Rainflood August 2020 Report.Cdr
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Pdf | 951.36 Kb
P a g e | 1 Operation Updates Report Pakistan: Monsoon Floods DREF n° MDRPK019 GLIDE n° FL-2020-000185-PAK Operation update n° 1; Date of issue: 6/10/2020 Timeframe covered by this update: 10/08/2020 – 07/09/2020 Operation start date: 10/08/2020 Operation timeframe: 6 months; End date: 28/02/2021 Funding requirements (CHF): DREF second allocation amount CHF 339,183 (Initial DREF CHF 259,466 - Total DREF budget CHF 598,649) N° of people being assisted: 96,250 (revised from the initially planned 68,250 people) Red Cross Red Crescent Movement partners currently actively involved in the operation: IFRC Pakistan Country Office is actively involved in the coordination and is supporting Pakistan Red Crescent Society (PRCS) in this operation. In addition, PRCS is maintaining close liaison with other in-country Movement partners: International Committee of the Red Cross (ICRC), German Red Cross (GRC), Norwegian Red Cross (NorCross) and Turkish Red Crescent Society (TRCS) – who are likely to support the National Society’s response. Other partner organizations actively involved in the operation: National Disaster Management Authority (NDMA), Provincial Disaster Management Authorities (PDMAs), District Administration, United Nations (UN) and local NGOs. Summary of major revisions made to emergency plan of action: Another round of continuous heavy rains started in most part of the country on the week of 20 August 2020 until 3 September 2020 intermittently. The second round of torrential rains caused urban flooding in the Sindh province and flash flooding in Khyber Pakhtunkhwa (KP). New areas have been affected by the urban flooding including the districts of Malir, Karachi Central, Karachi West, Karachi East and Korangi (Sindh), and District Shangla, Swat and Charsadda in Khyber Pakhtunkhwa. -
Autobiography of M H Panhwar
CONTENTS NO. TITLE PAGE NO. INTRODUCTION 1 1. MY MATERNAL GRAND FATHER’S HOUSE, MY BIRTH PLACE AND THE SPOT WHERE I WAS BORN. 4 2. LOOKING AT SKIES AT NIGHT. 7 3. THE LAST JOURNEY OF SALEH, THE FATHER OF MY MATERNAL GRANDFATHER AHMED 8 4. USE OF LEFT HAND FOR EATING FOOD. 10 5. HUBBLE-BUBBLE. 11 6. MY VILLAGE. 12 7. HEALTH CARE IN THE VILLAGE. 16 8. VISITORS TO THE VILLAGE. 19 9. MY ANCESTORS. 20 10. MY GREAT GRAND MOTHER. 24 11. MY GRAND FATHER. 25 12. MY FATHER. 27 13. HOONDA WILL YOU EAT BEEF. 30 14. COBRA BITES MY UNCLE. 32 15. MY BUJKI. 35 16. DEVELOPING OF READING HABIT. 36 17. I WILL GROW ONLY FRUIT TREES. 41 18. KHIRDHAHI AND AIWAZSHAH GRAVEYARD. 43 19. GETTING SICK, QUACKS, HAKIMS, VACCINATORS AND DOCTORS. 46 20. MUHAMMAD SALEH PANHWAR’S CONTRIBUTION TO UPLIFT OF VILLAGE PEOPLE 50 21. A VISIT TO THE INDUS. 54 22. I WILL NEVER BE AN ORPHAN. 60 23. MY GRANDFATHER’S AGRICULTURE. 70 24. OUR PIRS OF KHHIYARI SHARIF. 73 25. MOSQUE OF THE VILLAGE. 76 26. THE DRAG LINE OR EXCAVATOR 79 27. DOOMSDAY OR QAYAMAT IS COMING - A PREDICTION 81 28. SEPARATION OF SINDH FROM BOMBAY PRESIDENCY 84 29. IN SEARCH OF CALORIES AND VITAMINS 86 30. OUR POULTRY 91 31. OUR VILLAGE CARPENTER 93 32. OUR VILLAGE SHOEMAKER 95 33. BOOK SHOP AT MAKHDOOM BILAWAL 99 34. WALL MOUNTED MAPS AND CHARTS IN SCHOOL 102 35. WELL IN THE VILLAGE “EUREKA” 104 36. OUR VILLAGE POTTER 108 37. -
Table of Contents
TABLE OF CONTENTS 1. Introductionp. 1 2. Political developments since early 1992p. 1 3. Amnesty International's work on torture, deaths in custody, extrajudicial executions and "disappearances" in Pakistan since 1991p. 3 4. Methods of torture employed in Pakistanp. 