Raymer to Bernson Double Track Project Van Nuys–Northridge–Chatsworth

Total Page:16

File Type:pdf, Size:1020Kb

Raymer to Bernson Double Track Project Van Nuys–Northridge–Chatsworth metro.net/regionalrail regional rail safety & mobility enhancements Raymer to Bernson Double Track Project Van Nuys–Northridge–Chatsworth Overview Fact Sheet Overview Project Goals Metro is moving forward with final design of the Raymer > Promote rail corridor safety and accessibility. to Bernson Double Track Project (Van Nuys-Northridge- > Improve operational reliability and on time performance Chatsworth). It will add 6.4 miles of second mainline along the Ventura Line. track between Control Point (CP) Bernson (near DeSoto Ave) and CP Raymer (near Woodley Ave) in > Allow for future additional intercity passenger and Los Angeles County. Other improvements will include commuter service consistent with the State’s intercity grade crossing equipment upgrades, tra;c controls and passenger rail improvement goals for the corridor. road improvements. Once complete, this will improve > Upgrade the Northridge station to serve more passengers safety, add capacity, and improve operational reliability and trains due to the increased capacity from the along the Metrolink Ventura Line and Amtrak’s double track. Los Angeles – San Diego – San Luis Obispo (LOSSAN) Pacific Surfliner corridor. > Enhance passenger experience at the Northridge station including additional displays, wayfinding, security and safety improvements. Background The Raymer to Bernson Double Track Project will complete Currently, the single track along the corridor limits the a continuous double track corridor along the LOSSAN ability of trains to recover from any lost schedule time. corridor through Los Angeles County. It will provide a The double track will minimize the need for trains to idle second mainline track on the Metrolink Ventura Line. This at control points. This will lead to better air quality and line is also used by Amtrak’s Intercity Pacific Surfliner and lower greenhouse emissions. Upon project completion, long distance Coast Starlight corridor as well as UPRR the upgraded street and rail crossings will enhance train Freight. The total length of the new second mainline track and tra;c safety and better serve passengers. The second is approximately 6.4 miles between CP Raymer at Milepost mainline track will improve the flow of Metrolink, Amtrak (MP) 453.1, to CP Bernson, at MP 446.7. The project is and UPRR trains. located in a corridor owned by both the Union Pacific Metro has secured funds from the California State Railroad (UPRR) and the Los Angeles County Metropolitan Transportation Improvement Program (STIP) and Authority (Metro). As part of this work, nine at-grade rail State Proposition 1B for final design and construction. crossings and two bridges will be reconstructed. In addition, Measure R and other funds were used to complete the a second side platform and a grade separated pedestrian preliminary engineering and environmental clearance. underpass will be built to connect the existing and new platform at the Northridge Station. Chatsworth to Van Nuys