Network Statement

Total Page:16

File Type:pdf, Size:1020Kb

Network Statement Network Statement Valid from 15/12/2019 to 12/12/2020 Version of 21/08/2019 VERSION CONTROL Adaptations Version Date (More details can be found in the document “Network Statement – Modifications”, which is available on the website www.infrabel.be) 1 07.12.2018 First version Note for point 4.9 and chapter 6: As indicated in the introduction to these points, the texts still need to be changed, after the legal framework has been adjusted and/or after consulting the applicants who will be contacted at the appropriate time. 2 01.04.2019 The main modifications concern: – General: updating of legal references and adaptation of contact details and internet sites; – Points 1.4.3.3, 2.2.2 and 4.2.2.1.2: adaptation of the texts relating to the liberalisation of the national passenger transport market in accordance with the law of 11/01/2019 amending the Rail Code; – Point 1.4.3.1: extension of the competences of the Regulatory Body for Railway Transport and for Brussels Airport Operations with regard to its task of handling complaints, in accordance with the law of 11/01/2019 amending the Rail Code; – Erratum point 4.3.2.2.2.2: clarification that the term mentioned is the final publication term; 3 16.05.2019 – Point 1.8.6 Corridor One-Stop-Shop: There is currently no contact for RFC Rhine-Alpine. Requests can be made to the specified functional mailbox or to the contacts of the other RFCs; – Erratum point 3.3.3.3 Communication systems: modification of the date on which the railway undertaking must inform Infrabel of the measures taken to prevent interference. 4 10.07.2019 – Point 1.8 Contacts: adjustment of the contact details; – Point 2.2.5 Cover of liabilities: adaptation of the Royal Decree of 8 December 2013 establishing the minimum amount for the coverage of civil liability for driving on the railway infrastructure, by the Royal Decree of 23 May 2019; – Point 3.3.3.3 Communication systems: new information regarding the ETSI TS 102 933-1 and TS 102 933-2 standards; – Points 3.6, 3.7, 5.3, 5.4, 5.5 and 6.1 Service facilities: transfer of information to appendix E.2; – Points 4.5.2 Nature of the Temporary Capacity Restrictions and 4.5.5 Consultation and information to applicants: addition of information on the national operating window and withdrawal of appendix B.5. 5 21.08.2019 Updating the links to websites. Version control Network statement 2020 – 21.08.2019 3 / 88 TABLE OF CONTENTS VERSION CONTROL ________________________________________________ 3 TABLE OF CONTENTS ______________________________________________ 4 1 . GENERAL INFORMATION ________________________________________ 9 Introduction __________________________________________________________ 9 Objective ____________________________________________________________ 10 Legal framework and regulation _________________________________________ 10 Legal status _________________________________________________________ 11 General remarks .................................................................................................................. 11 Liability ................................................................................................................................. 11 Appeals procedure ............................................................................................................... 11 Structure of the network statement ______________________________________ 12 Validity and updating process __________________________________________ 13 Validity period ...................................................................................................................... 13 Updating process ................................................................................................................. 13 Publishing ___________________________________________________________ 13 Contacts ____________________________________________________________ 14 Infrabel ................................................................................................................................. 14 The Regulatory Body for Railway Transport and for Brussels Airport Operations (Service de Régulation du Transport ferroviaire et de l’Exploitation de l’Aéroport de Bruxelles-National)...... 16 Minister of Mobility, in charge of Belgocontrol and the National Railway Company of Belgium (Société nationale des chemins de fer belges) ............................................................... 16 Federal Public Service for Mobility and Transport ............................................................... 16 Neighbouring Infrastructure managers ................................................................................ 