Bus Routes 2019 for Sept 1St Below Are Potential Bus Routes to Main OC Transpo Locations Using the Last Buses That Will Leave Campus

Total Page:16

File Type:pdf, Size:1020Kb

Bus Routes 2019 for Sept 1St Below Are Potential Bus Routes to Main OC Transpo Locations Using the Last Buses That Will Leave Campus Bus Routes 2019 for Sept 1st Below are potential bus routes to main OC Transpo locations using the last buses that will leave campus. Please be advised these are subject to change and students are responsible for staying up to date with routes on http://www.octranspo.com/en/. These are the last times buses will be leaving campus: - Route 7 + 10 at 11:30pm - Route 104 at 12:45am - Terry Fox Station ( Kanata Centrum) 1. 12:15am take route 104 direction Place D’Orleans. Get off at HURDMAN D 2. Walk to Hurdman B. Take route 61 direction Terry Fox. 3. Get off at TERRY FOX 3C. Fallowfield Station 1. 12:44am take route 104 direction Place d’Orleans 2. Get off at BLAIR 1A. Walk to station BLAIR 2A 3. 1:24am Take route 95 direction Barrhaven Centre 4. Get off at FALLOWFIELD 1A OR 1. 12:44am Take route 104 Direction Place d’Orleans 2. Get off at HERON 4A. walk to HERON 2A 3. 1:23am Take route 97 direction Bells Corners 4. Get off at LINCOLN FIELDS 1B 5. 2:05am Take route 95 directions Barrhaven Center 6. Get off at FALLOWFIELD 1A Mackenzie King ( Rideau center) 1. 11:30pm Bus Route 7 and 10 go directly to Rideau street. Get off at RIDEAU 3A. Walk to Mackenzie King station. College Square ( Baseline) 1. 12:14 am Take route 104 direction Place d’Orleans. 2. Get off at BLAIR 1A. walk to BLAIR 2A 3. 12:54 take route 95 direction Barrhaven Center 4. Get off at BASLINE 1D. Place D’Orleans Station 1. At 12:15am or 12:44am take route 104 direction Place D’Orleans 2. Get off at Orleans 1B. Bayshore Station 1. 12:45am take route 104 direction Place d’Orleans 2. Get off at HURDMAN D. walk to HURDMAN B 3. 1:21am take route 61 direction Terry Fox 4. Get off at BAYHORE 1A Billings Bridge Station 1. 12:15am or 12:45am take route 104 direction Place d’Orleans. 2. Get off at Billings Bridge Station South Keys Station 1. 12:15am take route 104 direction Place d’Orleans 2. Get off at HERON 4A. walk to HERON 1A 3. 12:36am take route 97 direction Airport. Get off at SOUTH KEYS 1C .
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • 1357 Baseline Road Transportation Impact Assessment Strategy Report
    1357 Baseline Road Transportation Impact Assessment Strategy Report January 17, 2020 Prepared for: Selection Groupe International Inc. Prepared by: Stantec Consulting Ltd. 1357 Baseline Road Transportation Impact Assessment Table of Contents 1.0 SCREENING ................................................................................................................................................... 1 1.1 SUMMARY OF DEVELOPMENT .................................................................................................................... 1 1.2 TRIP GENERATION TRIGGER ....................................................................................................................... 1 1.3 LOCATION TRIGGERS ................................................................................................................................... 2 1.4 SAFETY TRIGGERS ....................................................................................................................................... 2 1.5 SUMMARY ...................................................................................................................................................... 2 2.0 SCOPING ........................................................................................................................................................ 3 2.1 EXISTING AND PLANNED CONDITIONS ...................................................................................................... 3 2.1.1 Proposed Development .............................................................................................................
