Notice of Variation and Consolidation with Introductory Note the Environmental Permitting (England & Wales) Regulations 2016
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Application Site Condition Report
APPLICATION SITE CONDITION REPORT Saltholme North Gas Fired Generating Facility Permit Application EPR/LP3300PZ/A001 JER1691 Application Site Condition Report V1 Final 9 September 2019 rpsgroup.com Quality Management Version Revision Authored by Reviewed by Approved by Review date 0 Draft Frances Bodman Jennifer Stringer Jennifer Stringer 16/08/2019 Statera Energy / 0 Client comments Frances Bodman - 27/09/2019 Jennifer Stringer 1 Final Frances Bodman Jennifer Stringer Jennifer Stringer 09/09/2019 Approval for issue Jennifer Stringer Technical Director [date] File Location O:\JER1691 - Statera EP GHG and EMS\5. Reports\1. Draft Report\Saltholme_North\Appendix G - ASCR\190909 R JER1691 FB Applicaiton Site Condition Report v1 final .docx © Copyright RPS Group Plc. All rights reserved. The report has been prepared for the exclusive use of our client and unless otherwise agreed in writing by RPS Group Plc, any of its subsidiaries, or a related entity (collectively 'RPS'), no other party may use, make use of, or rely on the contents of this report. The report has been compiled using the resources agreed with the client and in accordance with the scope of work agreed with the client. No liability is accepted by RPS for any use of this report, other than the purpose for which it was prepared. The report does not account for any changes relating to the subject matter of the report, or any legislative or regulatory changes that have occurred since the report was produced and that may affect the report. RPS does not accept any responsibility or liability for loss whatsoever to any third party caused by, related to or arising out of any use or reliance on the report. -
Green Infrastructure Supplementary Planning Document Consultation Statement May 2020
Green Infrastructure Supplementary Planning Document Consultation Statement May 2020 1 1. Introduction 1.1 The Green Infrastructure Supplementary Planning Document (SPD) has been prepared by Hartlepool Borough Council. The Draft SPD was published for public consultation over a ten week period from 7 February 2020 until 17 April 2020. The consultation period was extended to provide further time to comment in light of the Covid-19 pandemic. 1.2 This Consultation Statement addresses the requirements of Regulation 12 of the Town and Country Planning (Local Planning) (England) Regulations 2012 that requires Local Planning Authorities to prepare a statement setting out: the persons the Local Planning Authority consulted when preparing the supplementary planning document; a summary of the main issues raised by those persons; and how those issues have been addressed in the supplementary planning document. 1.3 Section 2 of this Statement outlines the consultation processes and provides details of those people and organisations that were consulted. 1.4 Section 3 gives an overview of the representations made within the consultation period. Appendix 1 provides a full schedule of the representations made and the Council’s response to each. Where a representation has informed a revision to the SPD, this is set out. 1.5 Section 4 gives a brief overview of the next steps in the process of adopting the SPD. 2. Consultation Process 2.1 A public consultation on the Draft SPD was approved at the Regeneration Services Committee meeting of 5 February 2020. 2.2 The public consultation began on the 7 February 2020 until 17 April 2020. -
Building Offshore Wind in England CORE: Centres for Offshore Renewable Engineering
Building Offshore Wind in England CORE: Centres for Offshore Renewable Engineering BUSINESS IS 2 Building Offshore Wind in England Ministerial Foreword Offshore wind is a UK success story and the UK is open for business. The UK is the world leader in offshore wind. We have more offshore wind installed than anywhere else in the world. We are an island nation, blessed with strong winds and shallow seas – and this energy resource is on our doorstep. We are determined to move to cleaner electricity generation and offshore wind has an important role to play in our long term plan for a balanced, low carbon energy mix. I want the UK to secure the economic benefits of this new industry. Through our offshore wind industrial strategy, the Government is committed to working in partnership with business to build a competitive, innovative UK supply chain for offshore wind, delivering jobs and economic growth. Building a strong supply chain needs the commitment and expertise of local partners, working alongside central government to support businesses who want to invest here. The Centres for Offshore Renewable Engineering (CORE) partnership offers an integrated and cooperative approach between Government and Local Enterprise Partnerships in England, to provide the best possible support to businesses choosing England as an investment location. The Rt Hon Matthew Hancock MP Minister of State for Business, Enterprise and Energy CORE brings together the relevant expertise from UK Central Government and the six major investment hubs in England to support business growth and showcase opportunities for foreign direct investment (FDI) for the offshore wind sector. -
