Managing Director's Report

Total Page:16

File Type:pdf, Size:1020Kb

Managing Director's Report 2010 MANAGING DIRECTOR’S REPORT National Engineering Services Pakistan (Pvt) Limited CONTENTS Fields of Managing Activities Director's Services Message 3 2 4 Energy 6 Sector Water Resources Development 9 Sector Dam Engineering 12 Sector Transportation 14 Sector Environmental & Public Health 18 Engineering Sector Architecture & 21 Planning Sector Information Technology 24 & GIS Sector Oil, Gas & 28 Industrial Sector List of Selected New, 26 Ongoing & Completed Projects SERVICES Appraisals, Pre-feasibility & Feasibility Studies Reconnaissance Studies Preliminary Investigations Development of Alternative Proposals Outline Designs and Cost Estimates Evaluation of Technical & Economic Feasibilities Investigations Surveys & Mapping Geotechnical and Soil Investigations Hydrological and Environmental Surveys Traffic Surveys Data Analyses Determination of Design Parameters Deformation Monitoring of Structures Design Preliminary Designs and Costs Model Tests Computer Simulations Detailed Designs and Specifications Detailed Drawings Tender & Contract Documents Bill of Quantities, Cost Estimates & Schedules Tender Documents Prequalification of Contractors Evaluation of Tenders and Recommendations Contract Documents Construction Supervision & Contract Management Contract Coordination Progress Monitoring and Control Works Supervision and Quality Control Measurements Certification of Periodic Payments to Contractors Equipment Inspection and Commissioning Post-construction Services Completion Reports Operation & Maintenance Manuals Routine Maintenance and Safety Inspections Performance Monitoring Specialised Services Inspection of Dams & Barrages Development of Building Codes Asset Valuation 2 FIELDS OF ACTIVITIES Water Resources Planning, Drainage, Salinity Control and Land Reclamation, Dams and Barrages, Irrigation Systems, Agriculture Development and Allied Fields, Groundwater Resources Development, Flood Management and Forecasting/Warning Systems, Institutional and Social Development Power Transmission and Distribution, Substations, Hydropower, Thermal Power, Nuclear Power, Rural Electrification, SCADA and Telecommunications, Oil & Gas, Heating, Ventilation and Air-conditioning Motorways, Highways, Urban Roads, Rural Roads, Grade Separated Interchanges, Bridges & Flyovers, Subways & Underpasses, Tunnels Geotechnical, Geo-environmental, Geohazards, Site Investigations, Geological Characterisation, Geophysical Surveys, Construction Materials, Liquefaction Analysis, Seismic Risk Evaluation, Hazard Microzonation, Ground Improvement, Deep Excavation Support Systems Airport Terminal Buildings, Hangars, Runways, Taxiways, Air Traffic Control Towers Deep Seaports, Fish Harbours, Marine Terminals, Container Terminals, Inland River Navigation, Marine Jetties Healthcare Buildings, Educational Buildings, High-rise Buildings, Office Buildings, Sports Facilities, Industrial Buildings, Low-cost Housing, Residential Communities, Urban Planning, Slum Upgradation, Landscaping, Interior Design Water Supply, Sewerage, Stormwater Drainage, Solid Waste Management, Plumbing, Water and Waste Water Treatment Site Characterisation/Baseline Data for Environmental Impact Assessment, Environmental Risk Assessment, Environmental Planning and Management, Environmental Health & Safety, Air and Noise Pollution Control, Contaminated Site Assessment and Mitigation, Environmental Audit Steel Mills, Automobile Plants, Cement Plants, Fertilizer Plants, Polyester Plants, Sugar Plants, Textile Units Business Process Re-engineering, Management Information System, Database Applications, Web Portals, Data Ware Housing, Data Conversion, Networking and Data Centres, Satellite Imagery Processing, Digital Terrain Modelling, GPS Survey, GIS Development, Map Digitisation, Analyses and Production Land Surveying, Cadastral Surveying, Hydrographic Survey, Geodetic Survey, Deformation Studies, Surveying Services during Construction Supervision 3 MessageMANAGING DIRECTOR'S ESPAK started its journey 38 years ago, and there was no looking back in Nterms of growth and development. It offers a broad spectrum of services in the realm of engineering consultancy ranging from energy to environment as well as information technology. NESPAK has always remained in the forefront, showing steady growth at home and abroad. By the grace