to SUMMITCREST DR Major Road Resurfacing Active 2018 2018 Shave and Pave Services AVE DIVERSION [RAMP] to BROADVIEW AVE [S] EASTERN AVE DIVERSION [BRANCH] from [E] DON VALLEY TANGLEWOOD TR from [60 m S] FIESTA LANE [END] to Transportation Major Road Resurfacing Active 2018 2018 PKWY [BRIDGE] to [S/E] Shave and Pave RIVERVALLEY CRES Services EASTERN AVE DIVERSION [RAMP]

Source: MCIC data Note: Future projects subject to change Page 86 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope New sidewalk from Botham Rd to [50 m W] Bassano Rd including all required traffic control, drainage, curb Transportation FRANKLIN AVE from BOTHAM GOVERNMENT RD from MILL COVE CV to WALFORD RD Sidewalk Construction Completed 2018 2018 alignment modification, utility Services RD to [50 m W] BASSANO RD relocation, property acquisition, any other requirements to facilitate sidewalk construction

[N-S] SUNNYBRAE CRES [LEG] from [E-W] SUNNYBRAE Transportation MORNINGSIDE AVE (TO) from East side from Milner Ave to Sidewalk Construction Completed 2018 2018 CRES [LEG] to BARTONVILLE AVE W Services Cinemart Dr to Milner Ave Cinemart Dr FRANKLIN AVE (N YK) from Transportation Local Road DOWNING ST from WILMAR RD to HARJOLYN DR Active 2018 2018 WALKER RD to [35 m E] WALKER Local Road Reconstruction Services Reconstruction RD [END] East Side- Build multi use Don Mills Rd (east side) from BURTONWOOD CRES from DORWARD DR to NETHERLY Transportation recreational trail on east side Sidewalk Construction Active 2018 2018 703 Don Mills Rd to Lower Don DR Services from 703 Don Mills to Lower Recreational Trail Don Recreational Trail [35.80 m S] WELLINGTON ST W Transportation LYDON AVE from BERNICE CRES to EILEEN AVE Laneway Reconstruction Active 2018 2018 from WINDSOR ST (TO) to BLUE Laneway Reconstruction Services JAYS WAY LLOYD MANOR RD from [N] FIRWOOD CRES to PRINCESS Transportation [37 m N] WOBURN AVE from Laneway Reconstruction Active 2018 2018 Laneway Reconstruction MARGARET BLVD Services GREY RD to [143 m E] GREY RD [111 m N] ROSECLIFFE AVE from Transportation MIDDEN CRES from SEDGELEY DR to CALLOWHILL DR Laneway Reconstruction Active 2018 2018 LAUDER AVE to [33 m E] Laneway Reconstruction Services NORTHCLIFFE BLVD [38.10 m N] BLOOR ST W from Transportation FIESTA LANE from STONEGATE RD to TANGLEWOOD TR Laneway Reconstruction Active 2018 2018 BROCK AVE to MARGUERETTA Laneway Reconstruction Services ST CLEMENT RD from DENFIELD ST to [67 m W] KIPLING Transportation [45 m E] YONGE ST from FINCH Laneway Reconstruction Active 2018 2018 Laneway Reconstruction AVE Services AVE E to OLIVE AVE (N YK)

Transportation Local Road [183.78m W] CULFORD RD from ELM ST (YK) from WILLIAM ST to JOHN ST (YK) Active 2018 2018 Walkway Reconstruction Services Reconstruction QUEENS DR to MAPLE LEAF DR

Transportation Local Road BYNG AVE (ETBK) from ALBION Albion Rd over Albion Creek from ALBION CREEK to Completed 2018 2018 Local Road Reconstruction Services Reconstruction RD to TANDRIDGE CRES HIGHLAND CRES (N YK) from Sidewalk on Highland Cres (N BURNHAMILL PL from OLD BURNHAMTHORPE RD to Transportation Sidewalk Construction Active 2018 2018 BAYVIEW AVE to BAYVIEW YK) from Bayview Ave to MILL RD Services RIDGE Bayview Ridge

Source: MCIC data Note: Future projects subject to change Page 87 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope from Little Transportation Dundas St W from Huron St to Bridge Rehabilitation Completed 2018 2018 Rouge River to east of Reesor Scope description is blank Services Road Transportation On Street Bikeway Yorkwood Gt from Jane St to Installation of bikeway BRIMLEY RD from PROGRESS AVE to HUNTINGWOOD DR Active 2017 2018 Services Paving Markings Driftwood Ave pavement markings DUNDAS ST W from INDIAN ROAD CRES, MEDLAND ST to Transportation On Street Bikeway Sentinel Road from Dovehouse Installation of cycling Active 2017 2018 HIGH PARK AVE, KEELE ST Services Paving Markings Ave to Sheppard Ave W pavement markings

[N] LAKE SHORE BLVD E [BRANCH] from DON RDWY to Transportation On Street Bikeway Ln S Cambrone Ave from Exbury Installation of bikeway Active 2017 2018 BOOTH AVE Services Paving Markings Rd to Black Creek Trail pavement markings Transportation On Street Bikeway Cambrone Ave from Roding St Installation of cycling HUNTINGWOOD DR from KENNEDY RD to BRIMLEY RD Active 2017 2018 Services Paving Markings to Exbury Rd pavement markings Transportation On Street Bikeway Driftwoods Ave from Yorkwoods Installation of bikeway SILVERTHORN AVE from KERSDALE AVE to AILEEN AVE Active 2017 2018 Services Paving Markings GT to London Green Crt pavement markings LAKE SHORE BLVD W from LAKE Transportation On Street Bikeway Installation of bikeway Adelaide Street West from Sheppard St to Active 2017 2018 SHORE BLVD W to F G Services Paving Markings pavement markings GARDINER XY E RYDING AVE from [182.20 m E] GOURLAY CRES, [26.60 Transportation On Street Bikeway Dovehouse Rd from Sentinel Rd Installation of bikeway m E] GOURLAY CRES to [26.60 m E] GOURLAY CRES, Active 2017 2018 Services Paving Markings to Keele St pavement markings COBALT AVE Construction of new trail in GATINEAU HYDRO CORRIDOR DIESEL DR from EVANS AVE (ETBK) to [192 m N] EVANS Transportation hydro corridor to extend trail Bikeway Trail Active 2017 2018 TRL from EGLINTON AVE E to AVE (ETBK) [END] Services west from existing trail at VICTORIA PARK AVE Victoria Park to Eglinton Transportation On Street Bikeway Stilecroft Drive from Black Creek Installation of bikeway Baby Point Cres from Baby Point Ter to Baby Point Ter Active 2018 2018 Services Paving Markings Trail to Sentinel Rd pavement markings DANFROTH AVE from PRINCE Installation of Bikeway Transportation On Street Bikeway Bushby Dr from McCowan Rd to Grangeway Ave Active 2018 2018 EDWARD VIADUCT to Pavement Markings (Vision Services Paving Markings BROADVIEW AVE Zero) Installation of Bikeway Transportation On Street Bikeway LOWER SHERBOURNE ST from Havendale Rd from Agincourt Dr to Stainforth Dr Active 2018 2018 Pavement Markings (Vision Services Paving Markings E to FRONT ST E Zero) Installation of Bikeway Diesel Dr from Evans Ave (ETBK) to [192 m N] Evans Ave Transportation On Street Bikeway BLOOR ST W from SHERBOURE Active 2018 2018 Pavement Markings (Vision (ETBK) [END] Services Paving Markings ST to PRINCE EDWARD VIADUCT Zero) RUSKIN AVE from WEST Transportation On Street Bikeway Installation of cycling NORTHROP RD from CHAUNCEY AVE to BERING AVE Active 2018 2018 TORONTO RAIL PATH TRL to Services Paving Markings pavement markings EDWIN AVE Transportation Transit Shelter SHAW ST from HARRISON ST to COLLEGE ST Completed 2017 2018 Finch Ave W from Weston Rd Planned Transit Shelter Services Installation ROYAL YORK RD from SUMMITCREST DR to BRAECREST Transportation Transit Shelter Eglinton Ave W from Completed 2017 2018 Planned Transit Shelter AVE Services Installation Widdicombe Hill Blvd

Source: MCIC data Note: Future projects subject to change Page 88 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope WINTER GARDENS TRL from PORT UNION RD to Transportation Chorley from Chorley Park to Bikeway Trail Active 2017 2018 Installation of bikeway trail GOLDERS GREEN AVE Services Highland Creek - Gatineau Trail IRVINE RD from [141.50 m S] LAWSON RD [END] to Transportation Bikeway Trail Active 2017 2018 from Ellesmere Rd/ Military Trl Installation of bikeway trail LAWSON RD Services to Morningside Park Trail

Transportation LAURELEAF RD from BESTVIEW GOOD RD from CONLINS RD to CALVERLEY TRL Local Road Resurfacing Completed 2018 2018 Local Road Resurfacing Services DR to STEELES AVE E

