Executive Summary

Total Page:16

File Type:pdf, Size:1020Kb

Executive Summary AUDIT REPORT ON THE ACCOUNTS OF WATER AND POWER DEVELOPMENT AUTHORITY AUDIT YEAR 2014-15 AUDITOR-GENERAL OF PAKISTAN TABLE OF CONTENTS Page No. ABBREVIATIONS & ACRONYMS i PREFACE v EXECUTIVE SUMMARY vii SUMMARY TABLES & CHARTS I Audit Work Statistics xiii II Audit observations regarding financial xiii management III Outcome Statistics xiii IV Irregularities pointed out xiv V Cost Benefit Xiv MINISTRY OF WATER AND POWER (A) WATER AND POWER DEVELOPMENT AUTHORITY (WAPDA) CHAPTER 1 WATER WING 1.1 Introduction 1 1.2 Brief comments on the status of compliance with 2 PAC directives 1.3 Audit Paras 2 CHAPTER 2 WAPDA HYDRO ELECTRIC POWER 2.1 Introduction 25 2.2 Brief comments on the status of compliance with 26 PAC directives 2.3 Audit Paras 26 (B) PAKISTAN ELECTRIC POWER COMPANY (PEPCO) CHAPTER 3 PAKISTAN ELECTRIC POWER COMPANY (PEPCO) 3.1 Introduction 43 3.2 Brief comments on the status of compliance 43 with PAC directives 3.3 Audit Paras 43 CHAPTER 4 COMMON ISSUES REGARDING GENCOs, NTDC & DISCOs 4.1 Audit Paras 55 CHAPTER 5 JAMSHORO POWER GENERATION COMPANY (GENCO-I) 5.1 Introduction 69 5.2 Comments on Financial Statements 69 5.3 Audit Paras 71 CHAPTER 6 CENTRAL POWER GENERATION COMPANY (GENCO-II) 6.1 Introduction 77 6.2 Audit Paras 77 CHAPTER 7 NORTHERN POWER GENERATION COMPANY (GENCO-III) 7.1 Introduction 87 7.2 Audit Paras 87 CHAPTER 8 LAKHRA POWER GENERATION COMPANY (GENCO-IV) 8.1 Introduction 99 8.2 Comments on Financial Statements 99 8.3 Audit Paras 102 CHAPTER 9 NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) 9.1 Introduction 107 9.2 Brief comments on the status of compliance 108 with PAC directives 9.3 Audit Paras 109 CHAPTER 10 FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO) 10.1 Introduction 129 10.2 Comments on Financial Statements 129 10.3 Brief comments on the status of compliance 134 with PAC directives 10.4 Audit Paras 134 CHAPTER 11 GUJRANWALA ELECTRIC POWER COMPANY (GEPCO) 11.1 Introduction 147 11.2 Comments on Financial Statements 147 11.3 Audit Paras 151 CHAPTER 12 HYDERABAD ELECTRIC SUPPLY COMPANY (HESCO) 12.1 Introduction 163 12.2 Comments on Financial Statements 163 12.3 Audit Paras 167 CHAPTER 13 ISLAMABAD ELECTRIC SUPPLY COMPANY (IESCO) 13.1 Introduction 177 13.2 Comments on Financial Statements 177 13.3 Audit Paras 181 CHAPTER 14 LAHORE ELECTRIC SUPPLY COMPANY (LESCO) 14.1 Introduction 193 14.2 Comments on Financial Statements 193 14.3 Audit Paras 197 CHAPTER 15 MULTAN ELECTRIC POWER COMPANY (MEPCO) 15.1 Introduction 217 15.2 Comments on Financial Statements 217 15.3 Brief comments on the status of compliance 221 with PAC directives 15.4 Audit Paras 221 CHAPTER 16 PESHAWAR ELECTRIC SUPPLY COMPANY (PESCO) 16.1 Introduction 237 16.2 Comments on Financial Statements 237 16.3 Audit Paras 241 CHAPTER 17 QUETTA ELECTRIC SUPPLY COMPANY (QESCO) 17.1 Introduction 265 17.2 Brief comments on the status of compliance 265 with PAC directives 17.3 Audit Paras 265 CHAPTER 18 SUKKUR ELECTRIC POWER COMPANY (SEPCO) 18.1 Introduction 277 18.2 Audit Paras 277 CHAPTER 19 TRIBAL AREAS ELECTRIC SUPPLY COMPANY (TESCO) 19.1 Introduction 285 19.2 Audit Paras 285 CHAPTER 20 SPECIAL STUDY REPORT ON ENERGY CRISIS – REASONS AND SOLUTIONS Executive Summary 291 Key Findings 291 Recommendations 293 Introduction 294 Audit Objectives 295 CHAPTER 21 PERFORMANCE AUDIT REPORT ON SATPARA DAM PROJECT SKARDU Executive Summary 329 Key Findings 329 Recommendations 330 Introduction 330 Audit Findings 333 ANNEXURES & TABLES Annexure-I 355 Audit paras, not considered significant enough to report to the parliament, included in MFDAC Annexure-II 360 Tables 361 ABBREVIATIONS AND ACRONYMS ACSR Aluminum Conductor Steel Re-enforced ADB Asian Development Bank AEDB Alternative Energy Development Board