Working together to understand, conserve and manage the heritage and mission

Camilla Finlay B Arch (Hons) Dip Arch M Arch Dip Con RIBA AABC Cathedral Architect to Churchcare : Building Performance : 2 October 2014 ‘We are all no more than life tenants of our heritage and we have a moral duty to pass it on in as good a condition as that in which we received it’ William Morris

Today, it is our duty not only to pass our heritage on to future generations in ‘good condition’ but also with a greater understanding of the heritage asset and its specific conservation needs together with a means to maintain the conservation through resources, skills, materials and viable funding streams.

To pass on the tools to maintain the condition Exeter Cathedral Exeter Cathedral exists for the glory of God and as a sign of God’s kingdom in the community. It stands at the crossroads of the sacred and the secular, the spirit and the senses, and expresses its mission through:

• Daily worship and prayer • Welcome and pastoral care • Evangelism and Spiritual Development • Education and learning • Service to the community

Mission Statement EXETER

CREDITON M5

A377

A30

EXETER AIRPORT A30 EXETER

RIVER EXE

A376

A38

EXMOUTH

A380

TEIGNMOUTH Exeter Cathedral - Location and Setting

Retro-quire

Sanctuary

Choir

Chapter House North South Transept

Nave

Exeter Cathedral - Key Phasing the ‘impressive scale and richness of architectural conception’ Sir Nicholas Pevsner & Bridget Cherry ‘one of the finest interior spaces which has come down to us from the later Middle Ages’ Richard Morris the ‘unforgettable luxuriant palm-branch effect of the vaulting’ Sir Nicholas Pevsner & Bridget Cherry the ‘enchanting realism of the bosses’ Sir Nicholas Pevsner & Bridget Cherry the ‘inexhaustible variation’ of the window Sir Nicholas Pevsner & Bridget Cherry the ‘outstanding figure drawing’ of the early 14th-century glass Sir Nicholas Pevsner & Bridget Cherry ‘unprecedented grandeur’ of the ’s throne – ‘the most exquisite piece of woodwork for its date in and perhaps in Europe.’ Sir Nicholas Pevsner & Bridget Cherry

‘miraculous preservation’ of the earliest series of misericords in Britain Sir Nicholas Pevsner & Bridget Cherry We can add to these the West Front, Image Screen and its fine figures

West Front Geology West Front Phasing (J.Allan, S.Blaylock, T.Ives) (J.Allan, S.Blaylock, T.Ives)

And our understanding of the unique geology and phasing the collection of related Medieval documents and Anglo-Saxon literature

And below Cathedral Green the hypocaust of the Roman Bath House

Exeter Cathedral - 2012 The installation of the 70th of Exeter Cathedral The Very Revd Dr and the development of the management and fabric teams at the Cathedral. The delivery of the Third Millennium Campaign, securing the West Front, new Library & Archive, education and music facilities, funding for music, and renewed 2/3rds of the Cathedral Green. A Quinquennial Inspection followed by a new Conservation Management Plan and a detailed assessment of all properties, uses and resources. An Initial benchmarking exercise Quinquennial Inspection Highlighted a need to invest more in the maintenance of the general fabric and the team of masons and conservators who care for structure and artefacts - local areas of severe fabric decay that may be connected to wider environmental impacts - a general lack of understanding as to how the building is performing environmentally and structurally and the impact that this may have on the condition of the fabric - a need for a more ‘inclusive approach’ to projects both in terms of scope and specialists Recommendation - establishing a programme of general monitoring Complexity and weakness in the rainwater disposal systems Limited records of the existing drainage system Defects in the stonework of the building envelope Effectiveness and impact of heating system and services Condition of stained glass and monuments Areas of poor energy conservation Conservation Management Plan Defined the spiritual, historical, aesthetic and community significance of the architecture, collections and setting - limitations of physical assets and endowments as well as the general shortage of roofed space - confirmed the guiding principles for projects: - Understand the place - Significance should guide decisions. - Assess and consult on all proposed interventions thoroughly before deciding whether to undertake them. - Keep thorough records. - Do everything in a logical order. Policy - Understanding comes before work 8

9 1 Great West Door NORTH 2 Bishop Grandisson's Chapel TRANSEPT 10 3 Chapel of St Edmund NORTH 4 The Font PORCH 5 The Minstrel's Gallery 3 6 The Martyr's 12 7 The Great Pulpitum Screen with the Organ over

