Design of Surface Mine Haulage Roads - a Manual by Walter W

Total Page:16

File Type:pdf, Size:1020Kb

Design of Surface Mine Haulage Roads - a Manual by Walter W Information Circular 8758 Design of Surface Mine Haulage Roads - A Manual By Walter W. Kaufman and James C. Ault UNITED STATES DEPARTMENT OF THE INTERIOR Cecil D. Andrus, Secretary BUREAU OF MINES WMC Resources Ltd have the expressed permission of the "National Institute for Occupational Safety and Health" to replicate and present this document in Full for use by its employee's. This document was kindly supplied by the: National Institute for Occupational Safety and Health Pittsburgh Research Laboratory Library P.O. Box 18070 PITTSBURCH, PA 15236-0070 Page 1 of 49 CONTENTS ABSTRACT .....................................................................................................................................................4 INTRODUCTION .............................................................................................................................................4 HAULAGE ROAD ALIGNMENT ..........................................................................................................................4 Stopping Distance--Grade and Brake Relationships .......................................................................................5 Sight Distance ............................................................................................................................................8 Vertical Alignment ......................................................................................................................................9 Maximum and Sustained Grades..............................................................................................................9 Vertical Curves .....................................................................................................................................11 Horizontal Alignment ................................................................................................................................13 Superelevation Rate..............................................................................................................................13 Superelevation Runout..........................................................................................................................14 Sharp Curve Design--Widening on Curves ..............................................................................................15 Combination of Horizontal and Vertical Alignment.......................................................................................17 HAULAGE ROAD CROSS SECTION .................................................................................................................17 Sub base..................................................................................................................................................17 Surface Materials......................................................................................................................................20 Asphaltic Concrete................................................................................................................................22 Compacted Gravel and Crushed Stone ...................................................................................................23 Stabilized Earth ....................................................................................................................................25 Haulageway Width....................................................................................................................................25 Cross Slope ..............................................................................................................................................27 Conventional Parallel Berms ......................................................................................................................27 Traffic Signs .............................................................................................................................................29 Speed Limit Signs .................................................................................................................................29 Stop Signs............................................................................................................................................29 Curve and Intersection Warning Signs ...................................................................................................30 Culvert Crossing Markers.......................................................................................................................30 Traffic Control Signs .............................................................................................................................30 Limited Access Designators ...................................................................................................................30 Safety Access Indicators .......................................................................................................................30 Drainage Provisions ..................................................................................................................................30 Ditch Configuration and Location ...........................................................................................................30 Ditch Capacity and Protection................................................................................................................31 Culverts ...............................................................................................................................................32 Location...........................................................................................................................................32 Type and Size ..................................................................................................................................33 Placement........................................................................................................................................34 Inlet-Outlet Controls .........................................................................................................................34 Typical Haulageway Sections.....................................................................................................................36 Page 2 of 49 ROAD MAINTENANCE CRITERIA....................................................................................................................38 