Flight Calibration of Landing and Navigation Aids

Flight Calibration of Landing and Navigation Aids

UNITED REPUBLIC OF TANZANIA AIC TANZANIA CIVIL AVIATION AUTHORITY Aeronautical Information Management 05/19 Nyerere/ Kitunda Road Junction FAX: (255 22) 2844300, 2844302 (Pink 70) Aviation House, 1st Floor, PHONE: (255 22) 2198100, 2844291. P.O. Box 2819, DAR ES SALAAM AFS: HTDQYOYO 07 OCT Email: [email protected], [email protected] Website: www.tcaa.go.tz Document No: Title: AIC Page 1 of 2 TCAA/FRM/ANS/AIS-30 The following circular is promulgated for information, guidance and necessary action Hamza S. Johari Director General FLIGHT CALIBRATION OF LANDING AND NAVIGATIONAL AIDS The following Landing and Navigational Aids in the Dar es Salaam Flight Information Region (DAR FIR) were flight checked and approved for operational use on the dates indicated:- 1. Julius Nyerere International Airport – HTDA i) ILS (GP) and (LLZ) Runway 05 routine flight checked on 11 September 2019 and approved for operational use. ii) PAPI Runway 05 and 23 routine flight checked on 11 March 2019 and approved for operational use. iii) ‘DV’ DVOR/DME DV 112.7 MHz routine flight check carried out on 25 September 2018 and approved for operational use. 2. Kilimanjaro International Airport – HTKJ i) ‘KV’ DVOR/DME KV 115.3 MHz routine flight checked on 24 September 2018 and approved for operational use. ii) ILS (GP) and (LLZ) Runway 09 routine flight checked on 09 September 2019 and approved for operational use. iii) PAPI Runway 09 and 27 routine flight checked on 05 March 2019 and approved for operational use. 3. Abeid Amani Karume International Airport – HTZA i) PAPI Runway 18 and 36 routine flight checked on 10 March 2019 and approved for operational use. ii) ‘ZV’ CVOR/DME 116.7 MHz routine flight checked on 10 March 2019 and approved for operational use. 4. Mwanza Airport – HTMW i) ‘MV’ DVOR/DME MV 115.7 MHz routine flight checked on 3 May 2017 and approved for operational use. ii) PAPI Runway 12 and 30 routine flight checked on 06 March 2019 and approved for operational use. This is a controlled document Document No: Title: AIC Page 2 of 2 TCAA/FRM/ANS/AIS-30 5. Tabora Airport – HTTB i) ‘TV’ DVOR/DME TV 114.7 MHz routine flight checked on 13 April 2018 and approved for operational use. ii) PAPI Runway 13 and 31 routine flight checked on 06 March 2019 and approved for operational use. 6. Songwe Airport – HTGW i) PAPI Runway 27 routine flight checked on 07 March 2019 and approved for operational use. 7. Dodoma Airport – HTDO i) PAPI Runway 09 and 27 routine flight checked on 07 March 2019 and approved for operational use. 8. Pemba Airport – HTPE i) PAPI Runway 03 and 21 routine flight checked on 08 March 2019 and approved for operational use. Note: This information is being published in accordance with Conclusion 10/1 of the 7th AFI/RAN meeting Abuja, May 1997. Cancel AIC 12/17 (Pink 67) _________________________________________________ This is a controlled document .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us