ASPHALT PAVING DESIGN GUIDE Minnesota Asphalt Pavement Association I Asphalt Paving Design Guide
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
(Vocs and Svocs) from Warm Mix Asphalt Incorporating Natural Zeolite and Reclaimed Asphalt Pavement for Sustainable Pavements
sustainability Article Evaluation of Reductions in Fume Emissions (VOCs and SVOCs) from Warm Mix Asphalt Incorporating Natural Zeolite and Reclaimed Asphalt Pavement for Sustainable Pavements Javier Espinoza 1,2 , Cristian Medina 1,2, Alejandra Calabi-Floody 3 , Elsa Sánchez-Alonso 3 , Gonzalo Valdés 3 and Andrés Quiroz 1,2,* 1 Chemical Ecology Laboratory, Department of Chemical Sciences and Natural Resources, University of La Frontera, Temuco 4811230, Chile; [email protected] (J.E.); [email protected] (C.M.) 2 Biotechnological Research Center Applied to the Environment (CIBAMA), University of La Frontera, Temuco 4811230, Chile 3 Department of Civil Works Engineering, University of La Frontera, Temuco 4811230, Chile; [email protected] (A.C.-F.); [email protected] (E.S.-A.); [email protected] (G.V.) * Correspondence: [email protected] Received: 26 September 2020; Accepted: 10 November 2020; Published: 17 November 2020 Abstract: Conventional asphalt mixtures used for road paving require high manufacturing temperatures and therefore high energy expenditure, which has a negative environmental impact and creates risk in the workplace owing to high emissions of pollutants, greenhouse gases, and toxic fumes. Reducing energy consumption and emissions is a continuous challenge for the asphalt industry. Previous studies have focused on the reduction of emissions without characterizing their composition, and detailed characterization of volatile organic compounds (VOCs) and semi-volatile organic compounds (SVOCs) in asphalt fumes is scarce. This communication describes the characterization and evaluation of VOCs and SVOCs from asphalt mixtures prepared at lower production temperatures using natural zeolite; in some cases, reclaimed asphalt pavement (RAP) was used. -
Module 6. Hov Treatments
Manual TABLE OF CONTENTS Module 6. TABLE OF CONTENTS MODULE 6. HOV TREATMENTS TABLE OF CONTENTS 6.1 INTRODUCTION ............................................ 6-5 TREATMENTS ..................................................... 6-6 MODULE OBJECTIVES ............................................. 6-6 MODULE SCOPE ................................................... 6-7 6.2 DESIGN PROCESS .......................................... 6-7 IDENTIFY PROBLEMS/NEEDS ....................................... 6-7 IDENTIFICATION OF PARTNERS .................................... 6-8 CONSENSUS BUILDING ........................................... 6-10 ESTABLISH GOALS AND OBJECTIVES ............................... 6-10 ESTABLISH PERFORMANCE CRITERIA / MOES ....................... 6-10 DEFINE FUNCTIONAL REQUIREMENTS ............................. 6-11 IDENTIFY AND SCREEN TECHNOLOGY ............................. 6-11 System Planning ................................................. 6-13 IMPLEMENTATION ............................................... 6-15 EVALUATION .................................................... 6-16 6.3 TECHNIQUES AND TECHNOLOGIES .................. 6-18 HOV FACILITIES ................................................. 6-18 Operational Considerations ......................................... 6-18 HOV Roadway Operations ...................................... 6-20 Operating Efficiency .......................................... 6-20 Considerations for 2+ Versus 3+ Occupancy Requirement ............. 6-20 Hours of Operations .......................................... -
Pedestrian and Light Traffic Applications Introduction Brick Pavers Are Arranged Cost Savings That Upon the Bedding Sand in Supplement the Savings the Desired Pattern