4 4.1 Rape in custodyp.10 5. Deaths in custody, extrajudicial executions and "disappearances"p.13 6. Reasons for the use of torture in Pakistanp.19 7. The prohibition of arbitrary arrest, torture, extrajudicial executions and "disappearances" in Pakistan's national law and in international lawp.20 8. Amnesty International's recommendations regarding safeguards against torture, extrajudicial killings and "disappearances" in Pakistanp.23 Appendix A: Cases of torture, death in custody and extrajudicial execution in Pakistan in 1992 and 1993p.29 1. Illegal detention and torture of Ghulam Mustafa Soomro p.29 2. Illegal detention and torture of Inderjit Lohanap.31 3. Death of Bebal Khatoon Shirazip.32 4. Death of Nazir Masih p.33 5. Illegal detention and torture of labourers and their families in rural private jailsp.34 6. A political party, the Mohajir Qaumi Movement (MQM), as perpetrator and victim of human rights violationsp.37 7. Illegal detention, torture and extrajudicial execution of Niaz Hussain Amnesty International December 1993AI Index: ASA 33/05/93 Pakistan: Torture and deaths in custody Pathan p.43 8. Illegal detention, torture and death in custody or extrajudicial execution of Mujib Aijaz Jatoip.46 9. Extrajudicial executions of nine men at Tando Bahawalp.47 10. Reported torture and extrajudicial executions of seven young men at Shah Bandarp.49 11. Illegal detention, torture and death in custody or extrajudicial execution of Yusuf Jakhrani p.52 12. -
Bonded Labour in Agriculture: a Rapid Assessment in Sindh and Balochistan, Pakistan
InFocus Programme on Promoting the Declaration on Fundamental Principles WORK IN FREEDOM and Rights at Work International Labour Office Bonded labour r in agriculture: e a rapid assessment p in Sindh and Balochistan, a Pakistan P Maliha H. Hussein g Abdul Razzaq Saleemi Saira Malik Shazreh Hussain n i k r Special Action Programme to Combat Forced Labour o DECLARATION/WP/26/2004 ISBN 92-2-115484-X W WP. 26 Working Paper Bonded labour in agriculture: a rapid assessment in Sindh and Balochistan, Pakistan by Maliha H. Hussein Abdul Razzaq Saleemi Saira Malik Shazreh Hussain International Labour Office Geneva March 2004 Foreword In June 1998 the International Labour Conference adopted a Declaration on Fundamental Principles and Rights at Work and its Follow-up that obligates member States to respect, promote and realize freedom of association and the right to collective bargaining, the elimination of all forms of forced or compulsory labour, the effective abolition of child labour, and the elimination of discrimination in respect of employment and occupation.1 The InFocus Programme on Promoting the Declaration is responsible for the reporting processes and technical cooperation activities associated with the Declaration; and it carries out awareness raising, advocacy and research – of which this Working Paper is an example. Working Papers are meant to stimulate discussion of the questions covered by the Declaration. They express the views of the author, which are not necessarily those of the ILO. This Working Paper is one of a series of Rapid Assessments of bonded labour in Pakistan, each of which examines a different economic sector. -
Government of Sindh Road Resources Management (RRM) Froject Project No
FINAL REPORT Mid-Term Evaluation /' " / " kku / Kondioro k I;sDDHH1 (Koo1,, * Nowbshoh On$ Hyderobcd Bulei Pt.ochi 7 godin Government of Sindh Road Resources Management (RRM) Froject Project No. 391-0480 Prepared for the United States Agency for International Development Islamabad, Pakistan IOC PDC-0249-1-00-0019-00 * Delivery Order No. 23 prepared by DE LEUWx CATHER INTERNATIONAL LIMITED May 26, 1993 Table of Contents Section Pafle Title Page i Table of Contents ii List of Tables and Figures iv List of Abbieviations, Acronyms vi Basic Project Identification Data Sheet ix AID Evaluation Summary x Chapter 1 - Introduction 1-1 Chapter 2 - Background 2-1 Chapter 3 - Road Maintenance 3-1 Chapter 4 - Road Rehabilitation 4-1 Chapter 5 - Training Programs 5-1 Chapter 6 - District Revenue Sources 6-1 Appendices: - A. Work Plan for Mid-term Evaluation A-1 - B. Principal Officers Interviewed B-1 - C. Bibliography of Documents C-1 - D. Comparison of Resources and Outputs for Maintenance of District Roads in Sindh D-1 - E. Paved Road System Inventories: 6/89 & 4/93 E-1 - F. Cost Benefit Evaluations - Districts F-1 - ii Appendices (cont'd.): - G. "RRM" Road Rehabilitation Projects in SINDH PROVINCE: F.Y.'s 1989-90; 1991-92; 1992-93 G-1 - H. Proposed Training Schedule for Initial Phase of CCSC Contract (1989 - 1991) H-1 - 1. Maintenance Manual for District Roads in Sindh - (Revised) August 1992 I-1 - J. Model Maintenance Contract for District Roads in Sindh - August 1992 J-1 - K. Sindh Local Government and Rural Development Academy (SLGRDA) - Tandojam K-1 - L. -
