Methods to Estimate Railway Capacity and Passenger Delays

Total Page:16

File Type:pdf, Size:1020Kb

Methods to Estimate Railway Capacity and Passenger Delays Downloaded from orbit.dtu.dk on: Dec 17, 2017 Methods to estimate railway capacity and passenger delays Landex, Alex; Kaas, Anders H.; Nielsen, Otto Anker Publication date: 2008 Document Version Publisher's PDF, also known as Version of record Link back to DTU Orbit Citation (APA): Landex, A., Kaas, A. H., & Nielsen, O. A. (2008). Methods to estimate railway capacity and passenger delays. Kgs. Lyngby, Denmark: Technical University of Denmark (DTU). General rights Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. • Users may download and print one copy of any publication from the public portal for the purpose of private study or research. • You may not further distribute the material or use it for any profit-making activity or commercial gain • You may freely distribute the URL identifying the publication in the public portal If you believe that this document breaches copyright please contact us providing details, and we will remove access to the work immediately and investigate your claim. Methods to estimate railway capacity and passenger Infrastructure delays 100% 95,4% 95,4% 92,7% 90,6% 90,3% 91,4% 86,8% 90% 84,0% 85,0% 80,5% Alex Landex 80% 70% 60% 50% EltiEvaluation PhD thesis 40% 30% 22,5% 22,5% 19,6% 20% 15,7% 17,3% Timetable 10% November 2008 0% Morning Day Afternoon Other time Total Train regularity [%] Passenger regularity [%] Arrivals before time [%] Passenger delay model Simu la tion UIC 406 capacity analysis Methods to estimate railway capacity and passenger delays PhD thesis Alex Landex Technical University of Denmark Department of Transport Supervisor: Professor Otto Anker Nielsen Technical University of Denmark Department of Transport Co-supervisor: External lecturer Anders H. Kaas Atkins Danmark A/S & Technical University of Denmark Department of Transport November 2008 Preface This PhD thesis is the result of research work at the Department of Transport at the Technical University of Denmark. I started working in this department in 2003 when I worked on research projects and taught courses in Rail Traffic Engineering, Public Transport Planning and ArcGIS and Traffic Planning. One year later, I started this project on “Methods to estimate railway capacity and passenger delays”. The work was conducted on a ¾ time basis to allow me to continue teaching the courses in Rail Traffic Engineering and Public Transport Planning. Writing this thesis has been a lot of hard work, but it has also been a lot of fun, for most of the time. Railways are not only the topic of my thesis but have also been, and still are, a hot topic in the media: underinvestment in the railway network, reduced speed on the main railway lines, new IC4 trains not put into service and, above all, delays. When studying railway systems and, in my case, “Methods to estimate railway capacity and passenger delays”, there is always something to talk about at parties! Despite the fact that a PhD thesis does not get finished during social chats, there is no chance of finishing the job without other people. In fact, the summary below is just an attempt to cover the people and organizations whose inputs have been truly indispensable for completing my dissertation. First of all, I would like to thank my co-supervisor Anders H. Kaas, without his introductory course on railway systems I would never have started writing this thesis. Anders is also thanked for being there when I needed motivation, new ideas or a good academic and/or scientific discussion during the work on this thesis—also before he became co-supervisor. Professor Otto Anker Nielsen is also thanked for supervising the project. Bernd Schittenhelm was always ready for a good discussion about my work, and I enjoyed his provocative contributions and practical views on the subject. His proofreading of articles and the thesis has contributed to improving the output, and he has also given me many useful ideas for further research. I am happy that Bernd has now decided to become a PhD student himself, and I am looking forward to many new, rewarding discussions. My thanks to Rapidis Ltd, who coded the passenger delay model presented in this thesis. Also thanks to Rasmus Dyhr Frederiksen, Bjarke Brun and Philip Bagger from Rapidis Ltd and Stephen Hansen from DTU Transport (now Rapidis Ltd), who assisted in making the (different versions of) the 3rd generation passenger delay model work together with RailSys. The project has given rise to a series of articles and academic discussions. I thank all involved, both the people and the organizations. In particular, I want to thank Rail Net Denmark (Banedanmark), the National Rail Authority (Trafikstyrelsen), the Danish State Railways (DSB), and my co-authors on