Draft-Freight-Implementation-Plan.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Draft-Freight-Implementation-Plan.Pdf Contents 1. Introduction 3 2. Role of Freight 4 3. Existing Conditions / Current Issues 5 4. Aspirations for Tees Valley Freight Network 21 5. Interventions 22 7. Action Plan 25 2 Draft Freight Implementation Plan 1. Introduction Tees Valley Combined Authority is the local transport authority for the Tees Valley. This is the Tees Valley Freight Implementation Plan, part of the first Strategic Transport Plan for the region, for the period up to 2029. It has been developed by the Combined Authority in collaboration with our five constituent Local Authorities, Darlington, Hartlepool, Middlesbrough, Redcar & Cleveland and Stockton-on-Tees. The Combined Authority has ambitious plans to grow the region’s economy and our Strategic Economic Plan aims to create 25,000 Our vision for new jobs and deliver an additional £2.8billion into Tees Valley by Tees Valley is: 2026. We are also developing a Local Industrial Strategy, an agreement between us and the Government on how we will To provide a high improve our economy over the next ten years and how this will quality, clean, feed into the Government’s overall UK strategy. quick, affordable, reliable and safe In order to ensure that everyone in Tees Valley is able to work, transport network study, enjoy and fully participate in these ambitious plans for the for people and future, we need a world-class transport system that also encourages inward investment. Transport is about connecting freight to move people and businesses in Tees Valley and beyond. Delivering a within, to and from world-class transport system that is fit for the future is a critical Tees Valley. enabler for the success of the area. In preparing the Strategic Transport Plan, a framework was developed based upon six themes, which are closely linked and will all require improvement in order to meet the overall transport vision for the Tees Valley. The six key themes are: National Rail. Major Roads. Connecting Economic Centres. Unlocking Key Sites. Local Journeys. Deliver Social Equality and Protect and Enhance the Environment To support the Strategic Transport Plan itself, a series of Implementation Plans have been prepared which go into more detail on the current and future issues, and the interventions needed, across the six themes listed above. This Freight Implementation Plan aims to recognise the contribution that the sector makes to economic growth, puts forward proposals to support freight and logistics, whilst examining any negative social impact associated with growing freight movements and proposing mitigating measures. The strategy considers the activities of all modes of freight transport and complements the other daughter documents, particularly the Road and Rail Strategies. As with the Strategic Transport Plan, we are looking for feedback on this supporting document, before it is finalised towards the end of 2019. Please visit our website to provide your input. www.teesvalley-ca.gov.uk/consultations Draft Freight Implementation Plan 3 2. Role of Freight The freight and logistics sector has a key role to play in delivering the Tees Valley Strategic Economic Plan. The freight sector is a key enabler in terms of investment, jobs and economic wellbeing. The efficient movement of goods is vitally important for economic success, as it allows the raw materials and finished goods that we manufacture to reach their destinations. Any improvement in efficiency offers a significant opportunity for economic growth through increases in productivity. The freight industry lies almost entirely in the private sector, which makes significant economic investments each year and which provides industry, commerce and the wider population with a level of service that generally does not rely on public sector investment. Logistics is a highly competitive and commercially driven sector which operates in a global marketplace where low operating margins are not uncommon. There is little security of business and many operators carry freight on a ‘spot’ basis, that is, as and when required. The sector requires high levels of investment in both infrastructure and equipment, largely on a speculative basis, and in markets that are vulnerable to external factors such as shifts in trade, competition, government policy and fuel prices. The sea freight and rail freight sectors in particular are based on significant capital costs and long asset life. Ship and freight train operators require significant third party infrastructure and a critical mass of tonnage to underwrite the cost of providing a service. Similarly, port and terminal operators who provide that infrastructure have to plan long term investment in a sector that operates in a very dynamic marketplace. The Tees Valley is an important link in the UK’s supply chain, providing an international gateway for the movement of goods in and out of the country and a key hub for the transport of domestic freight. We are proud to have one of the UK’s biggest port complexes and England’s largest exporting port as part of our transport infrastructure, an international airport, and a network and road and rail routes which give the City Region good access to national and international transport links. The A1(M) and A19 provide north-south links, and the A66 and A174 east-west road links. In terms of rail, the Tees Valley network provides both passenger and freight connections, with direct routes to London and other major cities. Darlington’s railway station is located on the East Coast Main Line and provides rail connections southwards to London and northwards to Glasgow and Edinburgh in a little over two hours. Teesside International Airport offers flights to a number of UK destinations and Schiphol, Amsterdam. 