Milton GO Target Density: 150 Ppj/Ha Population 49

Total Page:16

File Type:pdf, Size:1020Kb

Milton GO Target Density: 150 Ppj/Ha Population 49 21 20 1 6 1 0 32 33 31 35 30 29 27 28 1 8 25 26 11 24 23 34 22 37 8 9 7 1 2 1 3 6 1 7 5 1 4 1 3 2 96 79 99 78 93 / MEADOWVALE GO APRIL 16, 2020 HWY 401 MEADOWVALE BLVD ) alk n w mi 0 (1 s iu ad r m 0 0 MISSISSAUGA RD 8 DERRY RD W 82 93 77 MTSA Station, 800m Buffer Preliminary Boundary Delineation Urban Growth Centre (UGC) Designated Greenfield Area (DGA) Provincially Significant Employment 0 100 200 300 400m Zone N MTSA Preliminary Boundary Delineation Station: Meadowvale GO Corridor Type: Other Transit Corridor Area (ha) 110 Municipality: City of Mississauga Combined Station: n/a Corridor: Milton GO Target Density: 150 ppj/ha Population 49 Employment 5,174 ANALYTICAL LENS • Strategic Alignment Total Density (ppj/ha) 47.5 MOBILITY • Meadowvale GO Station, MiWay Transit Additional People and Jobs to 11,300 • Pedestrian and Cycling Multi-use Trail Achieve Target Density (ppj) • Moderate availability of vacant land MTSA 800m Radius MARKET AND GROWTH • Low development pipeline activity Area (ha) 201 POTENTIAL • Optimal parcel size and configuration 76 for intensifiation Population 2,234 LAND USE AND • Low flood risk, proximity to Mullett Creek • GP Built Up Urban Area, Provincially Significant Employment 8,230 BUILT FORM Employment Zone 52.1 Total Density (ppj/ha) • Access to quality sports and recreation facilities COMMUNITY 19,700 CONSIDERATIONS • Proximity to community amenities and parks *DataAdditional source: Scenario People 16, prepared and by Hemson Jobs Consulting to for the • Landmarks: Meadowvale Community Centre RegionAchieve of Peel (2016 Target Census Density Data) (ppj) 75 81 74 64 63 62 97 61 73 60 59 57 56 55 54 72 84 71 53 86 70 69 95 68 67 1 00 101 39 40 43 87 48 44 80 41 47 45 46 49 50 51 52 66 83 65 88 89 90 85 92 21 20 1 6 1 0 32 33 31 35 30 29 27 28 1 8 25 26 11 24 23 34 22 37 8 9 7 1 2 1 3 6 1 7 5 1 4 1 3 2 96 79 99 78 82 93 77 76 75 81 74 64 63 62 97 61 73 60 59 57 56 95 / ERINDALE GO APRIL 16, 2020 55 54 HWY 403 72 84 71 53 ) k l 86 a w n i m 0 1 ( 70 s u 69 i d a r m 95 0 0 8 68 MTSA Station, 800m Buffer Preliminary Boundary Delineation BURNHAMTHORPE RD W Urban Growth Centre (UGC) CENTRAL PKWY WDesignated Greenfield Area (DGA) Provincially Significant Employment 0 100 200 300 400m Zone N MTSA Preliminary Boundary Delineation Station: Erindale GO Corridor Type: Other Transit Corridor Area (ha) 42 Municipality: City of Mississauga Combined Station: n/a 1 00 Corridor: Milton GO Target Density: 150 ppj/ha 67 Population 474 Employment 2,458 101 ANALYTICAL LENS • Station Ready Total Density (ppj/ha) 70.8 MOBILITY • Erindale GO Station, MiWay Transit Station 39 Additional People and Jobs to 3,300 • Pedestrian and Cycling Multi-use Trail Achieve Target Density (ppj) 40 • High availability of vacant land MTSA 800m Radius MARKET AND GROWTH • Low development pipeline activity Area (ha) 201 POTENTIAL • Parcel size and configuration for intensifiation 4,895 LAND USE AND • Low flood risk, significant grade separation 43 Population • GP Built Up Urban Area, Provincially Significant 