17 Corridor One-Stop-Shop (C-OSS) ....................................................................................... 18 International rail corridors for competitive freight (Rail Freight Corridors-RFC) __ 18 RailNetEurope – International cooperation between infrastructure managers __ 19 One-Stop-Shop (OSS) ....................................................................................................... 20 Applications RNE ............................................................................................................... 20 “TimeTabling Redesign” (TTR) pilot projects ..................................................................... 21 Documents and applications __________________________________________ 21 Glossary ___________________________________________________________ 21 Table of contents Network statement 2020 – 21.08.2019 4 / 88 2 . CONDITIONS FOR SUBMITTING A CAPACITY REQUEST AND ACCESS CONDITIONS ______________________________________________________ 22 Introduction _________________________________________________________ 22 General Access Requirements __________________________________________ 22 Conditions for applying for capacity ..................................................................................... 22 Conditions for access to the railway infrastructure .............................................................. 23 Licence ................................................................................................................................. 24 Safety certificate .................................................................................................................. 24 Cover of liabilities ................................................................................................................. 24 Commercial conditions ________________________________________________ 25 Contracts concluded between Infrabel and the railway undertaking ................................... 25 Contracts concluded between Infrabel and the non-railway undertaking applicant ............ 26 Framework agreement ......................................................................................................... 27 Operational rules _____________________________________________________ 27 Exceptional transports __________________________________________ 27 Transport of dangerous goods __________________________________________ 27 Admission of rolling stock _____________________________________________ 28 Staff acceptance process ______________________________________________ 28 3 . INFRASTRUCTURE _____________________________________________ 29 Introduction _________________________________________________________ 29 Extent of network _____________________________________________________ 29 Limits .................................................................................................................................... 29 Connected railway networks ................................................................................................ 30 Network description ___________________________________________________ 30 Geographic identification ..................................................................................................... 30 Capabilities .......................................................................................................................... 30 Traffic control and communication systems ........................................................................ 32 Traffic restrictions ____________________________________________________ 34 Specialised infrastructure .................................................................................................... 34 Environmental restrictions ................................................................................................... 34 Dangerous goods ................................................................................................................ 34 Tunnel restrictions ............................................................................................................... 34 Bridge restrictions ................................................................................................................ 34 Availability of the infrastructure _________________________________________ 34 Service facilities ______________________________________________________ 35 Passenger stations .............................................................................................................. 35 Freight terminals .................................................................................................................. 35 Marshalling yards and train formation facilities .................................................................... 35 Storage sidings ...................................................................................................................