Flexible Brick Industry Brick Paving Association Pedestrian and Light Traffic Applications Traffic Light and Pedestrian Introduction brick pavers are arranged cost savings that upon the bedding sand in supplement the savings the desired pattern. Sand afforded by the brick is then spread into the itself. In addition, spaces between the pavers replacement of pavers as jointing material. after repair of utilities beneath a flexible brick As the whole paving pavement is easily system compacts with time achieved. and use, the bricks interact with the jointing sand and base materials to achieve the unique quality of “interlock.” Interlock holds the pavers in place Brick paving has been used for thousands and distributes the load of years. The Romans laid brick in roads through the layers down crisscrossing their vast empire, some of to the subgrade, enabling which still exist. Americans have employed the surface to contribute the material since the earliest Colonial days, to the strength of the and brick pathways and sidewalks thread whole system. When through the landmark sites and properly installed, brick As an architect’s medium, historic areas across the country. interlocking pavements are brick is equally flexible. highly stable and durable. Its basic aesthetic appeal is legendary as a material Today, as many property the flexible nature of its This basic advantage begets that exudes warmth and owners and architects foundation and the action others. Because flexible elegance through the attest, brick paving is of the pavers themselves. brick paving provides permanent color of fired timeless, especially for In such flexible pavements, interlock, no rigid concrete clay or shale. -
Pavements and Surface Materials
N O N P O I N T E D U C A T I O N F O R M U N I C I P A L O F F I C I A L S TECHNICAL PAPER NUMBER 8 Pavements and Surface Materials By Jim Gibbons, UConn Extension Land Use Educator, 1999 Introduction Traffic Class Type of Road Pavements are composite materials that bear the weight of 1 Parking Lots, Driveways, Rural pedestrian and vehicular loads. Pavement thickness, width and Roads type should vary based on the intended function of the paved area. 2 Residential Streets 3 Collector Roads Pavement Thickness 4 Arterial roads 5 Freeways, Expressways, Interstates Pavement thickness is determined by four factors: environment, traffic, base characteristics and the pavement material used. Based on the above classes, pavement thickness ranges from 3" for a Class 1 parking lot, to 10" or more for Class 5 freeways. Environmental factors such as moisture and temperature significantly affect pavement. For example, as soil moisture Sub grade strength has the greatest effect in determining increases the load bearing capacity of the soil decreases and the pavement thickness. As a general rule, weaker sub grades require soil can heave and swell. Temperature also effects the load thicker asphalt layers to adequately bear different loads associated bearing capacity of pavements. When the moisture in pavement with different uses. The bearing capacity and permeability of the freezes and thaws, it creates stress leading to pavement heaving. sub grade influences total pavement thickness. There are actually The detrimental effects of moisture can be reduced or eliminated two or three separate layers or courses below the paved wearing by: keeping it from entering the pavement base, removing it before surface including: the sub grade, sub base and base. -
MDG 15 – Trucks and Loaders Open Cut Incidents
MDG 15 – Trucks and Loaders Open Cut Incidents Incident Agent of Events Recommendations Information Fatality COAL OPEN-CUT INCIDENTS 8/01/2008 Unintended Fatally injured while attempting to Maintain adequate berm United States operation of dump spoil. The truck travelled heights, monitor work Coal Equipment over the edge of the dump and practices, ensure correct task Open-Cut rolled down the spoil slope 140 training, conduct pre-op feet. checks and use seat belts. 16/11/2007 Drowning Driver was attempting to dump Ensure adequate berms and United States spoil when he reversed over a 70 that safe work procedures are Coal foot high slope and down to the followed. Ensure work areas Open-Cut mine floor. are illuminated at night and that Pre-op checks of equipment are performed. 2/07/2007 Other Dozer operator was standing by his Mine shall train all workers in United States machine when foreman told him to regards to pick-up trucks and Coal move it for a highwall shot. He to use all available safety Open-Cut was then run over by the foreman equipment within a truck. on his way to the dozer. 28/11/2006 Unintended Driver reported that the park brake Strengthened policy about United States Operation of was sticking and was then found at applying park brakes before Coal Equipment the base of hill crushed between exiting truck, ensure proper Open-Cut the truck and a berm. Was either machine maintenance. thrown from truck or got out and brakes released. 23/05/2006 Unintended Miner driving a Mack water truck Implement extensive driver United States Operation of lost control descending a steep training, implement Coal Equipment mine access road. -