LLOYD MANOR RD from RATHBURN RD to [S] FIRWOOD Transportation Utility Cut Grind and GLEN RD from HOWARD ST to Active 2018 2018 Utility Cut Grind and Pave CRES Services Pave [88 m N] HOWARD ST [END] [E-W] FAIRLEIGH CRES [LEG] Transportation Utility Cut Grind and DERRYDOWN RD from SENTINEL RD to OLLERTON RD Active 2018 2018 from FAIRLEIGH CRES to PARK Grind & Pave Services Pave HILL RD [E-W] FAIRLEIGH CRES [LEG] Transportation Utility Cut Grind and GILLEY RD from GARRATT BLVD to KESWICK RD Active 2018 2018 from PARK HILL RD to [W] Grind & Pave Services Pave WILLIAM R ALLEN RD [BRIDGE] CITY VIEW (N) DR from BELFIELD ST LEONARD'S AVE from WEYBOURNE CRES to Transportation Local Road Resurfacing Completed 2018 2018 RD to [631 m N] BELFIELD RD Local Road Resurfacing MILDENHALL RD Services [RING] LOTHIAN (N) AVE from [91 m S] STRATFORD CRES from MILDENHALL RD to STRATFORD Transportation Local Road Resurfacing Completed 2018 2018 SPRINGBROOK GDNS to BLOOR Local Road Resurfacing PARK TRL Services ST Transportation SAMMON AVE from PAPE AVE to WOODBINE AVE Bridge Rehabilitation Active 2019 2019 from Albion Creek Culvert Rehab/replacement Services Transportation ID 149 Lawrence ave over DVP - ID 149 Lawrence ave over DVP ARGYLE ST from OSSINGTON AVE to SHAW ST Bridge Rehabilitation Active 2019 2019 Services Substructure - Substructure Transportation ID 191 Wynford Dr over DVP - ID 191 Wynford Dr over DVP - EDGEWOOD AVE from DUNDAS ST E to EASTWOOD RD Bridge Rehabilitation Active 2019 2019 Services Substructure Substructure Transportation BORDEN ST from HARBORD ST to BLOOR ST W Bridge Rehabilitation Active 2019 2019 ID 112 Spanbridge over DVP ID 112 Spanbridge over DVP Services Transportation Culvert 274 Islington Ave o CHATSWORTH DR from LAWRENCE AVE W to YONGE ST Bridge Rehabilitation Active 2019 2019 Bridge Rehab Services Humber Transportation Neilson Road from CPR to 0.67 ST EDMUND'S DR from YONGE ST to WEYBOURNE CRES Bridge Rehabilitation Active 2018 2019 Bridge Rehab Services km south of Finch Ave MORNINGSIDE AVE (TO) from Transportation Local Road TECUMSETH ST from NIAGARA ST to QUEEN ST W Active 2018 2019 [E] MORNINGSIDE AVE (TO) Local Road Reconstruction Services Reconstruction [END] to RIVERSIDE DR (TO)

MORNINGSIDE AVE (TO) from FRIENDSHIP AVE from STARSPRAY BLVD to BLUEKING Transportation Local Road Active 2018 2019 SOUTH KINGSWAY to [W] Local Road Reconstruction CRES Services Reconstruction MORNINGSIDE AVE (TO) [END]

Source: MCIC data Note: Future projects subject to change Page 89 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope MILFORD HAVEN DR from GREENOCK AVE to [37.42 m E] Transportation Pedestrian Infrastructure Reduce corner radius to 1.0 m Completed 2018 2019 Dundas St W / Huron St GREENOCK AVE [END] Services Improvement at SW corner

NEWARK RD from SCARBOROUGH GOLF CLUB RD to Transportation Utility Cut Road DUNDAS ST W from CARLYLE ST Active 2018 2019 Major Road Resurfacing MILFORD HAVEN DR Services Rehabilitation to [W] CARLYLE ST [BRANCH]

Removal of right turn channel Transportation Pedestrian Infrastructure at the Kennedy Road and LOCKIE AVE from AGINCOURT DR to MIDLAND AVE Active 2019 2019 Danforth Rd / Kennedy Rd Services Improvement Danforth Road intersection. Signal design required. Removal of right turn Transportation Pedestrian Infrastructure ADANAC DR from COLONIAL AVE to BELLAMY RD S Active 2019 2019 Danforth Rd / Birchmount Rd channels. Signal design Services Improvement required. Removal of right turn Transportation Pedestrian Infrastructure BALCARRA AVE from FENWOOD HTS to PINE RIDGE DR Active 2019 2019 Danforth Rd / Warden Ave channels. Signal design Services Improvement required. Removal of right turn Transportation Pedestrian Infrastructure INGRID DR from SLAN AVE to MILFORD HAVEN DR Active 2019 2019 Danforth Rd / St Clair Ave E channels. Signal design Services Improvement required. Transportation Pedestrian Infrastructure Lower the sidewalk by 1 to 2 PITFIELD RD from BRIMLEY RD to MCCOWAN RD Completed 2019 2019 2100 Weston Rd Services Improvement inches for residents To bridge gap in hydro Transportation Finch Trail Connection from BLACKWELL AVE from BERNER TRL to TAPSCOTT RD Bikeway Trail Active 2019 2019 corridor trail across Yonge Services Finch Corridor Trl to HEPC Street Proposed bump-out from the south curb of Wales Avenue, Transportation Safety adjacent to the east curb line Transportation Leonard Ave / Wales Ave from BUSHBY DR from MCCOWAN RD to GRANGEWAY AVE Local Improvements Active 2019 2019 of Leonard Avenue to prevent Services Leonard Ave to Wales Ave Program wong-way travel on Wales Avenue East of Leonard Avenue.

Proposed intersection Transportation Safety Dundas St W / Carlyle St / Ln N tightening at Transportation STONEWALL GT from PITFIELD RD to LAWNMERE CRES Local Improvements Completed 2018 2019 Dundas E Carlyle from Dundas West and Carlyle Street to Services Program St W to Carlyle St normalize the skewed intersection. Removal of channelized right- Transportation Safety FALLINGBROOK RD from LAKE ONTARIO to KINGSTON Transportation Danforth Rd / Kennedy Rd from turn lane at the Kennedy Road Local Improvements Active 2019 2019 RD Services Danforth Rd to Kennedy Rd and Danforth Road Program intersection.

Source: MCIC data Note: Future projects subject to change Page 90 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Reduce corner radius to 1.0 m at NE corner, as there are no ROYDAWN CRT from LAWSON RD to [77 m E] IVAN RD Transportation Pedestrian Infrastructure Active 2018 2019 Dundas St W / Elizabeth St right turns occuring there. [CUL-DE-SAC] Services Improvement Bumpouts on both sides or narrowing. [E-W] RIVERSIDE CRES [LEG] Transportation Major Road HOTSPUR RD from BATHURST ST to NEPTUNE DR Active 2018 2019 from RIVERSIDE DR (TO) to [N-S] Local Road Reconstruction Services Reconstruction RIVERSIDE CRES [LEG]

Large crossing distance for peds & stepped sidewalk which TS wishes to make FAWNHAVEN CRT from HIDDEN TRL to [100 m W] Transportation Pedestrian Infrastructure accessible. Curb adjustments Active 2019 2019 from Church St HIDDEN TRL [CUL-DE-SAC] Services Improvement and shorter corssing and a full curb extension on Church on the south side is required. Signal deisgn is required.

[S/E] BRIDLETOWNE CRCL Transportation KILLDEER CRES from BRENTCLIFFE RD to BRENTCLIFFE RD Local Road Resurfacing Active 2019 2019 [QUADRANT] from WARDEN Local Road Resurfacing Services AVE to FINCH AVE E Transportation Safety Intersection Transportation Russel Hill Rd from Boulton Dr GLENCAIRN AVE from DUFFERIN ST to CALEDONIA RD Local Improvements Active 2019 2019 realighnment/throat Services to Russel Hill Rd Program narrowing. DUNDAS ST W from [W] Transportation Utility Cut Road HILLMOUNT AVE from DANESBURY AVE to DUFFERIN ST Active 2018 2019 UNIVERSITY AVE [BRANCH] to Major Road Resurfacing Services Rehabilitation SIMCOE ST Adjustment of curb cuts to match crosswalks. Survey is required. Bumpouts on SE (dimensions to be determined GRAYDON HALL DR from FENELON DR to GRAYDON HALL Transportation Pedestrian Infrastructure Active 2018 2019 from Chestnut St by traffic ops) after PL Services Improvement coordinating with Courthouse traffic study, investigate potential to mirror on North side.

Bumpouts on SE (dimensions to be determined by traffic ELISE TER from GREENWIN VILLAGE RD to GREENWIN Transportation Pedestrian Infrastructure ops) after coordinating with Active 2018 2019 from Centre Ave (TO) VILLAGE RD Services Improvement Courthouse traffic study, investigate potential to mirror on North side Transportation Utility Cut Road DUNDAS ST W from HURON ST KEYSTONE AVE from BECK AVE to MORTON RD Active 2018 2019 Major Road Resurfacing Services Rehabilitation to LARCH ST

Source: MCIC data Note: Future projects subject to change Page 91 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation Local Road [W] GLEN RD [BRANCH] from GOWAN AVE from BROADVIEW AVE to LOGAN AVE Active 2019 2019 Local Road Reconstruction Services Reconstruction GLEN RD to ROXBOROUGH DR DUNDAS ST W from [W] Road resurfacing to Transportation Pedestrian Infrastructure HERBERT AVE from QUEEN ST E to HARTFORD AVE Active 2018 2019 UNIVERSITY AVE [BRANCH] to incorporate design by existing Services Improvement SIMCOE ST streetscape plan. Road resurfacing to Transportation Pedestrian Infrastructure DUNDAS ST W from HURON ST CAMERON ST from QUEEN ST W to GRANGE AVE Active 2018 2019 incorporate design by existing Services Improvement to LARCH ST streetscape plan. Transportation Miscellaneous Halford Ave from Riverview Slope and Retaining Wall PHIN AVE from OAKVALE AVE to CHATHAM AVE Active 2018 2019 Services Transportation Programs Gardens to Humberview Rd Stabilization Infrastructure RIDGEWOOD RD (TO) from [212 m E] BATHURST ST Transportation (King-Liberty Bridge) from King/Liberty Pedestrian Enhancement - Active 2018 2019 [END] to BATHURST ST Services Duoro St to Western Battery Rd Bridge: Construction Construction Stage Doninio Avenue from Don River, Transportation ULSTER ST from EUCLID AVE (TO) to MANNING AVE (TO) Bridge Rehabilitation Active 2019 2019 west to 0.6 km east of Yonge Bridge Rehab Services Stree [N] LAKE SHORE BLVD E INDEX RD from NORTH QUEEN ST to [305 m N] NORTH Transportation Utility Cut Road Major Road Resurfacing, Active 2019 2019 [BRANCH] from DON RDWY to QUEEN ST [CUL-DE-SAC] Services Rehabilitation Utility Cut Road Rehabilitation BOOTH AVE Reduce corner radius to 1.0 m BRENTSIDE CRT from CHAPMAN RD to [39 m N] Transportation Pedestrian Infrastructure Adelaide Street West from at NE corner, NW corner, as Active 2019 2019 CHAPMAN RD [CUL-DE-SAC] Services Improvement Sheppard St there are no right turns occuring there. Transportation CALLAGHAN LANE from THIRTY THIRD ST from PARK BLVD to LAKE SHORE BLVD Laneway Reconstruction Active 2019 2019 Laneway Reconstruction Services ONTARIO ST to BERKELEY ST

Geometric modifications to introduce north-south ped crossing at west-leg of Transportation Safety intersection. Work involves Transportation Algonquin Road from Harbour to on Algonquin Island Local Improvements Completed 2019 2019 2231 Lawrence Ave E tree removal, curb radii Services Program adjustments, potential median for signal plant, signal plant design and installation of ped- heads.

