London North Eastern & East Midlands Route

Total Page:16

File Type:pdf, Size:1020Kb

London North Eastern & East Midlands Route LNE & EM Route Strategic Plan London North Eastern & East Midlands Route Route Strategic Plan March 2019 Network Rail 1 LNE & EM Route Strategic Plan Introduction from the Route Managing Director During CP6 we will focus on ensuring that our railway meets the needs of network with the deployment of Digital Railway with the conversion of the the passengers and customers that it serves. It is this straightforward aim ECML to Digital Rail. This will not only transform the passenger experience which underpins our vision and mission for CP6, which is to achieve: but also bring the industry ever closer due to the nature of this technology, ‘Efficient and effective delivery which is responsive to customer and and greatly reduce the tax payer’s burden for the operation, maintenance stakeholder priorities’. and renewal of this railway for generations to come. We will do this by ensuring our delivery, whether it be operations, The most important transformation of all in CP6 will be that of our people. maintenance or renewals is both efficient and effective. Efficiency has not Too long have the basic needs of our frontline people been overlooked. With had sufficient focus in CP5 and we are changing this now with an objective 45% of the workforce becoming eligible for retirement over the next two for renewals of returning to CP4 levels of efficiency. control periods, we will put in place now a strategic workforce plan that responds to the future needs of our business and the people we want to Durung CP6 we will deliver unprecedented levels of change to the LNE & attract and retain. We will exit CP6 with a more diverse, inclusive and EM route with the realisation of multi-million pound investments on the MML, empowered leadership within the Route that will carry on the pace of ECML and Transpennine corridors. This will be transformational for transformation. passengers with a 15% growth in train services across our Route. Whilst growing our railway we will also improve underlying infrastructure reliability and sustainabilty, reducing the number of service affecting failures by 9.9% through targeted renewals and a significant investment in our maintainence capabilty. This will support an ongoing drive to improve operating performance in the face of the headwinds of additional intensity of usage of our network on an aging asset base. The safety of our passengers, the wider public and those that work on the railway is and always has been our top priority. During CP6 we will target a 65% reduction in working time lost to injuries. This will be underpinned by our main safety objective of elminating manual handling injuries, our single biggest cause of accidents. Rob McIntosh The Network Rail devolution agenda rightly pushes us towards our Route Managing Director stakeholders and in doing so brings track and train closer together for the benefit of passengers, communities and economies. This will allow us to ensure that our investment decisions are focused towards those who matter most, and in doing so are better placed to realise the opportunity of third party investment on our railway. Investing money in and around the LNE & EM route will become easier, faster and much more customer focused. I am determined that CP6 will be the true dawn of a new era on the UK rail Network Rail 2 LNE & EM Route Strategic plan 4.4 Operational Performance strategy .......................................................... 34 Contents 4.5 Capacity and timetabling strategy .......................................................... 35 4.6 Organisational capability ........................................................................ 37 Foreword and summary ........................................................................... 5 1.1 Background to LNE & EM ........................................................................ 5 Sustainability & asset management capability ........................................ 39 1.2 CP6 strategic context challenges and opportunities ................................ 6 5.1 Sustainability & asset management capability objectives ....................... 39 1.3 Railway vision, objectives and commitments for CP6 .............................. 7 5.2 Sustainability & asset management capability activity prioritisation ....... 40 1.4 What we will deliver .................................................................................. 9 5.3 Asset by asset key outputs ..................................................................... 41 1.5 Summary of our proposed distribution of funding and efficiencies to 5.4 Long run forecast ................................................................................... 51 deliver our plan ...................................................................................... 10 5.5 Sustainable Development strategy ......................................................... 52 1.6 Summary of the remainder of our RSP ................................................. 11 5.6 Research, Development and Technology (R, D&T) ............................... 52 1.7 Output summary .................................................................................... 12 5.7 Innovation strategy ................................................................................. 53 Route objectives ..................................................................................... 14 5.8 Asset management capability ................................................................. 53 2.1 Long term scorecard .............................................................................. 