Standard Construction Specifications for Asphalt Surfacing Division 40 Index

Total Page:16

File Type:pdf, Size:1020Kb

Standard Construction Specifications for Asphalt Surfacing Division 40 Index STANDARD CONSTRUCTION SPECIFICATIONS FOR ASPHALT SURFACING DIVISION 40 INDEX SECTION 40.01 GENERAL....................................................................................... 1 Article 1.1 Scope of Work................................................................................. 1 Article 1.2 Applicable Standards ...................................................................... 1 Article 1.3 Subsurface Investigation................................................................. 3 Article 1.4 Materials and Inspection ................................................................. 3 Article 1.5 Stripping Test for Aggregates ......................................................... 3 Article 1.6 Payment - General.......................................................................... 3 SECTION 40.02 SEAL COAT.................................................................................... 4 Article 2.1 Description ...................................................................................... 4 Article 2.2 Asphalt ............................................................................................ 4 Article 2.3 Cover Aggregate............................................................................. 4 Article 2.4 Equipment....................................................................................... 5 Article 2.5 Construction.................................................................................... 6 Article 2.6 Measurement .................................................................................. 7 Article 2.7 Basis of Payment ............................................................................ 8 SECTION 40.03 PRIME COAT.................................................................................. 9 Article 3.1 Description ...................................................................................... 9 Article 3.2 Materials ......................................................................................... 9 Article 3.3 Construction.................................................................................... 9 Article 3.4 Application of Bituminous Material .................................................. 9 Article 3.5 Application of Blotter Material........................................................ 10 Article 3.6 Measurement ................................................................................ 10 Article 3.7 Basis of Payment .......................................................................... 10 SECTION 40.04 TACK COAT.................................................................................. 11 Article 4.1 Description .................................................................................... 11 Article 4.2 Material ......................................................................................... 11 Article 4.3 Equipment..................................................................................... 11 Article 4.4 Construction.................................................................................. 12 Article 4.5 Measurement ................................................................................ 13 Article 4.6 Basis of Payment .......................................................................... 13 SECTION 40.05 CRACK AND JOINT SEALANT .................................................... 14 Article 5.1 General ......................................................................................... 14 Article 5.2 Materials ....................................................................................... 14 Article 5.3 Construction.................................................................................. 15 Article 5.4 Measurement ................................................................................ 16 Article 5.5 Basis of Payment .......................................................................... 16 i SECTION 40.06 ASPHALT CONCRETE PAVEMENT ............................................ 17 Article 6.1 Description .................................................................................... 17 Article 6.2 Material and Testing...................................................................... 17 Article 6.3 Composition of Mixes.................................................................... 19 Article 6.4 Equipment..................................................................................... 22 Article 6.5 Construction.................................................................................. 26 Article 6.6 Density and Surface Requirements............................................... 33 Article 6.7 Measurement ................................................................................ 34 Article 6.8 Basis of Payment .......................................................................... 35 SECTION 40.07 STONE MASTIC ASPHALT CONCRETE PAVEMENT ................ 36 Article 7.1 General ......................................................................................... 36 Article 7.2 Material and Testing...................................................................... 36 Article 7.3 Composition of Mixes.................................................................... 37 Article 7.4 Equipment..................................................................................... 43 Article 7.5 Construction.................................................................................. 45 Article 7.6 Density and Surface Requirements............................................... 51 Article 7.7 Measurement ................................................................................ 51 Article 7.8 Basis of Payment .......................................................................... 52 SECTION 40.08 RECYCLED ASPHALT PAVING (RAP) ........................................ 53 Article 8.1 General ......................................................................................... 53 Article 8.2 Material ......................................................................................... 53 Article 8.3 Construction.................................................................................. 54 Article 8.4 Measurement ................................................................................ 55 Article 8.5 Basis of Payment .......................................................................... 