4 Draft Freight Implementation Plan 3. Existing Conditions / Current Issues Overview Efficient logistics requires a comprehensive freight transport network where all modes work together effectively for the benefit of the industry and the local area. In the Tees Valley there are 555 enterprises classified as ‘Transportation and Storage’, employing 16,500 people (Source: ONS Business Register Employment Survey). For its size and location within the UK, the Tees Valley punches above its weight, particularly in terms of exports. Local port facilities on the River Tees export more than any other port in England and Tees Valley exporters have the highest value per exporter of goods in the country. The dominance of large companies exporting machinery and chemicals reflects our strong manufacturing sector. Data for the ports of Tees and Hartlepool shows that we are operating within a global, deep-sea market and handling a large range of commodities including both raw materials and finished goods. By road, the single biggest area of freight for Tees Valley is food products, pushing the movement of chemicals into second place. The greater than national average length of haul for the Tees Valley suggests that the City Region’s freight hinterland is actually wider than that for other areas. Freight by rail is still dominated by large, bulk movements serving major industry in the area. However, the daily intermodal services to Scotland, the south and east of England extend the Tees Valley hinterland further and suggests greater potential for the port to act as a UK gateway for imported consumer goods if rail, together with good road access, provide a cost- effective and resilient point for onward distribution. Key statistics relating to freight in the Tees Valley include: 16,500 people employed in the sector; 825 logistics companies located in the City Region; Home to the 9th largest port in the UK; and The sector contributes £533 million of Gross Value Added (GVA) to the City Region’s economy each year. Draft Freight Implementation Plan 5 Key Strengths Deepest port facilities on the east coast with open access to the sea Good availability of brownfield sites Enterprise Zones Main freight sites connected by good road and rail infrastructure Relatively uncongested roads and economic centres Long-established daily rail and sea connections for shipping containers Extensive pipeline network for liquid bulk movements Supportive planning regimes Major industrial cluster and key manufacturing sites Strong supply base for exports Competitive rates for land, warehousing and road haulage A local airport with proximity to main freight sites Almost half of the UK population is within a 4.5 hour drive for a lorry Road Heavy Goods Vehicles are defined as goods-carrying vehicles with a gross vehicle weight over 3.5 tonnes while Light Goods Vehicles are essentially vans with a gross weight of 3.5 tonnes or less. In 2006, there were just over 4,600 HGVs registered in the Tees Valley City Region. By 2015, this had reduced to just over 3,600 whilst the number of Light Goods Vehicle (LGV) registrations has increased from just under 3,000 to almost 74,000. This decline in the number of HGVs registered in the Tees Valley reflects the national picture. There has been a significant move nationally towards a greater number of light vans delivering goods to the marketplace and vans are now the fastest growing element of the road freight sector. Local data on road volumes confirms a decline of HGV traffic and a rise in LGV traffic. HGVs vs. LGVs Tees Crossing (Indexed = 100) 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 2000 2002 2004 2006 2008 2010 2012 2014 2016 LightGoodsVehicles AllHGVs 6 Draft Freight Implementation Plan Despite the decline in the number of registered HGVs, they continue to be an integral part of the supply chain and it has been estimated by the Road Haulage Association that “85% of everything we eat, wear and buy and use is moved, at some point, on the back of a UK- registered lorry”. The type and weight of HGV carrying goods is, however, changing with a growing number of goods now carried by larger articulated lorries and a shrinking demand for smaller, rigid vehicles.
Recommended publications
  • Gülnak and Cape Mathilde Were Completed in Teesport
    ACCIDENT REPORT MA RINE ACCI DENT INVES TIGAT ION BRA NCH SERIOUS MARINE CASUALTY REPORT NO 5/2020 FEBRUARY 2020 Extract from The Collision between the bulk carrier Gülnak and United Kingdom the moored bulk carrier Cape Mathilde Merchant Shipping (Accident Reporting and River Tees, England on 18 April 2019 Investigation) Regulations 2012 – Regulation 5: SUMMARY “The sole objective of the investigation of an accident On 18 April 2019, the Turkey registered bulk carrier Gülnak collided with the under the Merchant Shipping (Accident Reporting and Panama registered bulk carrier Cape Mathilde, which was moored alongside the Investigation) Regulations Redcar bulk terminal, Teesport, England. Both vessels were damaged but there 2012 shall be the prevention of future accidents through were no injuries and there was no pollution. the ascertainment of its Images courtesy of Kenneth Karsten and www.shipspotting.com causes and circumstances. It shall not be the purpose of an such investigation to determine liability nor, except so far as is necessary to achieve its objective, to apportion blame.” NOTE This report is not written with litigation in mind and, pursuant to Regulation 14(14) of the Merchant Shipping (Accident Reporting and Investigation) Regulations 2012, shall be inadmissible in any judicial proceedings whose purpose, or one of whose purposes is to attribute or apportion liability or blame. © Crown copyright, 2020 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication.
