World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document Report No. 89109-IN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized July 1, 2014 Public Disclosure Authorized The Inspection Panel In Memoriam Alf Morten Jerve (1953 – 2014) The Inspection Panel Acknowledgements The preparation of this Report would not have been possible without the support and valuable contributions of many people. The Panel wishes to thank the Requesters and the communities in Uttarakhand who met with the Panel in the Project area and welcomed them into their villages. The Panel expresses its appreciation to the many government officials in India with whom the Panel met. They provided valuable insights and information. The Panel also conveys its appreciation to the staff of Tehri Hydro Development Corporation (THDC) India Limited for spending time in Chamoli and in Rishikesh with the Panel team thereby facilitating a better understanding of the Project. The Panel also wishes to thank the World Bank Staff in Washington D.C. and in the India Country Office for assisting with logistical arrangements, providing documents, and responding to requests for information. Similarly, the Panel extends its thanks to the members of civil society organizations working in India who met with the Panel, generously gave their time, and provided valuable insights. The Panel is grateful for the expert advice provided by its consultants Malavika Chauhan, Dipak Gyawali, A.K. (Dunu) Roy, and Richard Fuggle and appreciates the objective judgment and professionalism they exhibited at all times. The Panel would also like to thank its interpreter/translator Nidhi Agarwal for the excellent support she provided throughout, especially during the field visits. The Panel wishes to express its deepest gratitude to the late Alf Jerve, former Panel member and lead inspector during the first phase of the investigation, for his guidance, support, and tireless efforts in fulfilling the Panel’s mandate and function. Special appreciation also goes to Panel member Zeinab Elbakri who competently and efficiently took over the reins of the investigation midway. Finally, the Panel wishes to convey its gratitude and appreciation to the members of its Secretariat for their professionalism in processing this investigation. i Abbreviations, Acronyms, and Terms ADB Asian Development Bank AHEC Alternate Hydro Energy Centre BP Bank Procedures BPL Below Poverty Line CES Consulting Engineering Services (India) Private Limited Cumec Cubic Meter Per Second DHI Danish Hydraulic Institute DO Dissolved Oxygen EA Environmental Assessment E-flow Environmental Flow EFR Environmental Flow Requirement EIA Environmental Impact Assessment EMP Environmental Management Plan FDC Flow Duration Curve GHG Greenhouse Gas GOI Government of India GRC Grievance Redress Committee Ha. Hectare HEP Hydro Electric Project HIV/AIDS Human Immunodeficiency Virus Infection/Acquired Immunodeficiency Syndrome HRT Head Race Tunnel IBRD International Bank for Reconstruction and Development ICIMOD International Centre for Integrated Mountain Development IDA International Development Association IIT-R Indian Institute of Technology-Roorkee IMG Inter-Ministerial Group INR Indian Rupee IPN Inspection Panel kWh kilowatt-hour MoEF Ministry of Environment and Forests MR Management Response MW Megawatt NGO Non-Governmental Organization NGRBA National Ganga River Basin Authority NRRP National Resettlement & Rehabilitation Policy (2007) OMS Operational Manual Statement OP Operational Policy PAA Project Affected Area PAD Project Appraisal Document PAF Project Affected Family PAP Project Affected Person PIA Project Influence Area PIAA Project Immediate Affected Area ii R&R Resettlement and Rehabilitation RAP Rehabilitation Action Plan/Resettlement Action Plan1 REA Regional Environment Assessment SBMA Sri Bhubaneshwari Mahila Ashram SEA Sectoral Environmental Assessment SHG Self-help Group SIA Social Impact Assessment TBM Tunnel Boring Machine THDC Tehri Hydro Development Corporation Limited TRT Tail Race Tunnel VDAC Village Development Advisory Committee VPHEP Vishnugad Pipalkoti Hydro Electric Project WB World Bank WII Wildlife Institute of India 1 The RAP has 5 volumes that are alternatively titled Resettlement Action Plan (volumes 1& 4 which are executive summaries of the main document), and Rehabilitation Action Plan (volumes 2 & 5 which are the main documents). iii Table of Contents Acknowledgements .......................................................................................................................... i Abbreviations, Acronyms, and Terms ............................................................................................ ii Table of Contents ........................................................................................................................... iv Executive Summary ...................................................................................................................... vii Chapter 1: Introduction and Background ...................................................................................... 1 A. Organization of the Report ..................................................................................................... 1 B. Issues raised in the Request for Inspection and Management Response ............................... 2 C. Additional Issues raised during Panel Eligibility Visit .......................................................... 6 D. Description of the Project and its Context ............................................................................. 6 E. Panel process ........................................................................................................................ 