MDG 15 – Trucks and Loaders Open Cut Incidents

Total Page:16

File Type:pdf, Size:1020Kb

MDG 15 – Trucks and Loaders Open Cut Incidents MDG 15 – Trucks and Loaders Open Cut Incidents Incident Agent of Events Recommendations Information Fatality COAL OPEN-CUT INCIDENTS 8/01/2008 Unintended Fatally injured while attempting to Maintain adequate berm United States operation of dump spoil. The truck travelled heights, monitor work Coal Equipment over the edge of the dump and practices, ensure correct task Open-Cut rolled down the spoil slope 140 training, conduct pre-op feet. checks and use seat belts. 16/11/2007 Drowning Driver was attempting to dump Ensure adequate berms and United States spoil when he reversed over a 70 that safe work procedures are Coal foot high slope and down to the followed. Ensure work areas Open-Cut mine floor. are illuminated at night and that Pre-op checks of equipment are performed. 2/07/2007 Other Dozer operator was standing by his Mine shall train all workers in United States machine when foreman told him to regards to pick-up trucks and Coal move it for a highwall shot. He to use all available safety Open-Cut was then run over by the foreman equipment within a truck. on his way to the dozer. 28/11/2006 Unintended Driver reported that the park brake Strengthened policy about United States Operation of was sticking and was then found at applying park brakes before Coal Equipment the base of hill crushed between exiting truck, ensure proper Open-Cut the truck and a berm. Was either machine maintenance. thrown from truck or got out and brakes released. 23/05/2006 Unintended Miner driving a Mack water truck Implement extensive driver United States Operation of lost control descending a steep training, implement Coal Equipment mine access road. Service brakes procedures for regular Open-Cut were not adequate, engine brake maintenance of machines inoperable and worker not task brakes and start pre- trained. operational checks o trucks. 6/12/2005 Unintended Driver lost control and slid over Overhaul of maintenance staff United States Operation of embankment while descending a and procedures, runaway truck Coal Equipment grade into the mines lower pit. safety procedures, seatbelt use Open-Cut policy and hazard recognition training. 8/11/2005 Unintended Driver lost control and slid over Maintain equipment in good United States Operation of embankment of mine haul road. working order, wear seatbelt Coal Equipment and follow speed limits. Open-Cut 7/08/2005 Uncontrolled Person suffered fatal injuries when Follow the standard for Australia Release of Energy changing a dual tyre and rim changing tyres, follow Queensland assembly on a drive axle bogey of manufacturers’ procedures and Coal a road train prime mover. ensure safe maintenance Open-Cut conditions. 21/04/2005 Contact with Moving Technician was standing in New written procedures to be United States or Rotating Plant articulating section of front end adhered to when entering the Coal (Guarding/Access to loader repairing it with engine on, articulating area of a loader. Open-Cut Danger Zone) when it articulated and crushed him. 1/10/2004 Fire Abrasion of a hose caused oil to All equipment should be United States leak into the cabin of loader which tested after purchase to ensure Coal ignited and the operator was it is in working order, Open-Cut unable to escape. installation of fire suppression systems and initiate the shut down of faulty equipment. Page 1 of 51 4/04/2004 Other Empty coal truck failed to Check equipment prior to United States negotiate a 90 degree turn and operation for any defaults, Coal overturned killing driver without check all guardrails for Open-Cut seatbelt. structural quality, ensure radios are used properly, ensure enough rest breaks for staff, and ensure road signs are marked properly. 10/02/2004 Drowning The brakes failed on a truck and it Initiate frequent checks of United States ran down a steep grade, through a equipment to ensure it is Coal berm and into water at the bottom. operational, pre-operational Open-Cut and tag out lock out procedures for faulty equipment. 17/09/2003 Other Van was run over by a rock truck Mine should use standardized United States due to a lack of communication signals on site, monitor work Coal between trucks habits to ensure compliance, Open-Cut conduct pre-operational inspections and make equipment highly visible. 9/09/2003 Other Using trucks in muddy conditions Hook was not attached to an United States to haul equipment, one of the anchored towing point, proper Coal hooks used to tow failed and towing rope was not used and Open-Cut swung back, striking one of the truck was too small to be drivers in the head. towing equipment of that size. 26/06/2003 Other Driver went straight past a Dumping practices and United States dumping pit and then rolled down location reviewed and check Coal an embankment to pit floor. up on staff when they are Open-Cut working. 