Road Surface Quality: What Road Users Want from Highways England November 2017 Road Surface Quality: What Road Users Want from Highways England

Total Page:16

File Type:pdf, Size:1020Kb

Road Surface Quality: What Road Users Want from Highways England November 2017 Road Surface Quality: What Road Users Want from Highways England Road surface quality: what road users want from Highways England November 2017 Road surface quality: what road users want from Highways England Anthony Smith Jim O’Sullivan Chief Executive Chief Executive Transport Focus Highways England Foreword ransport Focus research in 2015 showed that not something separate. They prefer asphalt roads T surface quality was road users’ top priority for to concrete ones, partly because they are quieter improvement to England’s motorways and major to drive on. ‘A’ roads1, by some margin. But what wasn’t clear Highways England believes a connected was exactly which aspects of the surface users country is better for everyone. The company works wanted to be improved and why. hard to deliver the safest, smoothest, most Transport Focus and Highways England have reliable connections possible. In 2015/2016 therefore worked together to research just that. 1471 lane miles of resurfacing was carried out Our purpose being to ensure that the views of – 23 per cent higher than the original target. those using the roads shape decision-making in But Highways England is not complacent. this area. That’s why Transport Focus and Highways England The research shows that what road users want are both using this research to help inform the is not complicated. They want a surface without Government’s second Road Investment Strategy dips, bumps, potholes, undulations or deep ruts (RIS 2), covering 2020-25. Separately, Highways – in other words continuously smooth. They also England is considering the recommendations want clearer white lines and ‘cats eyes’, which Transport Focus has made in light of this users regard as part of the surface and research. 2 1 Road users’ priorities for improvement: car and van drivers and motorcyclists and Road users’ priorities for improvement: heavy goods vehicle drivers (2015) Key findings Why does surface quality matter? What is a good surface? In this research road users were not saying To a road user a good quality road surface: Highways England’s roads are in a poor state. • is continuously smooth, without dips, bumps, However they were saying that surface quality potholes, undulations and deep ruts on England’s strategic roads matters to them. • has white lines and ‘cats eyes’ in excellent condition There were three main reasons. – road users think of these as part of the surface and • Precisely because Highways England’s roads are not something separate to do with signage important strategic roads, users want them maintained • is preferably made of asphalt rather than concrete to a high standard. Those taking part were unsurprised because it is considered quieter to drive on and to learn that the earlier study had found the area to viewed as less bumpy. be users’ highest priority for improvement. • Road users think surface defects on 70mph roads with huge volumes of traffic – a characteristic of much of the strategic road network (SRN) – must in some way compromise safety. Those taking part mentioned having to swerve around faults in the road, feeling unsafe when white lines and ‘cats eyes’ are not clear, and experiencing water not draining properly from the carriageway. Motorcyclists cite safety in relation to surface defects to an even greater extent than drivers of other vehicles, while caravan drivers mention the dangers of being ‘caught’ in ruts caused by heavy vehicles using the inside lane. • A continuously smooth surface gives a more comfortable journey experience. Road users have a clear preference for an SRN where the surface is smooth and free from defects – it is simply a more pleasant experience. Road users with particular disabilities can experience physical discomfort as a result of poor road surface. A surface which is not continuously smooth impacts on journey comfort and is viewed as less safe. Road users cite surface defects as being the cause of poor driving, such as vehicles not returning to the inside lane to avoid deep ruts. Some perceive that smooth surfaces lead to smoother traffic flow and therefore fewer delays. Where a defect has been there for a long time, frequent users lose faith that maintenance standards are right or that contractors are adhering to them. It is important to highlight that the condition of Highways England’s assets has a more direct bearing on customer experience than is the case with most regulated utilities. Road users see and feel the bumps in the road in a way that consumers do not, generally, see and feel leaks from a worn-out water main. 3 Road surface quality: what road users want from Highways England Where would road users like Variation by vehicle type and driver to see improvements? Unsurprisingly, aspects of road surface quality affect different road users in different ways. Road users are not saying that surface quality on the SRN • Motorcyclists fear that defects cause risks. is poor in general, but they are saying that they want it Potholes, dips or deep ruts can cause problems, either to be better than it currently is. In particular, they want directly or where a rider attempts to avoid them. They Highways England to make improvements to the way it: feel that deterioration of the surface between the lanes • continuously monitors the SRN to identify problems is dangerous when changing lanes. Surfaces with with the surface, road markings and ‘cats eyes’ poor grip or where road markings are slippery are • carries out permanent repairs