Double Track Project RESEDA BLVD NORDHOFF AVE NORDHOFF WINNETKA AVE WOODLEY AVE BALBOA BLVD LINDLEY AVE DE SOTO AVE BULL CREEK CORBIN AVE MASON AVE TAMPA AVE New Second Side Platform No Modifications to New Double Track Bridge at Northridge Station Bridge Over Parthenia St Existing Track Track Shift at Bull Creek LIMEKILN CREEK Northridge Station Van Nuys Airport Grade Crossing New Slope Retaining Wall New Single Track Bridge No Modifications to Proposed Track Safety Enhancements Under Nordhoff Bridge at Limekiln Creek Bridge Over Reseda Blvd ROSCOE BLVD PARTHENIA ST PROJECT LIMITS 14 90TH w 90TH 170TH w 170TH s i e r r a h LANCASTER RD w 138 y 5 av d av D av d 138 138 138 60TH w 60TH 30TH w 30TH av F av F PINE C ANYON rnes j ba 14 iam ll i w 138 ave g av g av g ave g e LANCASTER RD 90TH DIVISION challener ave h av h av h ave h 15TH w 10TH e 10TH 20TH e 20TH 30TH e 30TH 40TH e 40TH e 50TH 70TH e 5TH e 5TH 60TH w 60TH 50TH w 50TH 30TH w 30TH av i av i ave i ave i LANCASTER LANCASTER bl LANCASTER LANCASTER bl ave j ave j ave j av j av j w 35TH PIN w 32nd E C ANY ON 90TH w 90TH 85TH w 85TH 150TH e 110TH w 110TH DIVISION 50TH e 50TH 15TH e 15TH 10TH e 10TH 40TH e 40TH 20TH e 20TH s e 30TH i 70TH w 70TH 65TH w 65TH e r av k av k r ave k a 40TH w 40TH 45TH w 45TH 60TH w 60TH 25TH w 20TH w 10th w h w y ELI ZABETH L AKE 30TH 5TH e 5TH 160TH e av l av l av l av l 90TH e JO HNSON UGHES H E K 5 LA LL RD Z HI RT av M av M av M 65TH w 65TH 60TH w 60TH 50TH w 50TH A 70th w av M QU E LIZ ABE TH L 14 AK E 138 av n av n e H G T O 170 D D E 20TH w 30TH w 30TH 45THw 10th w H I L L R ANC HO V IST av o ave o A bl s i av p e av p ave p r r a h w y 70TH e 70TH ELIZABETH e 90TH L e 110TH AKE YON N e 50TH 35TH e 35TH T CA highland UE BOUQ e 240TH 10th w PA av q LM DA LE t i e PALMDALE r b r l a 25TH e 25TH 20TH e 20TH e 30TH PALMDALE bl PALMDALE bl PALMDALE bl s u b 138 i d 5th w a av r av r N YO N A e TH 95 C PALMDALE e 100TH T E U Q U 47TH e O B av r12 e 170TH 10th e av s av s av s av s fairfield FORT TEJON 2 5 T H e g o l d av t av t e n s t 5 a 5 t e f w y 14 s 87TH e 96TH e ie 138 r r a h w y av u S E H G U H E pearblossom hwy K A L s ie r e 165TH r a h VINCENT GRADE/ACTON w r i y d g e r PEARBLOSSOM HWY o N ut O e Y 138 N A C 14 E C av w PEARBLOSSOM HWY DUL 138 A s e ie U n AGUA yo s rr VALYERMO G n c a ca o h A o n w DULCE did d y escon id o c r c o a CASTAIC n w y LONGVIEW o n n v a l YON l N e A d venpor y C a t D A ANTELOPE HWY D E L O n S o y n ACTON a c n a N lo O s Y N T CA UE 138 UQ BO A pper h N co i G ll ll VISTA LARGO hi E r N L e O E p y Y S p w N A F o h C O c S a E r R r C E ie O S s E r y T C e C t w n L H n k A o U W e e p N ll y D a c Y s n Y a n mar v N tine l SAUGUS p z O a e e A lum c E c c S N A a d n r A B l y U l o N e C n e 5 D G m M k A C s m d e a A o c o h N c ro Y n O N ew h i h l a l DEVILS PUNCHBOWL l g l s r b c n a o h o y VAL VERDE 126 SCOTT n n r i n ca q o d y r o et v u u n a q a u ou S THE OLD rd n i b i c O c e g AD YON t e h LED CAN o y w h c r a n O y Y o A n M RY HEN CANYON COUNTRY 138 n o y CYN VIEW MAGIC MOUNTAIN PKWY n a c SANTA CLARITA s e t i to h u 14 r w NYON ne SOLEDAD CA y l b A I V C M