14 5.9 Specific Sustainability Targeted Investment ........................................... 54 2.2 Key drivers of long-term performance .................................................... 17 Financial performance ............................................................................ 56 2.3 Regulatory floors .................................................................................... 19 6.1 Financial performance objectives ........................................................... 56 Safety ..................................................................................................... 20 6.2 Financial performance activity prioritisation ............................................ 57 3.1 Safety ..................................................................................................... 20 6.3 Financial Sustainability strategy ............................................................. 58 3.2 Safety activity prioritisation and risk outcome ........................................ 21 Activities & expenditure .......................................................................... 61 3.3 Safety strategy ....................................................................................... 22 7.1 Cost and volume summary ..................................................................... 61 3.4 Occupational Health & Wellbeing strategy ............................................. 26 7.2 Enhancements ....................................................................................... 65 3.5 Security strategy .................................................................................... 26 7.3 Digital Railway ........................................................................................ 67 Performance, Customers and People .................................................... 28 7.4 Telecoms strategy .................................................................................. 71 4.1 Performance, Customers and People objectives ................................... 28 7.5 Property strategy .................................................................................... 73 4.2 Activity prioritisation and risk outcome ................................................... 30 Delivery strategy ..................................................................................... 77 4.3 Train Performance Strategy ................................................................... 33 8.1 Summary route deliverability statement .................................................. 77 Network Rail 3 LNE & EM Route Strategic plan 8.2 Planning a Better Network strategy ........................................................ 78 Appendix G List of supporting annexes .................................................. 151 8.3 Project Delivery (IP) strategy ................................................................. 79 Appendix H Glossary of terms ................................................................ 152 8.4 Costing approach ................................................................................... 80 8.5 Maintenance strategy ............................................................................. 83 8.6 Communications .................................................................................... 87 8.7 Change .................................................................................................. 88 8.8 Social & environmental performance ..................................................... 89 8.9 Diversity & inclusion ............................................................................... 89 8.10 Quality .................................................................................................... 90 8.11 Information Technology and Information Management .......................... 90 Headwinds and efficiency ...................................................................... 92 9.1 Capex fishbone .....................................................................................
Recommended publications
  • Midland Lodge, Sutton Park
    MIDLAND LODGE, SUTTON PARK A history of the building with details of its architecture, its association with two well-known tenants and the establishment of Sutton Coldfield’s Vesey Club in 1888. Roy Billingham Midland Lodge is a residential property situated within Sutton Park, designed by William Jenkins, a Birmingham architect, and built in 1880 for the Warden and Society of Sutton Coldfield. Following the Town’s incorporation in 1886, ownership passed to the new Corporation of Sutton Coldfield, and to Birmingham City Council in 1974 after Government reorganisation of local authority boundaries. The site of Midland Lodge (O.S. Grid Ref. SP 1121 9715) is adjacent to the Midland Gate entrance to Sutton Park at the western end of Midland Road which was constructed as a private road by the Midland Railway Company in 1879 to provide direct access for train passengers to and from the Park for their Sutton Park railway station. “New Lodge”, as the cottage was originally called, had several tenants prior to 1886 when Benjamin Stone, Sutton Coldfield’s first Mayor, took over the tenancy in order to meet the necessary residential qualifications to become a burgess of the Town. During his four years as Mayor, 1886-90, the lodge was known as “The Mayor’s Cottage” which he treated as his pied- à-terre, his own home being in Grange Lane, Erdington. After Stone terminated his tenancy in 1891 the cottage was referred to ever afterwards as “Midland Lodge”. Fig. 1(a) – Midland Lodge in c. 1910 Fig. 1(b) – Midland Lodge in February, 2014 Photograph by Benjamin Stone [Ref.