12 Chapter 2: The claim that the Project will contribute to regional and cumulative impacts that have not been adequately assessed and addressed ........................................................................ 14 A. Introduction .......................................................................................................................... 14 B. Cumulative impacts of multiple dams on the Alaknanda .................................................... 15 1. Requesters Claims and Management Response ......................................................... 15 2. Panel observations and analysis ................................................................................. 21 2.1 Link between the Project and harm or potential harm ................................................ 21 2.2 Assessment of the issues in Project and other documents .......................................... 24 2.3 Relevant provisions in Bank policy ............................................................................ 35 3. Panel findings – Assessment of Cumulative Environmental and Cultural Impacts ... 36 Chapter 3: Claim that Project is likely to cause serious adverse local environmental impact .... 39 A. Introduction .......................................................................................................................... 39 B. The risk to village water sources from blasting and tunneling ............................................ 39 1. Requesters’ claims and Management Response ......................................................... 39 2. Panel Observations and Analysis ............................................................................... 40 2.1 Link between the Project and the harm or potential harm .......................................... 40 2.2 Relevant provisions of Bank policy ............................................................................ 42 2.3 Assessment of the issues in Project documents .......................................................... 42 2.4 Mitigation measures introduced and Bank supervision .............................................. 49 3. Panel findings on issues of policy compliance and harm ........................................... 50 C. Risks relating to structures, landslides, and earthquakes ..................................................... 51 1. Requesters’ claims and Management Response ......................................................... 51 iv 2. Panel Observations and Analysis ............................................................................... 52 2.1 Link between the Project and the harm or potential harm .......................................... 52 2.2 Relevant provisions in Bank policy ............................................................................ 55 2.3 Assessment of the issues in Project documents .......................................................... 55 2.4 Mitigation measures offered under the Project ........................................................... 57 3. Panel findings on issues of policy compliance and harm ........................................... 58 D. Risk to aquatic life and ecology from altered flow and sediment release ........................... 59 1. Requesters’ claims and Management Response ......................................................... 59 2. Panel observations and analysis ................................................................................. 60 2.1 Link between the Project and the harm or potential harm .......................................... 60 2.2 Relevant provisions in Bank policy ............................................................................ 62 2.3 Assessment of the issues in Project documents .......................................................... 62 2.4 Mitigation measures introduced and Bank
Recommended publications
  • The Alaknanda Basin (Uttarakhand Himalaya): a Study on Enhancing and Diversifying Livelihood Options in an Ecologically Fragile Mountain Terrain”
    Enhancing and Diversifying Livelihood Options ICSSR PDF A Final Report On “The Alaknanda Basin (Uttarakhand Himalaya): A Study on Enhancing and Diversifying Livelihood Options in an Ecologically Fragile Mountain Terrain” Under the Scheme of General Fellowship Submitted to Indian Council of Social Science Research Aruna Asaf Ali Marg JNU Institutional Area New Delhi By Vishwambhar Prasad Sati, Ph. D. General Fellow, ICSSR, New Delhi Department of Geography HNB Garhwal University Srinagar Garhwal, Uttarakhand E-mail: [email protected] Vishwambhar Prasad Sati 1 Enhancing and Diversifying Livelihood Options ICSSR PDF ABBREVIATIONS • AEZ- Agri Export Zones • APEDA- Agriculture and Processed food products Development Authority • ARB- Alaknanda River Basin • BDF- Bhararisen Dairy Farm • CDPCUL- Chamoli District Dairy Production Cooperative Union Limited • FAO- Food and Agricultural Organization • FDA- Forest Development Agency • GBPIHED- Govind Ballabh Pant Institute of Himalayan Environment and Development • H and MP- Herbs and Medicinal Plants • HAPPRC- High Altitude Plant Physiology Center • HDR- Human Development Report • HDRI- Herbal Research and Development Institute • HMS- Himalayan Mountain System • ICAR- Indian Council of Agricultural Research • ICIMOD- International Center of Integrated Mountain and Development • ICSSR- Indian Council of Social Science Research LSI- Livelihood Sustainability Index • IDD- Iodine Deficiency Disorder • IMDP- Intensive Mini Dairy Project • JMS- Journal of Mountain Science • MPCA- Medicinal Plant
    [Show full text]
  • How Do They Add to the Disaster Potential in Uttarakhand?
