Guidelines for Mine Haul Road Design

Total Page:16

File Type:pdf, Size:1020Kb

Guidelines for Mine Haul Road Design GGUUIIDDEELLIINNEESS FFOORR MMIINNEE HHAAUULL RROOAADD DDEESSIIGGNN Dwayne D. Tannant & Bruce Regensburg 2001 Guidelines for Mine Haul Road Design Table of Contents 1 SURVEY OF HAUL TRUCKS & ROADS FOR SURFACE MINES ............................... 1 1.1 Introduction ..................................................................................................................... 1 1.2 Haul Trucks and Construction/Maintenance Equipment ................................................. 1 1.3 Haul Road Length ............................................................................................................ 3 1.4 Haul Road Geometry ....................................................................................................... 4 1.5 Haul Road Construction Materials .................................................................................. 6 1.6 Symptoms and Causes of Haul Road Deterioration ........................................................ 6 1.7 Haul Road Maintenance .................................................................................................. 7 1.8 Evolution of Haul Road Design at Syncrude ................................................................... 8 1.8.1 Layer Thickness .................................................................................................................. 9 1.8.2 Haul Road Geometry .......................................................................................................... 9 1.8.3 Construction Techniques .................................................................................................. 10 1.9 Summary ........................................................................................................................ 11 2 HAUL ROAD PLANNING AND ALIGNMENT ............................................................... 12 2.1 General .......................................................................................................................... 12 2.2 Key Road Planning and Alignment Factors .................................................................. 12 2.3 Haul Truck Stopping Distance ...................................................................................... 13 2.4 Sight Distance and Vertical Curves ............................................................................... 15 2.5 Road Width .................................................................................................................... 16 2.6 Curves and Switchbacks ................................................................................................ 18 2.7 Super-Elevation ............................................................................................................. 20 2.7.1 Super-Elevation Runout .................................................................................................... 22 2.8 Optimal Grades .............................................................................................................. 23 2.8.1 Maximum Sustained Grade .............................................................................................. 26 2.8.2 Runaway Provisions ......................................................................................................... 26 2.9 Combination of Horizontal and Vertical Alignment ..................................................... 27 2.10 Safety Berms and Ditches .............................................................................................. 27 3 DESIGN OF HAUL ROAD CROSS-SECTION ................................................................ 28 3.1 Introduction ................................................................................................................... 28 3.2 Design Based on CBR ................................................................................................... 30 3.2.1 Modifications to CBR Design Method ............................................................................. 32 3.3 Design Based on Critical Strain and Resilient Modulus ................................................ 34 3.3.1 Critical Strain Limit .......................................................................................................... 36 3.3.2 Design Procedure .............................................................................................................. 37 3.4 Comparison of the Two Methods .................................................................................. 38 3.5 Correlation Between the Vertical Strain and Surface Deflection .................................. 40 3.6 Summary ........................................................................................................................ 42 4 ROAD SURFACE ................................................................................................................. 43 4.1 Introduction ................................................................................................................... 43 4.2 Roughness ...................................................................................................................... 43 4.3 Traction .......................................................................................................................... 44 4.4 Rolling Resistance ......................................................................................................... 45 4.4.1 Measuring Rolling Resistance .......................................................................................... 47 4.4.2 Typical Rolling Resistance Values ................................................................................... 48 4.4.3 Economic Impact of Rolling Resistance ........................................................................... 50 4.5 Haul Road Trafficability and Cycle Time ..................................................................... 51 4.6 Road Maintenance and Repair ....................................................................................... 52 4.7 Drainage Requirements ................................................................................................. 53 4.8 Dust Suppressants .......................................................................................................... 54 ii Guidelines for Mine Haul Road Design 5 ROAD CONSTRUCTION MATERIALS .......................................................................... 