    [Show full text]
  • West Midlands & Chilterns Route Study Technical Appendices
    Long Term Planning Process West Midlands & Chilterns Route Study Technical Appendices August 2017 Contents August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 02 Technical Appendices 03 A1 - Midlands Rail Hub: Central Birmingham 04 elements A2 - Midlands Rail Hub: Birmingham to 11 Nottingham/Leicester elements A3 - Midlands Rail Hub: Birmingham to 17 Worcester/Hereford via Bromsgrove elements A4 - Chiltern Route 24 A5 - Birmingham to Leamington Spa via 27 Coventry A6 - Passenger capacity at stations 30 A7 - Business Case analysis 50 Technical Appendicies August 2017 Network Rail – West Midlands & Chilterns Route Study Technical Appendices 03 Introduction to Technical Appendices Cost estimation These Technical Appendices provide the technical evidence to Cost estimates have been prepared for interventions or packages of support the conclusions and choices for funders presented in the interventions proposed in the Route Study. The estimates are based main Route Study document. The areas of technical analysis on the pre-GRIP data available, concept drawings and high level outlined in these appendices are capability analysis, concept specification of the intervention scope. To reflect the level of development (at pre-GRIP level), cost estimation, business case information available to support the estimate production, a analysis and passenger capacity analysis at stations. contingency sum of 60% has been added. The estimates do not include inflation. Indicative cost ranges have been provided based The appendices are presented by geographical area with the on this assessment. exception of the business case analysis and passenger capacity analysis. Business case analysis The areas of technical analysis are summarised below. Business case analysis has been undertaken to demonstrate to funders whether a potential investment option is affordable and Capability Analysis offers value for money.
    [Show full text]
  • Guided Walks and Folk Trains in the High Peak and Hope Valley
    High Peak and Hope Valley January – April 2020 Community Rail Partnership Guided Walks and Folk Trains in the High Peak and Hope Valley Welcome to this guide It contains details of Guided Walks and Folk Trains on the Hope Valley, Buxton and Glossop railway lines. These railway lines give easy access to the beautiful Peak District. Whether you fancy a great escape to the hills, or a night of musical entertainment, let the train take the strain so you can concentrate on enjoying yourself. High Peak and Hope Valley This leaflet is produced by the High Peak and Hope Valley Community Rail Partnership. Community Rail Partnership Telephone: 01629 538093 Email: [email protected] Telephone bookings for guided walks: 07590 839421 Line Information The Hope Valley Line The Buxton Line The Glossop Line Station to Station Guided Walks These Station to Station Guided Walks are organised by a non-profit group called Transpeak Walks. Everyone is welcome to join these walks. Please check out which walks are most suitable for you. Under 16s must be accompanied by an adult. It is essential to have strong footwear, appropriate clothing, and a packed lunch. Dogs on a short leash are allowed at the discretion of the walk leader. Please book your place well in advance. All walks are subject to change. Please check nearer the date. For each Saturday walk, bookings must be made by 12:00 midday on the Friday before. For more information or to book, please call 07590 839421 or book online at: www.transpeakwalks.co.uk/p/book.html Grades of walk There are three grades of walk to suit different levels of fitness: Easy Walks Are designed for families and the occasional countryside walker.
    [Show full text]
  • A6 Corridor Study Final Summary Report Stockport Metropolitan Borough Council
    A6 Corridor Study Final Summary Report Stockport Metropolitan Borough Council August 2014 A6 Corridor Study Final Summary Report Notice This document and its contents have been prepared and are intended solely for use in relation to the A6 Corridor Study. Atkins Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. Document history Job number: 5115815 Document ref: Final Summary Report Revision Purpose description Originated Checked Reviewed Authorised Date Rev 1.0 Draft - Client comment GR NM NM NM 31/01/14 Rev 1.1 Final Draft GR NM NM NM 20/02/14 Rev 2.0 Final GR NM NM NM 04/07/14 Rev 2.1 Final GR NM NM NM 13/08/14 Atkins Final Summary Report | Version 2.1 | August 2014 | 5115815 A6 Corridor Study Final Summary Report Summary Report Overview 1. Atkins has been commissioned by the A6 Corridor Group led by Stockport Metropolitan Borough Council (SMBC) and comprising representatives from Cheshire East Council, Derbyshire County Council, High Peak Borough Council, and Transport for Greater Manchester, to undertake a study to consider the potential impact of predicted traffic growth and demands on public transport within the A6 Corridor (Buxton to Stockport / Manchester) over the next twenty years. Peak District National Park Authority has been consulted during the course of the study. 2. The study is undertaken against the backdrop of plans for housing growth in the corridor, the proposed A6 to Manchester Airport Relief Road (A6MARR) scheme, and the wider South East Manchester Multi Modal Strategy (SEMMMS).