Intersection geometric safety SHUTER ST from [E] BLEVINS PL [BRANCH], REGENT ST, Transportation Pedestrian Infrastructure improvements. Survey SHERBOURNE ST, NICHOLAS AVE to [E] BLEVINS PL Active 2019 2019 Steeles Ave E from Don Mills Rd Services Improvement required. Signal design [BRANCH], REGENT ST, RIVER ST, NICHOLAS AVE required.

Source: MCIC data Note: Future projects subject to change Page 92 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Improvements of pedestrian infrastructure including removal of channelized right- turn lanes, cutback of Transportation Pedestrian Infrastructure Kingston Rd from Lawrence Ave O'CONNOR DR from SANDRA RD to BERMONDSEY RD Active 2019 2019 medians, and installation of Services Improvement E accessible pedestrian signals and TWSI. Survey required. Relocation of hydro/traffic plants/poles required.

Intersection geometric safety Transportation Pedestrian Infrastructure Steeles Ave E from Birchmount improvements. Survey CLAREMORE AVE from KINGSTON RD to MEWBURN AVE Active 2019 2019 Services Improvement Rd required. Signal design required. New sidewalk from Lockie Ave to 84 Agincourt Dr including all required traffic control, drainage, curb alignment O'KEEFE LANE from [15.20 m N] GOULD ST to GERRARD Transportation Agincourt Dr from Lockie Ave to Sidewalk Construction Active 2019 2019 modification, utility relocation, ST E Services [84 Agincourt Dr] property acquisition, any other requirements to facilitate sidewalk construction

New sidewalk from Lascelles Blvd to Lawton Blvd including all required traffic control, drainage, curb alignment BEAVERBROOK AVE from KIPLING AVE to RAVENCREST Transportation Brentdale Dr from Lascelles Blvd Sidewalk Construction Active 2019 2019 modification, utility relocation, DR Services to Lawton Blvd property acquisition, any other requirements to facilitate sidewalk construction

KIPLING AVE from MOUNT OLIVE DR, STEELES AVE W to Transportation Safety Transportation Kennedy Park Rd from Margdon [136.39 m N] STEELES AVE W [CITY LIMITS], STEELES AVE Local Improvements Active 2019 2019 Intersection throat narrowing Services Rd W NORTH Program CRTL removal. To be Transportation Safety coordinated with planned WYNFORD DR from ST DENNIS DR to EGLINTON AVE Transportation Local Improvements Active 2019 2019 Weston Rd from St Phillips Rd resurfacing. Signal design [OVERPASS] Services Program required. Hydro pole to be relocated. Transportation Safety Transportation Removal of traffic circle in the MANNING AVE (TO) from QUEEN ST W to ROBINSON ST Local Improvements Completed 2019 2019 Brooke Ave from Falkirk St Services middle of the intersection Program

Source: MCIC data Note: Future projects subject to change Page 93 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope CHURCH ST from ASQUITH AVE, WELLESLEY ST E, Transportation Safety Transportation Jane St from Threthewey Dr to CRTL removal. Signal design GLOUCESTER ST, MONTEITH ST to PARK RD, ASQUITH Local Improvements Active 2019 2019 Services Denison Rd E required. AVE, MONTEITH ST, GLOUCESTER ST Program Geometric modifications to make permanent the temporary concrete barrier Transportation Safety Transportation discouraging westbound Steeles Ave E from Kelvin Grove Ave to Midland Ave Local Improvements Active 2019 2019 Ryding Ave from Cobalt Ave Services traffic from disobeying "Do Program Not Enter" prohibition on Ryding Avenue at a point 20 m east of Cobalt Avenue

New sidewalk from Brookdale Ave to Cranbrooke Ave including all required traffic control, drainage, curb Transportation Barse St from Brookdale Ave to Mount Pleasant Rd from Roxborough Dr to Sidewalk Construction Active 2019 2019 alignment modification, utility Services Cranbrooke Ave relocation, property acquisition, any other requirements to facilitate sidewalk construction

ELLESMERE RD from MARKHAM RD to SCARBOROUGH Transportation Miscellaneous Rowntree Mill Rd from Emily Slope and Retaining Wall Active 2019 2019 GOLF CLUB RD Services Transportation Programs Ave to Emily Ave Stabilization

Transportation Safety Addition of pedestrian Transportation Queen's Plate Dr from Highway ELLESMERE RD from MORNINGSIDE AVE to CONLINS RD Local Improvements Active 2019 2019 crossings at the north leg and Services 27 N Program removal of the turn channel [N] LAKE SHORE BLVD E Transportation Utility Cut Road [BRANCH] from [E] CHERRY ST KINGSTON RD from LAKEHURST DR to GLEN EVEREST RD Active 2019 2019 Utility Cut Road Rehabilitation Services Rehabilitation [BRANCH] to [W] DON RIVER [BRIDGE] CHERRY ST from [S] LAKE SHORE Transportation Utility Cut Road Koos Rd from Bloor St W to Radway Dr Active 2019 2019 BLVD E [BRANCH] to [S] Shave & Pave Services Rehabilitation RAILWAY LANDS - CNR [BRIDGE]

[N] EASTERN AVE DIVERSION Transportation Utility Cut Road [BRANCH] from [E] DON VALLEY GERRARD ST W from ELIZABETH ST to YONGE ST Active 2019 2019 Shave and Pave Services Rehabilitation PKWY [BRIDGE] to BROADVIEW AVE

[N] LAKE SHORE BLVD E Transportation Utility Cut Road BORDEN ST from COLLEGE ST to VANKOUGHNET ST Active 2019 2019 [BRANCH] from PARLIAMENT ST Utility Cut Road Rehabilitation Services Rehabilitation to CHERRY ST

Source: MCIC data Note: Future projects subject to change Page 94 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope [N] EASTERN AVE DIVERSION Transportation Utility Cut Road SHUTER ST from SHERBOURNE ST to RIVER ST Active 2019 2019 [RAMP] from SUMACH ST to Shave and Pave Services Rehabilitation RICHMOND ST E EGLINTON AVE W from 189 M S OF RENFORTH DR to 471 Transportation MANNING AVE (TO) from Local Road Resurfacing Active 2019 2019 Local Road Resurfacing M W OF THE EAST MALL Services HARBORD ST to LENNOX ST Transportation OLD MILL TR from OLD MILL RD Alness St from Steeles Ave W to Finch Ave W Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to BLOOR ST W CLAIREVILLE RD from [N] VICTORIA PARK AVE from GERRARD ST E to DANFORTH Transportation Local Road Resurfacing Active 2019 2019 HUMBERLINE DR [BRANCH] to Local Road Resurfacing AVE Services [S] HUMBERLINE DR [BRANCH] EDGAR AVE (TO) from Clintwood Gate from Victoria Park Ave to Broadlands Transportation Local Road Resurfacing Active 2019 2019 MACLENNAN AVE to Local Road Resurfacing Blvd Services ROXBOROUGH DR RATHBURN RD from 122 M E OF THE EAST MALL to Transportation On Street Bikeway HUMBER BLVD S from ALLIANCE Installation of bikeway Active 2019 2019 MARTIN GROVE RD Services Paving Markings AVE to NORTH END pavement markings THE EAST MALL ML from Transportation Major Road Lumsden Ave from Cedarvale Ave to Active 2019 2019 NORTH QUEEN ST to VICKERS Major Road Reconstruction Services Reconstruction RD THE KINGSWAY (N) from ASHLEY RD to 213 M N/W OF Transportation THE EAST MALL ML from Major Road Resurfacing Active 2019 2019 Major Road Resurfacing ANGLESEY BLVD Services VICKERS RD to EAST MALL CRES Transportation Local Road CONRAD AVE from HILLCREST Montcalm Ave from Clarkson Ave to Montcalm Ave [End] Active 2019 2019 Local Road Reconstruction Services Reconstruction DR to TYRREL AVE [36.60 m S] BEDFORD PARK AVE [33.50 m W] YONGE ST from WELLINGTON ST W to Transportation Laneway Reconstruction Active 2019 2019 from [62 m W] YONGE ST to Laneway Reconstruction MELINDA ST Services [112 m W] YONGE ST [253 m E] WESTON RD from [27.40 m W] BAY ST from TEMPERANCE ST to Transportation Laneway Reconstruction Active 2019 2019 VICTORIA BLVD to RUTHERFORD Laneway Reconstruction RICHMOND ST W Services AVE [143.30 m E] YONGE ST from [41.50 m E] JONES AVE from [89.90 m N] GERRARD ST E Transportation Laneway Reconstruction Active 2019 2019 [29.20 m S] PRICE ST to PRICE Laneway Reconstruction to [36.60 m S] MYRTLE AVE Services ST [30 m S] LAKE SHORE BLVD W BARBARA BARRETT LANE from BRUNSWICK AVE to Transportation Laneway Reconstruction Active 2019 2019 from THIRD ST (ETBK) to Laneway Reconstruction BORDEN ST Services SECOND ST (ETBK) [274 m E] WESTON RD from [91.40 m N] GERRARD ST E from JONES AVE to BUSHELL Transportation Laneway Reconstruction Active 2019 2019 CRAYDON AVE to MAHONEY Laneway Reconstruction AVE Services AVE [36.60 m S] BEDFORD PARK AVE [36 m N] EGLINTON AVE W from SHORTT ST to Transportation Laneway Reconstruction Active 2019 2019 from [62 m E] UNSWORTH AVE Laneway Reconstruction FAIRBANK AVE Services to UNSWORTH AVE

