AN INTRODUCTION TO INTERIORS COMMERCIAL WELCOME

This is the home of high quality fit-outs and interior refurbishments. As the specialist interior design and refurbishment arm of the Willmott Dixon Group, we have the experience, expertise and resources to fulfil every kind of project nationwide – from £1,000 to £30 million.

Willmott Dixon Interiors’ approach is very simple. We put our client and partner relationships at the heart of our business. The long term relationships we build with clients and partners are testimony to our professional and inventive approach to every fit-out or interior refurbishment project.

You can choose Willmott Dixon with complete confidence. We always deliver on our promises, and we always put your needs first. Whether taking the lead on a fit-out or interior refurbishment project or acting as a guide, we are unstinting in our pursuit of excellence.

PROVIDING INTERIOR FIT OUT SOLUTIONS NATIONWIDE WE ARE WILLMOTT DIXON INTERIORS

DUN AND BRADSTREET RATING 69%OF OUR PROJECTS ARE CARRIED OUT IN 2A1 LIVE ENVIRONMENTS BEV WILLIAMS TOM MCEVOY DAVE BOWERS

WDI RECOGNISE 175 ‘IT’S ALL ABOUT HAPPY PEOPLE’ WORKERS STEVE COOPER ROMA SAINI TOM ARKLEY CLARE TELFORD

WE PROMOTE FROM MORE THAN 30% WITHIN OF OUR STAFF HAVE BEEN WITH US FOR WHERE WE CAN LONGER THAN 5 YEARS DOMINIE SHELLEY DANNY MALONE SHARON WALTON

2 KEY FACTS PROFESSIONAL

COMPANY REGISTRATION NUMBER: 4118020 ASPIRATIONAL DATE INCORPORATED: 01/12/2000

WDI TURNOVER WD GROUP TURNOVER RELATIONSHIP 2012: £40.72m 2012: £1bn 2013: £49m 2013: £1bn 2014: £74m 2014: £1.26bn 2015: Projected Turnover £100m 2015: Projected Turnover £1.3bn FOCUSED

INSURANCE DETAILS Employers Liability - £25m ACCESSIBLE Third Party & Product Liability – £49m Contractors “All Risks” Insurance - £50m Professional Indemnity - £20m INTEGRITY

Our Dunn & Bradstreet Rating 2A1, which means that Risk INVENTIVE of Business Failure is Minimum. DEVOTED