57 5.1 Surface Layer Materials ................................................................................................. 57 5.1.1 Compacted Gravel and Crushed Rock .............................................................................. 58 5.1.2 Asphaltic Concrete ............................................................................................................ 61 5.1.3 Roller Compacted Concrete .............................................................................................. 62 5.2 Materials for Base and Sub-Base Layers ....................................................................... 63 5.2.1 Material Properties ............................................................................................................ 63 5.2.2 Fly Ash ............................................................................................................................. 65 5.3 Compaction Requirements ............................................................................................ 66 6 HAUL ROAD ECONOMICS ............................................................................................... 68 6.1 Introduction ................................................................................................................... 68 6.2 Costs Associated with Road Building ........................................................................... 68 6.2.1 Pre-Road Construction Preparation .................................................................................. 68 6.2.2 Road Construction Costs .................................................................................................. 69 6.2.3 Road Removal Costs ......................................................................................................... 69 6.2.4 Fleet Productivity .............................................................................................................. 69 6.3 Road Maintenance ......................................................................................................... 70 6.4 Extra Fleet Operating and Maintenance Costs .............................................................. 70 6.5 Other Considerations ..................................................................................................... 71 6.5.1 Climate.............................................................................................................................. 71 6.5.2 Application of Larger Trucks ........................................................................................... 71 6.6 Comparison of Temporary and Semi-Permanent Roads ............................................... 72 6.6.1 Temporary Road ............................................................................................................... 72 6.6.2 Semi-Permanent Road ...................................................................................................... 73 6.6.3 Conclusion ........................................................................................................................ 73 6.7 Example of Full Life Cycle
Recommended publications
  • Pavements and Surface Materials
    N O N P O I N T E D U C A T I O N F O R M U N I C I P A L O F F I C I A L S TECHNICAL PAPER NUMBER 8 Pavements and Surface Materials By Jim Gibbons, UConn Extension Land Use Educator, 1999 Introduction Traffic Class Type of Road Pavements are composite materials that bear the weight of 1 Parking Lots, Driveways, Rural pedestrian and vehicular loads. Pavement thickness, width and Roads type should vary based on the intended function of the paved area. 2 Residential Streets 3 Collector Roads Pavement Thickness 4 Arterial roads 5 Freeways, Expressways, Interstates Pavement thickness is determined by four factors: environment, traffic, base characteristics and the pavement material used. Based on the above classes, pavement thickness ranges from 3" for a Class 1 parking lot, to 10" or more for Class 5 freeways. Environmental factors such as moisture and temperature significantly affect pavement. For example, as soil moisture Sub grade strength has the greatest effect in determining increases the load bearing capacity of the soil decreases and the pavement thickness. As a general rule, weaker sub grades require soil can heave and swell. Temperature also effects the load thicker asphalt layers to adequately bear different loads associated bearing capacity of pavements. When the moisture in pavement with different uses. The bearing capacity and permeability of the freezes and thaws, it creates stress leading to pavement heaving. sub grade influences total pavement thickness. There are actually The detrimental effects of moisture can be reduced or eliminated two or three separate layers or courses below the paved wearing by: keeping it from entering the pavement base, removing it before surface including: the sub grade, sub base and base.
    [Show full text]
  • MDG 15 – Trucks and Loaders Open Cut Incidents
    MDG 15 – Trucks and Loaders Open Cut Incidents Incident Agent of Events Recommendations Information Fatality COAL OPEN-CUT INCIDENTS 8/01/2008 Unintended Fatally injured while attempting to Maintain adequate berm United States operation of dump spoil. The truck travelled heights, monitor work Coal Equipment over the edge of the dump and practices, ensure correct task Open-Cut rolled down the spoil slope 140 training, conduct pre-op feet. checks and use seat belts. 16/11/2007 Drowning Driver was attempting to dump Ensure adequate berms and United States spoil when he reversed over a 70 that safe work procedures are Coal foot high slope and down to the followed. Ensure work areas Open-Cut mine floor. are illuminated at night and that Pre-op checks of equipment are performed. 2/07/2007 Other Dozer operator was standing by his Mine shall train all workers in United States machine when foreman told him to regards to pick-up trucks and Coal move it for a highwall shot. He to use all available safety Open-Cut was then run over by the foreman equipment within a truck. on his way to the dozer. 28/11/2006 Unintended Driver reported that the park brake Strengthened policy about United States Operation of was sticking and was then found at applying park brakes before Coal Equipment the base of hill crushed between exiting truck, ensure proper Open-Cut the truck and a berm. Was either machine maintenance. thrown from truck or got out and brakes released. 23/05/2006 Unintended Miner driving a Mack water truck Implement extensive driver United States Operation of lost control descending a steep training, implement Coal Equipment mine access road.