of God, the Company has emerged successful in the ventures it has been engaged, both in the public and private sectors. In the years behind us, NESPAK saw several ups and downs in its business acquisition and implementation of projects. Through the years, it nevertheless rose to the challenges it came across and continues to move ahead. NESPAK made record progress during 2009-2010 by acquiring projects worth Rs. 10.16 billion compared to the last year's business of Rs. 6.5 billion, showing an increase of more than 56 percent. It acquired 101 new projects at home and abroad amid tough national and international competition. Major projects acquired in foreign countries include dams in southern region of Saudi Arabia, transmission of water from Khulais and Rabigh dams to Jeddah in Makkah Al-Mukarramah region, upgradation of roads and distribution network in Oman, three sports clubs in Qatar and an irrigation/drainage project in Ethiopia. NESPAK remained actively involved in reconstruction activities in Afghanistan as construction work progressed on projects in the health and education sectors. The major projects acquired in Pakistan during the year include West Bank Bypass Project Muzaffarabad, Quick Impact Projects FATA, Prime Minsiter's Southern Punjab Water Supply and Sewerage Schemes Multan, Transmission Scheme for dispersal of power from Neelum-Jhelum Hydropower Project, 500 kV transmission line 3rd circuit Jamshoro-Moro-Dadu-Rahim Yar Khan and Moro Substation projects. Strict quality assurance has always been the hallmark of NESPAK. During the year, audit reports were generated after internal audits were executed through the Internal Quality Audit Programme at all NESPAK divisions/offices. Surveillance audits were 4 carried out by the lead auditor of Moody International at NESPAK's Lahore, Karachi and Islamabad offices. NESPAK was issued the new standard and the UKAS (United Kingdom Accreditation Services) Certificate by Moody International for three years. NESPAK is an icon of precision and engineering excellence and it applies the same throughout the broad spectrum of its consultancy services. Our strength lies in our professional staff. Specialised training programmes are regularly held to enhance professional capabilities of the employees. NESPAK Human Resource Division organised a series of courses/lectures on technical, managerial and support competencies during 2009-2010 at Lahore, Karachi and Islamabad, imparting training to 527 employees. As many as 88 courses were conducted on project management, monitoring & evaluation, assertive client handling, problem solving and decision making. For support competencies, courses on thinking skills, presentation skills, technical report writing, leadership and conflict resolution were arranged. NESPAK believes in quality work and meeting timelines for the projects in hand. NESPAK's performance in the earthquake-hit areas has been commendable, where it continues to play its role in the reconstruction of the projects worth Rs. 15. 7 billion. NESPAK is committed to its clients and staff and we cherish the core values of integrity, respect and teamwork. In the service of its clients, NESPAK pursues the highest standards of professionalism, being open to new technologies and acting decisively and consistently. In my second year as Managing Director, I reiterate my goal to maintain the positive and nurturing environment within NESPAK, keeping an open door policy, striving towards the path of sustainable growth and the general well-being of its employees. Asad I. A. Khan President & Managing Director 5163 4546 1200 1000 800 3391 600 400 200 405 2570 2009 2010 2008 474 2007 2006 2022 2006 2007 878 2008 2009 3000 1000 2000 4000 5000 2010 2010 2009 1135 2008 2007 2006 10161 2000 1034 4000 6525 6000 5527 4383 5130 8000 10000 12000 5 ESPAK is providing technical, block in Pakistan – the 747 MW ENERGY Nfinancial and environmental Combined Cycle Power Plant Guddu, advice on all aspects of power costing Rs 50.6 billion. The contract for generation, transmission and design, equipment supply, installation, distribution system on the projects of testing and commissioning has already national importance to combat the been signed by the CPGCL with M/s SECTOR unprecedented power crisis prevailing Harbin Power Engineering, China. in the country. During the year, NESPAK acquired 10 new projects NESPAK has been engaged by