quickly, particularly particularly challenging in wet weather. where there is a safety impact, and ensures a smooth, • Lorry drivers say that, although it is often heavy seamless transition to the surrounding section of road vehicles that cause ruts, they are also most likely to • carries out full resurfacing where there is an appreciable struggle to maintain good control when driving on a length in poor condition, whether because of wear and rutted road. It is less easy for larger vehicles to avoid tear, undulations, tramlines or other degradation defects when travelling at speed. • makes full use of engineering advances and • Disabled drivers/passengers can suffer physical international best practice to identify materials which discomfort on roads that have uneven surfaces. will deliver a smooth and seamless experience, for • Caravanners report control and stability issues example harder-wearing material to prevent deep if driving in a lane with ruts. ruts forming in the inside lane • Cyclists indicated in previous Transport Focus • tells users if a problem is already known about and research2 that surface quality of carriageways, or give a date by which repairs will be carried out parallel dedicated paths, is also important. They • ensures a consistent standard of road surface is mentioned their vulnerability when encountering provided across the network, without apparent variation a defect, ironwork that sticks up from the surface from road to road or area to area. and temporary repairs that don’t last. 4 2 Cyclists, pedestrians and equestrians: a summary of priorities for Highways England’s Network (2017) The issues Material used Potholes Asphalt – smooth Concrete – rough, Consistent smoothness Grit and loose material – and quiet, less noise bumpy ride, increased – enables relaxed driving adds to driver anxiety, is and vibration noise (although less relaxing to drive on, acknowledged as harder causes concerns about wearing than asphalt) damage to vehicles Black surface – maximum Light-coloured surfaces Speedy repair if potholes Potholes – large or small, contrast with white road – less contrast with white do arise felt to be dangerous markings road markings Long-lasting repair Patched repairs – experience suggests it doesn’t last and Road markings creates grit as the repair breaks up Bright, bold markings Faded and worn away markings Surface water Directional information Old markings showing painted on the road through, causing confusion Carriageways that Standing water – (motorcyclists less keen, and anxiety drain effectively risk of aquaplaning slippery in the wet) Drains that work properly Blocked drains Old markings (from Conflicting information previous road layouts) to between markings on Drains that are flush Spray – particularly from be completely removed the road and signs with the carriageway lorries, because it reduces (motorcyclists in particular) visibility Rumble strips (particularly Missing and broken marking the edge of the road) ‘cats eyes’ to alert drivers if they ‘drift’ Joins in the road Bright reflective ‘cats Defects caused by eyes’ (motorcyclists less removing ‘cats eyes’ keen on raised designs (motorcyclists in Smooth transition from one Changes in level of ‘cats eyes’) particular) section of surface to another beyond a small bump Anti-slip surfaces The smooth type of at junctions asphalt – this material is felt to give more seamless transitions than ‘noisy asphalt’ and concrete Deep ruts (tramlines/grooves) Drains that are flush with the carriageway Stronger surface in Deep ruts – causes (motorcyclists in particular) the inside lane – to cope issues for car drivers, with the weight of lorries lorry drivers, those towing caravans, motorcyclists Surface quality in roadworks (to a lesser extent) Some road users also commented about the need to Restrictions on the number maintain road surface quality during long-term roadworks, of lorries – to prevent particularly where lanes have been narrowed or re-aligned further damage and vehicle wheels are now pounding the joins between sections of asphalt. 5 Road surface quality: what road users want from Highways
Recommended publications
  • Brick Streets Plan
    BRICK STREETS PLAN City of Rock Island Community & Economic Development Department Planning & Redevelopment Division Rock Island Preservation Commission Adopted 1988 by Rock Island City Council Amended: January 23, 2012 August 22, 2011 March 28, 2005 April 10, 2000 May 12, 1997 September 14, 1992 Rock Solid. Rock Island. 1899 - The first brick pavement was laid in the Tri-Cities on the corner of Twentieth Street and Second Avenue, Rock Island. The first brick was placed by Mayor William McConochie. Civil Engineer for the project was H.G. Paddock. -- From Historical Souvenir of Moline and Vicinity, 1909 TABLE of CONTENTS Executive Summary ..................................................................................... 3 Prioritization List ........................................................................................... 5 Map of Brick Streets ..................................................................................... 6 Methodology ................................................................................................ 9 History of Brick Street Construction in Rock Island ...................................... 10 Condition of Brick Streets ............................................................................. 13 Utilities and Brick Streets ............................................................................. 17 Street Standards .......................................................................................... 18 Owner-Occupancy Along Brick Streets .......................................................