    South Asia Network on Dams, Rivers and People Uttarakhand: Existing, under construction and proposed Hydropower Projects: How do they add to the disaster potential in Uttarakhand? As Uttarakhand faced unprecedented flood disaster and as the issue of contribution of hydropower projects in this disaster was debated, one question for which there was no clear answer is, how many hydropower projects are there in various river basins of Uttarakhand? How many of them are operating hydropower projects, how many are under construction and how many more are planned? How projects are large (over 25 MW installed capacity), small (1-25 MW) and mini-mirco (less than 1 MW installed capacity) in various basins at various stages. This document tries to give a picture of the status of various hydropower projects in various sub basins in Uttarakhand, giving a break up of projects at various stages. River Basins in Uttarakhand Entire Uttarakhand is Uttarakhand has 98 operating hydropower part of larger Ganga basin. The Ganga River is a projects (all sizes) with combined capacity trans-boundary river of India and Bangladesh. The close to 3600 MW. However, out of this 2,525 km long river rises in the western Himalayas capacity, about 1800 MW is in central sector in the Indian state of Uttarakhand, and flows south and 503 MW in private sector, making it and east through the Gangetic Plain of North India into Bangladesh, where it empties into the Bay of uncertain how much power from these Bengal. The Ganga begins at the confluence of the projects the state will get.
    [Show full text]
  • Recent and Past Floods in the Alaknanda Valley: Causes and Consequences
    COMMENTARY Recent and past floods in the Alaknanda valley: causes and consequences Naresh Rana, Sunil Singh, Y. P. Sundriyal and Navin Juyal Uttarakhand Himalaya in general and wide at the summit1,2. It was estimated (district surveyor of Garhwal), helped to Alaknanda and Bhagirathi valleys in par- that the lake would have taken at least a meticulously estimate the magnitude of ticular have experienced one of the worst year to fill. The dam would partially downstream inundation. An excellent forms of disaster in recent times (Figure breach only after the water began to top- telegraph system was installed between 1). Flash floods are common in the ple it, which would cause flash floods Birahi Ganga and Haridwar for real-time Himalaya, but the kind of destruction in the downstream till Haridwar. The monitoring and timely warning of the witnessed this time was unparalleled in untiring efforts of Pulford, the then flood. Around May 1894, pilgrim traffic recent history. Houses collapsed like a superintending engineer and his team, on the way to Kedarnath and Badrinath pack of cards and the roads and bridges particularly Pandit Hari Krishen Pant was diverted to the new pedestrian route swept away in the turbulent flood waters. Probably the worst causality of the cen- tury was the destruction of Kedarnath valley. According to the data published in various national dailies, nearly 4000 people were either killed or lost, 2232 houses were damaged, 1520 roads in dif- ferent parts of Garhwal were badly dam- aged and about 170 bridges have been washed away. According to economists, the tourism industry in Uttarakhand will suffer a loss of ~12,000 crore rupees, which is around 30% of the state’s GDP.