80 87 48 BUILT FORM 44 41 Employment 2,312 Employment Zone • West of Significant Natural Area and Green Space Total Density (ppj/ha) 35.9 COMMUNITY • Access to sports and recreation facilities 22,900 CONSIDERATIONS • Proximity to community amenities and parks *DataAdditional source: Scenario People 16, prepared and by Hemson Jobs Consulting to for the RegionAchieve of Peel (2016 Target Census Density Data) (ppj) 47 • Landmarks: Erindale Park 45 46 49 50 51 52 66 83 65 88 89 90 85 92 21 20 1 6 1 0 32 33 31 35 30 29 27 28 1 8 25 26 11 24 23 34 22 37 8 9 7 1 2 1 3 6 1 7 5 1 4 1 3 2 96 79 99 78 82 93 77 76 97 / STREETSVILLE GO APRIL 16, 2020 75 81 QUEEN ST S ST QUEEN 8 0 0 m • Limited Mobility ra ANALYTICAL LENS d 74 iu s ( 1 0 • Streetsville GO Station, MiWay Transit MOBILITY m i • Limited pedestrian and pedestrian infrastructuren 64 w a l • High availability of vacant land k THOMASMARKET ST AND ) 63 GROWTH • High development pipeline activity POTENTIAL • Parcel size and9 configuration7 for intensifiation 62 LAND USE AND • Low to moderate flood risk 61 BUILT FORM • GP Built Up Urban Area • Surrounded by low-density residential development COMMUNITY • Access to sports and recreation facilities CONSIDERATIONS • Proximity to community amenities and parks • Landmarks: Erindale Park, Vic Johnston Community Centre MTSA Station, 800m Buffer 60 Preliminary Boundary Delineation 73 Urban Growth Centre (UGC) Designated Greenfield Area (DGA) ERIN MILLS PKWY MILLS ERIN Provincially Significant Employment 0 100 200 300 400m Zone N 59 MTSA Preliminary Boundary Delineation Station: Streetsville GO Corridor Type: Other Transit Corridor Area (ha) 72 Municipality: City of Mississauga Combined Station: n/a Corridor: Milton GO Target Density: 150 ppj/ha Population 1,561 57 Employment 1,454 ANALYTICAL LENS • Limited Mobility Total Density (ppj/ha) 41.6 56 MOBILITY • Streetsville GO Station, MiWay Transit Additional People and Jobs to 7,900 • Limited pedestrian and pedestrian infrastructure Achieve Target Density (ppj) • High availability of vacant land MTSA 800m Radius MARKET AND GROWTH • High development pipeline activity Area (ha) 201 POTENTIAL • Parcel size and configuration for intensifiation 55 4,776 LAND USE AND • Low to moderate flood risk Population • GP Built Up Urban Area BUILT FORM Employment 1,587 • Surrounded by low-density residential development • Access to sports and recreation facilities Total Density (ppj/ha) 31.7 COMMUNITY 54 CONSIDERATIONS • Proximity to community amenities and parks 23,800 • Landmarks: Erindale Park, Vic Johnston Community 72 *DataAdditional source: Scenario People 16, prepared and by Hemson Jobs Consulting to for the 84RegionAchieve of Peel (2016 Target Census Density Data) (ppj) Centre 71 53 86 70 69 95 68 67 1 00 101 39 40 43 87 48 44 80 41 47 45 46 49 50 51 52 66 83 65 88 89 90 85 92 21 20 1 6 1 0 32 33 31 35 30 29 27 28 1 8 25 26 11 24 23 34 22 37 8 9 7 1 2 1 3 6 1 7 5 1 4 99 / LISGAR GO APRIL1 16, 2020 HWY 401 3 2 lk) wa n WINSTON CHURCHILL BLVD 96 mi 0 (1 s iu d ra 79 m 0 0 8 99 78 BRISTOL RD W MTSA Station, 800m Buffer Preliminary Boundary Delineation Urban Growth Centre (UGC) Designated Greenfield Area (DGA) Provincially Significant Employment 0 100 200 300 400m Zone N MTSA Preliminary Boundary Delineation Station: Lisgar GO Corridor Type: Other Transit Corridor Area (ha) 120 Municipality: City of Mississauga Combined Station: n/a Corridor: Milton GO Target Density: 150 ppj/ha Population 7 93 82Employment 1,515 ANALYTICAL LENS • Strategic Alignment Total Density (ppj/ha) 12.7 MOBILITY • Lisgar GO Station, MiWay Transit Additional People and Jobs to 16,500 • Pedestrian and pedestrian infrastructure in place Achieve Target Density (ppj) 77 • High availability of vacant land MTSA 800m Radius MARKET AND GROWTH • Limited development pipeline activity Area (ha) 201 POTENTIAL • Parcel size and configuration for intensifiation 6,144 LAND USE AND • Low to moderate flood risk Population • GP Built Up Urban Area BUILT FORM Employment 1,345 • Active hydro corridor intersects site, limited neighborhood connections from physical barriers Total Density (ppj/ha) 37.3 COMMUNITY • Limited access to sports and recreation facilities 22,600 CONSIDERATIONS • Proximity to community amenities and parks *DataAdditional source: Scenario People 16, prepared and by Hemson Jobs Consulting to for the RegionAchieve of Peel (2016 Target Census Density Data) (ppj) 76 75 81 74 64 63 62 97 61 73 60 59 57 56 55 54 72 84 71 53 86 70 69 95 68 67 1 00 101 39 40 43 87 48 44 80 41 47 45 46 49 50 51 52 66 83 65 88 89 90 85 92 21 20 1 6 1 0 32 33 31 35 30 29 27 28 1 8 25 26 11 24 23 34 22 37 8 9 7 1 2 1 3 6 1 7 5 1 4 1 3 2 96 79 99 78 82 93 77 76 75 81 74 64 63 62 97 61 73 60 59 57 56 55 54 72 84 71 53 86 70 69 95 101 / DIXIE APRIL 16, 2020 68 BLOOR ST W DIXIE DR DIXIE ) alk n w mi 0 (1 s iu ad r m 0 0 8 67 1 00 101 39 40 DUNDAS ST E 43 MTSA Station, 800m Buffer 80 87 Preliminary Boundary Delineation 48 44 41 Urban Growth Centre (UGC) Designated Greenfield Area (DGA) Provincially Significant Employment 0 100 200 300 400m Zone 47 45 N 46 49 MTSA Preliminary Boundary Delineation Station: Wharton Corridor Type: Other Transit Corridor Area (ha) 190 Municipality: City of Mississauga Combined Station: 94/Dixie GO 50 Corridor: Milton GO Target Density: 160 ppj/ha Population 3,538 51 Employment 5,748 ANALYTICAL LENS • Limited Potential 52 Total Density (ppj/ha) 49.0 66 MOBILITY • Dixie GO train station and MiWay Transit Additional People and Jobs to 21,000 • Pedestrian and pedestrian infrastructure in place Achieve Target Density (ppj) • Moderate availability of vacant land MTSA 800m Radius MARKET AND GROWTH • Limited development pipeline activity Area (ha) 201 POTENTIAL • Limited parcel configuration for intensifiation 5,367 LAND USE AND • High flood risk, proximity to Etobicoke Creek Population • GP Built Up Urban Area, Provincially Significant BUILT FORM 83 Employment 5,312 Employment Zone • Existing condition surrounded by light industrial Total Density (ppj/ha) 53.1 COMMUNITY • Limited access to sports and recreation facilities 21,500 CONSIDERATIONS • Limited proximity to community amenities and *DataAdditional source: Scenario People 16, prepared and by Hemson Jobs Consulting to for the RegionAchieve of Peel (2016 Target Census Density Data) (ppj) parks 65 88 89 90 85 92.