    [Show full text]
  • A1 Corridor Logistics Assessment
    AUGUST 2021 AUGUST A1 Corridor Logistics Assessment: Bassetlaw Council Final Report Iceni Projects Limited ICENI PROJECTS LIMITED August 2021 : Iceni Projects London: Da Vinci House, 44 Saffron Hill, London, EC1N 8FH Edinburgh: 11 Alva Street, Edinburgh, EH2 4PH Glasgow: 177 West George Street, Glasgow, G2 2LB Manchester: This is the Space, 68 Quay Street, Manchester, M3 3EJ A1 Corridor Logistics Assessment Logistics Corridor A1 FINAL REPORT t: 020 3640 8508 | w: iceniprojects.com | e: [email protected] linkedin: linkedin.com/company/iceni -projects | twitter: @iceniprojects 2 CONTENTS INTRODUCTION ......................................................................................................... 1 LOGISTICS PROPERTY MARKET AREA ................................................................. 2 POLICY AND LITERATURE REVIEW ........................................................................ 7 MARKET REVIEW – DEMAND ASSESSMENT ....................................................... 14 SUPPLY ASSESSMENT........................................................................................... 22 ROLE IF THE A1 IN WIDER MARKET CONTEXT ................................................... 26 CONCLUSIONS ........................................................................................................ 28 APPENDIX A ..................................................................................................................... 30 0 INTRODUCTION Bassetlaw District Council has commissioned Iceni Projects Ltd to produce
    [Show full text]
  • A6 Corridor Study Final Report Stockport Metropolitan Borough Council
    A6 Corridor Study Final Report Stockport Metropolitan Borough Council August 2014 A6 Corridor Study Final Report Notice This document and its contents have been prepared and are intended solely for use in relation to the A6 Corridor Study. Atkins Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 202 pages including the cover. Document history Job number: 5115815 Document ref: Final Report Revision Purpose description Originated Checked Reviewed Authorised Date Rev 1.1 Draft - Client comment AB PB GR GR 14/12/12 Rev 1.2 Draft - Client comment GR AB NM NM 26/2/13 Rev 1.3 Draft - Client comment GR AB NM NM 26/6/13 Rev 1.4 Draft - Client comment GR AB NM NM 31/7/13 Final Draft – Client Rev 1.5 GR NM NM NM 20/12/13 comment Rev 1.6 Final Draft GR NM NM NM 20/02/14 Rev 2.0 Final GR NM NM NM 04/07/14 Rev 2.1 Final GR NM NM NM 31/07/14 Rev 2.2 Final GR NM NM NM 13/08/14 Atkins Final Report | Version 2.2 | August 2014 | 5115815 A6 Corridor Study Final Report Table of contents Chapter Pages 1. Introduction 4 Study Brief 4 Background to Commission 4 2. Setting the Context for an A6 Corridor Transport Strategy 6 SEMMMS 6 A6 to Manchester Airport Relief Road 7 A6MARR Traffic Model 7 Traffic Growth/ A6MARR Scheme Impact 9 Existing Traffic Conditions 12 Understanding Travel Demands 23 3.