56 SECTION 40.09 BITUMINOUS SURFACE TREATMENT....................................... 57 Article 9.1 Description .................................................................................... 57 Article 9.2 Asphalt .......................................................................................... 57 Article 9.3 Aggregates.................................................................................... 57 Article 9.4 Equipment..................................................................................... 58 Article 9.5 Construction.................................................................................. 59 Article 9.6 Measurement ................................................................................ 60 Article 9.7 Basis of Payment .......................................................................... 61 SECTION 40.10 PAVEMENT ROTOMILLING......................................................... 62 Article 10.1 General ......................................................................................... 62 Article 10.2 Construction.................................................................................. 62 Article 10.3 Measurement ................................................................................ 62 Article 10.4 Basis of Payment .......................................................................... 62 SECTION 40.11 REMOVE AND REPLACE ASPHALT SURFACING ..................... 63 Article 11.1 Description .................................................................................... 63 Article 11.2 Materials ....................................................................................... 63 Article 11.3 Construction.................................................................................. 63 Article 11.4 Measurement ................................................................................ 64 Article 11.5 Basis of Payment .......................................................................... 64 ii STANDARD CONSTRUCTION SPECIFICATIONS FOR ASPHALT SURFACING DIVISION 40 SECTION 40.01 GENERAL Article 1.1 Scope of Work The Work covered by these Specifications consists of providing all plant, labor, equipment supplies, material, transportation, handling, and storage, and performing all operations necessary to complete the construction of hot mix asphalt concrete pavement consisting of one or more courses on a previously prepared base, seal coat of asphalt cement and cover aggregate, and bituminous surface treatment in single or multiple courses. Article 1.2 Applicable Standards The latest revision of the following standards: American Society for Testing and Materials (ASTM), American Association of State Highway and Transportation Officials (AASHTO), and State of Alaska Department of Transportation and Public Facilities, Alaska Test Methods and Standard Practices (ATM) are hereby made a part of these Specifications. Additionally, the Western Alliance for Quality Transportation Construction (WAQTC) Test Methods and Procedures are hereby incorporated into these Specifications.
Recommended publications
  • (Vocs and Svocs) from Warm Mix Asphalt Incorporating Natural Zeolite and Reclaimed Asphalt Pavement for Sustainable Pavements
    sustainability Article Evaluation of Reductions in Fume Emissions (VOCs and SVOCs) from Warm Mix Asphalt Incorporating Natural Zeolite and Reclaimed Asphalt Pavement for Sustainable Pavements Javier Espinoza 1,2 , Cristian Medina 1,2, Alejandra Calabi-Floody 3 , Elsa Sánchez-Alonso 3 , Gonzalo Valdés 3 and Andrés Quiroz 1,2,* 1 Chemical Ecology Laboratory, Department of Chemical Sciences and Natural Resources, University of La Frontera, Temuco 4811230, Chile; [email protected] (J.E.); [email protected] (C.M.) 2 Biotechnological Research Center Applied to the Environment (CIBAMA), University of La Frontera, Temuco 4811230, Chile 3 Department of Civil Works Engineering, University of La Frontera, Temuco 4811230, Chile; [email protected] (A.C.-F.); [email protected] (E.S.-A.); [email protected] (G.V.) * Correspondence: [email protected] Received: 26 September 2020; Accepted: 10 November 2020; Published: 17 November 2020 Abstract: Conventional asphalt mixtures used for road paving require high manufacturing temperatures and therefore high energy expenditure, which has a negative environmental impact and creates risk in the workplace owing to high emissions of pollutants, greenhouse gases, and toxic fumes. Reducing energy consumption and emissions is a continuous challenge for the asphalt industry. Previous studies have focused on the reduction of emissions without characterizing their composition, and detailed characterization of volatile organic compounds (VOCs) and semi-volatile organic compounds (SVOCs) in asphalt fumes is scarce. This communication describes the characterization and evaluation of VOCs and SVOCs from asphalt mixtures prepared at lower production temperatures using natural zeolite; in some cases, reclaimed asphalt pavement (RAP) was used.
    [Show full text]
  • Module 6. Hov Treatments
    Manual TABLE OF CONTENTS Module 6. TABLE OF CONTENTS MODULE 6. HOV TREATMENTS TABLE OF CONTENTS 6.1 INTRODUCTION ............................................ 6-5 TREATMENTS ..................................................... 6-6 MODULE OBJECTIVES ............................................. 6-6 MODULE SCOPE ................................................... 6-7 6.2 DESIGN PROCESS .......................................... 6-7 IDENTIFY PROBLEMS/NEEDS ....................................... 6-7 IDENTIFICATION OF PARTNERS .................................... 6-8 CONSENSUS BUILDING ........................................... 6-10 ESTABLISH GOALS AND OBJECTIVES ............................... 6-10 ESTABLISH PERFORMANCE CRITERIA / MOES ....................... 6-10 DEFINE FUNCTIONAL REQUIREMENTS ............................. 6-11 IDENTIFY AND SCREEN TECHNOLOGY ............................. 6-11 System Planning ................................................. 6-13 IMPLEMENTATION ............................................... 6-15 EVALUATION .................................................... 6-16 6.3 TECHNIQUES AND TECHNOLOGIES .................. 6-18 HOV FACILITIES ................................................. 6-18 Operational Considerations ......................................... 6-18 HOV Roadway Operations ...................................... 6-20 Operating Efficiency .......................................... 6-20 Considerations for 2+ Versus 3+ Occupancy Requirement ............. 6-20 Hours of Operations ..........................................