ALEN C B E r A 126 o N c p S BIG PINES hwy k k A w w VIA PRINCESSA N e y D l l C C SANTA CLARITA A A N N y Y INC w O Y R E h SSA rra N O P sie N IA V ventura st THE OLD rd H 126 C N railroad A R N orchard O village S N N YO E AN V C E y P T YON e LA ERITA AN l C S C i CA O NY IC w O P LYONS N NEWHALL DO N CK EW W HA EIL LL ER powell A 5 V 2 ANGE calgro LES C ve REST HWY 2 23 y w g h r i a m r r e e s i c s a n y o n 2 14 5 GA 210 VIN BORDEN ELDRIDGE A SAYRE GLENOAKS HUBBARD A O B L ROXFORD G A HERRICK N B I SAN FERNANDO GLADSTONE D N BLEDSOE R O 23 BRADLEY H A Y N POLK N A O C Y FOOTHILL Z N SAYRE E P A C LO A G N JU TU n E BIG o L TU y TT JU n LI NG a A c t C u A n 118 POLK N l 5 Y p O a L 210 N o A SAN FERNANDO w r A MOORPARK t P U e M R SAN FERNANDO r A E L r T C a Y ARROYO n N c MOORPARK h E d PORTER N r CO R RB 118 O IN RANCH SB 2 los angeles av RINALDI O VAUGHN 118 m 405 o or HERRICK s pa p r BRAND AN r k BRADLEY GE in g r 118 LE d los angeles av FOX S da los angeles av 118 SAN FERNANDO MISSION LAKEVIEW foR reja PA ES erra A ANA SS T h ti M US 118 wy WY T S TERRACE H SIMI VALLEY R TA ST SIMI VALLEY A E N GRANADA LAUREL CANYON RE K/METROL IN SA S C I kuehner L WENTWORTH LE N GE tierra r K MASON CHATSWORTH ST HILLS GLENOAKS Hansen Dam eja V O AN da E C MISSION Recreational Area 2 madera Project Goals NTURA Project Map HILLS SAN FERNANDO 23 SHADOW HILLS 210 DEVONSHIRE DEVONSHIRE PACOIMA d r k r CHATSWORTH a p r o w o a LASSEN SEPULVEDA WOODLEY BALBOA CHATSWORTH WILBUR CORBIN o RESEDA BL r ZELZAH m made TAMPA o TERRA BELLA d METROLINK r a STATION ARLETA n CANTERBURY c L h NORTHRIDGE 5 B D p N k PLUMMER WOODMAN A w PLUMMER L y N SHELDON E U rd L California State S ta rosa EY CIRC BRANFORD san VALL University NORTH of Northridge OSBORNE d NORDHOFF HILLS r NORDHOFF rk a LA TUNA CANYON p s r unset h o ills NORDHOFF ARLETA o Bernson LA CRESCENTA 2 m VAN NUYS BL NUYS VAN 210 p PARTHENIA PARTHENIA GLENOAKS f e TUXFORD d WEBB e e NORTHRIDGE l r c s y t METROLINK k n o 39 s e n n s e g l u STATION i r 405 o o b b Raymer m e s ROSCOE ROSCOE LA CAÑADA y ROSCOE hw los ar enida de boles FLINTRIDGE av T SUN VALLEY S CANOGA PARK PANORAMA E STRATHERN SAN FERNANDO R s C avenida de e los arbole Van Nuys CITY la avenida d S s Airport E L Y f E lo (VNY) D res G L WOODLAKE A SATICOY SATICOY SATICOY 5 N SATICOY B janss A E 170 TUJUNGA r L VINELAND an B N C cho E Y co L C R L LANKERSHIM n I MONTROSE e C j o TOPANGA CANYON LAUREL CANYON FALLBROOK WINNETKA WILBUR DE SOTO RESEDA BL CANOGA TAMPA MASON CORBIN loma alta LA CRESCENTA AV WHITE OAK SEPULVEDA SHERMAN BALBOA jans Y SHERMAN WOODLEY SHERMAN SHERMAN s NAN E Bob Hope FOOTHILL KA L n L n A SUNSET CANYON y l Airport camino V 2 d RESEDA BURBANK v ios r VAN NUYS (BUR) BEL AIRE DR en dos r ALTADENA t k l u r a VANOWEN VANOWEN WOODMAN pa VANOWEN LAKE rk a g VANOWEN KENNETH r ALTADENA dr t p e WHITSETT COLFAX l a BL NUYS VAN ler r n o 23 a 6TH o d Project Development Phases GLENOAKS s a 210 m VALLEY e b hillcre t r y s e GLEN VINELAND d 101 VICTORY VICTORY VICTORY VICTORY n VICTORY e COLDWATER CANYON E Public involvement is of paramount importance for all agencies and jurisdictions involved.