Recommended publications
  • Twinning Conference Presentation – 12Th December 2017
    Welcome to the conference Network rail 10-Apr-18 Safety Culture Twinning conference 1 Agenda 10:00 - 10:15 The value of twinning (Keir Fitch, European Commission) 10:15 – 10:30 Welcome (Lisbeth Fromling, Network Rail) 10:30 – 11:30 Group 1 presentation (Network Rail, CFR, Infrabel and HZ) 11:30 – 11:50 Break 11:50 – 12:40 Group 2 presentation (ProRail, Irish Rail and OBB) 12:40 – 13:15 Lunch 13:15 – 14:05 Group 3 presentation (Trafikverket, Adif and PLK) 14:05 – 14:35 Group 4 presentation (RFI and SNCF Reseau) 14:35 – 14:55 Learning activity based on safety culture evaluation 14:55 – 15:15 Opportunity for questions 15:15 – 15:30 Summary of event and closure 10-Apr-18 Safety Culture Twinning conference 2 Welcome from Keir Fitch Head of Unit C4 "Rail Safety & Interoperability”, European Commission 10-Apr-18 Safety Culture Twinning conference 3 Welcome from Lisbeth Fromling Chief Health, Safety, Quality and Environment Officer, Network Rail 10-Apr-18 Safety Culture Twinning conference 4 10-Apr-18 Safety Culture Twinning Programme Welcome to the final conference • Thank you for joining us • Today is a good day! • Purely pro-active project • All information is good • Lots to share PRIME Safety Culture Sub-Group / 5 10-Apr-18 Safety Culture Twinning Programme Co-ordinator Participant PRIME Safety Culture Sub-Group / 6 10-Apr-18 Safety Culture collaboration PRIME Safety Culture Sub-Group / 7 Group 1 Presentations Network Rail, CFR, Infrabel and HZ 10-Apr-18 Safety Culture Twinning conference 8 Group 1 Presentations Network Rail 10-Apr-18 Safety
    [Show full text]
  • Genesee & Wyoming Inc. 2016 Annual Report
    Genesee & Wyoming Inc. 2016 Annual Report Genesee & Wyoming Inc.*owns or leases 122 freight railroads worldwide that are organized into 10 operating regions with approximately 7,300 employees and 3,000 customers. * The terms “Genesee & Wyoming,” “G&W,” “the company,” “we,” “our,” and “us” refer collectively to Genesee & Wyoming Inc. and its subsidiaries and affiliated companies. Financial Highlights Years Ended December 31 (In thousands, except per share amounts) 2012 2013 2014 2015 2016 Statement of Operations Data Operating revenues $874,916 $1,568,643 $1,639,012 $2,000,401 $2,001,527 Operating income 190,322 380,188 421,571 384,261 289,612 Net income 52,433 271,296 261,006 225,037 141,096 Net income attributable to Genesee & Wyoming Inc. 48,058 269,157 260,755 225,037 141,137 Diluted earnings per common share attributable to Genesee & Wyoming Inc. common stockholders: Diluted earnings per common share (EPS) $1.02 $4.79 $4.58 $3.89 $2.42 Weighted average shares - Diluted 51,316 56,679 56,972 57,848 58,256 Balance Sheet Data as of Period End Total assets $5,226,115 $5,319,821 $5,595,753 $6,703,082 $7,634,958 Total debt 1,858,135 1,624,712 1,615,449 2,281,751 2,359,453 Total equity 1,500,462 2,149,070 2,357,980 2,519,461 3,187,121 Operating Revenues Operating Income Net Income Diluted Earnings ($ In Millions) ($ In Millions) ($ In Millions) 421.61,2 Per Common Share 2 2,001.5 401.6 1 $2,000 2,000.4 $400 394.12 $275 271.3 $5.00 1 2 4.79 1 374.3 1 380.21 384.3 261.0 4.581 1,800 250 4.50 350 1,639.0 225.01 225 2 1 1,600 233.5 4.00 2 3.89 1,568.6 4.10 2 300 2 200 213.9 213.3 2 3.78 2 1,400 1 3.50 3.69 289.6 183.32 3.142 250 175 1,200 3.00 211.
    [Show full text]
  • DB Netz AG Network Statement 2016 Valid from 14 April 2015 DB Netz
    DB Netz AG Network Statement 2016 valid from 14 April 2015 DB Netz AG Headquarters I.NMN Version control Date Modification 12.12.2014 Amendment of Network Statement 2015 as at 12 December 2014 (Publication of the Network Statement 2016) Inclusion of detailed information in sections 1.9 ff and 4.2.5 ff due to 14.10.2015 commissioning of rail freight corridors Sandinavian-Mediterranean and North Sea-Balitc. Addition of connection to Port of Hamburg (Hohe Schaar) in section 13.12.2015 3.3.2.5 Printed by DB Netz AG Editors Principles of Network Access/Regulation (I.NMN) Theodor-Heuss-Allee 7 60486 Frankfurt am Main Picture credits Front page photo: Bildschön, Silvia Bunke Copyright: Deutsche Bahn AG Contents Version control 3 List of Annexes 7 1 GENERAL INFORMATION 9 1.1 Introduction 9 1.2 Purpose 9 1.3 Legal basis 9 1.4 Legal framework of the Network Statement 9 1.5 Structure of the Network Statement 10 1.6 Term of and amendments to the Network Statement 10 1.7 Publication and opportunity to respond 11 1.8 Contacts at DB Netz AG 11 1.9 Rail freight corridors 12 1.10 RNE and international cooperation between DB Netz AG and other RIUs 14 1.11 List of abbreviations 15 2 CONDITIONS OF ACCESS 16 2.1 Introduction 16 2.2 General conditions of access to the railway infrastructure 16 2.3 Types of agreement 17 2.4 Regulations and additional provisions 17 2.5 Special consignments 19 2.6 Transportation of hazardous goods 19 2.7 Requirements for the rolling stock 19 2.8 Requirements for the staff of the AP or the involved RU 20 2.9 Special conditions