23/06/2003 Other Mechanic was operating on All raised equipment to be United States excavator when loader moved and blocked against motion and Coal he was crushed between loader train staff in blocking Open-Cut holding it steady and excavator. procedures. 9/04/2003 Other Truck driver had inoperable brakes Management to establish United States when he lost control and jumped brake testing guidelines, Coal from the cabin, only to be hit by ensure seatbelts are worn and Open-Cut one the tray of the truck. perform pre-operational checks on equipment. 17/03/2003 Other Truck driver had inoperable brakes Make sure workers are United States when he lost control and jumped wearing seat belts, grade of Coal from the cabin, only to be hit by hill was too steep for Open-Cut one of the tyres and killed. equipment being used, and truck differentials should all be locked before ascending this steep road. 28/12/2002 Contact with Moving Victim was pinned between inside Increased safety and task United States or Rotating Plant wall of truck bed and basket of training for staff present in the Coal (Guarding/Access to hydraulic excavator while welding mine. Open-Cut Danger Zone) a steel plate into truck. 30/08/2002 Unintended Driver in truck rolled down road Improvement of the berm in United States Operation of and 700 feet over berm and down the area of the accident would Coal Equipment to mine floor. have prevented the low speed Open-Cut crash. 10/07/2002 Other Driver was attempting to free a Block motion to equipment United States locked axle, and while using a pry- before performing Coal bar to free this, the truck moved, maintenance on it, initiate Open-Cut crushing him. procedures for truck maintenance and give training on hazard recognition. Page 2 of 51 26/04/2002 Unintended A mechanic/welder was fatally Don’t leave mobile equipment United States Operation of injured fuelling a bulldozer in pit unattended unless brakes are Coal Equipment of a surface coal mine. While set. When mobile equipment is Open-Cut fuelling bulldozer, victim's service left unattended turn wheels truck began to roll away. Victim into bank or block them. ran after truck and jumped on, Emphasize proper methods of however slipped off and was run blocking wheels in task over. training. Perform tasks such as refuelling on level ground. 1/11/2001 Unintended A truck driver was fatally injured Perform pre-start safety United States Operation of when he was run over by a tractor. inspections of your equipment. Coal Equipment Victim returned from dumping a Follow safe operating Open-Cut load and parked behind other procedures. Park brakes to be trucks, near a tractor. Due to faulty set before exiting equipment. air lines, trailer brakes weren’t De-energize equipment, set activated and truck rolled forward brake and be sure it is blocked hitting tractor. against motion, before repair or maintenance work 3/10/2001 Unintended A fuel truck driver was critically Haul equipment be examined United States Operation of injured when he apparently lost for safety defects before it is Coal Equipment control of the Mack DM600 fuel placed in service. Equipment Open-Cut truck while descending down a operators should immediately 15% grade, and jumped from the report defects affecting safety vehicle. He died the following day to management. Preventive from the injuries received in the maintenance programs to be accident. implemented for all haul equipment. 19/12/2000 Other A truck driver was fatally injured Trucks dumping side by side United States preparing to dump his load along should stay a distance of at Coal side another truck in process of least the height of trailer apart. Open-Cut dumping a load. Coal in other Trucks dumping side by side truck was frozen and wouldn’t to be positioned so that drivers discharge when bed was raised. As can see each other. If possible, trailer reached maximum height it agents to be used to keep fell, crushing the cab of truck. materials from freezing in bed of haul truck. 9/12/2000 Fall From Heights A truck driver sustained fatal Truck drivers should assure United States injuries after falling from a loaded material is properly loaded Coal coal truck. Victim had parked his into truck bed to eliminate Open-Cut loaded truck, climbed into the back need to manually distribute and began throwing out some rock. material in truck. When The victim lost his balance and fell working in elevated work some 10ft to the ground. areas, always use a safety harness and line. 29/07/2000 Unintended A haul truck operator was Perform pre-operational safety United States Operation of operating a coal truck when he lost inspections of your equipment.