    [Show full text]
  • PASER Manual Asphalt Roads
    Pavement Surface Evaluation and Rating PASER ManualAsphalt Roads RATING 10 RATING 7 RATING 4 RATING PASERAsphalt Roads 1 Contents Transportation Pavement Surface Evaluation and Rating (PASER) Manuals Asphalt PASER Manual, 2002, 28 pp. Introduction 2 Information Center Brick and Block PASER Manual, 2001, 8 pp. Asphalt pavement distress 3 Concrete PASER Manual, 2002, 28 pp. Publications Evaluation 4 Gravel PASER Manual, 2002, 20 pp. Surface defects 4 Sealcoat PASER Manual, 2000, 16 pp. Surface deformation 5 Unimproved Roads PASER Manual, 2001, 12 pp. Cracking 7 Drainage Manual Patches and potholes 12 Local Road Assessment and Improvement, 2000, 16 pp. Rating pavement surface condition 14 SAFER Manual Rating system 15 Safety Evaluation for Roadways, 1996, 40 pp. Rating 10 & 9 – Excellent 16 Flagger’s Handbook (pocket-sized guide), 1998, 22 pp. Rating 8 – Very Good 17 Work Zone Safety, Guidelines for Construction, Maintenance, Rating 7 – Good 18 and Utility Operations, (pocket-sized guide), 1999, 55 pp. Rating 6 – Good 19 Wisconsin Transportation Bulletins Rating 5 – Fair 20 #1 Understanding and Using Asphalt Rating 4 – Fair 21 #2 How Vehicle Loads Affect Pavement Performance Rating 3 – Poor 22 #3 LCC—Life Cycle Cost Analysis Rating 2 – Very Poor 23 #4 Road Drainage Rating 1 – Failed 25 #5 Gravel Roads Practical advice on rating roads 26 #6 Using Salt and Sand for Winter Road Maintenance #7 Signing for Local Roads #8 Using Weight Limits to Protect Local Roads #9 Pavement Markings #10 Seal Coating and Other Asphalt Surface Treatments #11 Compaction Improves Pavement Performance #12 Roadway Safety and Guardrail #13 Dust Control on Unpaved Roads #14 Mailbox Safety #15 Culverts-Proper Use and Installation This manual is intended to assist local officials in understanding and #16 Geotextiles in Road Construction/Maintenance and Erosion Control rating the surface condition of asphalt pavement.