    [Show full text]
  • Monitoring and Evaluation of River Ganga System in Himalayan Region with Reference to Limnological Aspects
    World Applied Sciences Journal 33 (2): 203-212, 2015 ISSN 1818-4952 © IDOSI Publications, 2015 DOI: 10.5829/idosi.wasj.2015.33.02.72 Monitoring and Evaluation of River Ganga System in Himalayan Region with Reference to Limnological Aspects 12Gagan Matta and Ajendra Kumar 1Department of Zoology and Environmental Science, Gurukula Kangri University, Haridwar, India 2Department of Mathematics and Statistics, Gurukula Kangri University, Haridwar, India Abstract: Water is an important asset for every developing country especially the river water which is the prime source for drinking water. The Ganges, one of the largest river system of Indian subcontinent is being severely polluted by mass bathing, sewage treatment plants, factory effluents and various other human activities. In Haridwar River Ganga System comprising of River Ganga and Ganga Canal emerging out from Ganga River, both with great ritual importance among pilgrims and tourists at Haridwar, Uttarakhand, India. Here also Ganga River and Canal are day by day getting polluted due to mass bathing, washing, disposal of sewage, industrial waste and these human activities deteriorating its water quality severely. River water samples collected in all the seasons of the years 2013 and 2014 were analyzed for various water quality characteristics. Data has statistically been analysed indicating positive and negative relation among parameters. The present study revealed that major factors contributing to deterioration of water quality might be continues discharge of industrial discharge, tourism, anthropogenic and spiritual practices. Therefore, to restore the vitality and water quality of river, proper water resource planning programme should be developed. Key words: River Ganga System River Ganga Haridwar Ganga Canal Water Quality Himalayas INTRODUCTION in 1947, India had 22 million ha under irrigation.
    [Show full text]
  • LIST of INDIAN CITIES on RIVERS (India)
    List of important cities on river (India) The following is a list of the cities in India through which major rivers flow. S.No. City River State 1 Gangakhed Godavari Maharashtra 2 Agra Yamuna Uttar Pradesh 3 Ahmedabad Sabarmati Gujarat 4 At the confluence of Ganga, Yamuna and Allahabad Uttar Pradesh Saraswati 5 Ayodhya Sarayu Uttar Pradesh 6 Badrinath Alaknanda Uttarakhand 7 Banki Mahanadi Odisha 8 Cuttack Mahanadi Odisha 9 Baranagar Ganges West Bengal 10 Brahmapur Rushikulya Odisha 11 Chhatrapur Rushikulya Odisha 12 Bhagalpur Ganges Bihar 13 Kolkata Hooghly West Bengal 14 Cuttack Mahanadi Odisha 15 New Delhi Yamuna Delhi 16 Dibrugarh Brahmaputra Assam 17 Deesa Banas Gujarat 18 Ferozpur Sutlej Punjab 19 Guwahati Brahmaputra Assam 20 Haridwar Ganges Uttarakhand 21 Hyderabad Musi Telangana 22 Jabalpur Narmada Madhya Pradesh 23 Kanpur Ganges Uttar Pradesh 24 Kota Chambal Rajasthan 25 Jammu Tawi Jammu & Kashmir 26 Jaunpur Gomti Uttar Pradesh 27 Patna Ganges Bihar 28 Rajahmundry Godavari Andhra Pradesh 29 Srinagar Jhelum Jammu & Kashmir 30 Surat Tapi Gujarat 31 Varanasi Ganges Uttar Pradesh 32 Vijayawada Krishna Andhra Pradesh 33 Vadodara Vishwamitri Gujarat 1 Source – Wikipedia S.No. City River State 34 Mathura Yamuna Uttar Pradesh 35 Modasa Mazum Gujarat 36 Mirzapur Ganga Uttar Pradesh 37 Morbi Machchu Gujarat 38 Auraiya Yamuna Uttar Pradesh 39 Etawah Yamuna Uttar Pradesh 40 Bangalore Vrishabhavathi Karnataka 41 Farrukhabad Ganges Uttar Pradesh 42 Rangpo Teesta Sikkim 43 Rajkot Aji Gujarat 44 Gaya Falgu (Neeranjana) Bihar 45 Fatehgarh Ganges
    [Show full text]