    [Show full text]
  • Signing Strategies for Low-Water and Flood-Prone Highway Crossings
    Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FHWA/TX-12/0-6262-1 4. Title and Subtitle 5. Report Date SIGNING STRATEGIES FOR LOW-WATER AND FLOOD-PRONE February 2011 HIGHWAY CROSSINGS Published: November 2011 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Kevin Balke, Laura Higgins, Sue Chrysler, Geza Pesti, Nadeem Report 0-6262-1 Chaudhary, and Robert Brydia 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Texas Transportation Institute The Texas A&M University System 11. Contract or Grant No. College Station, Texas 77843-3135 Project No. 0-6262 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Texas Department of Transportation Technical Report: Research and Technology Implementation Office September 2008–August 2010 P. O. Box 5080 Austin, Texas 78763-5080 14. Sponsoring Agency Code 15. Supplementary Notes Research performed in cooperation with the Texas Department of Transportation and the U.S. Department of Transportation, Federal Highway Administration. Research Project Title: Signing Guidelines for Flooding Conditions and Warrants for Flood-Condition Detection Systems URL: http://tti.tamu.edu/documents/0-6262-1.pdf 16. Abstract In Texas, approximately eight flood-related fatalities occur each year—the majority of these (78.6 percent) involve motorists that are trapped in their vehicles or washed away. In many cases, victims, not wanting to take a lengthy detour, ignored barricades and tried to drive across a flooded street or low-water crossing— literally driving themselves into harm’s way. It takes as little as 2 ft of water to float most cars.
    [Show full text]
  • PASER Manual Asphalt Roads
    Pavement Surface Evaluation and Rating PASER ManualAsphalt Roads RATING 10 RATING 7 RATING 4 RATING PASERAsphalt Roads 1 Contents Transportation Pavement Surface Evaluation and Rating (PASER) Manuals Asphalt PASER Manual, 2002, 28 pp. Introduction 2 Information Center Brick and Block PASER Manual, 2001, 8 pp. Asphalt pavement distress 3 Concrete PASER Manual, 2002, 28 pp. Publications Evaluation 4 Gravel PASER Manual, 2002, 20 pp. Surface defects 4 Sealcoat PASER Manual, 2000, 16 pp. Surface deformation 5 Unimproved Roads PASER Manual, 2001, 12 pp. Cracking 7 Drainage Manual Patches and potholes 12 Local Road Assessment and Improvement, 2000, 16 pp. Rating pavement surface condition 14 SAFER Manual Rating system 15 Safety Evaluation for Roadways, 1996, 40 pp. Rating 10 & 9 – Excellent 16 Flagger’s Handbook (pocket-sized guide), 1998, 22 pp. Rating 8 – Very Good 17 Work Zone Safety, Guidelines for Construction, Maintenance, Rating 7 – Good 18 and Utility Operations, (pocket-sized guide), 1999, 55 pp. Rating 6 – Good 19 Wisconsin Transportation Bulletins Rating 5 – Fair 20 #1 Understanding and Using Asphalt Rating 4 – Fair 21 #2 How Vehicle Loads Affect Pavement Performance Rating 3 – Poor 22 #3 LCC—Life Cycle Cost Analysis Rating 2 – Very Poor 23 #4 Road Drainage Rating 1 – Failed 25 #5 Gravel Roads Practical advice on rating roads 26 #6 Using Salt and Sand for Winter Road Maintenance #7 Signing for Local Roads #8 Using Weight Limits to Protect Local Roads #9 Pavement Markings #10 Seal Coating and Other Asphalt Surface Treatments #11 Compaction Improves Pavement Performance #12 Roadway Safety and Guardrail #13 Dust Control on Unpaved Roads #14 Mailbox Safety #15 Culverts-Proper Use and Installation This manual is intended to assist local officials in understanding and #16 Geotextiles in Road Construction/Maintenance and Erosion Control rating the surface condition of asphalt pavement.