VEHICLE MAINTENANCE CRITERIA ...............................................................................................................39 RUNAWAY VEHICLE SAFETY PROVISIONS .....................................................................................................41 Runaway Vehicle Collision Berms...............................................................................................................42 Escape Lanes ...........................................................................................................................................44 Entrance ..............................................................................................................................................44 Deceleration.........................................................................................................................................44 Stopping ..............................................................................................................................................45 CONCLUSIONS .............................................................................................................................................46 Appendix......................................................................................................................................................48 Page 3 of 49 Design of Surface Mine Haulage Roads – A Manual By Walter W. Kaufman and James C. Ault ABSTRACT This Bureau of Mines manual for design of surface mine haulage roads covers such aspects of haulage road design as road alignment (both vertical and horizontal), construction materials, cross slope, and drainage provisions. Traffic control and design of proper lane widths to promote safe vehicle movement are included, as are suggested criteria for road and vehicle maintenance and for runaway vehicle safety provisions. The aim of this publication is to provide those involved with surface mine haulage road design with a complete manual of recommended practices that, if implemented, will promote safer, more efficient haulage routes. INTRODUCTION During the past 30 years, surface mine haulage equipment has developed from trucks capable of moving 20 tons of material to vehicles that transport as much as 350 tons. Unfortunately, the design of roads this equipment must traverse has not advanced at the same rate. In many areas, road-building technology appropriate to vehicles of three decades past is still being practiced today. As a result, numerous unnecessary haulage road accidents have occurred every year. A number of these mishaps can be attributed to operator error. However, far too many are caused by road conditions that are beyond the vehicle's ability to negotiate safely. With this history of haulage related problems in mind, the Bureau of Mines undertook a project to produce a design manual that would ultimately guide surface mine road planners toward safer, more efficient haulage systems. Such a manual did not exist prior to the conclusion of this project. This manual was
Recommended publications
  • Pavements and Surface Materials
    N O N P O I N T E D U C A T I O N F O R M U N I C I P A L O F F I C I A L S TECHNICAL PAPER NUMBER 8 Pavements and Surface Materials By Jim Gibbons, UConn Extension Land Use Educator, 1999 Introduction Traffic Class Type of Road Pavements are composite materials that bear the weight of 1 Parking Lots, Driveways, Rural pedestrian and vehicular loads. Pavement thickness, width and Roads type should vary based on the intended function of the paved area. 2 Residential Streets 3 Collector Roads Pavement Thickness 4 Arterial roads 5 Freeways, Expressways, Interstates Pavement thickness is determined by four factors: environment, traffic, base characteristics and the pavement material used. Based on the above classes, pavement thickness ranges from 3" for a Class 1 parking lot, to 10" or more for Class 5 freeways. Environmental factors such as moisture and temperature significantly affect pavement. For example, as soil moisture Sub grade strength has the greatest effect in determining increases the load bearing capacity of the soil decreases and the pavement thickness. As a general rule, weaker sub grades require soil can heave and swell. Temperature also effects the load thicker asphalt layers to adequately bear different loads associated bearing capacity of pavements. When the moisture in pavement with different uses. The bearing capacity and permeability of the freezes and thaws, it creates stress leading to pavement heaving. sub grade influences total pavement thickness. There are actually The detrimental effects of moisture can be reduced or eliminated two or three separate layers or courses below the paved wearing by: keeping it from entering the pavement base, removing it before surface including: the sub grade, sub base and base.
    [Show full text]
  • MDG 15 – Trucks and Loaders Open Cut Incidents
    MDG 15 – Trucks and Loaders Open Cut Incidents Incident Agent of Events Recommendations Information Fatality COAL OPEN-CUT INCIDENTS 8/01/2008 Unintended Fatally injured while attempting to Maintain adequate berm United States operation of dump spoil. The truck travelled heights, monitor work Coal Equipment over the edge of the dump and practices, ensure correct task Open-Cut rolled down the spoil slope 140 training, conduct pre-op feet. checks and use seat belts. 16/11/2007 Drowning Driver was attempting to dump Ensure adequate berms and United States spoil when he reversed over a 70 that safe work procedures are Coal foot high slope and down to the followed. Ensure work areas Open-Cut mine floor. are illuminated at night and that Pre-op checks of equipment are performed. 2/07/2007 Other Dozer operator was standing by his Mine shall train all workers in United States machine when foreman told him to regards to pick-up trucks and Coal move it for a highwall shot. He to use all available safety Open-Cut was then run over by the foreman equipment within a truck. on his way to the dozer. 28/11/2006 Unintended Driver reported that the park brake Strengthened policy about United States Operation of was sticking and was then found at applying park brakes before Coal Equipment the base of hill crushed between exiting truck, ensure proper Open-Cut the truck and a berm. Was either machine maintenance. thrown from truck or got out and brakes released. 23/05/2006 Unintended Miner driving a Mack water truck Implement extensive driver United States Operation of lost control descending a steep training, implement Coal Equipment mine access road.