the articles. Also, thanks to all the students on the course Rail Traffic Engineering and all the other persons who (deliberately or unwittingly) asked “tricky” questions about my work. This has been a source of inspiration and also a reminder to explain the sometimes tricky answers in a straightforward way. Things did not always go as planned. And it was in those cases that I was especially thankful to my good colleagues, my friends and my family for their tremendous support. Sten Hansen gave me excellent guidance and advice. He also had a knack of pointing me in the right direction to find the best solutions to get the project moving. Finally, thanks to all those other persons who assisted and supported me over the last four years. And a heartfelt thank you to the Technical Information Centre of Denmark (DTIC) for the invaluable help provided the last months of this project. Without this help, it would not have been possible to finalize this thesis. Alex Landex Kgs. Lyngby, November 2008 DTU Transport, Technical University of Denmark I II DTU Transport, Technical University of Denmark Summary CHAPTER 1 explains the importance of having knowledge about railway capacity and how, over time, it has become possible to operate more trains by improving the infrastructure and rolling stock. Additionally, the aim and structure of the thesis are outlined. CHAPTER 2 describes the difficulties of defining railway capacity, which depends on the infrastructure, the rolling stock and the actual timetable. In 2004, the International Union of Railways (UIC) published a leaflet giving a method to measure the capacity consumption of line sections based on the actual infrastructure and timetable (and thereby also the rolling stock used)—the UIC 406 capacity method. The UIC 406 capacity method can be used in an analytical way determining the capacity consumption as the sum of the occupation time, buffer time, and time supplements. This sum is then divided by the time window observed. In addition to the analytical way of determining the capacity consumption, capacity consumption can be measured by compressing the timetable graphs as much as possible for the line section and then using the compression ratio as a measurement of the capacity consumption. CHAPTER 3 shows how the UIC 406 method can be expounded in different ways. It is, therefore, important to divide the railway line into line sections of the “right” length. The thesis illustrates that it may be reasonable not to divide the railway lines into line sections at all locations as suggested in the UIC 406 capacity method. Not dividing the railway lines into line sections at overtakings may result in additional challenges when working out the capacity consumption. To handle overtakings in line sections, the thesis recommends maintaining the order of the trains (both before and after the overtaking) and allowing for changing the dwell time to the minimum dwelling time for exchange of passengers and/or the needed time for start moving (a freight train) after a complete halt. At crossing stations, line end stations, larger stations with shunting, and junctions, the thesis recommends that attention be paid to conflicting train paths. The crossing station’s lack of ability to handle parallel movement can reduce the capacity of the line section as the dwell time is extended. The line end stations can be limiting for the capacity because not all avoiding lines may be scheduled and/or the layover time is longer than needed. The thesis recommends dealing with this by reducing the layover time to a minimum and by using all possible avoiding tracks. Larger stations with shunting can be difficult to examine due to lack of knowledge of the exact shunting operation. Therefore, the thesis recommends that larger stations should be evaluated according to the published timetable and only the known shunting operations but with a higher quality factor or other time supplements to include the remaining shunting implicitly. At junctions and crossing stations, conflicting train routes can result in reduced capacity for some train paths. Accordingly, the thesis recommends extending the analysis area for crossing stations and junctions to include the entire crossing station and/or junction. For line sections with more than two tracks, the thesis illustrates that attention must be paid to the order of the trains at both the beginning and the end of the line section as otherwise there is a risk of additional overtakings occurring. Furthermore, more tracks can result in uneven capacity consumption. Accordingly, the thesis recommends allowing trains to change from one track to another if there is a large difference in the capacity consumption of the tracks. If tracks are located apart from each other it might be difficult to determine how many tracks a railway line comprises.