Source: MCIC data Note: Future projects subject to change Page 95 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope [36 m W] FIFTH ST (ETBK) from Transportation GERRARD ST W from YONGE ST to ELIZABETH ST (TO) Laneway Reconstruction Active 2019 2019 [28 m N] LAKE SHORE BLVD W Laneway Reconstruction Services to BIRMINGHAM ST [30 m S] LAKE SHORE BLVD W Transportation DOVERCOURT RD from QUEEN ST W to DUNDAS ST W Laneway Reconstruction Active 2019 2019 from SEVENTH ST to SIXTH ST Laneway Reconstruction Services (ETBK) [30 m S] LAKE SHORE BLVD W Transportation THE EAST MALL ML from YARN RD to BLOOR ST Laneway Reconstruction Active 2019 2019 from FIFTH ST (ETBK) to Laneway Reconstruction Services FOURTH ST (ETBK) [30.50 m N] DAVENPORT RD Transportation SHEPPARD AVE E from BAYVIEW AVE to YONGE ST Laneway Reconstruction Active 2019 2019 from AVENUE RD to [69.80 m Laneway Reconstruction Services W] AVENUE RD [23.50 m W] YONGE ST from THE WEST MALL from WEST MALL CRES to [300 m N] Transportation Laneway Reconstruction Active 2019 2019 WELLESLEY ST W to [25.90 m N] Laneway Reconstruction WEST MALL CRES Services WELLESLEY ST W CALGIE LANE from [40.30 m N] Transportation GLADSTONE AVE from QUEEN ST W to PEEL AVE Laneway Reconstruction Active 2019 2019 DUNDAS ST E to [40.30 m S] Laneway Reconstruction Services GERRARD ST E [30 m S] LAKE SHORE BLVD W [37 m N] BEDFORD PARK AVE from GREY RD to [81 m W] Transportation Laneway Reconstruction Active 2019 2019 from FOURTH ST (ETBK) to Laneway Reconstruction GREY RD Services THIRD ST (ETBK) [69.80 m W] AVENUE RD from THE WEST MALL from WEST MALL CRES to 300M N OF Transportation Laneway Reconstruction Active 2019 2019 [30.50 m N] DAVENPORT RD to Laneway Reconstruction WEST MALL CRES Services [27.40 m S] PEARS AVE [29.20 m S] PRICE ST from Transportation Dovercourt Rd from Foxley St to Laneway Reconstruction Active 2019 2019 [85.30 m E] YONGE ST to [157 m Laneway Reconstruction Services E] YONGE ST [262 m E] WESTON RD from Transportation Church St from Gloucester St to Laneway Reconstruction Active 2019 2019 RUTHERFORD AVE to CRAYDON Laneway Reconstruction Services AVE Transportation [30 m S] LAKE SHORE BLVD W Gerrard St W from La Plante Ave to Laneway Reconstruction Active 2019 2019 Laneway Reconstruction Services from NINTH ST to EIGHTH ST [59.70 m W] YONGE ST from Transportation Oakdale Rd from Torbarrie Rd to Laneway Reconstruction Active 2019 2019 [47.90 m S] FARNHAM AVE to Laneway Reconstruction Services FARNHAM AVE Transportation EUCLID AVE (SC) from ZAPH AVE Kipling Ave from Kidron Valley Dr to Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services to MEADOWVALE RD Transportation HALFMOON SQ from CANMORE WYNDALE DR from KEELE ST to CULFORD RD Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services BLVD to HALFMOON SQ

Transportation Neighbourhood QUEEN ST E from KINGSTON RD BOLSTER AVE from PITT AVE to PHARMACY AVE Active 2019 2019 Sidewalk widening Services Improvements to 110 m W of KINGSTON RD

Source: MCIC data Note: Future projects subject to change Page 96 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Curb depressions and crosswalk lines associated with adding a ped crossing. Transportation Safety Contact Transportation JOCADA RD from RUSTIC RD to FLORAL PKWY Local Improvements Completed 2019 2019 Keele St from Junction Rd [email protected] Services Program for conceptual. ECS scope includes required surveys, drainage and curb realignment. Transportation Rehab of Redwater Dr bridge Rehab of Redwater Rd bridge SUTHERLAND DR from BESSBOROUGH DR to ASTOR AVE Bridge Rehabilitation Active 2019 2019 Services over Berry Creek over Berry Creek Transportation Rehab of ID 291 Ellesmere Road Rehab of ID 291 Ellesmere ROSELAWN AVE from ROSEWELL AVE to ORIOLE PKWY Bridge Rehabilitation Active 2019 2019 Services over Highland Creek Road over Highland Creek Transportation Rehab of ID 514 Coxwell Avenue Rehab of ID 514 Coxwell BROADBENT AVE from MIDLAND AVE to CHILLERY AVE Bridge Rehabilitation Active 2019 2019 Services over CN Rail Avenue over CN Rail MALLARD RD from DON MILLS RD to [240 m W] DON Transportation Rehab of ID 902 Centennial Rehab of ID 902 Centennial Bridge Rehabilitation Active 2019 2019 MILLS RD [RING] Services Road over watercourse Road over watercourse

ARROWDALE AVE from MANGROVE RD to [123 m N] Transportation Rehab of Culvert ID 661 Toledo Bridge Rehabilitation Active 2019 2019 rehab of culvert MANGROVE RD [CUL-DE-SAC] Services Rd over Renforth Creek MAYFIELD AVE from ARMADALE AVE to SOUTH Transportation Rehab of ID 119 Dufferin St Bridge Rehabilitation Active 2019 2019 Rehab of bridge KINGSWAY Services under Rail Path Trail [N] PALMERSTON SQ [BRANCH] Transportation On Street Bikeway Installation of bikeway BARTON AVE from HOWLAND AVE (TO) to ALBANY AVE Active 2019 2019 from PALMERSTON AVE to Services Paving Markings pavement markings PALMERSTON AVE

Transportation On Street Bikeway Willowdale Ave from Empress Installation of bikeway MUTUAL ST from WOOD ST to MAITLAND ST Active 2019 2019 Services Paving Markings Ave to Elmwood Ave pavement markings WESTMOUNT AVE from REGAL RD to ROSEMOUNT AVE Transportation On Street Bikeway OSSINGTON ST from DEWSON Installation of cycling Completed 2019 2019 (TO) Services Paving Markings ST to DEWSON ST pavement markings WOODFIELD RD TRAIL from Transportation GLENGROVE AVE W from ROSEWELL AVE to AVENUE RD Bikeway Trail Active 2019 2019 LAKE SHORE BLVD E to Installation of multi-use trail Services WOODFIELD RD Transportation MAXWELL ST from DELLBANK JOPLING AVE S from DUNDAS ST W to BLOOR ST W Local Road Resurfacing Active 2019 2019 Local Road Resurfacing Services RD to OVERBROOK PL AUSTIN TER from [E] WALMER Transportation MALVERN ST from SHEPPARD AVE E to MCLEVIN AVE Local Road Resurfacing Active 2019 2019 RD [BRANCH] to [W] WALMER Local Road Resurfacing Services RD [BRANCH] SUNLIGHT PARK RD from Transportation Utility Cut Grind and PRITCHARD AVE from JANE ST to FLORENCE CRES Active 2019 2019 BROADVIEW AVE to EASTERN Grind & Pave Services Pave AVE Transportation Utility Cut Grind and NELSON ST (TO) from SIMCOE PRITCHARD AVE from CASTLETON AVE to JANE ST Active 2019 2019 Utility Cut Grind and Pave Services Pave ST to DUNCAN ST

Source: MCIC data Note: Future projects subject to change Page 97 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation from Berry Creek Bridge Rehabilitation Active 2020 2020 from Berry Creek Culvert rehab/replacement Services

ID 077 PEV structural repairs ID 077 PEV repairs to the suicide to the suicide barrier. Work ID 077 PEV repairs to the suicide barrier and connections Transportation Bridge Rehabilitation Active 2020 2020 barrier and connections to expected to take six months to structure. Services structure. with the curb lane occupied for the duration. Transportation Slope restoration and ID 155 - Slope Restoration Bridge Rehabilitation Active 2020 2020 ID 155 - Slope Restoration Services expansion joint work Replacement of existing Transportation ID 288 Bloor St Pedestrian ID 288 Bloor St Pedestrian Crossing Bridge Rehabilitation Active 2020 2020 pedestrian tunnel associated Services Crossing with ID 249 Transportation Glen Road from Rosedale Valley Glen Road from Rosedale Valley to north of Bridge Rehabilitation Active 2020 2020 Bridge Rehab Services to north of Bloor Street Transportation from Victoria Park Avenue from Pedestrian to at TTC Bridge Rehabilitation Active 2019 2020 Bridge Rehab Services Pedestrian to at TTC ID 639 Indian Line Road from ID 639 Indian Line Road from CNR to 0.24 km west of Transportation Bridge Rehabilitation Active 2020 2020 CNR to 0.24 km west of Highway Bridge Rehab Highway 42 Services 42 Transportation Algonquin Road from Harbour Algonquin Road from Harbour to on Algonquin Island Bridge Rehabilitation Active 2019 2020 Bridge Rehab Services to on Algonquin Island Transportation Safety Dundas St E / Coxwell Ave from Dundas St E to Coxwell Transportation Dundas St E / Coxwell Ave from Intersection realignment and Local Improvements Active 2020 2020 Ave Services Dundas St E to Coxwell Ave removal of CRTL Program Transportation BEECH AVE from FIR AVE to BEECH AVE from FIR AVE to PINE AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services PINE AVE

Intersection improvements Transportation Safety including curb radii Transportation Southvale Dr from Millwood Rd Local Improvements Active 2020 2020 Southvale Dr from Millwood Rd adjustments. Design and Services Program relocation of traffic signals and street lighting.

Evans Avenue from Brown's Line to south of FGG Transportation Evans Avenue from Brown's Line Bridge Rehabilitation Active 2019 2020 Bridge Rehab Expressway Services to south of FGG Expressway Rathburn Road from Mimico Rathburn Road from Mimico Creek to 0.24 km east of Transportation Bridge Rehabilitation Active 2019 2020 Creek to 0.24 km east of Martin Bridge Rehab Martin Gro Services Gro Plymbridge Road from Don Plymbridge Road from Don River, west to 1 km east of Transportation Bridge Rehabilitation Active 2020 2020 River, west to 1 km east of Bridge Rehab Yonge Street Services Yonge Street

Source: MCIC data Note: Future projects subject to change Page 98 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation Local Road MANNING AVE (TO) from MANNING AVE (TO) from QUEEN ST W to ROBINSON ST Active 2019 2020 Local Road Reconstruction Services Reconstruction QUEEN ST W to ROBINSON ST

Removal of NE right turn channel, installation of APS, bike lanes on St Clair east of Transportation Safety Transportation St Clair Ave E from O'Connor Dr intersection, installation of St Clair Ave E from O'Connor Dr to St Clair Ave E Local Improvements Active 2020 2020 Services to St Clair Ave E dedicated bike facilities: 2- Program stage left turn bike box at NW corner, raised cycle track on N side of St Clair at NE corner.