    [Show full text]
  • Chapter 18, Lesson 3 World War One Trench Warfare
    Name:______________________________________ Chapter 18, Lesson 3 World War One Trench Warfare Below are illustrations of a typical World War One trench system. Use the proceeding illustrations to answer the questions. Key 1. Were the artillery batteries (cannons, mortars, and large guns) located in front or behind the infantry soldiers in the trenches? Why might it be set up this way? _____________________________________________________________________________ _____________________________________________________________________________ 2. Based on the location of the listening posts, what was their purpose? _____________________________________________________________________________ ______________________________________________________________________________ 3. The communication trenches connected the first support line trench to what three areas? _____________________________________________________________________________ _____________________________________________________________________________ 4. What would be the reason for having wire breaks in the barbed wire entanglements? _____________________________________________________________________________ ______________________________________________________________________________ 5. After answering questions 14 and 15, tell what two parts of the trench were used to minimize the devastation from explosions. ______________________________________________________________________________ 6. This allowed soldiers to see over the trench when shooting the enemy. ________________
    [Show full text]
  • The Mineral Industry of Virginia
    THE MINERAL INDUSTRY OF VIRGINIA This chapter has been prepared under a Memorandum of Understanding between the U.S. Geological Survey and the Virginia Department of Mines, Minerals and Energy for collecting information on all nonfuel minerals. In 2000, the estimated value1 of nonfuel mineral production lime. The State increased to 7th from 9th in the production of for Virginia was $692 million, based upon preliminary U.S. common clays. Although the only producing kyanite mine and Geological Survey (USGS) data. This was a 6.5% increase calcined kyanite (mullite) facilities in the United States were in from that of 19992 and followed a 2.2% increase from 1998 to Virginia, synthetic mullite, which is a calcined bauxite, was 1999. Virginia was 22d in rank among the 50 States in total produced in one other State. About 90% of the U.S. kyanite and nonfuel mineral production value, of which the State accounted mullite output is used in refractories for the smelting and for more than 1.5% of the U.S. total. processing of a variety of metals and in glass and in high- Crushed stone was, by value, Virginia’s leading raw nonfuel temperature ceramics manufacturing. mineral, accounting for 60% of the State’s total mineral The following narrative information was provided by the production value. From 1990 through 2000, the State produced Virginia Division of Mineral Resources3 (VDMR). Some more than 628 million metric tons of crushed stone, or an production data in the text that follows are those reported by the average of almost 57 million metric tons per year.
    [Show full text]
  • VIRGINIA.2Ool
    VIRGINIA DIVISION OF MINERAL RESOURCES PUBLICATION 164 DIRECTORY OF THE MINERAL INDUSTRY IN VIRGINIA.2OOl Palmer C. Sweet COMMONWEALTH OF \'IRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY DTVISION OF MINERAL RESOURCES Stanley S. Johnson, State Geologist CIIARLOTTESVILLE, VIRGINIA 2001 VIRGINIA DIVISION OF MINE,RAL RESOURCES PUBLICATION 164 DIRECTORY OF THE MINERAL INDUSTRY IN VIRGINIA.2OOl Palmer C. Sweet COMMONWEALTH OF VIRGINIA DEPARTMENT OF MINES, MINERALSAND ENERGY DIVISION OF MINERAL RESOURCES Stanley S. Johnson, State Geologist CHARLOTTESVILLE, VIRGINIA 200r DEPARTMENT OF MINES. MINERALS AND ENERGY RICHMOND,VIRGINIA O.Gene Dishner. Director DIVISION OF MINERAL RESOURCES C}IARLOTTESVILLE, VIRGINIA Staaley S. Johnson, State Geologist and Division Director 804951-6350 STAIF Kay T. Hasenauer, Executive Secretary 804951-63,18 ECONOMICMINERALSANDENERGYSECTION SPATIALDATAANDEASTERNGEOLOGY PalmerC. Sweet, SectionHead,804-951-6362 IanJ. Duncan, SectionHead 804-951-6344 Rebecca S. Hope, Geologist Senior, 804-95 I -635 1 C. R. Berquist, Jr., Geologist Senior ,7 57 -221-2448 RoyS. Sitcs, GeologistSenior,804-951-6360 ElizabethV.M. Campbell,GeologistSenior,804-951-6343 Michaell. Upchurch, GeologistSenior,804-951-6363 NickH. Evans, GeologistSenior, 304-951-6345 William S. Henika, Geologist Senior, SOUTHWESTMINERALSANDGEOLOGYSECTION KarenK.Hostettler,GeologistSenior,804-951-6352 AlfredR. Taylor, SectionHead,540-676-5577 DavidB. Spears,GeologistSenior, 304-95 1-6361 James A. Lovett, Geologist Senior, 540-676-5830 WilliamW.Whitlock,GeologistSenor,540-676-5829 PUBLICATIONSANDWESTERNGEOI.OGYSECTION EugeneK. Rader,SectionHeadandEditor, 804-95 1-6358 SALESANDSIJPPORTSECTION DavidA.Hubbard,Jr.,GeologistSenior,804-951-6353 DeloresJ.Green, OfficeManager,804-951-6346 JohnD. Man, Jr., GeologistSenior, 304-951-6354 DeborahC. Farrish, StoreOperations Supervisor, 304-951-6359 VernonN.Monis,CartographicDrafterAssist.,S04-951-6356 EdwinW.Marshall, GeologistTechniciar\ 804-951-6355 GeraldP.