Recommended publications
  • Entuitive Credentials
    CREDENTIALS SIMPLIFYING THE COMPLEX Entuitive | Credentials FIRM PROFILE TABLE OF CONTENTS Firm Profile i) The Practice 1 ii) Approach 3 iii) Better Design Through Technology 6 Services i) Structural Engineering 8 ii) Building Envelope 10 iii) Building Restoration 12 iv) Special Projects and Renovations 14 Sectors 16 i) Leadership Team 18 ii) Commercial 19 iii) Cultural 26 iv) Institutional 33 SERVICES v) Healthcare 40 vi) Residential 46 vii) Sports and Recreation 53 viii) Retail 59 ix) Hospitality 65 x) Mission Critical Facilities/Data Centres 70 xi) Transportation 76 SECTORS Image: The Bow*, Calgary, Canada FIRM PROFILE: THE PRACTICE ENTUITIVE IS A CONSULTING ENGINEERING PRACTICE WITH A VISION OF BRINGING TOGETHER ENGINEERING AND INTUITION TO ENHANCE BUILDING PERFORMANCE. We created Entuitive with an entrepreneurial spirit, a blank canvas and a new approach. Our mission was to build a consulting engineering firm that revolves around our clients’ needs. What do our clients need most? Innovative ideas. So we created a practice environment with a single overriding goal – realizing your vision through innovative performance solutions. 1 Firm Profile | Entuitive Image: Ripley’s Aquarium of Canada, Toronto, Canada BACKED BY DECADES OF EXPERIENCE AS CONSULTING ENGINEERS, WE’VE ACCOMPLISHED A GREAT DEAL TAKING DESIGN PERFORMANCE TO NEW HEIGHTS. FIRM PROFILE COMPANY FACTS The practice encompasses structural, building envelope, restoration, and special projects and renovations consulting, serving clients NUMBER OF YEARS IN BUSINESS throughout North America and internationally. 4 years. Backed by decades of experience as Consulting Engineers. We’re pushing the envelope on behalf of – and in collaboration with OFFICE LOCATIONS – our clients. They are architects, developers, building owners and CALGARY managers, and construction professionals.
    [Show full text]
  • New Station Initial Business Case Milton-Trafalgar Final October 2020
    New Station Initial Business Case Milton-Trafalgar Final October 2020 New Station Initial Business Case Milton-Trafalgar Final October 2020 Contents Introduction 1 The Case for Change 4 Investment Option 12 Strategic Case 18 Economic Case 31 Financial Case 37 Deliverability and Operations Case 41 Business Case Summary 45 iv Executive Summary Introduction The Town of Milton in association with a landowner’s group (the Proponent) approached Metrolinx to assess the opportunity to develop a new GO rail station on the south side of the Milton Corridor, west of Trafalgar Road. This market-driven initiative assumes the proposed station would be planned and paid for by the private sector. Once built, the station would be transferred to Metrolinx who would own and operate it. The proposed station location is on undeveloped land, at the heart of both the Trafalgar Corridor and Agerton Employment Secondary Plan Areas studied by the Town of Milton in 2017. As such, the project offers the Town of Milton the opportunity to realize an attractive and vibrant transit-oriented community that has the potential to benefit the entire region. Option for Analysis This Initial Business Case (IBC) assesses a single option for the proposed station. The opening-day concept plan includes one new side platform to the north of the corridor, with protection for a future second platform to the south. The site includes 1,000 parking spots, a passenger pick-up/drop-off area (40 wait spaces, 10 load spaces), bicycle parking (128 covered spaces, 64 secured spaces) and a bus loop including 11 sawtooth bus bays.