    [Show full text]
  • An Uphill Struggle for the Right to Travel by Train
    AN INDEPENDENT VOICE FOR RAIL USERS No 154 £2 December 2017 An uphill struggle for the right to travel Picture: Paul Tattam by train SEE PAGE 2 PAGE ONE PICTURE: Chinley (and many other stations) deserve better access Our page one picture shows red- The sun should be setting on diesels up there too. The £70 million coated MP Ruth George surrounded national initiative for full accessi- By Chris Austin by people on the footbridge steps of bility on the railways launched in [email protected] Chinley station in October. 2016 by Transport Minister Alex- Since the shock announcement The High Peak MP promised to ander Dobrindt started, interest- from Transport Secretary Chris deliver an 800-signature petition ingly, with smaller stations with Grayling in July which brought to the Department for Transport, Picture: Paul Tattam less than one 1,000 entries/exits to a close the ambitious electri- calling for better access to the per day. Additionally the Ger- fication programme supported station. man “Northern Powerhouse” of previously by industry and Gov- Lifts and ramps can be life- Nordrhein-Westfalen has its own ernment, Railfuture has been Picture: NETWORK RAIL transforming for people with £900 million programme for the working to understand the issues disabilities but they help virtually modernisation of 150 of its 697 and what is best for the passen- everyone else, especially those with stations between 2017 and 2023, ger, the freight customer and the prams, luggage and bicycles too. by which date 80% of its stations railway which serves them. And Chinley is typical of many other will have step-free access (cur- None of us believes that the pres- stations throughout Britain where rently 73%).
    [Show full text]
  • Draft-Freight-Implementation-Plan.Pdf
    Contents 1. Introduction 3 2. Role of Freight 4 3. Existing Conditions / Current Issues 5 4. Aspirations for Tees Valley Freight Network 21 5. Interventions 22 7. Action Plan 25 2 Draft Freight Implementation Plan 1. Introduction Tees Valley Combined Authority is the local transport authority for the Tees Valley. This is the Tees Valley Freight Implementation Plan, part of the first Strategic Transport Plan for the region, for the period up to 2029. It has been developed by the Combined Authority in collaboration with our five constituent Local Authorities, Darlington, Hartlepool, Middlesbrough, Redcar & Cleveland and Stockton-on-Tees. The Combined Authority has ambitious plans to grow the region’s economy and our Strategic Economic Plan aims to create 25,000 Our vision for new jobs and deliver an additional £2.8billion into Tees Valley by Tees Valley is: 2026. We are also developing a Local Industrial Strategy, an agreement between us and the Government on how we will To provide a high improve our economy over the next ten years and how this will quality, clean, feed into the Government’s overall UK strategy. quick, affordable, reliable and safe In order to ensure that everyone in Tees Valley is able to work, transport network study, enjoy and fully participate in these ambitious plans for the for people and future, we need a world-class transport system that also encourages inward investment. Transport is about connecting freight to move people and businesses in Tees Valley and beyond. Delivering a within, to and from world-class transport system that is fit for the future is a critical Tees Valley.
    [Show full text]
  • Derby to Manchester Railway Matlock to Buxton / Chinley Link Study Main Report Volume 1A: Version: Final