AEL Annual Energy Losses AJ&K Azad Jammu and Kashmir ALM Assistant Line Man B&C Budget & Consolidation BOD Board of Directors BOOT Built, Own, Operate and Transfer BOQ Bill of Quantity BPCs Bulk Power Consumers BPS Basic Pay Scale BTU British Thermal Unit CAATs Computed Assisted Auditing Techniques CCC Central Contract Cell CCPP Combined Cycle Power Plant CDA Capital Development Authority CDL Cash Development Loan CDWP Central Development Working Party CEO Chief Executive Officer CFL Compact Florescent Lamps CHASNUPP Chashma Nuclear Power Plant COBOL Common Business Oriented Language CP Commercial Procedure CP Commercial Procedure CPGCL Central Power Generation Company Limited CPPA Central Power Purchasing Agency CRBC Chashma Right Bank Canal CRRK Chief Resident Representative Karachi CSA Consultancy Services Agreement DAC Departmental Accounts Committee DDO Drawing & Disbursing Officer DG Director General DHA Defence Housing Authority DISCOs Distribution Companies DoP Development of Power DP Draft Para E&M Electrical & Mechanical ECC Economic Coordination Committee ECNEC Executive Committee of the National Economic Council EHV Extra High Voltage ELR Energy Loss Reduction EMB Electrical Measurement Bank EOT Extension of Time EPC Engineering Procurement and Construction EPC Engineering, Procurement & Construction ERO Equipment Removal Order ERP Enterprise Resource Planning FATA Federally Administered Tribal Area FBR Federal Board of Revenue i FC Frontier Constabulary FCC Foreign Currency Component FCC Fuel Cost Component FCC Fixed Cost Component FCS Free Consignee Store FESCO Faisalabad Electric Supply Company FIA Federal Investigation Agency FIDIC Federation International Des Ingenieurs-Conseils FIR First Information Report FPA Fuel Price Adjustment FWO Frontier Works Organization GBHP Ghazi Barotha Hydropower Project GCC Gas Cost Component GENCOs Generation Companies GEPCO Gujranwala Electric Power Company GFR General Financial Rules GHCL GENCO Holding Company Limited GM General Manager GoP Government of Pakistan GSC Grid System Construction GSO Grid System Operation GST General Sales Tax GTPS Gas Thermal Power Station GWH Gegawatt Hours GZD Gomal Zam Dam HESCO Hyderabad Electric Supply Company HFO High Speed Furnace Oil HP Horse Power HPP Hydro Power Project HPS Hydel Power Station HSD High Speed Diesel HT High Tension IAS International Accounting Standards IDC Interest During Construction IESCO Islamabad Electric Supply Company IPC Interim Payment Certificate IPPs Independent Power Producers IRSA Indus River System Authority ISRIP International Sedimentation Research Institute, Pakistan JICA Japan International Co-operation Agency JPGCL Jamshoro Power Generation Company Limited JV Journal Voucher KAPCO Kot Addu Power Company KESC Karachi Electric Supply Company KIBOR Karachi Inter Bank Offer Rates KPK Khyber Pukhtunkhwa KV Kilo Volt KVA Kilo Volt Amps KW Kilo Watt KWh Kilo Watt Hours LAC Land Acquisition Collector LC Letter of Credit LD Liquidated Damages ii LESCO Lahore Electric Supply Company LOI Letter of Intent LPGCL Lakhra Power Generation Company Limited LT Low Tension M.S Medical Superintendent MD Managing Director MDI Maximum Demand Indicator MDR Mangla Dam Raising MDRP Mangla Dam Raising Project MEPCO Multan Electric Power Company MFDAC Memorandum for Departmental Accounts Committee MIS Management Information System MKWH Million Kilo Watt Hour MMBTU Million British Thermal Unit MMCFT Million Cubic Feet MRN Material Return Note MT Metric Ton MVA Mega Volt Ampere MW Mega Watt NAB National Accountability Bureau NEO Net Electric Output NEPRA National Electric Power Regulatory Authority NGPS Natural Gas Power Station NJHPC Neelum Jhelum Hydro Power Company NJS Neelum Jhelum Surcharge NPCC National Power Control Centre NPGCL Northern Power Generation