    [Show full text]
  • The Rail Freight Challenge for Emerging Economies How to Regain Modal Share
    The Rail Freight Challenge for Emerging Economies How to Regain Modal Share Bernard Aritua INTERNATIONAL DEVELOPMENT IN FOCUS INTERNATIONAL INTERNATIONAL DEVELOPMENT IN FOCUS The Rail Freight Challenge for Emerging Economies How to Regain Modal Share Bernard Aritua © 2019 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW, Washington, DC 20433 Telephone: 202-473-1000; Internet: www.worldbank.org Some rights reserved 1 2 3 4 22 21 20 19 Books in this series are published to communicate the results of Bank research, analysis, and operational experience with the least possible delay. The extent of language editing varies from book to book. This work is a product of the staff of The World Bank with external contributions. The findings, interpre- tations, and conclusions expressed in this work do not necessarily reflect the views of The World Bank, its Board of Executive Directors, or the governments they represent. The World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Nothing herein shall constitute or be considered to be a limitation upon or waiver of the privileges and immunities of The World Bank, all of which are specifically reserved. Rights and Permissions This work is available under the Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) http:// creativecommons.org/licenses/by/3.0/igo.
    [Show full text]
  • Eighth Annual Market Monitoring Working Document March 2020
    Eighth Annual Market Monitoring Working Document March 2020 List of contents List of country abbreviations and regulatory bodies .................................................. 6 List of figures ............................................................................................................ 7 1. Introduction .............................................................................................. 9 2. Network characteristics of the railway market ........................................ 11 2.1. Total route length ..................................................................................................... 12 2.2. Electrified route length ............................................................................................. 12 2.3. High-speed route length ........................................................................................... 13 2.4. Main infrastructure manager’s share of route length .............................................. 14 2.5. Network usage intensity ........................................................................................... 15 3. Track access charges paid by railway undertakings for the Minimum Access Package .................................................................................................. 17 4. Railway undertakings and global rail traffic ............................................. 23 4.1. Railway undertakings ................................................................................................ 24 4.2. Total rail traffic .........................................................................................................
    [Show full text]
  • List of Numeric Codes for Railway Companies (RICS Code) Contact : [email protected] Reference : Code Short
    List of numeric codes for railway companies (RICS Code) contact : [email protected] reference : http://www.uic.org/rics code short name full name country request date allocation date modified date of begin validity of end validity recent Freight Passenger Infra- structure Holding Integrated Other url 0006 StL Holland Stena Line Holland BV NL 01/07/2004 01/07/2004 x http://www.stenaline.nl/ferry/ 0010 VR VR-Yhtymä Oy FI 30/06/1999 30/06/1999 x http://www.vr.fi/ 0012 TRFSA Transfesa ES 30/06/1999 30/06/1999 04/10/2016 x http://www.transfesa.com/ 0013 OSJD OSJD PL 12/07/2000 12/07/2000 x http://osjd.org/ 0014 CWL Compagnie des Wagons-Lits FR 30/06/1999 30/06/1999 x http://www.cwl-services.com/ 0015 RMF Rail Manche Finance GB 30/06/1999 30/06/1999 x http://www.rmf.co.uk/ 0016 RD RAILDATA CH 30/06/1999 30/06/1999 x http://www.raildata.coop/ 0017 ENS European Night Services Ltd GB 30/06/1999 30/06/1999 x 0018 THI Factory THI Factory SA BE 06/05/2005 06/05/2005 01/12/2014 x