3 Our expertise spans both Private and Public sectors.

WE HAVE SIGNIFICANT LISTED BUILDING EXPERIENCE

4 PROJECT EXPERIENCE

IN THE UK 90% OF BUSINESS BELIEVE A WORK ENVIRONMENT SHOULD INSPIRE & TRANSFORM YOUR WORK LIFE

5 EXISTING CLIENTS Charities / NFP EFG Financial Marathon Asset Management Marketing / Media Public Sector Technology Big Lottery Fund Financial Reporting Council Nikko Investments August One Communications City of London Corporation 3Com Carbon Trust FSCS Oceanship Brokers Euro Sport English Heritage Atos Origin Commission for Racial Equality Mazars Onslow Capital Management Fremantle Media Hammersmith and Fulham Council Avocent ExtraCare Pension Corporation Seymour Pierce IBC Hampshire Police Cambridge Silicon Radio Great Ormond Street Hospital Radian Unibanco Inferno Intellectual Property Office Colorcon Medical Protection Society Royal & Sun Alliance Innocean Worldwide Job Centre Plus Dr Reddy’s The Order of St John Leisure Miller Starr London Borough of Waltham Forest Facebook WSPA Health Ambassador Tickets Miramax Mole Valley District Council First Advantage Chelsea & Westminster British Film Institute Powerscourt Media Group Monmouth County Council G Pharmaceutical Education GPIC Easy Gyms Racepoint Newlon Housing Trust GSM Association Christ’s Hospital School Marie Curie Hospices H2 Soho Simon Kucher Palace of Westminster HCL Technology Elstree UTC Medway Maritime Hospital Klick Fit Text 100/Next Fifteen Parliamentary Works Directorate Norbain Greenwich School of Management Pembury Hospital LA Fitness Trimedia South African High Commission Nortel Networks Hewens Free Primary School Royal Free Little Chef Turn Tourism Australia Oracle Imperial College London South London & Maudsley NHS Orient Express YOC Performa London School of Economics The London Clinic Sleep Bar Retail / Retail Banking Precision Data Ventures Royal College of Surgeons The Design Museum Professional Services Barclays Reach Communications Royal Holloway University London Hotels Ambition Blurb Sharp Electronics Thames Valley University Holiday Inn Express Legal Thirty Three IHennig Synopsys University College London Mandarin Oriental 7 Bedford Row Javelin Liberty Telstra University College Suffolk My Hotel Bevan Brittan Mott Macdonald Lloyds University of Brighton Premier Inn Bird and Bird Marks and Spencer Utilities / Transport University of Sussex Sheraton Park Lane Brick Court Chambers Property McQ Afferro Mining Westminster Kingsway College Travelodge Collyer Bristow Artesain Property Partnership Morrisons Cairn India Fenwick Elliot Holborn Links Polo Ralph Lauren Cemex Financial Services Investment IP Group Legal & General Principality Freight Transport Association AMP Lorem ipsumAberdeen dolor Asset Management sit amet,Maitland consectetur Chambers MWB Business Exchange Radley & Co Network Rail Ashcourt Rowanadipiscing Banquoelit. Credit Sed Management aliquamProlegal nunc lorem, Prospect First SAB Miller Marathon Oil Barbican Insurance Carnegie Russell Jones & Walker Slough Estates Tesco OFGEM Budget Insurancea auctor ligulaElectra Partners vestibulum et.SNR Denton Standard Life Virgin Holidays Veolia Water City Financial Gores The Old Court House, Kingston XLB Property Waitrose WSP Dexia GSA Capital Dun and Bradstreet Innisfree NETWORK RAIL CONSULTANT TEAM SCOTT BROWNRIGG SWEETT GROUP LONDON Architect Project Manager SWEETT GROUP WSP PB 54 WEEKS | COMMERCIAL | £21.0 M | 110,000 SQ FT Cost Consultant Service Engineer

The project entails the detailed design, refurbishment and fit out to CAT A standard of office space at 1 Puddle Dock for Network Rail.

The building is adjacent to a Key features: major transport link at Blackfriars • The replacement of existing Station, served by Thames Link mechanical & electrical installations. and London Underground and with • Exposed concrete soffits and ceiling public access from the station to services with low level perimeter the adjoining Mermaid Theatre FCUs. meaning extensive liaison with • Substantial re-modelling of the structure to overcome issues of the both Network Rail and London changes of level across the site and Underground is constantly building. TARGETED TO ACHIEVE required. • New lift installation within the exiting lift cores. • Extensive Green Roof with sedum mat. BREEAM • Large scale asbestos strip out under fully controlled conditions. VERY GOOD

CURRENT CONTRACT

8 LEGAL & GENERAL CONSULTANT TEAM JOHN COBB CONSULTING JOHN COBB CONSULTING STOCKLEY PARK Architect Project Manager JOHN COBB CONSULTING WSP 34 WEEKS | COMMERCIAL | £4.6M | 80,000 SQ FT Cost Consultant Service Engineer

As a part of its strategy to make the recently purchased Stockley Park development a more attractive rental property for new high calibre tenants, Legal & General appointed WDI to refurbish the newly acquired building in Stockley Park, London.

The client needed a contemporary the existing space, maximising the office space with differentiation potential and of the building. to appeal to multiple occupiers. Working in partnership with John KEY RESULTS Cobb Consulting, WDI refurbished • Two floor refurbishment the 2nd and 3rd floor to bring it to totalling 80,000 sq. ft. Category A standard. The project AWARDED • Full capital plant replacement involved refurbishing all core areas • New two storey entrance of the two floors – a total of over BREEAM EXCELLENT 80,000 sq. ft. A new two storey atrium created REFURBISHMENT entrance atrium was created in SCHEME FOR THE “WDI delivered the refurbishment and new services infrastructure to meet a demanding programme and achieved a high standard of BRE finishes on all areas. Engineering solutions were complex for the entrance remodelling and WDI provided good expertise in this and the softer contracting requirements. We are pleased with WDI’s considerable input” PIPPA BURCHETT, TECHNICAL SERVICES

7 9 STANDARD LIFE, COUNTY MALL CONSULTANT TEAM COMPREHENSIVE DESIGN GARDINER & THEOBALD CRAWLEY Architect Project Manager GARDINER & THEOBALD KJ TAIT ENGINEERS 38 WEEKS | COMMERCIAL | £4.2M Cost Consultant Service Engineer

Internal refurbishment of mall involving high level works, balustrade replacement, internal decorations & car park works.