the worth Rs. 380 billion (US$ 4.5 billion) Punjab Irrigation and Power with the Riyadh Power Plant No. 10 in Department for feasibility studies for Saudi Arabia being the highlight of the small hydel power stations at 10 sites Company's business. under the Punjab irrigation system. A US$ 500 million (Rs. 41.6 billion) loan New projects: The Central Power has been negotiated with the Asian Generation Company Limited Development Bank for the Renewable (CPGCL) has hired a NESPAK-led Energy Development Sector joint venture for providing design Programme for which NESPAK has review and construction supervision already completed ranking of sites. services for the largest combined cycle NESPAK signed a contract with National Transmission & Despatch Company (NTDC) for the Rs. 25 billion 500kV Transmission Line 3rd Circuit Jamshoro-Moro-Dadu
Recommended publications
  • PAKISTAN WATER and POWER DEVELOPMENT AUTHORITY (April
    PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY (April 2011) April 2011 www.wapda.gov.pk PREFACE Energy and water are the prime movers of human life. Though deficient in oil and gas, Pakistan has abundant water and other energy sources like hydel power, coal, wind and solar power. The country situated between the Arabian Sea and the Himalayas, Hindukush and Karakoram Ranges has great political, economic and strategic importance. The total primary energy use in Pakistan amounted to 60 million tons of oil equivalent (mtoe) in 2006-07. The annual growth of primary energy supplies and their per capita availability during the last 10 years has increased by nearly 50%. The per capita availability now stands at 0.372 toe which is very low compared to 8 toe for USA for example. The World Bank estimates that worldwide electricity production in percentage for coal is 40, gas 19, nuclear 16, hydro 16 and oil 7. Pakistan meets its energy requirement around 41% by indigenous gas, 19% by oil, and 37% by hydro electricity. Coal and nuclear contribution to energy supply is limited to 0.16% and 2.84% respectively with a vast potential for growth. The Water and Power Development Authority (WAPDA) is vigorously carrying out feasibility studies and engineering designs for various hydropower projects with accumulative generation capacity of more than 25000 MW. Most of these studies are at an advance stage of completion. After the completion of these projects the installed capacity would rise to around 42000 MW by the end of the year 2020. Pakistan has been blessed with ample water resources but could store only 13% of the annual flow of its rivers.
    [Show full text]
  • Climate Change Profile of Pakistan
    Climate Change Profi le of Pakistan Catastrophic fl oods, droughts, and cyclones have plagued Pakistan in recent years. The fl ood killed , people and caused around billion in damage. The Karachi heat wave led to the death of more than , people. Climate change-related natural hazards may increase in frequency and severity in the coming decades. Climatic changes are expected to have wide-ranging impacts on Pakistan, a ecting agricultural productivity, water availability, and increased frequency of extreme climatic events. Addressing these risks requires climate change to be mainstreamed into national strategy and policy. This publication provides a comprehensive overview of climate change science and policy in Pakistan. About the Asian Development Bank ADB’s vision is an Asia and Pacifi c region free of poverty. Its mission is to help its developing member countries reduce poverty and improve the quality of life of their people. Despite the region’s many successes, it remains home to a large share of the world’s poor. ADB is committed to reducing poverty through inclusive economic growth, environmentally sustainable growth, and regional integration. Based in Manila, ADB is owned by members, including from the region. Its main instruments for helping its developing member countries are policy dialogue, loans, equity investments, guarantees, grants, and technical assistance. CLIMATE CHANGE PROFILE OF PAKISTAN ASIAN DEVELOPMENT BANK 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines ASIAN DEVELOPMENT BANK www.adb.org Prepared by: Qamar Uz Zaman Chaudhry, International Climate Technology Expert ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2017 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2444 www.adb.org Some rights reserved.