    Derby to Manchester Railway Matlock to Buxton / Chinley Link Study Main Report Volume 1A: Version: Final June 2004 Derbyshire County Council Volume 1A: Main Report Version: Final Derby to Manchester Railway Matlock to Buxton / Chinley Link Study Derbyshire County Council ON BEHALF OF THE FOLLOWING FUNDING PARTNERS: • AMBER VALLEY BOROUGH COUNCIL • BUXTON AND THE PEAK DISTRICT SRB 6 PARTNERSHIP • COUNTRYSIDE AGENCY • DERBY CITY COUNCIL • DERBYSHIRE COUNTY COUNCIL • DERBYSHIRE DALES DISTRICT COUNCIL • EAST MIDLANDS DEVELOPMENT AGENCY (EMDA) • EUROPEAN REGIONAL DEVELOPMENT FUND (ERDF) • GOVERNMENT OFFICE FOR THE EAST MIDLANDS (GOEM) • HIGH PEAK BOROUGH COUNCIL • PEAK DISTRICT NATIONAL PARK AUTHORITY • PEAK PARK TRANSPORT FORUM • RURAL DEVELOPMENT PROGRAMME • STRATEGIC RAIL AUTHORITY • TARMAC PLC DERBY TO MANCHESTER RAILWAY MATLOCK TO BUXTON / CHINLEY LINK STUDY Volume 1A: Main Report File Ref Volume 1A Main Report Final Issue A010338 Scott Wilson Railways Derbyshire County Council Volume 1A: Main Report Version: Final Derby to Manchester Railway Matlock to Buxton / Chinley Link Study DERBY TO MANCHESTER RAILWAY MATLOCK TO BUXTON / CHINLEY LINK STUDY Volume 1A: Main Report REPORT VERIFICATION Name Position Signature Date Prepared Bob Langford Study Manager 08/6/04 By: Checked Project Keith Wallace 08/6/04 By: Director Approved Project Keith Wallace 08/6/04 By: Director VERSION HISTORY Date Changes Since Last Version Issue Version Status 19 March None – Initial Issue for Comment by Advisory Draft Final 1 2004 Group 8 June 2004 Revised based on comments from Advisory Group FINAL 1 File Ref Volume 1A Main Report Final Issue A010338 Scott Wilson Railways Derbyshire County Council Volume 1A: Main Report Version: Final Derby to Manchester Railway Matlock to Buxton / Chinley Link Study DERBY TO MANCHESTER RAILWAY MATLOCK TO BUXTON/CHINLEY LINK STUDY Volume 1A: Main Report CONTENTS EXECUTIVE SUMMARY 1.
    [Show full text]
  • Community Rail Report
    Community Rail Report Author: Jerry Swift, Interim Project Manager Date: August 2016 Table of Contents 1. Introduction 2 1.1 Committed obligations 2 1.2 Director's foreword 6 1.3 Executive Summary 7 2. Community Rail Report 8 2.1 Introduction to the report 8 2.2 Community and Sustainability Director’s report 8 2.2.1 Community Rail Partnerships 8 2.2.2 Funding for Community Rail Partnerships 8 2.2.3 Community Rail Partnership funding 9 2.2.4 Additional funding to support community rail 10 2.2.5 ComREG 11 2.2.6 Station adoption 12 2.2.7 Community Rail Partnerships 12 2.2.8 Volunteering 12 2.2.9 Working with communities 12 2.2.10 Growth in passenger numbers 13 2.2.11 The CRPs in their own words 13 3. Community Rail Partnership profiles 14 3.1 Settle & Carlisle Railway Development Company (SCRDC) 15 3.2 Leeds-Morecambe Community Rail Partnership (The Bentham Line) 17 3.3 Barton-Cleethorpes Community Rail Partnership 19 3.4 Yorkshire Coast Community Rail Partnership (YCCRP) 20 3.5 Penistone Line Community Rail Partnership 22 3.6 Bishop Line Community Rail Partnership 24 3.7 Tyne Valley Community Rail Partnership 26 3.8 Esk Valley Railway Development Company 28 3.9 South Fylde Line Community Rail Partnership 29 3.10 West of Lancashire Community Rail Partnership (WofLCRP) 31 3.11 Cumbrian Coast Line Community Rail Partnership 33 3.12 Furness Line Community Rail Partnership 35 3.13 Lakes Line Community Rail Partnership 37 3.14 North Cheshire Rail Users Group 39 3.15 Mid Cheshire Community Rail Partnership 40 3.16 East Lancashire Community Rail Partnership 42 3.17 Clitheroe Line Community Rail Partnership (CLCRP) 44 3.18 South East Manchester Community Rail Partnership 46 3.19 Crewe to Manchester Community Rail Partnership 48 3.20 High Peak and Hope Valley Community Rail Partnership 50 4.