Company Limited NTDC National Transmission and Despatch Company O&M Operation and Maintenance PAC Public Accounts Committee PAEC Pakistan Atomic Energy Commission PC Poles Pre-stressed Concrete Poles PCC Particular Condition of Contract PC-I Planning Commission Proforma-I PCRET Pakistan Council of Renewable Energy Technology PD Project Director PDP Proposed Draft Para PEC Pakistan Engineering Council PEPCO Pakistan Electric Power Company PESCO Peshawar Electric Supply Company PHPL Power Holding Private Limited PITC Power Information Technology Company PMU Project Management Unit PMU Project Management Unit POL Petrol, Oil and Lubricants POs Provisional Orders PPA Power Purchase Agreement PPIB Pakistan Power Infrastructure Board PPRA Public Procurement Regulatory Authority PRES Pakistan Renewable Energy Society PSC Power Sector Companies PSCs Public Sector Companies PSDP Public Sector Development Programme iii PSO Pakistan State Oil PWP Peoples Works Programme QESCO Quetta Electric Supply Company RBOD Right Bank Outfall Drainage RCO Reconnection Order REAP Renewable Energy Association Pakistan RFO Residual Furnace Oil RPP Rental Power Project SAP System Augmentation Project SCARP Salinity Control and Reclamation Project SEPCO Sukkur Electric Power Company SEPCOL Southern Electric Power Company Limited SHPS Small Hydel Power Station SHYDO Sarhad Hydro Development Organization SMS Secured Metering System SNGPL Sui Northern Gas Pipelines SO System Operator SOPs Standard Operating Procedures SPP Small Power Producer SRO Statutory Regulatory Order SSGC Sui Southern Gas Company STG Secondary Transmission Lines and Grids T&D Transmission & Distribution T&T Transformation and Transmission TBM Tunnel Boring Machine TDS Tariff Differential Subsidy TESCO Tribal Areas Electric Supply Company TLC Transmission Line Construction TNO Transmission Network Operator TNO Transmission Network Operator TOU Time of Use TPS Thermal Power Station UDC Upper Division Clerk UOSC Use of System Charges VO Variation Order WAPDA Water and
Recommended publications
  • Public Sector Development Program
    2011-12 Public Sector Development Program Planning and Development Department Government of Balochistan Government of Balochistan Planning & Development Department Public Sector Development Programme 2011-12 (Original) June, 2011 PREFACE The PSDP 2010 – 11 has seen its completion in a satisfactory manner. Out of 961 schemes, 405 schemes have successfully been completed at an aggregated expenditure of Rs. Rs.10.180 billion. Resultantly, communications links will get more strengthened in addition to increase in the employment rate in the province. More specifically, 60 schemes of water sector will definitely reinforce other sectors attached to it such as livestock and forestry. The PSDP 2011-12 has a total outlay of Rs.31.35 billion having 1084 schemes. Of this Rs.31.35 billion, 47.4% has been allocated to 590 ongoing schemes. The strategy adopted in preparation of the PSDP 2011-12 focuses chiefly on infrastructural sectors. Education, health and potable safe drinking water have been paid due attention with a view to bring about positive increase in their representation in social indicators. Worth mentioning is the fact that involvement of the Elected Members of the Provincial Assembly has excessively been helpful in identification of schemes in the constituencies having followed a well thought criteria. This has ensured that no sector has remained dormant as far its development and allocation of funds is concerned. Feasibility studies will be undertaken during FY 2011-12, especially for construction of mega dams to utilize 6.00 MAF flood water, which goes unutilized each year. Besides, feasibility studies for exploration and exploitation of viable minerals in the province will also be carried out.