    [Show full text]
  • Development Expenditure (Volume-IV) Budget Estimates 2021-22
    For Departmental use only FEDERAL BUDGET 2021–2022 DETAILS OF DEMANDS FOR GRANTS AND APPROPRIATIONS Development Expenditure (Volume-IV) Budget Estimates 2021-22 Government of Pakistan Finance Division Islamabad PART III - DEVELOPMENT EXPENDITURE A - DEVELOPMENT EXPENDITURE ON REVENUE ACCOUNT : I - CABINET SECRETARIAT - PAGES 86 Development Expenditure of Cabinet Division 2403 87 Development Expenditure of Aviation Division 2407 88 Development Expenditure of Establishment Division 2417 89 Development Expenditure of Poverty Alleviation and Social Safety Division 2420 90 Development Expenditure of SUPARCO 2423 II - CLIMATE CHANGE, MINISTRY OF - 91 Development Expenditure of Climate Change Division 2431 III - COMMERCE, MINISTRY OF - 92 Development Expenditure of Commerce Division 2437 IV - COMMUNICATIONS, MINISTRY OF - 93 Development Expenditure of Communications Division 2443 V - DEFENCE, MINISTRY OF - 94 Development Expenditure of Defence Division 2449 95 Development Expenditure of Survey of Pakistan 2456 VI - DEFENCE PRODUCTION, MINISTRY OF - 96 Development Expenditure of Defense Production Division 2461 VII - ENERGY, MINISTRY OF - 97 Development Expenditure of Power Division 2465 (i) VIII - FEDERAL EDUCATION, PROFESSIONAL TRAINING, PAGES NATIONAL HERITAGE AND CULTURE, MINISTRY OF - 98 Development Expenditure of Federal Education and Professional Training Division 2475 99 Development Expenditure of Higher Education Commission (HEC) 2490 100 Development Expenditure of National Vocational & Technical Training Commission (NAVTTC) 2527 101
    [Show full text]
  • Public Sector Development Programme 2020-21
    GOVERNMENT OF PAKISTAN PUBLIC SECTOR DEVELOPMENT PROGRAMME 2020-21 PLANNING COMMISSION MINISTRY OF PLANNING, DEVELOPMENT & SPECIAL INITIATIVES June, 2020 WATER RESOURCES DIVISION (Rupees Million) G.Sl. Name of Project Approval Estimated Cost Expenditure Throw- Allocation 2020-21 No. Status Total Foreign upto forward Foreign Rupee Total Aid 30.06.2020 01.07.2020 Aid 1 2 3 4 5 6 7 8 9 10 Hydel Projects On-going Schemes: 927 Chitral Hydel Power Station Capacity CDWP 2188.835 567.111 10.000 2178.835 60.000 63.000 123.000 Enhancement From 1 MW to 5 MW 08.03.2017 928 Dargai Hydroelectric Power Station ECNEC 4050.364 2284.888 70.000 3980.364 30.000 90.000 120.000 Rehabilitation & Capacity Enhancement 14.11.2018 from 20 to 22 MW 929 Dasu Hydro Power Project Stage-I (2160 ECNEC 510980.200 218547.500 126203.202 384776.998 4500.000 75559.000 80059.000 MW) (District Kohistan, Khyber 07.11.2019 Pakhtunkhwa) 930 Establishment of Pakistan Glacier CDWP 891.780 681.050 295.842 595.938 70.000 130.000 200.000 Monitoring Network Upper Indus Basin 08.06.2016 Area Falling within KPK, Gilgit Baltistan, and Azad Jammu & Kashmir 931 Ghazi Barotha Hydropower Project CDWP 112.000 0.000 11.000 101.000 0.000 101.000 101.000 (Feasibility) 06.08.2019 932 Golen Gol Hydro Power Project (106 MW) ECNEC 29077.173 10679.880 37223.645 -8146.472 400.000 588.000 988.000 (Chitral) 30.09.2016 933 Keyal Khawar Hydro Power Project, ECNEC 26084.178 26084.178 4104.223 21979.955 680.000 678.000 1358.000 Khyber Pakhtunkhwa, (Kohistan) (128 29.01.2016 MW) 934 Mangla Hydropower Training
    [Show full text]
  • Annual Plan 2019-20 of 12Th Five Year Plan (2018-23) Is Very Challenging
    ANNUAL PLAN 2019-20 Table of Contents No. Contents Page No. Foreword iii Review Committee v Executive Summary vii Abbreviations and Acronyms xix Part I: Economic Recovery to Inclusive and Sustainable Growth 1 1. Economic Framework-Growth, Investment and Savings 3 2. Balance of Payments 13 3. Fiscal, Monetary and Capital Market Development 25 4. Public Sector Development Programme (PSDP) 35 5. Food Security and Agriculture Development 45 6. Manufacturing, Mineral and Commerce Sectors 57 7. Information & Communication Technology 63 8. Population 69 9. School and College Education 75 10. Higher Education 79 11. Science and Technology 87 12. Health 93 13. Nutrition 105 14. Labour, Employment and Skill Development 111 15. Mass Media, Culture & National Heritage 119 16. Energy 127 17. Water Resources Development 147 18. Transport and Logistics 153 19. Physical Planning & Housing 161 20. Poverty Alleviation and Achieving SDGs 163 21. Social Welfare- Inclusion of Vulnerable Groups 171 22. Gender and Women Empowerment 175 23. Religious Pluralism and Interfaith Harmony 179 24. Governance and Institutional Reforms 181 Part II: Special Areas of Focus 189 25. Balanced Development – Focus on the Less Developed Regions 191 26. Climate Change and Environment 199 FOREWORD The Annual Plan 2019-20 of 12th Five Year Plan (2018-23) is very challenging. It is first year of the present government which is committed to put Pakistan on sustainable and inclusive economic growth trajectory. In pursuance of its agenda, the government has already taken various urgent Fiscal and External sectors measures to stabilize the economy. In addition, Extended Financing Facility (EFF) with the IMF has already been concluded for providing support to the reform program and seek assistance from WB and ADB to build fundamentals of the economy.