    [Show full text]
  • Transportation Needs
    Chapter 2 – Transportation Needs 407 TRANSITWAY – WEST OF BRANT STREET TO WEST OF HURONTARIO STREET MINISTRY OF TRANSPORTATION - CENTRAL REGION 2.6.4. Sensitivity Analysis 2-20 TABLE OF CONTENTS 2.7. Systems Planning – Summary of Findings 2-21 2. TRANSPORTATION NEEDS 2-1 2.1. Introduction 2-1 2.1.1. Background 2-1 2.1.2. Scope of Systems Planning 2-1 2.1.3. Study Corridor 2-1 2.1.4. Approach 2-2 2.1.5. Overview of the Chapter 2-2 2.2. Existing Conditions and Past Trends 2-2 2.2.1. Current Land Use 2-2 2.2.2. Transportation System 2-3 2.2.3. Historic Travel Trends 2-4 2.2.4. Current Demands and System Performance 2-5 2.3. Future Conditions 2-7 2.3.1. Land Use Changes 2-7 2.3.2. Transportation Network Changes 2-8 2.3.3. Changes in Travel Patterns 2-9 2.3.4. Future Demand and System Performance 2-10 2.4. Service Concept 2-13 2.4.1. Operating Characteristics 2-13 2.4.2. Conceptual Operating and Service Strategy 2-13 2.5. Vehicle Maintenance and Storage support 2-14 2.5.1. Facility Need 2-14 2.5.2. West Yard – Capacity Assessment 2-15 2.5.3. West Yard – Location 2-15 2.6. Transitway Ridership Forecasts 2-15 2.6.1. Strategic Forecasts 2-15 2.6.2. Station Evaluation 2-17 2.6.3. Revised Forecasts 2-18 DRAFT 2-0 . Update ridership forecasts to the 2041 horizon; 2.
    [Show full text]
  • (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016
    Bolton Residential Expansion Study (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016 The purpose of this memorandum is to review the professional literature pertaining to the potential develop- ment of a Transit-Oriented Development (TOD) in the Bolton Residential Expansion Study area, in response to the Region of Peel’s recent release of the Discussion Paper. The Discussion Paper includes the establishment of evaluation themes and criteria, which are based on provincial and regional polices, stakeholder and public comments. It should be noted that while the Discussion Paper and the Region’s development of criteria does not specifi- cally advocate for TOD, it is the intent of this memorandum to illustrate that TOD-centric planning will not only adequately address such criteria, but will also complement and enhance the Region’s planning principles, key points and/or themes found in stakeholder and public comments. In the following are research findings related to TOD generally, and specifically, theMetrolinx Mobility Hub Guidelines For The Greater Toronto and Hamilton Area (September 2011) objectives. Additionally, following a review and assessment of the “Response to Comments Submitted on the Bolton Residential Expansion Study ROPA” submission prepared by SGL Planning & Design Inc. (March 15, 2016), this memorandum evaluates some of the key arguments and assumptions made in this submission relative to the TOD research findings. Planning for Transit-Oriented Developments TOD policy and programs can result in catalytic development that creates walkable, livable neighborhoods around transit providing economic, livability and equitable benefits. The body of research on TODs in the United States has shown that TODs are more likely to succeed when project planning takes place in conjunction with transit system expansion.