    [Show full text]
  • Water and Power Resources of West Pakistan
    Water and Power Resources PAKISTAN "& of WEST I1158 Public Disclosure Authorized A Study in Sector Planning g' c - J) A N D e XJ ~~~~~~~ S >>)~~~~~TM RHELA AS H M I R Public Disclosure Authorized VISLAMABA > 2 t \ . Public Disclosure Authorized C ,,'_ o / z 'N ~~VOLUME g,_ -THE MAIN REPORT \ < ,pre~lppared by a World Bank Study Group Headed by X f .,/ ~~~PIETER LIEFTINCK t i '_z ~~~A. ROBERT SADOVE Public Disclosure Authorized tt I ~~~~~~~~~Deputy Hlead S n THOMAS-4 C.CREYKE ~~~~< < /r~~~~~~~~~~~trigation and Agr-icultut-e WATER AND POWER RESOURCES OF WEST PAKISTAN A Study in Sector Planning Volume I: The Main Report $10.00 Volume II: The Development of Irrigation and Agriculture $12.50 Volume III: Background and Methodology $ 12.50 $28.50 the set Prepared by a World Bank Study Group Headed by Pieter Lieftinck; A. Robert Sadove, Deputy Head; Thomas C. Creyke, Irrigation and Agriculture. Without doubt, the greatest single co- ordinated development operation in which the World Bank has been involved is the massive program for development of the Indus Basin. This pioneering study is an integral part of that project and is unique both in its conceptualization and its compre- hensiveness. It demonstrates the feasibility of a new and more rigorous approach to resource planning and development and will serve as an indispensible model for engi- neers, economists, and planners for years to come. Focal points of the Study are the Indus River, which runs the length of west Paki- stan, several of its tributaries, and a huge natural underground reservoir.
    [Show full text]
  • Presentation on Water Sector Development
    PRESENTATION ON WATER SECTOR DEVELOPMENT By AFTAB AHMAD KHAN SHERPAO Minister for Water and Power At Pakistan Development Forum March 18, 2004 COUNTRY PROFILE • POPULATION: 141 MILLION • GEOGRAPHICAL AREA: 796,100 KM2 • IRRIGATED AREA: 36 MILLION ACRES • ANNUAL WATER AVAILABILITY AT RIM STATIONS: 142 MAF • ANNUAL CANAL WITHDRAWALS: 104 MAF • GROUND WATER PUMPAGE: 44 MAF • PER CAPITA WATER AVAILABLE (2004): 1200 CUBIC METER CURRENT WATER AVAILABILITY IN PAKISTAN AVAILABILITY (Average) o From Western Rivers at RIM Stations 142 MAF o Uses above Rim Stations 5 MAF TOTAL 147 MAF USES o Above RIM Stations 5 MAF o Canal Diversion 104 MAF TOTAL 109 MAF BALANCE AVAILABLE 38 MAF Annual Discharge (MAF) 100 20 40 60 80 0 76-77 69.08 77-78 30.39 (HYDROLOGICAL YEAR FROMAPRILTOMARCH) (HYDROLOGICAL YEAR FROMAPRILTOMARCH) 78-79 80.59 79-80 29.81 ESCAPAGES BELOW KOTRI 80-81 20.10 81-82 82-83 9.68 33.79 83-84 45.91 84-85 29.55 85-86 10.98 86-87 26.90 87-88 17.53 88-89 52.86 Years 89-90 17.22 90-91 42.34 91-92 53.29 92-93 81.49 93-94 29.11 94-95 91.83 95-96 62.76 96-97 45.40 97-98 20.79 98-99 AVG.(35.20) 99-00 8.83 35.15 00-01 0.77 01-02 1.93 02-03 2.32 03-04 20 WATER REQUIREMENT AND AVAILABILITY Requirement / Availability Year 2004 2025 (MAF) (MAF) Surface Water Requirements 115 135 Average Surface Water 104 104 Diversions Shortfall 11 31 (10 %) (23%) LOSS OF STORAGE CAPACITY Live Storage Capacity (MAF) Reservoirs Original Year 2004 Year 2010 Tarbela 9.70 7.28 25% 6.40 34% Chashma 0.70 0.40 43% 0.32 55% Mangla 5.30 4.24 20% 3.92 26% Total 15.70 11.91 10.64
    [Show full text]
  • Life Science Journal 2013;10(3) Http
