The World Bank Implementation Status & Results
Total Page:16
File Type:pdf, Size:1020Kb
The World Bank Report No: ISR15624 Implementation Status & Results Colombia CO APL1 La Guajira Water & Sanitation Infrast and Service Mngmt Proj (P096965) Operation Name: CO APL1 La Guajira Water & Sanitation Infrast and Service Project Stage: Implementation Seq.No: 14 Status: ARCHIVED Archive Date: 09-Jul-2014 Mngmt Proj (P096965) Country: Colombia Approval FY: 2007 Product Line:IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Key Dates Public Disclosure Copy Board Approval Date 15-Mar-2007 Original Closing Date 15-Oct-2011 Planned Mid Term Review Date 11-Apr-2011 Last Archived ISR Date 23-Feb-2014 Effectiveness Date 26-Jun-2007 Revised Closing Date 15-Oct-2015 Actual Mid Term Review Date 01-Nov-2011 Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the proposed Project (APL Phase I) is to improve the quality of water supply and sanitation services in urban and peri-urban areas of La Guajira, moving towards complete coverage with continuous supply of potable water for urban areas. Specifically, the proposed operation will increase service quality for water supply, sanitation, and wastewater treatment in urban areas for 300,000 consumers and improve the sustainability of service by (a) supporting utility institutional performance through the Government of Colombia#s #Specialized Operator# policy, and (b) delivering the necessary water and sanitation infrastructure. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) Component Name Component Cost Urban Water Supply and Sewerage Infrastructure Component 129.00 Rural Pilot Component 7.00 Program Management and Analytical Activities 7.00 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Public Disclosure Copy Implementation Status Overview Project implementation is accelerating, with approximately US$43 million of works and services under contract, and an additional US$48 million of works expected to be contracted or Page 1 of 4 The World Bank Report No: ISR15624 in the process of contracting by the end of 2014. A new operator, INASSA which manages the water systems in Barranquilla and Santa Martha, has taken over the management of the Riohacha water company. The Department of La Guajira has also contracted INASSA as the Project Implementation Unit (PIU) responsible for managing the Bank-financed investments in the Department. Locations Country First Administrative Division Location Planned Actual Colombia Not Entered Villanueva Colombia Not Entered Urumita Colombia Not Entered Uribia Public Disclosure Copy Colombia Not Entered San Juan del Cesar Colombia Not Entered Riohacha Colombia Not Entered Manaure Colombia Not Entered Maicao Colombia Not Entered La Jagua del Pilar Colombia Not Entered Hatonuevo Colombia Not Entered Fonseca Colombia Not Entered El Molino Colombia Not Entered Distraccion Colombia Not Entered Dibulla Colombia Not Entered Barrancas Colombia Not Entered Albania Results Project Development Objective Indicators Public Disclosure Copy Page 2 of 4 The World Bank Report No: ISR15624 Indicator Name Core Unit of Measure Baseline Current End Target Specialized Operators Number Value 2.00 2.00 6.00 Date 06-Jan-2012 27-Jun-2014 15-Oct-2015 Comments This needs to be confirmed during the next mid-term review. Water Service Lelve Text Value Moderately Unsatisfactory Moderately UnSatisfactory Satisfactory Date 06-Jan-2012 06-Jan-2012 15-Oct-2015 Comments Infrastructure necessary to improve service levels Public Disclosure Copy currently under construction; Indigenous Peoples Satisfaction Levle Text Value Moderately Satisfactory Surveys will be undertaken in Satisfactory Sub Type late 2014/early 2015 Supplemental Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Value of Water Supply and Sewerage Works Amount(USD) Value 0.00 28000000.00 100000000.00 Constructed Date 01-Jan-2008 27-Jun-2014 15-Oct-2015 Comments There are six works contracts worth US$28 million in progress. Number of Rural Reservoirs Constructed Number Value 0.00 8.00 11.00 Sub Type Supplemental Data on Financial Performance (as of 16-Dec-2013) Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P096965 IBRD-74340 Effective 15-Mar-2007 16-Apr-2007 26-Jun-2007 15-Oct-2011 15-Oct-2015 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P096965 IBRD-74340 Effective USD 90.00 90.00 0.00 15.00 75.00 17.00 Public Disclosure Copy Disbursement Graph Page 3 of 4 The World Bank Report No: ISR15624 Public Disclosure Copy Key Decisions Regarding Implementation The La Guajira Assembly will need to authorize funding (Vigencias Futuras) for the pending contracts in 2014 and 2015. Restructuring History Level two Approved on 07-Oct-2011 Related Projects There are no related projects. Public Disclosure Copy Page 4 of 4.