    [Show full text]
  • Appendix A: Exempt Sites
    APPENDIX A: EXEMPT SITES There are sites in Mississauga identified in Part 3 as Applewood Neighbourhood “exempt”. Exempt sites reflect unique circumstances that are not representative of the vision, direction and planning policies of the Plan, Exempt Site1 but nonetheless are recognized because they contain established land uses. Mississauga Official Plan will not be interpreted to prevent the use of any land or building on these sites for a purpose that is contrary to the Plan, if such uses or buildings lawfully existed on the date of the approval of the Plan. Generally such uses will be encouraged to relocate to lands appropriately designated. It is intended that “exempt sites” will be reviewed during the preparation of local area plans or other planning studies. Lands zoned to permit such uses or buildings are deemed to be in conformity with the provisions of the Plan. The lands identified as Exempt Site 1 are located at the northwest corner of Grand Forks Road and Bloor Street. Existing offices are permitted. Mississauga Official Plan Draft: March, 2010 Appendix A -1 Applewood Neighbourhood Clarkson Village Community Node (continued) Exempt Site 2 Exempt Site 1 The lands identified as Exempt Site 2 are located on The lands identified as Exempt Site 1 are located at the south side of Burnhamthorpe Road East, east of the northwest corner of Lakeshore Road West and Ponytrail Drive. An existing veterinary clinic is Clarkson Road. permitted. An existing motor vehicle service station and motor vehicle wash is permitted. 2- Appendix A Draft: March, 2010 Mississauga Official Plan Clarkson-Lorne Park Neighbourhood Exempt Site 1 Exempt Site 2 The lands identified as Exempt Site 1 are located at The lands identified as Exempt Site 2 are located on the southeast corner of South Sheridan Way and the west side of Clarkson Road North, south of Indian Grove.
    [Show full text]
  • Mississauga Transit, 2013-2016 Business Plan
    Mississauga Transit 2013-2016 Business Plan City of Mississauga, Ontario, Canada MORE THAN 3,650 BUS STOps. 3RD LARGesT MUNICIPAL TRANSIT SYSTEM IN ONTARIO. 93 TRANSIT ROUTes, 1.3 MILLION HOURS OF seRVICE. FULLY ACCessIBLE 458 BUS FLeeT. Table of Contents Existing Core Services ...................................................................................................................................................................... 3 1.0 Vision and Mission ............................................................................................................................................................... 3 2.0 Service Delivery Model ........................................................................................................................................................ 4 3.0 Past Achievements .............................................................................................................................................................. 5 4.0 Current Service Levels ......................................................................................................................................................... 8 5.0 Opportunities and Challenges ............................................................................................................................................ 12 6.0 Looking Ahead ................................................................................................................................................................... 14 7.0 Engaging our Customers
    [Show full text]
  • Downloadable Data Sets Are Available Online
    2016 ONTARIO ECONOMIC OUTLOOK AND FISCAL REVIEWBUILDING ONTARIO UP FOR EVERYONE 2016 ONTARIO ECONOMIC OUTLOOK AND FISCAL REVIEW ISSN 1483-5967 (PRINT) ISSN 1496-2829 (PDF /HTML) © Queen’s Printer for Ontario, 2016 The Honourable CHARLES SOUSA Minister of Finance Background Papers PERSPECTIVES ÉCONOMIQUES ET REVUE FINANCIÈRE DE L’ontARIO 2016 PERSPECTIVES ÉCONOMIQUES ET REVUE FINANCIÈRE DE L’ontARIO BUILDING ONTARIO UP FOR EVERYONE 2016 ONTARIO ECONOMIC OUTLOOK AND FISCAL REVIEW The Honourable CHARLES SOUSA Minister of Finance Background Papers For general inquiries regarding the Building Ontario Up for Everyone — 2016 Ontario Economic Outlook and Fiscal Review, Background Papers, please call: Toll-free English & French inquiries: 1-800-337-7222 Teletypewriter (TTY): 1-800-263-7776 For electronic copies of this document, visit our website at ontario.ca/fallupdate © Queen’s Printer for Ontario, 2016 ISSN 1483-5967 (Print) ISSN 1496-2829 (PDF/HTML) Ce document est disponible en français sous le titre : Favoriser l’essor de l’Ontario pour tous — Perspectives économiques et revue financière de l’Ontario 2016, Documents d’information Foreword Foreword Introduction Like most jurisdictions around the world, Ontario was affected by the global economic recession that began in 2008. But instead of cutting jobs and services, we created a plan to build Ontario up. We chose to improve our schools, strengthen health care and invest in modern infrastructure. We chose to support our business community so it can rise to meet the challenges of a technology‐ driven, competitive global economy. Our plan is working. Ontario’s economy has continued to grow in an uncertain global environment.