http://www.thalys.com/ 0019 Eurostar I Eurostar International Limited GB 30/06/1999 30/06/1999 x http://www.eurostar.com/ 0020 OAO RZD Joint Stock Company 'Russian Railways' RU 30/06/1999 30/06/1999 x http://rzd.ru/ 0021 BC Belarusian Railways BY 11/09/2003 24/11/2004 x http://www.rw.by/ 0022 UZ Ukrainski Zaliznytsi UA 15/01/2004 15/01/2004 x http://uz.gov.ua/ 0023 CFM Calea Ferată din Moldova MD 30/06/1999 30/06/1999 x http://railway.md/ 0024 LG AB 'Lietuvos geležinkeliai' LT 28/09/2004 24/11/2004 x http://www.litrail.lt/ 0025 LDZ Latvijas dzelzceļš LV 19/10/2004 24/11/2004 x http://www.ldz.lv/ 0026 EVR Aktsiaselts Eesti Raudtee EE 30/06/1999 30/06/1999 x http://www.evr.ee/ 0027 KTZ Kazakhstan Temir Zholy KZ 17/05/2004 17/05/2004 x http://www.railway.ge/ 0028 GR Sakartvelos Rkinigza GE 30/06/1999 30/06/1999 x http://railway.ge/ 0029 UTI Uzbekistan Temir Yullari UZ 17/05/2004 17/05/2004 x http://www.uzrailway.uz/ 0030 ZC Railways of D.P.R.K.
    [Show full text]
  • DB Netz AG Network Statement 2020 Valid from 15.12.2019
    DB Netz AG Network Statement 2020 valid from 15.12.2019 DB Netz AG Headquarters I.NMN Version control Date Modification 09.12.2018 Amendment of Network Statement 2019 as at 09. December 2018 (Publication of the Network Statement 2020) 06.12.2018 Addition of detailed information concerning funding of rail freight transport by way of pro-rated financing of the approves track access charges 13.02.2019 Amendment of Network Statement 2020 due to decision of the Fed- eral Network Agency (BNetzA) to the application of DB Netz AG for approval of the charging principles and charges for the provision of the minimum access package with effect from 15. December 2019 (TPS 2020) 21.06.2019 Amendment Section 6.3.3.1 of the Network Statement 08.08.2019 Amendment Section 6.5 of the Network Statement “Incentive system to enhance performance capability” 23.10.2019 Addition of detailed information concerning the implementation of terms of use Click&Ride Printed by DB Netz AG Editors Principles of Network Access/Regulation (I.NMN) Theodor-Heuss-Allee 7 60486 Frankfurt am Main Picture credits Front page photo: Urheber: Volker Emersleben Copyright: Deutsche Bahn AG Network Statement 2020, editorial status 23.10.2019 2 Notes 1. Pending court proceedings regarding prohibitions of individual clauses The following clauses may still be modified due to court proceedings: Section 2.9.8.3 The Federal Network Agency (BNetzA) rejected the intended modification in section 2.9.8.3 sentence 2 lit. c) of the Network Statement 2018 with its decision of 18 November 2016 – BK 10-16-0009_Z, namely the modification to use the word “material” in relation to contractual duties.
    [Show full text]
  • Eurolink “Raison D’Être”
    Towards a better international timetable in Europe Photo Vidar Nordli-Mathiesen 17.05.2021 | Jeroen Wesdorp and Thomas Moerman EuroLink “Raison d’être” Challenges: Green deal, climate debate, short haul flights, … Need for a green solution for high CO2-emissioning transport modes Suboptimal use of rail infrastructure and capacity Planning of international trains within fixed national timetables vs Tabula Rasa and redesign of the European transportplan with a macro to micro philopsophy Suboptimal travel times Plea to make rail great again by improving travel times and making international train travel more attractive and competitive with the flight market 2 Example: Eurostar London – Amsterdam From national timetables first and Air-Rail substitution international second >50 daily retour flights Amsterdam-London Suboptimal use of infra To international timetable first Suboptimal travel times from Amsterdam to London: 2019 4h40 2020 (direct) 4h10 Optimal (direct) 3h40 3 Our motives for a better international passenger rail network in Europe Sustainable growth Better connectivity Optimized use of infrastructure International rail Rail can accommodate Alignment of national transport enables growing demand and networks and full use of sustainable growth as an the need existing and planned alternative to air and for connectivity within infrastructure. road traffic. Europe. 4 Our design philosophy Higher Frequencies Shorter Travel Times Direct Connections Optimized Transfers ‒ More cross-border ‒ More attractive slots ‒ Much more direct ‒ Attractive transfers connections ‒ Needless run time connections (in addition to direct ‒ Systematic slots with margin to be throughout Europe trains) potential for growth avoided ‒ Not just link two ‒ Pan-European countries but three or integral clock face even more timetable More and better quality travel options for more people 5 Since 2020 EuroLink offers a platform for network planning experts of a growing number of rail infrastructure managers.
