Draft Initial Study and Mitigated Negative Declaration Leo Solar Project
DRAFT Initial Study and Mitigated Negative Declaration LEO Solar Project November 2019 Lead Agency: Kings County 1400 West Lacey Boulevard, Building. #6 Hanford, California 93230 Prepared for: Apex Energy Solutions, LLC 604 Sutter Street, Suite 250 Folsom, California 95630 (916) 985-9461 Prepared by: 2525 Warren Drive Rocklin, California 95677 Draft Initial Study and Mitigated Negative Declaration Leo Solar Project DRAFT MITIGATED NEGATIVE DECLARATION LEO SOLAR PROJECT Lead Agency: Kings County Community Development Agency, Kings County Government Center, 1400 West Lacey Boulevard, Hanford, California 93230 Project Proponent: Apex Energy Solutions, LLC, 604 Sutter Street Suite 250, Folsom, California 95630 Project Location: The proposed Leo Solar Project (Project) occupies ±30 acres of a 40-acre parcel located near 25th Avenue 15 miles south of unincorporated Kettleman City, California (Assessor’s Parcel Number [APN] 048-350-016- 000). The project site is situated in the unincorporated area of Kings County, California, along the Kings County/Kern County border, between California State Route (SR) 33 and Interstate 5 (I-5), approximately 0.5 mile east of 25th Avenue. The site corresponds to a portion of Section 36, Township 24 South, and Range 19 East of the Mount Diablo Base and Meridian (MDBM) of the “Avenal Gap” topographic quadrangles 7.5- minute quadrangle (U.S. Geological Survey [USGS] 2015). Project Description: The Project includes the development of up to a 5-megawatt (MW) solar photovoltaic (PV) energy generating facility and battery storage system (BESS) facility on ±30 acres of 40 undeveloped acres. The facility would consist of solar PV modules mounted on stationary fixed-tilt, ground- mounted racking or single-axis trackers and would include up to 5-MW alternating current (AC) maximum capacity, four-hour battery energy storage system.
[Show full text]