Recommended publications
  • Pavements and Surface Materials
    N O N P O I N T E D U C A T I O N F O R M U N I C I P A L O F F I C I A L S TECHNICAL PAPER NUMBER 8 Pavements and Surface Materials By Jim Gibbons, UConn Extension Land Use Educator, 1999 Introduction Traffic Class Type of Road Pavements are composite materials that bear the weight of 1 Parking Lots, Driveways, Rural pedestrian and vehicular loads. Pavement thickness, width and Roads type should vary based on the intended function of the paved area. 2 Residential Streets 3 Collector Roads Pavement Thickness 4 Arterial roads 5 Freeways, Expressways, Interstates Pavement thickness is determined by four factors: environment, traffic, base characteristics and the pavement material used. Based on the above classes, pavement thickness ranges from 3" for a Class 1 parking lot, to 10" or more for Class 5 freeways. Environmental factors such as moisture and temperature significantly affect pavement. For example, as soil moisture Sub grade strength has the greatest effect in determining increases the load bearing capacity of the soil decreases and the pavement thickness. As a general rule, weaker sub grades require soil can heave and swell. Temperature also effects the load thicker asphalt layers to adequately bear different loads associated bearing capacity of pavements. When the moisture in pavement with different uses. The bearing capacity and permeability of the freezes and thaws, it creates stress leading to pavement heaving. sub grade influences total pavement thickness. There are actually The detrimental effects of moisture can be reduced or eliminated two or three separate layers or courses below the paved wearing by: keeping it from entering the pavement base, removing it before surface including: the sub grade, sub base and base.
    [Show full text]
  • The Mineral Industry of Virginia
    THE MINERAL INDUSTRY OF VIRGINIA This chapter has been prepared under a Memorandum of Understanding between the U.S. Geological Survey and the Virginia Department of Mines, Minerals and Energy for collecting information on all nonfuel minerals. In 2000, the estimated value1 of nonfuel mineral production lime. The State increased to 7th from 9th in the production of for Virginia was $692 million, based upon preliminary U.S. common clays. Although the only producing kyanite mine and Geological Survey (USGS) data. This was a 6.5% increase calcined kyanite (mullite) facilities in the United States were in from that of 19992 and followed a 2.2% increase from 1998 to Virginia, synthetic mullite, which is a calcined bauxite, was 1999. Virginia was 22d in rank among the 50 States in total produced in one other State. About 90% of the U.S. kyanite and nonfuel mineral production value, of which the State accounted mullite output is used in refractories for the smelting and for more than 1.5% of the U.S. total. processing of a variety of metals and in glass and in high- Crushed stone was, by value, Virginia’s leading raw nonfuel temperature ceramics manufacturing. mineral, accounting for 60% of the State’s total mineral The following narrative information was provided by the production value. From 1990 through 2000, the State produced Virginia Division of Mineral Resources3 (VDMR). Some more than 628 million metric tons of crushed stone, or an production data in the text that follows are those reported by the average of almost 57 million metric tons per year.