Works comprised of the Internal KEY RESULTS refurbishment of mall shopping • Barisol stretch fabric ceilings centre including decorations, in various areas. balustrading & high level ceilings/ • The installation of a new lighting installations plus works feature lighting system. to car park areas. Works had to be undertaken out of hours whilst • Externally we refurbished all the mall was closed on Sunday car park areas and created new to Thursday nights inclusive. All feature entrances. works are undertaken out of hours • A great deal of works were HANDOVER TO A and comprise the re-modeling & undertaken at height, so LIVE ENVIRONMENT re-decoration of the internal areas, safety control has been of

Terrazzo flooring, balustrade- EVERY MORNING paramount importance. replacement and signage. WITH NO DISRUPTIONS

10 8 APAX CONSULTANT TEAM CS2 CS2 LONDON Architect Project Manager CS2 HOMES/CS2 21 WEEKS | FINANCE | £2.2M | 40,000SQFT Cost Consultant Service Engineer

Having successfully completed a Category A refurbishment for landlord Standard Life, WDI was appointed to refurbish occupied office space in the same building for the global investment management company, Apax Partners.

WDI removed and disposed of and infilled with new steel beams all demountable partition walls and concrete to gain more office and glazing, before installing and space. relocating the partitions. The existing metal pan/MF ceiling KEY RESULTS system was in part retained or • Steel Installation to voided areas replaced. The HVAC system and • Phased out of hours WE HAVE DELIVERED OVER existing lighting and power was refurbishment to occupied areas relocated. WDI stripped out the • More office space created internal staircases between floors 3M SQ FT OF OFFICE FIT OUT IN THE UK

9 11 LONDON SCHOOL OF ECONOMICS CONSULTANT TEAM JESTICO AND WHILES DAVID LANGDON LINCOLNS INN FIELD’S, LONDON Architect Project Manager AECOM/ 38 WEEKS | EDUCATION | £10.7M | 120,000 SQ FT Cost Consultant Service Engineer

WDI was appointed to refurbish and fit out of the Grade II listed seven storey building purchased by London School of Economics (LSE). Once selected, our dedicated project team spent a number of weeks investigating all aspects and risks associated with conducting Grade II works to meet LSE’s requirements. Having expanded our knowledge KEY RESULTS of Grade II projects and evaluated • BREEAM Very Good rating the client’s needs, WDI conducted all works including demolition and achieved and an EPC rating strip out of existing fixtures and of C fittings and installation of new • Overall waste >97% diverted M&E services throughout. WE HAVE from landfill

In addition, WDI installed • WDI piloted the re-cycling of SIGNIFICANT LISTED BUILDING new partitions – forming new 3300 m2 of waste mineral academic and teaching areas – as wool ceiling tiles from the EXPERIENCE well as decorating throughout strip-out phase. These were and providing all flooring finishes. Finally, WDI provided collected and recycled, refurbishment to the heritage resulting in Net Embodied areas, creating a new glazed Carbon savings of 5,142 entrance pavilion and Harvard kgCO2e Style lecture theatres.

12 10 11 CITY OF LONDON CORPORATION CONSULTANT TEAM WILLMOTT DIXON INTERIORS GUILDHALL YARD EAST, LONDON Architect Project Manager PICK EVERARD CHAPMAN BDSP 20 WEEKS | COMMERCIAL | £3M | 28,000 SQ FT Cost Consultant Service Engineer

Willmott Dixon Interiors have been appointed to carry out full Category B refurbishment works to the first to fourth floors inclusive and the ground floor reception area of the building known as Number One Guildhall Buildings. The works include the upgrading KEY FEATURES and reconfiguring of all of the existing office accommodation to a • Provide new lighting, power, data, fire alarm and access specification driven by the bespoke controls requirements of the City of London Police. • Replace VAV terminals & modify controls infrastructure Works include upgrading the air management and cooling of the • Supplement existing cooling building, complete refurbishment with VRV. of existing WCs and tea points, updating and reconfiguring • Construct new partitions to the office floors and increasing form offices and meeting the number of WCs in order to rooms including high security accommodate the increased internal doors density of occupation. • New ceilings throughout in conjunction with new lighting and ventilation distribution

• New sanitary ware.

