UNITED REPUBLIC OF AIC TANZANIA CIVIL AVIATION AUTHORITY Aeronautical Information Management 05/19 Nyerere/ Kitunda Road Junction FAX: (255 22) 2844300, 2844302 (Pink 70) Aviation House, 1st Floor, PHONE: (255 22) 2198100, 2844291. P.O. Box 2819, AFS: HTDQYOYO 07 OCT Email: [email protected], [email protected] Website: www.tcaa.go.tz Document No: Title: AIC Page 1 of 2 TCAA/FRM/ANS/AIS-30

The following circular is promulgated for information, guidance and necessary action

Hamza S. Johari Director General

FLIGHT CALIBRATION OF LANDING AND NAVIGATIONAL AIDS

The following Landing and Navigational Aids in the Dar es Salaam Flight Information Region (DAR FIR) were flight checked and approved for operational use on the dates indicated:-

1. Julius Nyerere International Airport – HTDA i) ILS (GP) and (LLZ) Runway 05 routine flight checked on 11 September 2019 and approved for operational use.

ii) PAPI Runway 05 and 23 routine flight checked on 11 March 2019 and approved for operational use.

iii) ‘DV’ DVOR/DME DV 112.7 MHz routine flight check carried out on 25 September 2018 and approved for operational use.

2. Kilimanjaro International Airport – HTKJ i) ‘KV’ DVOR/DME KV 115.3 MHz routine flight checked on 24 September 2018 and approved for operational use.

ii) ILS (GP) and (LLZ) Runway 09 routine flight checked on 09 September 2019 and approved for operational use.

iii) PAPI Runway 09 and 27 routine flight checked on 05 March 2019 and approved for operational use.

3. Abeid Amani Karume International Airport – HTZA i) PAPI Runway 18 and 36 routine flight checked on 10 March 2019 and approved for operational use.

ii) ‘ZV’ CVOR/DME 116.7 MHz routine flight checked on 10 March 2019 and approved for operational use.

4. Airport – HTMW i) ‘MV’ DVOR/DME MV 115.7 MHz routine flight checked on 3 May 2017 and approved for operational use.

ii) PAPI Runway 12 and 30 routine flight checked on 06 March 2019 and approved for operational use.

This is a controlled document

Document No: Title: AIC Page 2 of 2 TCAA/FRM/ANS/AIS-30

5. – HTTB i) ‘TV’ DVOR/DME TV 114.7 MHz routine flight checked on 13 April 2018 and approved for operational use.

ii) PAPI Runway 13 and 31 routine flight checked on 06 March 2019 and approved for operational use.

6. – HTGW i) PAPI Runway 27 routine flight checked on 07 March 2019 and approved for operational use.

7. Airport – HTDO i) PAPI Runway 09 and 27 routine flight checked on 07 March 2019 and approved for operational use.

8. – HTPE i) PAPI Runway 03 and 21 routine flight checked on 08 March 2019 and approved for operational use.

Note: This information is being published in accordance with Conclusion 10/1 of the 7th AFI/RAN meeting Abuja, May 1997.

Cancel AIC 12/17 (Pink 67) ______

This is a controlled document