    [Show full text]
  • Brick Streets Plan
    BRICK STREETS PLAN City of Rock Island Community & Economic Development Department Planning & Redevelopment Division Rock Island Preservation Commission Adopted 1988 by Rock Island City Council Amended: January 23, 2012 August 22, 2011 March 28, 2005 April 10, 2000 May 12, 1997 September 14, 1992 Rock Solid. Rock Island. 1899 - The first brick pavement was laid in the Tri-Cities on the corner of Twentieth Street and Second Avenue, Rock Island. The first brick was placed by Mayor William McConochie. Civil Engineer for the project was H.G. Paddock. -- From Historical Souvenir of Moline and Vicinity, 1909 TABLE of CONTENTS Executive Summary ..................................................................................... 3 Prioritization List ........................................................................................... 5 Map of Brick Streets ..................................................................................... 6 Methodology ................................................................................................ 9 History of Brick Street Construction in Rock Island ...................................... 10 Condition of Brick Streets ............................................................................. 13 Utilities and Brick Streets ............................................................................. 17 Street Standards .......................................................................................... 18 Owner-Occupancy Along Brick Streets .......................................................
    [Show full text]
  • Replacement of Davis Avenue Bridge Over Indian Harbor Bridge No
    REPLACEMENT OF DAVIS AVENUE BRIDGE OVER INDIAN HARBOR BRIDGE NO. 05012 November 19, 2019 1 MEETING AGENDA • Project Team • Project Overview • Existing Conditions • Alternatives Considered • Traffic Impacts • Proposed Alternative • Railing Options • Construction Cost / Schedule • Contact Information • Questions 2 PROJECT TEAM Town of Greenwich Owner Alfred Benesch & Company Prime Consultant, Structural, Highway, Hydraulic, Drainage Design GZA GeoEnvironmantal Inc. Environmental Permitting Didona Associates Landscape Architects, LLC Landscaping Services, Planning 3 LOCATION MAP EXIT 4 EXIT 3 BRIDGE LOCATION 4 AERIAL VIEW BRIDGE LOCATION 5 PROJECT TIMELINE CURRENT PROJECT STATUS INVESTIGATION ALTERNATIVES PRELIMINARY FINAL CONSTRUCTION PHASE ASSESSMENT DESIGN DESIGN Spring to Fall 2020 February 2018 to June 2018 to January 2019 to May 2019 to May 2018 January 2019 April 2019 December 2019 6 PROJECT GOALS • Correct Existing Deficiencies of the Bridge (Structural and Functional) • Improve Multimodal Traffic Flow at Bridge Crossing (Vehicles / Bicycles / Pedestrians) • Maintain / Enhance Safety at Bridge Crossing • Meet Local, State, and Federal Requirements 7 EXISTING BRIDGE – BRIDGE PLAN 8 EXISTING BRIDGE – CURRENT PLAN VIEW 9 EXISTING BRIDGE Existing Bridge Data • Construction Year: 1934 • Structure Type: Concrete Slab Supported on Stone Masonry Abutments and Pier • Structure Length: 37’‐3” (17’‐1” Span Lengths) • Bridge Width: 43’+ (Outside to Outside) • Lane Configuration: Two Lanes, Two 4’ Sidewalks • Existing Utilities: Water, Gas (Supported
    [Show full text]
  • PASER Manual Asphalt Roads
    Pavement Surface Evaluation and Rating PASER ManualAsphalt Roads RATING 10 RATING 7 RATING 4 RATING PASERAsphalt Roads 1 Contents Transportation Pavement Surface Evaluation and Rating (PASER) Manuals Asphalt PASER Manual, 2002, 28 pp. Introduction 2 Information Center Brick and Block PASER Manual, 2001, 8 pp. Asphalt pavement distress 3 Concrete PASER Manual, 2002, 28 pp. Publications Evaluation 4 Gravel PASER Manual, 2002, 20 pp. Surface defects 4 Sealcoat PASER Manual, 2000, 16 pp. Surface deformation 5 Unimproved Roads PASER Manual, 2001, 12 pp. Cracking 7 Drainage Manual Patches and potholes 12 Local Road Assessment and Improvement, 2000, 16 pp. Rating pavement surface condition 14 SAFER Manual Rating system 15 Safety Evaluation for Roadways, 1996, 40 pp. Rating 10 & 9 – Excellent 16 Flagger’s Handbook (pocket-sized guide), 1998, 22 pp. Rating 8 – Very Good 17 Work Zone Safety, Guidelines for Construction, Maintenance, Rating 7 – Good 18 and Utility Operations, (pocket-sized guide), 1999, 55 pp. Rating 6 – Good 19 Wisconsin Transportation Bulletins Rating 5 – Fair 20 #1 