In Case of Rural Areas in Case of Urban Area Electoral Roll in Case Electoral Area Is to Polling Stations Booths No and Name of Polling Bifurcated S.No Station
ELECTION COMMISSION OF PAKISTAN FORM-28 [ see rule 50] DRAFT LIST OF POLLING STATIONS FOR A CONSTITUENCY Election to the Provincial Assembly of the Sindh No.and Name of Constitunecy PS-83 Dadu-I S.No of voters on the Number of Voters assigned Number of Polling In case of rural areas In case of Urban Area electoral roll in case Electoral area is to polling stations Booths No and Name of Polling Bifurcated S.No Station Name of Census Block Name of Electoral Name of Electoral Census Block area Male Female Total Male Female Total electoral Area Code area Area 1 2 3 4 5 6 7 8 9 10 11 12 13 351050101 381 0 381 Golimar Muhalla 351050107 342 0 342 Ex-Xen Highways office, - 4 0 4 1 351050103 492 0 492 K.N.Shah DDO Road (Male)(P ) Shahbaz Colony 351050109 334 0 334 1549 0 1549 351050101 0 291 291 Golimar Muhalla 351050107 0 250 250 GPS,Shahbaz Colony,K.N.Shah 0 4 4 2 351050103 0 389 389 (Female) ( P ) Shahbaz Colony 351050109 0 307 307 0 1237 1237 351050104 276 0 276 Shaikh Muhalla 351050110 172 0 172 GHS,Boys K.N.Shah Madina Colony 351050301 320 0 320 3 4 0 4 (Male) (southerm Side) ( P ) 351050403 302 0 302 Mir Colony 351050409 345 0 345 1415 0 1415 351050104 0 211 211 Shaikh Muhalla 351050110 0 201 201 GPS,Bughia Muhalla,K.N.Shah Madina Colony 351050301 0 256 256 4 (Female) Part-I new Building 0 4 4 351050403 0 269 269 Wasterm Side ( P ) Mir Colony 351050409 0 260 260 1197 1197 Shaikh Muhalla 351050303 189 0 189 351050201 117 0 117 Noorani Masjid 351050205 188 0 188 351050202 200 0 200 GBPS,Main K.N.Shah (Male) Burira Muhalla 5 351050206 115 -
PAKISTAN WATER and POWER DEVELOPMENT AUTHORITY (April
PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY (April 2011) April 2011 www.wapda.gov.pk PREFACE Energy and water are the prime movers of human life. Though deficient in oil and gas, Pakistan has abundant water and other energy sources like hydel power, coal, wind and solar power. The country situated between the Arabian Sea and the Himalayas, Hindukush and Karakoram Ranges has great political, economic and strategic importance. The total primary energy use in Pakistan amounted to 60 million tons of oil equivalent (mtoe) in 2006-07. The annual growth of primary energy supplies and their per capita availability during the last 10 years has increased by nearly 50%. The per capita availability now stands at 0.372 toe which is very low compared to 8 toe for USA for example. The World Bank estimates that worldwide electricity production in percentage for coal is 40, gas 19, nuclear 16, hydro 16 and oil 7. Pakistan meets its energy requirement around 41% by indigenous gas, 19% by oil, and 37% by hydro electricity. Coal and nuclear contribution to energy supply is limited to 0.16% and 2.84% respectively with a vast potential for growth. The Water and Power Development Authority (WAPDA) is vigorously carrying out feasibility studies and engineering designs for various hydropower projects with accumulative generation capacity of more than 25000 MW. Most of these studies are at an advance stage of completion. After the completion of these projects the installed capacity would rise to around 42000 MW by the end of the year 2020. Pakistan has been blessed with ample water resources but could store only 13% of the annual flow of its rivers. -
Managing Director's Report