Bench Bench 8 Chapel of the Holy Cross (Sylke Chantry) 9 Chapel of St Paul screen 10 Chapel of St Andrew and St Catherine 11 11 Bishop Stapledon's Tomb 5 12 Chapel of St George (Speke Chantry) 13 13 Chapel of St John the Evangelist 14 Bishop Stafford's Tomb (Lady Chapel) 15 Bisho p Bronescombe's Tomb 16 Chapel of St Gabriel 17 Chapel of St Saviour (Bishop Oldham's Chantry) 6 14 18 Chapel of St James 19 The Bishop's Throne LADY CHAPEL 20 The High 1 7 20 21 Sedilia PRESBYTERY 22 Chapel of St John the Baptist 23 The Courtenay and Gilbert Tombs 15 24 Former Chapel of the Holy Ghost 2 4 19 21

16

17

18 SOUTH TRANSEPT 23 22

S .V .P

SHOP

S .V .P

CLOISTER

CHAPTER HOUSE NO. 2 CLOISTERS BUILDING

BISHOP'S PALACE CHURCH HOUSE PEARSON BUILDING NO. 1 CLOISTERS BUILDING

DEANS OFFICE UP

UP UP

K E Y

RECEPTION / ENTRANCE AREA PLATFORM LIFT ENTRANCE

SHOP WC's VOID TO SPACE BELOW

AREA FOR WORSHIP/FUNCTIONS STORAGE AREAS WORKSHOPS & SERVICES

CHAPEL (DEDICATED AREA OF WORSHIP) KITCHEN & REFECTORY OFFICES/MEETING ROOMS

CIRCULATION ROUTES ACTIVITY SPACES RESIDENTIAL

LIBRARY & ARCHIVE SONG SCHOOL & SACRISTRY GROUND FLOOR LEVEL 0 10 20 30 40 50 EXISTING USAGES metres (THIS AnalysisIS NOT A MEASURED SURVEY. of FOR existingILLUSTRATIVE PURPOSES groundONLY.) level spaces and uses Emerging themes

Enhanced facilities for staff and volunteers More covered space to improve welcome, support enterprise initiatives including events, retail and catering Quality visitor facilities including toilets Significant space for interpretation of the Cathedral and Bath House, display and exhibitions Modern and properly functional office and work space for staff, especially works department Improved sound, lighting and data infrastructure Sustainable environmental control ‘Back of house’ and general storage capacity Celebrating the past - Securing the future We now understand Exeter Cathedral has under-invested in many aspects of its life over the past decades. It also has no great endowments and has only a few properties (occupied by clergy or the Cathedral School).

The only significant way in which income can be increased is through work with visitors.

And that any increase in visitors would need to be carefully considered to conserve the architecture and artefacts The Fundamental Problem Working together to establish the wider ‘conservation’ issues and manage the care and development of the Cathedral We have been growing our team of specialists: Cathedral Archaeologist - John Allan Architectural Historian - Dr Jo Cox Conservator - Nick Durnan Structural Engineer - John Mann Environmental Consultant - Tobit Curteis M & E Engineers - Martin and Anne Thomas Interpretation and Exhibition Designers - Event Landscape Architect - Robert Myers and Members of the FAC including Timber Specialist, Hugh Harrison and former Master Mason, Peter Dare Working together to form a common understanding

And with the support of the Friends - establishing a programme of environmental and structural monitoring to inform our approach to all projects at the Cathedral

E NVIRONMENTAL S U R V E Y A N D M ONITORING AT E X E T E R C ATHEDRAL : P H A S E I

A RUnderstandingEPORT FOR THE D E Athe N A Nbuilding D C HAPTER performance

J U L Y 2 0 1 4

Thermal modelling from the initial assessment Thermal modelling from the initial assessment 41.13

40.79 40.97 41.25 41.0 40.79 40.9741.10 40.9240.92 41.10 41.13 41.23 41.06 41.00 41.04 41.00 41.11 40.94 40.94 41.05TW 41.72 41.05 41.11 KERB LINE TW 41.72 41.04 41.0541.05 41.03 41.04 40.96 41.12 CONC SLAB FOOTPATH TW41.05 41.67