Replacement of Davis Avenue Bridge Over Indian Harbor Bridge No
REPLACEMENT OF DAVIS AVENUE BRIDGE OVER INDIAN HARBOR BRIDGE NO. 05012 November 19, 2019 1 MEETING AGENDA • Project Team • Project Overview • Existing Conditions • Alternatives Considered • Traffic Impacts • Proposed Alternative • Railing Options • Construction Cost / Schedule • Contact Information • Questions 2 PROJECT TEAM Town of Greenwich Owner Alfred Benesch & Company Prime Consultant, Structural, Highway, Hydraulic, Drainage Design GZA GeoEnvironmantal Inc. Environmental Permitting Didona Associates Landscape Architects, LLC Landscaping Services, Planning 3 LOCATION MAP EXIT 4 EXIT 3 BRIDGE LOCATION 4 AERIAL VIEW BRIDGE LOCATION 5 PROJECT TIMELINE CURRENT PROJECT STATUS INVESTIGATION ALTERNATIVES PRELIMINARY FINAL CONSTRUCTION PHASE ASSESSMENT DESIGN DESIGN Spring to Fall 2020 February 2018 to June 2018 to January 2019 to May 2019 to May 2018 January 2019 April 2019 December 2019 6 PROJECT GOALS • Correct Existing Deficiencies of the Bridge (Structural and Functional) • Improve Multimodal Traffic Flow at Bridge Crossing (Vehicles / Bicycles / Pedestrians) • Maintain / Enhance Safety at Bridge Crossing • Meet Local, State, and Federal Requirements 7 EXISTING BRIDGE – BRIDGE PLAN 8 EXISTING BRIDGE – CURRENT PLAN VIEW 9 EXISTING BRIDGE Existing Bridge Data • Construction Year: 1934 • Structure Type: Concrete Slab Supported on Stone Masonry Abutments and Pier • Structure Length: 37’‐3” (17’‐1” Span Lengths) • Bridge Width: 43’+ (Outside to Outside) • Lane Configuration: Two Lanes, Two 4’ Sidewalks • Existing Utilities: Water, Gas (Supported -
PASER Manual Asphalt Roads
Pavement Surface Evaluation and Rating PASER ManualAsphalt Roads RATING 10 RATING 7 RATING 4 RATING PASERAsphalt Roads 1 Contents Transportation Pavement Surface Evaluation and Rating (PASER) Manuals Asphalt PASER Manual, 2002, 28 pp. Introduction 2 Information Center Brick and Block PASER Manual, 2001, 8 pp. Asphalt pavement distress 3 Concrete PASER Manual, 2002, 28 pp. Publications Evaluation 4 Gravel PASER Manual, 2002, 20 pp. Surface defects 4 Sealcoat PASER Manual, 2000, 16 pp. Surface deformation 5 Unimproved Roads PASER Manual, 2001, 12 pp. Cracking 7 Drainage Manual Patches and potholes 12 Local Road Assessment and Improvement, 2000, 16 pp. Rating pavement surface condition 14 SAFER Manual Rating system 15 Safety Evaluation for Roadways, 1996, 40 pp. Rating 10 & 9 – Excellent 16 Flagger’s Handbook (pocket-sized guide), 1998, 22 pp. Rating 8 – Very Good 17 Work Zone Safety, Guidelines for Construction, Maintenance, Rating 7 – Good 18 and Utility Operations, (pocket-sized guide), 1999, 55 pp. Rating 6 – Good 19 Wisconsin Transportation Bulletins Rating 5 – Fair 20 #1 Understanding and Using Asphalt Rating 4 – Fair 21 #2 How Vehicle Loads Affect Pavement Performance Rating 3 – Poor 22 #3 LCC—Life Cycle Cost Analysis Rating 2 – Very Poor 23 #4 Road Drainage Rating 1 – Failed 25 #5 Gravel Roads Practical advice on rating roads 26 #6 Using Salt and Sand for Winter Road Maintenance #7 Signing for Local Roads #8 Using Weight Limits to Protect Local Roads #9 Pavement Markings #10 Seal Coating and Other Asphalt Surface Treatments #11 Compaction Improves Pavement Performance #12 Roadway Safety and Guardrail #13 Dust Control on Unpaved Roads #14 Mailbox Safety #15 Culverts-Proper Use and Installation This manual is intended to assist local officials in understanding and #16 Geotextiles in Road Construction/Maintenance and Erosion Control rating the surface condition of asphalt pavement. -
Characteristics of Oil Sands Products