    [Show full text]
  • The Mineral Industry of Virginia
    THE MINERAL INDUSTRY OF VIRGINIA This chapter has been prepared under a Memorandum of Understanding between the U.S. Geological Survey and the Virginia Department of Mines, Minerals and Energy for collecting information on all nonfuel minerals. In 2000, the estimated value1 of nonfuel mineral production lime. The State increased to 7th from 9th in the production of for Virginia was $692 million, based upon preliminary U.S. common clays. Although the only producing kyanite mine and Geological Survey (USGS) data. This was a 6.5% increase calcined kyanite (mullite) facilities in the United States were in from that of 19992 and followed a 2.2% increase from 1998 to Virginia, synthetic mullite, which is a calcined bauxite, was 1999. Virginia was 22d in rank among the 50 States in total produced in one other State. About 90% of the U.S. kyanite and nonfuel mineral production value, of which the State accounted mullite output is used in refractories for the smelting and for more than 1.5% of the U.S. total. processing of a variety of metals and in glass and in high- Crushed stone was, by value, Virginia’s leading raw nonfuel temperature ceramics manufacturing. mineral, accounting for 60% of the State’s total mineral The following narrative information was provided by the production value. From 1990 through 2000, the State produced Virginia Division of Mineral Resources3 (VDMR). Some more than 628 million metric tons of crushed stone, or an production data in the text that follows are those reported by the average of almost 57 million metric tons per year.
    [Show full text]
  • Experimental Study on the Dynamics of Washboard Road on Various Surfaces
    Experimental Study on the Dynamics of Washboard Road on Various Surfaces Teeranai SRIMAHACHOTA Candidate for the Degree of Master’s Degree Supervisor: Prof. Shunji KANIE Division of Engineering and Policy for Sustainable Environment Introduction Washboarding is the spontaneous formation of transverse ripple on dirt road. It is usually found on unpaved heavy- traffic road under dry weather condition. Driving over washboard road may increase risk of traffic accident since ripples reduce the contact area of the wheel to the road. Mitigating washboard road has long been a challenge for the road maintenance [1]. In addition, spontaneous formation of ripple pattern similar to washboarding can be found on other physical system; for examples, rail corrugation [2, 3], sand dune [4], lubricated disks [5], and periodic ripples on snow covered road [6]. The mechanism of washboarding was first studied in 1962 Fig. 1. Schematic illustration of the experimental apparatus. by Mather [7], and he concluded that it caused by the (a) top view of the self-rotating track showing several ripples bouncing motion of the wheel excided by random formed on the track. (b) diagram of the seesaw-shaped perturbation on road surface. Recent studies have shown that oscillator. washboard road can be formed using rolling wheel [8] and inclined plowed dragged on a granular surface [9, 10]. measure original height of the surface. Then we place the Washboarding can be described by theoretical models which oscillator to touch gently on the flat surface. The oscillator is determine the effect of lift and drag forces to the time in the balance of force so that almost no compression force variation of surface geometry.