Understanding and Using Asphalt Rating 4 – Fair 21 #2 How Vehicle Loads Affect Pavement Performance Rating 3 – Poor 22 #3 LCC—Life Cycle Cost Analysis Rating 2 – Very Poor 23 #4 Road Drainage Rating 1 – Failed 25 #5 Gravel Roads Practical advice on rating roads 26 #6 Using Salt and Sand for Winter Road Maintenance #7 Signing for Local Roads #8 Using Weight Limits to Protect Local Roads #9 Pavement Markings #10 Seal Coating and Other Asphalt Surface Treatments #11 Compaction Improves Pavement Performance #12 Roadway Safety and Guardrail #13 Dust Control on Unpaved Roads #14 Mailbox Safety #15 Culverts-Proper Use and Installation This manual is intended to assist local officials in understanding and #16 Geotextiles in Road Construction/Maintenance and Erosion Control rating the surface condition of asphalt pavement.
    [Show full text]
  • Characteristics of Oil Sands Products
    CHARACTERISTICS OF OIL SANDS PRODUCTS Heather D. Dettman Center for Spills in the Environment Oil Sands Products Training Portland, Maine December 4 & 5, 2012 2 Simplified —Oil Sands to Motor“ Value Chain Tailings Pipeline Transport Desalter Extraction Mining Pipeline Terminal Distillation W ater/Solids Primary Upgrading Removal Coking or Residue Performed at Upgraders DiluentAddition Hydrocracking Performed at Refineries In Situ Production Secondary Upgrading May be needed in future Catalytic Processing (Hydrogen) Refining Catalytic Processing (Hydrogen) Gasoline Diesel 3 Pipeline Definitions Transm ission Tailings Pipeline Transport Desalter Extraction Mining Pipeline Terminal Distillation Feeder W ater/Solids Primary Upgrading Removal Coking or Residue Performed at Upgraders DiluentAddition Hydrocracking Gathering Performed at Refineries In Situ Production Secondary Upgrading May be needed in future Catalytic Processing (Hydrogen) http://www.cepa.com /about-pipelines/types-of-pipelines Refining Catalytic Processing (Hydrogen) Gasoline Diesel 4 0hat Is Bitumen? ° Bitumen is the —extra heavy“ crude oil that remains after the biodegradation of oil in Northern Alberta ° Initial boiling point is 204°C/399.2°F ° Approximately 50wt% of the oil boils at temperatures below 524°C/975.2°F ° Biodegradation has resulted in organic acids being left behind in the oil ° Total acid number (TAN) is 3mg KOH/g which corresponds to an organic acid content of 3wt% in the oil ° Organic acid species in bitumen are relatively large molecules with 70wt% boiling
    [Show full text]
  • Secure Fuels from Domestic Resources ______Profiles of Companies Engaged in Domestic Oil Shale and Tar Sands Resource and Technology Development
    5th Edition Secure Fuels from Domestic Resources ______________________________________________________________________________ Profiles of Companies Engaged in Domestic Oil Shale and Tar Sands Resource and Technology Development Prepared by INTEK, Inc. For the U.S. Department of Energy • Office of Petroleum Reserves Naval Petroleum and Oil Shale Reserves Fifth Edition: September 2011 Note to Readers Regarding the Revised Edition (September 2011) This report was originally prepared for the U.S. Department of Energy in June 2007. The report and its contents have since been revised and updated to reflect changes and progress that have occurred in the domestic oil shale and tar sands industries since the first release and to include profiles of additional companies engaged in oil shale and tar sands resource and technology development. Each of the companies profiled in the original report has been extended the opportunity to update its profile to reflect progress, current activities and future plans. Acknowledgements This report was prepared by INTEK, Inc. for the U.S. Department of Energy, Office of Petroleum Reserves, Naval Petroleum and Oil Shale Reserves (DOE/NPOSR) as a part of the AOC Petroleum Support Services, LLC (AOC- PSS) Contract Number DE-FE0000175 (Task 30). Mr. Khosrow Biglarbigi of INTEK, Inc. served as the Project Manager. AOC-PSS and INTEK, Inc. wish to acknowledge the efforts of representatives of the companies that provided information, drafted revised or reviewed company profiles, or addressed technical issues associated with their companies, technologies, and project efforts. Special recognition is also due to those who directly performed the work on this report. Mr. Peter M. Crawford, Director at INTEK, Inc., served as the principal author of the report.