    [Show full text]
  • Community Rail Report
    Community Rail Report Author: Carolyn Watson Date: 31 March 2017 Table of Contents 1. Introduction 2 1.1 Foreword 2 1.2 Executive Summary 3 2. Community Rail Report 4 2.1 Introduction to the Report 4 2.1.1 Community Rail Partnerships 4 2.1.2 Funding for Community Rail Partnerships 4 2.1.3 Community Rail Partnership Funding Table 1 5 2.1.4 Community Rail Executive Group (ComREG) 6 2.1.5 Community Rail Conference 6 2.1.6 Seed Corn Fund – Kick-starting new ideas 6 2.1.7 Association of Community Rail Partnerships (ACoRP) - Partnership delivery 8 2.1.8 Community Rail Lancashire (CRL) - Developing Engagement Through Education 9 2.1.9 Station Adoption Scheme 10 2.1.10 Northern Franchise/Arriva Strategy - Working with Communities 12 2.1.11 The Community Rail Partnerships 13 3. Community Rail Partnership profiles 14 3.1 Settle - Carlisle Railway Development Company 14 3.2 Leeds - Morecambe Community Rail Partnership 16 3.3 Barton - Cleethorpes Community Rail Partnership 18 3.4 Yorkshire Coast Community Rail Partnership 19 3.5 Penistone Line Community Rail Partnership 20 3.6 Bishop Line Community Rail Partnership 22 3.7 Tyne Valley Community Rail Partnership 24 3.8 Esk Valley Railway Development Company 26 3.9 South Fylde Line Community Rail Partnership 28 3.10 West of Lancashire Community Rail Partnership 30 3.11 Cumbrian Coast Line Community Rail Partnership 32 3.12 Furness Line Community Rail Partnership 34 3.13 Lakes Line Community Rail Partnership 36 3.14 North Cheshire Rail Users Group 38 3.15 Mid Cheshire Community Rail Partnership 39 3.16 East Lancashire Community Rail Partnership 41 3.17 Clitheroe Line Community Rail Partnership 43 3.18 South East Manchester Community Rail Partnership 45 3.19 Crewe to Manchester Community Rail Partnership 47 3.20 High Peak and Hope Valley Community Rail Partnership 49 4.
    [Show full text]
  • Derbyshire Misc Ellany
    DERBYSHIRE MISC ELLANY ?Iir-of a \aff [V"\nU view of D[JtrF[trLD (0 (.U] LNV\zIC[o The Local History Bulletin of the Derbyshire Archaeological Soci Volume 9 Autumn 1982 Part 6 DEBBYSHIRE MISCELI"ANT Yol. IX : Part 6 Autumn 1982 CONTENTS Page The Railway Network of Southern Derbyshire by Christopher J. Swain 147 A Visit to Derbyshire Being part of a tour through England mad.e by Thomas Wright and- others in 1750 by S. L. Garlic 160 New Evid.ence Regard.ing the Balcony Field at Swarkestone by J. A. Yor:ng 161 Book Beview by D. V. Fowkes 164 Copyright in each contribution to Derbyshire Miscellany is reserved, by the author. rssN 0417 0687 -1 45- EDITORS Miss J. C. Sinar I'lr. D. V. Fowkes Derbyshire Record Office Stafford.shire Becord 0ffice County 0ffices County Buildings Matlock Eastgate Street DE4 3AG Stafford. 3T16 2L7, TREASUBER, Mr. T. J. Larimore 43 Reginald Road. South Chadd.estlen Derby DE2 6NG NOTE BY MRS. A. A. NIXON IN THE COVER, ILLUSTRATION OI'VOL. IX The picture of Duffield Chr:rch is taken from a larger lithograph belonging to the D.A.S. ar-d housed- at the Cor.urty Record- Office at Matlock. The futl lithograph shows the old, Vicarage and. it is by Moses I{ebster, a Derby man, 1792 - 1870, r,rho painted flor+ers on Derby porcelain. -146- TIfi P^A,IL}TAY NETIfOBK OF SOTIIHM,N DER,BYSHIRE (ty Ctrristopher J. Swain, 4O Beaconsfield. Boad., Burton-on-Trent) a Introcluction The main aim of this article is to give the picture of the railway network in the area around.
    [Show full text]