    [Show full text]
  • Emerging Phenomenon of Un-Timely Rain Floods in Sindh and Ways to Mitigate Their Damaging Effects
    Symposium on “Emerging Phenomenon of Untimely Rains / Floods – 2011 in Pakistan” EMERGING PHENOMENON OF UN-TIMELY RAIN FLOODS IN SINDH AND WAYS TO MITIGATE THEIR DAMAGING EFFECTS By Jam Mitha Khan1 1. INTRODUCTION It is anticipated that the change of global weather conditions particularly in Pakistan, would cause untimely rains / floods in coming years. The example of super flood 2010 in river Indus and unprecedented rain falls during 2011 is a paradigm like a mirror before us. No doubt, province of Sindh has sustained enormous physical / financial losses during super flood 2010 and succeeding unprecedented rainfall during 2011, which caused death blow to the economy of Sindh which is called ‘bread basket’ of Pakistan. What happened in the past is history but there is dire need to proceed ahead for better planning and foolproof management to avert such damaging and devastating situation in future, so much so that if at all we can not be able to overcome upon the whole disaster, we should confine at least to minimize the losses. The floods in Sindh Province can be categorized in following three (3) groups: (i) Floods in River Indus (ii) Rainstorm and cyclone floods in coastal belt and central area (iii) Flash floods of hill torrents emerging from the catchment areas of mountainous range on right side of Indus The major contributing factor in all above type of floods is heavy rains, but each type posses its distinct problem and specific geographical effect. Each type of flood can be controlled and mitigated by its own structural and non-structural remedial measures.
    [Show full text]
  • Public Sector Development Programme 2021-22
    GOVERNMENT OF PAKISTAN PUBLIC SECTOR DEVELOPMENT PROGRAMME 2021-22 PLANNING COMMISSION MINISTRY OF PLANNING, DEVELOPMENT & SPECIAL INITIATIVES June, 2021 PREFACE Public Sector Development Programme (PSDP) is an important policy instrument aiming to achieve sustainable economic growth and socioeconomic objectives of the government. The outgoing fiscal year PSDP was made with a particular focus on strengthening the health sector and creating economic opportunities to combat widespread disruptions caused by COVID-19 pandemic. As a result of efficient and well-coordinated management of the pandemic, the economy showed signs of recovery and economic growth stood at 3.94% during FY 2020-21. In the upcoming year 2021-22, the priority of the Government is to further spur economic activities. Therefore, the PSDP in 2021-22 has been enhanced by 38% from Rs 650 billion in FY 2020-21 to Rs. 900 billion (including foreign aid of Rs 100 billion). The focus of PSDP 2021-22 is on improving transport and communication facilities with special emphasis on inter-provincial and regional connectivity, investment on building large dams and water conservation systems as per the National Water Policy, augmenting and strengthening health sector infrastructure and service delivery, improving access to higher education, social protection, increasing employment and livelihood opportunities, reducing regional disparities, mitigating effects of climate change, building knowledge economy, enhancing agricultural productivity & ensuring food security and supporting Public Private Partnership initiatives through providing Viability Gap funding. Special Development Packages have been initiated under the Regional Equalization Programme to ensure the development of the deprived areas to bring them at par with other developed regions of the country.