    [Show full text]
  • Green Infrastructure Supplementary Planning Document Consultation Statement May 2020
    Green Infrastructure Supplementary Planning Document Consultation Statement May 2020 1 1. Introduction 1.1 The Green Infrastructure Supplementary Planning Document (SPD) has been prepared by Hartlepool Borough Council. The Draft SPD was published for public consultation over a ten week period from 7 February 2020 until 17 April 2020. The consultation period was extended to provide further time to comment in light of the Covid-19 pandemic. 1.2 This Consultation Statement addresses the requirements of Regulation 12 of the Town and Country Planning (Local Planning) (England) Regulations 2012 that requires Local Planning Authorities to prepare a statement setting out: the persons the Local Planning Authority consulted when preparing the supplementary planning document; a summary of the main issues raised by those persons; and how those issues have been addressed in the supplementary planning document. 1.3 Section 2 of this Statement outlines the consultation processes and provides details of those people and organisations that were consulted. 1.4 Section 3 gives an overview of the representations made within the consultation period. Appendix 1 provides a full schedule of the representations made and the Council’s response to each. Where a representation has informed a revision to the SPD, this is set out. 1.5 Section 4 gives a brief overview of the next steps in the process of adopting the SPD. 2. Consultation Process 2.1 A public consultation on the Draft SPD was approved at the Regeneration Services Committee meeting of 5 February 2020. 2.2 The public consultation began on the 7 February 2020 until 17 April 2020.
    [Show full text]
  • Minerals and Waste Core Strategy
    Tees Valley Joint Minerals and Waste Development Plan Documents In association with Core Strategy DPD Adopted September 2011 27333-r22.indd 1 08/11/2010 14:55:36 i ii Foreword The Tees Valley Minerals and Waste Development Plan Documents (DPDs) - prepared jointly by the boroughs of Darlington, Hartlepool, Middlesbrough, Redcar and Cleveland and Stockton-on-Tees - bring together the planning issues which arise from these two subjects within the sub-region. Two DPDs have been prepared. This Minerals and Waste Core Strategy contains the long-term spatial vision and the strategic policies needed to achieve the key objectives for minerals and waste developments in the Tees Valley. The separate Policies and Sites DPD, which conforms with it, identifies specific sites for minerals and waste development and sets out policies which will be used to assess minerals and waste planning applications. The DPDs form part of the local development framework and development plan for each Borough. They cover all of the five Boroughs except for the part within Redcar and Cleveland that lies within the North York Moors National Park. (Minerals and waste policies for that area are included in the national park’s own local development framework.) The DPDs were prepared during a lengthy process of consultation. This allowed anyone with an interest in minerals and waste in the Tees Valley the opportunity to be involved. An Inspector appointed by the Secretary of State carried out an Examination into the DPDs in early 2011. He concluded that they had been prepared in accordance with the requirements of the Planning and Compulsory Purchase Act 2004 and were sound.
    [Show full text]
  • Redcar Draft CPO Map V2.0
    Agenda item 9a Confidential Paper 7.7 South Tees Development Corporation 25 July 2018 The Proposed South Tees Development Corporation (Land at the former Redcar steel works, Redcar) Compulsory Purchase Order Purpose 1. A key priority and responsibility of the Corporation is to secure the comprehensive regeneration of the land within its area ("the Area"). Fundamental to achieving this objective is acquiring the necessary land interests within the Area. 2. As the Board is aware, the Corporation has already entered into discussions with landowners with a view to acquiring their land interests by private negotiation. However, mindful that such negotiations may take some time and may ultimately be unsuccessful, in February 2018 the Corporation made an in-principle resolution to make a compulsory purchase order ("CPO") to acquire any land interests compulsorily should it become necessary. 3. Since February, discussions with landowners have continued in tandem with preparation of the CPO. However, whilst discussions with some landowners are progressing well, it has not yet been possible to acquire the necessary land interests by agreement. Market interest in bringing forward development across the Area is high but the Corporation is concerned that delays in securing land assembly could lead to developers looking elsewhere for land which is more readily available. 4. This paper accordingly seeks authority for the Corporation to proceed to make the CPO and to refer the CPO to Tees Valley Combined Authority ("TVCA") for consent to submit the CPO, once made, to the Secretary of State for confirmation. The extent of the land proposed to be acquired pursuant to the CPO is indicatively shown edged red on the attached map at Appendix 1 ("the Site").