    [Show full text]
  • Pavement Mgmt Plan Street Listing
    Town of Ashburnham Pavement Management Data 1/7/2021 Key REMINDER Town Accepted - Inspected It's important to keep the following in mind when reviewing this plan. State Roads Each fiscal year is subject to changes for any or all of the following reasons. Town Accepted - Gravel • Budget increases or decreases Town Accepted - Scenic Roads • Not receiving applied for grant monies Private • Changes to material costs RSR = Road Surface Rating • Unexpected changes to the condition of a particular road TIP = MA Transportation Improvement Program • Subject to funding allocation (Capital Plan) TOWN ACCEPTED INSPECTED Street Name Street Segment From Street RSR Repair Method Est. Cost Func. Class Estimated Action ACADEMY STREET ACADEMY ST-01 CENTRAL ST 99.23 No Maintenance Required $0.00 Local Completed ACADEMY STREET ACADEMY ST-02 PLEASANT ST N 99.23 No Maintenance Required $0.00 Local Completed AMES AVENUE AMES AVE CENTRAL ST 11.13 Major Rehabilitation $30,394.54 Local Cul De Sac/Dead End ASHBY ROAD ASHBY RD-01 CHAPEL ST 87.73 Routine Maintenance $6,852.38 Major Collector ASHBY ROAD ASHBY RD-02 STOWELL RD 89.73 Routine Maintenance $8,518.91 Major Collector ASHBY ROAD ASHBY RD-03 HOLT RD 91.73 Routine Maintenance $6,049.28 Major Collector ASHBY ROAD ASHBY RD-04 OLD ASHBY RD 96.73 No Maintenance Required $0.00 Major Collector Completed ASHBY ROAD ASHBY RD-05 OLD STEELE RD 96.73 No Maintenance Required $0.00 Major Collector Completed ASHBY ROAD ASHBY RD-06 RINGE TPKE 96.73 No Maintenance Required $0.00 Major Collector Completed BIRCHWOOD TERRACE
    [Show full text]
  • Gravel Roads Maintenance & Frontrunner Training Workshop
    A Ditch In Time Gravel Roads Maintenance Workshop 1 So you think you’ve got a wicked driveway 2 1600’ driveway with four switchbacks and 175’ of elevation change (11% grade) 3 Rockhouse Development, Conway 4 5 6 Swift River (left) through National Forest into Saco River that drains the MWV Valley’s developments 7 The best material starts as solid rock that is drilled & blasted… 8 Then crushed into smaller pieces and screened to produce specific size aggregate 9 How strong should it be? One big truck = 10,000 cars! 10 11 The road surface… • Lots of small aggregate (stones) to provide strength with a shape that will lock stones together to support wheels • Sufficient “fines,” the binder that will lock the stones together, to keep the stones from moving around 12 • The stone: hard and uniform in size and more angular than that made just from screening bank run gravel 13 • A proper combination of correctly sized broken rock, sand and silt/clay soil materials will produce a road surface that hardens into a strong and stable crust that forms a reasonably impervious “roof” to our road • An improper balance- a surface that is loose, soft & greasy when wet, or excessively dusty when dry (see samples) 14 One way to judge whether gravel will pack or not… 15 Here’s another way… 16 Or: The VeryFine test The sticky palm test As shown in the Camp Roads manual 17 • “Dirty” gravel packs but does not drain • “Clean” gravel drains but does not pack 18 Other road surfacing materials: • Rotten Rock- traditional surfacing material in the Mt Washington Valley
    [Show full text]
  • Advance Traffic Markings ATM Installation Road Surface Guide
    Advance Traffic Markings ATM Installation Road Surface Guide Advance Traffic Markings P.O. Box H Roanoke Rapids, NC 27870 Phone: 252-536-2574 Fax: 252-526-4940 Introduction _____________________________________________________________ This Road Surface Guide is to help determine the suitability of pavements for the application of ATM Marking Tapes. It describes a wide variety of pavement conditions from newly treated to severely distressed and a recommendation for application of ATM Marking Tapes. Further Information For more information or road conditions not covered in this guide, please contact Advance Traffic Markings, 252-536-2574. How to Use This Guide _____________________________________________________________ The first part of this guide describes common surfaces and gives application recommendations for them. The remaining pages describe distressed surfaces with visual examples. This guide also addresses applications over oil drip zones and existing markings. The distress pages are formatted as follows: Type of Distress – The name or type of distress as it is commonly known. Description – A brief description of the distress and its most common physical appearance. Application Recommendations – Recommendations for the application of Advance Traffic Markings Pavement Marking Tapes. This is the recommendations for the distressed or affected portion of the road. A more complete examination of the entire roadway and types of other distresses should also be considered when using this guide. Asphalt Surfaces _____________________________________________________________ There are different types and textures of asphalt surfaces in which markings are applied. They vary greatly from one place to another. This is mainly due to the fact that some states have different standards than others and sometimes rely on what is locally available.