41.08 41.08 GRASS TW 41.67 41.20 CONC SLABS 40.80TW 41.01 40.9840.97 40.80 41.3840.75 KERB LINE 41.01

41.00 FOOTPATH 40.51 41.17 40.51 40.77 TW40.75 41.38 40.69 41.0041.0041.02 40.78 40.69 40.97 41.01 40.77 40.97 40.94 CONC SLABS 40.7340.73 40.87 40.72TWTW 41.34 41.34

40.87 CONCRETE 40.89 40.72 40.8940.96 40.96 41.0 41.10 C A T H E D R A L C L O S E SERVICES SWEPT JUL 2009 40.90 41.04 40.98 40.8940.89 40.36 40.8640.91 40.36 LP 40.85 40.85

40.92 40.85 40.92 GRASS 41.05 40.75 40.60 40.75 40.6040.78 40.79 40.95 COBBLED CHANNEL 40.79 40.96 DEC COBBLED CHANNEL Dia 260 GRASS TARMAC FOOTPATH Sp 6000

41.04 40.88 Ht 9000 40.88 40.48

40.75 40.82 40.78 40.85 40.48 40.22 40.75 40.78 40.6340.63 GRASS 40.90 40.82 40.5740.51 40.5240.22 40.57 40.47 40.52 40.94 LP 40.51 MH 40.73 40.51 40.5740.73TW 41.30 40.77 40.59 40.4540.45 CL 40.63 40.57 TW 41.30 40.59 40.72 40.77 SERVICES SWEPT40.41 JUL 2009 IL 36.01 40.71 40.41 TW 41.31 LOW STONE WALL 40.73 40.87 40.83 DEC TW 41.31 GRASS 40.70 Dia 200 40.5 40.52 40.93 40.70 Sp 6000 40.52 CONC SLABS 40.67 Ht 9000 40.7340.73 40.71

40.67

40.62 40.20 RG 40.76 40.62 GRASS 40.62 40.75 40.2040.30 40.74 40.76 40.62 40.74 ST02 40.30TW 40.83 40.39 GRASS 39.83 40.71 40.76 40.397 40.26 40.71 40.50 40.50 40.50 40.23 39.83 40.39 TW40.26 40.83 40.18 40.50 40.51 40.23 40.18 40.34 40.38 40.23 TW 41.3341.33 40.34 40.18 40.49 40.72 CONC SLABS 40.18 40.4940.67 40.18 40.67 40.71 LP 40.72 40.57 40.18 40.72 40.71 40.46 40.4440.44 40.71 40.52 40.16 LOW STONE WALL 40.16 40.16 40.49 40.0440.04 40.49 40.72 39.82 40.74 GRASS 40.62 40.52 40.21 40.07 40.7740.76 40.61 HORSE CHESTNUT 40.21 40.7940.61 40.10 40.79TW 41.34 Dia 1400 39.95 40.79 40.78 Sp 20000 39.98TW 40.68 40.79 40.78 TW40.78 41.35 40.75 Ht 22000 39.97 40.31 40.16 40.19 LP 39.94 TW 41.3540.78 40.16 40.19 40.39 KERB LINE 40.75 CONC SLABS 40.26 40.75 C A T H E D R A L Y A R D 39.97 .83 40.03 40.63 40.83 40.26 40.63 40.71 40.03 39.97 40.7940.79 40.02 40.76 40.47 Gulleys not surveyed 40.01 40.76 only from SWMH1 to 39.95 40.25 GRASS 40.0 39.79