    [Show full text]
  • Coastal Erosion
    Guidance for Flood Risk Analysis and Mapping Coastal Erosion February 2018 Requirements for the Federal Emergency Management Agency (FEMA) Risk Mapping, Assessment, and Planning (Risk MAP) Program are specified separately by statute, regulation, or FEMA policy (primarily the Standards for Flood Risk Analysis and Mapping). This document provides guidance to support the requirements and recommends approaches for effective and efficient implementation. Alternate approaches that comply with all requirements are acceptable. For more information, please visit the FEMA Guidelines and Standards for Flood Risk Analysis and Mapping webpage (www.fema.gov/guidelines-and-standards-flood-risk-analysis-and- mapping). Copies of the Standards for Flood Risk Analysis and Mapping policy, related guidance, technical references, and other information about the guidelines and standards development process are all available here. You can also search directly by document title at www.fema.gov/library. Coastal Erosion February 2018 Guidance Document 40 Page i Document History Affected Section or Date Description Subsection Sections 2.1.1.1 and February Replaced Figures 2.1.1-1, 2.1.1-2, and 2.1.1-3 to contain 2.1.1.2 2018 correct reference to water level above which Primary Frontal Dune reservoir volume is determined. Coastal Erosion February 2018 Guidance Document 40 Page ii Table of Contents 1.0 Overview ............................................................................................................................ 1 1.1 Beach and Shoreline Settings ........................................................................................ 2 1.1.1 Sandy Beach Backed by High Sand Dune: ............................................................. 3 1.1.2 Sandy Beach Backed by Low Sand Dune Berm: .................................................... 4 1.1.3 Sandy Beach Backed by Shore Protection Structure: ............................................. 4 1.1.4 Mixed Grain Size Beach .........................................................................................
    [Show full text]
  • Chapter 1 Overview and History of the Expanded Shale, Clay and Slate
    Chapter 1 Overview and History of the Expanded Shale, Clay and Slate Industry April 2007 Expanded Shale, Clay & Slate Institute (ESCSI) 2225 E. Murray Holladay Rd, Suite 102 Salt Lake City, Utah 84117 (801) 272-7070 Fax: (801) 272-3377 [email protected] www.escsi.org CHAPTER 1 1.1 Introduction 1.2 How it started 1.3 Beginnings of the Expanded Shale, Clay and Slate (ESCS) Industry 1.4 What is Rotary Kiln Produced ESCS Lightweight Aggregate? 1.5 What is Lightweight Concrete? 1.6 Marine Structures The Story of the Selma Powell River Concrete Ships Concrete Ships of World War II (1940-1947) Braddock Gated Dam Off Shore Platforms 1.7 First Building Using Structural Lightweight Concrete 1.8 Growth of the ESCS Industry 1.9 Lightweight Concrete Masonry Units Advantages of Lightweight Concrete Masonry Units 1.10 High Rise Building Parking Structures 1.11 Precast-Prestressed Lightweight Concrete 1.12 Thin Shell Construction 1.13 Resistance to Nuclear Blast 1.14 Design Flexibility 1.15 Floor and Roof Fill 1.16 Bridges 1.17 Horticulture Applications 1.18 Asphalt Surface Treatment and Hotmix Applications 1.19 A World of Uses – Detailed List of Applications SmartWall® High Performance Concrete Masonry Asphalt Pavement (Rural, City and Freeway) Structural Concrete (Including high performance) Geotechnical Horticulture Applications Specialty Concrete Miscellaneous Appendix 1A ESCSI Information Sheet #7600 “Expanded Shale, Clay and Slate- A World of Applications…Worldwide 1-1 1.1 Introduction The purpose of this reference manual (RM) is to provide information on the practical application of expanded shale, clay and slate (ESCS) lightweight aggregates.