    [Show full text]
  • VIRGINIA.2Ool
    VIRGINIA DIVISION OF MINERAL RESOURCES PUBLICATION 164 DIRECTORY OF THE MINERAL INDUSTRY IN VIRGINIA.2OOl Palmer C. Sweet COMMONWEALTH OF \'IRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DTVISION OF MINERAL RESOURCES Stanley S. Johnson, State Geologist CIIARLOTTESVILLE, VIRGINIA 2001 VIRGINIA DIVISION OF MINE,RAL RESOURCES PUBLICATION 164 DIRECTORY OF THE MINERAL INDUSTRY IN VIRGINIA.2OOl Palmer C. Sweet COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALSAND ENERGY DIVISION OF MINERAL RESOURCES Stanley S. Johnson, State Geologist CHARLOTTESVILLE, VIRGINIA 200r DEPARTMENT OF MINES. MINERALS AND ENERGY RICHMOND,VIRGINIA O.Gene Dishner. Director DIVISION OF MINERAL RESOURCES C}IARLOTTESVILLE, VIRGINIA Staaley S. Johnson, State Geologist and Division Director 804951-6350 STAIF Kay T. Hasenauer, Executive Secretary 804951-63,18 ECONOMICMINERALSANDENERGYSECTION SPATIALDATAANDEASTERNGEOLOGY PalmerC. Sweet, SectionHead,804-951-6362 IanJ. Duncan, SectionHead 804-951-6344 Rebecca S. Hope, Geologist Senior, 804-95 I -635 1 C. R. Berquist, Jr., Geologist Senior ,7 57 -221-2448 RoyS. Sitcs, GeologistSenior,804-951-6360 ElizabethV.M. Campbell,GeologistSenior,804-951-6343 Michaell. Upchurch, GeologistSenior,804-951-6363 NickH. Evans, GeologistSenior, 304-951-6345 William S. Henika, Geologist Senior, SOUTHWESTMINERALSANDGEOLOGYSECTION KarenK.Hostettler,GeologistSenior,804-951-6352 AlfredR. Taylor, SectionHead,540-676-5577 DavidB. Spears,GeologistSenior, 304-95 1-6361 James A. Lovett, Geologist Senior, 540-676-5830 WilliamW.Whitlock,GeologistSenor,540-676-5829 PUBLICATIONSANDWESTERNGEOI.OGYSECTION EugeneK. Rader,SectionHeadandEditor, 804-95 1-6358 SALESANDSIJPPORTSECTION DavidA.Hubbard,Jr.,GeologistSenior,804-951-6353 DeloresJ.Green, OfficeManager,804-951-6346 JohnD. Man, Jr., GeologistSenior, 304-951-6354 DeborahC. Farrish, StoreOperations Supervisor, 304-951-6359 VernonN.Monis,CartographicDrafterAssist.,S04-951-6356 EdwinW.Marshall, GeologistTechniciar\ 804-951-6355 GeraldP.
    [Show full text]
  • Chapter 1 Overview and History of the Expanded Shale, Clay and Slate
    Chapter 1 Overview and History of the Expanded Shale, Clay and Slate Industry April 2007 Expanded Shale, Clay & Slate Institute (ESCSI) 2225 E. Murray Holladay Rd, Suite 102 Salt Lake City, Utah 84117 (801) 272-7070 Fax: (801) 272-3377 [email protected] www.escsi.org CHAPTER 1 1.1 Introduction 1.2 How it started 1.3 Beginnings of the Expanded Shale, Clay and Slate (ESCS) Industry 1.4 What is Rotary Kiln Produced ESCS Lightweight Aggregate? 1.5 What is Lightweight Concrete? 1.6 Marine Structures The Story of the Selma Powell River Concrete Ships Concrete Ships of World War II (1940-1947) Braddock Gated Dam Off Shore Platforms 1.7 First Building Using Structural Lightweight Concrete 1.8 Growth of the ESCS Industry 1.9 Lightweight Concrete Masonry Units Advantages of Lightweight Concrete Masonry Units 1.10 High Rise Building Parking Structures 1.11 Precast-Prestressed Lightweight Concrete 1.12 Thin Shell Construction 1.13 Resistance to Nuclear Blast 1.14 Design Flexibility 1.15 Floor and Roof Fill 1.16 Bridges 1.17 Horticulture Applications 1.18 Asphalt Surface Treatment and Hotmix Applications 1.19 A World of Uses – Detailed List of Applications SmartWall® High Performance Concrete Masonry Asphalt Pavement (Rural, City and Freeway) Structural Concrete (Including high performance) Geotechnical Horticulture Applications Specialty Concrete Miscellaneous Appendix 1A ESCSI Information Sheet #7600 “Expanded Shale, Clay and Slate- A World of Applications…Worldwide 1-1 1.1 Introduction The purpose of this reference manual (RM) is to provide information on the practical application of expanded shale, clay and slate (ESCS) lightweight aggregates.