Recommended publications
  • People to Walk More
    MORE PEOPLE TO WALK MORE The Pedestrian strategy of Copenhagen 2 More People to Walk More... ... it’s healthy ... you protect the environment ... you contribute to a living city ... you get new ideas ... you discover more ... you meet other people ... it’s free 3 PREFACE We are all pedestrians – every day. Sometimes we’re just out for a walk, other times we have a specific goal in mind. Even when we take our bike or car, go by bus, train or metro the trip usually starts and ends on foot. Most of us can walk in the city with no problems, whereas some of us need a bit of help on our walk. If you use a walking stick, a walker, a wheelchair or something similar, then you’re particularly dependent on the pavements, roads and so on being easy to access. This, however, does not change the fact that we are all pedestrians. In Copenhagen, we are very keen to focus on pedestrians so we can achieve an even better city life for everybody even more healthy citizens and a better environment. It is essential for us to create an even more interesting, exciting and safe city. For this reason, I would like to introduce here one of the goals in the City of Copenha- gen’s proposal for city life entitled “Metropolis for People”: ”More People to Walk More”. The pedestrian strategy “ More People to Walk More” contains a number of proposals as to how Copenhagen can become an even better city for pedestrians, showing how to achieve the goal of 20 % more pedestrians by 2015.
    [Show full text]
  • Blad Efteraar.Indd
    Turcyklisten 3 2015 www.turcyklisterne.dk Turcyklisten 2015/ 3 1 Bladet Turcyklisten - er medlemsblad for foreningen Redaktør Turcyklisterne, der har til formål at Lone Belhage udbrede og formidle viden om og glæde [email protected] ved turcykkling på ethvert plan. Udkommer 4 gang årligt. Koordinator Finn A. Kristensen Klubben er åben for alle som deler tlf: 22 16 27 30 glæden ved at cykle. Så har vi vakt din interesse er du velkommen til at kikke Bestyrelse forbi på en klubaften eller at møde op til en af de annoncerede ture for at se hvad vi egentlig er for nogle. Se i øvrigt også: Formand Knud Hofgart WWW.TURCYKLISTERNE.DK tlf. 28 40 65 42 [email protected] Klublokale Sankt Annæ Gymnasium Kasserer Sjælør Boulevard 135 Flemming Nielsen Valby tlf. 43 64 49 03 Lokale B210 2sal Flemming.K.R.Nielsen@ mail.dk Kontigent 2015 Almindeligt kontigent: 275.- Husstands kontigent: 450.- Øvrige bestyrelsesmedlemmer Passivt kontigent: 100.- Aksel Koplev Indbetaling kan ske på giro: 5 713 846, tlf. 22 80 25 22 vælg korttype 01. [email protected] Eller via netbank, brug reg.nr: 1551 konto 5 713 846. Hjælp med at holde Lone Belhage medlemslisten aktuel. tlf. 24 80 46 87 Send ændringerne i adresse, tlf.nr, eller Erik Carlsen e-mail til kasseren. 41 23 35 07 Birgit Rudolf 1. suppleant 26 27 44 19 Bert Due Jensen 2. suppleant 26 67 63 35 2 Turcyklisten 2015 / 3 Turcyklisten 2015/ 3 Strøtanker om en træerne og høre fuglesangen, mens nogle af os pustede ud. Undervejs i tur for cyklister Santa Maria indtog vi kaffe eller øl.