    [Show full text]
  • Executive Summary
    Executive Summary 407 TRANSITWAY – WEST OF BRANT STREET TO WEST OF HURONTARIO STREET MINISTRY OF TRANSPORTATION - CENTRAL REGION TABLE OF CONTENTS E. EXECUTIVE SUMMARY E-1 E.1. Background E-1 E.1.1. 407 Transitway Background and Status E-1 E.1.2. Study Purpose and Objectives E-2 E.1.3. Study Area E-2 E.1.4. Transit Project Assessment Process E-2 E.1.5. Statutory Requirements E-8 E.2. Transportation Needs Assessment E-8 E.2.1. Route Structure Conceptual Operating and Service Strategy E-8 E.2.2. 407 Transitway Ridership Forecasts E-9 E.2.3. Vehicle Storage and Maintenance Needs Assessment E-10 E.3 Existing and Future Conditions E-10 E.4 Identification and Evaluation of Alternatives Process E-10 E.4.1 Corridor Assessment E-10 E.4.2 Evaluation of Station Alternatives E-10 E.4.3 Evaluation of Alignment Alternatives E-12 E.4.4 Evaluation of MSF Sites E-12 E.5. Final Project Description E-12 E.6. Impact Assessment, Mitigation, and Monitoring E-14 E.7. Implementation Strategy E-14 E.8. Consultation Process E-14 E.9. Commitments to Future Action E-15 E-0 E. EXECUTIVE SUMMARY parallel to the Lakeshore GO corridor that will connect the municipalities in this corridor. The Transitway will also integrate with north-south transit services by providing stations for quick and convenient E.1. Background transfers. MTO has received Ministry of the Environment, Conservation and Parks (MECP) approval under the E.1.1. 407 Transitway Background and Status Transit Project Assessment Process (TPAP) Regulation for the sections located between Hurontario Street in Brampton and Brock Road in Pickering and has finalized the TPAP study from Brant Street to The complete planned 407 Transitway is a 150 km high-speed public transit facility on a separate right- Hurontario Street, which is presented in this EPR.
    [Show full text]
  • Appendix a Public Consultation Records
    Appendix A Public Consultation Records TABLE OF CONTENTS 1. Public Information Centre #1 Summary ..................................................................... 2 1.1 Introduction ............................................................................................................ 2 1.2 Notification ............................................................................................................ 2 1.3 PIC Presentation Material ...................................................................................... 2 1.4 PIC #1 Comments .................................................................................................. 3 2. Public Information Centre #2 Summary ..................................................................... 6 2.1 Introduction ............................................................................................................ 6 2.2 Event Format ......................................................................................................... 6 2.3 Summary of Feedback ........................................................................................... 7 2.4 Future Road Network ............................................................................................ 7 2.5 Future Transit Network .......................................................................................... 8 2.6 Active Transportation ............................................................................................ 8 2.7 Requests for Clarity and Information ...................................................................