    Life Science Journal 2013;10(3) http://www.lifesciencesite.com Pakistan’s Hydro Potential and Energy Crisis Tahir Mahmood 1, Hasham Khan 2, Mohammad Ahmad Choudhry 1 1. Department of Electrical Engineering, University of Engineering & Technology, Taxila 47050, Pakistan 2. Department of Electrical Engineering, GCT, Abbottabad, Pakistan [email protected] Abstract: Pakistan has abundant water resources. Hydro-potential resources can play effective role in contributing towards energy security as well as energy independence of Pakistan. This research paper delineates hydro potential in Pakistan. At present, Pakistan is facing severe short fall of electric energy. A brief history and the present situation of the hydro-electricity production, its consumption in the country and importance of utilization of water resources for the production of electric power have been discussed. Predictions to solve energy crises are made on the basis of empirical data and preliminary observations. The root causes of the shortfall in energy generation, an estimated forecast of demand and generation of electricity for the next twenty years has also been predicted. Energy projections have been discussed in detail. [T. MAhmoo, H. Khan, M.A. Choudhry. Pakistan’s Hydro Potential and Energy Crisis. Life Sci J 2013;10(3):1059-1069] (ISSN:1097-8135). http://www.lifesciencesite.com. 154 Keywords: Energy crisis, electricity generation, hydro potential. 1. Introduction facing by the whole world now a day. At present, the Pakistan, at present facing serious short fall duration of forced load shedding in peak season is of electric energy and this has evolved as crises. All between 8 hrs to 10 hrs in urban areas while 16 hrs to kinds of industries as well as common man had been 18 hours in rural areas.
    [Show full text]
  • Worldwide Attacks Against Dams
    Worldwide Attacks Against Dams A Historical Threat Resource for Owners and Operators 2012 i ii Preface This product is a compilation of information related to incidents that occurred at dams or related infrastructure world-wide. The information was gathered using domestic and foreign open-source resources as well as other relevant analytical products and databases. This document presents a summary of real-world events associated with physical attacks on dams, hydroelectric generation facilities and other related infrastructure between 2001 and 2011. By providing an historical perspective and describing previous attacks, this product provides the reader with a deeper and broader understanding of potential adversarial actions against dams and related infrastructure, thus enhancing the ability of Dams Sector-Specific Agency (SSA) partners to identify, prepare, and protect against potential threats. The U.S. Department of Homeland Security (DHS) National Protection and Programs Directorate’s Office of Infrastructure Protection (NPPD/IP),which serves as the Dams Sector- Specific Agency (SSA), acknowledges the following members of the Dams Sector Threat Analysis Task Group who reviewed and provided input for this document: Jeff Millenor – Bonneville Power Authority John Albert – Dominion Power Eric Martinson – Lower Colorado River Authority Richard Deriso – Federal Bureau of Investigation Larry Hamilton – Federal Bureau of Investigation Marc Plante – Federal Bureau of Investigation Michael Strong – Federal Bureau of Investigation Keith Winter – Federal Bureau of Investigation Linne Willis – Federal Bureau of Investigation Frank Calcagno – Federal Energy Regulatory Commission Robert Parker – Tennessee Valley Authority Michael Bowen – U.S. Department of Homeland Security, NPPD/IP Cassie Gaeto – U.S. Department of Homeland Security, Office of Intelligence and Analysis Mark Calkins – U.S.