CHARACTERISTICS OF OIL SANDS PRODUCTS Heather D. Dettman Center for Spills in the Environment Oil Sands Products Training Portland, Maine December 4 & 5, 2012 2 Simplified —Oil Sands to Motor“ Value Chain Tailings Pipeline Transport Desalter Extraction Mining Pipeline Terminal Distillation W ater/Solids Primary Upgrading Removal Coking or Residue Performed at Upgraders DiluentAddition Hydrocracking Performed at Refineries In Situ Production Secondary Upgrading May be needed in future Catalytic Processing (Hydrogen) Refining Catalytic Processing (Hydrogen) Gasoline Diesel 3 Pipeline Definitions Transm ission Tailings Pipeline Transport Desalter Extraction Mining Pipeline Terminal Distillation Feeder W ater/Solids Primary Upgrading Removal Coking or Residue Performed at Upgraders DiluentAddition Hydrocracking Gathering Performed at Refineries In Situ Production Secondary Upgrading May be needed in future Catalytic Processing (Hydrogen) http://www.cepa.com /about-pipelines/types-of-pipelines Refining Catalytic Processing (Hydrogen) Gasoline Diesel 4 0hat Is Bitumen? ° Bitumen is the —extra heavy“ crude oil that remains after the biodegradation of oil in Northern Alberta ° Initial boiling point is 204°C/399.2°F ° Approximately 50wt% of the oil boils at temperatures below 524°C/975.2°F ° Biodegradation has resulted in organic acids being left behind in the oil ° Total acid number (TAN) is 3mg KOH/g which corresponds to an organic acid content of 3wt% in the oil ° Organic acid species in bitumen are relatively large molecules with 70wt% boiling -
Secure Fuels from Domestic Resources ______Profiles of Companies Engaged in Domestic Oil Shale and Tar Sands Resource and Technology Development
5th Edition Secure Fuels from Domestic Resources ______________________________________________________________________________ Profiles of Companies Engaged in Domestic Oil Shale and Tar Sands Resource and Technology Development Prepared by INTEK, Inc. For the U.S. Department of Energy • Office of Petroleum Reserves Naval Petroleum and Oil Shale Reserves Fifth Edition: September 2011 Note to Readers Regarding the Revised Edition (September 2011) This report was originally prepared for the U.S. Department of Energy in June 2007. The report and its contents have since been revised and updated to reflect changes and progress that have occurred in the domestic oil shale and tar sands industries since the first release and to include profiles of additional companies engaged in oil shale and tar sands resource and technology development. Each of the companies profiled in the original report has been extended the opportunity to update its profile to reflect progress, current activities and future plans. Acknowledgements This report was prepared by INTEK, Inc. for the U.S. Department of Energy, Office of Petroleum Reserves, Naval Petroleum and Oil Shale Reserves (DOE/NPOSR) as a part of the AOC Petroleum Support Services, LLC (AOC- PSS) Contract Number DE-FE0000175 (Task 30). Mr. Khosrow Biglarbigi of INTEK, Inc. served as the Project Manager. AOC-PSS and INTEK, Inc. wish to acknowledge the efforts of representatives of the companies that provided information, drafted revised or reviewed company profiles, or addressed technical issues associated with their companies, technologies, and project efforts. Special recognition is also due to those who directly performed the work on this report. Mr. Peter M. Crawford, Director at INTEK, Inc., served as the principal author of the report. -
The Mineral Industry of Virginia
THE MINERAL INDUSTRY OF VIRGINIA This chapter has been prepared under a Memorandum of Understanding between the U.S. Geological Survey and the Virginia Department of Mines, Minerals and Energy for collecting information on all nonfuel minerals. In 2000, the estimated value1 of nonfuel mineral production lime. The State increased to 7th from 9th in the production of for Virginia was $692 million, based upon preliminary U.S. common clays. Although the only producing kyanite mine and Geological Survey (USGS) data. This was a 6.5% increase calcined kyanite (mullite) facilities in the United States were in from that of 19992 and followed a 2.2% increase from 1998 to Virginia, synthetic mullite, which is a calcined bauxite, was 1999. Virginia was 22d in rank among the 50 States in total produced in one other State. About 90% of the U.S. kyanite and nonfuel mineral