Curb radius reduction at intersection of one-way street. Conceptual design available. Transportation Safety Transportation Macpherson Ave from Rathnelly Contact Macpherson Ave from Rathnelly Ave Local Improvements Active 2020 2020 Services Ave [email protected] Program for conceptual. ECS scope inculdes required pre- engineering surveys. Streetscape Improvements Transportation Neighbourhood Millwood Rd from Southvale Dr Active 2020 2020 Millwood Rd from Southvale Dr associated with PII/TSLIP. To Services Improvements be bundled with PII/TSLIP.

Streetscape Improvements Transportation Neighbourhood St Clair Ave E from O Connor Dr Active 2020 2020 St Clair Ave E from O Connor Dr associated with PII/TSLIP. To Services Improvements be bundled with PII/TSLIP. EDMUND AVE (YK) from EDMUND AVE (YK) from MONKLANDS AVE to CENTRE RD Transportation Local Road Resurfacing Active 2018 2020 MONKLANDS AVE to CENTRE RD Local Road Resurfacing (YK) Services (YK) Transportation ID 157 Islington O Humber River ID 157 Islington O Humber River - Bridge Rehabilitation Bridge Rehabilitation Active 2019 2020 Bridge Rehab Services - Bridge Rehabilitation

Reduce corner radius to 1.0 m at SW corner, NE corner. Candidate for bumpout for SW corner, extending into Transportation Pedestrian Infrastructure Adelaide Street West from Widmer St. Contact Adelaide Street West from WIdmer St Active 2020 2020 Services Improvement WIdmer St [email protected] for conceptual. ECS scope includes required surveys, drainage and curb realignment.

Source: MCIC data Note: Future projects subject to change Page 99 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Reduce corner radius to 1.0 m at SE corner, SW corner, as there are no right turns occuring there. Contact Transportation Pedestrian Infrastructure Richmond Street East from Richmond Street East from Church St Active 2020 2020 [email protected] Services Improvement Church St for conceptual. ECS scope includes required surveys drainage and curb realignment.

Bumpout, replace existing curb & sidewalk. Contact Transportation Safety [email protected] Transportation Howard Park Ave from Dundas Howard Park Ave from Dundas St W Local Improvements Active 2020 2020 for conceptual. ECS scope Services St W Program includes required surveys, drainage, curb realignment and utility relocation.

Transportation DON LAKE GT from BATHURST DON LAKE GT from BATHURST ST to ANTIBES DR Local Road Resurfacing Active 2019 2020 Local Road Resurfacing Services ST to ANTIBES DR [30.50 m E] LIPPINCOTT ST from NASSAU ST to OXFORD Transportation [30.50 m E] LIPPINCOTT ST from Laneway Reconstruction Active 2019 2020 Laneway Reconstruction ST (TO) Services NASSAU ST to OXFORD ST (TO)

ATTWELL (N) DR from DISCO RD ATTWELL (N) DR from DISCO RD to [370 m N] DISCO RD Transportation to [370 m N] DISCO RD ATTWELL (N) DR from [370 m N] DISCO RD to Cold In Place Recycling Active 2019 2020 Local Road Reconstruction Services ATTWELL (N) DR from [370 m N] CARLINGVIEW DR DISCO RD to CARLINGVIEW DR [N/W] BRIDLETOWNE CRCL [N/W] BRIDLETOWNE CRCL [QUADRANT] from WARDEN Transportation Major Road Resurfacing, Local Major Road Resurfacing Active 2020 2020 [QUADRANT] from WARDEN AVE to FINCH AVE E Services Road Resurfacing AVE to FINCH AVE E RTC removal & signal with crossride.Hydro pole, bus shelter relocation.TPIM to provide signal design. Signal build part of ECS Transportation Safety Transportation Mt Pleasant Rd from scope.Contact Mt Pleasant Rd from Roxborough Dr Local Improvements Active 2020 2020 Services Roxborough Dr [email protected] for Program conceptual.ECS scope includes surveys drainage curb realignment & utility relocation.

Source: MCIC data Note: Future projects subject to change Page 100 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Widening south side to provide sufficient SB RT radius for trucks as per two development applications Transportation Pedestrian Infrastructure Don Mills Rd from Barber (UDSB-1218, UDSB-1231). Ped Don Mills Rd from Barber Greene Rd to Don Mills Rd Active 2020 2020 Services Improvement Greene Rd to Don Mills Rd Projects submitting as PII as an exception while MCIC creates mechanism for Traffic Operations to make submissions.

DUNDAS ST [RAMP G] from DUNDAS ST [RAMP G] from [WB] DUNDAS Transportation [WB] DUNDAS ST/KINGSWAY ST/KINGSWAY NORTH to [WB] KINGSWAY Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services NORTH to [WB] KINGSWAY NORTH/DUNDAS ST NORTH/DUNDAS ST

Streetscape Improvements Transportation Neighbourhood Mount Pleasant Rd from Mount Pleasant Rd from Roxborough Dr Active 2020 2020 associated with PII/TSLIP. To Services Improvements Roxborough Dr be bundled with PII/TSLIP.

Streetscape Improvements Transportation Neighbourhood Lumsden Ave from Cedarvale Lumsden Ave from Cedarvale Ave Active 2020 2020 associated with PII/TSLIP. To Services Improvements Ave be bundled with PII/TSLIP. Transportation Neighbourhood Ellesmere Rd from Scarborough Paving replacement bundled Ellesmere Rd from Scarborough Golf Club Rd Active 2020 2020 Services Improvements Golf Club Rd with resurfacing

Removal of turning circle and replacement with public realm Transportation Neighbourhood Trudelle St Active 2020 2020 Trudelle St enhancements (nit paving, Services Improvements sod, tree planting) funded by seciton 37

Corner radii adjustment and Transportation Neighbourhood Gerrard St E from Parliament St Active 2020 2020 Gerrard St E from Parliament St pole relocation to be bundled Services Improvements with resurfacing project. Transportation SHAW ST from DEWSON ST to SHAW ST from DEWSON ST to HARBORD ST Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services HARBORD ST

Rehabilitation of centre Clintwood Gate from Victoria Park Ave to Broadlands Transportation Neighbourhood Clintwood Gate from Victoria median (resurfacing, tree and Active 2020 2020 Blvd Services Improvements Park Ave to Broadlands Blvd shrub planting). To commence after adjacent development. Transportation MARTIN GROVE TRAIL from MARTIN GROVE TRAIL from GAYLORD AVE to SWAN AVE Bikeway Trail Active 2020 2020 Installation of multi-use trail Services GAYLORD AVE to SWAN AVE

Source: MCIC data Note: Future projects subject to change Page 101 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope GATINEAU TRAIL from GATINEAU TRAIL from BERMONDSEY RD to EGLINTON Transportation Bikeway Trail Active 2020 2020 BERMONDSEY RD to EGLINTON Installation of multi-use trail AVE E Services AVE E Upgrading of existing signed Transportation On Street Bikeway SHAW ST from DEWSON ST to SHAW ST from DEWSON ST to HARBORD ST Active 2020 2020 and marked route with Services Paving Markings HARBORD ST contraflow bike lane Radius adjustments complementing cycling facility.Push buttons relocation needed.Contact Transportation Pedestrian Infrastructure The Donway W from Lawrence The Donway W from Lawrence Ave E Active 2020 2020 [email protected] Services Improvement Ave E for conceptual.ECS scope includes required surveys drainage and curb realignment. Bump outs.Contact [email protected] for conceptual.ECS scope Transportation Pedestrian Infrastructure Winnett Ave from Arlington Ave Active 2020 2020 Winnett Ave from Arlington Ave includes required surveys Services Improvement drainage and curb realignment.

Bump out on Mt Royal at the NW corner. Contact Transportation Pedestrian Infrastructure Davenport Rd from Mount Royal [email protected] Davenport Rd from Mount Royal Ave Active 2020 2020 Services Improvement Ave for conceptual.ECS scope includes required surveys, drainage, curb realignment.

Raised intersection and bump outs. Contact [email protected] Transportation Pedestrian Infrastructure Valewood Ave from Cherrywood Valewood Ave from Cherrywood Ave Active 2020 2020 for conceptual. ECS scope Services Improvement Ave includes required pre- engineering surveys, drainage and curb realignment.

Bumpouts and possible relocation of PXO poles. Contact Transportation Pedestrian Infrastructure The Kingsway from Anglesey [email protected] The Kingsway from Anglesey Blvd Active 2020 2020 Services Improvement Blvd for conceptual. ECS scope includes required pre- engineering surveys, curb realignment, drainage.

Source: MCIC data Note: Future projects subject to change Page 102 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Radius adjustments complementing cycling facility. Push buttons relocation needed. Contact Transportation Pedestrian Infrastructure The Donway E from Lawrence The Donway E from Lawrence Ave E Active 2020 2020 [email protected] Services Improvement Ave E for conceptual.ECS scope includes required surveys, drainage and curb realignment.

Raised intersection and bumpouts. Contact [email protected] Transportation Pedestrian Infrastructure Shaw St from Dewson St Active 2020 2020 Shaw St from Dewson St for conceptual. ECS scope Services Improvement includes required pre- engineering surveys, drainage and curb realignment.

RTC removal. Hydro pole relocation.Signal design & relocation & more illumination needed. Contact Transportation Pedestrian Infrastructure Howard Park Ave from Parkside Howard Park Ave from Parkside Dr Active 2020 2020 [email protected] Services Improvement Dr for conceptual. ECS scope includes required pre- engineering surveys and utility relocation.

Raised intersection. Contact [email protected] Transportation Pedestrian Infrastructure Maplewood Ave from for conceptual.ECS scope Maplewood Ave from Cherrywood Ave Active 2020 2020 Services Improvement Cherrywood Ave includes required surveys, drainage and curb realignment.

Remove/Modify RTC. Hydro pole relocation. Signal design and relocation. Contact Transportation Pedestrian Infrastructure The Queensway from Park Lawn [email protected] The Queensway from Park Lawn Rd Active 2020 2020 Services Improvement Rd for conceptual. ECS scope includes required pre- engineering surveys and utility relocation.