    [Show full text]
  • Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan
    ←ボックス隠してある Pakistan by Japan International Cooperation Agency (JICA) Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan Data Collection Survey ←文字上 / 上から 70mm on Infrastructure Improvement of Energy Sector in Pakistan by Japan International Cooperation Agency (JICA) Final Report Final Report February 2014 February 2014 ←文字上 / 下から 70mm Japan International Cooperation Agency (JICA) Nippon Koei Co., Ltd. 4R JR 14-020 ←ボックス隠してある Pakistan by Japan International Cooperation Agency (JICA) Data Collection Survey on Infrastructure Improvement of Energy Sector in Islamic Republic of Pakistan Data Collection Survey ←文字上 / 上から 70mm on Infrastructure Improvement of Energy Sector in Pakistan by Japan International Cooperation Agency (JICA) Final Report Final Report February 2014 February 2014 ←文字上 / 下から 70mm Japan International Cooperation Agency (JICA) Nippon Koei Co., Ltd. 4R JR 14-020 Data Collection Survey on Infrastructure Improvement of Energy Sector in Pakistan Final Report Location Map Islamabad Capital Territory Punjab Province Islamic Republic of Pakistan Sindh Province Source: Prepared by the JICA Survey Team based on the map on http://www.freemap.jp/. February 2014 i Nippon Koei Co., Ltd. Data Collection Survey on Infrastructure Improvement of Energy Sector in Pakistan Final Report Summary Objectives and Scope of the Survey This survey aims to collect data and information in order to explore the possibility of cooperation with Japan for the improvement of the power sector in Pakistan. The scope of the survey is: Survey on Pakistan’s current power supply situation and review of its demand forecast; Survey on the power development policy, plan, and institution of the Government of Pakistan (GOP) and its related companies; Survey on the primary energy in Pakistan; Survey on transmission/distribution and grid connection; and Survey on activities of other donors and the private sector.
    [Show full text]
  • Expanding Informality &Diminishing Wages 2011
    Labour Rights in Pakistan Expanding Informality &Diminishing Wages 2011 Pakistan Institute of Labour Education & Research 2 Labour Rights in Pakistan Advisor Karamat Ali Editor Zeenat Hisam Contributors Dr. Pervez Tahir Dr. Nadia Saleem Dr. Naheed Nabi Dr. Aly Ercelawn Yasmin Qureshi & Sameena Haidermota Altaf Hussain Nayyar Ahmed Siddiqui Design & Layout K.B. Abro First Published: December 2011 ISBN 978-969-9153-11-2 Printed at Print Vision Published by: Pakistan Institute of Labour Education & Research PILER Centre ST-001, Sector X, Sub-Sector V, Gulshan-e-Maymar Karachi 75340 Pakistan 3 Labour Rights in Pakistan Contents Foreword 5 Section One 1. Introduction 9 The Year of the Disaster War on Terror Legislative Changes Economic Overview Labour Force participation and Employment Structure Labour Force Indicators at a Glance 2. Labour Struggles 2010-22011 15 Informal Sector Ship Breaking Industry Fisheries Power Looms Formal (Public) Sector PTCL KESC Lady Health Workers Formal Private Sector Coca Cola Beverages Pakistan Ltd. 3. The Floods 2010: Impact on Vulnerable Lives and Livelihoods 23 Attribution and the Affected Government Response and the Gaps The Displaced Population Meagre Incomes, Poor Livelihoods Social Deprivation and Insecurity Section Two Special Articles 1. Economy and Labour Dr. Pervez Tahir 29 2. Emerging Shape of Labour Market and Women Dr. Nadia Saleem 39 3. Occupational Health and Safety in the Brick Kilns of Shahdadpur Dr. Naheed Nabi 57 4. Rural Workers and Residential Land Entitlement Altaf Hussain 65 5. Women in the Fisheries Yasmin Qureshi & Sameena H. 73 6. Minimum Wage: Deficit in Decent Wage A. Ercelawn 85 7. The Devolved Course: Constitutional Reforms and the Status of Implementation of Labour Provisions Zeenia Shaukat 91 4 Labour Rights in Pakistan 5 Labour Rights in Pakistan Foreword Inequitable processes are unjust, whether across groups or generations.