Minerals and Waste Core Strategy
Tees Valley Joint Minerals and Waste Development Plan Documents In association with Core Strategy DPD Adopted September 2011 27333-r22.indd 1 08/11/2010 14:55:36 i ii Foreword The Tees Valley Minerals and Waste Development Plan Documents (DPDs) - prepared jointly by the boroughs of Darlington, Hartlepool, Middlesbrough, Redcar and Cleveland and Stockton-on-Tees - bring together the planning issues which arise from these two subjects within the sub-region. Two DPDs have been prepared. This Minerals and Waste Core Strategy contains the long-term spatial vision and the strategic policies needed to achieve the key objectives for minerals and waste developments in the Tees Valley. The separate Policies and Sites DPD, which conforms with it, identifies specific sites for minerals and waste development and sets out policies which will be used to assess minerals and waste planning applications. The DPDs form part of the local development framework and development plan for each Borough. They cover all of the five Boroughs except for the part within Redcar and Cleveland that lies within the North York Moors National Park. (Minerals and waste policies for that area are included in the national park’s own local development framework.) The DPDs were prepared during a lengthy process of consultation. This allowed anyone with an interest in minerals and waste in the Tees Valley the opportunity to be involved. An Inspector appointed by the Secretary of State carried out an Examination into the DPDs in early 2011. He concluded that they had been prepared in accordance with the requirements of the Planning and Compulsory Purchase Act 2004 and were sound. -
New Waste Management Capacity Permitted in the North East Since the Urban Mines Baseline
New Waste Management Capacity permitted in the North East since the Urban Mines Baseline Background In accordance with the Duty to Cooperate, and as part of work on our joint evidence base, the Waste Planning Authorities (WPAs) in the North East of England1 commissioned a study ‘Model of Waste Arisings and Waste Management Capacity for the North East of England Waste Planning Authorities’ (Urban Mines, July 2012) to provide forecasts of waste arisings for commercial and industrial waste and hazardous waste to 2030 using the data from the North East of England Commercial and Industrial Waste Survey 2010 and the most up-to-date hazardous waste arisings information. The Urban Mines study contains: detailed forecast arisings; capacity data; analysis and conclusions on commercial and industrial waste; analysis and conclusions on hazardous waste; details on municipal waste as so many key facilities in the North East process waste from both municipal and commercial and industrial sources; commentary on arisings of agricultural, construction and demolition and Low Level Radioactive wastes. The study carried out a capacity gap analysis by comparing forecast arisings with data on available and future capacity. This was done on a regional and sub-regional (WPA) basis. By aggregating arisings estimates for all the WPAs in North East England, the report found that total arisings amount to some 3.6 million tonnes per year. These comprise 1.48 million tonnes from municipal sources (2011 estimates) and 2.15 million from commercial and industrial sources (2011 estimates). Applying the growth methodologies explained in the report, it was estimated that these total waste arisings for North East England are anticipated to remain fairly constant over the forecast period to 2030. -
Draft-Freight-Implementation-Plan.Pdf
Contents 1. Introduction 3 2. Role of Freight 4 3. Existing Conditions / Current Issues 5 4. Aspirations for Tees Valley Freight Network 21 5. Interventions 22 7. Action Plan 25 2 Draft Freight Implementation Plan 1. Introduction Tees Valley Combined Authority is the local transport authority for the Tees Valley. This is the Tees Valley Freight Implementation Plan, part of the first Strategic Transport Plan for the region, for the period up to 2029. It has been developed by the Combined Authority in collaboration with our five constituent Local Authorities, Darlington, Hartlepool, Middlesbrough, Redcar & Cleveland and Stockton-on-Tees. The Combined Authority has ambitious plans to grow the region’s economy and our Strategic Economic Plan aims to create 25,000 Our vision for new jobs and deliver an additional £2.8billion into Tees Valley by Tees Valley is: 2026. We are also developing a Local Industrial Strategy, an agreement between us and the Government on how we will To provide a high improve our economy over the next ten years and how this will quality, clean, feed into the Government’s overall UK strategy. quick, affordable, reliable and safe In order to ensure that everyone in Tees Valley is able to work, transport network study, enjoy and fully participate in these ambitious plans for the for people and future, we need a world-class transport system that also encourages inward investment. Transport is about connecting freight to move people and businesses in Tees Valley and beyond. Delivering a within, to and from world-class transport system that is fit for the future is a critical Tees Valley. -