production value, of which the State accounted mullite output is used in refractories for the smelting and for more than 1.5% of the U.S. total. processing of a variety of metals and in glass and in high- Crushed stone was, by value, Virginia’s leading raw nonfuel temperature ceramics manufacturing. mineral, accounting for 60% of the State’s total mineral The following narrative information was provided by the production value. From 1990 through 2000, the State produced Virginia Division of Mineral Resources3 (VDMR). Some more than 628 million metric tons of crushed stone, or an production data in the text that follows are those reported by the average of almost 57 million metric tons per year. -
CONCRETE Pavingtechnology Concrete Intersections a Guide for Design and Construction
CONCRETE PAVINGTechnology Concrete Intersections A Guide for Design and Construction Introduction Traffic causes damage to pavement of at-grade street and road intersections perhaps more than any other location. Heavy vehicle stopping and turning can stress the pavement surface severely along the approaches to an intersection. The pavement within the junction (physical area) of an intersection also may receive nearly twice the traffic as the pavement on the approaching roadways. At busy intersections, the added load and stress from heavy vehicles often cause asphalt pavements to deteriorate prematurely. Asphalt surfaces tend to rut and shove under the strain of busses and trucks stopping and turning. These deformed surfaces become a safety concern for drivers and a costly maintenance problem for the roadway agency. Concrete pavements better withstand the loading and turning movements of heavy vehicles. As a result, city, county and state roadway agencies have begun rebuilding deteriorated asphalt intersections with con- crete pavement. These agencies are extending road and street system maintenance funds by eliminating the expense of intersections that require frequent maintenance. At-grade intersections along business, industrial and arterial corridor routes are some of the busiest and most vital pavements in an urban road network. Closing these roads and intersections for pavement repair creates costly traffic delays and disruption to local businesses. Concrete pavements provide a long service life for these major corridors and intersections. Concrete pavements also offer other advantages for As a rule, it is important to evaluate the existing pave- intersections: ment condition before choosing limits for the new concrete pavement. On busy routes, it may be desir- 1. -
Concrete Sidewalk Specifications
CONCRETE SIDEWALK SPECIFICATIONS GENERAL Concrete sidewalks shall be constructed in accordance with these specifications and the requirements of the State of Wisconsin, Department of Transportation, Standard Specifications for Road and Bridge Construction, Current Edition (hereafter “Standard Specifications”). Concrete sidewalks shall conform to the lines and grades established by the City Engineer. All removal and replacements will be made as ordered by the City Engineer. The Contractor shall construct one-course sidewalks of a minimum thickness of four (4) inches in accordance with the plans and specifications. Sidewalk through a driveway section shall be a minimum thickness of six (6) inches. Concrete driveway approaches shall be a minimum thickness of six (6) inches. SUBGRADE A new sub-base may be required by the Engineer if, in his opinion, the soil in the subgrade is soft or spongy in places and will swell or shrink with changes in its moisture content. If a new sub- base is required, it shall consist of granular material and shall be spread to a depth of at least three (3) inches and thoroughly compacted. While compacting the sub-base the material shall be thoroughly wet and shall be wet when the concrete is deposited but shall not show any pools of water. If the Contractor undercuts the subgrade two (2) inches or more, he shall, at his expense, bring the subgrade to grade by using gravel fill and it shall be thoroughly compacted. Where sidewalk is placed over excavations such as tree roots or sewer laterals, four (4) one-half (1/2) inch reinforcing bars shall be placed to prevent settling or cracking of the sidewalk.