    [Show full text]
  • Cro Ssro Ads Asia
    CROSSROADS 06 ASIA Conflict · · Development The Anxiety of Development Megaprojects and the Politics of Place in Gwadar, Pakistan Hafeez Jamali Working Paper Series Paper Working crossroads asia crossroads ISSN 2192-6034 Bonn, January 2013 Crossroads Asia Working Papers Competence Network Crossroads Asia: Conflict – Migration – Development Editors: Ingeborg Baldauf, Stephan Conermann, Anna-Katharina Hornidge, Hermann Kreutzmann, Shahnaz Nadjmabadi, Dietrich Reetz, Conrad Schetter and Martin Sökefeld. How to cite this paper: Jamali, Hafeez A. (2013): The Anxiety of Development: Mega-projects and the Politics of Place in Gwadar, Pakistan. In: Crossroads Asia Working Paper Series, No. 6. Partners of the Network: Imprint Competence Network Crossroads Asia: Conflict – Migration – Development Project Office Center for Development Research/ZEFa Department of Political and Cultural Change University of Bonn Walter-Flex Str. 3 D-53113 Bonn Tel: + 49-228-731722 Fax: + 49-228-731972 Email: [email protected] Homepage: www.crossroads-asia.de 1 The Anxiety of Development: Mega-Projects and the Politics of Place in Gwadar, Pakistan Hafeez Ahmed Jamali1 Table of Contents Abstract ......................................................................................................................................................... 3 1. Introduction .......................................................................................................................................... 4 2. Anxiety of Development ......................................................................................................................
    [Show full text]
  • Performance Audit Report on Mirani Dam Project, Turbat
    PERFORMANCE AUDIT REPORT ON MIRANI DAM PROJECT, TURBAT AUDIT YEAR 2016-17 AUDITOR GENERAL OF PAKISTAN PREFACE Articles 169 and 170 of the Constitution of the Islamic Republic of Pakistan, 1973 read with Sections 8 and 12 of the Auditor General’s (Functions, Powers, Terms and Conditions of Service) Ordinance, 2001 require the Auditor General of Pakistan to conduct audit of Expenditure and Receipts of Government of Pakistan. This Report is based on performance audit to examine the economy, efficiency and effectiveness aspects of Mirani Dam Project, Turbat for the period up to June, 2016. The Directorate General of Audit WAPDA conducted the performance audit of the Mirani Dam Project, Turbat during December, 2016 with a view to reporting significant findings to the relevant stakeholders. In addition, Audit also assessed, on the test check basis whether the management complied with applicable laws, rules and regulations in managing the Mirani Dam Project, Turbat. Audit findings indicate the need for taking specific actions to realize the objectives of the Mirani Dam Project, Turbat besides instituting and strengthening internal controls to avoid recurrence of violations and irregularities. Audit observations have been finalized in the light of discussion in the Departmental Accounts Committee (DAC) meeting. The Audit Report is submitted to the President in pursuance of the Article 171 of the Constitution of the Islamic Republic of Pakistan, 1973 for causing it to be laid before the both Houses of Majlis-e-Shoora [Parliament]. Sd/- Dated: 02 JUL 2018 Javaid Jehangir Islamabad Auditor General of Pakistan TABLE OF CONTENTS EXECUTIVE SUMMARY SECTIONS Page 1.