    [Show full text]
  • VIRGINIA.2Ool
    VIRGINIA DIVISION OF MINERAL RESOURCES PUBLICATION 164 DIRECTORY OF THE MINERAL INDUSTRY IN VIRGINIA.2OOl Palmer C. Sweet COMMONWEALTH OF \'IRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DTVISION OF MINERAL RESOURCES Stanley S. Johnson, State Geologist CIIARLOTTESVILLE, VIRGINIA 2001 VIRGINIA DIVISION OF MINE,RAL RESOURCES PUBLICATION 164 DIRECTORY OF THE MINERAL INDUSTRY IN VIRGINIA.2OOl Palmer C. Sweet COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALSAND ENERGY DIVISION OF MINERAL RESOURCES Stanley S. Johnson, State Geologist CHARLOTTESVILLE, VIRGINIA 200r DEPARTMENT OF MINES. MINERALS AND ENERGY RICHMOND,VIRGINIA O.Gene Dishner. Director DIVISION OF MINERAL RESOURCES C}IARLOTTESVILLE, VIRGINIA Staaley S. Johnson, State Geologist and Division Director 804951-6350 STAIF Kay T. Hasenauer, Executive Secretary 804951-63,18 ECONOMICMINERALSANDENERGYSECTION SPATIALDATAANDEASTERNGEOLOGY PalmerC. Sweet, SectionHead,804-951-6362 IanJ. Duncan, SectionHead 804-951-6344 Rebecca S. Hope, Geologist Senior, 804-95 I -635 1 C. R. Berquist, Jr., Geologist Senior ,7 57 -221-2448 RoyS. Sitcs, GeologistSenior,804-951-6360 ElizabethV.M. Campbell,GeologistSenior,804-951-6343 Michaell. Upchurch, GeologistSenior,804-951-6363 NickH. Evans, GeologistSenior, 304-951-6345 William S. Henika, Geologist Senior, SOUTHWESTMINERALSANDGEOLOGYSECTION KarenK.Hostettler,GeologistSenior,804-951-6352 AlfredR. Taylor, SectionHead,540-676-5577 DavidB. Spears,GeologistSenior, 304-95 1-6361 James A. Lovett, Geologist Senior, 540-676-5830 WilliamW.Whitlock,GeologistSenor,540-676-5829 PUBLICATIONSANDWESTERNGEOI.OGYSECTION EugeneK. Rader,SectionHeadandEditor, 804-95 1-6358 SALESANDSIJPPORTSECTION DavidA.Hubbard,Jr.,GeologistSenior,804-951-6353 DeloresJ.Green, OfficeManager,804-951-6346 JohnD. Man, Jr., GeologistSenior, 304-951-6354 DeborahC. Farrish, StoreOperations Supervisor, 304-951-6359 VernonN.Monis,CartographicDrafterAssist.,S04-951-6356 EdwinW.Marshall, GeologistTechniciar\ 804-951-6355 GeraldP.
    [Show full text]
  • The Road Inventory of Mackay Island National Wildlife Refuge Knotts Island, NC
    The Road Inventory of Mackay Island National Wildlife Refuge Knotts Island, NC Prepared By: Federal Highway Administration Central Federal Lands Highway Division October, 2010 Report Generated: 10/05/2010 TABLE OF CONTENTS SECTION PAGE I. INTRODUCTION 1 - 1 II. SUMMARY INFORMATION Summaries by Condition, Surface Type and Functional Class 2 - 1 III. REFUGE ROUTE LOCATION MAPS 3 - 1 IV. ROUTE IDENTIFICATION LIST 4 - 1 V. ROUTE CONDITION RATING SHEETS 5 - 1 VI. PARKING LOT CONDITION RATING SHEETS 6 - 1 VII. BRIDGE INVENTORY INFORMATION 7 - 1 VIII. PHOTOGRAPHIC SHEETS 8 - 1 IX. ACCIDENT SUMMARY 9 - 1 APPENDIX Funcitonal Classification Table i Description of Rating System ii INTRODUCTION The Transportation Equity Act for the 21st Century (Public Law 105-178) created the Refuge Roads Program. Refuge roads are those public roads that provide access to or within a unit of the National Wildlife Refuge System and for which title and maintenance responsibility is vested in the United States Government. Funds from the Highway Trust Fund are available for refuge roads and can be used by the station to pay the cost of: (a) Maintenance and improvements of refuge roads. (b) Maintenance and improvements of: (1) Adjacent vehicle parking areas (2) Provision for pedestrians and bicycles and (3) Construction and reconstruction of roadside rest areas that are located in or adjacent to wildlife refuges (c) Administrative costs associated with such maintenance and improvements. The funds available for refuge roads are to be disbursed based on the relative needs of the various refuges in the National Wildlife Refuge System, and taking into consideration: (a) The comprehensive conservation plan for each refuge; (b) The need for access as identified through land use planning; and (c) The impact of land use planning on existing transportation facilities.