• Clear anti blast window film to be applied to the inner surface of all windows 11 13 LANCER ESTATE CONSULTANT TEAM HORDEN CHERRY LEE ARCHITECTS LTD 33 CAVENDISH SQUARE, LONDON Architect POTTER RAPER PARTNERSHIP HILSON MORAN 26 WEEKS | COMMERCIAL | £5.6M | 62,000 SQ FT Cost Consultant Service Engineer

WDI were recently appointed to carry out fit out works to three floors at 33 Cavendish Square.

Category A Fit Out Works to the KEY RESULTS 8th, 12th & 13th Floors, Inclusive • Live environment of Major Mechanical & Electrical • Major M&E infrastructure Infrastructure Works to the entire works to the entire building building Taking new mechanical services from basement to floor 20 through a sealed riser while the entire building remains live ACHIEVED and the remaining tenants are not disturbed and Shower Installations CONSIDERATE CONTRACTORS to the Basement. SCORE OF 43

14 12 13 CITY OF LONDON CORPORATION CONSULTANT TEAM FREDRICK GIBBERD PARTNERSHIP GRESHAM STREET, LONDON Architect Project Manager CAPITA CUNDALLS 39 WEEKS | COMMERCIAL | £6M | 58,000 SQ FT Cost Consultant Service Engineer

Guildhall House is a six storey building constructed in the mid-80s in the Guildhall Conservation Area in the City of London. Compromising a basement, raised ground floor and a further five floors of offices, WDI was invited to fit out the building ahead of bringing it back to market to let as in a key city location near Bank. WDI carried out the major KEY RESULTS refurbishment of Guildhall House • WDI is now a trusted partner to Category A. We assumed full working with the City of design and build responsibility London Corporation on a from Stage E. Works included LAST YEAR WE DELIVERED range of projects refurbishment of Mechanical and Electrical systems (including lift), • Together we have created a reception and WCs. standardised specification model for future property fit 27 outs PROJECTS IN THE COMMERCIAL SECTOR

13 15 TURN CONSULTANT TEAM WDI BMS LONDON Interior Designer M&E 5 WEEKS | MARKETING & MEDIA | £310K | 3,800 SQ FT

WDI were appointed to refurbish occupied office space.

This involved the removal and KEY RESULTS disposal of all demountable • Interior fit out of the 3rd floor partition walls and glazing, plus (decorations to the 2nd) installing/relocating partitions. • Minor layout changes The existing metal pan/MF ceiling system to be new or retained. The • Installation of new kitchen, HVAC system and the existing plasma TVs, new floor finishes, lighting and power were relocated. decorations, new artwork and new furniture. WE HAVE DESIGNED OVER 100 INTERIOR SPACES

16 14 RUSSELL JONES & WALKER CONSULTANT TEAM WDI LONDON Interior Designer 14 WEEKS | LEGAL | £4M | 31,000 SQ FT

Following the successful completion of projects in Sheffield, Manchester and Cardiff, WDI’s long term relationship with Russell Jones & Walker led to us being appointed to carry out the refurbishment of RJW’s offices on Chancery Lane, London.

KEY RESULTS Project features included complete staff break-out/game areas and strip out of the lower ground floor kitchen facilities. The entire 5th to create a reception area and the Floor of the building was dedicated refurbishment of three floors of to meeting suites and client IN THE LAST 12 MONTHS the building dedicated to staff, lounge. We used creative furniture with mainly open plan and several solutions to create private areas cellular offices, showers, spacious and informal meeting space. 69% OF OUR WORK HAS BEEN FOR

“With everyone working to the same goal, it was a REPEAT CLIENTS united front to make Chancery Lane the best it could be. I was confident the project would be delivered on time. I knew they would deliver“ DARREN HACKETT, FACILITIES

15 17 MATHWORKS CONSULTANT TEAM CREATE JONES LANG LASALLE CAMBRIDGE BUSINESS PARK Architect Project Manager JONES LANG LASALLE AECOM 11 WEEKS | COMMERCIAL | £800K | 21,000 SQ FT Cost Consultant Service Engineer

Requiring more space for increasing employee numbers, Mathworks had taken out a lease of approx. 21,000 sq. ft. over two floors in a recently refurbished building adjacent to its existing building. WDI was appointed to carry out a Category B fit out of Cavendish House on the Cambridge Business Park.

