Solar Resource Mapping in Tanzania PHASE 2 IMPLEMENTATION PLAN
Total Page:16
File Type:pdf, Size:1020Kb
Public Disclosure Authorized Solar Resource Mapping in Tanzania PHASE 2 IMPLEMENTATION PLAN AUGUST 2015 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized This report was prepared by CENER, under contract to The World Bank. It is one of several outputs from the solar Resource Mapping and Geospatial Planning Tanzania [Project ID: P145287]. This activity is funded and supported by the Energy Sector Management Assistance Program (ESMAP), a multi-donor trust fund administered by The World Bank, under a global initiative on Renewable Energy Resource Mapping. Further details on the initiative can be obtained from the ESMAP website. This document is an interim output from the above-mentioned project. Users are strongly advised to exercise caution when utilizing the information and data contained, as this has not been subject to full peer review. The final, validated, peer reviewed output from this project will be the Tanzania Solar Atlas, which will be published once the project is completed. Copyright © 2015 International Bank for Reconstruction and Development / THE WORLD BANK Washington DC 20433 Telephone: +1-202-473-1000 Internet: www.worldbank.org This work is a product of the consultants listed, and not of World Bank staff. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work and accept no responsibility for any consequence of their use. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. The material in this work is subject to copyright. Because The World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for non-commercial purposes as long as full attribution to this work is given. Any queries on rights and licenses, including subsidiary rights, should be addressed to World Bank Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: +1-202-522-2625; e-mail: [email protected]. Furthermore, the ESMAP Program Manager would appreciate receiving a copy of the publication that uses this publication for its source sent in care of the address above, or to [email protected]. Renewable Energy Resource Mapping. Solar Tanzania. (Project ID: P145287) Phase 2 Implementation Plan. July, 2015 Renewable Energy Resource Mapping: Tanzania. Phase 2 Implementation Plan Table of contents 1 BACKGROUND .................................................................................................................................................... 4 2 INTRODUCTION .................................................................................................................................................. 4 3 GROUND MEASUREMENT SITES ......................................................................................................................... 4 3.1 LONGLIST OF SITES .................................................................................................................................................. 4 3.2 IDENTIFICATION OF CANDIDATE SITES FOR SHORTLIST ..................................................................................................... 6 3.3 SITE VISITS . ANALYSIS OF POTENTIAL EMPLACEMENTS . ................................................................................................... 7 3.3.1 Dar es Salaam ............................................................................................................................................... 7 3.3.2 Dodoma......................................................................................................................................................... 8 3.3.3 Iringa ........................................................................................................................................................... 11 3.3.4 Songea ........................................................................................................................................................ 13 3.3.5 Tabora ......................................................................................................................................................... 16 3.3.6 Mwanza ...................................................................................................................................................... 18 3.3.7 Arusha-Moshi .............................................................................................................................................. 21 3.3.8 Mbeya ......................................................................................................................................................... 24 3.4 SELECTED EMPLACEMENTS ..................................................................................................................................... 25 4 IMPLEMENTATION OF THE MEASUREMENT NETWORK .....................................................................................26 4.1 PERMISSIONS AND AGREEMENTS ............................................................................................................................. 26 4.2 TRANSPORT ......................................................................................................................................................... 27 4.2.1 International transport ............................................................................................................................... 27 4.2.2 In-country storage and domestic transport ................................................................................................ 28 4.3 CUSTOMS CLEARANCE ........................................................................................................................................... 28 4.4 INSURANCE AND THIRD PARTY LIABILITY .................................................................................................................... 29 4.5 OWNERSHIP ........................................................................................................................................................ 29 4.6 EQUIPMENT INSTALLATION AND COMMISSIONING ....................................................................................................... 29 4.6.1 Site preparation .......................................................................................................................................... 29 4.6.2 Communications for data transmission ...................................................................................................... 30 4.6.3 Installation and commissioning .................................................................................................................. 31 4.7 MAINTENANCE .................................................................................................................................................... 31 4.7.1 Routine maintenance .................................................................................................................................. 31 4.7.2 Predictive Maintenance .............................................................................................................................. 33 4.7.3 Corrective Maintenance .............................................................................................................................. 33 5 MEASURED DATA MANAGEMENT .....................................................................................................................34 5.1 DATA TRANSMISSION ............................................................................................................................................ 34 5.2 DATA ADMINISTRATION ......................................................................................................................................... 34 5.3 DATA MONITORING .............................................................................................................................................. 35 5.3.1 Data recording time and visual inspection .................................................................................................. 35 6 METEOROLOGICAL STATIONS REPORTING. .......................................................................................................37 6.1 PREPARATION OF SITE INSTALLATION REPORTS ........................................................................................................... 37 Page 2 Renewable Energy Resource Mapping: Tanzania. Phase 2 Implementation Plan, July 2015 Renewable Energy Resource Mapping: Tanzania. Phase 2 Implementation Plan 6.2 PREPARATION OF SITE RESOURCE REPORTS ................................................................................................................ 37 7 CAPACITY BUILDING AND TRAINING .................................................................................................................38 7.1 STAKEHOLDERS .................................................................................................................................................... 38 7.1.1 Station hosts ..............................................................................................................................................