    [Show full text]
  • Depot Information United Kingdom & Ireland
    Depot Information United Kingdom & Ireland UNITED KINGDOM Depot Name Address Post Code Telephone no. Email address (ABP) EXXTOR Terminal, Mineral Quay Road, ABP (Associated British Ports) Immingham Dock, Immingham DN40 2QT +44 (0) 1469 551308 [email protected] Belfast Containers (N.I) 2000 Ltd Dargan Drive, Harbour Industrial Estate, Belfast BT3 9JG +44 (0) 2890371717 [email protected] Coastal House, Victoria Terminal 3, Westbank +44 (0) 7584250276 [email protected] Belfast Container Terminal Road, Belfast BT3 9JL +44 (0) 7584249661 [email protected] Corstor Ltd Sub-Station Road, Felixstowe, Suffolk IP11 3JB +44 (0) 1394 674210 [email protected] DB Schenker Wakefield Euro Terminal Wakefield Europort, Normanton WF10 5UA +44 (0) 1302-576028 [email protected] DP World London Gateway Gate 2, The Manorway, Stanford-Le-Hope SS17 9PD +44 (0) 1375 648300 [email protected] DP World Southampton 204 - 207 Weston Docks, Southampton SO15 1DA +44 (0) 2380-701701 [email protected] Duncan Adams Ltd Grangedock, Grangemouth FK3 8UG +44 (0) 1324-484951 [email protected] Eldapoint Ltd (Felixstowe) Sub-Station Road, Felixstowe, Suffolk IP11 3JB +44 (0) 1394 270777 [email protected] Eldapoint Ltd (Grangemouth) Laurieston Road, Thornbridge, Grangemouth FK3 8XX +44 (0) 1324 638918 [email protected].,uk Charleywood Road, Knowsley Industrial Park Eldapoint Ltd (Liverpool) North, Liverpool L33 7SG +44 (0) 151-632 9330 [email protected]
    [Show full text]
  • A1 Corridor Logistics Assessment
    AUGUST 2021 AUGUST A1 Corridor Logistics Assessment: Bassetlaw Council Final Report Iceni Projects Limited ICENI PROJECTS LIMITED August 2021 : Iceni Projects London: Da Vinci House, 44 Saffron Hill, London, EC1N 8FH Edinburgh: 11 Alva Street, Edinburgh, EH2 4PH Glasgow: 177 West George Street, Glasgow, G2 2LB Manchester: This is the Space, 68 Quay Street, Manchester, M3 3EJ A1 Corridor Logistics Assessment Logistics Corridor A1 FINAL REPORT t: 020 3640 8508 | w: iceniprojects.com | e: [email protected] linkedin: linkedin.com/company/iceni -projects | twitter: @iceniprojects 2 CONTENTS INTRODUCTION ......................................................................................................... 1 LOGISTICS PROPERTY MARKET AREA ................................................................. 2 POLICY AND LITERATURE REVIEW ........................................................................ 7 MARKET REVIEW – DEMAND ASSESSMENT ....................................................... 14 SUPPLY ASSESSMENT........................................................................................... 22 ROLE IF THE A1 IN WIDER MARKET CONTEXT ................................................... 26 CONCLUSIONS ........................................................................................................ 28 APPENDIX A ..................................................................................................................... 30 0 INTRODUCTION Bassetlaw District Council has commissioned Iceni Projects Ltd to produce
    [Show full text]
  • An Uphill Struggle for the Right to Travel by Train
    AN INDEPENDENT VOICE FOR RAIL USERS No 154 £2 December 2017 An uphill struggle for the right to travel Picture: Paul Tattam by train SEE PAGE 2 PAGE ONE PICTURE: Chinley (and many other stations) deserve better access Our page one picture shows red- The sun should be setting on diesels up there too. The £70 million coated MP Ruth George surrounded national initiative for full accessi- By Chris Austin by people on the footbridge steps of bility on the railways launched in [email protected] Chinley station in October. 2016 by Transport Minister Alex- Since the shock announcement The High Peak MP promised to ander Dobrindt started, interest- from Transport Secretary Chris deliver an 800-signature petition ingly, with smaller stations with Grayling in July which brought to the Department for Transport, Picture: Paul Tattam less than one 1,000 entries/exits to a close the ambitious electri- calling for better access to the per day. Additionally the Ger- fication programme supported station. man “Northern Powerhouse” of previously by industry and Gov- Lifts and ramps can be life- Nordrhein-Westfalen has its own ernment, Railfuture has been Picture: NETWORK RAIL transforming for people with £900 million programme for the working to understand the issues disabilities but they help virtually modernisation of 150 of its 697 and what is best for the passen- everyone else, especially those with stations between 2017 and 2023, ger, the freight customer and the prams, luggage and bicycles too. by which date 80% of its stations railway which serves them. And Chinley is typical of many other will have step-free access (cur- None of us believes that the pres- stations throughout Britain where rently 73%).