    [Show full text]
  • CONCRETE Pavingtechnology Concrete Intersections a Guide for Design and Construction
    CONCRETE PAVINGTechnology Concrete Intersections A Guide for Design and Construction Introduction Traffic causes damage to pavement of at-grade street and road intersections perhaps more than any other location. Heavy vehicle stopping and turning can stress the pavement surface severely along the approaches to an intersection. The pavement within the junction (physical area) of an intersection also may receive nearly twice the traffic as the pavement on the approaching roadways. At busy intersections, the added load and stress from heavy vehicles often cause asphalt pavements to deteriorate prematurely. Asphalt surfaces tend to rut and shove under the strain of busses and trucks stopping and turning. These deformed surfaces become a safety concern for drivers and a costly maintenance problem for the roadway agency. Concrete pavements better withstand the loading and turning movements of heavy vehicles. As a result, city, county and state roadway agencies have begun rebuilding deteriorated asphalt intersections with con- crete pavement. These agencies are extending road and street system maintenance funds by eliminating the expense of intersections that require frequent maintenance. At-grade intersections along business, industrial and arterial corridor routes are some of the busiest and most vital pavements in an urban road network. Closing these roads and intersections for pavement repair creates costly traffic delays and disruption to local businesses. Concrete pavements provide a long service life for these major corridors and intersections. Concrete pavements also offer other advantages for As a rule, it is important to evaluate the existing pave- intersections: ment condition before choosing limits for the new concrete pavement. On busy routes, it may be desir- 1.
    [Show full text]
  • Concrete Sidewalk Specifications
    CONCRETE SIDEWALK SPECIFICATIONS GENERAL Concrete sidewalks shall be constructed in accordance with these specifications and the requirements of the State of Wisconsin, Department of Transportation, Standard Specifications for Road and Bridge Construction, Current Edition (hereafter “Standard Specifications”). Concrete sidewalks shall conform to the lines and grades established by the City Engineer. All removal and replacements will be made as ordered by the City Engineer. The Contractor shall construct one-course sidewalks of a minimum thickness of four (4) inches in accordance with the plans and specifications. Sidewalk through a driveway section shall be a minimum thickness of six (6) inches. Concrete driveway approaches shall be a minimum thickness of six (6) inches. SUBGRADE A new sub-base may be required by the Engineer if, in his opinion, the soil in the subgrade is soft or spongy in places and will swell or shrink with changes in its moisture content. If a new sub- base is required, it shall consist of granular material and shall be spread to a depth of at least three (3) inches and thoroughly compacted. While compacting the sub-base the material shall be thoroughly wet and shall be wet when the concrete is deposited but shall not show any pools of water. If the Contractor undercuts the subgrade two (2) inches or more, he shall, at his expense, bring the subgrade to grade by using gravel fill and it shall be thoroughly compacted. Where sidewalk is placed over excavations such as tree roots or sewer laterals, four (4) one-half (1/2) inch reinforcing bars shall be placed to prevent settling or cracking of the sidewalk.