  • Floral and Faunal Diversity in Alaknanda River Mana to Devprayag
    Report Code: 033_GBP_IIT_ENB_DAT_11_Ver 1_Jun 2012 Floral and Faunal Diversity in Alaknanda River Mana to Devprayag GRBMP : Ganga River Basin Management Plan by Indian Institutes of Technology IIT IIT IIT IIT IIT IIT IIT Bombay Delhi Guwahati Kanpur Kharagpur Madras Roorkee Report Code: 033_GBP_IIT_ENB_DAT_11_Ver 1_Jun 2012 2 | P a g e Report Code: 033_GBP_IIT_ENB_DAT_11_Ver 1_Jun 2012 Preface In exercise of the powers conferred by sub-sections (1) and (3) of Section 3 of the Environment (Protection) Act, 1986 (29 of 1986), the Central Government has constituted National Ganga River Basin Authority (NGRBA) as a planning, financing, monitoring and coordinating authority for strengthening the collective efforts of the Central and State Government for effective abatement of pollution and conservation of the river Ganga. One of the important functions of the NGRBA is to prepare and implement a Ganga River Basin Management Plan (GRBMP). A Consortium of 7 Indian Institute of Technology (IIT) has been given the responsibility of preparing Ganga River Basin Management Plan (GRBMP) by the Ministry of Environment and Forests (MoEF), GOI, New Delhi. Memorandum of Agreement (MoA) has been signed between 7 IITs (Bombay, Delhi, Guwahati, Kanpur, Kharagpur, Madras and Roorkee) and MoEF for this purpose on July 6, 2010. This report is one of the many reports prepared by IITs to describe the strategy, information, methodology, analysis and suggestions and recommendations in developing Ganga River Basin Management Plan (GRBMP). The overall Frame Work for documentation of GRBMP and Indexing of Reports is presented on the inside cover page. There are two aspects to the development of GRBMP. Dedicated people spent hours discussing concerns, issues and potential solutions to problems.
    [Show full text]
  • Ganga River Basin Management Plan Interim Report Anga River Basin
    Ganga River Basin Management Plan Interim Report September 2013 by Consortium of 7 “Indian Institute of Technology”s (IITs) IIT IIT IIT IIT IIT IIT IIT Bombay Delhi Guwahati Kanpur Kharagpur Madras Roorkee In Collaboration with IIT NIH CIFRI NEERI JNU PU NIT-K DU BHU ISI Allahabad WWF Kolkata University India • ii • Preface In exercise of the powers conferred by sub-sections (1) and (3) of Section 3 of the Environment (Protection) Act, 1986 (29 of 1986), the Central Government constituted the National Ganga River Basin Authority (NGRBA) as a planning, financing, monitoring and coordinating authority for strengthening the collective efforts of the Central and State Governments for effective abatement of pollution and conservation of the Ganga river. One of the important functions of the NGRBA is to prepare and implement a Ganga River Basin Management Plan (GRBMP). A Consortium of 7 “Indian Institute of Technology”s (IITs) was given the responsibility of preparing the GRBMP by the Ministry of Environment and Forests (MoEF), GOI, New Delhi. A Memorandum of Agreement (MoA) was signed between 7 IITs (Bombay, Delhi, Guwahati, Kanpur, Kharagpur, Madras and Roorkee) and MoEF for this purpose on July 6, 2010. This is the Interim “Ganga River Basin Management Plan”. The thrust of this Plan is to relate the diverse environmental degradations occurring in the basin with their causal factors, and thereby frame a roadmap for redeeming National River Ganga Basin’s Environment. The task involved different thematic groups of experts from 7 IITs and other premier organizations identifying different causal factors and assessing their impacts on the basin to synthesize the findings and recommendations in fulfillment of the important missions identified in the Plan.