    [Show full text]
  • Best Practices in Data Visualization
    Best Practices in Data Visualization Jodie Jenkinson, Associate Professor + Director Biomedical Communications University of Toronto bmc.med.utoronto.ca Why visualize data? • Because of the inexplicability of complex information or raw data • In order to leverage visual perception • To create an aid to understanding • To provide insight Best Practices in Data Visualization – ComSciComCan Jenkinson Leveraging visual perception Vision is high bandwidth • 40%+ of cortex devoted to visual perception • Information processing capacity of the visual system • High-bandwidth channel • 109 bits per second* • Parallel processing • = 1 billion bits • = ~120 Megabytes per second * Information Capacity of a Single Retinal Channel, DH Kelly, IRE Transactions on Information Theory, 1962, pp. 221 Best Practices in Data Visualization – ComSciComCan Jenkinson Best Practices in Data Visualization – ComSciComCan Jenkinson All visual stimuli Pre-attentive Pre-attentive Attend to Leveraging visual perception Vision is high bandwidth • 40%+ of cortex devoted to visual perception • Information processing capacity of the visual system • High-bandwidth channel • 109 bits per second* • Parallel processing • = 1 billion bits • = ~120 Megabytes per second * Information Capacity of a Single Retinal Channel, DH Kelly, IRE Transactions on Information Theory, 1962, pp. 221 Best Practices in Data Visualization – ComSciComCan Jenkinson Best Practices in Data Visualization – ComSciComCan Jenkinson All visual stimuli Pre-attentive Pre-attentive Attend to Providing insight
    [Show full text]
  • Peel Salt Management Facility – Design Build FEATURE PROJECT
    TEAMKENAIDAN REGISTERED ISO 9001 ISO 14001 ISO 45001 Peel Salt Management Facility – Design Build FEATURE PROJECT Corporate Donations Project Requirements Kenaidan recently made donations to: The Region of Peel uses salt and brine (liquid to support a pre-engineered building. The 13 m Following a phased design and permitting • Leukemia and Lymphoma Society of Canada salt) for their winter maintenance operations to high salt building has a capacity to store 13,000 process that began in January 2020, construction improve winter driving and walking conditions. tonnes of salt. The brine building and truck-rinse began in Spring 2020. The main salt storage These seasonal services are supported by building is a conventional steel frame clad with building is complete and ready for use, while several facilities located throughout the Region. precast concrete panels. remaining work is anticipated to be completed To increase capacity, the Salt Management by April 2021. The existing facility has remained Facility (SMF), located at 2 Copper Road in the Kenaidan is self-performing the concrete fully operational throughout the duration of City of Brampton, is being expanded. formwork and various mechanical installations, the contract. including: The new SMF has a gross area of approximately • 3,029 m3 of concrete with a large component 2 Roles & Responsibilities 2,300 m with three interconnected buildings set being chloride resistant aside for salt storage, brine production, and an 2 automated truck rinse. To create space for the • 4,220 m of formwork that includes 10 m high Owner: The Regional Municipality of Peel concrete bunker walls for the salt storage area Design Build Lead Consultant: Garry Cunningham Chris Kodama Marisa Nardini Andrea Howson Julie Dorie Elia Rizkalla new development, work included demolition of the existing salt dome foundations, the original brine • Three 100,000 litre underground Fiberglass R.V.
    [Show full text]
  • 3 Feasibility Study for Proposed Rerouting of the Greater Toronto Rail Network
    Clause 3 in Report No. 1 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on January 21, 2016. 3 Feasibility Study for Proposed Rerouting of the Greater Toronto Rail Network Committee of the Whole recommends: 1. Receipt of the presentation by Stephen Collins, Director, Infrastructure Management and Project Management Office. 2. Adoption of the following recommendations, as amended, in the report dated December 19, 2015 from Commissioner of Transportation Services: 1. Council formally request Metrolinx to undertake consultation with York Region, the Cities of Markham and Vaughan and the Town of Richmond Hill before proceeding with additional detailed studies relating to the rerouting of a freight rail proposal. 2. The Regional Clerk circulate a copy of this report to the Clerks of the Cities of Cambridge, Markham, Mississauga, Toronto, Vaughan, the Towns of Richmond Hill and Milton and Metrolinx. 1. Recommendation It is recommended that: 1. Council formally request Metrolinx to undertake consultation with York Region and the Cities of Markham and Vaughan before proceeding with additional detailed studies relating to the rerouting of a freight rail proposal. 2. The Regional Clerk circulate a copy of this report to the Clerks of the Cities of Cambridge, Markham, Mississauga, Toronto, Vaughan, Town of Milton and Metrolinx. Committee of the Whole 1 Transportation Services January 14, 2016 Feasibility Study for Proposed Rerouting of the Greater Toronto Rail Network 2. Purpose This report informs Council on the findings of a feasibility study commissioned by Cities of Cambridge, Mississauga, Toronto and Town of Milton to look at rerouting freight rail traffic to separate it from passenger rail services on the GO Transit Milton and Kitchener lines.
    [Show full text]