GRASS 39.96 Gulley 1B 39.96 39.93 40.05 39.97 39.93 SERVICES SWEPT JUL 2009 39.95 39.93 39.91 40.79 40.28 40.15 39.97 LP40.7840.79 S109 CONC SLABS 40.81 40.78 40.28 G1E G1D 40.81 40.41 40.12 40.08 39.97 40.81 39.96 GRASS 40.17 TWTW 40.53 40.53 40.54 GRASS 39.95 RG 40.70 39.95 39.98 40.23 40.35 39.78 40.76 39.97 G1B 39.74 40.50 TARMAC FOOTPATH 39.82 39.81 39.85 39.81 39.93 39.96 39.86 40.82 G1C RG GRASS GRASS 40.67 39.70 39.95 39.82 39.78 LOW STONE WALL 40.22 RG 39.62 39.63 39.74 39.61 GRASS 40.48 RG 40.78 MH GRASS 39.55 CL 40.12 39.72 IL 35.44 39.63 40.68 LIGHTING BOX 39.54 39.54 RG 39.76 39.64 39.49 39.46 39.71 39.79 39.76 TW 40.32 WV 39.49 39.66 39.79 WV RG 39.62 39.76 39.80 39.70 TARMAC FOOTPATH WV 39.76 TW 40.32 39.70 39.40 S110 39.80 39.53 CONC SLABS 39.72 39.47 39.56 39.58 TW 40.30 MH(CONC SLAB) 39.71 MH(CONC SLAB) CL CL 40.10 39.53 40.48 39.41 39.40 39.49 39.34 LIGHTING BOX 39.41 40.11 39.35 39.43 39.45 39.73 39.85 39.66 MAPLE 39.66 39.36 39.40 39.74 MH(CONC SLAB) 39.30 Dia 900 40.26 39.33 39.66 GRASS 39.47 CL 40.07 39.29 39.36 Sp 16000 39.36 39.29 39.66 TW 40.19 39.55 CONCRETE FOOTPATH 39.29 Ht 17000 FMH1 RG GRASS 39.61 40.45 39.25 ST03 LP 39.63 IL 4.8m 39.25 39.24 39.25 39.30 39.73 39.25 39.22 39.295 39.50 39.63 39.25 39.58 39.27 LIGHTING BOX 39.68 39.62

39.27

39.25 39.62 Appears to be concealed MH TARMAC FOOTPATH 39.53 39.38 39.53 39.18 39.22 under york slabs - drain runs 39.18 RG 39.40 39.18 LIGHTING BOX 39.11 39.18 ST04 straight through - not a silt 39.13 39.20 39.45 39.45 39.53 39.0 39.5 39.548 39.54 trap. There are 2 laterals - 39.12 39.54 39.55 TW 40.05 38.98 39.56 38.96 assumed redundant from old 39.29 39.69 LOW STONE WALL 39.91 38.96 39.09 39.55 38.96 gulleys now picked up by G8 G6 G7 39.44 38.91 39.15 39 38.89 39.44 39.06 38.89 LIGHTING BOX 39.40 3939.36.45.36 38.88 & G7 (needs investigation) 39 G1 GRASS .45 RS RG G10 SERVICES SWEPT JUL 2009 GRASS SWMH 1 G2 38.99 39.12 39.17 39.37 38.87 39.49 40.05 IL 1.4m 39.02 LIGHTING BOX 39.51 39.17 39.5739.51 39.34 LP G3A 39.05 39.09 39.25 39.30

38.88 FOOTPATH TARMAC 39.56 38.84 39.05 Redundant drain38.97 run to gulley 38.99 39.59 150 dia. clay EARTH STRAP 39.56 39.36 5.3m from MH, gulley hidden 39.07 39.3239.3039.30 38.81 SWMH 2 39.3939.3639.37 39.10 38.71 under grass by edge of path 38.97 GRASS 38.80 38.88 GRASS TW 40.06 IL 1.0m G11 GRASS 39.46 38.99 38.94 39.06 38.98 39.07 38.92 SWMH 3 Concealed MH 38.87 CONC SLABS 38.94 39.03 G12 GRASS 38.72 39.64 39.4539.46 150 dia. clay 38.93 39.0539.0539.05 TW39.4539.46 40.06 39.0 RG 38.95 39.6439.6939.67 38.85 39.01 38.88 38.90 RG COBBLED CHANNEL 38.87 38.90 38.97 38.91 Not a gulley - only open ended 39.72 38.85 MH(CONC SLAB) 38.91 39.0 39.72 STEP DOWN 38.91 pipe at base of wall to edge of path CL 38.89 150 dia. clay 39.03 39.55 SIGNAL DISAPPEARS G2A 38.91 38.94 39.00 39.53 39.55 38.61 38.92 38.92 38.98 39.70 GULLEY 38.78 38.92 38.94 38.82 G10A MH(CONC SLAB) TW 40.87 39.6239.54 38.94 38.92 39.53 38.74 STEP DOWN G5 38.96 39.54 RG 38.64 39.10 39.07 SWMH 5 CL 38.80 38.73 38.96 39.42 RWP direct STEP DOWN 38.92 SERVICES SWEPT JUL 2009 150 dia. clay 39.42 39.64 39.71 39.11 39.06 COBBLED CHANNEL connection no gully G3 G13 38.81 DEC 39.58 SWMH 4 39.71 39.64 G8 39.03 Dia 200 G4 38.98 RG LP 38.75 38.75 Sp 8000 38.97 38.84 38.89 WM 38.82 Ht 6000 STEP DOWN 39.03 39.03 SWMH 6 39.55 39.02 Redundant drain G17A 39.53 GULLEY 39.01 38.92 39.53 39.02 PAVIOUR SURFACE capped at edge of path 38.80 STEP DOWN 38.88 38.80 RG 38.97 (granite setts) G16 38.77 38.78 HOLLY 39.01 150 dia. clay 38.98 Dia 400 38.78 38.73