2010 MANAGING DIRECTOR’S REPORT National Engineering Services Pakistan (Pvt) Limited CONTENTS Fields of Managing Activities Director's Services Message 3 2 4 Energy 6 Sector Water Resources Development 9 Sector Dam Engineering 12 Sector Transportation 14 Sector Environmental & Public Health 18 Engineering Sector Architecture & 21 Planning Sector Information Technology 24 & GIS Sector Oil, Gas & 28 Industrial Sector List of Selected New, 26 Ongoing & Completed Projects SERVICES Appraisals, Pre-feasibility & Feasibility Studies Reconnaissance Studies Preliminary Investigations Development of Alternative Proposals Outline Designs and Cost Estimates Evaluation of Technical & Economic Feasibilities Investigations Surveys & Mapping Geotechnical and Soil Investigations Hydrological and Environmental Surveys Traffic Surveys Data Analyses Determination of Design Parameters Deformation Monitoring of Structures Design Preliminary Designs and Costs Model Tests Computer Simulations Detailed Designs and Specifications Detailed Drawings Tender & Contract Documents Bill of Quantities, Cost Estimates & Schedules Tender Documents Prequalification of Contractors Evaluation of Tenders and Recommendations Contract Documents Construction Supervision & Contract Management Contract Coordination Progress Monitoring and Control Works Supervision and Quality Control Measurements Certification of Periodic Payments to Contractors Equipment Inspection and Commissioning Post-construction Services Completion Reports Operation & Maintenance Manuals Routine Maintenance -
Climate Change Profile of Pakistan
Climate Change Profi le of Pakistan Catastrophic fl oods, droughts, and cyclones have plagued Pakistan in recent years. The fl ood killed , people and caused around billion in damage. The Karachi heat wave led to the death of more than , people. Climate change-related natural hazards may increase in frequency and severity in the coming decades. Climatic changes are expected to have wide-ranging impacts on Pakistan, a ecting agricultural productivity, water availability, and increased frequency of extreme climatic events. Addressing these risks requires climate change to be mainstreamed into national strategy and policy. This publication provides a comprehensive overview of climate change science and policy in Pakistan. About the Asian Development Bank ADB’s vision is an Asia and Pacifi c region free of poverty. Its mission is to help its developing member countries reduce poverty and improve the quality of life of their people. Despite the region’s many successes, it remains home to a large share of the world’s poor. ADB is committed to reducing poverty through inclusive economic growth, environmentally sustainable growth, and regional integration. Based in Manila, ADB is owned by members, including from the region. Its main instruments for helping its developing member countries are policy dialogue, loans, equity investments, guarantees, grants, and technical assistance. CLIMATE CHANGE PROFILE OF PAKISTAN ASIAN DEVELOPMENT BANK 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines ASIAN DEVELOPMENT BANK www.adb.org Prepared by: Qamar Uz Zaman Chaudhry, International Climate Technology Expert ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2017 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2444 www.adb.org Some rights reserved. -
Development Expenditure (Volume-IV) Budget Estimates 2021-22
For Departmental use only FEDERAL BUDGET 2021–2022 DETAILS OF DEMANDS FOR GRANTS AND APPROPRIATIONS Development Expenditure (Volume-IV) Budget Estimates 2021-22 Government of Pakistan Finance Division Islamabad PART III - DEVELOPMENT EXPENDITURE A - DEVELOPMENT EXPENDITURE ON REVENUE ACCOUNT : I - CABINET SECRETARIAT - PAGES 86 Development Expenditure of Cabinet Division 2403 87 Development Expenditure of Aviation Division 2407 88 Development Expenditure of Establishment Division 2417 89 Development Expenditure of Poverty Alleviation and Social Safety Division 2420 90 Development Expenditure of SUPARCO 2423 II - CLIMATE CHANGE, MINISTRY OF - 91 Development Expenditure of Climate Change Division 2431 III - COMMERCE, MINISTRY OF - 92 Development Expenditure of Commerce Division 2437 IV - COMMUNICATIONS, MINISTRY OF - 93 Development Expenditure of Communications Division 2443 V - DEFENCE, MINISTRY OF - 94 Development Expenditure of Defence Division 2449 95 Development Expenditure of Survey of Pakistan 2456 VI - DEFENCE PRODUCTION, MINISTRY OF - 96 Development Expenditure of Defense Production Division 2461 VII - ENERGY, MINISTRY OF - 97 Development Expenditure of Power Division 2465 (i) VIII - FEDERAL EDUCATION, PROFESSIONAL TRAINING, PAGES NATIONAL HERITAGE AND CULTURE, MINISTRY OF - 98 Development Expenditure of Federal Education and Professional Training Division 2475 99 Development Expenditure of Higher Education Commission (HEC) 2490 100 Development Expenditure of National Vocational & Technical Training Commission (NAVTTC) 2527 101 -