Recommended publications
  • Master HSIPR Selection Sheet 030413 Updates.Xlsx
    FRA High‐Speed Intercity Passenger Rail (HSIPR) Program Updated 3/4/2013 Funding Selection Summary (Sorted by State Abbreviation, Funding Source, and Project Type) Funding Potential Estimated State Project Type Project Name Project Summary Source Funding* Alabama ‐ Total Funding Amount: $200,000 AL FY 2009 Planning Project New Passenger Rail Service in Alabama Completion of a feasibility study to restore intercity passenger rail service from Birmingham to Montgomery to Mobile, AL.$ 200,000 Amtrak ‐ Total Funding Amount: $449,944,000 This project will boost capacity, reliability, and speed in one of the most heavily used sections of the Northeast Corridor (NEC). The project will create a 24 mile segment of track between New Brunswick and Trenton, NJ capable of 160 mph train operations with high‐tension catenary, upgraded electric Amtrak ARRA Corridor Program NEC Power, Signal, Track, Catenary Improvements power facilities, and high‐speed rail interlockings that allow express trains to overtake and pass local trains, reducing delays that often affect this track $ 449,944,000 section. In addition, this project makes related track and interlocking investments between Trenton, NJ and Morrisville, PA and at New York Penn Station. The upgraded power facilities will reduce power failures, which are frequently experienced on this segment of the NEC. California ‐ Total Funding Amount: $4,243,143,231 This project encompasses the purchase of 15 passenger rail cars and 4 locomotives for use on the Pacific Surfliner, San Joaquin, and Capitol Corridors in California. These new cars and locomotives will be compliant with standards for equipment that can travel at speeds up to 125 mph established Next Generation Passenger Rail Equipment CA ‐ DOT ARRA Corridor Program pursuant to Section 305 of the Passenger Rail Investment and Improvement Act of 2008.
    [Show full text]
  • Los Angeles City Clerk
    CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM j!; 23 PM 3: 26 OFFICI:ft CITY ADMINWR ATIVE Date: July 22, 2014 To: Honorable Eric Garcetti, Mayor Attention: Mandy Morales, Legislative Coordinator From: Jon Kirk Mukri, General Manager Department of Transportation Subject: RECOMMENDED CONTRACT A A BS FOR THE CONTINUED MANAGEMENT AND PERFORMANCE OF LANDSCAPING AND MAINTENANCE SERVICES FOR LADOT BIKE PATH AND TRANSIT FACILITIES SUMMARY The Department of Transportation (LADOT) requests authority to execute contracts with ShelterClean Services, Inc. (incumbent) for the continued provision of management and landscaping / maintenance services for LADOT bike path and transit facilities. RECOMMENDATIONS That the Council, subject to the approval of the Mayor: 1. AUTHORIZE the General Manager, Department of Transportation, to enter into a five-year contract with ShelterClean Services, Inc., for the management and performance of maintenance and landscaping services for eleven (11) City bike path facilities, with a total cost not-to-exceed $3,000,000, subject to the approval of the City Attorney as to form and legality. 2. AUTHORIZE the General Manager, Department of Transportation, to enter into a five-year contract with ShelterClean Services, Inc., for the management and performance of maintenance and landscaping services for seven (7) City transit facilities, with a total cost not-to-exceed $2,140,000, subject to the approval of the City Attorney as to form and legality. DISCUSSION As will be discussed in this section, the request for proposals(RFP) Evaluation Committee ranked the combined Economy of Scale proposal submitted by ShelterClean Services, Inc. as the best and most cost-effective for the City.