39.54 Sp 4000 39.44

39.37 38.73

39.25 38.73 39.01 39.12 39.03 39.19 G20 Ht 4000 38.73 WATER PIPE 39.09 39.50 39.16 38.98 GRASS 38.72 38.97 38.66 38.76 38.96 STONE WALL G14 39.18 CONC SLABS 38.87 38.90 G21 39.07 38.66 39.21 39.22 38.62 38.93 38.92 38.94 38.68 38.78 STEP DOWN 39.0 39.49 existing cobbled 38.93 RG 39.11 39.51 38.68 38.97 38.79 39.49 channel 610 STEP DOWN 38.98 39.00 edged both sides 38.71 G15 38.78 G16 38.72 39.11 with granite 38.79 39.00 150 dia rigidclay (foil sewer) 39.00 38.76 stone curb 38.71 150 dia. clay G17 STEP DOWN 38.76 STEPS 38.69 38.77 38.75 39.00 STEP DOWN 38.69 38.96 38.73 39.09 ST01 4120 G18 38.73 39.436 STEP DOWN 38.73 G19 G2338.56 G22 38.72 38.80 SWMH 7

.36 38.67

39.44 38.65 39 38.75 39.26 39.18 39.10 39.47 39.03 Not surveyed beyond

39.44 38.92 39.36 38.91 CONC SLABS GT 38.91 SWMH8, details 39.45 GATE 39.42 150 dia rigid clay RG 38.79 unknown

38.90 292050E 292100E 38.76 GULLEY G24 EXETER CATHEDRAL 38.81

38.90 38.79 39.59 38.86 150 dia clay S.W drain rigid laid 38.79

38.71 SERVICES SWEPT JUL 2009 38.71 SWMH 8 39.70 OLD CHURCH 38.7138.73 38.72 38.70 SPIRE 38.60 39.70 PAVIOUR SURFACE Drainage run out of SWMH 7

38.69 deviates in direction as shown, 92550N 38.69 92550N 38.70 no access to SWMH 8 at time 38.71 of survey - CCTV undertaken 38.70 from SWMH 7

38.89

38.70 38.94

39.0 38.80 38.79 38.80 COBBLED CHANNEL 39.32 38.79 38.79 39.00 38.72 38.57 39.63 38.66 38.66 38.63 COPPER BEECH RG 38.5738.50 38.66 38.55 Dia 380 38.81 GULLEY 38.53 Sp 8000 38.50 38.52 Ht 10000 39.09 38.52 redundant 38.64 38.67 39.09 38.49 39.09 GRASS SWMH 1 38.48 38.48IL 1.8m 38.51 37.48

FMH2 38.59 38.73 38.60 DEC 38.59 (combined MH Dia 300 sewer) CL 38.56 39.18 37.77 39.14 Sp 6000 IL 34.18 38.63 39.11 39.14 Ht 8000 39.04 39.03 LP 37.21 39.04 39.03 38.46 DEC 38.5 38.46 OVERHEAD 39.01 Dia 170 39.01 38.44 37.23 Sp 4000 WIRES 39.07 38.44 39.07 Ht 6000 DEC 38.61 Dia 300 Sp 8000 37.72 37.37 38.87 38.85 38.52 Ht 6000 37.62 38.38

IRON RAILING 38.37 37.35 37.67 37.49

38.51 38.35 37.42 38.96 38.5038.49 38.9538.99 38.80 37.56 38.93 38.85 37.32 38.82 38.32 37.37 38.20 LP GATE 38.97 37.43 39.0038.95 37.54 WV 37.69 WV 38.56 38.5 TIMBER CROSS 38.25 37.33 37.31 38.23 38.82 38.82 38.71 RG 38.25 38.30 37.53 38.28InvestigationsMULBERRY TREE and testing37.18 of drainage systems 37.46 35.44 38.25 38.35 S107 38.18 37.64 37.38 38.17 THE CLOISTERS 35.40 38.11 35.21 37.55 38.07 37.21 37.69 S101 35.34 37.67 37.41 38.10 37.75 37.57 35.27 37.98 37.39 37.18 35.45 38.04 37.41 34.98 37.32 35.02 34.99 35.32 37.21 35.00 S108 36.98 35.17 S102 NO.1 37.15 37.00 CLOISTERS 37.25 37.78 38.19 34.97 36.91 34.89 37.71