    [Show full text]
  • 1 (4Th Session) NATIONAL ASSEMBLY SECRETARIAT
    1 (4th Session) NATIONAL ASSEMBLY SECRETARIAT ————— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the National Assembly to be held on Thursday, the 29th August, 2013 (Originally Starred Question Nos. 77, 84, 85, 90, 93, 94, 100 and 101 were set down for answer on 21-08-2013) 77. *Dr. Azra Fazal Pechuho: Will the Minister for Water and Power be pleased to state the year- wise total amount of funds utilized during the last five years for the up-gradation of transmission lines and transformers under the various DISCOS alongwith the details of works completed during the said period? Minister for Water and Power (Khawaja Muhammad Asif): The requisite information received from DISCOs is at Annex-A. Annex-A Funds Utilized For Upgradation of Transmission Lines and Transformers (Million Rs.) ——————————————————————————————————————————— Disco’s 2008-09 2009-10 2010-11 2011-12 2012-13 Total ——————————————————————————————————————————— LESCO 1936.100 2922.000 2277.900 1105.450 1996.000 10237,450 GEPCO 1699.782 1244.540 782.609 1868.880 1855.632 7451.443 MEPCO 1017.000 2150.000 2331.000 2025.000 4400.000 11923.000 FESCO 554.189 971.687 923.979 679.323 692.634 3821.812 IESCO 1137.319 352.124 2908.474 1178.599 1526.389 7102.905 PESCO 384.730 124.640 661.308 1008.499 — 2179.177 TESCO — 233.211 40.000 — 70.000 343.211 HESCO 1110.996 1118.580 1223.000 571.280 667.670 4691.526 SEPCO — — 292.000 330,000 241.000 863.000 QESCO 1090.532 662.816 2113.817 1788.705 808.437 6464.307 ——————————————————————————————————————————— Total 8930.648 9779.598 13554.087 10555.736 12257.762 55077.831 ——————————————————————————————————————————— 2 84.
    [Show full text]
  • Rainflood August 2020 Report.Cdr
    Heavy rain, winds and thundershowers badly heavy rains played havoc in the province and affected 20 districts in Sindh province. damaging public and private property. Government of Sindh declared 20 Districts as Calamity affected areas. In pernent to this, the Sindh government issued noficaon for, fresh data shows that major damage has been “Sindh government has declared 20 districts of caused by heavy rains and the precauonary Sindh to be calamity affected under the Sindh steps have been taken by the relevant Calamies Act of 1958. departments to migate further destrucon in these areas. Thousands of people are in urgent need of assistance due to lack of food and safe drinking Torrenal monsoon rains have pounded water, as well as the loss of livelihoods and southern Pakistan, triggering serious flooding homes. and heavy rain affecng many people of Sindh. The many people displaced, destroyed or Sindh is by far the worst affected province, with damaged large number of their houses and torrenal rains in the hardest hit areas having flooded million acres of culvated land. led to rainfall exceeding, in a few days, what on average accumulates in an enre monsoon Sindh government has declared Karachi, season. The Government reports 20 districts of Hyderabad, Mirpurkhas and Shaheed Benazir Sindh are affected. Abad as calamity-hit areas aer five spells of TRDP is working in Dadu, Jamshoro, Tando In the evening of Friday August 7, 2020, the most Allahyar, Umerkot, Mirpurkhas and Tharparkar. of area of Taluka Johi was submerged due to Dadu district faces mul-hazard disasters like rainwater flooding and breaches in the Nai Gaj flash/riverine floods on the one hand and severe river.
    [Show full text]
  • 1 (47Th Session) NATIONAL ASSEMBLY SECRETARIAT
    1 (47th Session) NATIONAL ASSEMBLY SECRETARIAT ————— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the National Assembly to be held on Wednesday, the 14th November, 2012 (Originally Starred Question Nos. 45, 47, 52, 54, 55 and 59 were set down for answer during the 46th Session) 45. *Ms. Khalida Mansoor: Will the Minister for Production be pleased to state whether it is a fact that the government has made a new plan to make Pakistan Steel Mills, Karachi profitable during the year 2012-13; if so, the details thereof? Minister for Production (Mr. Anwar Ali Cheema): The Government is striving hard to pull out Pakistan Steel Mills from losses and to make it profitable. In this regard CCOR in its meeting held on 28th June 2012 under the Chairmanship of Dr. Abdul Hafeez Shaikh resolved to revitalize and develop PSM into profitable entity. In the afore said meeting Pakistan Steel Mills submitted a business plan based on 63% capacity utilization for the year 2012-13. It was agreed to plan/ achieve average capacity utilization of 50% to 55% for the year 2012-13, following a more flatter trajectory for revival. The ECC in its meeting held on 24th July, 2012, while endorsing the above recommendations of CCOR approved funding requirement for the PSM as under: 2 Rupees in Million —————————————————————————————— Month of Term Loan Markup Total Disbursement from NBP free loan from GoP —————————————————————————————— July 2012* 3,800 300 4,100 October 2012 5,050 300 5,350 January 2013 2,600 400 3,000 April 2013 2,150 — 2,150 —————————————————————————————— Total: 13,600 1,000 14,600 —————————————————————————————— *Rs.