    [Show full text]
  • Pavement Mgmt Plan Street Listing
    Town of Ashburnham Pavement Management Data 1/7/2021 Key REMINDER Town Accepted - Inspected It's important to keep the following in mind when reviewing this plan. State Roads Each fiscal year is subject to changes for any or all of the following reasons. Town Accepted - Gravel • Budget increases or decreases Town Accepted - Scenic Roads • Not receiving applied for grant monies Private • Changes to material costs RSR = Road Surface Rating • Unexpected changes to the condition of a particular road TIP = MA Transportation Improvement Program • Subject to funding allocation (Capital Plan) TOWN ACCEPTED INSPECTED Street Name Street Segment From Street RSR Repair Method Est. Cost Func. Class Estimated Action ACADEMY STREET ACADEMY ST-01 CENTRAL ST 99.23 No Maintenance Required $0.00 Local Completed ACADEMY STREET ACADEMY ST-02 PLEASANT ST N 99.23 No Maintenance Required $0.00 Local Completed AMES AVENUE AMES AVE CENTRAL ST 11.13 Major Rehabilitation $30,394.54 Local Cul De Sac/Dead End ASHBY ROAD ASHBY RD-01 CHAPEL ST 87.73 Routine Maintenance $6,852.38 Major Collector ASHBY ROAD ASHBY RD-02 STOWELL RD 89.73 Routine Maintenance $8,518.91 Major Collector ASHBY ROAD ASHBY RD-03 HOLT RD 91.73 Routine Maintenance $6,049.28 Major Collector ASHBY ROAD ASHBY RD-04 OLD ASHBY RD 96.73 No Maintenance Required $0.00 Major Collector Completed ASHBY ROAD ASHBY RD-05 OLD STEELE RD 96.73 No Maintenance Required $0.00 Major Collector Completed ASHBY ROAD ASHBY RD-06 RINGE TPKE 96.73 No Maintenance Required $0.00 Major Collector Completed BIRCHWOOD TERRACE
    [Show full text]
  • Concrete Pavementspavements N a a T T I I O O N N a a L L
    N N a a t t i i o o n n a a Technical Services l l , R R o o u u n n d d a a b b o o Vail, Colorado u u t t May 22-25, 2005 Steve Waalkes, P.E. C C o o n n f f e e r r e e Managing Director n n c American Concrete Pavement Association c e e 2 2 0 0 0 0 5 5 TRB National Roundabouts Conference D D Concrete Roundabouts R R Concrete Roundabouts A A F F T T N N a a Flexible Uses liquid asphalt as binder Pro: usually lower cost Con: requires frequent maintenance & rehabilitation t t i i Asphalt o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C Terminology Terminology o o n n f f e e r r e e n n c c e e 2 2 0 0 0 0 5 5 D D R R A A Rigid Uses cement as binder Pro: longer lasting Con: higher cost Concrete F F T T N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C o o s n n c f f e i e r r t e e n n e y c c t e h e t 2 2 e 0 0 f s 0 0 aterials onstructability a e conomics 5 erformance (future maintenance) 5 Why Concrete Roundabouts? Why Concrete Roundabouts? D D E C P M R R • • • • •S •A A A F F T T Realize there is a choice N N a a t t i i o o n n a a l l R R o o u u n n d d a a b b o o u u t t C C o o n n f f e e r r e e n n c c e e 2 2 0 0 0 0 What performance characteristics of Where do we typically use concrete pavement? (situations, traffic conditions, applications, etc.) concrete pavement make it the best choice for roundabouts? 5 5 Why Concrete Roundabouts? Why Concrete Roundabouts? D D R R 1.
    [Show full text]
  • Asphalt Concrete Pavement Design­ a Subsystem to Consider the Fatigue Mode of Distress
    Asphalt Concrete Pavement Design­ A Subsystem to Consider the Fatigue Mode of Distress D. A. KASIANCHUK, Associate Professor of Engineering, Carleton University, Ottawa; C. L. MONISMITH, Professor of Civil Engineering, Institute of Transportation and Traffic Engineering, University of California, Berkeley; and W. A. GARRISON, Materials Testing Engineer, Contra Costa County Public Works Department, Martinez, California In this paper a working model is presented for a subsystem to consider the fatigue mode of distress for asphalt concrete pavements. The de­ sign subsystem is divided into three general sections-(a) preliminary data acquisition, (b) materials characterization, and (c) analysis and evaluation. In developing a particular design with this subsystem, use is made of traffic and wheel load distributions, environmental condi­ tions based on available weather records for the vicinity of the pro­ posed design, multilayer elastic theory, resilient response of untreated granular materials and fine-grained soils, stiffness and fatigue char­ acteristics of the asphalt concrete, and a cumulative damage hypothesis based on the simple linear summation of cycle ratios. To expedite the design process, the majority of the design computations have been pro­ grammed for use with a high-speed digital computer. An example shows the use of the design procedure for a structural pavement section consisting of asphalt concrete resting directly on the subgrade soil. The design developed is shown for conventional mate­ rials and traffic to result in a thickness that is quite reasonable based on comparisons with other design methods. This particular subsystem would appear to have some advantages, however, in that it can be ex­ tended to consider loading conditions and material characteristics for which experience is not available.
    [Show full text]