    [Show full text]
  • PAKISTAN WATER and POWER DEVELOPMENT AUTHORITY (April
    PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY (April 2011) April 2011 www.wapda.gov.pk PREFACE Energy and water are the prime movers of human life. Though deficient in oil and gas, Pakistan has abundant water and other energy sources like hydel power, coal, wind and solar power. The country situated between the Arabian Sea and the Himalayas, Hindukush and Karakoram Ranges has great political, economic and strategic importance. The total primary energy use in Pakistan amounted to 60 million tons of oil equivalent (mtoe) in 2006-07. The annual growth of primary energy supplies and their per capita availability during the last 10 years has increased by nearly 50%. The per capita availability now stands at 0.372 toe which is very low compared to 8 toe for USA for example. The World Bank estimates that worldwide electricity production in percentage for coal is 40, gas 19, nuclear 16, hydro 16 and oil 7. Pakistan meets its energy requirement around 41% by indigenous gas, 19% by oil, and 37% by hydro electricity. Coal and nuclear contribution to energy supply is limited to 0.16% and 2.84% respectively with a vast potential for growth. The Water and Power Development Authority (WAPDA) is vigorously carrying out feasibility studies and engineering designs for various hydropower projects with accumulative generation capacity of more than 25000 MW. Most of these studies are at an advance stage of completion. After the completion of these projects the installed capacity would rise to around 42000 MW by the end of the year 2020. Pakistan has been blessed with ample water resources but could store only 13% of the annual flow of its rivers.
    [Show full text]
  • Managing Director's Report
    2010 MANAGING DIRECTOR’S REPORT National Engineering Services Pakistan (Pvt) Limited CONTENTS Fields of Managing Activities Director's Services Message 3 2 4 Energy 6 Sector Water Resources Development 9 Sector Dam Engineering 12 Sector Transportation 14 Sector Environmental & Public Health 18 Engineering Sector Architecture & 21 Planning Sector Information Technology 24 & GIS Sector Oil, Gas & 28 Industrial Sector List of Selected New, 26 Ongoing & Completed Projects SERVICES Appraisals, Pre-feasibility & Feasibility Studies Reconnaissance Studies Preliminary Investigations Development of Alternative Proposals Outline Designs and Cost Estimates Evaluation of Technical & Economic Feasibilities Investigations Surveys & Mapping Geotechnical and Soil Investigations Hydrological and Environmental Surveys Traffic Surveys Data Analyses Determination of Design Parameters Deformation Monitoring of Structures Design Preliminary Designs and Costs Model Tests Computer Simulations Detailed Designs and Specifications Detailed Drawings Tender & Contract Documents Bill of Quantities, Cost Estimates & Schedules Tender Documents Prequalification of Contractors Evaluation of Tenders and Recommendations Contract Documents Construction Supervision & Contract Management Contract Coordination Progress Monitoring and Control Works Supervision and Quality Control Measurements Certification of Periodic Payments to Contractors Equipment Inspection and Commissioning Post-construction Services Completion Reports Operation & Maintenance Manuals Routine Maintenance
    [Show full text]
  • Senate Secretariat ————— “Questions
    Shoaib.M 0000(18) Senate. on PC-09 1 (273rd Session) SENATE SECRETARIAT ————— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the Senate to be held on Friday, the 23rd February, 2018 DEFERRED QUESTIONS (Questions Nos. 68, 78, 68, 69, 80, 84, 85, 89 and 91 deferred on 15th February, 2018) (Def.) *Question No. 68 Senator Dr. Jehanzeb Jamaldini: (Notice received on 22-11-2017 at 01:30 p.m.) Will the Minister for Water Resources be pleased to state whether it is a fact that Afghanistan is building Hydro Power projects on River Kabul, if so, its possible impacts on water situation in Pakistan and the steps being taken to tackle the same? Reply not received. (Def.) *Question No. 78 Senator Muhammad Talha Mahmood: (Notice received on 05-12-2017 at 09:00 a.m.) Will the Minister for Water Resources be pleased to state: (a) the estimated volume of flood water in the country which flow into the sea every year; and (b) whether there is any proposal under consideration of the Government to store the said water and use the same during the dry season, if so, the details thereof? Syed Javed Ali Shah: (a) The annual average volume of water which flow into the sea below Kotri Barrage is about 29.02 Million Acre Feet (MAF) 2 for the Post Tarbela (1976 onward) Period. The detailed data is enclosed as Annex-I. (b) WAPDA has prepared a comprehensive plan to store water during high flow season and utilize the same during lean season.
    [Show full text]