    [Show full text]
  • Infrastrukturforbedringer På S-Banen - Tog Til Tiden
    Infrastrukturforbedringer på S-banen - tog til tiden Anders H. Kaas, [email protected] Atkins Danmark A/S Niels Wellendorf, [email protected] DSB S-tog 1. Indledning DSB S-tog har i de sidste mange år arbejdet hen imod, at indføre en ny køreplan med fuld ud- nyttelse af de nye S-tog, der nu er leveret til erstatning for de gamle tog fra 70’erne. For at kunne udnytte togenes højere hastighed og bedre acceleration og deceleration er store dele af infrastrukturen nu tilpasset og forbedret, bl.a. med højere hastighed på mange stræk- ninger. Hertil har Banedanmark anvendt omkring 1 mia. kr. over de sidste mange år. Hertil kommer en række yderligere projekter Banedanmark nu har igangsat for at sikre en for- nuftig regularitet for den nye køreplan, herunder en optimering af togfølgen i ”Røret”. Med den nye køreplan, der træder i kraft i august 2007 – når Banedanmark er helt klar med infrastrukturen, herunder den nye DIC-S – står DSB S-tog godt rustet til de kommende års drift. Figur 1: Linjekort, ny S-togskøreplan august 2007 Trafikdage på Aalborg Universitet 2006 1 Der er dog også behov for i de kommende år at udvide og udvikle driftstilbudet, herunder ger- ne med en ekstra linje. 2. Dagens driftssituation Det er ikke alene nye S-tog og dertil opgraderet infrastruktur, der gør det. Togene skal gerne køre til tiden hver dag, hvilket kræver at alle dele af infrastrukturen er gearet til at kunne klare de forsinkelser der af forskellige årsager altid vil opstå. Altså at infrastrukturen er indrettet på at kunne få togene frem til tiden, eller om nødvendigt at kunne sikre en hurtig genopretning af trafikken.
    [Show full text]
  • The Train Driver Recovery Problem – a Set Partitioning Based Model and Solution Method
    The Train Driver Recovery Problem – a Set Partitioning Based Model and Solution Method Natalia J. Rezanova Informatics and Mathematical Modelling, Technical University of Denmark Richard Petersens Plads 1, Building 305, DK-2800 Kgs. Lyngby, Denmark e-mail: [email protected] David M. Ryan The Department of Engineering Science, Faculty of Engineering The University of Auckland Private Bag 92019, Auckland Mail Centre, Auckland 1142, New Zealand e-mail: [email protected] IMM-TECHNICAL REPORT-2006-24 Abstract The need to recover a train driver schedule occurs during major disruptions in the daily railway operations. Using data from the train driver schedule of the Dan- ish passenger railway operator DSB S-tog A/S, a solution method to the Train Driver Recovery Problem (TDRP) is developed. The TDRP is formulated as a set partitioning problem. The LP relaxation of the set partitioning formulation of the TDRP possesses strong integer properties. The proposed model is there- fore solved via the LP relaxation and Branch & Price. Starting with a small set of drivers and train tasks assigned to the drivers within a certain time period, the LP relaxation of the set partitioning model is solved with column generation. If a feasible solution is not found, further drivers are gradually added to the prob- lem or the optimization time period is increased. Fractions are resolved with a constraint branching strategy using the depth-first search of the Branch & Bound tree. Preliminarily results are encouraging, showing that nearly all tested real-life instances produce integer solutions to the LP relaxation and solutions are found within a few seconds.
    [Show full text]
  • Regionplan 2005 Regionplan
    Regionplan 2005 Hovedstadens Udviklingsråd Gammel Køge Landevej 3 2500 Valby Telefon 36 13 14 00 www.hur.dk Som konsekvens af kommunalreformen nedlægges Hovedstadens Udviklingsråd pr. 31. december 2006. Regionplanopgaverne fordeles herefter mellem stat og kommuner bortset fra råstofplanlægning og deponering af forurenet jord, der overføres til de nye regioner. Regionplan 2005 for Hovedstadsregionen Visioner og hovedstruktur Retningslinjer og redegørelse Regionplan 2005 Visioner og hovedstruktur For Hovedstadsregionen Retningslinjer og redegørelse Redaktion og Hovedstadens Udviklingsråd grafi sk tilrettelæggelse Plandivisionen Omslag IdentityPeople | PeopleGroup Udgivet December 2005 af Hovedstadens Udviklingsråd Gammel Køge Landevej 3 2500 Valby Telefon 36 13 14 00 e-mail [email protected] Trykt hos Fihl-Jensen Grafi sk Produktion Oplag 2.500 Pris 100 kr. Kort Gengivet med Kort- og Matrikelstyrelsens tilladelse G13-00 Copyright ISBN nr. 87-7971-182-0 Forord Regionplan 2005 for Hovedstadsregionen Visioner og hovedstruktur Retningslinjer og redegørelse Visioner og hovedstruktur Forslag til Regionplan 2005 1 Udviklingsrådets medlemmer Carl Christian Ebbesen (O), Københavns Kommune Sven Milthers (F), Københavns Kommune 1. næstformand, Amtsborgmester Vibeke Storm Rasmussen (A), Københavns Amt Mogens Andersen (A), Roskilde Amt Formand, Borgmester Mads Lebech (C), Frederiksberg Kommune Lars Abel (C), Københavns Amt 2. næstformand, Amtsborgmester Kristian Ebbensgaard (V), Roskilde Amt Conny Dideriksen (A), Frederiksborg Amt Bent Larsen (V), Københavns Amt Jørgen Christensen (V), Frederiksborg Amt Lars Engberg (A), Københavns Kommune 2 Forslag til Regionplan 2005 Visioner og hovedstruktur Forord Med lidt god vilje kan man kalde vedtagelsen af Regionplan 2005 for historisk, fordi HUR her lægger den sidste regionplan frem med fokus på Danmarks eneste metropolregion. Planen udstikker rammerne for de kommende års fysiske planlægning i Hoved- stadsregionen og vil være grundlaget for de kommende års planarbejde efter overgangen til den nye kommunale struktur.