Source: MCIC data Note: Future projects subject to change Page 103 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Intersection normalization & island removal. Hydro pole, bus shelter relocation. More illumination needed. Contact Transportation Pedestrian Infrastructure [email protected] The Kingsway from Dundas St W Active 2020 2020 The Kingsway from Dundas St W Services Improvement for conceptual. ECS scope includes required pre- engineering surveys and utility relocation.

Bumpout at west curb at SE corner of the intersection. Contact [email protected] Transportation Safety Transportation Martin Grove Rd from Rathburn for conceptual. ECS scope Martin Grove Rd from Rathburn Rd Local Improvements Active 2020 2020 Services Rd includes required surveys, Program drainage, curb realignment and traffic signals design and relocation

Curb radius reduction at corners, potential crosswalk realignment. Signal design & Transportation Safety Transportation relocation required. Contact Bathurst St from Davenport Rd Local Improvements Active 2020 2020 Bathurst St from Davenport Rd Services [email protected] Program for conceptual. ECS scope includes required surveys, drainage and curb realignment

Intersection tightening / normalization. Contact [email protected] Transportation Safety Transportation for conceptual. ECS scope Ava Rd from Strathearn Rd Local Improvements Active 2020 2020 Ava Rd from Strathearn Rd Services includes required surveys, Program drainage and curb realignment.

Source: MCIC data Note: Future projects subject to change Page 104 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Removal of step sidewalk & reconstruct new sidewalk from building face to curb. Bus Transportation Safety shelter relocation. Contact Transportation Kingston Rd from Sandown Ave Local Improvements Active 2020 2020 Kingston Rd from Sandown Ave [email protected] Services Program for conceptual. ECS scope includes required surveys, drainage and curb realignment.

Three centre islands built out where paint already exists. Contact Transportation Safety [email protected] Transportation Martin Grove Rd from Rathburn Martin Grove Rd from Rathburn Rd to Donalbert Rd Local Improvements Active 2020 2020 for conceptual. ECS scope Services Rd to Donalbert Rd Program includes required surveys, drainage and curb realignment.

RTC removal & Intersection normalization. Hydro pole, bus shelter relocation. More Transportation Safety illumination needed. Contact Transportation Lumsden Ave from Cedarvale Lumsden Ave from Cedarvale Ave Local Improvements Active 2020 2020 [email protected] Services Ave Program for conceptual. ECS scope includes required surveys, drainage, curb realignment and utility relocation.

Ped level lighting on Walkway leading from intersection to Transportation Safety Morningside. Illumination Transportation Cindy Nicolas Dr from Lampman Cindy Nicolas Dr from Lampman Dr Local Improvements Active 2020 2020 project. Contact Services Dr Program [email protected] for conceptual. ECS scope includes required surveys.

Source: MCIC data Note: Future projects subject to change Page 105 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Construction of a bus bay at the northwest corner for westbound traffic. Traffic signals design and relocation. Transportation Safety Transportation Contact Eglinton Ave W from Russell Rd Local Improvements Active 2020 2020 Eglinton Ave W from Russell Rd Services [email protected] Program for conceptual. ECS scope includes required surveys, drainage and curb realignment. THE KINGSWAY from LAMBETH THE KINGSWAY from LAMBETH RD to 213 M N/W OF Transportation On Street Bikeway Installation of signed and Active 2020 2020 RD to 213 M N/W OF ANGLESEY ANGLESEY BLVD Services Construction marked route BLVD New sidewalk from Clarkson Ave to end of Montcalm Ave including all required traffic control, drainage, curb Transportation Montcalm Ave from Clarkson Montcalm Ave from Clarkson Ave to Montcalm Ave [End] Sidewalk Construction Active 2020 2020 alignment modification, utility Services Ave to Montcalm Ave [End] relocation, property acquisition, any other requirements to facilitate sidewalk construction

[33.50 m W] YONGE ST from [33.50 m W] YONGE ST from WELLINGTON ST W to Transportation Laneway Reconstruction Active 2020 2020 WELLINGTON ST W to MELINDA Laneway Reconstruction MELINDA ST Services ST [27.40 m W] BAY ST from [27.40 m W] BAY ST from TEMPERANCE ST to Transportation Laneway Reconstruction Active 2020 2020 TEMPERANCE ST to RICHMOND Laneway Reconstruction RICHMOND ST W Services ST W [41.50 m E] JONES AVE from [41.50 m E] JONES AVE from [89.90 m N] GERRARD ST E Transportation Laneway Reconstruction Active 2020 2020 [89.90 m N] GERRARD ST E to Laneway Reconstruction to [36.60 m S] MYRTLE AVE Services [36.60 m S] MYRTLE AVE BARBARA BARRETT LANE from BRUNSWICK AVE to Transportation BARBARA BARRETT LANE from Laneway Reconstruction Active 2020 2020 Laneway Reconstruction BORDEN ST Services BRUNSWICK AVE to BORDEN ST

[91.40 m N] GERRARD ST E from JONES AVE to BUSHELL Transportation [91.40 m N] GERRARD ST E from Laneway Reconstruction Active 2020 2020 Laneway Reconstruction AVE Services JONES AVE to BUSHELL AVE

[36 m N] EGLINTON AVE W from SHORTT ST to Transportation [36 m N] EGLINTON AVE W from Laneway Reconstruction Active 2020 2020 Laneway Reconstruction FAIRBANK AVE Services SHORTT ST to FAIRBANK AVE Transportation THE EAST MALL ML from YARN THE EAST MALL ML from YARN RD to BLOOR ST Major Road Resurfacing Active 2020 2020 Major Road Resurfacing Services RD to BLOOR ST

Source: MCIC data Note: Future projects subject to change Page 106 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

1.0m radius reduction at SE corner and radius reduction at NE corner. Candidate for Transportation Pedestrian Infrastructure bumpouts. Contact Dovercourt Rd from Foxley St Active 2020 2020 Dovercourt Rd from Foxley St Services Improvement [email protected] for conceptual. ECS scope includes pre-engineering surveys.

1.0 m radius reduction at SW corner. Conceptual design available. Contact Transportation Pedestrian Infrastructure Church St from Gloucester St Active 2020 2020 Church St from Gloucester St [email protected] Services Improvement for conceptual. ECS scope includes required pre- engineering surveys. Scope includes radius reductions on NW and NE corners and bumpouts. Pre- Transportation Pedestrian Infrastructure Gerrard St W from La Plante Ave Active 2020 2020 Gerrard St W from La Plante Ave Engineering Survey is Services Improvement required. Contact [email protected] for conceptual. Scope includes radius reductions & possible Transportation Pedestrian Infrastructure bumpouts. Pre-Engineering Oakdale Rd from Torbarrie Rd Active 2020 2020 Oakdale Rd from Torbarrie Rd Services Improvement Survey is required. Contact [email protected] for conceptual.

1.0m radius reduction at NW corner and radius reduction at SW corner. Replace existing bumpout on Dovercourt. Transportation Pedestrian Infrastructure Dovercourt Rd from MacKenzie Candidate for bumpout on Dovercourt Rd from MacKenzie Cres Active 2020 2020 Services Improvement Cres Mackenzie Cr. Contact [email protected] for conceptual. ECS scope includes pre-engineering surveys.

Source: MCIC data Note: Future projects subject to change Page 107 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Curb radii reductions at SE and SW corners and lane width modifications. Conceptual Transportation Pedestrian Infrastructure design available. Contact Kipling Ave from Steeles Ave W Active 2020 2020 Kipling Ave from Steeles Ave W Services Improvement [email protected] for conceptual. ECS scope includes required pre- engineering surveys.

1.0 m radius reduction at NW corner. Conceptual design available. Contact Transportation Pedestrian Infrastructure Church St from Dundonald St Active 2020 2020 Church St from Dundonald St [email protected] Services Improvement for conceptual. ECS scope includes required pre- engineering surveys.

1.0 m radius reduction at NE corner and radius reduction for SE corner. Candidate for Transportation Pedestrian Infrastructure bumpouts. Contact Dovercourt Rd from Humbert St Active 2020 2020 Dovercourt Rd from Humbert St Services Improvement [email protected] for conceptual. ECS scope includes pre-engineering surveys.

Curb radii reductions at NW corner. Conceptual design available. Contact Transportation Pedestrian Infrastructure Church St from Hayden St Active 2020 2020 Church St from Hayden St [email protected] Services Improvement for conceptual. ECS scope includes required pre- engineering surveys.

1.0 m radius reduction at SE and SW corner, including relocation of APS. Conceptual design available. Contact Transportation Pedestrian Infrastructure Church St from Charles St E Active 2020 2020 Church St from Charles St E [email protected] Services Improvement for conceptual. ECS scope includes required pre- engineering surveys, drainage and curb realignment.

Source: MCIC data Note: Future projects subject to change Page 108 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

1.0m radius reduction at NE corner and radius reductions for other corners. Candidate Transportation Pedestrian Infrastructure for bumpouts. Contact Dovercourt Rd from Argyle St Active 2020 2020 Dovercourt Rd from Argyle St Services Improvement [email protected] for conceptual. ECS scope includes pre-engineering surveys.

Curb radii reductions and lane width modifications. Conceptual design available. Transportation Pedestrian Infrastructure Contact Kipling Ave from Markbrook Ln Active 2020 2020 Kipling Ave from Markbrook Ln Services Improvement [email protected] for conceptual. ECS scope includes required pre- engineering surveys.

Scope applied to cul-de-sac west of Rathburn Rd and includes radius reduction & possible bumpouts for Transportation Pedestrian Infrastructure Rathburn Rd from [30m W] Rathburn Rd from [30m W] Martin Grove Rd Active 2020 2020 intersection normalization. Pre- Services Improvement Martin Grove Rd Engineering Survey is required. Contact [email protected] for conceptual.