37.49 37.21 37.17 36.79 34.97 47.48 36.65 37.39 37.42 37.10 37.08 37.56 51.63 37.04 37.60 36.80

34.93 34.99 Tobit Curteis Associates 33 Cavendish Avenue, Cambridge, CB1 7UR T: +44 (0)1223 501958 F: +44 (0)1223 304190 SITE: Exeter Cathedral E: [email protected] W: www.tcassociates.co.uk TYPE: sensor & transmitter locations

SCALE: Not to Scale DATE: May 2014 CHAPEL OF THE HOLY CROSS Repeater Conductivity/ PH AV CHAPEL OF RH/AT Dust dosimeter CO2 ST PAUL CHAPEL OF ST ANDREW AND ST CATHERINE ST 25 Room number VOC Lux Pulse count Tilt Rad T Linear Displacement 22389 21004 CHAPEL OF ST Diagram based on those supplied by Acanthus Clews Architects NORTH GEORGE (SPEKE TRANSEPT CHANTRY) CHAPEL OF NORTH ST PORCH 21006 EDMUND

Bench Bench 21010 screen THE MINSTREL'S GALLERY 21023 CHAPEL OF ST JOHN THE 20991 EVANGELIST

BISHOP STAPLEDON'S BISHOP TOMB THE STAFFORD'S MARTYR'S THE GREAT TOMB NAVE GREA PULPIT PULPITUM 22390 SCREEN WITH HIGH 21011 T CHOIR ALTAR WEST 21013 20994 21009 ORGAN OVER 20996 21012 LADY CHAPEL DOOR 23399 BISHOP 21007 BRONESCOMBE'S BISHOP 20993 TOMB GRADISSON' SEDILIA S CHAPEL FONT 20992 THRONE

CHAPEL OF 21005 ST GABRIEL 21008 TXserial Location SOUTH 20990 Chapter House TRANSEPT CHAPEL OF ST SAVIOUR 20991 Nave W end low CHAPELS OF ST 20992 Nave E end low JOHN THE OLDHAM BAPTIST 22388 PASSAGE 20993 Choir low (Bishops throne) 20995 20994 Nave roof

CHAPELS OF ST 20995 S transept tomb JAMES AND ST 21680 THOMAS THE 20996 Choir roof MARTYR FORMER CHAPEL OF 21004 St Andrew's Chapel THE HOLY GHOST 21681 21005 Choir S aisle low 20887 21632 21006 N Tower gallery screen 20990 21007 Lady Chapel tomb 21631 21008 Nave S aisle glass CHAPTER HOUSE Library and 21009 Nave E high (in roof space) Archive 21459 21010 Speke Chantry 21011 Lady Chapel roof 21012 Choir High (in roof space) 21013 Nave W end High (in roof space) 21023 External 21459 Archives, in case 21631 Repository, East 21632 Repository, West (near door) 21680 Archives, office 21681 Archives, reading room 20887 Archives, top of stairs 22388 SE staircase 22389 N tower, W wall 22390 Lady Chapel, E wall 23399 Pulpitum, S side Initial plan for sensor and transmitter locations Initial Findings The principal building envelope is providing a significant hydrothermal buffer between the internal and external environment, generally the environment is more stable than in other similar cathedral buildings That the buffering is undermined by air leakage The conditions are more variable within Chapels particularly to the north and within the Chapter House The glazing is particularly prone to thermal fluctuations and condensation events The heat emitters are creating hostile environments locally to the fabric, particularly to the south Next steps refine our questions ... Next steps Prayer & Events & Worship Education

Conserving Developing the Heritage ‘Visitors’

Balance of conservation and development Exeter Cathedral Working together to understand, conserve and manage the heritage and mission

Camilla Finlay B Arch (Hons) Dip Arch M Arch Dip Con RIBA AABC Cathedral Architect to Exeter Cathedral Churchcare : Building Performance : 2 October 2014