    [Show full text]
  • Integrated Rolling Stock Planning for Suburban Passenger Railways
    Downloaded from orbit.dtu.dk on: Dec 20, 2017 Integrated Rolling Stock Planning for Suburban Passenger Railways Thorlacius, Per; Larsen, Jesper; Groth, Julie Jespersen; Laumanns, Marco Publication date: 2017 Document Version Publisher's PDF, also known as Version of record Link back to DTU Orbit Citation (APA): Thorlacius, P., Larsen, J., Groth, J. J., & Laumanns, M. (2017). Integrated Rolling Stock Planning for Suburban Passenger Railways. DTU Management Engineering. General rights Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. • Users may download and print one copy of any publication from the public portal for the purpose of private study or research. • You may not further distribute the material or use it for any profit-making activity or commercial gain • You may freely distribute the URL identifying the publication in the public portal If you believe that this document breaches copyright please contact us providing details, and we will remove access to the work immediately and investigate your claim. Integrated Rolling Stock Planning for Suburban Passenger Railways Per Thorlacius, M.Sc. Ph.D. Thesis May 2017 DTU Management Engineering Department of Management Engineering Technical University of Denmark The carriage rolled noiselessly on the soft track, the shadows fell long on the dusty little plain interspersed with dark bushes, mounds of turned-up earth, low wooden buildings with iron roofs of the Railway Company; the sparse row of telegraph poles strode obliquely clear of the town, bearing a single, almost invisible wire far into the great campo – like a slender, vibrating feeler of that progress waiting outside for a moment of peace to enter and twine itself about the weary heart of the land.
    [Show full text]
  • Forslag Til Trafikerings- Og Infrastrukturplan for Jernbanen 2030
    Marts 2021 Forslag til Trafikerings- og infrastrukturplan for jernbanen 2030 2021, Det europæiske år for jernbanetransport 1 Indhold 1. Forslag til trafikerings- og infrastrukturplan for jernbanen 2030 ................................... 4 1.1 Jernbanen som Danmarks grønne puls .................................................................... 5 1.2. Jernbanens fordele ............................................................................................... 5 1.3. Ny organisering og planlægning af den kollektive trafik ............................................ 8 2. Trafikeringsplan for jernbanen .................................................................................. 9 2.1. Fjerntrafik og international trafik ......................................................................... 11 2.1.1. Indenlandsk fjerntrafik .................................................................................... 11 2.1.2. Internationale tog ........................................................................................... 11 2.2. Den regionale og lokale trafik .............................................................................. 12 2.2.1. Sjælland og omkringliggende øer ...................................................................... 12 2.2.2. Fyn, højere frekvens på de regionale linjer, en fynsk regional S-bane .................... 13 2.2.3. Nordjylland .................................................................................................... 13 2.2.4. Østjylland, en østjysk regional S-bane ..............................................................
