Network Statement
Total Page:16
File Type:pdf, Size:1020Kb
Network Statement Valid from 15/12/2019 to 12/12/2020 Version of 21/08/2019 VERSION CONTROL Adaptations Version Date (More details can be found in the document “Network Statement – Modifications”, which is available on the website www.infrabel.be) 1 07.12.2018 First version Note for point 4.9 and chapter 6: As indicated in the introduction to these points, the texts still need to be changed, after the legal framework has been adjusted and/or after consulting the applicants who will be contacted at the appropriate time. 2 01.04.2019 The main modifications concern: – General: updating of legal references and adaptation of contact details and internet sites; – Points 1.4.3.3, 2.2.2 and 4.2.2.1.2: adaptation of the texts relating to the liberalisation of the national passenger transport market in accordance with the law of 11/01/2019 amending the Rail Code; – Point 1.4.3.1: extension of the competences of the Regulatory Body for Railway Transport and for Brussels Airport Operations with regard to its task of handling complaints, in accordance with the law of 11/01/2019 amending the Rail Code; – Erratum point 4.3.2.2.2.2: clarification that the term mentioned is the final publication term; 3 16.05.2019 – Point 1.8.6 Corridor One-Stop-Shop: There is currently no contact for RFC Rhine-Alpine. Requests can be made to the specified functional mailbox or to the contacts of the other RFCs; – Erratum point 3.3.3.3 Communication systems: modification of the date on which the railway undertaking must inform Infrabel of the measures taken to prevent interference. 4 10.07.2019 – Point 1.8 Contacts: adjustment of the contact details; – Point 2.2.5 Cover of liabilities: adaptation of the Royal Decree of 8 December 2013 establishing the minimum amount for the coverage of civil liability for driving on the railway infrastructure, by the Royal Decree of 23 May 2019; – Point 3.3.3.3 Communication systems: new information regarding the ETSI TS 102 933-1 and TS 102 933-2 standards; – Points 3.6, 3.7, 5.3, 5.4, 5.5 and 6.1 Service facilities: transfer of information to appendix E.2; – Points 4.5.2 Nature of the Temporary Capacity Restrictions and 4.5.5 Consultation and information to applicants: addition of information on the national operating window and withdrawal of appendix B.5. 5 21.08.2019 Updating the links to websites. Version control Network statement 2020 – 21.08.2019 3 / 88 TABLE OF CONTENTS VERSION CONTROL ________________________________________________ 3 TABLE OF CONTENTS ______________________________________________ 4 1 . GENERAL INFORMATION ________________________________________ 9 Introduction __________________________________________________________ 9 Objective ____________________________________________________________ 10 Legal framework and regulation _________________________________________ 10 Legal status _________________________________________________________ 11 General remarks .................................................................................................................. 11 Liability ................................................................................................................................. 11 Appeals procedure ............................................................................................................... 11 Structure of the network statement ______________________________________ 12 Validity and updating process __________________________________________ 13 Validity period ...................................................................................................................... 13 Updating process ................................................................................................................. 13 Publishing ___________________________________________________________ 13 Contacts ____________________________________________________________ 14 Infrabel ................................................................................................................................. 14 The Regulatory Body for Railway Transport and for Brussels Airport Operations (Service de Régulation du Transport ferroviaire et de l’Exploitation de l’Aéroport de Bruxelles-National)...... 16 Minister of Mobility, in charge of Belgocontrol and the National Railway Company of Belgium (Société nationale des chemins de fer belges) ............................................................... 16 Federal Public Service for Mobility and Transport ............................................................... 16 Neighbouring Infrastructure managers ................................................................................ 17 Corridor One-Stop-Shop (C-OSS) ....................................................................................... 18 International rail corridors for competitive freight (Rail Freight Corridors-RFC) __ 18 RailNetEurope – International cooperation between infrastructure managers __ 19 One-Stop-Shop (OSS) ....................................................................................................... 20 Applications RNE ............................................................................................................... 20 “TimeTabling Redesign” (TTR) pilot projects ..................................................................... 21 Documents and applications __________________________________________ 21 Glossary ___________________________________________________________ 21 Table of contents Network statement 2020 – 21.08.2019 4 / 88 2 . CONDITIONS FOR SUBMITTING A CAPACITY REQUEST AND ACCESS CONDITIONS ______________________________________________________ 22 Introduction _________________________________________________________ 22 General Access Requirements __________________________________________ 22 Conditions for applying for capacity ..................................................................................... 22 Conditions for access to the railway infrastructure .............................................................. 23 Licence ................................................................................................................................. 24 Safety certificate .................................................................................................................. 24 Cover of liabilities ................................................................................................................. 24 Commercial conditions ________________________________________________ 25 Contracts concluded between Infrabel and the railway undertaking ................................... 25 Contracts concluded between Infrabel and the non-railway undertaking applicant ............ 26 Framework agreement ......................................................................................................... 27 Operational rules _____________________________________________________ 27 Exceptional transports __________________________________________ 27 Transport of dangerous goods __________________________________________ 27 Admission of rolling stock _____________________________________________ 28 Staff acceptance process ______________________________________________ 28 3 . INFRASTRUCTURE _____________________________________________ 29 Introduction _________________________________________________________ 29 Extent of network _____________________________________________________ 29 Limits .................................................................................................................................... 29 Connected railway networks ................................................................................................ 30 Network description ___________________________________________________ 30 Geographic identification ..................................................................................................... 30 Capabilities .......................................................................................................................... 30 Traffic control and communication systems ........................................................................ 32 Traffic restrictions ____________________________________________________ 34 Specialised infrastructure .................................................................................................... 34 Environmental restrictions ................................................................................................... 34 Dangerous goods ................................................................................................................ 34 Tunnel restrictions ............................................................................................................... 34 Bridge restrictions ................................................................................................................ 34 Availability of the infrastructure _________________________________________ 34 Service facilities ______________________________________________________ 35 Passenger stations .............................................................................................................. 35 Freight terminals .................................................................................................................. 35 Marshalling yards and train formation facilities .................................................................... 35 Storage sidings ...................................................................................................................