    [Show full text]
  • Surface Pavement Materials Used Ion Urban Areas
    Session 4 - Specific techniques and innovation Paper : Pavement surface materials used in urban areas Authors : Egbert BEUVING (EAPA) - Netherlands Jean-Paul MICHAUT (COLAS) - France Pavement surface materials used in urban areas -The range of urban materials- Egbert Beuving (EAPA) and Jean-Paul Michaut (COLAS) Summary A wide variety of pavement surface materials have been used in urban areas. The choice of the surface material depends on a range of rational and irrational arguments. In former days the availability of the materials was a dominant factor. Nowadays a broad scale of materials is available and functional requirements play an important role in the decision for a certain pavement type and surface layer now. The materials available are: • Bituminous bound materials (asphalt concrete, mastic asphalt) • Cement bound materials (concrete, concrete elements) • (Small) paving elements (block pavers, modular materials, stone, terracotta) • Composite pavements (a combination of the above mentioned ones) In urban areas there is a wide variety of pavement users, as there are: pedestrians, wheelchair- users, parents with prams, roller-skates, bicyclists, scoot-mobiles, motorists, passenger cars and trucks. The choice of the surface material depends on the (functional) requirements. Some of these requirements are the same as for highways; other ones might depend on the local situation. Additional requirements for urban areas might be a certain surface texture or colour for a certain image, easy to repair to guarantee the accessibility of houses, shops and other buildings, noise reducing, open for water infiltration, smooth to avoid vibrations and easy to open for accessing sewerage, gas and water systems. There might also be a need for flexible materials for creating ramps, roundabouts, cables and wiring.
    [Show full text]
  • Practical Guide to Street Works Operatives and Supervisors Under the New Roads and Street Works Act 1991
    This guide provides practical advice to assist good workmanship and promote the highest standards of reinstatement by site Practical Guide to Street Works operatives and supervisors under the New Roads and Street Works Act 1991. It is NOT a replacement or abbreviated version of the Code of Practice, Specification for the Reinstatement of Openings in Highways (Second Edition [England], June 2002). Information is presented in the order that a reinstatement is undertaken, from signing, excavating, reinstating and then leaving a completed job. Each section is typically broken down to cover: • Specification details • checks, with hints and tips of what to look out for • a list of tasks to be completed • health and safety issues to be aware of. £9.95 www.tso.co.uk 5527465X_PGTSW cover_Vn1_0.indd 1 18/4/06 10:42:01 Practical Guide to Street Works Compiled and designed by TRL Limited on behalf of the Department for Transport and in consultation with HAUC (UK) June 2006 London: TSO Published by TSO (The Stationery Office) Department for Transport and available from: Great Minster House 76 Marsham Street Online London SW1P 4DR www.tsoshop.co.uk Telephone 020 7944 8300 Web site www.dft.gov.uk Mail,Telephone, Fax & E-mail TSO © Queen’s Printer and Controller of Her Majesty’s PO Box 29, Norwich, NR3 1GN Stationery Office, 2006, except for the following: Telephone orders/ • extracts from the Specification for the General enquiries: 0870 600 5522 Reinstatement of Openings in Highways (Second Fax orders: 0870 600 5533 Edition [England], June 2002), highlighted in yellow, E-mail: [email protected] which are Crown copyright; Textphone 0870 240 3701 • photographs, which have been provided by Bomag, NJUG,Terex,TRL Limited and Wacker (Great TSO Shops Britain) Limited; 123 Kingsway, London,WC2B 6PQ 020 7242 6393 Fax 020 7242 6394 • other illustrations.