Teesside Archaological Society
Recording the First World War in the Tees Valley TEESSIDE ARCHAOLOGICAL SOCIETY The following gazetteer is a list of the First World War buildings in the Tees Valley Area. Tees Archaeology has the full image archive and documentation archive. If particular sites of interest are wanted, please contact us on [email protected] 1 | P a g e Recording the First World War in the Tees Valley HER Name Location Present/Demolished Image 236 Kirkleatham Hall TS0 4QR Demolished - 260 WWI Listening Post Boulby Bank Present (Sound Mirror) NZ 75363 19113 270 Marske Hall Redcar Road, Present Marske by the Sea, TS11 6AA 2 | P a g e Recording the First World War in the Tees Valley 392 Seaplane Slipway Previously: Present Seaplane Slipway, Seaton Snook Currently: on foreshore at Hartlepool Nuclear Power Plant, Tees Road, Hartlepool TS25 2BZ NZ 53283 26736 467 Royal Flying Corps, Green Lane, Demolished - Marske Marske by the Sea (Airfield) Redcar 3 | P a g e Recording the First World War in the Tees Valley 681 Hart on the Hill Hart on the Hill, Present (Earthworks) Dalton Piercy, parish of Hart, Co. Durham TS27 3HY (approx. half a mile north of Dalton Piercy village, on the minor road from Dalton Piercy to Hart Google Maps (2017) Google Maps [online] Available at: https://www.google.co.uk/maps/place/Hart-on-the- Hill/@54.6797131,- 1.2769667,386m/data=!3m1!1e3!4m5!3m4!1s0x487ef3527f0a44 21:0xe4080d467b98430d!8m2!3d54.67971!4d-1.274778 4 | P a g e Recording the First World War in the Tees Valley 698 Heugh Gun Battery Heugh Battery, Present Hartlepool -
Tees Valley Joint Minerals and Waste Development Plan Documents
Draft Only i APPENDIX 2(i) Tees Valley Joint Minerals and Waste Development Plan Documents Core Strategy Publication Document August 2009 Draft Only ii Draft Only iii Foreword The preparation of Joint Minerals and Waste Development Plan Documents (DPDs) for Darlington, Hartlepool, Middlesbrough, Redcar and Cleveland and Stockton-on-Tees Boroughs presents an important opportunity to understand and deal with the cross boundary issues which arise from these two subjects in the Tees Valley. Two DPDs are being prepared. This Core Strategy contains the long-term spatial vision and the strategic policies needed to achieve the key objectives for minerals and waste developments in the Tees Valley. The Policies and Sites document will, in conformity with this Core Strategy, identify specific sites for future minerals and waste development and provide a limited range of policies which will be used to assess minerals and waste planning applications. The DPDs will form part of the Local Development Framework for each Borough, which together with the Regional Spatial Strategy for North East England will form the Development Plan for the area. The DPDs cover all of the land within the five Boroughs except for the part within Redcar & Cleveland Borough that also falls within the North York Moors National Park. The Publication Document represents the third stage of the preparation process. The first stage, in May 2007, was the production of an Issues and Options Report, where the issues affecting minerals and waste development in the Tees Valley were identified and consultees and the general public were asked to identify which of the options presented were the most appropriate for dealing with the issues. -
Distribution Network Review
A DISTRIBUTION NETWORK REVIEW ETSU K/EL/00188/REP Contractor P B Power Merz & McLellan Division PREPARED BY R J Fairbairn D Maunder P Kenyon The work described in this report was carried out under contract as part of the New and Renewable Energy Programme, managed by the Energy Technology Support Unit (ETSU) on behalf of the Department of Trade and Industry. The views and judgements expressed in this report are those of the contractor and do not necessarily reflect those of ETSU or the Department of Trade and Industry.__________ First published 1999 © Crown copyright 1999 Page iii 1. EXECUTIVE SUMMARY.........................................................................................................................1.1 2. INTRODUCTION.......................................................................................................................................2.1 3. BACKGROUND.........................................................................................................................................3.1 3.1 Description of the existing electricity supply system in England , Scotland and Wales ...3.1 3.2 Summary of PES Licence conditions relating to the connection of embedded generation 3.5 3.3 Summary of conditions required to be met by an embedded generator .................................3.10 3.4 The effect of the Review of Electricity Trading Arrangements (RETA)..............................3.11 4. THE ABILITY OF THE UK DISTRIBUTION NETWORKS TO ACCEPT EMBEDDED GENERATION...................................................................................................................................................4.1 -
Industry in the Tees Valley