    [Show full text]
  • National Ganga River Basin Authority (Ngrba)
    NATIONAL GANGA RIVER BASIN AUTHORITY (NGRBA) Public Disclosure Authorized (Ministry of Environment and Forests, Government of India) Public Disclosure Authorized Environmental and Social Management Framework (ESMF) Public Disclosure Authorized Volume I - Environmental and Social Analysis March 2011 Prepared by Public Disclosure Authorized The Energy and Resources Institute New Delhi i Table of Contents Executive Summary List of Tables ............................................................................................................... iv Chapter 1 National Ganga River Basin Project ....................................................... 6 1.1 Introduction .................................................................................................. 6 1.2 Ganga Clean up Initiatives ........................................................................... 6 1.3 The Ganga River Basin Project.................................................................... 7 1.4 Project Components ..................................................................................... 8 1.4.1.1 Objective ...................................................................................................... 8 1.4.1.2 Sub Component A: NGRBA Operationalization & Program Management 9 1.4.1.3 Sub component B: Technical Assistance for ULB Service Provider .......... 9 1.4.1.4 Sub-component C: Technical Assistance for Environmental Regulator ... 10 1.4.2.1 Objective ...................................................................................................
    [Show full text]
  • Uttarakhand Flash Flood
    Uttarakhand Flash Flood drishtiias.com/printpdf/uttarakhand-flash-flood Why in News Recently, a glacial break in the Tapovan-Reni area of Chamoli District of Uttarakhand led to massive Flash Flood in Dhauli Ganga and Alaknanda Rivers, damaging houses and the nearby Rishiganga power project. In June 2013, flash floods in Uttarakhand wiped out settlements and took lives. Key Points Cause of Flash Flood in Uttarakhand: It occurred in river Rishi Ganga due to the falling of a portion of Nanda Devi glacier in the river which exponentially increased the volume of water. Rishiganga meets Dhauli Ganga near Raini. So Dhauli Ganga also got flooded. Major Power Projects Affected: Rishi Ganga Power Project: It is a privately owned 130MW project. Tapovan Vishnugad Hydropower Project on the Dhauliganga: It was a 520 MW run-of-river hydroelectric project being constructed on Dhauliganga River. Several other projects on the Alaknanda and Bhagirathi river basins in northwestern Uttarakhand have also been impacted by the flood. 1/4 Flash Floods: About: These are sudden surges in water levels generally during or following an intense spell of rain. These are highly localised events of short duration with a very high peak and usually have less than six hours between the occurrence of the rainfall and peak flood. The flood situation worsens in the presence of choked drainage lines or encroachments obstructing the natural flow of water. Causes: It may be caused by heavy rain associated with a severe thunderstorm, hurricane, tropical storm, or meltwater from ice or snow flowing over ice sheets or snowfields. Flash Floods can also occur due to Dam or Levee Breaks, and/or Mudslides (Debris Flow).
    [Show full text]
  • Introduction
    Chapter 1 Introduction Our Planet Earth is unique among other planets of the solar system in the presence of water that has made it possible for the life – in its millions of forms - to exist on it. And the water occurs in great abundance – an estimated 1386 million km3 of which 96.54% resides in the oceans and another about one per cent is also saline (Shiklomanov 1993, Shiklomanov and Rodda 2003; see also Trenberth et al. 2007). Out of the remaining 2.5% that is fresh water, about 69% is frozen in glaciers, polar ice caps, snow and permafrost areas, and 30% is locked in deep aquifers. Lakes account for a total of 91,000 km3 of water but most of it resides in just a few large lakes. Marshes and wetlands hold about 11,500 km3 of water and the rivers have only a little more than 2000 km3. However, of greatest significance is the fact that water moves continually around, through and above the Earth and as it cycles through ocean, atmosphere, land and biota, continually changes its form between all physical states – liquid (water), gas (water vapour), and solid (snow and ice). It is noteworthy that the hydrological cycle and its importance were described in detail several thousand years ago in Rigveda, Puranas, Mahabharat and other Indian scriptures (see Jain et al. 2007). Estimates of global water budget of the hydrological cycle shows that annually about 45,000 km3 of water is transported from the oceans to land through the atmosphere (by evaporation from oceans and precipitation over land) and then returned back to the oceans as it flows mostly over the land surface in the rivers.