Pakistan Multi-Sectoral Action for Nutrition Program
SFG3075 REV Public Disclosure Authorized Pakistan Multi-Sectoral Action for Nutrition Program Public Disclosure Authorized Environmental and Social Management Framework (ESMF) Directorate of Urban Policy & Strategic Planning, Planning & Public Disclosure Authorized Development Department, Government of Sindh Final Report December 2016 Public Disclosure Authorized Environmental and Social Management Framework Final Report Executive Summary Local Government and Housing Town Planning Department, GOS and Agriculture Department GOS with grant assistance from DFID funded multi donor trust fund for Nutrition in Pakistan are planning to undertake Multi-Sectoral Action for Nutrition (MSAN) Project. ESMF Consultant1 has been commissioned by Directorate of Urban Policy & Strategic Planning to fulfil World Bank Operational Policies and to prepare “Environmental and Social Management Framework (ESMF) for MSAN Project” at its inception stage via assessing the project’s environmental and social viability through various environmental components like air, water, noise, land, ecology along with the parameters of human interest and mitigating adverse impacts along with chalking out of guidelines, SOPs, procedure for detailed EA during project execution. The project has two components under Inter Sectoral Nutrition Strategy of Sindh (INSS), i) the sanitation component of the project aligns with the Government of Sindh’s sanitation intervention known as Saaf Suthro Sindh (SSS) in 13 districts in the province and aims to increase the number of ODF villages through certification while ii) the agriculture for nutrition (A4N) component includes pilot targeting beneficiaries for household production and consumption of healthier foods through increased household food production in 20 Union Councils of 4 districts. Saaf Suthro Sindh (SSS) This component of the project will be sponsored by Local Government and Housing Town Planning Department, Sindh and executed by Local Government Department (LGD) through NGOs working for the Inter-sectoral Nutrition Support Program. -
Public Sector Development Programme 2020-21
GOVERNMENT OF PAKISTAN PUBLIC SECTOR DEVELOPMENT PROGRAMME 2020-21 PLANNING COMMISSION MINISTRY OF PLANNING, DEVELOPMENT & SPECIAL INITIATIVES June, 2020 WATER RESOURCES DIVISION (Rupees Million) G.Sl. Name of Project Approval Estimated Cost Expenditure Throw- Allocation 2020-21 No. Status Total Foreign upto forward Foreign Rupee Total Aid 30.06.2020 01.07.2020 Aid 1 2 3 4 5 6 7 8 9 10 Hydel Projects On-going Schemes: 927 Chitral Hydel Power Station Capacity CDWP 2188.835 567.111 10.000 2178.835 60.000 63.000 123.000 Enhancement From 1 MW to 5 MW 08.03.2017 928 Dargai Hydroelectric Power Station ECNEC 4050.364 2284.888 70.000 3980.364 30.000 90.000 120.000 Rehabilitation & Capacity Enhancement 14.11.2018 from 20 to 22 MW 929 Dasu Hydro Power Project Stage-I (2160 ECNEC 510980.200 218547.500 126203.202 384776.998 4500.000 75559.000 80059.000 MW) (District Kohistan, Khyber 07.11.2019 Pakhtunkhwa) 930 Establishment of Pakistan Glacier CDWP 891.780 681.050 295.842 595.938 70.000 130.000 200.000 Monitoring Network Upper Indus Basin 08.06.2016 Area Falling within KPK, Gilgit Baltistan, and Azad Jammu & Kashmir 931 Ghazi Barotha Hydropower Project CDWP 112.000 0.000 11.000 101.000 0.000 101.000 101.000 (Feasibility) 06.08.2019 932 Golen Gol Hydro Power Project (106 MW) ECNEC 29077.173 10679.880 37223.645 -8146.472 400.000 588.000 988.000 (Chitral) 30.09.2016 933 Keyal Khawar Hydro Power Project, ECNEC 26084.178 26084.178 4104.223 21979.955 680.000 678.000 1358.000 Khyber Pakhtunkhwa, (Kohistan) (128 29.01.2016 MW) 934 Mangla Hydropower Training