New This Week Construction Area Crews begin subcut Full Reconstruction: Circle Down, Turners Cross- on Circle Down , King Creek Rd, King Hill Rd, Harold Ave, news Rhode Island Ave, Welcome Ave, Phoenix St Mill and Overlay: Welcome Cir 2012 PAVEMENT MANAGEMENT PROGRAM JUNE 15, 2012

Base Paving Complete, Subcut Starts Deadlines For Driveway Estimates In the last two weeks, the contractor completed the subcut and paved the base If you’re interested in receiving an estimate to layer of pavement (see article below) on King Hill Rd and King Creek Rd. replace your driveway as part of the ’s On Circle Down, crews completed utility work and started work on the subcut.* reconstruction project, call Public Works (763- The subcut work is expected to continue into next week. Once the subcut is com- 593-8030). pleted, crews will install curb and gutter.* For homes on Rhode Island Ave and Harold On Harold Ave and Rhode Island Ave, the private utility companies (Centerpoint, Ave, the deadline to request an estimate is CenturyLink, Comcast, Xcel) continued their relocation work, which is anticipated Monday, July 2. The deadline has passed for to continue until the City’s project begins in July. all other areas. * For more information on subcuts, see the article in the May 18, 2012 Construc- tion News. For more information on curb and gutter, see the article in the June 1, 2012 Construction News. Copies also available at www.goldenvalleymn.gov/ /pmp/property-owners.php. Why Pave In Two Layers? Driveway Maintenance Tips Golden Valley’s new The following information will tural benefit; however, if you asphalt are help you maintain your new choose to use a sealer, it is paved in two lay- blacktop or driveways: recommended not to use any ers called the base products labeled “ .” New Blacktop Driveways: course and the wear Instead, use asphalt emulsion • Please be aware for at least course. The first layer sealers. Follow the manufac- six months after construction, of asphalt, known as turer’s directions for applica- parking any vehicle, trailer, the base course, is 3 tion of these products. Wait motorcycle, , etc on inches thick. a minimum of three years your driveway, especially before applying any sealer. It provides a smooth surface while the construction work focuses when the blacktop tempera- on smaller scale items such as boulevards, driveways, and rais- ture is above 60 degrees New Concrete Driveways: ing utility structures to the level of the new street. Fahrenheit, may leave de- • You should not drive on your pressions in the pavement. driveway for at least one Not only is the smooth surface easier to drive on for residents, • Also, avoid making sharp week after it is constructed. it also helps with drainage during rainstorms and reduces the turns because they can scuff • The contractor sprays the amount of dust in the air. the new surface. Though new concrete with curing Finally, paving the base course and letting it sit for a while gives the some depressions and scuff- compound when it is poured. new road time to settle before the final layer of asphalt is applied. ing are expected because This seals the concrete to the new asphalt is tender for keep it moist and help it cure. The second layer, known as the wear course, is 1.5 inches thick and several months until it has • Wait until next spring before is the final component of the new road. Soon after the final layer of time to cure, parking in your sealing your concrete drive- asphalt is paved and cooled down, the road is open to traffic. garage is recommended to way. Several concrete sealant Your help is needed to keep the new streets looking good. Please keep depressions and scuff- products, including clear do not turn the of your vehicle when the vehicle is not in motion, ing to a minimum. acrylic sealers, linseed oil, and as this can scuff the asphalt. Also, please do not park a vehicle on • Applying sealers normally penetrating sealers, are avail- the street in the same spot for an extended time (days). Leaving the does not result in any struc- able from a variety of retailers. vehicle stationary can cause depressions in the pavement. news 7800 Golden Valley Road Golden Valley, MN 55427-4588

This document is available in alternate formats upon a 72-hour request. Please call 763-593-8006 (TTY: 763-593-3968) to make a request. Examples of alternate formats may include large print,

electronic, Braille, audiocassette, etc.

there, contact Public Works at 763-593-8030. at Works Public contact there,

your new driveway or sod, go to the City website and check out the PMPs Tips & Answers page. If you don’t find answers answers find don’t you If page. Answers & Tips PMPs the out check and website City the to go sod, or driveway new your

If you’re wondering about various construction practices, or if you’re looking for information about things like taking care of of care taking like things about information for looking you’re if or practices, construction various about wondering you’re If

www.goldenvalleymn.gov/streets/pmp/ Tips & Answers & Tips

relayed to on-call Public Works personnel. Works Public on-call to relayed rides, etc. Call Public Works at 763-593-8030. at Works Public Call etc. rides,

goldenvalleymn.gov.