    [Show full text]
  • Melt Water Characteristics of Gangotri Glacier, Headwater of Ganga River Manohar Arora* & Jatin Malhotra National Institute of Hydrology, Roorkee, Uttarakhand, India
    Roorkee Water Conclave 2020 Melt Water Characteristics of Gangotri Glacier, Headwater of Ganga River Manohar Arora* & Jatin Malhotra National Institute of Hydrology, Roorkee, Uttarakhand, India Abstract: Behavior of glacier plays an important role in runoff delaying characteristics of the glacier. Changes in delaying characteristics of the runoff over the melt season can be understood by studying the variation in time to peak (tp) and time-lag (t1) between melt generation and its emergence as runoff. In this study, the runoff delaying characteristics of the Gangotri Glacier in the Garhwal Himalayas (glacierized area 286 km2; drainage area 556 km2) have been studied. For this purpose, hourly discharge and temperature data were monitored near the snout of the glacier for the entire ablation period (May-October, 2010). In the early stages of the ablation period, poor drainage network and stronger storage characteristics of the glaciers due to the presence of seasonal snow cover resulted in a much delayed response of melt water, providing a higher tl and tp. In the beginning of melt season, the night time flow is almost equal to day time flow, but in the later part of the melt season, night time flow is slightly lower than the day time flow. This analysis suggests that storage characteristics are much stronger in the early part of melt season and reduce as the melt season progresses. Keywords: Gangotri Glacier, Himalayas, Melt Season, Runoff Delay Characteristics, Storage Characteristics 1. Introduction Glaciers fed rivers provide much of the water supply in some parts of the world. All the major south Asian rivers originate in the Himalayan and their upper catchments are covered with snow and glaciers.
    [Show full text]
  • Microbiology ABSTRACT
    Research Paper Volume : 4 | Issue : 11 | November 2015 • ISSN No 2277 - 8179 Microbiology Assessment of Physico-Chemical Parameters of KEYWORDS : Temperature, pH, Dissolved Oxygen, Biological Oxygen Demand River Ganga and Its Tributaries in Uttarakhand Department of Microbiology, Himalayan University, Naharlagun, Itanagar, Arunachal Nidhi Singh Chauhan Pradesh Manjul Dhiman Department of Botany, KLDAV PG College, Roorkee ABSTRACT Water quality assessment conducted in the tributaries of Ganga River in the year 2012 and 2013 identified hu- man activities as the main sources of pollution. For the study three tributaries of river Ganga in Uttarakhand were chosen i.e. Alaknanda (A), Bhagirathi (B) and Ganga (G). Water samples were collected from five sampling stations on river Alaknanda viz. Devprayag (A1), Rudraprayag (A2), Karnaprayag (A3), Chamoli (A4) and Vishnuprayag (A5), only one sampling station on Bhagirathi near residential area at Devprayag (B), two sampling station on river Ganga viz. Har ki pauri (G1) and Rishikesh (G2). The samples were analysed for physical and chemical parameters using standard methods. The sample temperatures ranged from 7.7 –18.3 0C. Summer maxima and winter minima were observed at all the sites of sampling stations (A, B and G). pH ranged from 7.4 - 8.2, DO ranged from 7 – 8.61 mg/l and BOD ranged from 0.2 – 1.9 mg/l. All samples showed permissible limit except samples from Harki pauri and Rishikesh on river Ganga. INTRODUCTION initiate biochemical reactions. These biochemical reactions are Rivers have been used by man since the dawn of civilization as measured as BOD and COD in laboratory (Tchobanoglous et al., a source of water, for food, for transport, as a defensive barrier, 2003).
    [Show full text]