    [Show full text]
  • Guidelines for Mine Haul Road Design
    GGUUIIDDEELLIINNEESS FFOORR MMIINNEE HHAAUULL RROOAADD DDEESSIIGGNN Dwayne D. Tannant & Bruce Regensburg 2001 Guidelines for Mine Haul Road Design Table of Contents 1 SURVEY OF HAUL TRUCKS & ROADS FOR SURFACE MINES ............................... 1 1.1 Introduction ..................................................................................................................... 1 1.2 Haul Trucks and Construction/Maintenance Equipment ................................................. 1 1.3 Haul Road Length ............................................................................................................ 3 1.4 Haul Road Geometry ....................................................................................................... 4 1.5 Haul Road Construction Materials .................................................................................. 6 1.6 Symptoms and Causes of Haul Road Deterioration ........................................................ 6 1.7 Haul Road Maintenance .................................................................................................. 7 1.8 Evolution of Haul Road Design at Syncrude ................................................................... 8 1.8.1 Layer Thickness .................................................................................................................. 9 1.8.2 Haul Road Geometry .......................................................................................................... 9 1.8.3 Construction Techniques .................................................................................................
    [Show full text]
  • Infiltration Berm
    Stormwater Maintenance Fact Sheet PROTECTING AND ENHANCING THE NATURAL ENVIRONMENT THROUGH COMPREHENSIVE ENVIRONMENTAL PROGRAMS INFILTRATION BERMS Infiltration berms are mounds of stone covered with soil and vegetation placed along gentle slopes to slow the flow of water and encourage stormwater infiltration and absorption. In some cases, earth is excavated on the upslope side of the berm to create a pooling area to slow and store water as it filters through the berm. Infiltration berms are appropriate for residential, commercial, or open field/wooded applications, where there is less than a 10% slope in topography. As stormwater flows down the slope, it is slowed and pools as it filters through the berm. The main purpose of a Undesireable shape for a berm berm is to slow the velocity of the flow and reduce the energy of stormwater flows, thereby reducing erosion and flood risk. Desireable shape for a berm Source: CH2MHill presentation WHY IT’S IMPORTANT TO MAINTAIN YOUR INFILTRATION Who is responsible for this BERMS maintenance? An unmaintained infiltration berm may: As the property owner, you are • Stop filtering the rainwater and allow trash and pollutants to enter into responsible for all maintenance of nearby streams. your infiltration berm. • Block the flow of rainwater and cause local flooding. • Allow water to pool on the surface long enough to allow mosquitoes to breed (longer than 3 days). MAINTENANCE AND MONITORING Anne Arundel County Department of Public Works FREQUENCY* ACTIVITY* As needed • Remove litter and debris. • Mow grass. • Replace thinning or patchy vegetation. Semi-annually, or more • Ensure standing water does not persist longer than 48 hours.