    [Show full text]
  • Guidelines for Mine Haul Road Design
    GGUUIIDDEELLIINNEESS FFOORR MMIINNEE HHAAUULL RROOAADD DDEESSIIGGNN Dwayne D. Tannant & Bruce Regensburg 2001 Guidelines for Mine Haul Road Design Table of Contents 1 SURVEY OF HAUL TRUCKS & ROADS FOR SURFACE MINES ............................... 1 1.1 Introduction ..................................................................................................................... 1 1.2 Haul Trucks and Construction/Maintenance Equipment ................................................. 1 1.3 Haul Road Length ............................................................................................................ 3 1.4 Haul Road Geometry ....................................................................................................... 4 1.5 Haul Road Construction Materials .................................................................................. 6 1.6 Symptoms and Causes of Haul Road Deterioration ........................................................ 6 1.7 Haul Road Maintenance .................................................................................................. 7 1.8 Evolution of Haul Road Design at Syncrude ................................................................... 8 1.8.1 Layer Thickness .................................................................................................................. 9 1.8.2 Haul Road Geometry .......................................................................................................... 9 1.8.3 Construction Techniques .................................................................................................
    [Show full text]
  • Design of Surface Mine Haulage Roads - a Manual by Walter W
    Information Circular 8758 Design of Surface Mine Haulage Roads - A Manual By Walter W. Kaufman and James C. Ault UNITED STATES DEPARTMENT OF THE INTERIOR Cecil D. Andrus, Secretary BUREAU OF MINES WMC Resources Ltd have the expressed permission of the "National Institute for Occupational Safety and Health" to replicate and present this document in Full for use by its employee's. This document was kindly supplied by the: National Institute for Occupational Safety and Health Pittsburgh Research Laboratory Library P.O. Box 18070 PITTSBURCH, PA 15236-0070 Page 1 of 49 CONTENTS ABSTRACT .....................................................................................................................................................4 INTRODUCTION .............................................................................................................................................4 HAULAGE ROAD ALIGNMENT ..........................................................................................................................4 Stopping Distance--Grade and Brake Relationships .......................................................................................5 Sight Distance ............................................................................................................................................8 Vertical Alignment ......................................................................................................................................9 Maximum and Sustained Grades..............................................................................................................9
    [Show full text]
  • Crushed Stone
    STONE (CRUSHED)1 (Data in million metric tons unless otherwise noted) Domestic Production and Use: In 2020, 1.46 billion tons of crushed stone valued at more than $17.8 billion was produced by an estimated 1,410 companies operating 3,440 quarries and 180 sales and (or) distribution yards in 50 States. Leading States were, in descending order of production, Texas, Missouri, Florida, Pennsylvania, Ohio, Georgia, Virginia, Illinois, North Carolina, and Kentucky, which combined accounted for more than one-half of the total crushed stone output. Of the total domestic crushed stone produced in 2020, about 70% was limestone and dolomite; 15%, granite; 6%, traprock; 5%, miscellaneous stone; 3%, sandstone and quartzite; and the remaining 1% was divided, in descending order of tonnage, among marble, volcanic cinder and scoria, calcareous marl, slate, and shell. It is estimated that of the 1.5 billion tons of crushed stone consumed in the United States in 2020, 72% was used as construction aggregate, mostly for road construction and maintenance; 16% for cement manufacturing; 8% for lime manufacturing; 2% for agricultural uses; and the remainder for other chemical, special, and miscellaneous uses and products. The estimated output of crushed stone in the United States shipped for consumption in the first 9 months of 2020 was 1.10 billion tons, a decrease of 3% compared with that of the same period of 2019. Third quarter shipments for consumption decreased by 6% compared with those of the same period of 2019. Additional production information, by quarter for each State, geographic division, and the United States, is reported in the U.S.