    [Show full text]
  • HISTORY on the ROAD CLEVELAND’S HESSLER COURT by Dianne Timblin
    HISTORY ON THE ROAD CLEVELAND’S HESSLER COURT By Dianne Timblin hen you Millennia later and half a world away, turn the wood roads appeared in colonial North Wcorner onto America. Corduroy roads, named for the Hessler Court, just off cotton cloth because of its similarly ridged the Case Western appearance, provided a means of crossing Reserve University particularly muddy or swampy areas.2 In campus, the first thing a few cases, the swampy ground itself has you notice is the allowed vestiges of these roads to remain sound. Or more accu- in place for examination centuries later. In rately, the lack of it, especially when you April 2008, for example, the remains of a turn onto Hessler Court from Hessler corduroy-style log road dating to 1684 Road, the brick-paved street that runs per- were uncovered in Annapolis, Maryland.3 pendicular to it. Over the decades, the brick Canadians were first to experiment with street has buckled and cracked, and using sawed plank surfaces and in the although the brickwork remains pic- 1830s became the first North Americans turesque, the ride is bumpy and loud. to begin systematically installing plank Hessler Court, however, the last remain- roads. Residents of Onondaga County, ing wood block road in Cleveland, remains New York, liked what they saw their smooth and quiet, serving as a reminder neighbors doing and in the 1840s followed of one reason wood block paving became suit with their own.4 Planking helped a popular option on urban streets in the make rural American roads more pass- latter half of the nineteenth century.
    [Show full text]
  • Road Design and Construction Terms
    Glossary of Road Design and Construction Terms Nebraska ◆Department ◆of ◆Roads 3-C Planning The continuing, cooperative, comprehensive planning process in an urbanized area as required by federal law. (e.g. Lincoln, Omaha, or Sioux City Area Planning) 3R Project 3R stands for resurfacing, restoration and rehabilitation. These projects are designed to extend the life of an existing highway surface and to enhance highway safety. These projects usually overlay the existing surface and replace guardrails. 3R projects are generally constructed within the existing highway right-of-way. Abutment An abutment is made from concrete on piling and supports the end of a bridge deck. Access Control The extent to which the state, by law, regulates where vehicles may enter or leave the highway. Action Plan A set of general guidelines and procedures developed by each state to assure that adequate consideration is given to possible social, economic and environmental effects of proposed highway projects. All states were directed to develop this plan by the Federal Highway Administration. Adapted Grasses Grasses which are native to the area in which they are planted, but have adjusted to the conditions of the environment. Adverse Environmental Effects Those conditions which cause temporary or permanent damage to the environment. Aesthetics In the highway context, the considerations of landscaping, land use and structures to insure that the proposed highway is pleasing to the eye of the viewer from the roadway and to the viewer looking at the roadway. Aggregate Stone and gravel of various sizes which compose the major portion of the surfacing material. The sand or pebbles added to cement in making concrete.
    [Show full text]
  • Considerations for High Occupancy Vehicle (HOV) Lane to High Occupancy Toll (HOT) Lane Conversions Guidebook
    Office of Operations 21st Century Operations Using 21st Century Technology Considerations for High Occupancy Vehicle (HOV) Lane to High Occupancy Toll (HOT) Lane Conversions Guidebook U.S. Department of Transportation Federal Highway Administration June 2007 Considerations for High Occupancy Vehicle (HOV) to High Occupancy Toll (HOT) Lanes Conversions Guidebook Prepared for the HOV Pooled-Fund Study and the U.S. Department of Transportation Federal Highway Administration Prepared by HNTB Booz Allen Hamilton Inc. 8283 Greensboro Drive McLean, VA 22102 Under contract to Federal Highway Administration (FHWA) June 2007 Notice This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or the use thereof. The contents of this Report reflect the views of the contractor, who is responsible for the accu- racy of the data presented herein. The contents do not necessarily reflect the official policy of the Department of Transportation. This Report does not constitute a standard, specification, or regulation. The United States Government does not endorse products or manufacturers named herein. Trade or manufacturers’ names appear herein only because they are considered essential to the objective of this document. Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. FHWA-HOP-08-034 4. Title and Subtitle 5. Report Date Consideration for High Occupancy Vehicle (HOV) to High Occupancy Toll June 2007 (HOT) Lanes Study 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Martin Sas, HNTB. Susan Carlson, HNTB Eugene Kim, Ph.D., Booz Allen Hamilton Inc.