    [Show full text]
  • Furesø Kommuneplan 2013
    Furesø Kommuneplan 2013 Rammer for lokalplanlægningen Bydele oversigt Indholdsfortegnelse - Rammer for lokalplanlægningen 1. Hæfte 1. Hovedstruktur 2. Hæfte 2. Rammer for lokalplanlægningen 3. Oversigtskort 1:20.000 Indledning . 7 1C2, Farum Hovedgade 24-40 og 17-31 m .fl . 25 Generelle rammer for 1C3, Boliger ved Nordtoftevej / Farum Hovedgade . 26 lokalplanlægning for alle områder . 9 1C4, Område ved Gammelgårdsvej . 26 Generelle rammer for boligområder . 11 1C5, Farum Hovedgade 42-52 og 33-39 . 27 Generelle rammer for centerområder . 12 1C6, Farum Hovedgade 54-86 og 41-77 . 27 Generelle rammer for områder til offentlige formål . 13 1C7, Akacietorvet . 28 Generelle rammer for erhvervsområder . 13 1C8, Farum Hovedgade 94-120 og 89-131 m .fl . .. 28 Generelle rammer for fritidsområder . 13 1D1, Gedevasevang . 29 Generelle rammer for natur- og landbrugsområder . 14 1D3, Vandværk . 29 Forklarende noter . 14 1F1, Farumgård Skov . 29 1F4, Farum Park, svømmehal, skole mv . 30 1 Farum Vest .................................... 17 1L1, Skovområde ved Farum Sø . 30 1B1, Lindegårds- og Gedevasekvarteret . 18 1L2, Farumgård mv . 30 1B2, Lillevangskvarteret . 18 1B3, Ryttergården . 18 2 Farum Midt .................................... 31 1B4, Boligområde i Vestbyen . 19 2B1, Fensmarkskvarteret mv . 32 1B5, Nygårdsvej og Nordvænget . 19 2B2, Lejerbo - Frederiksborgvej . .. 32 1B6, Området omkring Stationsvej . 19 2B4, Nordvænget II m .fl . 32 1B7, Område ved Skovvængets Allé . 20 2B5, Farum Midtpunkt . 33 1B8, Farum Landsby . 20 2B6, Område ved Farum station . 33 1B9, Solvang . 21 2B7, Elmely og Byparken . 34 1B10, Nordvænget I . .. 21 2B8, Boliger Rugmarken . 34 1B11, Æblelunden . .. 21 2C1, Farum Bytorv . 35 1B12, Akaciepark . 22 2C2, Erhvervs- og boligområde ved Frederiksborgvej 35 1B13, Sejlgårdspark .
    [Show full text]
  • Møde I Udvalg for Natur, Miljø Og Grøn Omstilling
    Møde i Udvalg for natur, miljø og grøn omstilling Åben Referat Dato: Torsdag den 7. november 2019 Tidspunkt: 16:00 Sted: Rådhuset Mødelokale 21 Furesø Kommune Møde i Udvalg for natur, miljø og grøn omstilling / 07-11-2019 Sagsoversigt: 1. Beslutning: Det videre arbejde med strukturanalyse for renseanlæg, Roskilde Fjord ...........................................................................................................2 2. Beslutning: Hovedindhold i ny spildevandsplan ..................................................4 3. Beslutning: Budgetopfølgning III 2019 - UNMG .................................................6 4. Beslutning: Indledning af proces om ophør af iltning af Furesø ..........................11 5. Beslutning: Regulativ for standsning og parkering i Furesø Kommune .................13 6. Beslutning: Godkendelse af vejprojekt og vejudlæg for vejadgang til Hangar 1 ....15 7. Beslutning: Fremtidig administration af den privat fællesvej Gydebakken beliggende i landzone ..................................................................................17 8. Beslutning: Farumgård fredning ....................................................................19 9. Beslutning: Etablering af Skovbørnehave i Jægerhytten ....................................21 10. Beslutning: Nye boformer på Tibbevangen 86 .................................................23 11. Beslutning: Mødekalender 2020 og 2021 ........................................................26 12. Orientering: Status på vejrenovering 2018-2019 .............................................27
    [Show full text]
  • Getting from AIB Hotels to CBS Using Copenhagen Public Transportation
    Getting from AIB Hotels to CBS using Copenhagen Public Transportation The following information has been gathered from the website and application “Rejseplanen”, which can be set to English and used to find your destination. 