    [Show full text]
  • Section 5 5 Roadway Construction Standards
    Section 5 5 Roadway Construction Standards 5.1 Roadway Design 5.1.1 General A. All plans shall be on 24-inch x 36-inch sheets. B. Plan and Profile of sections shall be on separate sheets. C. The horizontal scale of the plan and profile shall be the same. D. Boring or test pits shall be taken as determined by the Department of Public Works. These shall show soil strata and high ground water elevations. Drought conditions shall be noted. E. Electric, telephone, cable television and fire alarm cables and ducts shall be placed in the grass strip or sidewalk outside of the traveled way, on the opposite side of the centerline of the street as the water main. F. Street light standard locations shall be determined by the Department of Public Works and NSTAR Electric Company. G. DIG SAFE shall be contacted to determine the location of all existing underground utilities prior to any excavation. Call the Framingham Fire Department to mark out their lines. H. A note shall be placed on all plans stating “The Town of Framingham Department of Public Works and Engineering Department shall be notified seventy-two (72) hours in advance of any roadway or municipal service construction. No portion of any utility shall be backfilled until approval for such backfilling is obtained from the Department of Public Works. Such approval does not constitute acceptance of such utilities by the Town of Framingham.” 5.1.2 Streets and Roadways A. For the purposes of these Standards, streets shall be classified as Local, Collector and Arterial.
    [Show full text]
  • Greater Goose Pond Forest Trail Construction Specifications
    Greater Goose Pond Forest Trail Construction Specifications Trail Spec A: Singletrack Cribbing Rationale: Cribbing is used to elevate a trail out of a wet area or to maintain a specific trail grade. A turnpike is constructed of two parallel crib walls that elevate the trail tread. Crib walls and turnpikes can be constructed out of timber or stone and have the ability to allow walkers to cross intermittent wet areas or to maintain a sustainable grade. Construction Specification: Cribbing: Material: Cribbing can be constructed out of timber or stone. Stone cribbing will last longer than timber cribbing. Stone can be harvested on site or imported. Large stones are the best building stones for crib walls. Dimension: A crib wall retains the trail tread. That said, hikers and bikers should never have to walk on the crib wall as it is typically located far outside the designated trail. Installation: 1. Crib Wall: The height of the crib wall is determined by calculating how high the trail tread needs to be in order to keep hikers out of the wet area or to maintain grade. Once height is determined, stones are chosen that match the height plus an additional 1/3 that is dug into the ground for stability. 2. Drainage Stone: The center of the crib wall is filled with 1 ½” crushed stone, leaving at least 4” for surfacing. 3. Surfacing: 3” (4-6” ideally) of natural surfacing caps the drainage stone. Construction Specification: Timber Turnpike: Material: A timber turnpike is constructed out of rot resistant lumber (locust, cedar, hemlock, or PT) and is filled with 1 ½ ” crushed stone and capped with 3/8” minus natural stone surfacing.