    [Show full text]
  • Table of Contents INTRODUCTION City of Lubbock Street Department
    TABLE OF CONTENTS TABLE OF CONTENTS Introduction • Brief Summary of the Pavement Preservation Strategy and Assessment of Current Conditions Pavement Preservation Overview • What is Pavement Preservation? iVIaintenance Strategies and Practices • strategies for Asphalt Paving • Strategies for Concrete Paving • Strategies for Brick Paving Test Sections of Streets • List of Test Sections • Test Sections Evaluations PAVER • Overview of MicroPAVER • Sample Inspections Sheets • Sample Report Sheets Pavement Distresses • Paved Asphalt Distresses • Paved Concrete Distresses • Paved Brick Distresses Paver Aids in Implementing GASB 34 • PAVER Aids in Implementing GASB 34 • Current Estimated Value of City of Lubbock Streets • Current Estimated Value of City of Lubbock Streets by Council District • Articles briefly explaining GASB 34 Glossary • Pavement Preservation Glossary of Terms Appendix • November 1983, APWA Reporter Article on PAVER • Asset Management and Innovative Finance Page 1 of 1 Pavement Preservation Strategies Table of Contents INTRODUCTION City of Lubbock street Department August 22, 2003 Brief Summary of the Pavement Preservation Strategy And Assessment of Current Conditions The City of Lubbock has over 2600 lane-miles of paved streets with a replacement value of approximately $250,000,000. Street Department is charged with the responsibility of effectively preserving this extensive portion of the City's infrastructure. Although the overall pavement preservation strategy has many aspects, the following is a brief summary of the typical scenario. A. History: The City of Lubbock since 1984 has been a subscriber to the American Public Works Association (APWA) PAVER Project. This computerized street maintenance program, as well as an associated Microsoft Access database program, provides such information on each block of paved street as; 1.
    [Show full text]
  • Drivers License Manual
    6973_Cover 9/5/07 8:15 AM Page 2 LITTERING: ARKANSAS ORGAN & TISSUE DONOR INFORMATION Following the successful completion of driver testing, Arkansas license applicants will IT’S AGAINST THE LAW. be asked whether they wish to register as an organ or tissue donor. The words “Organ With a driver license comes the responsibility of being familiar with Donor” will be printed on the front of the Arkansas driver license for those individuals the laws of the road. As a driver you are accountable for what may be who choose to participate as a registered organ donor. thrown from the vehicle onto a city street or state highway. Arkansas driver license holders, identified as organ donors, will be listed in a state 8-6-404 PENALTIES registry. The donor driver license and registry assist emergency services and medical (a)(1)(A)(i) A person convicted of a violation of § 8-6-406 or § 8-6-407 for a first offense personnel identify the individuals who have chosen to offer upon death, their body’s shall be guilty of an unclassified misdemeanor and shall be fined in an amount of not organs to help another person have a second chance at life (i.e. the transplant of heart, less than one hundred dollars ($100) and not more than one thousand dollars ($1,000). kidneys, liver, lungs, pancreas, corneas, bone, skin, heart valves or tissue). (ii) An additional sentence of not more than eight (8) hours of community service shall be imposed under this subdivision (a)(1)(A). It will be important, should you choose to participate in the donor program to speak (B)(i) A person convicted of a violation of § 8-6-406 or § 8-6- court shall have his or her driver's license suspended for six with your family about the decision so that your wishes can be carried-out upon your 407 for a second or subsequent offense within three (3) years (6) months by the Department of Finance and Administration, death.