    [Show full text]
  • Teesside Archaological Society
    Recording the First World War in the Tees Valley TEESSIDE ARCHAOLOGICAL SOCIETY The following gazetteer is a list of the First World War buildings in the Tees Valley Area. Tees Archaeology has the full image archive and documentation archive. If particular sites of interest are wanted, please contact us on [email protected] 1 | P a g e Recording the First World War in the Tees Valley HER Name Location Present/Demolished Image 236 Kirkleatham Hall TS0 4QR Demolished - 260 WWI Listening Post Boulby Bank Present (Sound Mirror) NZ 75363 19113 270 Marske Hall Redcar Road, Present Marske by the Sea, TS11 6AA 2 | P a g e Recording the First World War in the Tees Valley 392 Seaplane Slipway Previously: Present Seaplane Slipway, Seaton Snook Currently: on foreshore at Hartlepool Nuclear Power Plant, Tees Road, Hartlepool TS25 2BZ NZ 53283 26736 467 Royal Flying Corps, Green Lane, Demolished - Marske Marske by the Sea (Airfield) Redcar 3 | P a g e Recording the First World War in the Tees Valley 681 Hart on the Hill Hart on the Hill, Present (Earthworks) Dalton Piercy, parish of Hart, Co. Durham TS27 3HY (approx. half a mile north of Dalton Piercy village, on the minor road from Dalton Piercy to Hart Google Maps (2017) Google Maps [online] Available at: https://www.google.co.uk/maps/place/Hart-on-the- Hill/@54.6797131,- 1.2769667,386m/data=!3m1!1e3!4m5!3m4!1s0x487ef3527f0a44 21:0xe4080d467b98430d!8m2!3d54.67971!4d-1.274778 4 | P a g e Recording the First World War in the Tees Valley 698 Heugh Gun Battery Heugh Battery, Present Hartlepool
    [Show full text]
  • A Free Zone Policy Fit for the UK Should Include
    Foreword Over the past three years there has been much discussion of the potential benefits of Free Trade Zones (FTZ) in the UK and how these might work. As the mayor of one of the regions with the most to gain from such a policy, and perhaps the greatest need for an economic boost, I commissioned this policy paper and the accompanying economic analysis to gain a realistic interpretation of the benefits, and an understanding of which incentives would work best. I also saw the need to dispel some of the myths surrounding FTZs. While it cannot be disguised that the excitement around FTZs was sparked by the UK’s decision to leave the European Union, this policy can yield significant economic benefits regardless of our ultimate Brexit deal. Likewise, regardless of our relationship with the EU, it is undeniable Ben Houchen that our future economic wellbeing is dependent on our ability to close Tees Valley Mayor the productivity gap, and to attract significant inward investment in sectors that can harness the potential of trade with fast-growing economies. What this paper proposes, contrary to some public commentary, is neither a silver bullet for the economic challenges of Brexit Britain, nor is it a regulatory free for all designed for emerging economies. It puts forward a fiscally credible means of sustaining and growing the UK’s manufacturing base, while delivering growth in some of the most deprived parts of the country. The paper proposes a pilot FTZ in the Tees Valley on our South Tees Development Corporation site, which could support the creation of thousands of jobs for local people.