WDI conducted the strip out desks within the open plan office works, and installed new partitions, area. glazing and floor finishes. We also modified the ceilings and KEY RESULTS the existing air conditioning to • Increased working space the cellularised areas. WDI also created WILLMOTT DIXON INTERIORS refurbished the reception areas, • Full refurbishment meeting facilities, kitchen facilities HAVE COMPLETED OVER • Refurbishment of working and and break out space. Finally, we common areas installed approximately 150 fixed 450 PROJECTS

18 16 17 FSCS CONSULTANT TEAM WDI LONDON Interior Designer 14 WEEKS | FINANCIAL SERVICES | 27,000 SQ FT

Having moved into new offices on the 10th floor at Beaufort House, the Financial Services Compensation Scheme (FSCS) appointed WDI to design and fit-out their new space. This required both Category A and Category B fit outs, the most important aspects of which were for our team to produce a design that would reinforce FSCS’s vision and image.

WDI delivered a complete ‘turn and ancillary items was also key’ solution. This encompassed all instrumental in delivering the FSCS aspects of the strategy for the new vision. workplace, including the interior KEY RESULTS design and build. We also managed • Complete ‘turn key’ project FSCS’s move to their new premises. Due to the importance of data • Workplace strategy, including FSCS’s activities, the Mechanical move management & Electrical components proved • Category A and Category B 10% critical. Fitting the right furniture fit outs OR OUR PROJECTS ARE IN THE FINANCIAL SERVICES The post-completion snagging period has been dealt with SECTOR efficiently, and as the offices continue to bed-in, Steve has continued to support us getting any problems resolved. The resulting fitout was a great success, and both staff and visitors have been very appreciative of their new surroundings. David Supple, FSCS

17 19 THE OLD COURT HOUSE CONSULTANT TEAM BLACK ARCHITECTURE FAITHFUL & GOULD KINGSTON Architect Project Manager FAITHFUL & GOULD ETEC ENGINEER 21 WEEKS | COMMERCIAL | £2.5M | 10,000 SQ FT Cost Consultant Service Engineer

The works form part of the wider redevelopment of the former Magistrate Courts, which will become the new home of the RBK Registration Service (Births, deaths and marriages).

This Project involves the removal KEY FEATURES of two out house buildings within separate courtyard’s making good • Installation of new toilets and new paving in these exterior areas. • Reusing existing furniture and refurbishing for joinery Within the building itself the items as part of Heritage majority of the works are on the requirements. ground floor except for some minor Mechanical and Electrical changes • Structural openings for further up the floors for ventilation, doorways air flow etc. REUSING EXISTING FURNITURE

20 18 19 MIRAMAX CONSULTANT TEAM WDI COVENT GARDEN, LONDON Interior Designer 6 WEEKS | MARKETING & MEDIA | £108K | 4,000 SQ FT

The internationally acclaimed entertainment company Miramax, opened their first European office in London, Covent Garden and partnered with WDI to deliver the design and fit out of the new office space.

From the outset it was apparent KEY RESULTS that Innocean Worldwide had a WDI has created a contemporary clear vision for the look and feel and stylish office scheme, for the new space. This proved an combining loft style office with exciting challenge to bridge both exposed brick and feature AV walls, strong Korean design principles film displays and bespoke flooring with raw creative UK flair. The goal features. was to incorporate their brand guidelines whilst introducing forward thinking innovate concepts LAST YEAR WE DELIVERED but in subtle ways. 115 PROJECTS

“The space provides a great environment for our team, and represents the quality of Miramax to our clients. We are delighted to be working with WDI, who have delivered creative and original solutions.“ DAN GOPA, MIRAMAX

19 21 XAFINITY CONSULTANT TEAM WDI NESCOR READING Interior Designers Project Manager 13 WEEKS | FINANCIAL SERVICES | £855K | 20,000 SQ FT

Xafinity, one of the UK’s leading specialists in pensions and employee benefits decided that moving to a modern office building would better suit their operational requirements.