    [Show full text]
  • January 2015
    metro.net Metro Orange Line Connections h s a W h s a a Hansen Dam n DEVONSHIRE ST DEVONSHIRE ST DEVONSHIRE ST 5 a W s u r S Chatsworth Station u a lb t i ARLETA AVG Metro Rapid Stop n 405 W W O a Chatsworth Station L S O D METROLINK GLENOAKS BL O E LAUREL CYN BL D Metro Rapid Line TOPANGA CYN BL CYN TOPANGA TOPANGA CYN BL CYN TOPANGA N M LASSEN ST LASSEN ST LASSEN ST A N S Metro Orange Line T SAN FERNANDO RD CHATSWORTH A A T Station VA V E TAMPA AV TAMPA Sepulveda Metro Orange Line CORBIN AV ZELZAH AV F WILBUR AV RESEDA BL RESEDA PLUMMER ST PLUMMER ST PLUMMER BL BALBOA ST PLUMMER ST ARLETA W DE SOTO AV DE SOTO WOODLEY AV WOODLEY Y WINNETKA AV SEPULVEDA BL SEPULVEDA Metro Rail Station VINCENNES ST TERRA BELLA ST Northridge East CanyonARLETA Channel AV SUN AMTRAK/METROLINK 27 Fashion CSUN NORTH HILLS VALLEY Metro Red Line Center NORTHRIDGE NORDHOFF ST AV DARBY NORDHOFF ST NORDHOFF ST OSBORNE ST Transfers SAN DIEGO FWY Nordhoff Station Metrolink h SHELDON ST NORDHOFF ST Northridge Station s a PANORAMA W Amtrak 5 Bull Creek BRANFORD ST PARTHENIA ST PARTHENIA ST PARTHENIA ST CITY Parking a 15-0989 ©2014 LACMTA m H WEST HILLS i o CHASE ST O DEC 2014 Subject to Change c L a L P ROSCOE BL Roscoe Station ROSCOE BL ROSCOE BL Y W TUXFORD ST O O Sun Valley Station METROLINK D Aliso Canyon Wash Aliso Canyon SAN FERNANDO RD STRATHERN ST STRATHERN ST F STRATHERN ST W Y DE SOTO AV DE SOTO Van Nuys Station Tujunga Wash FlyAway WHITSETT AV Bus Terminal NUYS BL VAN WHITE OAK AV WHITE OAK TAMPA AV TAMPA VARIEL AV VARIEL WOODLAKE AV WOODLAKE WOODLAKE AV
    [Show full text]
  • June 2008 Metrolink Matters
    METROLINK NEWS & EVENTS • JUNE 2008 (800) 371-LINK • www.metroLINKtraINs.com Metrolink Ticket Vending Machines Now Sell Amtrak Tickets In case you haven’t noticed, Metrolink TVMs now have the ability to sell Amtrak tickets. This is the result of a partnership between Metrolink, Amtrak, and Caltrans to fund and install this capability on TVMs throughout the Metrolink system and at Amtrak stations from San Diego to San Luis Obispo. Installations are complete at all stations,* and the TVMs have a new “Buy Tickets Here” sign as well. Now, passengers have a new level of convenience to purchase both an Amtrak and a Metrolink ticket to complete a trip that uses both services. Just use the Metrolink/Amtrak TVM now available at all Metrolink stations and at most Amtrak Pacific Surfliner stations.* * Installation at the Carpinteria and San Clemente Pier stations and Amtrak 10-trip-ticket availability will take place at a later date. (continued on page 3) Metrolink and Amtrak passengers can also continue to enjoy the benefits of the Rail 2 Rail program. Metrolink monthly-pass holders still travel for free on any Amtrak Pacific Surfliner trains or buses within the origin-and-destination pair of their passes, including on weekends. Amtrak Pacific Surfliner ticket holders can also ride any Metrolink train within the limits of their tickets at no additional charge. All Metrolink and Amtrak tickets continue to be valid on either service between Bob Hope Airport in Burbank and L.A. Union Station as Construction & Maintenance Update long as those two stations are within the trip limits of the ticket being used.
    [Show full text]
  • Agenda Number: 9
    Los Angeles County Metro Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Board Report Los Angeles, CA File #:2016-0284, File Type:Motion / Motion Agenda Number:9. Response REVISED PLANNING AND PROGRAMMING COMMITTEE OCTOBER 19, 2016 SUBJECT: BURBANK-GLENDALE-LOS ANGELES CORRIDOR ACTION: AUTHORIZE STUDIES RECOMMENDATION AUTHORIZE the Chief Executive Officer (CEO) to: A. CONDUCT a study for providing up to two additional Metrolink stations in the City of Glendale and up to two additional stations in the City of Los Angeles as well as providing increased Metrolink train service throughout the day from Union Station to the City of Burbank with opportunities to include expanded service to the Antelope Valley as a first step in examining increased rail connectivity in the Los Angeles, Glendale and Burbank Corridor. Additional stations would need to be spaced appropriately and limited so as not to severely affect travel time for those travelling beyond Burbank to the outer terminus of the lines in Ventura and the Antelope Valley; B. PROGRAM AND AMEND the FY 17 budget to add $900,000 in Measure R Commuter Rail service funds to conduct this study; and C. INVENTORY the options for increasing the City of Glendale’s access to the Regional Transit System given the existing baseline Metrolink and future High Speed Rail service. This inventory will examine the existing infrastructure, planned and funded projects and potential future initiatives to improve connectivity to the greater Metro system. ISSUE At the March 24, 2016 Board meeting, the Board directed the CEO to look at creating a new Metrolink station at Rio Hondo College on the Riverside Line and relocating the Northridge Station on the Ventura County Line.