    [Show full text]
  • Preliminary Design Report
    Guemes Island Ferry Replacement Preliminary Design Report PREPARED FOR: BY: Jeffrey M. Rider, PE Skagit County Public Works PROJECT ENGINEER Mount Vernon, Washington CHECKED: William L. Moon III, PE PROJECT MANAGER APPROVED: Matthew S. Miller, PE PRINCIPAL-IN-CHARGE DOC: REV: FILE: DATE: 17097.02-053-02 - 17097.02 12 February 2021 References 1. Guemes Island Ferry Replacement, Concept Design Report, Glosten Inc., Report No. 17097- 053-01, Rev -, 11 December 2017. 2. Guemes Island Ferry Replacement, Vessel Capacity Study, Glosten Inc., Report No. 17097- 000-01, Rev -, 20 October 2017. 3. Guemes Island Ferry Replacement, Transportation System Assessment, Glosten Inc., Report No. 17097-000-02, Rev -, 14 December 2017. 4. Kristensen, H. O. H. "The manoeuvrability of double-ended ferries: design considerations, construction and service experience." Proceedings of the International Conference on Ship Motions & Manoeuvrability, RINA, London, UK, Paper: P1998-5 Proceedings. 1998. 5. Guemes Island Ferry Replacement, Preliminary Vessel Cost Estimate, Glosten Inc., Report No. 17097.02-043-03. 6. Guemes Island Ferry Replacement, Preliminary Vessel Cost Estimate, Glosten Inc., Report No. 17097.02-043-03. 7. Guemes Island Ferry Replacement, Preliminary Shoreside Cost Estimate, Glosten Inc., Report No. 17097.02-043-04. Summary This report describes the preliminary vessel design developed to replace the M/V Guemes, currently operating as a vehicle and passenger ferry between Anacortes and Guemes Island, Washington. The following drawings and reports
    [Show full text]
  • Chapter 1 Overview and History of the Expanded Shale, Clay and Slate
    Chapter 1 Overview and History of the Expanded Shale, Clay and Slate Industry April 2007 Expanded Shale, Clay & Slate Institute (ESCSI) 2225 E. Murray Holladay Rd, Suite 102 Salt Lake City, Utah 84117 (801) 272-7070 Fax: (801) 272-3377 [email protected] www.escsi.org CHAPTER 1 1.1 Introduction 1.2 How it started 1.3 Beginnings of the Expanded Shale, Clay and Slate (ESCS) Industry 1.4 What is Rotary Kiln Produced ESCS Lightweight Aggregate? 1.5 What is Lightweight Concrete? 1.6 Marine Structures The Story of the Selma Powell River Concrete Ships Concrete Ships of World War II (1940-1947) Braddock Gated Dam Off Shore Platforms 1.7 First Building Using Structural Lightweight Concrete 1.8 Growth of the ESCS Industry 1.9 Lightweight Concrete Masonry Units Advantages of Lightweight Concrete Masonry Units 1.10 High Rise Building Parking Structures 1.11 Precast-Prestressed Lightweight Concrete 1.12 Thin Shell Construction 1.13 Resistance to Nuclear Blast 1.14 Design Flexibility 1.15 Floor and Roof Fill 1.16 Bridges 1.17 Horticulture Applications 1.18 Asphalt Surface Treatment and Hotmix Applications 1.19 A World of Uses – Detailed List of Applications SmartWall® High Performance Concrete Masonry Asphalt Pavement (Rural, City and Freeway) Structural Concrete (Including high performance) Geotechnical Horticulture Applications Specialty Concrete Miscellaneous Appendix 1A ESCSI Information Sheet #7600 “Expanded Shale, Clay and Slate- A World of Applications…Worldwide 1-1 1.1 Introduction The purpose of this reference manual (RM) is to provide information on the practical application of expanded shale, clay and slate (ESCS) lightweight aggregates.
    [Show full text]