    [Show full text]
  • Fall 2020 Final
    CITY COUNCILLOR / CONSEILLER MUNICIPAL RILEY BROCKINGTON River Ward Ward / Quartier/ Quartier Rivière Rivière 613--580580-2486-2486 ● [email protected][email protected] @RiverWardRiley October 2020 Website: RileyBrockington.ca Proudly serving all residents of River Ward Dear Neighbours and Residents, I anticipate reopening the Ward Office in I trust you are well, had a restful summer the Hunt Club - Riverside Park Community and continue to enjoy autumn. As the Centre once the centre fully reopens to cooler weather arrives we will soon be the public. Currently only those registered spending more time indoors. for classes or a fitness session may enter the building. However, if you wish to meet Don’t forget that River Ward has some of with me face-to-face, please call my office the City’s best wooded walking trails, a and we can make the necessary 5km groomed cross country ski trail at the arrangements. Terry Fox Athletic Centre and Mooney’s Bay Park, spectacular toboggan hills, the I have used my time during the pandemic Carleton Heights Curling rink, dozens of to successfully champion a number of outdoor community-run ice rinks, the JA battles including allowing community Dulude Arena and Deborah Anne Kirwan gardens to open during the shutdown, staggered reopening of library services, indoor pool. Enjoy the bounty that our Supporting River’s Ward small businesses will be the key to our recovery. Premier ward has to offer. With the on-going offering summer camp programs, advanced the re-opening of the City’s Cleaners on Merivale Road in Carlington is a family-run business that has felt the COVID pandemic, it is important to ensure brunt of COVID-19 like so many others.
    [Show full text]
  • Insert Budget Title Here
    Transportation Master Plan Ottawa Cycling Plan Ottawa Pedestrian Plan 2013 Review October Consultation Summary Presentation to: Transportation Committee 15 November 2013 Presentation Overview • Summarize feedback from October 2013 consultation process • Identify proposed changes in response to comments • Present additional transit-related details for extending LRT to the suburban town centres outside the Greenbelt 2 Ottawa Pedestrian Plan October 2013 Consultation Feedback Major Themes: • Comments relating to maintenance, operation and design of pedestrian infrastructure • Specific feedback about intersection design, vehicle speeds, and winter maintenance • Changes to Varley Drive and Halton Terrance in the Kanata North 3 Recommended Changes Affordable Pedestrian Projects 4 Ottawa Cycling Plan October 2013 Consultation Feedback Major Themes: • Accessibility concerns • Paved shoulders policies • Visibility of future cycling infrastructure as part of integrated projects • Rideau Canal Footbridge (Fifth Avenue and Clegg Street) • Changes in Barrhaven, Vanier, Sandy Hill, Lowertown, Old Montreal Road, Prince of Wales Drive 5 Recommended Changes Affordable Cycling Projects 6 TMP - Transit October 2013 Consultation Feedback Major Themes: • Greater emphasis on accessibility and Para Transpo • O-Train extension to the Ottawa International Airport • Rapid Transit through the Fernbank Community • More LRT expansion (i.e. Canada Tire Centre, Trim Road, Barrhaven) • Kanata North Bus Rapid Transit extension • West Transitway (Terry Fox Station to March
    [Show full text]
  • Kanata Light Rail Transit Planning and Environmental Assessment Study (Moodie Drive to Hazeldean Road) – Recommendations
    1 Report to Rapport au: Transportation Committee Comité des transports 2 May 2018 / 2 mai 2018 and Council et au Conseil 9 May 2018 / 9 mai 2018 Submitted on April 17, 2018 Soumis le 17 avril 2018 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: Vivi Chi, Director / Directeur, Transportation Planning / Planification des transports, Transportation Services Department / Direction générale des transports (613) 580-2424, 21877, [email protected] Ward: KANATA NORTH (4) / KANATA File Number: ACS2018-TSD-PLN-0002 NORD (4) / STITTSVILLE (6) / BAY (7) / BAIE (7) / COLLEGE (8) / COLLÈGE (8) / KANATA SOUTH (23) / KANATA-SUD (23) SUBJECT: Kanata Light Rail Transit Planning and Environmental Assessment Study (Moodie Drive to Hazeldean Road) – Recommendations OBJET: Étude de planification et d’évaluation environnementale du Train léger sur rail proposé vers Kanata (de la promenade Moodie au chemin Hazeldean) – Recommandations 2 REPORT RECOMMENDATIONS That Transportation Committee recommend that Council: 1. Approve the functional design for the Kanata Light Rail Transit (Moodie Drive to Hazeldean Road), as described in this report and supporting documents one and two; and, 2. Direct Transportation Planning staff to initiate the Transit Project Assessment Process in accordance with the Ontario Environmental Assessment Act (Regulation 231/08), including the preparation and filing of the Environmental Project Report for final public review and comment. RECOMMANDATIONS DU RAPPORT Que le Comité des transports recommande au Conseil : 1. d’approuver la conception fonctionnelle du Train léger sur rail vers Kanata (de la promenade Moodie au chemin Hazeldean), comme présentée dans le présent rapport et dans les documents un à deux; et, 2.