    [Show full text]
  • Construction of Large and Medium Dams for Sustainable Irrigated Agriculture and Environmental Protection
    World Environment Day June-2012 61 CONSTRUCTION OF LARGE AND MEDIUM DAMS FOR SUSTAINABLE IRRIGATED AGRICULTURE AND ENVIRONMENTAL PROTECTION By Irshad Ahmad1, Dr. Allah Bakhsh Sufi2, Shahid Hamid3 and Wassay Gulrez4 Abstract: Pakistan is suffering from drought conditions since year 2000 till June 2010, due to which reduction in river discharges and lesser rains occurred. The reliance on ground water increased remarkably and extensive pumping was observed during the period. To integrate the available surface water in the system, a series of dams are needed, in a cascading manner for adequate storage as well as flood regulation and which also provide more hydel generation of cheap energy for reducing load-shedding. The catastrophic floods of 2010 critically focused the need of large reservoirs to minimize flood damages to human life, crops, buildings, roads as well as environmental hazards. In using natural resources, agriculture can create good and bad environmental outcomes. The storages and water regulations will enhance agriculture benefits if at the same time reduction of water losses from water conveyance system are also properly managed. 1. Introduction Water is the essential component both for the existence of mankind and for the sustainable country’s economic growth and environment protection is the key to the suitable development of water resources. Today emphasis on proper and balanced utilization of available water resources is more than ever before. Pakistan is suffering from drought conditions since year 2000 till June 2010, due to which reduction in river discharges and lesser rains occurred. The average annual flow across the rivers is 138 MAF. The average escapage below Korti is 31.35 MAF (1976-2011), whilst downstream Kotri requirement is only 8.6 MAF, also considering the raising of Mangla dam and future usage by India, there is still 17.81 MAF water available for future development.
    [Show full text]
  • Psdp 2010-2011
    WATER & POWER DIVISION (WATER SECTOR) 0.823109275 (Million Rupees) Sl. Name, Location & Status of the Estimated Cost Expenditure Throw- Allocation for 2010-11 Allocation for 2011-12 Allocation for 2012-13 No Scheme Total Foreign upto June forward as on Foreign Loan Rupee Total Total Foreign Total Foreign Loan 2010 01-7-10 Loan Loan 1 2 3 4 5 6 7 8 9 10 11 12 13 On-going Schemes 1 Raising of Mangla Dam including 62553.000 0.000 78535.030 0.000 0.000 2469.328 2469.328 2469.328 0.000 0.000 0.000 resettlement 2 Mirani Dam 5861.000 0.000 4993.980 867.020 0.000 82.311 82.311 82.311 0.000 0.000 0.000 3 Sabakzai Dam Project 1960.820 0.000 1588.990 371.830 0.000 82.311 82.311 82.311 0.000 0.000 0.000 4 Satpara Multipurpose Dam 4480.020 554.680 2545.715 1934.305 0.000 164.622 164.622 164.622 0.000 200.000 0.000 5 Gomal Zam Dam 12829.000 4964.000 5431.380 7397.620 0.000 823.109 823.109 823.109 0.000 3000.000 0.000 6 Greater Thal Canal (Phase - I) 30467.000 0.000 8652.440 21814.560 0.000 200.000 200.000 740.798 0.000 1500.000 0.000 7 Kachhi Canal (Phase - I) 31204.000 0.000 23589.180 7614.820 0.000 2263.551 2263.551 2263.551 0.000 4000.000 0.000 8 Rainee Canal (Phase - I) 18861.580 0.000 8930.960 9930.620 0.000 1810.840 1810.840 1810.840 0.000 3000.000 0.000 9 Lower Indus Right Bank Irrigation & 14707.000 0.000 11783.080 2923.920 0.000 658.487 658.487 658.487 0.000 400.000 0.000 Drainage, Sindh 10 Balochistan Effluent Disposal into RBOD.
    [Show full text]