    [Show full text]
  • 2Nd Report of the TAP TSI Implementation
    2nd report of the TAP TSI Implementation RU/IM Telematics Joint Sector Group (JSG) February 2018 Version 1.1 Jan-Christian Arms, JSG Vice-chairman Document history Version Name Changes Date 0.1 Jan-Christian Arms Initial version for IRG 12.02.2018 0.2 Jan-Christian Arms Revised at IRG 15.02.2018 0.3 Jan-Christian Arms Agreed at ERA/JSG consultation meeting 16.02.2018 0.4 Jan-Christian Arms Approved at JSG 27.02.2018 1.0 Jan-Christian Arms Document finalised after ERA TAF TSI Cooperation Group 04.04.2018 1.1 Jan-Christian Arms Corrections following NCP remarks 09.04.2018 February 2018 Page 2/27 Contents LIST OF TABLES 4 LIST OF DIAGRAMS 4 EXECUTIVE SUMMARY 5 1. BACKGROUND TO THE ASSIGNMENT 6 2. METHODOLOGY 7 General assumptions 7 Establishment of this report 7 3. PARTICIPATION IN THE 2ND REPORTING SESSION 9 Responses to the survey 9 Participation per company type 11 4. DATA BASIS FOR EVALUATION 12 5. IMPLEMENTATION MONITORING OF TAP TSI FUNCTIONS 13 Common Reference Files – Primary Location Codes (IMs) 13 Common Reference Files - Company Code (all companies) 14 Common Interface Implementation (all companies) 15 Train Running Information (IMs and RUs-P) 16 Reasons for not starting implementation of TAF/TAP TSI functions 18 7. CONCLUSION AND FINDINGS 19 ANNEX 1: MEMBERS OF THE IMPLEMENTATION REPORTING GROUP (IRG) 20 ANNEX 2: RESPONSES CONTACT LIST V7 21 ANNEX 3: RESPONSES CONTACT LIST V6 26 February 2018 Page 3/27 LIST OF TABLES Table 1: Reporting periods 8 Table 2: TAF/TAP TSI functions as reported per type of company 8 LIST OF DIAGRAMS
    [Show full text]
  • Railway Capacity Allocation: a Survey of Market Organizations, Allocation Processes and Track Access Charges
    Railway Capacity Allocation: A Survey of Market Organizations, Allocation Processes and Track Access Charges VTI Working Paper 2019:1 Abderrahman Ait Ali1,2 and Jonas Eliasson2 1 Transport Economics, VTI, Swedish National Road and Transport Research Institute 2 Communications and Transport Systems, Linköping University Abstract In the last few decades, many railway markets (especially in Europe) have been restructured to allow competition between different operators. This survey studies how competition has been introduced and regulated in a number of different countries around the world. In particular, we focus on a central part of market regulation specific to railway markets, namely the capacity allocation process. Conflicting capacity requests from different train operators need to be regulated and resolved, and the efficiency and transparency of this process is crucial. Related to this issue is how access charges are constructed and applied. Several European countries have vertically separated their railway markets, separating infrastructure management from train services provisions, thus allowing several train operators to compete with different passengers and freight services. However, few countries have so far managed to create efficient and transparent processes for allocating capacity between competing train operators, and incumbent operators still have larger market-share in many markets. Keywords Railway markets; vertical separation; competition; capacity allocation; access charges. JEL Codes R40 Swedish National Road and Transport Research Institute www.vti.se Swedish National Road and Transport Research Institute www.vti.se Railway Capacity Allocation: A Survey of Market Organizations, Allocation Processes and Track Access Charges Abderrahman Ait Ali1,2,* and Jonas Eliasson2 1Swedish National Road and Transport Research Institute (VTI), Malvinas väg 6, SE-114 28 Stockholm, Sweden 2Linköping University, Luntgatan 2, SE-602 47 Norrköping, Sweden (*) Corresponding author.