    [Show full text]
  • Bells Corners Community Improvement Plan 1
    Document 2 Bells Corners Community Improvement Plan 1. Background Bells Corners has been identified as needing economic development activity, particularly, measures are needed to incent urban revitalization. Over the last several decades, the quality and vibrancy of the Robertson Road corridor, between the CN Railway bridge on the east and the City-owned railway bridge (now a multi-purpose pathway) on the west, has declined significantly, resulting in a lack of business investment; declining levels of property maintenance; and the closure, downsizing, and/or relocation of many existing businesses. Some 468 business have closed or moved away from Bells Corners in this period, and well-known brands like Staples, IKEA, Kentucky Fried Chicken, Wendy's, 2nd Cup, Alexanian Carpet, Burger King, Arby's, Baskin-Robbins, and Pizza Hut are all long gone. Hurley’s, a former thriving restaurant, was replaced by Local Heroes, but now it too has downsized and moved across the street, leaving a large vacant building. The restaurant that initially opened as Corkscrew Restaurant at 3795 Richmond Road (now 1961 Robertson Road) has housed a long list of businesses since Corkscrew’s failure, including Buffet Palace, Vox Lounge, Houston's Restaurant, and Miss Saigon, but now all have failed, and the building has been torn down and the land sits vacant. The purpose of this Community Improvement Plan (CIP) is to encourage and facilitate rehabilitation, redevelopment, and revitalization of the existing built environment while providing enhanced employment opportunities, all of which are important for the health and liveability of this section of Bells Corners. The CIP benefits private landowners undertaking redevelopment projects on private property; however, the eligibility and reporting criteria require that the tenants creating the jobs are made aware of the CIP incentives so they can negotiate appropriate lease terms with complete information.
    [Show full text]
  • BELLS CORNERS UNITED CHURCH 3955 Old Richmond Rd., Nepean
    BELLS CORNERS UNITED CHURCH ‘The Story-Tellin’ Man’ by Ken Medema will be 3955 Old Richmond Rd., Nepean, ON K2H 5C5 performed here at BCUC on Saturday April 27, Tel: 613-820-8103 Fax: 613-820-5628 7:00 pm. Freewill offering to the Mission Website: www.bcuc.org Email: [email protected] Exposure Fund. Refreshments to follow. Come Facebook: @bellscornersunitedchurch and bring your friends for a fun evening as Minister: Rev. Kim Vidal Ministry Candidate: Lorrie Lowes Parables of Jesus are told with song/dance and Music Director: Abe TeGrotenhuis dialogue by an all-ages cast from our Office Administrators: Nancy Meyers, Ellen Boynton congregation. Chair, Church Board: Jordan Berard ANNOUNCEMENTS: April 21, 2019 Retirement Home Worship Services - April & May 2019 Meetings This Week Here at the Church: Harmer House: Wednesday , April 24 – 10 am Communion Service Lectionary Group: meets Tuesday April 23, 10:30 am. “Witness and Truth” Stillwater Creek: Wednesday, May 8 – 10 am (Acts 5:27-32) Bridlewood Trails: Thursday, May 9 – 10:45 am Seekers meet Tuesday April 23, 6:30 pm for ‘teatime’ and study. Lynwood Park Lodge: Wednesday, May 15 – 11 am Musical Rehearsal: April 25th at 6:30pm; 6pm for costumes Harmer House: Wednesday, May 29 – 10 am Upcoming Worship Services: What is Oberammergau Passion Play? Seasons of Lent and Eastertide Sermon Series - What Would Jesus Do? Oberammergau Passion Play is a one-of-a-kind theatrical experience that April 28: First Sunday after Easter / Celebration of Baptism / Congregational is performed once every ten years. This exceptional event involves Photo Sunday (Theme: Welcome Spring! Wear green or pastel coloured thousands of villagers from Oberammergau to re-enact the passion of tops) / Sermon Focus: “Witness and Truth” (Acts 5:27-32) Jesus Christ from Palm Sunday to the story of Easter.