1. Scandic Hotel Copenhagen to CBS Solbjerg Plads Start Point: Vester Søgade 6, 1601 Copenhagen – Scandic Hotel Copenhagen End Point: Solbjerg Plads 3, 2000 Frederiksberg, Frederiksberg K – Solbjerg Plads Travel Time: approximately 15-20 minutes - walking, train and metro combined Step by step Instructions: STEP 1 (7 min. walk to Vesterport station) STEP 2 (2 min. by the S-train) Taking the train from Vesterport station to Nørreport station, there are multiple options since almost all of the S-trains go to Nørreport Station. Here are your options: - The A-line, the A-line towards Hillerød station, comes every 2-4 min. - The B-line, the B-line towards Farum station, comes every 2-4 min. - The C-line, the C-line towards Klampenborg station, comes every 2-4 min. - The E line (as seen in the photo above), The E-line towards Holte station, comes every 2-4. Min. STEP 3 (4 min. by metro) Once arrived at Nørreport station, you will need to find the metro/subway. Follow the metro sign and go downstairs since it is at the very bottom floor. Take the metro towards Vanløse station, it comes every 2-3 min. Get off the train at Frederiksberg station and then you will have arrived at your final station and destination. STEP 4 (1 min. walk) Go up the stairs and the CBS building is at your right, as seen in the photo below.
    [Show full text]
  • Udbudsmateriale Til
    Udbudsmateriale til A20 – Udbud af almindelig rutekørsel i Movia Trafikselskabet Movia Kontrakter Januar 2021 A20 – Udbud af almindelig rutekørsel side 2 Indholdsfortegnelse 1. Udbudsbetingelser ............................................................................................................................... 17 1.1 Spørgsmål ......................................................................................................................................... 18 1.2 Prækvalifikation ................................................................................................................................. 19 1.2.1 Ansøgning om prækvalifikation ................................................................................................... 19 1.2.2 Udelukkelsesgrunde .................................................................................................................... 20 1.2.3 Egnethed ..................................................................................................................................... 20 1.2.4 Udvælgelse ................................................................................................................................. 21 1.2.5 Dokumentation for egnethed og opfyldelse af udvælgelseskriterier ........................................... 21 1.3 Afgivelse af tilbud .............................................................................................................................. 21 1.3.1 Tilbudsgivere ..............................................................................................................................
    [Show full text]
  • The Train Driver Recovery Problem - Solution Method and Decision Support System Framework
    Downloaded from orbit.dtu.dk on: Oct 05, 2021 The Train Driver Recovery Problem - Solution Method and Decision Support System Framework Rezanova, Natalia Jurjevna Publication date: 2009 Document Version Publisher's PDF, also known as Version of record Link back to DTU Orbit Citation (APA): Rezanova, N. J. (2009). The Train Driver Recovery Problem - Solution Method and Decision Support System Framework. DTU Management PhD thesis No. 4.2009 General rights Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. Users may download and print one copy of any publication from the public portal for the purpose of private study or research. You may not further distribute the material or use it for any profit-making activity or commercial gain You may freely distribute the URL identifying the publication in the public portal If you believe that this document breaches copyright please contact us providing details, and we will remove access to the work immediately and investigate your claim. The Train Driver Recovery Problem – Solution Method and Decision Support System Framework Natalia J. Rezanova Kgs. Lyngby, Denmark, 2009 DTU Management Engineering Department of Management Engineering Technical University of Denmark Produktionstorvet, building 424 DK-2800 Kgs. Lyngby, Denmark Phone +45 45 25 48 00, Fax +45 45 25 48 05 www.man.dtu.dk Preface This thesis is prepared at DTU Management Engineering Department, the Technical University of Denmark, in partial fulfillment of the requirements for acquiring the Degree of Doctor of Philosophy (Ph.D.) in Engineering Science.
    [Show full text]