Transportation Pedestrian Infrastructure Pedestrian Infrastructure Claxton Blvd from Raglan Ave Active 2020 2020 Claxton Blvd from Raglan Ave Services Improvement Improvements

Curb radii reductions, lane width and bus lay-by modifications. Conceptual Transportation Pedestrian Infrastructure design available. Contact Kipling Ave from Annabelle Dr Active 2020 2020 Kipling Ave from Annabelle Dr Services Improvement [email protected] for conceptual. ECS scope includes required pre- engineering surveys. Curb radii reductions, lane width and bus lay-by modifications. Conceptual Transportation Pedestrian Infrastructure Kipling Ave from Kidron Valley design available. Contact Kipling Ave from Kidron Valley Dr Active 2020 2020 Services Improvement Dr [email protected] for conceptual. ECS scope includes required pre- engineering surveys.

Source: MCIC data Note: Future projects subject to change Page 109 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

1.0 m radius reduction at NE and NW corner, including relocation of APS. Conceptual design available. Contact Transportation Pedestrian Infrastructure Church St from Isabella St Active 2020 2020 Church St from Isabella St [email protected] Services Improvement for conceptual. ECS scope includes required pre- engineering surveys and utility relocation.

Curb radii reductions, lane width and bus lay-by modifications. Conceptual Transportation Pedestrian Infrastructure design available. Contact Kipling Ave from Mount Olive Dr Active 2020 2020 Kipling Ave from Mount Olive Dr Services Improvement [email protected] for conceptual. ECS scope includes required pre- engineering surveys. Curb radii reductions, lane width and bus lay-by modifications. Conceptual Transportation Pedestrian Infrastructure design available. Contact Kipling Ave from Beaconhill Rd Active 2020 2020 Kipling Ave from Beaconhill Rd Services Improvement [email protected] for conceptual. ECS scope includes required pre- engineering surveys.

Scope includes radius reductions, pedestrian clearway expansion, and Transportation Pedestrian Infrastructure Sheppard Ave E from Wilfred possible signal pole relocation. Sheppard Ave E from Wilfred Ave Active 2020 2020 Services Improvement Ave Pre-Engineering Survey is required. Contact [email protected] for conceptual.

COLLEGE ST (TO) from COLLEGE ST (TO) from LANSDOWNE AVE (TO) to [N] Transportation On Street Bikeway On Street Bikewayl Active 2020 2020 LANSDOWNE AVE (TO) to [N] COLLEGE ST (TO) [BRANCH] Services Construction Construction COLLEGE ST (TO) [BRANCH] Infrastructure Rean Drive / Kenaston Transportation (New Street) from Kenaston (New Street) from Kenaston Gdns to Rean Dr Enhancement - Active 2020 2020 Gardens New Street: Services Gdns to Rean Dr Construction Stage Construction [N] COLLEGE ST (TO) [BRANCH] [N] COLLEGE ST (TO) [BRANCH] from COLLEGE ST (TO) to Transportation Local Road Active 2020 2020 from COLLEGE ST (TO) to ST Local Road Reconstruction ST HELEN'S AVE Services Reconstruction HELEN'S AVE

Source: MCIC data Note: Future projects subject to change Page 110 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope [N] COLLEGE ST [BRANCH] from [N] COLLEGE ST [BRANCH] from COLLEGE ST (TO) to ST Transportation On Street Bikeway Active 2020 2020 COLLEGE ST (TO) to ST HELEN'S On Street Bikewy Construction HELEN'S AVE Services Construction AVE Transportation WILLARD AVE (TO) from BLOOR WILLARD AVE (TO) from BLOOR ST W to GRASSMERE RD Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ST W to GRASSMERE RD

PETERBOROUGH AVE from MC FARLAND AVE to VIA Transportation PETERBOROUGH AVE from MC Local Road Resurfacing Active 2020 2020 Local Road Resurfacing ITALIA Services FARLAND AVE to VIA ITALIA Transportation WILLARD AVE (TO) from WILLARD AVE (TO) from ARDAGH ST to ANNETTE ST Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ARDAGH ST to ANNETTE ST

ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure MCINTOSH ST from VANBURGH including required surveys, MCINTOSH ST from VANBURGH AVE Active 2020 2020 Services Improvement AVE drainage and curb realignment. Contact [email protected].

ECS Scope includes intersection normalization on south side of Park St including Transportation Pedestrian Infrastructure MCINTOSH ST from PARK ST Active 2020 2020 MCINTOSH ST from PARK ST required surveys, drainage Services Improvement and curb realignment. Contact [email protected]. [email protected].

ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure MCINTOSH ST from SANDOWN including required surveys, MCINTOSH ST from SANDOWN AVE Active 2020 2020 Services Improvement AVE drainage and curb realignment. Contact [email protected].

ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure including required surveys, MCINTOSH ST from ATLEE AVE Active 2020 2020 MCINTOSH ST from ATLEE AVE Services Improvement drainage and curb realignment. Contact [email protected].

Source: MCIC data Note: Future projects subject to change Page 111 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure MCINTOSH ST from including required surveys, MCINTOSH ST from CLAREMORE AVE Active 2020 2020 Services Improvement CLAREMORE AVE drainage and curb realignment. Contact [email protected].

ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure including required surveys, MCINTOSH ST from PHILlIP AVE Active 2020 2020 MCINTOSH ST from PHILlIP AVE Services Improvement drainage, curb realignment. Contact [email protected].

ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure including required surveys, MCINTOSH ST from NATAL AVE Active 2020 2020 MCINTOSH ST from NATAL AVE Services Improvement drainage and curb realignment. Contact [email protected]. Transportation BOULTBEE AVE from BLAKE ST BOULTBEE AVE from BLAKE ST to JONES AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to JONES AVE [E-W] NORTHERN PL [LEG] from [E-W] NORTHERN PL [LEG] from ST CLARENS AVE to Transportation Local Road Resurfacing Active 2020 2020 ST CLARENS AVE to NORTHERN Local Road Resurfacing NORTHERN PL Services PL Transportation CRAWFORD ST from CANNIFF ST CRAWFORD ST from CANNIFF ST to KING ST W Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to KING ST W Transportation VESTA DR from AVA CRES to VESTA DR from AVA CRES to OLD FOREST HILL RD Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services OLD FOREST HILL RD Transportation SHAW ST from MELVILLE AVE to SHAW ST from MELVILLE AVE to BURNFIELD AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services BURNFIELD AVE [E] OLD PARK RD [BRANCH] [E] OLD PARK RD [BRANCH] from [N] ELM RIDGE CRCL Transportation Local Road Resurfacing Active 2020 2020 from [N] ELM RIDGE CRCL Local Road Resurfacing [BRANCH] to RIDELLE AVE Services [BRANCH] to RIDELLE AVE Transportation HARRIET ST from LESLIE ST (TO) HARRIET ST from LESLIE ST (TO) to HASTINGS AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to HASTINGS AVE Transportation SHERIDAN AVE from BANK ST to SHERIDAN AVE from BANK ST to FRANKISH AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services FRANKISH AVE Transportation FRANKLIN AVE (TO) from FRANKLIN AVE (TO) from PARKMAN AVE to DUPONT ST Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services PARKMAN AVE to DUPONT ST

[S] MELITA CRES [BRANCH] from [S] MELITA CRES [BRANCH] from [126 m W] MELITA Transportation Local Road Resurfacing Active 2020 2020 [126 m W] MELITA CRES to [W] Local Road Resurfacing CRES to [W] MELITA CRES [BRANCH] Services MELITA CRES [BRANCH]

Source: MCIC data Note: Future projects subject to change Page 112 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation FRANKLIN AVE (TO) from FRANKLIN AVE (TO) from DUPONT ST to HUGO AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services DUPONT ST to HUGO AVE [S] BELSIZE DR [BRANCH] from WILFRID AVE to ACACIA Transportation [S] BELSIZE DR [BRANCH] from Local Road Resurfacing Active 2020 2020 Local Road Resurfacing RD Services WILFRID AVE to ACACIA RD MARKHAM ST from [38 m S] MARKHAM ST from [38 m S] COLLEGE ST (TO) to Transportation Local Road Resurfacing Active 2020 2020 COLLEGE ST (TO) to COLLEGE ST Local Road Resurfacing COLLEGE ST (TO) Services (TO) Transportation BARTON AVE from CHRISTIE ST BARTON AVE from CHRISTIE ST to WILLOWVALE LANE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to WILLOWVALE LANE FRANKLIN AVE (TO) from EDITH FRANKLIN AVE (TO) from EDITH AVE to [110 m N] EDITH Transportation Local Road Resurfacing Active 2020 2020 AVE to [110 m N] EDITH AVE Local Road Resurfacing AVE [END] Services [END] [N-S] COATSWORTH CRES [LEG] [N-S] COATSWORTH CRES [LEG] from COATSWORTH Transportation Local Road Resurfacing Active 2020 2020 from COATSWORTH CRES to Local Road Resurfacing CRES to HANSON ST Services HANSON ST Transportation BEECH AVE from BALSAM AVE BEECH AVE from BALSAM AVE to KINGSTON RD Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services to KINGSTON RD Transportation CANNIFF ST from STRACHAN CANNIFF ST from STRACHAN AVE to CRAWFORD ST Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to CRAWFORD ST Transportation FRANKLIN AVE (TO) from HUGO FRANKLIN AVE (TO) from HUGO AVE to EDITH AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services AVE to EDITH AVE [S] MELITA CRES [BRANCH] from [S] MELITA CRES [BRANCH] from [E] MELITA CRES Transportation Local Road Resurfacing Active 2020 2020 [E] MELITA CRES [BRANCH] to Local Road Resurfacing [BRANCH] to [126 m W] MELITA CRES Services [126 m W] MELITA CRES

[S] BELSIZE DR [BRANCH] from HARWOOD RD to Transportation [S] BELSIZE DR [BRANCH] from Local Road Resurfacing Active 2020 2020 Local Road Resurfacing FORMAN AVE Services HARWOOD RD to FORMAN AVE

Transportation FRANKLIN AVE (TO) from FRANKLIN AVE (TO) from ANTLER ST to PARKMAN AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ANTLER ST to PARKMAN AVE [N] ARDWOLD GT [LEG] from [N- [N] ARDWOLD GT [LEG] from [N-S] ARDWOLD GT [LEG] Transportation Local Road Resurfacing Active 2020 2020 S] ARDWOLD GT [LEG] to Local Road Resurfacing to SPADINA RD (TO) Services SPADINA RD (TO) Transportation SHAW ST from BLOOR ST W to SHAW ST from BLOOR ST W to IRENE AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services IRENE AVE Transportation BERNARD AVE from WALMER BERNARD AVE from WALMER RD to KENDAL AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services RD to KENDAL AVE Transportation FRANKLIN AVE (TO) from FRANKLIN AVE (TO) from RUSKIN AVE to ANTLER ST Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services RUSKIN AVE to ANTLER ST Transportation WALLACE AVE from DUFFERIN WALLACE AVE from DUFFERIN ST to RUSSETT AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services ST to RUSSETT AVE