They appointed WDI on a and feature joinery. One of our turnkey basis to deliver a cost challenges was to maximise the effective working environment optimum space for all of their that enhances their sociable & filing and record keeping. This was supportive culture at the Phoenix achieved by using a roller-racking Building, Reading. This CAT B fit filing system, creating total storage out of new commercial office space of some 700 liner meters. Overall, over two floors had a 12 week the whole job was a huge success programme and was successfully - a great client, good supply chain DELIVERED completed within 10 ½ weeks. and organization from start to Works included M&E adjustments, finish. cellular partitioning, floor finishes 10 DAYS EARLY

22 20 CITY OF LONDON CORPORATION CONSULTANT TEAM PRINGLE BRANDON PICK EVERARD TABERNACLE STREET, LONDON Architect Project Manager PICK EVERARD ETEC ASSOCIATES 48 WEEKS | COMMERCIAL | £4.5M | 20,000 SQ FT Cost Consultant Service Engineer WDI were appointed via the SCAPE framework to undertake the strip out & demolition of major structural elements, installation of new UKPN substation and full Cat A office fit out of 4-14 Tabernacle Street The building had been unoccupied KEY RESULTS for 2 years when WDI commenced • The removal of asbestos, diesel storage on site. There are 5 floors including a tank, old car lift and decommissioning of basement. Works included raised access the old sub-station with limited access to floor installation, lift replacement, street level. new toilet cores on each floor, ceilings • The boiler room area was significantly are decorated but the structural slab altered with new foundations and remains exposed with services fixed steelwork installed to create the new reception area. direct, window replacement and the elevations overclad. The 1st floor • The installation of a hidden disabled lift which rises out of the floor involved 3 terrace was fitted with artificial grass WDI companies working together to create a whilst the addition of 3 walk on roof one off solution. lights provided light into otherwise dark PROVIDED A FULL • All the windows were replaced and the corners of the basement and ground rear elevation was fully rendered. floor. Structural alterations included BIM MODEL stair removals, forming access holes • A new substation built in the basement whilst complying to UKPN requirements in slabs and creating new window & maximising lettable space for the FOR THE BUILDING openings. client.

“Willmott Dixon Interiors are an enthusiastic team who are able to effectively manage client requirements and expectations. The fit out and refurbishment work delivered is of quality standards”.

HUW RHYS LEWIS, DIRECTOR OF PROPERTY PROJECTS GROUP, CITY OF LONDON CORPORATION 23 CITY OF LONDON CORPORATION CONSULTANT TEAM EPR ARCHITECTS PICK EVERARD BRIDGE HOUSE Architect Project Manager CORDEROY HOARE LEA 50 WEEKS | COMMERCIAL | £5.4M | 25,177 SQ FT Cost Consultant Service Engineer

Refit of an existing 6 storey building, built in 1895, including full CAT A fit out over two phases and external repairs to provide a sustainable, high quality office accommodation procured via the SCAPE 3 Framework.

Works include strip out of existing Also a full brick/blockwork clean to floor plates to provide open plan all facades. office space, increasing the area New reception area will be from 2050m2 to 2339m2. relocated with a new automated Installation of a new core in the access controlled entrance that existing light well to provide a leads onto Queen Victoria Street. modern building facility with 2 new lifts, with disabled and able bodied KEY FEATURES WC facilities to all levels. TARGETED TO ACHIEVE • Unoccupied for 10 years Replacement of all windows and shop fronts to all elevations as • Adjacent to Blackfriars station, well as a full repair and repaint to substations, bridges, high existing facade to East, South, West power cables BREEAM & North West elevation. • City Thames Link nearby VERY GOOD • BREEAM Very Good

CURRENT CONTRACT

24 21 We spend locally wherever we can , supporting local enterprises and businesses. Using local labour and services means that money we spend stays within the local economy.

IN THE LAST 12 MONTHS 69% OF OUR WORK HAS BEEN FOR REPEAT CLIENTS!

21 25 OUR 10 POINT SUSTAINABLE PLAN

2622 WILLMOTT DIXON INTERIORS

32 Farringdon Street London EC4A 4HJ

T: 0207 634 9600 E: [email protected] willmottdixoninteriors.co.uk weareWDI

BEV WILLIAMS SALES DIRECTOR M: 07896 701 114 T: 0207 634 9600 Email: [email protected]