    [Show full text]
  • Passenger Rail
    TRANSPORTATION SYSTEM PASSENGER RAIL SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS TECHNICAL REPORT DRAFT FOR PUBLIC REVIEW AND COMMENT EXECUTIVE SUMMARY 1 INTRODUCTION 2 REGIONAL SIGNIFICANCE 2 REGULATORY FRAMEWORK 3 ANALYTICAL APPROACH 5 EXISTING CONDITIONS 6 STRATEGIES 27 NEXT STEPS 44 CONCLUSION 45 TECHNICAL REPORT PASSENGER RAIL DRAFT FOR PUBLIC REVIEW AND COMMENT connectsocal.org EXECUTIVE SUMMARY TRANSPORTATION SYSTEM This Connect SoCal Passenger Rail report lays out a vision of passenger rail services for the SCAG Region for the next three decades. It demonstrates Passenger Rail the progress that has been made over the last two decades in terms of growing ridership, new rail services, capital improvements and new funding opportunities. It demonstrates the regional importance and significance of passenger rail in the SCAG region, and why growing rail services by increasing frequencies in underserved corridors, as well as establishing service in unserved markets, is crucial to the future mobility and sustainability of our region. The report highlights recent success in establishing new funding opportunities for passenger rail, including the Transit and Intercity Rail Capital Program (TIRCP) and Senate Bill (SB) 1. Amtrak’s Pacific Surfliner intercity rail service is benefiting from these new funding opportunities as well as recent institutional arrangements that establish local control for the service. The Southern California Regional Rail Authority’s (SCRRA) Southern California Optimized Rail Expansion (SCORE) program is an ambitious
    [Show full text]
  • Passenger Rail
    TRANSPORTATION SYSTEM PASSENGER RAIL SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS TECHNICAL REPORT ADOPTED ON SEPTEMBER 3, 2020 EXECUTIVE SUMMARY 1 INTRODUCTION 2 REGIONAL SIGNIFICANCE 2 REGULATORY FRAMEWORK 3 ANALYTICAL APPROACH 5 EXISTING CONDITIONS 7 STRATEGIES 28 NEXT STEPS 45 CONCLUSION 46 TECHNICAL REPORT PASSENGER RAIL ADOPTED ON SEPTEMBER 3, 2020 connectsocal.org EXECUTIVE SUMMARY TRANSPORTATION SYSTEM This Connect SoCal Passenger Rail report lays out a vision of passenger rail services for the SCAG Region for the next three decades. It demonstrates Passenger Rail the progress that has been made over the last two decades in terms of growing ridership, new rail services, capital improvements and new funding opportunities. It demonstrates the regional importance and significance of passenger rail in the SCAG region, and why growing rail services by increasing frequencies in underserved corridors, as well as establishing service in unserved markets, is crucial to the future mobility and sustainability of our region. The report highlights recent success in establishing new funding opportunities for passenger rail, including the Transit and Intercity Rail Capital Program (TIRCP) and Senate Bill (SB) 1. Amtrak’s Pacific Surfliner intercity rail service is benefiting from these new funding opportunities as well as recent institutional arrangements that establish local control for the service. The Southern California Regional Rail Authority’s (SCRRA) Southern California Optimized Rail Expansion (SCORE) program is an ambitious long-term capital improvement program to increase service on most of its lines to 15- and 30-minute frequencies, and SCRRA was recently awarded nearly one billion dollars in TIRCP funds for initial improvements. Finally, the report takes a look at existing conditions; a needs assessment which discusses, among other things, capacity constraints and opportunities for improved connectivity, including rail access to the region’s airports; and rail projects in the pipeline, both under construction and unfunded strategic long-term projects.