Source: MCIC data Note: Future projects subject to change Page 113 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure Russell Hill Rd from Dunnvegan Russell Hill Rd from Dunnvegan Rd Active 2020 2020 including surveys, drainage Services Improvement Rd and curb realignment. Contact [email protected]

ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure Castle Frank Rd from Hawthorn Castle Frank Rd from Hawthorn Ave Active 2020 2020 including surveys, drainage Services Improvement Ave and curb realignment. Contact [email protected]

ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure Kilbarry Rd from Dunvegan Kilbarry Rd from Dunvegan Rd/Old Forest Hill Rds Active 2020 2020 including surveys, drainage Services Improvement Rd/Old Forest Hill Rds and curb realignment. Contact [email protected]

ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure Russle Hill Rd from Hillholm Rd Active 2020 2020 Russle Hill Rd from Hillholm Rd including surveys, drainage Services Improvement and curb realignment. Contact [email protected]

ECS Scope includes intersection normalization Transportation Pedestrian Infrastructure Elm Ave from South Dr Active 2020 2020 Elm Ave from South Dr including surveys, drainage Services Improvement and curb realignment. Contact [email protected]

Transportation BEECH AVE from PINE AVE to BEECH AVE from PINE AVE to BALSAM AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services BALSAM AVE Old Forst Hill Rd from Russel Hill Old Forst Hill Rd from Russel Hill Rd to 65 n North of Transportation Sidewalk Construction Active 2020 2020 Rd to 65 n North of Russel Hill New Sidewalk Russel Hill Rd Services Rd Russel Hill Rd from Old Forst Hill Russel Hill Rd from Old Forst Hill Rd to 65 m North of Old Transportation Sidewalk Construction Active 2020 2020 Rd to 65 m North of Old Forst New Sidewalk Forst Hill Rd Services Hill Rd

Source: MCIC data Note: Future projects subject to change Page 114 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope

Reduce corner radii to 1.0 m at SE and SW corner. The NE corner is proposed to have a compound radius of 5.0m and Transportation Pedestrian Infrastructure BEDFORD RD from LOWTHER BEDFORD RD from LOWTHER AVE Active 2020 2020 14.0m, whereas the NW Services Improvement AVE corner is reduced to a radius of 4.0m. Conceptual design available. Contact [email protected]

[S] BELSIZE DR [BRANCH] from FORMAN AVE to BOYTON Transportation [S] BELSIZE DR [BRANCH] from Local Road Resurfacing Active 2020 2020 Local Road Resurfacing RD Services FORMAN AVE to BOYTON RD Transportation ID 604 Reid Manor Bridge Rehabilitation Active 2020 2020 ID 604 Reid Manor Bridge Rehab Services Transportation Culvert 279 Warden Ave over Rehabiliation of ID 279 Culvert 279 Warden Ave over Stream - Rehab Bridge Rehabilitation Active 2020 2020 Services Stream - Rehab Warden Ave over Stream Transportation Culvert 127 Danforth over Rehab of culvert ID 127 Culvert 127 Danforth over Stream - Rehab Bridge Rehabilitation Active 2020 2020 Services Stream - Rehab Danforth over stream Transportation Rehab of ID 944 Reesor Rd Culver 944 Reesor Rd rehab Bridge Rehabilitation Active 2020 2020 Culver 944 Reesor Rd rehab Services over Rough RIver Tributary Transportation ID 758 Don River Blvd Bridge ID 758 Don River Blvd Bridge ID 758 Don River Blvd Bridge Rehab Bridge Rehabilitation Active 2020 2020 Services Rehab Rehab Transportation Rehab of bridge ID 109 Don Rehab of bridge ID 109 Don Mills Rd over DVP Bridge Rehabilitation Active 2019 2020 Rehab of Bridge Services Mills Rd over DVP Rehab of bridge ID 762 Transportation Rehab of bridge ID 762 Downsview Ave over Black Creek Bridge Rehabilitation Active 2020 2020 Downsview Ave over Black Rehab of bridge Services Creek Transportation Rehab of bridge ID 35 Rehab of bridge ID 35 Queensway over Parkside Dr Bridge Rehabilitation Active 2019 2020 Rehab of bridge Services Queensway over Parkside Dr Transportation Rehab of ID 669 Drumheller Rd Rehab of ID 669 Drumheller Rd over Berry Creek Bridge Rehabilitation Active 2020 2020 Rehab of bridge Services over Berry Creek Transportation Rehab of bridge ID 605 Van Rehab of bridge ID 605 Van Dussen over Mimico Creek Bridge Rehabilitation Active 2020 2020 Rehab of bridge Services Dussen over Mimico Creek Transportation Rehab of Culvert ID 340 Rehab of Culvert ID 340 Sheppard Ave over Black Creek Bridge Rehabilitation Active 2020 2020 Rehab of culver Services Sheppard Ave over Black Creek Transportation Rehab of Culvert ID 335 Steeles Rehab of Culvert ID 335 Steeles Ave over Creek Bridge Rehabilitation Active 2020 2020 Rehab of culvert Services Ave over Creek Rehab of bridge ID 761 Gordon MacKay Dr over Black Transportation Rehab of bridge ID 761 Gordon Bridge Rehabilitation Active 2020 2020 Rehab of bridge Creek Services MacKay Dr over Black Creek Transportation ID11 Bathrust o TTR - Bridge ID11 Bathrust o TTR - Bridge Deck Construction Bridge Rehabilitation Active 2020 2020 Bridge Rehabilitation Services Deck Construction

Source: MCIC data Note: Future projects subject to change Page 115 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation ID11 Bathrust o TTR - BR Const Bridge Rehabilitation Active 2020 2020 ID11 Bathrust o TTR - BR Const Deck Rehab Services Transportation Rehab of bridge ID 324 Rexdale Rehab of bridge ID 324 Rexdale Blvd over Jockey Club Rd Bridge Rehabilitation Active 2020 2020 Rehab of bridge Services Blvd over Jockey Club Rd Transportation Rehab of bridge ID 670 Berry Rehab of bridge ID 670 Berry Creek Dr over Berry Creek Bridge Rehabilitation Active 2020 2020 Bridge rehab Services Creek Dr over Berry Creek Transportation Rehab of ID 764 Shoreham Dr Rehab of ID 764 Shoreham Dr under pedestrain bridge Bridge Rehabilitation Active 2020 2020 Rehab of bridge Services under pedestrain bridge Transportation Rehab of Culvert ID 921 Rehab of Culvert ID 921 Foxbridge Dr over Massey Creek Bridge Rehabilitation Active 2020 2020 Rehab of culvert Services Foxbridge Dr over Massey Creek Transportation On Street Bikeway BARTON AVE from ALBANY AVE Installation of bikeway BARTON AVE from ALBANY AVE to HOWLAND AVE Active 2020 2020 Services Paving Markings to HOWLAND AVE pavement markings EAST DON RIVER TRL from Construction of new trail in EAST DON RIVER TRL from WEST DON RIVER TRL to Transportation WEST DON RIVER TRL to hydro corridor to extend from Bikeway Trail Active 2017 2020 GATINEAU HYDRO CORRIDOR TRAIL Services GATINEAU HYDRO CORRIDOR West River Don Trail to East TRAIL Don River Trail

Construction of new trail in GATINEAU HYDRO CORRIDOR GATINEAU HYDRO CORRIDOR TRAIL from EAST DON Transportation hydro corridor to extend from Bikeway Trail Active 2018 2020 TRAIL from EAST DON RIVER RIVER TRAIL to BERMONDSEY RD Services East Don River Trail to TRAIL to BERMONDSEY RD Bermondsey Rd

Construction of new trail in EAST DON - WIGMORE TRL from EAST DON - WIGMORE TRL from EAST DON RIVER TRL to Transportation hydro corridor to extend from Bikeway Trail Active 2018 2020 EAST DON RIVER TRL to ELVASTON DR Services West River Don Trail to East ELVASTON DR Don River Trail LOWER DON TRAIL from LAKE LOWER DON TRAIL from LAKE SHORE BLVD to Transportation Bikeway Trail Active 2019 2020 SHORE BLVD to RIVERDALE Multi-use trail widening RIVERDALE PARK Services PARK Improvement of exisiting Transportation On Street Bikeway SHUTER ST from CHURCH ST SHUTER ST from CHURCH ST [TO] to SHERBOURNE ST Active 2020 2020 cycling pavement markings. Services Paving Markings [TO] to SHERBOURNE ST Northbound painted proper. Installation of signed and Transportation On Street Bikeway STANLEY TERR from KING ST W STANLEY TERR from KING ST W to RICHMOND ST W Active 2020 2020 marked route with contraflow Services Paving Markings to RICHMOND ST W bike lane Transportation On Street Bikeway BERKLEY ST from RICHMOND ST Installation of bikeway BERKLEY ST from RICHMOND ST E to THE ESPLANADE Active 2020 2020 Services Paving Markings E to THE ESPLANADE pavement markings ST. CLAIR AVE W from ST. CLAIR AVE W from DUNVEGAN RD to POPLAR PLAINS Transportation On Street Bikeway Installation of improved Active 2020 2020 DUNVEGAN RD to POPLAR RD Services Construction connection PLAINS RD

Source: MCIC data Note: Future projects subject to change Page 116 of 117 January 15, 2020 Location Ward Owner Program name Status Start year End year Description Scope Transportation CLAREMONT ST from TREFORD CLAREMONT ST from TREFORD PL to MANSFIELD AVE Local Road Resurfacing Active 2020 2020 Local Road Resurfacing Services PL to MANSFIELD AVE [E-W] ROSEMARY LANE [LEG] [E-W] ROSEMARY LANE [LEG] from ROSEMARY LANE to Transportation Local Road Resurfacing Active 2020 2020 from ROSEMARY LANE to Local Road Resurfacing BATHURST ST Services BATHURST ST

Source: MCIC data Note: Future projects subject to change Page 117 of 117 January 15, 2020