    [Show full text]
  • CSS Brochure
    Western Ottawa Community Resource Centre Community Support Services Services available to you in Stittsville, Kanata and Nepean Contact us! 613-591-3686 Option 3 wocrc.community BRINGING CARE supportservices.ca &COMMUNITY TOGETHER [email protected] COMMUNITY SUPPORT SERVICES Our Community Support Services are available to seniors aged 55+ and adults with a physical disability living in the communities of Kanata, Stittsville, Nepean and West Carleton. 613-591-2501 Community Support Services are for individuals who need support to function independently at home, because of a disability, illness or limitation due to aging. Also known as home and community care, these services help individuals live at home and keep connected with their community. facebook.com/ Community Support Services are based on guiding beliefs that value WOCRC.CRCOO empowerment, equity, partnership and innovation. This is translated into meaningful, caring and personalized service, in order to enhance self-esteem and promote independence at home. @WOCRC_CRCOO Eligibility criteria may apply. These services are provided by volunteers and paid workers who have been screened (including a police record check for the vulnerable sector). All are trained by staff at the Western Ottawa Community Resource Centre. wocrc.ca The WOCRC tries to accommodate all requests for service; however this depends on the availability of volunteers and paid workers. For further information or to access these services, please call 613-591-3686 and choose option 3. If you live outside of Kanata, Nepean or West Carleton, please use Caredove (https://www.caredove.com/champlaincss) to find the nearest providers of 2 MacNeil Court these services. Kanata, ON K2L 4H7 Updated March 2019 BN: 12821 9201 RR 0001 Services Available 613-591-3686, option 3 Financial subsidy may be available for any of the services.
    [Show full text]
  • September 2020 Update
    September 2020 Update Transportation Services Department FEDCo September 1, 20201 2 O-Train South Design Progress • The following submissions have been Issued-For- Construction: – Structures throughout the alignment including Rail Bridges at Airport Parkway, Uplands, Leitrim, Bowesville, Earl Armstrong and Lester; and, – Utility Relocations throughout the alignment. 3 O-Train South Design Progress • The City has received construction drawings of the following project elements: – Airport Station; – Guideway for the Airport Link; and, – Structures throughout the alignment including High Road MUP Bridge, Limebank Road Elevated Guideway, Airport Elevated Guideway, VIA Grade Separation, Rideau River Pedestrian Bridge. 4 O-Train South Design Progress • The City has received final design drawings of the following project elements: – Guideway for the South Extension to Limebank; – Guideway for the existing portion of the line; – Landscape design for the existing line and Airport Link; – Dow’s Lake Tunnel, including Tunnel Ventilation; and – Vehicle elements, including the driver’s cab, interior layout and HVAC System. 5 O-Train South Design Progress • The City has received pre-final design drawings of the following project elements: – Walkley Yard Maintenance and Storage Facility (MSF); – Operational Modelling for the Overall System and the MSF; – Signaling and Train Control System; – Greenboro, Carleton, Mooney’s Bay, Gladstone and Walkley Stations; and, – Communication Systems designs for Greenboro and Carleton Stations and interface control documents for several subsystems on the project. 6 O-Train South Construction Progress • Rock excavation started on Gladstone Station; • Walkley Maintenance and Storage Facility structure construction has commenced; • Work has commenced at Ellwood Diamond grade separation. Caisson construction is underway; • Work has begun on Carleton south MUP; and, • Commenced work at South Keys and Bowesville Stations.