    [Show full text]
  • Tees Valley Joint Minerals and Waste Development Plan Documents
    Draft Only i APPENDIX 2(i) Tees Valley Joint Minerals and Waste Development Plan Documents Core Strategy Publication Document August 2009 Draft Only ii Draft Only iii Foreword The preparation of Joint Minerals and Waste Development Plan Documents (DPDs) for Darlington, Hartlepool, Middlesbrough, Redcar and Cleveland and Stockton-on-Tees Boroughs presents an important opportunity to understand and deal with the cross boundary issues which arise from these two subjects in the Tees Valley. Two DPDs are being prepared. This Core Strategy contains the long-term spatial vision and the strategic policies needed to achieve the key objectives for minerals and waste developments in the Tees Valley. The Policies and Sites document will, in conformity with this Core Strategy, identify specific sites for future minerals and waste development and provide a limited range of policies which will be used to assess minerals and waste planning applications. The DPDs will form part of the Local Development Framework for each Borough, which together with the Regional Spatial Strategy for North East England will form the Development Plan for the area. The DPDs cover all of the land within the five Boroughs except for the part within Redcar & Cleveland Borough that also falls within the North York Moors National Park. The Publication Document represents the third stage of the preparation process. The first stage, in May 2007, was the production of an Issues and Options Report, where the issues affecting minerals and waste development in the Tees Valley were identified and consultees and the general public were asked to identify which of the options presented were the most appropriate for dealing with the issues.
    [Show full text]
  • Anglo American Woodsmith Limited Annual Report and Financial Statements for the Year Ended 31 December 2019
    Anglo American Woodsmith Limited Annual report and financial statements for the year ended 31 December 2019 Company number: 04948435 Contents Strategic Report Introduction 1 Our Project 4 Our Strategy 6 Our Product 9 Our Market 10 Our Business Model 11 Working responsibly 12 Delivering value to our stakeholders 18 Financial review 19 Risk management 21 Governance Remuneration Committee Report Annual Statement 25 Annual Report on Remuneration 26 Directors Remuneration Policy 38 Directors Report 45 Directors Responsibilities 49 Financial Statements Independent Auditors Report 51 Consolidated Statement of Comprehensive Income 59 Consolidated Statement of Financial Position 60 Consolidated Statement of Changes in Equity 61 Consolidated Statement of Cash Flows 62 Notes to the Consolidated Statements 63 Parent Company Statement of Financial Position 99 Parent Company Statement of Changes in Equity 100 Notes to the Parent Company Financial Statements 101 Additional Information Glossary 106 This Annual Report contains forward-looking statements. These forward-looking statements are made in good faith, based on a number of assumptions concerning future events and information available to the Directors at the time of their approval of this report. These forward-looking statements should be treated with caution due to the inherent uncertainties underlying any such forward looking information. The user of this document should not rely unduly on these forward-looking statements, which are not a guarantee of performance and which are subject to a number of uncertainties and other events, many of which are outside of the Company’s control and could cause actual events to differ materially from those in these statements. No guarantee can be given of future results, levels of activity, performance or achievements.
    [Show full text]
  • The South Tees Development Corporation (Land at the Former Redcar Steelworks, Redcar) Compulsory Purchase Order 2019
    THE SOUTH TEES DEVELOPMENT CORPORATION (LAND AT THE FORMER REDCAR STEELWORKS, REDCAR) COMPULSORY PURCHASE ORDER 2019 Second Witness Statement of Simon Melhuish-Hancock Table of contents 1) Introduction; 2) Consultation by the Development Corporation; 3) Negotiations between the Development Corporation and the Thai Banks; 4) Conclusions; and 5) Statement of truth. Annex: Defined Terms Appendix 10 Chronology of discussions between the Thai Banks and the Development Corporation Appendix 11 Proposed agenda for 29th March 2019 meeting; Appendix 12 Contemporaneous notes taken at the meeting dated 29th March 2019; Appendix 13 Addleshaw Goddard letter to Mishcon de Reya dated 5th April 2019; Appendix 14 Addleshaw Goddard letter to Mishcon de Reya dated 3rd May 2019; and Appendix 15 Mishcon de Reya letter to Gowling WLG dated 7th October 2019. 1. INTRODUCTION 1.1 My name is Simon Melhuish-Hancock and I refer to section 1 (Introduction, Qualifications and Structure of Evidence) of my first witness statement, dated 21st January 2020 (hereafter simply "my first statement"). I will use the Defined Terms in this second witness statement with the same meaning that they have in my first statement. I have realised, however, that my first statement as submitted was truncated at the signature page with effect that the intended Annex (a glossary) was omitted. That is now included with this statement. 1.2 This evidence is based on a review of the proofs of evidence submitted by the Development Corporation. It provides my response to that evidence and an update on certain matters referred to in my first statement. It has been written to be read alongside my first statement.
    [Show full text]