    [Show full text]
  • Cost of Pavement Marking Materials
    Synthesis Report 2000-11 Cost of Pavement Marking Materials Technical Report Documentation Page 1. Report No. 2. 3. Recipient’s Accession No. 2000-11 4. Title and Subtitle 5. Report Date COST OF PAVEMENT MARKING MATERIALS March 2000 6. 7. Author(s) 8. Performing Organization Report No. David Montebello Jacqueline Schroeder 9. Performing Organization Name and Address 10. Project/Task/Work Unit No. SRF Consulting Group, Inc. One Carlson Parkway North, Suite 150 11. Contract (C) or Grant (G) No. Minneapolis, MN 55447 12. Sponsoring Organization Name and Address 13. Type of Report and Period Covered Minnesota Department of Transportation Final Report 395 John Ireland Boulevard Mail Stop 330 St. Paul, Minnesota 55155 14. Sponsoring Agency Code 15. Supplementary Notes 16. Abstract (Limit: 200 words) Recent changes in laws regarding the use of volatile organic compounds will impact the type of pavement marking material that many communities use to mark/delineate their roads. This report presents information on the various types of pavement marking materials available. It is intended to provide readers with sufficient data to make educated decisions regarding the selection of an appropriate pavement marking material. The report pulls together information on pavement marking material terminology, the various types of pavement marking materials, their durability and their retroreflectivity. Changes in formulas relating to laws regulating the use of volatile organic compounds are explained, as well as the impacts of those changes. Additionally, there is a list of best management practices that can be implemented to enable an agency or community to get the most value for its money.
    [Show full text]
  • Particulate Matter from the Road Surface Abrasion As a Problem of Non-Exhaust Emission Control
    Review Particulate Matter from the Road Surface Abrasion as a Problem of Non-Exhaust Emission Control Magdalena Penkała 1, Paweł Ogrodnik 2 and Wioletta Rogula-Kozłowska 2,3,* 1 The State School of Higher Education, 54 Pocztowa St., 22-100 Chełm, Poland; [email protected] 2 The Main School of Fire Service, Faculty of Fire Safety Engineering, 52/54 Słowackiego St., 01-629 Warsaw, Poland; [email protected] 3 Institute of Environmental Engineering, Polish Academy of Sciences, 34 M. Skłodowskiej-Curie St., 41-819 Zabrze, Poland * Correspondence: [email protected] or [email protected]; Tel.: +48-225-617-553 Received: 27 October 2017; Accepted: 5 January 2018; Published: 7 January 2018 Abstract: Along with house heating and industry, emissions from road traffic (exhaust and tire, brake, car body or road surface abrasions) are one of the primary sources of particulate matter (PM) in the atmosphere in urban areas. Though numerous regulations and vehicle-control mechanisms have led to a significant decline of PM emissions from vehicle exhaust gases, other sources of PM remain related to road and car abrasion are responsible for non-exhaust emissions. Quantifying these emissions is a hard problem in both laboratory and field conditions. First, we must recognize the physicochemical properties of the PM that is emitted by various non-exhaust sources. In this paper, we underline the problem of information accessibility with regards to the properties and qualities of PM from non-exhaust sources. We also indicate why scarce information is available in order to find the possible solution to this ongoing issue.
    [Show full text]