    [Show full text]
  • Report Template
    1 Report to/Rapport au : Transportation Committee Comité des transports and Council / et au Conseil November 7, 2013 7 novembre 2013 Submitted by/Soumis par : Nancy Schepers, Deputy City Manager/Directrice municipale adjointe, Planning and Infrastructure/Urbanisme et Infrastructure Contact Person / Personne ressource: Vivi Chi, Manager/Gestionnaire, Transportation Planning/Planification des transports, Planning and Growth Management/Urbanisme et Gestion de la croissance (613) 580-2424 x 21877, [email protected] CITY WIDE / À L'ÉCHELLE DE LA VILLE Ref N°: ACS2013-PAI-PGM-0230 SUBJECT: TRANSPORTATION MASTER PLAN, OTTAWA PEDESTRIAN PLAN AND OTTAWA CYCLING PLAN UPDATE – ADDENDUM REPORT OBJET : PLAN DIRECTEUR DES TRANSPORTS, PLAN DE LA CIRCULATION PIÉTONNIÈRE D’OTTAWA ET PLAN SUR LE CYCLISME D’OTTAWA – ADDENDA REPORT RECOMMENDATION That Transportation Committee recommend Council approve the recommended changes identified in this report (Table 1) to the draft Transportation Master Plan, Ottawa Pedestrian Plan and Ottawa Cycling Plan that was tabled on October 9, 2013 at the Joint Transportation Committee and Transit Commission meeting. RECOMMANDATION DU RAPPORT Que le Comité des transports recommande au Conseil d’approuver les modifications recommandées et précisées dans le présent rapport (tableau 1) pour la version provisoire du Plan directeur des transports, le Plan de la circulation piétonnière d’Ottawa et le Plan sur le cyclisme d’Ottawa qui ont été déposé le 9 octobre 2013 lors de la réunion conjointe du Comité des transports et de la Commission du transport en commun. 2 EXECUTIVE SUMMARY Assumptions and Analysis This is an addendum to the October 9, 2013 joint Transportation Committee and Transit Commission staff report (ACS2013-PAI-PGM-0193) to summarize the consultation feedback and proposed changes following the tabling and public release of the draft 2013 Transportation Master Plan (TMP), Ottawa Pedestrian Plan (OPP) and Ottawa Cycling Plan (OCP).
    [Show full text]
  • The United Church of Canada Synode Montreal and Ottawa Conference
    THE UNITED CHURCH OF CANADA SYNODE MONTREAL AND OTTAWA CONFERENCE PROFILE 1: DEMOGRAPHIC, FINANCIAL AND COMMUNITY Purpose: To provide information about the Mission Unit/Pastoral Charge to prospective applicants. PART A: ABOUT OUR PEOPLE: (Multi-point Pastoral Charges: please complete a profile for each congregation/mission unit) Number of congregations: X1 ☐2 ☐3 ☐N/A (e.g. Outreach Ministries) Congregation: Barrhaven United Church 180-190 households (2016) 125-130 fall/winter; 30-50 summer (Name of Congregation) (No. on roll) (Average Sunday attendance) We think of ourselves mainly as: ☐Rural☐Remote ☐Small town X Suburban ☐Urban ☐Inner City ☐Other__________ Most of us live (check only one): ☐ in an apartment X 1- in single-family homes ☐in retirement homes ☐in long-term care homes ☐on working farms ☐on rural retirement properties ☐ in low income or rent-to-income housing The rest of us live (check all that apply): X 4-in apartments X 1-in single-family homes X 2-in retirement homes X 5-in long-term care homes ☐on working farms ☐on rural retirement properties X 3- in low income or rent-to-income housing ************************************************************************ PART B: ABOUT OUR PASTORAL CHARGE: The congregation of Barrhaven United Church (BUC) includes the following demographic groups based on the church’s current list of Active BUC Members and Adherents. We have added to this data the name and age categories of the dependents of the members/adherents that are currently active in the life and work of BUC. BUC Active Infant/
    [Show full text]
  • Transit Support Division 2009 Operational Plan
    Network Optimization Final Recommendations Media Briefing April 13, 2011 1 Setting the Stage • On March 23rd we released a draft network optimization proposal designed to achieve $19.5M in annual savings for public input • The public consultation process gave us the valuable customer feedback that has helped us come back with a refined system proposal that better serves the needs of our customers • As a result, over 2/3 of the draft proposal was improved based on this feedback • These recommendations address key issues that were raised during the consultation period while still allowing us to achieve the designated savings of $19.5M annually through network optimization 2 Budget Context • Council approved 2011 Budget, which directed Transit Services to achieve $22M in annualized savings • The 2011 Budget includes free service to seniors Mondays and Fridays from noon onward, continuation of free Wednesdays for seniors and of the U-Pass program, and freezes Community Pass rates at current prices • If network changes are not implemented, our public transit system will demand a property tax increase of at least 5% by 2016 – this represents an additional $145M tax pressure for residents • The 2011 Budget builds on $21M in previous efficiency savings achieved by OC Transpo since 2008 3 Budget Context • Total savings to be realized in 2011 - $7.3M. Total savings on an annualized basis going forward are $22M • Saving of $19.5M annually and $6.5M in 2011 will be achieved as a result of “network optimization” • Savings of $750K will be achieved through internal efficiencies in 2011 • Savings of $2.5M will be realized in 2012 as a result of the purchase of double-decker buses.
    [Show full text]