Industry in the Tees Valley Industry in the Tees Valley A Guide by Alan Betteney This guide was produced as part of the River Tees Rediscovered Landscape Partnership, thanks to money raised by National Lottery players. Funding raised by the National Lottery and awarded by the Heritage Lottery Fund It was put together by Cleveland Industrial Archaeology Society & Tees Archaeology Tees Archaeology logo © 2018 The Author & Heritage Lottery/Tees Archaeology CONTENTS Page Foreword ........................................................................................ X 1. Introduction....... ...................................................................... 8 2. The Industrial Revolution .......... .............................................11 3. Railways ................................................................................ 14 4. Reclamation of the River ....................................................... 18 5. Extractive industries .............................................................. 20 6. Flour Mills .............................................................................. 21 7. Railway works ........................................................................ 22 8. The Iron Industry .................................................................... 23 9. Shipbuilding ........................................................................... 27 10. The Chemical industry ............................................................ 30 11. Workers ................................................................................. -
Durham Rare Plant Register 2016
County Durham Rare Plant Register 2016 JOHN L. DURKIN MSc. MCIEEM BSBI Recorder for County Durham 25 May Avenue. Winlaton Mill, Blaydon, NE21 6SF [email protected] www.durhamnature.co.uk Contents Introduction to the rare plants register Notes on plant distribution and protection The individual species accounts in alphabetical order Site Index First published 2010. This is the 2016, fourth edition of the “RPR”, dedicated to Keith Cunningham, who helped so much with the early databases and in many other ways. Improvements in this edition include- The new English Red List is incorporated into this edition. An additional 10% records, most of these more recent and more precise. Cover picture—Bird’s Eye Primrose at Widdybank Fell. Introduction Most counties are in the process of compiling a County Rare Plant Register, to assist in the study and conservation of their rare species. The process is made easier if the county has a published Flora and a strong Biological Records Centre, and Durham is fortunate to have Gordon Graham's Flora and the Durham Wildlife Trust’s “Recorder" system. We have also had a Biodiversity project, based at Rainton Meadows, which until 2013 carried out conservation projects to protect the rare species. It is hoped that the “RPR” will act as a stimulus for local botanists to make special efforts to improve the database by recording these species. The register will be used to increase our understanding of the status and distribution of the rare species, and to aid and promote their conservation. Species Covered Three groups of vascular plant species are included. -
Appendices to the Appraisal of Sustainability Site Report for Hartlepool
Appendices to the Appraisal of Sustainability Site Report for Hartlepool EN-6: Revised Draft National Policy Statement for Nuclear Power Generation Planning for new energy infrastructure October 2010 Appendices to the Appraisal of Sustainability Site Report for Hartlepool Appraisal of Sustainability of the revised draft Nuclear National Policy Statement The Appraisal of Sustainability (AoS), incorporating Strategic Environmental Assessment, of the revised draft Nuclear National Policy Statement (Nuclear NPS) has been undertaken at a strategic level. It considers the effects of the proposed policy at a national level and the sites to be assessed for their suitability for the deployment of new nuclear power stations by 2025. These strategic appraisals are part of an ongoing assessment process that started in March 2008 and, following completion of this AoS, will continue with project level assessments when developers make applications for development consent in relation to specific projects. Applications for development consents to the Infrastructure Planning Commission will need to be accompanied by an Environmental Statement having been the subject of a detailed Environmental Impact Assessment. The AoS/SEA Reports are presented in the following documents: AoS Non-Technical Summary Main AoS Report of draft Nuclear NPS Introduction Approach and Methods Alternatives Radioactive Waste Findings Summary of Sites Technical Appendices Annexes to Main AoS Report: Reports on Sites Site AoS Reports Technical Appendices All documents are available on the website of the Department of Energy and Climate Change at http://www.energynpsconsultation.decc.gov.uk This document is the Appendices to the Appraisal of Sustainability Site Report for Hartlepool. These appendices have been prepared by the Department of Energy and Climate Change with expert input from a team of specialist planning and environmental consultancies led by MWH UK Ltd with Enfusion Ltd, Nicholas Pearsons Associates Ltd, Studsvik UK Ltd and Metoc plc.