    [Show full text]
  • Passenger Rail
    TRANSPORTATION SYSTEM PASSENGER RAIL SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS TECHNICAL REPORT DRAFT FOR PUBLIC REVIEW AND COMMENT EXECUTIVE SUMMARY 1 INTRODUCTION 2 REGIONAL SIGNIFICANCE 2 REGULATORY FRAMEWORK 3 ANALYTICAL APPROACH 5 EXISTING CONDITIONS 6 STRATEGIES 27 NEXT STEPS 44 CONCLUSION 45 TECHNICAL REPORT PASSENGER RAIL DRAFT FOR PUBLIC REVIEW AND COMMENT connectsocal.org EXECUTIVE SUMMARY TRANSPORTATION SYSTEM This Connect SoCal Passenger Rail report lays out a vision of passenger rail services for the SCAG Region for the next three decades. It demonstrates Passenger Rail the progress that has been made over the last two decades in terms of growing ridership, new rail services, capital improvements and new funding opportunities. It demonstrates the regional importance and significance of passenger rail in the SCAG region, and why growing rail services by increasing frequencies in underserved corridors, as well as establishing service in unserved markets, is crucial to the future mobility and sustainability of our region. The report highlights recent success in establishing new funding opportunities for passenger rail, including the Transit and Intercity Rail Capital Program (TIRCP) and Senate Bill (SB) 1. Amtrak’s Pacific Surfliner intercity rail service is benefiting from these new funding opportunities as well as recent institutional arrangements that establish local control for the service. The Southern California Regional Rail Authority’s (SCRRA) Southern California Optimized Rail Expansion (SCORE) program is an ambitious
    [Show full text]
  • Planning and Programming Committee Agenda
    Metro Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA Agenda - Final Wednesday, September 14, 2016 2:00 PM One Gateway Plaza, Los Angeles, CA 90012, 3rd Floor, Metro Board Room Planning and Programming Committee Hilda Solis, Chair Paul Krekorian, Vice Chair Michael Antonovich James Butts Ara Najarian Carrie Bowen, non-voting member Phillip A. Washington, Chief Executive Officer METROPOLITAN TRANSPORTATION AUTHORITY BOARD RULES (ALSO APPLIES TO BOARD COMMITTEES) PUBLIC INPUT A member of the public may address the Board on agenda items, before or during the Board or Committee’s consideration of the item for one (1) minute per item, or at the discretion of the Chair. A request to address the Board should be submitted in person at the meeting to the Board Secretary. Individuals requesting to speak on more than three (3) agenda items will be allowed to speak up to a maximum of three (3) minutes per meeting. For individuals requiring translation service, time allowed will be doubled. The public may also address the Board on non-agenda items within the subject matter jurisdiction of the Board during the public comment period, which will be held at the beginning and/or end of each meeting. Each person will be allowed to speak for up to three (3) minutes per meeting and may speak no more than once during the Public Comment period. Speakers will be called according to the order in which the speaker request forms are received. Elected officials, not their staff or deputies, may be called out of order and prior to the Board’s consideration of the relevant item.
    [Show full text]
  • MTA Report September 2008
    Metro Report: Home CEO Hotline Viewpoint Classified Ads Archives Metro.net (web) Metrolink Crash in Chatsworth Takes a Violent Toll on Metro Family Resources 'Worst Train Accident in Recent Years' claims the life of Metro Safety Storekeeper Donna Remata Pressroom (web) Ask the CEO See myMetro.net report Sept 24: Metrolink Crash Survivor Says No Horror Movie Could Capture the Scene CEO Forum By GAYLE ANDERSON Employee Recognition (September 15, 2008) Metro employees and friends are Employee Activities mourning the loss of fellow Metro Projects employee Donna Remata, a storekeeper at Metro Headquarters Facts at a Glance who was among the 25 (web) passengers and train crew Archives members killed in a Metrolink train accident on Friday. Events Calendar Research Center/ Remata was aboard Ventura Library County Line 111 in car one. The Metro Classifieds Metrolink train that had departed Union Station at 3:35 p.m. en Bazaar Image of friend and co-worker Donna Remata is route to Moorpark collided with a encased in floral wreath at the stationery store Union Pacific freight train on the Metro Info on P-1 where she worked. tracks about a mile and a half 30/10 Initiative north of the Chatsworth Metrolink Remembering Donna Remata - Share your Station. The accident, which memories here. Policies occurred at approximately 4:23 Training Also, visit Donna Remata's memorial page at p.m., has claimed 25 lives and left the Los Angeles Times website commemoration 135 injured, 40 critically. Help Desk of the crash victims: http://projects.latimes.com/metrolink- The accident involved an Intranet Policy crash/name/donna-remata/ undetermined number of Metro Need e-Help? employees, some of whom are Call the Help Desk regular passengers on the Ventura County Line 111 Metrolink train.