sewer back-up, etc). Your message will be be will message Your etc). back-up, sewer ing access for wheelchairs, Metro Mobility Mobility Metro wheelchairs, for access ing

at 763-593-3987 or pschutrop@ or 763-593-3987 at street, disruption to water service, sanitary sanitary service, water to disruption street, - need residents with work will contractor The

immediate assistance by the City (flooded (flooded City the by assistance immediate newsletter by email, contact us us contact email, by newsletter Needs? Special

763-593-8079 to report problems that require require that problems report to 763-593-8079 To get this this get To you. to useful be

Call the Golden Valley Police Department at at Department Police Valley Golden the Call Customer Service Office • 612-321-5369 • Office Service Customer

and other information that may may that information other and

AFTER-HOUR EMERGENCIES AFTER-HOUR

Energy CenterPoint

numbers of contact persons, persons, contact of numbers

construction scheduling, phone phone scheduling, construction Jeannine Clancy, Director of Public Works • 763-593-8035 • [email protected] • 763-593-8035 • Works Public of Director Clancy, Jeannine

Al Lundstrom, City Forester • 763-593-8046 • [email protected] • 763-593-8046 • Forester City Lundstrom, Al

newsletter will include updates on on updates include will newsletter

Jeff Oliver, City Engineer • 763-593-8034 • [email protected] • 763-593-8034 • Engineer City Oliver, Jeff

will be printed biweekly. The The biweekly. printed be will News

Brian Dahlberg, Technician • 763-593-8112 • [email protected] • 763-593-8112 • Technician Engineering Dahlberg, Brian

Construction Construction construction, During

Mark Ray, Engineering Technician • 763-593-3960 • [email protected] • 763-593-3960 • Technician Engineering Ray, Mark

Valley Golden of City Newsletters

(When calling, please provide your address.) your provide please calling, (When

Contact Us Contact

Project

tips-answers.php. tips-answers.php. all missed pick-ups to Allied Waste at 952-941-5174. at Waste Allied to pick-ups missed all

www.goldenvalleymn.gov/streets/pmp/ will collect recycling in street reconstruction areas on schedule. Please continue to report report to continue Please schedule. on areas reconstruction street in recycling collect will

and provides helpful coping tips. Go to to Go tips. coping helpful provides and

am on Fridays of your service week. The recycling contractor contractor recycling The week. service your of Fridays on am 7 by curbside recycling your

answers frequently asked questions, questions, asked frequently answers

Recycling should be picked up as scheduled. Please continue to have have to continue Please scheduled. as up picked be should Recycling Recycling

site also defines construction terms, terms, construction defines also site

- web City the process, construction Schutrop at 763-593-3987 or [email protected] to get on the list. the on get to [email protected] or 763-593-3987 at Schutrop

If you want to learn more about the the about more learn to want you If If you would prefer to have Construction News emailed to you, contact Pat Pat contact you, to emailed News Construction have to prefer would you If 8030.

project-related questions to City staff. For other questions, call Public Works at 763-593- at Works Public call questions, other For staff. City to questions project-related property-owners.php.

At the construction site, please direct all all direct please site, construction the At

Construction Questions Construction www.goldenvalleymn.gov/streets/pmp/

are available anytime online at at online anytime available are News

all of the doors around your house for written notices of upcoming work. work. upcoming of notices written for house your around doors the of all

Construction Construction of editions Published

part of a day (you will be able to get back into your driveway each evening). Please check check Please evening). each driveway your into back get to able be will (you day a of part

copy is? copy upcoming work, particularly if the work will make your driveway inaccessible for most or or most for inaccessible driveway your make will work the if particularly work, upcoming

but can’t remember where the paper paper the where remember can’t but

The contractor will routinely notify you about about you notify routinely will contractor The Check Doors For Notices For Doors Check

, , News Construction of edition old an in

Remember seeing an interesting article article interesting an seeing Remember makes an effort to notify residents as soon as possible. as soon as residents notify to effort an makes

Want More Info? More Want subcontractors, or other unforeseen events can cause schedule changes. The contractor contractor The changes. schedule cause can events unforeseen other or subcontractors,

Weather, delays by by delays Weather, Schedules May Change On Short Notice Short On Change May Schedules