    [Show full text]
  • Effects of Repeated Loading on Gravel and Crushed Stone Base Course Materials Used in the AASHO Road Test
    Effects of Repeated Loading on Gravel and Crushed Stone Base Course Materials Used in the AASHO Road Test JOHN H. HAYNES, Soils Engineer, Mason-Johnson and Associates, and ELDON J. YODER, Professor of Highway Engineering, Purdue University This paper presents the results of a laboratory investigation of the behavior of the AASHO Road Test gravel and crushed stone mixtures subjected to repeated loading. Cylindrical speci­ mens were stressed triaxially to levels approximating those which would be found in the base course of a highway pave­ ment. The repetitive loadings were applied with equipment developed in the laboratories of the School of Civil Engineering at Purdue University. The materials used were obtained from the site of the AASHO Road Test. The gravel and crushed stone with grain size dis­ tribution equal to that used in the Road Test and compacted to the mean density levels found in the field were U1e subject of primary interest. Variation in percent fines and degree of saturation were considered to have a great effect on these basic gradations. Therefore, the percent passing the No. 200 mesh sieve was varied so that three mixtures of each material were obtained. These three mixtures were tested at three levels of saturation. The effects of the;se variables on the deformation-rebound characteristics of the materials under repeated loads were studied. From these studies, the advantages and disadvantages of each material, concerning its value as a base course ma­ terial, were found and are reported in detail. Also, a com­ parison between the laboratory and field performance of the two AASHO materials is presented.
    [Show full text]
  • How to Install Reclaimed Materials by Scott Smith, Experienced Brick & Stone
    Feature Story How to Install Reclaimed Materials by Scott Smith, Experienced Brick & Stone Cobblestone Pavers First things first: Which side is up? You can install cobble- stones in a variety of ways to achieve any look your customer prefers: with the worn top side facing up, the rouge split sides up or a combination. In addition to providing multiple de- sign options, there are pros and cons to each side. For exam- ple, the worn tops can be slippery when wet, but offer the au- thenticity of worn stone. With a quick brush blast—after the stone is set, but before the joints are filled—you can roughen up the surface enough to improve slip resistance without losing the worn face. You can increase the coverage area of most jumbo cobblestones by laying the stones on their side because they are taller than they are wide. Kushequa Street Brick with spacing lugs The bedding for cobblestones needs to support their often- uneven bottom face. Wet-set cobbles should be tapped into hen working with reclaimed brick and stone pavers an overfilled bed to ensure complete contact. Meanwhile, the Wor curbing, one thing is for sure: There is no one right bedding for sand-set cobblestones benefits greatly from add- way to install these historic materials. Over my time in the ing 3/8” broken stone to give the bedding more structure and industry, masons have consistently surprised me with new increase its load-carrying capacity. Always use cement sand methods that work well for them—and who can argue with (crushed stone fines) because the more angular particles in ce- success? In this article, we will discuss the materials’ unique ment sand will “lock up” when compacted and are less likely to attributes and installation idiosyncrasies you should know to flow under loading.
    [Show full text]
  • Performance of Crushed-Stone Base Courses
    78 Performance of Crushed-Stone Base Courses RICHARD D. BARKSDALE ABSTRACT TEST FACILITY The pit in which the tests were performed was 8 ft Twelve full-scale, instrumented pavement (2.4 m) wide, 12 ft (3.7 m) long, and 5 ft (1.5 m) sections were tested to failure in a spe­ deep (Figure 1). To study a maximum number of base c i al laboratory facility under closely con­ variables a different structural section was con­ trolled environmental conditions. Seven of structed at each end of the pit to give two tests the pavement sections were loaded to more for each complete filling of the pit. Emphasis was than 1 million repetitions and five of placed during construction of the test sections on these sections to more than 2 million repe­ achieving uniform material properties and meeting titions. A 6.5-kip (29-kN) uniform circular GDOT material specifications. loading was applied to the surface and sys­ An air-over-oil cyclic loading system was devel­ t ema tically moved to prevent a punching oped to apply 6.5 to 7.5 kips (29.4 to 33.~ kN) to failure. ~avements tested consisted of five the pavement in 0 .17 sec to simulate a slowly mov­ conventional sections having crushed-stone ing, heavy wheel loading. About 70 to 90 load pulses bases, -five full-depth asphalt-concrete per minule were transmitted to the pavement surface sections, and two inverted sections. The through a water-filled circular rubber bladder. The inverted sections consisted of a crushed­ diameter of the 6.
    [Show full text]