    [Show full text]
  • PC-5 DIKES and BERMS Definition and Purpose a Permanent Dike Or
    Best Management Practices Manual PC-5 Dikes and Berms PC-5 DIKES AND BERMS Refer to: ITD Standard Specifications, Sections 205, 209, and 212. ITD Standard Drawings P-1-E and P-1-F. BMP Objectives Perimeter Control Slope Protection Borrow and Stockpiles Drainage Areas Sediment Trapping Stream Protection Temporary Stabilizing Permanent Stabilizing Definition and Purpose A permanent dike or berm is a ridge constructed of compacted soil, loose gravel, stone, or crushed rock that intercepts and prevents stormwater runoff from entering a sensitive area, and diverts or directs the water to a controlled or stabilized drainage outlet. Dikes or berms can be located or placed immediately along the top or bottom of cut or fill slopes, along the perimeter of an area, or adjacent to streams to prevent high stream flows from entering a site, or runoff from a site entering a stream or waterway. Appropriate Applications Directs water to slope drains, ditches, channels, sediment trap basins, retention ponds, or swales. Serves both as a temporary and later as a permanent erosion control that is left in place for the life of the project. Prevents runoff water from entering or overflowing slopes or intercepts and diverts overflow water after coming off a slope. Intercepts runoff from upland undisturbed areas and diverts to a sediment trap basin or slope drain. Intercepts runoff from a road or slope and directs the water to a slope drain or a sediment trap basin. Prevents off-site stormwater from entering the area when installed around the perimeter. Prevents high water from entering a project when installed next to live streams, ponds, or lakes.
    [Show full text]
  • Wetland Tip Sheet-2.Q
    Wetland Wetlands filter excess pesticides and nutrients. Many plants and animals find a home in wetlands. In your backyard you easily can turn it into a wetland What is a wetland? paradise. Even if you do not have a A mini-wetland in your yard can pro- naturally wet spot, you can establish A wetland is simply any area where vide many of the same benefits that an area in your yard to grow many of water covers the soil or keeps it natural wetlands offer. A mini-wet- the beautiful plants associated with saturated for at least two or three land can replace the important nat- wetlands. weeks during the growing season. ural functions of wetlands that may You will usually find them anywhere have been lost when your communi- ty was developed. A wetland in your backyard will temporarily store, filter, and clean runoff water from your roof and lawn. It will provide habitat for many interesting creatures--from butterflies and bees to salamanders, toads, frogs, and birds. Most wetland plants do not require standing water to grow successfully, and will survive even in an area that appears dry during most of the growing season. If you have a naturally occurring wet spot in your yard, or a low swale or drainageway with heavy clay soils, Even if you do not have a naturally wet spot, you can establish an area in your yard to grow many of the beautiful plants associated with wetlands. Backyard Conservation is a cooperative project of: USDA Natural Resources The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, gender, religion, age, disability, political beliefs, sexual orientation, and marital or family status.
    [Show full text]
  • Crushed Stone
    STONE (CRUSHED)1 (Data in million metric tons unless otherwise noted) Domestic Production and Use: In 2020, 1.46 billion tons of crushed stone valued at more than $17.8 billion was produced by an estimated 1,410 companies operating 3,440 quarries and 180 sales and (or) distribution yards in 50 States. Leading States were, in descending order of production, Texas, Missouri, Florida, Pennsylvania, Ohio, Georgia, Virginia, Illinois, North Carolina, and Kentucky, which combined accounted for more than one-half of the total crushed stone output. Of the total domestic crushed stone produced in 2020, about 70% was limestone and dolomite; 15%, granite; 6%, traprock; 5%, miscellaneous stone; 3%, sandstone and quartzite; and the remaining 1% was divided, in descending order of tonnage, among marble, volcanic cinder and scoria, calcareous marl, slate, and shell. It is estimated that of the 1.5 billion tons of crushed stone consumed in the United States in 2020, 72% was used as construction aggregate, mostly for road construction and maintenance; 16% for cement manufacturing; 8% for lime manufacturing; 2% for agricultural uses; and the remainder for other chemical, special, and miscellaneous uses and products. The estimated output of crushed stone in the United States shipped for consumption in the first 9 months of 2020 was 1.10 billion tons, a decrease of 3% compared with that of the same period of 2019. Third quarter shipments for consumption decreased by 6% compared with those of the same period of 2019. Additional production information, by quarter for each State, geographic division, and the United States, is reported in the U.S.
    [Show full text]