    [Show full text]
  • A.1 Glossary
    NETWORK STATEMENT Appendix A.1 - Glossary Version: 25/03/2021 Definitions Term Definition Source Additional service May comprise: traction current, for which charges shall be shown on the invoices Annex 1, point 3 of the Rail Code separately from charges for the use of the electrical supply equipment, without prejudice to the application of Directive 2009/72/EC; pre-heating of passenger trains; and tailor-made contracts (for the control of transport of dangerous goods and assistance in running exceptional transports). Ancillary service May comprise: access to the telecommunication networks; provision of Annex 1, point 4 of the Rail Code supplementary information; technical inspection of rolling stock; ticketing services in passenger stations; heavy maintenance services supplied in maintenance facilities dedicated to high-speed trains or to other types of rolling stock requiring specific facilities (as referred to in Directive 2012/34/EU, Annex II, point 4). Applicant A railway undertaking or an international grouping of railway undertakings or Article 3, 11° of the Rail Code other persons or legal entities, such as the competent authorities under Regulation (EC) 1370/2007 and shippers, freight forwarders and combined transport operators, with a public-service or commercial interest in procuring infrastructure capacity. Area Infrabel - Asset Management Each Infrabel - Asset Management area is directed by an Area Manager, under Infrabel the authority of the Director Asset Management. The areas have a specific works and coordination vocation. Area Infrabel – Traffic Operations The five areas (North-West, North-East, Centre, South-West, South-East) of the Infrabel Traffic Operations service are responsible for the organization of traffic and general monitoring.
    [Show full text]
  • Brussels Rail Transport Brief: March 2021
    BRUSSELS RAIL TRANSPORT BRIEF: MARCH 2021 Date: 21 April 2021 European Regulatory Newsletter By: Miguel A. Caramello Alvarez, Philip Torbøl, Alessandro Di Mario, Inês Mendes ANTITRUST AND COMPETITION German Court asks ECJ About Review of Rail Station Fees The Berlin Higher Regional Court has lodged a request for a preliminary ruling with the European Court of Justice (ECJ) concerning railway station fees charged by Deutsche Bahn's DB Station & Service. DB Station & Service was sued by a rail transport company for reimbursement of excessive fees between November 2006 and December 2010. The regional court backed the claim, concluding that the DB subsidiary is obliged to reimburse these amounts. On 30 December, the Berlin Higher Regional Court referred two questions to the ECJ, asking whether it is compatible with Directive 2001/14/EC concerning railway infrastructure charges for national courts to review fees based on antitrust rules independently of the monitoring carried out by the regulatory body and, if so, whether civil courts are allowed to conduct an antitrust review even when railway undertakings can ask the regulatory body to review the fairness of the price. Lastly, the court asked whether civil courts must wait for the decision of the regulatory body, or if it is contested before court, for that decision to become final. Czech Agency Fines Firm for High-speed Railway Tender Manipulation The Czech Office for Protection of Competition has fined Sudop Praha €360,000 for entering into an illegal bid- rigging agreement. It was found that between November 2014 and May 2015, Sudop and Výzkumný Ústav Železniční (VUZ) coordinated their bids for a tender for a technical operational study for high speed railway lines.
    [Show full text]