    [Show full text]
  • Board Report Los Angeles, CA
    Los Angeles County Metro Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Board Report Los Angeles, CA File #: 2016-0256, File Type: Informational Report Agenda Number: 9 PLANNING AND PROGRAMMING COMMITTEE APRIL 13, 2016 SUBJECT: REGIONAL RAIL UPDATE ACTION: RECEIVE AND FILE THE REGIONAL RAIL UPDATE THROUGH MARCH 2016 RECOMMENDATION RECEIVE AND FILE the Regional Rail Update through March 2016. ISSUE The Regional Rail unit of the Program Management Department is responsible for providing overall coordination, management, and the programming of funds for LACMTA’s commitment to the commuter, intercity, and high speed rail networks serving Los Angeles County. This unit also manages and coordinates capital improvement projects along the LACMTA owned railroad right-of- way. DISCUSSION LACMTA is the largest member agency for the Southern California Regional Rail Authority (SCRRA), the operator of the Metrolink commuter rail network. Metrolink carries approximately 42,000 riders per day throughout the southern California Region. LACMTA is a member of the Los Angeles - San Diego - San Luis Obispo (LOSSAN) Rail Corridor Agency. This Joint Powers Authority (JPA) coordinates the passenger rail services of the three carriers (Amtrak, Metrolink, and COASTER) within this intercity rail corridor. LACMTA is instrumental in the planning and coordination efforts within the County of Los Angeles for the future high speed rail program connecting northern California to southern California. Staff is involved with regional and statewide groups working to develop integrated passenger rail service in the state. The Regional Rail team coordinates and leads capital improvement projects for the Metro owned and Metrolink operated right-of-way.
    [Show full text]
  • Ventura County Line
    Radio-Tone: *64 VENTURA COUNTY LINE 404.44 Bristol Rd. 427.19 MOORPARK STATION* 6.30 403.66 Johnson Dr.* Metrolink Ventura Sub. 29/29-UP 96/96 403.5 CP WYE t/o 15 mph 427.39 Spring St. 403.3 EAST VENTURA STATION 427.4 CP COLONIA “P”45mph t/o 403.17 Ventura Blvd. 428.35 Avenida Colonia Metrolink 29/29-UP 96/96 429.51 W. Los Angeles Ave. 6.21.2 400.4 CO 400 SOUTH MONTALVO SIGNAL 429.5”P”/429.6 402.30 Vineyard Rd. 430.83 Quimisa Dr. SIGNAL 402.3/402.4 431.1 CP MILLHOUSE 45mph t/o 430.45 W/B 53 MPH 402.6 DETECTOR HB/DE (#) 432.8 CP STRATHEARN 45mph t/o 402.90 Gonzales Rd. 433.27 First St. 403.8 Colonia Rd. 434.31 Erringer Rd. 403.90 Cooper Rd. 435.32 Sycamore Dr. 403.9 CO 404 N. OXNARD 30 mph t/o SIGNAL 435.3/435.4 404.0 CO 404 OXNARD STATION 436.08 Sequoia Ave. 405.25 Rose Ave. 436.10 DETECTOR HW/HB/DE (talk) 405.6 CO 406 S. OXNARD 30 mph t/o 436.83 Tapo Cyn. Rd. 406.25 Rice Ave. 437.31 Tapo St. 407.10 Del Norte Blvd. SIGNAL 437.3/437.4 SIGNAL 407.1/407.2 437.74 Los Angeles Ave. 408.40 Pleasant Valley Rd. 438.1 SIMI VALLEY STATION 409.40 Wood Rd. 438.24 Hidden Ranch Dr. SIGNAL 409.1/409.0 439.2 CP SANTA SUSANA 45mph t/o 409.0 DETECTOR DE % 439.65 Katherin Rd * (6.32.6 in effect) 410.4 Las Posas Rd.
    [Show full text]